CN110006757A - 煤系断层形成模拟试验装置及正、逆断层模拟试验方法 - Google Patents
煤系断层形成模拟试验装置及正、逆断层模拟试验方法 Download PDFInfo
- Publication number
- CN110006757A CN110006757A CN201910274040.8A CN201910274040A CN110006757A CN 110006757 A CN110006757 A CN 110006757A CN 201910274040 A CN201910274040 A CN 201910274040A CN 110006757 A CN110006757 A CN 110006757A
- Authority
- CN
- China
- Prior art keywords
- fault
- baffle
- angle adjustment
- plate
- simulation test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/24—Investigating strength properties of solid materials by application of mechanical stress by applying steady shearing forces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F3/00—Devices, e.g. jacks, adapted for uninterrupted lifting of loads
- B66F3/24—Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated
- B66F3/25—Constructional features
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/02—Details
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
- G01N3/10—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
- G01N3/12—Pressure testing
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B23/00—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
- G09B23/40—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for geology
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0014—Type of force applied
- G01N2203/0016—Tensile or compressive
- G01N2203/0019—Compressive
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/003—Generation of the force
- G01N2203/0042—Pneumatic or hydraulic means
- G01N2203/0048—Hydraulic means
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0058—Kind of property studied
- G01N2203/006—Crack, flaws, fracture or rupture
- G01N2203/0067—Fracture or rupture
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Mathematical Optimization (AREA)
- Theoretical Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Paleontology (AREA)
- Algebra (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Educational Technology (AREA)
- Mathematical Physics (AREA)
- Pure & Applied Mathematics (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
一种煤系断层形成模拟试验装置及正、逆断层模拟试验方法,涉及相似材料模拟试验技术领域,包括液压升降装置、下角度调整装置、推杆装置、上部加载装置、上角度调整装置、侧向加载装置和透明侧板,液压升降装置和角度调整机构设置在实验体下方,上部加载装置和上角度调整装置设置在实验体上方,透明侧板设置在实验体的后侧面,侧向加载装置设置在实验体的端面。利用该装置模拟正断层时,下角度调整装置的倾斜板和上角度调整装置的倾斜推板的倾角相同,上部加载系统向下加载,形成正断层;模拟逆断层时在实验体的底部设置断层诱发装置,通过侧向加载装置加载形成逆断层。本发明解决了模拟断层的断层倾角和起裂位置控制不方便的技术问题。
Description
技术领域
本发明涉及相似材料模拟试验技术领域,尤其是一种煤系断层形成用的室内模拟试验装置,以及利用该装置进行正、逆断层模拟试验的方法。
背景技术
构造物理模拟实验是研究地质构造的一种重要而且有效的方法,是地质工作者研究地层变形过程和断层形成机制的重要手段。目前,地质构造模拟中所用的构造模拟实验装置是根据相似性原理,通过运动或力来控制实验模型进行变形实验,模拟或反演断层等地质成因的设备,设备主体多采用砂箱等实验容器,通过在砂箱内铺设多层不同目数的实验材料来模拟构造形成过程,研究地质构造的成因和演化机理,对地质构造的成因进行定性和定量分析。现有的断层形成模拟试验装置只能模拟正断层或逆断层的形成,并且无法实现对断层角度和起裂位置的调整,从而限制了地质工作者采用室内实验的手段来分析实际地质现象。如果每进行一次实验需要更换不同的试验设备,将耗费大量的时间和人力物力,造成了资源和时间的浪费,为此需要对现有的相似材料模拟试验装置作进一步的改进。
发明内容
为解决断层形成模拟试验设备不能同时模拟正断层和逆断层,并控制断层角度及起裂位置的技术问题,本发明提供了一种煤系断层形成模拟试验装置及正、逆断层模拟试验方法,其具体技术方案如下。
一种煤系断层形成模拟试验装置,包括底座、立柱、顶梁和挡板,底座的两端设置有立柱,立柱之间的底座上还设置有挡板,立柱的上端通过顶梁连接,实验体放置在挡板之间,还包括液压升降装置、下角度调整装置、推杆装置、上部加载装置、上角度调整装置、侧向加载装置和透明侧板,液压升降装置设置在底座上,连接底座和实验体;下角度调整装置贴邻液压升降装置设置,推杆装置连接下角度调整装置和立柱;上部加载装置设置在顶梁和上角度调整装置之间,上角度调整装置和挡板的上部相连;侧向加载装置压设在实验体端面上,透明侧板设置在实验体的后侧面上。
优选的是,侧向加载装置包括加载油缸和侧滑板,加载油缸的压头穿过挡板和侧滑板相连,侧滑板压设在实验体的侧端面上。
进一步优选的是,侧滑板和压头之间通过滑轨相连,侧滑板沿压头上下滑动。
还优选的是,液压升降装置包括滑块、液压缸和滑动挡板,实验体放置在滑动挡板上方,滑块沿底座上的滑轨移动,滑块的上方固定有液压缸,液压缸和滑动挡板相连。
还优选的是,下角度调整装置包括倾斜板、伸缩杆和下挡板,下挡板和滑动挡板相邻,倾斜板和下挡板的端部铰接,伸缩杆的两端分别与倾斜板和下挡板铰接。
还优选的是,上角度调整装置包括加压板、倾斜推板、上挡板、角度调节推杆和伸缩推杆,加压板的端部设置有滑轮,角度调节推杆调整倾斜推板的倾斜角度,伸缩推杆的端部固定在挡板上。
一种正断层模拟试验方法,利用上述的一种煤系断层形成模拟试验装置,步骤包括:
A.确定正断层起裂位置,推杆装置推动下挡板的端部移动至起裂位置;
B.确定断层倾角,调整倾斜板和下挡板之间的角度与断层倾角互补;
C.液压升降装置调整液压缸位置和高度将滑动挡板升至和下挡板齐平并接触;
D.确定实验体长度,固定实验体两端的挡板,同时固定实验体后侧面上的透明侧板;
E.从下部至上方逐层固定实验体前方的前挡板,并分层铺设相似材料,并在模拟煤岩层之间逐层铺设应力传感器;
F.安装上角度调整装置,通过调整角度调节推杆使倾斜推板和上挡板之间的夹角等于断层倾角;
G.上部加载装置施加载荷,形成正断层,并观测正断层的形成过程。
一种逆断层模拟试验方法,利用上述的一种煤系断层形成模拟试验装置,步骤包括:
A.液压升降装置调整液压缸位置和高度将滑动挡板升至和下挡板齐平并接触;
B.确定断层倾角和断层起裂位置,在起裂点安装固定断层诱发试验块体;
C.确定实验体的长度,固定实验体两端的挡板,同时固定实验体后侧面上的透明侧板;
D.从下部至上方逐层固定实验体前方的前挡板,并分层铺设相似材料,并在模拟煤岩层之间逐层铺设应力传感器;
E.侧向加载装置施加载荷,形成逆断层,并观测逆断层的形成过程。
进一步优选的是,正断层形成后,拆除模拟煤层和顶底板层位置的前挡板,然后开挖模拟煤层,模拟正断层处的采动致灾机理。
进一步优选的是,断层诱发试验块体的底角等于断层倾角;逆断层形成后,拆除模拟煤层和顶底板层位置的前挡板,然后开挖模拟煤层,模拟逆断层处的采动致灾机理。
本发明的有益效果包括:
(1)本发明提供的一种煤系断层形成模拟试验装置,通过液压升降装置、下角度调整装置、推杆装置、上部加载装置、上角度调整装置和侧向加载装置,可以模拟煤系底层中断层的形成过程,通过同一模拟试验装置进行正断层和逆断层的模拟,并且可以利用下角度调整装置和上角度调整装置实现了对断层倾角及断层的位置进行调整。
(2)装置侧向加载装置的加载油缸穿过挡板作用在侧滑板上,能够推动侧滑板运动从而形成逆断层,还通过侧向加载装置的侧滑板和压头通过滑轨相连,从而保证了在断层形成过程中实验体的模拟断层上盘或下盘能上下移动;液压升降装置随滑块沿底座上的滑轨移动,从而可以实时调整加压位置;通过上角度调整装置和下角度调整装置调整至角度一致,从而可以形成特定角度的断层。
(3)利用该装置进行试验的方法,可以再现煤系地层中断层形成过程,并在一个设备完成正逆两种断层的形成模拟试验,操作简便、高效;上、下角度调整装置和断层诱发试验块体能够实现断层倾角和断层起裂位置的灵活调整,解决了断层模拟仅能进行单一构造环境下模拟的实验缺陷;可在断层形成后进行煤层的模拟开采,对研究构造应力下采动致灾机理,以及近断层煤炭安全开采与灾害防治具有重要意义。
附图说明
图1是煤系断层形成模拟试验装置结构示意图;
图2是侧向加载装置机构示意图;
图3是断层诱发试验块体示意图;
图4是模拟正断层形成过程示意图;
图5是模拟逆断层形成过程示意图;
图中:1-底座;2-立柱;3-顶梁;4-挡板;5-液压升降装置;51-滑块;52-液压缸;53-滑动挡板;6-下角度调整装置;61-倾斜板;62-伸缩杆;63-下挡板;7-推杆装置;8-上部加载装置;9-上角度调整装置;91-加压板;92-倾斜推板;93-上挡板;94-角度调节推杆;95-伸缩推杆;10-侧向加载装置;11-加载油缸;12-侧滑板;13-透明侧板;14-实验体;15-断层诱发试验块体。
具体实施方式
结合图1至图5所示,本发明提供的一种煤系断层形成模拟试验装置及正、逆断层模拟试验方法具体实施方式如下。
一种煤系断层形成模拟试验装置具体包括底座1、立柱2、顶梁3和挡板4,其中底座1的两端设置有立柱2,立柱2之间的底座1上还设置有挡板4,立柱2的上端通过顶梁3连接,实验体14放置在挡板4之间。另外试验装置还包括液压升降装置5、下角度调整装置6、推杆装置7、上部加载装置8、上角度调整装置9、侧向加载装置10和透明侧板13。液压升降装置5通过升降以适应正断层形成过程中实验体一侧的高度变化,下角度调整装置6设置呈一定的角度保证断层倾角的一致,推杆装置7用于调整断层的位置,上部加载装置8在正断层形成时进行加载,上角度调整装置9控制实验体上表面的起裂位置及起裂角度,侧向加载装置10方便逆断层的模拟,透明侧板13方便观察断层的形成过程。通过液压升降装置5、下角度调整装置6、推杆装置7、上部加载装置8、上角度调整装置9和侧向加载装置10,可以模拟煤系底层中断层的形成过程,通过同一模拟试验装置进行正断层和逆断层的模拟,并且可以利用下角度调整装置和上角度调整装置实现了对断层倾角及断层的位置进行调整。
其中,液压升降装置5设置在底座1上,其连接底座1和实验体14,控制起裂位置并承载实验体的重量。具体的是,液压升降装置5的结构包括滑块51、液压缸52和滑动挡板53,实验体14放置在滑动挡板53的上方,滑块51沿底座1上的滑轨移动,滑块51的上方固定有液压缸52,液压缸52和滑动挡板53相连滑,滑块51带动液压缸52沿滑轨移动。液压升降装置5随滑块51沿底座1上的滑轨移动,从而可以实时调整加压位置。
下角度调整装置6贴邻液压升降装置5设置,推杆装置7连接下角度调整装置6和立柱2。具体的是下角度调整装置6包括倾斜板61、伸缩杆62和下挡板63,下挡板63和滑动挡板53相邻,倾斜板51和下挡板63的端部铰接,伸缩杆62的两端分别与倾斜板61和下挡板63铰接。推杆装置7连接在下角度调整装置的下挡板63上,下挡板63的一侧卡合在透明侧板13上的凹槽内,推杆装置7伸缩带动下挡板63调整位置。
上部加载装置9设置在顶梁3和上角度调整装置9之间,可以固定在顶梁3上,设置2-3个液压缸,上角度调整装置9和挡板4的上部相连。上角度调整装置9具体包括加压板91、倾斜推板92、上挡板93、角度调节推杆94和伸缩推杆95,加压板91的端部设置有滑轮,滑轮压在倾斜推板92上,倾斜推板92和上挡板93之间铰接,角度调节推杆94调整倾斜推板92的倾斜角度,角度调整推板92通过螺杆伸缩长度改变倾斜推板92和上挡板93之间的角度,伸缩推杆95的端部固定在挡板4上,伸缩推杆95可以通过丝杠机构带动上挡板运动。通过上角度调整装置9和下角度调整装置6调整至角度一致,从而可以形成特定角度的断层。
侧向加载装置10压设在实验体14端面上,透明侧板13设置在实验体14的后侧面上。侧向加载装置10包括加载油缸11和侧滑板12,加载油缸11的压头穿过挡板4和侧滑板12相连,侧滑板12压设在实验体14的侧端面上。侧滑板12和压头之间通过滑轨相连,侧滑板12沿压头上下滑动,保证断层形成后上盘或下盘的运动。侧向加载装置10的加载油缸11穿过挡板作用在侧滑板12上,能够推动侧滑板12运动从而形成逆断层,还通过侧向加载装置10的侧滑板12和压头通过滑轨相连,从而保证了在断层形成过程中实验体的模拟断层上盘或下盘能上下移动。
为进一步的说明煤系断层形成模拟试验装置的结构及使用方法,公开一种正断层模拟的试验方法和逆断层模拟试验的方法。
一种正断层模拟试验方法,利用上述的一种煤系断层形成模拟试验装置进行试验,装置包括底座1、立柱2、顶梁3和挡板4,以及液压升降装置5、下角度调整装置6、推杆装置7、上部加载装置8、上角度调整装置9、侧向加载装置10和透明侧板13,底座1的两端设置有立柱2,立柱2之间的底座上还设置有挡板4,立柱2的上端通过顶梁连接,实验体放置在挡板4之间,液压升降装置5设置在底座1上,连接底座1和实验体14;下角度调整装置6贴邻液压升降装置5设置,推杆装置7连接下角度调整装置6和立柱2;上部加载装置8设置在顶梁和上角度调整装置9之间,上角度调整装置9和挡板4的上部相连;侧向加载装置10压设在实验体14端面上,透明侧板13设置在实验体的后侧面上。
具体的试验步骤包括:
A.确定正断层起裂位置,推杆装置推动下挡板的端部移动至起裂位置。
B.确定断层倾角,调整倾斜板和下挡板之间的角度与断层倾角互补。
C.液压升降装置调整液压缸位置和高度将滑动挡板升至和下挡板齐平并接触。
D.确定实验体长度,固定实验体两端的挡板,同时固定实验体后侧面上的透明侧板。
E.从下部至上方逐层固定实验体前方的前挡板,分层铺设相似材料,并在模拟煤岩层之间逐层铺设应力传感器,尤其是在断层附近,以及模拟煤层及顶底板层位置密集铺设应力传感器。
F.安装上角度调整装置,通过调整角度调节推杆使倾斜推板和上挡板之间的夹角等于断层倾角。
G.上部加载装置施加载荷,形成正断层,并观测正断层的形成过程。
在正断层形成后,拆除模拟煤层和顶底板层位置的前挡板,然后开挖模拟煤层,模拟正断层处的采动致灾机理。
一种逆断层模拟试验方法,利用上述的一种煤系断层形成模拟试验装置,装置包括底座1、立柱2、顶梁3和挡板4,以及液压升降装置5、下角度调整装置6、推杆装置7、断层诱发试验块体15、侧向加载装置10和透明侧板13,底座1的两端设置有立柱2,立柱2之间的底座1上还设置有挡板4,立柱2的上端通过顶梁3连接,实验体放置在挡板4之间,液压升降装置5设置在底座1上,连接底座1和实验体14;下角度调整装置6贴邻液压升降装置设置5,推杆装置7连接下角度调整装置6和立柱2;断层诱发试验块体15设置在下角度调整装置6之上,侧向加载装置10压设在实验体14端面上,透明侧板13设置在实验体14的后侧面上。
具体的试验步骤包括:
A.液压升降装置调整液压缸位置和高度将滑动挡板升至和下挡板齐平并接触。
B.确定断层倾角和断层起裂位置,在起裂点安装固定断层诱发试验块体。
C.确定实验体的长度,固定实验体两端的挡板,同时固定实验体后侧面上的透明侧板。
D.从下部至上方逐层固定实验体前方的前挡板,分层铺设相似材料,并在模拟煤岩层之间逐层铺设应力传感器,尤其是在断层附近,以及模拟煤层及顶底板层位置密集铺设应力传感器。
E.侧向加载装置施加载荷,形成逆断层,并观测逆断层的形成过程。
其中,断层诱发试验块体的底角等于断层倾角,断层诱发试验块体呈三棱柱状,长度和实验体的宽度相等,并且可以设置多个底角不同的断层诱发试验块体,制作相应的倾角断层时需要更换该块体。逆断层形成后,拆除模拟煤层和顶底板层位置的前挡板,然后开挖模拟煤层,模拟逆断层处开采扰动诱发地质灾害的致灾机理。
上述试验的方法,可以再现煤系地层中断层形成过程,并在一个设备完成正逆两种断层的形成模拟试验,操作简便、高效;上、下角度调整装置和断层诱发试验块体能够实现断层倾角和断层起裂位置的灵活调整,解决了断层模拟仅能进行单一构造环境下模拟的实验缺陷;可在断层形成后进行煤层的模拟开采,对研究构造应力下采动致灾机理,以及近断层煤炭安全开采与灾害防治具有重要意义。
当然,上述说明并非是对本发明的限制,本发明也并不仅限于上述举例,本技术领域的技术人员在本发明的实质范围内所做出的变化、改型、添加或替换,也应属于本发明的保护范围。
Claims (10)
1.一种煤系断层形成模拟试验装置,包括底座、立柱、顶梁和挡板,底座的两端设置有立柱,立柱之间的底座上还设置有挡板,立柱的上端通过顶梁连接,实验体放置在挡板之间,其特征在于,还包括液压升降装置、下角度调整装置、推杆装置、上部加载装置、上角度调整装置、侧向加载装置和透明侧板,所述液压升降装置设置在底座上,连接底座和实验体;所述下角度调整装置贴邻液压升降装置设置,推杆装置连接下角度调整装置和立柱;所述上部加载装置设置在顶梁和上角度调整装置之间,上角度调整装置和挡板的上部相连;所述侧向加载装置压设在实验体端面上,所述透明侧板设置在实验体的后侧面上。
2.根据权利要求1所述的一种煤系断层形成模拟试验装置,其特征在于,所述侧向加载装置包括加载油缸和侧滑板,所述加载油缸的压头穿过挡板和侧滑板相连,侧滑板压设在实验体的侧端面上。
3.根据权利要求2所述的一种煤系断层形成模拟试验装置,其特征在于,所述侧滑板和压头之间通过滑轨相连,所述侧滑板沿压头上下滑动。
4.根据权利要求1所述的一种煤系断层形成模拟试验装置,其特征在于,所述液压升降装置包括滑块、液压缸和滑动挡板,实验体放置在滑动挡板上方,滑块沿底座上的滑轨移动,滑块的上方固定有液压缸,液压缸和滑动挡板相连。
5.根据权利要求4所述的一种煤系断层形成模拟试验装置,其特征在于,所述下角度调整装置包括倾斜板、伸缩杆和下挡板,所述下挡板和滑动挡板相邻,倾斜板和下挡板的端部铰接,伸缩杆的两端分别与倾斜板和下挡板铰接。
6.根据权利要求1所述的一种煤系断层形成模拟试验装置,其特征在于,所述上角度调整装置包括加压板、倾斜推板、上挡板、角度调节推杆和伸缩推杆,所述加压板的端部设置有滑轮,角度调节推杆调整倾斜推板的倾斜角度,伸缩推杆的端部固定在挡板上。
7.一种正断层模拟试验方法,利用权利要求1至6任一项所述的一种煤系断层形成模拟试验装置,其特征在于,步骤包括:
A.确定正断层起裂位置,推杆装置推动下挡板的端部移动至起裂位置;
B.确定断层倾角,调整倾斜板和下挡板之间的角度与断层倾角互补;
C.液压升降装置调整液压缸位置和高度将滑动挡板升至和下挡板齐平并接触;
D.确定实验体长度,固定实验体两端的挡板,同时固定实验体后侧面上的透明侧板;
E.从下部至上方逐层固定实验体前方的前挡板,并分层铺设相似材料,并在模拟煤岩层之间逐层铺设应力传感器;
F.安装上角度调整装置,通过调整角度调节推杆使倾斜推板和上挡板之间的夹角等于断层倾角;
G.上部加载装置施加载荷,形成正断层,并观测正断层的形成过程。
8.一种逆断层模拟试验方法,利用权利要求1至6任一项所述的一种煤系断层形成模拟试验装置,其特征在于,步骤包括:
A.液压升降装置调整液压缸位置和高度将滑动挡板升至和下挡板齐平并接触;
B.确定断层倾角和断层起裂位置,在起裂点安装固定断层诱发试验块体;
C.确定实验体的长度,固定实验体两端的挡板,同时固定实验体后侧面上的透明侧板;
D.从下部至上方逐层固定实验体前方的前挡板,并分层铺设相似材料,并在模拟煤岩层之间逐层铺设应力传感器;
E.侧向加载装置施加载荷,形成逆断层,并观测逆断层的形成过程。
9.根据权利要求7所述的一种正断层模拟试验方法,其特征在于,所述正断层形成后,拆除模拟煤层和顶底板层位置的前挡板,然后开挖模拟煤层,模拟正断层处的采动致灾机理。
10.根据权利要求8所述的一种逆断层模拟试验方法,其特征在于,所述断层诱发试验块体的底角等于断层倾角;所述逆断层形成后,拆除模拟煤层和顶底板层位置的前挡板,然后开挖模拟煤层,模拟逆断层处的采动致灾机理。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910274040.8A CN110006757B (zh) | 2019-04-08 | 2019-04-08 | 煤系断层形成模拟试验装置及正、逆断层模拟试验方法 |
| PCT/CN2019/084936 WO2020206759A1 (zh) | 2019-04-08 | 2019-04-29 | 煤系断层形成模拟试验装置及正、逆断层模拟试验方法 |
| US16/756,701 US10991271B2 (en) | 2019-04-08 | 2019-04-29 | Coal measures fault formation simulation experiment device and normal and reverse fault simulation experiment method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910274040.8A CN110006757B (zh) | 2019-04-08 | 2019-04-08 | 煤系断层形成模拟试验装置及正、逆断层模拟试验方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110006757A true CN110006757A (zh) | 2019-07-12 |
| CN110006757B CN110006757B (zh) | 2019-10-29 |
Family
ID=67170203
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910274040.8A Expired - Fee Related CN110006757B (zh) | 2019-04-08 | 2019-04-08 | 煤系断层形成模拟试验装置及正、逆断层模拟试验方法 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US10991271B2 (zh) |
| CN (1) | CN110006757B (zh) |
| WO (1) | WO2020206759A1 (zh) |
Cited By (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110646340A (zh) * | 2019-10-31 | 2020-01-03 | 西安科技大学 | 一种煤田地质构造运动耦合模拟试验装置及其试验方法 |
| CN111366707A (zh) * | 2020-04-14 | 2020-07-03 | 山东科技大学 | 一种模拟多类型导水通道耦合流动的试验系统及方法 |
| CN111596031A (zh) * | 2020-04-20 | 2020-08-28 | 中国矿业大学(北京) | 一种煤层底板灾害模拟装置及方法 |
| CN112116861A (zh) * | 2020-11-23 | 2020-12-22 | 西南交通大学 | 一种用于模拟断层错动下隧道动力响应的装置及方法 |
| CN112147269A (zh) * | 2020-09-30 | 2020-12-29 | 中国矿业大学(北京) | 一种模拟地下煤层气化过程的实验室相似模拟装置 |
| CN112461633A (zh) * | 2020-10-27 | 2021-03-09 | 山东科技大学 | 一种放顶煤相似材料的自动化模拟试验台及试验方法 |
| CN112557166A (zh) * | 2020-11-19 | 2021-03-26 | 山东科技大学 | 一种加载缓冲装置及用于断层模拟的试验系统和方法 |
| CN113192403A (zh) * | 2021-05-07 | 2021-07-30 | 王芳 | 一种模拟地质断层形成的系统 |
| CN113310716A (zh) * | 2021-05-19 | 2021-08-27 | 山东大学 | 断层错动对隧洞运行影响真三维物理模拟系统及试验方法 |
| CN113567244A (zh) * | 2021-07-23 | 2021-10-29 | 山东交通学院 | 一种用于煤与瓦斯突出模拟试验的正断层物理模拟试验装置及其方法 |
| CN114034841A (zh) * | 2021-11-10 | 2022-02-11 | 西南石油大学 | 一种地质断层封闭性模拟测试装置及方法 |
| CN114184767A (zh) * | 2021-12-16 | 2022-03-15 | 河北交通职业技术学院 | 一种跨导热断层段隧道热-震共同作用模拟系统 |
| CN115719560A (zh) * | 2022-11-29 | 2023-02-28 | 中国矿业大学 | 一种用于演示工作面复杂地质构造的模拟装置及工作方法 |
| CN116448979A (zh) * | 2023-03-20 | 2023-07-18 | 中国矿业大学(北京) | 一种适用于含断层构造沿空留巷三维物理开采试验方法 |
| CN118624268A (zh) * | 2024-06-26 | 2024-09-10 | 中国地质大学(武汉) | 一种用于模拟跨断层隧道错动作用的试验装置及方法 |
| CN118942319A (zh) * | 2023-05-10 | 2024-11-12 | 中国石油天然气集团有限公司 | 先存断层变形的构造模拟装置及方法 |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113155388B (zh) * | 2021-04-26 | 2023-06-20 | 常州大学 | 断层作用下盐岩储气库带夹层腔壁震动变形模拟实验装置 |
| CN113432975B (zh) * | 2021-06-11 | 2022-09-27 | 中国石油大学(北京) | 用于岩石试样加压测试的检测装置及检测系统 |
| CN113390906B (zh) * | 2021-06-11 | 2022-09-23 | 内蒙古科技大学 | 一种细观尺度下低渗透性煤岩体致裂增透效果的评价方法 |
| CN113589389B (zh) * | 2021-07-06 | 2023-11-07 | 太原理工大学 | 半空间瞬变电磁煤矿采空区模拟实验装置及方法 |
| CN115620605B (zh) * | 2021-07-14 | 2025-03-14 | 中国石油天然气集团有限公司 | 地质构造变形物理模拟实验装置和实验方法 |
| CN113267613B (zh) * | 2021-07-21 | 2021-10-29 | 中国科学院地质与地球物理研究所 | 一种模拟断层蠕滑和粘滑错动隧道结构的实验系统 |
| CN113820471A (zh) * | 2021-07-22 | 2021-12-21 | 宏大爆破工程集团有限责任公司 | 可控调节边孔角角度的室内模拟放矿装置及方法 |
| CN113848101B (zh) * | 2021-09-22 | 2024-04-19 | 中铁二十局集团第四工程有限公司 | 一种考虑平面应变状态下实现复合地层圆形隧道的相似模拟实验系统及使用方法 |
| CN114061874B (zh) * | 2021-09-29 | 2023-09-01 | 华北水利水电大学 | 一种模拟地表振动作用下采空区地层动力响应的实验装置 |
| CN115963020A (zh) * | 2021-10-09 | 2023-04-14 | 中国石油化工股份有限公司 | 走滑断裂带构造模拟实验装置、系统及实验方法 |
| CN114387866B (zh) * | 2022-01-21 | 2024-06-18 | 武汉科技大学 | 一种多变式矩形顶管实验系统 |
| CN114720236B (zh) * | 2022-06-10 | 2022-09-23 | 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) | 一种用于物理模型试验中三维倾斜岩层的制备装置及方法 |
| CN115165727B (zh) * | 2022-06-21 | 2024-05-10 | 辽宁工程技术大学 | 一种可调节倾角和倾向的岩层相似模拟实验装置及方法 |
| CN115112861A (zh) * | 2022-06-29 | 2022-09-27 | 辽宁工程技术大学 | 一种模拟岩浆岩侵入的实验装置与方法 |
| CN115791415B (zh) * | 2022-11-14 | 2025-07-25 | 扎赉诺尔煤业有限责任公司 | 一种基于煤层采动面的应力加载实验装置 |
| CN116337628B (zh) * | 2023-05-31 | 2024-03-22 | 中国地质大学(北京) | 三维应力下活动断裂粘滑发震模拟方法及装置 |
| CN119207221B (zh) * | 2023-06-25 | 2025-10-17 | 中国石油天然气股份有限公司 | 一种地质断层模拟装置及方法 |
| CN117309648B (zh) * | 2023-09-22 | 2024-05-07 | 江汉大学 | 一种非土岩围岩高地应力断层模拟试验装置 |
Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU488116A1 (ru) * | 1974-04-22 | 1975-10-15 | Научно-Исследовательская Лаборатория Физико-Химической Механики Материалов И Технологических Процессов | Устройство дл испытани железобетонных труб на герметичность и прочность |
| JPH0466838A (ja) * | 1990-07-09 | 1992-03-03 | Maruto Seisakusho:Kk | 合成樹脂試験片の予亀裂導入用切截機 |
| CN201378386Y (zh) * | 2009-04-17 | 2010-01-06 | 安徽新视野科教文化传播有限责任公司 | 正逆断层地震模拟演示器 |
| CN102323150A (zh) * | 2011-08-10 | 2012-01-18 | 中国地质科学院地质力学研究所 | 在断层作用下斜坡体稳定性模拟试验装置及其方法 |
| CN202473026U (zh) * | 2011-12-15 | 2012-10-03 | 付晓飞 | 一种固结-半固结成岩条件下泥岩涂抹形成演化物理模拟实验装置 |
| CN105204088A (zh) * | 2015-08-27 | 2015-12-30 | 山东科技大学 | 构造应力场模拟试验装置及方法 |
| CN106226808A (zh) * | 2016-07-20 | 2016-12-14 | 西南交通大学 | 一种模拟断层错动下隧道地震响应的试验装置及试验方法 |
| CN106875804A (zh) * | 2017-03-15 | 2017-06-20 | 浙江大学 | 一种模拟岩土体正逆断层运动的试验装置及方法 |
| CN207051126U (zh) * | 2017-08-25 | 2018-02-27 | 山东科技大学 | 一种用于模拟正断层形成的试验装置 |
| CN108444833A (zh) * | 2018-05-11 | 2018-08-24 | 山东科技大学 | 一种模拟正逆断层形成的试验装置 |
| CN208109600U (zh) * | 2018-05-11 | 2018-11-16 | 山东科技大学 | 一种模拟正逆断层形成的试验装置 |
| CN108956933A (zh) * | 2017-08-25 | 2018-12-07 | 山东科技大学 | 一种实验室内模拟逆断层形成的方法及装置 |
| CN108982219A (zh) * | 2018-08-01 | 2018-12-11 | 北方工业大学 | 隧道断层错动模型试验装置及错动模型试验系统 |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU1624156A1 (ru) * | 1989-02-01 | 1991-01-30 | Институт горного дела Севера Якутского филиала СО АН СССР | Способ подготовки зоны геологического нарушени к переходу лавой с механизированным комплексом |
| JP2948527B2 (ja) * | 1995-11-13 | 1999-09-13 | セラタ ショーセイ | 直下型巨大地震の定量予知方法及びその装置 |
| CN207051286U (zh) * | 2017-08-25 | 2018-02-27 | 山东科技大学 | 一种实验室内模拟逆断层形成的装置 |
| CN208060275U (zh) * | 2018-04-28 | 2018-11-06 | 山东科技大学 | 可模拟深部断层形成及裂隙发育的多功能试验系统 |
| CN109470839B (zh) * | 2018-11-22 | 2023-07-21 | 山东科技大学 | 模拟深部断层形成、断层活化和断层突水的物理试验装置及方法 |
| CN109946164B (zh) * | 2019-03-11 | 2020-07-24 | 中国矿业大学(北京) | 一种模拟煤矿采场煤岩灾变的实验平台及实验方法 |
| CN209764609U (zh) * | 2019-04-08 | 2019-12-10 | 山东科技大学 | 一种煤系断层形成模拟试验装置 |
-
2019
- 2019-04-08 CN CN201910274040.8A patent/CN110006757B/zh not_active Expired - Fee Related
- 2019-04-29 WO PCT/CN2019/084936 patent/WO2020206759A1/zh not_active Ceased
- 2019-04-29 US US16/756,701 patent/US10991271B2/en active Active
Patent Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU488116A1 (ru) * | 1974-04-22 | 1975-10-15 | Научно-Исследовательская Лаборатория Физико-Химической Механики Материалов И Технологических Процессов | Устройство дл испытани железобетонных труб на герметичность и прочность |
| JPH0466838A (ja) * | 1990-07-09 | 1992-03-03 | Maruto Seisakusho:Kk | 合成樹脂試験片の予亀裂導入用切截機 |
| CN201378386Y (zh) * | 2009-04-17 | 2010-01-06 | 安徽新视野科教文化传播有限责任公司 | 正逆断层地震模拟演示器 |
| CN102323150A (zh) * | 2011-08-10 | 2012-01-18 | 中国地质科学院地质力学研究所 | 在断层作用下斜坡体稳定性模拟试验装置及其方法 |
| CN202473026U (zh) * | 2011-12-15 | 2012-10-03 | 付晓飞 | 一种固结-半固结成岩条件下泥岩涂抹形成演化物理模拟实验装置 |
| CN105204088A (zh) * | 2015-08-27 | 2015-12-30 | 山东科技大学 | 构造应力场模拟试验装置及方法 |
| CN106226808A (zh) * | 2016-07-20 | 2016-12-14 | 西南交通大学 | 一种模拟断层错动下隧道地震响应的试验装置及试验方法 |
| CN106875804A (zh) * | 2017-03-15 | 2017-06-20 | 浙江大学 | 一种模拟岩土体正逆断层运动的试验装置及方法 |
| CN207051126U (zh) * | 2017-08-25 | 2018-02-27 | 山东科技大学 | 一种用于模拟正断层形成的试验装置 |
| CN108956933A (zh) * | 2017-08-25 | 2018-12-07 | 山东科技大学 | 一种实验室内模拟逆断层形成的方法及装置 |
| CN108444833A (zh) * | 2018-05-11 | 2018-08-24 | 山东科技大学 | 一种模拟正逆断层形成的试验装置 |
| CN208109600U (zh) * | 2018-05-11 | 2018-11-16 | 山东科技大学 | 一种模拟正逆断层形成的试验装置 |
| CN108982219A (zh) * | 2018-08-01 | 2018-12-11 | 北方工业大学 | 隧道断层错动模型试验装置及错动模型试验系统 |
Non-Patent Citations (1)
| Title |
|---|
| 陈绍杰 等: "断层影响下岩体采动灾变响应研究现状与展望", 《煤炭科学技术》 * |
Cited By (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110646340A (zh) * | 2019-10-31 | 2020-01-03 | 西安科技大学 | 一种煤田地质构造运动耦合模拟试验装置及其试验方法 |
| CN110646340B (zh) * | 2019-10-31 | 2021-12-03 | 西安科技大学 | 一种煤田地质构造运动耦合模拟试验装置及其试验方法 |
| CN111366707A (zh) * | 2020-04-14 | 2020-07-03 | 山东科技大学 | 一种模拟多类型导水通道耦合流动的试验系统及方法 |
| CN111596031A (zh) * | 2020-04-20 | 2020-08-28 | 中国矿业大学(北京) | 一种煤层底板灾害模拟装置及方法 |
| CN112147269A (zh) * | 2020-09-30 | 2020-12-29 | 中国矿业大学(北京) | 一种模拟地下煤层气化过程的实验室相似模拟装置 |
| CN112461633B (zh) * | 2020-10-27 | 2021-06-25 | 山东科技大学 | 一种放顶煤相似材料的自动化模拟试验台及试验方法 |
| US11519837B2 (en) | 2020-10-27 | 2022-12-06 | Shandong University Of Science And Technology | Automatic simulation test bench for similar materials of top-coal caving mining and test method thereof |
| CN112461633A (zh) * | 2020-10-27 | 2021-03-09 | 山东科技大学 | 一种放顶煤相似材料的自动化模拟试验台及试验方法 |
| CN112557166A (zh) * | 2020-11-19 | 2021-03-26 | 山东科技大学 | 一种加载缓冲装置及用于断层模拟的试验系统和方法 |
| CN112116861B (zh) * | 2020-11-23 | 2021-04-23 | 西南交通大学 | 一种用于模拟断层错动下隧道动力响应的装置及方法 |
| CN112116861A (zh) * | 2020-11-23 | 2020-12-22 | 西南交通大学 | 一种用于模拟断层错动下隧道动力响应的装置及方法 |
| CN113192403A (zh) * | 2021-05-07 | 2021-07-30 | 王芳 | 一种模拟地质断层形成的系统 |
| CN113310716A (zh) * | 2021-05-19 | 2021-08-27 | 山东大学 | 断层错动对隧洞运行影响真三维物理模拟系统及试验方法 |
| US11835431B1 (en) | 2021-05-19 | 2023-12-05 | Shandong University | True three-dimensional physical simulation system for influence of fault movement on tunnel operation and test method |
| CN113310716B (zh) * | 2021-05-19 | 2022-05-27 | 山东大学 | 断层错动对隧洞运行影响真三维物理模拟系统及试验方法 |
| CN113567244B (zh) * | 2021-07-23 | 2023-11-10 | 山东交通学院 | 一种用于煤与瓦斯突出模拟试验的正断层物理模拟试验装置及其方法 |
| CN113567244A (zh) * | 2021-07-23 | 2021-10-29 | 山东交通学院 | 一种用于煤与瓦斯突出模拟试验的正断层物理模拟试验装置及其方法 |
| CN114034841A (zh) * | 2021-11-10 | 2022-02-11 | 西南石油大学 | 一种地质断层封闭性模拟测试装置及方法 |
| CN114034841B (zh) * | 2021-11-10 | 2023-06-16 | 西南石油大学 | 一种地质断层封闭性模拟测试装置及方法 |
| CN114184767A (zh) * | 2021-12-16 | 2022-03-15 | 河北交通职业技术学院 | 一种跨导热断层段隧道热-震共同作用模拟系统 |
| CN115719560A (zh) * | 2022-11-29 | 2023-02-28 | 中国矿业大学 | 一种用于演示工作面复杂地质构造的模拟装置及工作方法 |
| CN116448979A (zh) * | 2023-03-20 | 2023-07-18 | 中国矿业大学(北京) | 一种适用于含断层构造沿空留巷三维物理开采试验方法 |
| CN116448979B (zh) * | 2023-03-20 | 2023-09-08 | 中国矿业大学(北京) | 一种适用于含断层构造沿空留巷三维物理开采试验方法 |
| CN118942319A (zh) * | 2023-05-10 | 2024-11-12 | 中国石油天然气集团有限公司 | 先存断层变形的构造模拟装置及方法 |
| CN118624268A (zh) * | 2024-06-26 | 2024-09-10 | 中国地质大学(武汉) | 一种用于模拟跨断层隧道错动作用的试验装置及方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2020206759A1 (zh) | 2020-10-15 |
| CN110006757B (zh) | 2019-10-29 |
| US10991271B2 (en) | 2021-04-27 |
| US20210049934A1 (en) | 2021-02-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110006757A (zh) | 煤系断层形成模拟试验装置及正、逆断层模拟试验方法 | |
| US20230280251A1 (en) | Three-dimensional dynamic and static load test system for simulating deep roadway excavation and method thereof | |
| CN105785468B (zh) | 一种模拟隧道穿越斜向错动活断层的破坏试验装置及方法 | |
| CN115901476B (zh) | 一种模拟采动影响下覆岩运动特征的三维试验装置及方法 | |
| CN108444833B (zh) | 一种模拟正逆断层形成的试验装置 | |
| CN105092816B (zh) | 一种三维多煤层开采相似材料模型实验系统 | |
| WO2021004015A1 (zh) | 锚杆(索)支护结构测试及锚固系统性能综合试验装置及方法 | |
| CN104200734B (zh) | 一种反演煤层底板突水的方法 | |
| CN204731039U (zh) | 一种适于矿井巷道底鼓模拟的试验台架 | |
| CN108982219A (zh) | 隧道断层错动模型试验装置及错动模型试验系统 | |
| CN108956933B (zh) | 一种实验室内模拟逆断层形成的方法及装置 | |
| CN107703278A (zh) | 一种煤岩层倾角与加载位置可调节加载相似模拟试验平台 | |
| CN104237024A (zh) | 一种矿井工作面底板采动破坏模拟试验方法 | |
| CN102928573B (zh) | 一种自重式滑坡物理模型试验液压调节加载装置 | |
| CN104237462B (zh) | 一种急倾斜煤层矸石充填试验装置及试验方法 | |
| CN205177261U (zh) | 一种矿用采煤工作面相似模拟立体实验模型 | |
| CN104266913A (zh) | 一种矿井工作面底板采动破坏模拟试验装置 | |
| CN211602719U (zh) | 一种多功能顶底板突水的采场矿压三维物理模拟试验平台 | |
| CN102879284A (zh) | 三向加载大型三维相似模拟试验试件箱 | |
| CN110082227A (zh) | 模拟动载荷刀柱式残采区煤柱群稳定的试验仪及其方法 | |
| CN108007760B (zh) | 隧道衬砌结构纵向力学特型试验装置 | |
| CN208109600U (zh) | 一种模拟正逆断层形成的试验装置 | |
| CN116448569A (zh) | 一种塌陷型矿震井联合监测物理模拟装置及方法 | |
| CN116067800A (zh) | 一种测试动、静载条件下岩层层间剪切滑移效应实验装置及实验方法 | |
| CN108414347B (zh) | 可模拟深部断层形成及裂隙发育的多功能试验系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191029 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |