CN118167032A - A method for constructing four-story urban rail transit stations based on innovative concepts - Google Patents
A method for constructing four-story urban rail transit stations based on innovative concepts Download PDFInfo
- Publication number
- CN118167032A CN118167032A CN202410392744.6A CN202410392744A CN118167032A CN 118167032 A CN118167032 A CN 118167032A CN 202410392744 A CN202410392744 A CN 202410392744A CN 118167032 A CN118167032 A CN 118167032A
- Authority
- CN
- China
- Prior art keywords
- frame
- push rod
- electric push
- fixedly connected
- limiting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B33/00—Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/04—Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Sustainable Development (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及城市轨道交通技术领域,具体为基于创新理念的城市轨道交通四层车站建设的方法,该方法包括以下步骤:S1、首先进行车站的土建施工,包括地下结构和地面建筑物的修建;S2、在土建施工过程中,同时进行轨道系统的施工。本发明通过电动机带动一个第二驱动轮转动,转动的第二驱动轮可以带动一个移动轮转动,并且第二驱动轮通过第二同步带和第一同步带可以使得相邻的第二驱动轮和第一驱动轮转动,并且转动的第一驱动轮可以带动同步转动杆转动,从而使得两侧的第一驱动轮和第二驱动轮同步的转动,从而使得各个移动轮同步的转动,同步转动的移动轮即可使得支撑架移动,使得本设备移动。
The present invention relates to the field of urban rail transit technology, specifically to a method for constructing a four-story urban rail transit station based on an innovative concept, the method comprising the following steps: S1, firstly, civil construction of the station is carried out, including the construction of underground structures and ground buildings; S2, during the civil construction process, the construction of the track system is carried out simultaneously. The present invention drives a second drive wheel to rotate through an electric motor, the rotating second drive wheel can drive a moving wheel to rotate, and the second drive wheel can rotate the adjacent second drive wheel and the first drive wheel through the second synchronous belt and the first synchronous belt, and the rotating first drive wheel can drive the synchronous rotating rod to rotate, so that the first drive wheel and the second drive wheel on both sides rotate synchronously, so that each moving wheel rotates synchronously, and the synchronously rotating moving wheel can move the support frame, so that the device moves.
Description
技术领域Technical Field
本发明涉及城市轨道交通技术领域,具体为基于创新理念的城市轨道交通四层车站建设的方法。The present invention relates to the technical field of urban rail transit, and in particular to a method for constructing a four-story urban rail transit station based on an innovative concept.
背景技术Background technique
城市轨道交通是指采用轨道结构进行承重和导向的车辆运输系统,依据城市交通总体规划的要求,设置全封闭或部分封闭的专用轨道线路,以列车或单车形式,运送相当规模客流量的公共交通方式。城市轨道交通包括地铁系统、轻轨系统、市域快速轨道交通系统、单轨系统、有轨电车系统、自动导向轨道(APM)系统、磁浮系统等。城市轨道交通是城市公共交通的骨干,具有节能、省地、运量大、全天候、无污染等特点,属绿色环保交通体系,特别适应于大中城市。但是现有的城市轨道交通修建的过程中缺乏创新的理念,并且修建的过程中效率低下费时费力,所以需要一种装置以及方法以解决上述中提出的问题。Urban rail transit refers to a vehicle transportation system that uses a rail structure for load-bearing and guidance. According to the requirements of the overall urban transportation plan, a fully enclosed or partially enclosed dedicated rail line is set up to transport a considerable amount of passenger traffic in the form of trains or bicycles. Urban rail transit includes subway systems, light rail systems, urban rapid rail transit systems, monorail systems, tram systems, automatic guided track (APM) systems, maglev systems, etc. Urban rail transit is the backbone of urban public transportation. It has the characteristics of energy saving, land saving, large transportation capacity, all-weather, and pollution-free. It is a green and environmentally friendly transportation system, especially suitable for large and medium-sized cities. However, the existing urban rail transit construction process lacks innovative concepts, and the construction process is inefficient, time-consuming and labor-intensive, so a device and method are needed to solve the above-mentioned problems.
发明内容Summary of the invention
本发明的目的在于提供基于创新理念的城市轨道交通四层车站建设的方法,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a method for constructing a four-story urban rail transit station based on an innovative concept to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
基于创新理念的城市轨道交通四层车站建设的方法,该方法包括以下步骤:A method for constructing a four-story urban rail transit station based on an innovative concept, the method comprising the following steps:
S1、首先进行车站的土建施工,包括地下结构和地面建筑物的修建;S1. First, the civil construction of the station is carried out, including the construction of underground structures and ground buildings;
S2、在土建施工过程中,同时进行轨道系统的施工;S2. During the civil construction process, the track system is constructed at the same time;
S3、完成土建和轨道系统施工后,开始进行车站设备的安装;S3. After the civil engineering and track system construction is completed, the installation of station equipment will begin;
S4、在设备安装完成后,进行车站的环境装饰和装修工作;S4. After the equipment is installed, the station environment decoration and renovation work will be carried out;
S5、在施工完成后,进行联调联试和验收工作。S5. After the construction is completed, joint debugging, testing and acceptance work will be carried out.
优选的,步骤2中会使用到移动限位装置,所述移动限位装置的两端分别对称固定安装有第一铺设调节装置和所述第二铺设调节装置,且所述第一铺设调节装置和所述第二铺设调节装置结构相同,所述移动限位装置的上端设置有调控装置。Preferably, a movable limiting device is used in step 2, and the first laying adjustment device and the second laying adjustment device are symmetrically fixedly installed at both ends of the movable limiting device, and the first laying adjustment device and the second laying adjustment device have the same structure, and a regulating device is arranged at the upper end of the movable limiting device.
优选的,所述移动限位装置包括限位框架、第一驱动轮、第一同步带、支撑架、电动推杆、第二同步带、第二驱动轮、移动轮、限位支撑架、同步转动杆、电动机和固定框架,所述支撑架对称设置,所述电动推杆均匀固定安装在所述支撑架上,所述限位框架位于所述支撑架的上方,且所述电动推杆的驱动端与所述限位框架的底端固定连接,所述限位支撑架固定连接在所述支撑架的两端,所述同步转动杆转动卡接在所述限位支撑架的上端之间,所述第一驱动轮固定连接在所述同步转动杆的两端,所述移动轮转动卡接在所述支撑架的两端,所述第二驱动轮固定连接在所述移动轮的外侧端,所述第二同步带转动卡接在所述第二驱动轮之间,所述第一同步带转动卡接在所述第一驱动轮与所述第二驱动轮之间,所述固定框架固定连接在所述支撑架上,所述电动机固定安装在所述固定框架上,且所述电动机的驱动端与所述第二驱动轮的外侧端中部固定连接。Preferably, the movable limiting device comprises a limiting frame, a first driving wheel, a first synchronous belt, a support frame, an electric push rod, a second synchronous belt, a second driving wheel, a moving wheel, a limiting support frame, a synchronous rotating rod, a motor and a fixed frame, the support frame is symmetrically arranged, the electric push rod is evenly fixedly mounted on the support frame, the limiting frame is located above the support frame, and the driving end of the electric push rod is fixedly connected to the bottom end of the limiting frame, the limiting support frame is fixedly connected to the two ends of the support frame, the synchronous rotating rod is rotatably clamped between the upper ends of the limiting support frame, the first driving wheel is fixedly connected to the two ends of the synchronous rotating rod, the moving wheel is rotatably clamped at the two ends of the support frame, the second driving wheel is fixedly connected to the outer ends of the moving wheel, the second synchronous belt is rotatably clamped between the second driving wheels, the first synchronous belt is rotatably clamped between the first driving wheel and the second driving wheel, the fixed frame is fixedly connected to the support frame, the motor is fixedly mounted on the fixed frame, and the driving end of the motor is fixedly connected to the middle part of the outer end of the second driving wheel.
优选的,所述调控装置包括第二电动推杆、安装横板、升降控制框架、第二电动推杆、滑动调节框、限位调节框、导向板、固定板体和第三电动推杆,所述安装横板对称固定安装在所述升降控制框架的两端内部,所述第二电动推杆对称固定安装在所述安装横板上,所述第二电动推杆的驱动端与所述滑动调节框的上端固定连接,所述第二电动推杆均匀分布在所述升降控制框架的两端底部,且所述第二电动推杆的驱动端与所述升降控制框架的底端固定连接,所述限位调节框对称设置在所述滑动调节框的两端底部,且所述限位调节框的上端滑动卡接在所述滑动调节框的底部,所述导向板固定连接在所述限位调节框的两端,所述第三电动推杆通过所述固定板体对称固定安装在所述滑动调节框的侧端。Preferably, the control device includes a second electric push rod, a mounting cross plate, a lifting control frame, a second electric push rod, a sliding adjustment frame, a limit adjustment frame, a guide plate, a fixed plate body and a third electric push rod, the mounting cross plate is symmetrically fixedly mounted inside the two ends of the lifting control frame, the second electric push rod is symmetrically fixedly mounted on the mounting cross plate, the driving end of the second electric push rod is fixedly connected to the upper end of the sliding adjustment frame, the second electric push rod is evenly distributed at the bottom of the two ends of the lifting control frame, and the driving end of the second electric push rod is fixedly connected to the bottom end of the lifting control frame, the limit adjustment frame is symmetrically arranged at the bottom of the two ends of the sliding adjustment frame, and the upper end of the limit adjustment frame is slidably clamped at the bottom of the sliding adjustment frame, the guide plate is fixedly connected to the two ends of the limit adjustment frame, and the third electric push rod is symmetrically fixedly mounted on the side ends of the sliding adjustment frame through the fixed plate body.
优选的,所述第一铺设调节装置包括第四电动推杆、连接支撑横板、夹持框、第五电动推杆和夹持挤压板,所述第四电动推杆均匀固定安装在所述连接支撑横板上,所述夹持框固定连接在所述第四电动推杆的驱动端,所述第五电动推杆均匀固定安装在所述夹持框上,且所述夹持挤压板位于所述夹持框的内侧,所述第五电动推杆的驱动端与所述夹持挤压板的内侧固定连接。Preferably, the first laying adjustment device includes a fourth electric push rod, a connecting support cross plate, a clamping frame, a fifth electric push rod and a clamping and extruding plate, the fourth electric push rod is evenly fixedly mounted on the connecting support cross plate, the clamping frame is fixedly connected to the driving end of the fourth electric push rod, the fifth electric push rod is evenly fixedly mounted on the clamping frame, and the clamping and extruding plate is located on the inner side of the clamping frame, and the driving end of the fifth electric push rod is fixedly connected to the inner side of the clamping and extruding plate.
优选的,所述滑动调节框滑动卡接在所述限位框架上。Preferably, the sliding adjustment frame is slidably connected to the limiting frame.
优选的,所述第二电动推杆固定安装在所述限位框架上。Preferably, the second electric push rod is fixedly mounted on the limiting frame.
优选的,所述导向板呈45°倾斜设置。Preferably, the guide plate is inclined at 45°.
优选的,所述连接支撑横板固定连接在所述滑动调节框的侧端。Preferably, the connecting support transverse plate is fixedly connected to the side end of the sliding adjustment frame.
优选的,所述滑动调节框的侧端设置有刻度线。Preferably, scale lines are provided on the side ends of the sliding adjustment frame.
与现有技术相比,本发明的有益效果如下:Compared with the prior art, the present invention has the following beneficial effects:
一、本发明通过电动机带动一个第二驱动轮转动,转动的第二驱动轮可以带动一个移动轮转动,并且第二驱动轮通过第二同步带和第一同步带可以使得相邻的第二驱动轮和第一驱动轮转动,并且转动的第一驱动轮可以带动同步转动杆转动,从而使得两侧的第一驱动轮和第二驱动轮同步的转动,从而使得各个移动轮同步的转动,同步转动的移动轮即可使得支撑架移动,使得本设备移动,移动的过程中通过限位调节框端头设置的导向板可以使得铺设放置的轨道居中导向的进入至限位调节框中,从而对称分布移动的限位调节框可以将对称放置铺设的各个轨道纠偏调节位置,使得本设备移动经过后铺设的各个轨道板水平,并且相邻之间平行,分便对铺设的轨道进行快速的铺设和调节。1. The present invention drives a second driving wheel to rotate through an electric motor, and the rotating second driving wheel can drive a moving wheel to rotate, and the second driving wheel can make the adjacent second driving wheel and the first driving wheel rotate through the second synchronous belt and the first synchronous belt, and the rotating first driving wheel can drive the synchronous rotating rod to rotate, so that the first driving wheels and the second driving wheels on both sides rotate synchronously, so that each moving wheel rotates synchronously, and the synchronously rotating moving wheels can move the support frame, so that the device moves, and during the movement, the guide plate set at the end of the limit adjustment frame can guide the laid track to enter the limit adjustment frame in the center, so that the symmetrically distributed moving limit adjustment frame can correct and adjust the position of each symmetrically placed and laid track, so that each track plate laid after the device moves is horizontal and parallel to each other, so that the laid track can be quickly laid and adjusted.
二、本发明当轨道铺设完毕需要将端头固定连接时,同步使用多个本设备,通过将本设备放置在轨道上,然后启动第四电动推杆使得夹持框向下移动,使得需要固定连接的轨道中部位于夹持框中,然后同步的启动第五电动推杆使得夹持框内部两侧的夹持挤压板同步的对夹持框中的轨道夹持,然后通过第四电动推杆将夹持框以及夹持框中夹持固定的轨道升起一定的高度,从而可以将需要对接固定的轨道端头之间连接,起到辅助安装的作用,使得安装对接固定省时省力精准。2. According to the present invention, when the track is laid and the end needs to be fixedly connected, multiple devices are used synchronously. The devices are placed on the track and the fourth electric push rod is started to move the clamping frame downward so that the middle of the track that needs to be fixedly connected is located in the clamping frame. The fifth electric push rod is then started synchronously so that the clamping and extrusion plates on both sides of the clamping frame clamp the track in the clamping frame synchronously. The clamping frame and the track clamped and fixed in the clamping frame are then raised to a certain height by the fourth electric push rod, so that the ends of the tracks that need to be docked and fixed can be connected, which plays a role in auxiliary installation and makes the installation, docking and fixing time-saving, labor-saving and accurate.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
图1为本发明的主体结构示意图;Fig. 1 is a schematic diagram of the main structure of the present invention;
图2为本发明的主体侧视立体结构示意图;FIG2 is a schematic diagram of a side view of a three-dimensional structure of a main body of the present invention;
图3为本发明移动限位装置的结构示意图;FIG3 is a schematic structural diagram of a movable limiting device according to the present invention;
图4为本发明移动限位装置侧视立体结构示意图;FIG4 is a schematic side view of the three-dimensional structure of the movable limiting device of the present invention;
图5为本发明调控装置的结构示意图;FIG5 is a schematic diagram of the structure of the control device of the present invention;
图6为本发明调控装置侧视立体结构示意图;FIG6 is a schematic diagram of a side view of the three-dimensional structure of the control device of the present invention;
图7为本发明第一铺设调节装置的结构示意图;FIG7 is a schematic structural diagram of a first laying adjustment device of the present invention;
图8为本发明调控装置的第二实施例结构示意图。;FIG8 is a schematic structural diagram of a second embodiment of the control device of the present invention. ;
图9为本发明施工场地剖面图。FIG. 9 is a cross-sectional view of the construction site of the present invention.
图中:1-第一铺设调节装置、2-移动限位装置、3-第二铺设调节装置、4-调控装置、5-限位框架、6-第一驱动轮、7-第一同步带、8-支撑架、9-电动推杆、10-第二同步带、11-第二驱动轮、12-移动轮、13-限位支撑架、14-同步转动杆、15-电动机、16-固定框架、17-第二电动推杆、18-安装横板、19-升降控制框架、20-第二电动推杆、21-滑动调节框、22-限位调节框、23-导向板、24-固定板体、25-第三电动推杆、26-第四电动推杆、27-连接支撑横板、28-夹持框、29-第五电动推杆、30-夹持挤压板、31-刻度线。In the figure: 1-first laying adjustment device, 2-moving limiting device, 3-second laying adjustment device, 4-regulating device, 5-limiting frame, 6-first driving wheel, 7-first synchronous belt, 8-support frame, 9-electric push rod, 10-second synchronous belt, 11-second driving wheel, 12-moving wheel, 13-limiting support frame, 14-synchronous rotating rod, 15-motor, 16-fixed frame, 17-second electric push rod, 18-mounting cross plate, 19-lifting control frame, 20-second electric push rod, 21-sliding adjustment frame, 22-limiting adjustment frame, 23-guide plate, 24-fixed plate body, 25-third electric push rod, 26-fourth electric push rod, 27-connecting support cross plate, 28-clamping frame, 29-fifth electric push rod, 30-clamping extrusion plate, 31-scale line.
具体实施方式Detailed ways
为了使本技术领域的人员更好地理解本申请方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分的实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。In order to enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this application.
需要说明的是,本申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本申请的实施例。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
下面结合附图对本发明进一步说明。The present invention is further described below in conjunction with the accompanying drawings.
实施例1Example 1
请参阅图1和图2和图9,本发明提供的一种实施例:基于创新理念的城市轨道交通四层车站建设的方法,该方法包括以下步骤:Please refer to FIG. 1 , FIG. 2 and FIG. 9 , an embodiment provided by the present invention: a method for constructing a four-story urban rail transit station based on an innovative concept, the method comprising the following steps:
S1、首先进行车站的土建施工,包括地下结构和地面建筑物的修建,包括地基处理、基础施工、结构施工等环节,确保车站的稳固性和安全性;S1. First, the civil construction of the station is carried out, including the construction of underground structures and ground buildings, including foundation treatment, foundation construction, structural construction and other links to ensure the stability and safety of the station;
S2、在土建施工过程中,同时进行轨道系统的施工,包括轨道的铺设、轨道连接、轨道调试等工作,还需要进行信号系统、电力供应等设备的安装和调试;S2. During the civil construction process, the track system is constructed at the same time, including track laying, track connection, track commissioning, etc., and the installation and commissioning of signal systems, power supply and other equipment are also required;
S3、完成土建和轨道系统施工后,开始进行车站设备的安装;S3. After the civil engineering and track system construction is completed, the installation of station equipment will begin;
S4、在设备安装完成后,进行车站的环境装饰和装修工作,包括站厅、站台、通道等区域的装修和美化,如安装艺术品、照明系统等,提升乘客的舒适感和整体美观度;S4. After the equipment is installed, the station environment decoration and renovation work will be carried out, including the decoration and beautification of the station hall, platform, passage and other areas, such as the installation of artworks and lighting systems, to enhance the comfort of passengers and the overall aesthetics;
S5、在施工完成后,进行联调联试和验收工作。S5. After the construction is completed, joint debugging, testing and acceptance work will be carried out.
步骤2中会使用到移动限位装置2,移动限位装置2的两端分别对称固定安装有第一铺设调节装置1和第二铺设调节装置3,且第一铺设调节装置1和第二铺设调节装置3结构相同,移动限位装置2的上端设置有调控装置4,移动限位装置2包括限位框架5、第一驱动轮6、第一同步带7、支撑架8、电动推杆9、第二同步带10、第二驱动轮11、移动轮12、限位支撑架13、同步转动杆14、电动机15和固定框架16,支撑架8对称设置,电动推杆9均匀固定安装在支撑架8上,限位框架5位于支撑架8的上方,且电动推杆9的驱动端与限位框架5的底端固定连接,限位支撑架13固定连接在支撑架8的两端,同步转动杆14转动卡接在限位支撑架13的上端之间,第一驱动轮6固定连接在同步转动杆14的两端,移动轮12转动卡接在支撑架8的两端,第二驱动轮11固定连接在移动轮12的外侧端,第二同步带10转动卡接在第二驱动轮11之间,第一同步带7转动卡接在第一驱动轮6与第二驱动轮11之间,固定框架16固定连接在支撑架8上,电动机15固定安装在固定框架16上,且电动机15的驱动端与第二驱动轮11的外侧端中部固定连接,通过电动机15带动一个第二驱动轮11转动,转动的第二驱动轮11可以带动一个移动轮12转动,并且第二驱动轮11通过第二同步带10和第一同步带7可以使得相邻的第二驱动轮11和第一驱动轮6转动,并且转动的第一驱动轮6可以带动同步转动杆14转动,从而使得两侧的第一驱动轮6和第二驱动轮11同步的转动,从而使得各个移动轮12同步的转动,同步转动的移动轮12即可使得支撑架8移动,使得本设备移动,移动的过程中通过限位调节框22端头设置的导向板23可以使得铺设放置的轨道居中导向的进入至限位调节框22中,从而对称分布移动的限位调节框22可以将对称放置铺设的各个轨道纠偏调节位置,使得本设备移动经过后铺设的各个轨道板水平,并且相邻之间平行,分便对铺设的轨道进行快速的铺设和调节。In step 2, a mobile limiting device 2 is used. The first laying adjustment device 1 and the second laying adjustment device 3 are symmetrically fixedly installed at both ends of the mobile limiting device 2, and the first laying adjustment device 1 and the second laying adjustment device 3 have the same structure. A regulating device 4 is arranged at the upper end of the mobile limiting device 2. The mobile limiting device 2 includes a limiting frame 5, a first driving wheel 6, a first synchronous belt 7, a support frame 8, an electric push rod 9, a second synchronous belt 10, a second driving wheel 11, a moving wheel 12, a limiting support frame 13, a synchronous rotating rod 14, a motor 15 and a fixed frame 16. The support frame 8 is symmetrically arranged, and the electric push rod 9 is arranged at the upper end. The rod 9 is evenly fixedly installed on the support frame 8, the limit frame 5 is located above the support frame 8, and the driving end of the electric push rod 9 is fixedly connected to the bottom end of the limit frame 5, the limit support frame 13 is fixedly connected to the two ends of the support frame 8, the synchronous rotation rod 14 is rotatably clamped between the upper ends of the limit support frame 13, the first driving wheel 6 is fixedly connected to the two ends of the synchronous rotation rod 14, the moving wheel 12 is rotatably clamped at the two ends of the support frame 8, the second driving wheel 11 is fixedly connected to the outer end of the moving wheel 12, the second synchronous belt 10 is rotatably clamped between the second driving wheel 11, and the first synchronous belt 7 is rotatably clamped between the first driving wheel 6 and the first Between the two driving wheels 11, a fixed frame 16 is fixedly connected to the support frame 8, and a motor 15 is fixedly installed on the fixed frame 16, and a driving end of the motor 15 is fixedly connected to the middle part of the outer end of the second driving wheel 11, and a second driving wheel 11 is driven to rotate by the motor 15, and the rotating second driving wheel 11 can drive a moving wheel 12 to rotate, and the second driving wheel 11 can make the adjacent second driving wheel 11 and the first driving wheel 6 rotate through the second synchronous belt 10 and the first synchronous belt 7, and the rotating first driving wheel 6 can drive the synchronous rotating rod 14 to rotate, so that the first driving wheels on both sides The driving wheel 6 and the second driving wheel 11 rotate synchronously, so that the various moving wheels 12 rotate synchronously. The synchronously rotating moving wheels 12 can move the support frame 8, so that the equipment moves. During the movement, the guide plate 23 set at the end of the limit adjustment frame 22 can guide the laid track to enter the limit adjustment frame 22 in the center, so that the symmetrically distributed and moving limit adjustment frame 22 can correct and adjust the position of the symmetrically placed and laid tracks, so that the track plates laid after the equipment moves are horizontal and parallel to each other, so that the laid tracks can be quickly laid and adjusted.
调控装置4包括第二电动推杆17、安装横板18、升降控制框架19、第二电动推杆20、滑动调节框21、限位调节框22、导向板23、固定板体24和第三电动推杆25,安装横板18对称固定安装在升降控制框架19的两端内部,第二电动推杆17对称固定安装在安装横板18上,第二电动推杆17的驱动端与滑动调节框21的上端固定连接,第二电动推杆20均匀分布在升降控制框架19的两端底部,且第二电动推杆20的驱动端与升降控制框架19的底端固定连接,限位调节框22对称设置在滑动调节框21的两端底部,且限位调节框22的上端滑动卡接在滑动调节框21的底部,导向板23固定连接在限位调节框22的两端,第三电动推杆25通过固定板体24对称固定安装在滑动调节框21的侧端,通过第三电动推杆25可以调节和控制两个限位调节框22之间的间距。The regulating device 4 includes a second electric push rod 17, a mounting cross plate 18, a lifting control frame 19, a second electric push rod 20, a sliding adjustment frame 21, a limit adjustment frame 22, a guide plate 23, a fixed plate body 24 and a third electric push rod 25. The mounting cross plate 18 is symmetrically fixedly installed inside the two ends of the lifting control frame 19, and the second electric push rod 17 is symmetrically fixedly installed on the mounting cross plate 18. The driving end of the second electric push rod 17 is fixedly connected to the upper end of the sliding adjustment frame 21. The second electric push rods 20 are evenly distributed on the lifting control frame. The bottom of both ends of the sliding adjustment frame 21, and the driving end of the second electric push rod 20 is fixedly connected to the bottom of the lifting control frame 19, the limit adjustment frames 22 are symmetrically arranged at the bottom of both ends of the sliding adjustment frame 21, and the upper end of the limit adjustment frame 22 is slidably connected to the bottom of the sliding adjustment frame 21, the guide plate 23 is fixedly connected to the two ends of the limit adjustment frame 22, and the third electric push rod 25 is symmetrically fixedly installed on the side end of the sliding adjustment frame 21 through the fixed plate body 24, and the distance between the two limit adjustment frames 22 can be adjusted and controlled by the third electric push rod 25.
第一铺设调节装置1包括第四电动推杆26、连接支撑横板27、夹持框28、第五电动推杆29和夹持挤压板30,第四电动推杆26均匀固定安装在连接支撑横板27上,夹持框28固定连接在第四电动推杆26的驱动端,第五电动推杆29均匀固定安装在夹持框28上,且夹持挤压板30位于夹持框28的内侧,第五电动推杆29的驱动端与夹持挤压板30的内侧固定连接,通过将本设备放置在轨道上,然后启动第四电动推杆26使得夹持框28向下移动,使得需要固定连接的轨道中部位于夹持框28中,然后同步的启动第五电动推杆29使得夹持框28内部两侧的夹持挤压板30同步的对夹持框28中的轨道夹持,然后通过第四电动推杆26将夹持框28以及夹持框28中夹持固定的轨道升起一定的高度,从而可以将需要对接固定的轨道端头之间连接,起到辅助安装的作用,使得安装对接固定省时省力精准。The first laying adjustment device 1 includes a fourth electric push rod 26, a connecting support cross plate 27, a clamping frame 28, a fifth electric push rod 29 and a clamping and extruding plate 30. The fourth electric push rod 26 is evenly fixedly installed on the connecting support cross plate 27, the clamping frame 28 is fixedly connected to the driving end of the fourth electric push rod 26, the fifth electric push rod 29 is evenly fixedly installed on the clamping frame 28, and the clamping and extruding plate 30 is located on the inner side of the clamping frame 28. The driving end of the fifth electric push rod 29 is fixedly connected to the inner side of the clamping and extruding plate 30. By placing the device on the track, Then start the fourth electric push rod 26 to move the clamping frame 28 downward so that the middle of the track to be fixedly connected is located in the clamping frame 28, and then start the fifth electric push rod 29 synchronously so that the clamping and extrusion plates 30 on both sides of the clamping frame 28 synchronously clamp the track in the clamping frame 28, and then raise the clamping frame 28 and the track clamped and fixed in the clamping frame 28 to a certain height through the fourth electric push rod 26, so that the ends of the tracks to be docked and fixed can be connected, which plays a role in auxiliary installation, making the installation, docking and fixing time-saving, labor-saving and accurate.
滑动调节框21滑动卡接在限位框架5上,起到限位的作用。The sliding adjustment frame 21 is slidably connected to the limiting frame 5 to play a limiting role.
第二电动推杆20固定安装在限位框架5上,起到固定的作用。The second electric push rod 20 is fixedly mounted on the limiting frame 5 to play a fixing role.
导向板23呈45°倾斜设置,起到导向居中的作用。The guide plate 23 is inclined at 45 degrees to guide the center.
连接支撑横板27固定连接在滑动调节框21的侧端,起到固定连接的作用。The connecting support horizontal plate 27 is fixedly connected to the side end of the sliding adjustment frame 21 to play a role of fixed connection.
本实施例在实施时,将本设备放置在指定的位置,并且使得对称分布的限位调节框22罩在铺设摆放的轨道上,并且通过启动第二电动推杆20可以控制升降控制框架19升降调节使用的位置,然后通过启动第二电动推杆17可以控制使得滑动调节框21沿着限位框架5升降调节使用的位置,从而使得对称使用的限位调节框22使用的位置进行升降调节,使得对称设置的限位调节框22可以将铺设的轨道上部进行限位罩住,然后启动电动机15,通过电动机15带动一个第二驱动轮11转动,转动的第二驱动轮11可以带动一个移动轮12转动,并且第二驱动轮11通过第二同步带10和第一同步带7可以使得相邻的第二驱动轮11和第一驱动轮6转动,并且转动的第一驱动轮6可以带动同步转动杆14转动,从而使得两侧的第一驱动轮6和第二驱动轮11同步的转动,从而使得各个移动轮12同步的转动,同步转动的移动轮12即可使得支撑架8移动,使得本设备移动,移动的过程中通过限位调节框22端头设置的导向板23可以使得铺设放置的轨道居中导向的进入至限位调节框22中,从而对称分布移动的限位调节框22可以将对称放置铺设的各个轨道纠偏调节位置,使得本设备移动经过后铺设的各个轨道板水平,并且相邻之间平行,分便对铺设的轨道进行快速的铺设和调节;When implementing this embodiment, the device is placed at a designated position, and the symmetrically distributed limit adjustment frames 22 are covered on the laid track, and the lifting control frame 19 can be controlled to be lifted and adjusted to a position by starting the second electric push rod 20, and then the sliding adjustment frame 21 can be controlled to be lifted and adjusted along the limit frame 5 by starting the second electric push rod 17, so that the position of the symmetrically used limit adjustment frame 22 is lifted and adjusted, so that the symmetrically set limit adjustment frame 22 can limit and cover the upper part of the laid track, and then the motor 15 is started, and a second driving wheel 11 is driven to rotate by the motor 15, and the rotating second driving wheel 11 can drive a moving wheel 12 to rotate, and the second driving wheel 11 is driven by the second synchronous belt 10 and the first The synchronous belt 7 can make the adjacent second driving wheel 11 and the first driving wheel 6 rotate, and the rotating first driving wheel 6 can drive the synchronous rotating rod 14 to rotate, so that the first driving wheel 6 and the second driving wheel 11 on both sides rotate synchronously, so that each moving wheel 12 rotates synchronously, and the synchronously rotating moving wheels 12 can move the support frame 8, so that the device moves. During the movement, the guide plate 23 set at the end of the limit adjustment frame 22 can guide the laid track to enter the limit adjustment frame 22 in the center, so that the symmetrically distributed moving limit adjustment frame 22 can correct and adjust the position of each symmetrically laid track, so that each track plate laid after the device moves is horizontal and parallel to each other, so that the laid track can be quickly laid and adjusted;
当轨道铺设完毕需要将端头固定连接时,同步使用多个本设备,通过将本设备放置在轨道上,然后启动第四电动推杆26使得夹持框28向下移动,使得需要固定连接的轨道中部位于夹持框28中,然后同步的启动第五电动推杆29使得夹持框28内部两侧的夹持挤压板30同步的对夹持框28中的轨道夹持,然后通过第四电动推杆26将夹持框28以及夹持框28中夹持固定的轨道升起一定的高度,从而可以将需要对接固定的轨道端头之间连接,起到辅助安装的作用,使得安装对接固定省时省力精准。When the track is laid and the ends need to be fixedly connected, multiple devices of the present invention are used synchronously. The devices are placed on the track and the fourth electric push rod 26 is started to move the clamping frame 28 downward so that the middle of the track that needs to be fixedly connected is located in the clamping frame 28. The fifth electric push rod 29 is then started synchronously so that the clamping and squeezing plates 30 on both sides of the clamping frame 28 synchronously clamp the track in the clamping frame 28. The clamping frame 28 and the track clamped and fixed in the clamping frame 28 are then raised to a certain height by the fourth electric push rod 26, so that the ends of the tracks that need to be docked and fixed can be connected, thereby assisting the installation and making the installation, docking and fixing time-saving, labor-saving and accurate.
实施例2Example 2
在实施例1的基础上,如图8所示,滑动调节框21的侧端设置有刻度线31。On the basis of the first embodiment, as shown in FIG. 8 , a scale line 31 is provided on the side end of the sliding adjustment frame 21 .
本实施例在实施时,通过设置的刻度线31可以对两个限位调节框22的位置进行精准的调节,使得两个限位调节框22之间的间距调节精准,使得铺设的轨道之间的间距精准,方便对接安装使用。When this embodiment is implemented, the positions of the two limit adjustment frames 22 can be accurately adjusted through the set scale lines 31, so that the distance between the two limit adjustment frames 22 can be accurately adjusted, and the distance between the laid tracks can be accurate, which is convenient for docking and installation.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410392744.6A CN118167032A (en) | 2024-04-02 | 2024-04-02 | A method for constructing four-story urban rail transit stations based on innovative concepts |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202410392744.6A CN118167032A (en) | 2024-04-02 | 2024-04-02 | A method for constructing four-story urban rail transit stations based on innovative concepts |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN118167032A true CN118167032A (en) | 2024-06-11 |
Family
ID=91348592
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202410392744.6A Pending CN118167032A (en) | 2024-04-02 | 2024-04-02 | A method for constructing four-story urban rail transit stations based on innovative concepts |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN118167032A (en) |
-
2024
- 2024-04-02 CN CN202410392744.6A patent/CN118167032A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102296971B (en) | A lining method for a tunnel emergency avoidance zone and a tunnel lining trolley | |
| CN108972864A (en) | Building concrete wallboard prefabricated components production line | |
| WO2019080824A1 (en) | Novel track laying machine for urban rail transport project and construction method therefor | |
| CN112918992B (en) | A concrete precast part overturning bidirectional conveying system | |
| CN107956487B (en) | Automatic inner formwork equipment suitable for pipe gallery construction and construction method thereof | |
| CN112323644B (en) | Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method | |
| CN206092022U (en) | Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling | |
| CN107060823B (en) | Non-dismantling trolley for tunnel anchor section secondary lining concrete construction | |
| CN108789810A (en) | Building concrete wallboard prefabricated components production line | |
| CN112610242A (en) | Integrative platform truck of cloth is hung to big section reinforcing bar of railway tunnel | |
| CN111038940A (en) | Rail mounted is used for hoist and mount traction system of transportation | |
| CN205894099U (en) | Be applied to underground pipe gallery's portable sliding template device | |
| CN103161334B (en) | Overhead parking space capable of accommodating vehicles above green belt and being hidden in non-work state | |
| CN103742160A (en) | Mounting device for upper structure in tunnel | |
| CN113463683A (en) | Double-pipe gallery slip form trolley and double-pipe gallery construction method | |
| CN110777681B (en) | Whole hole Liang Huan sets of equipment | |
| CN118167032A (en) | A method for constructing four-story urban rail transit stations based on innovative concepts | |
| CN109355983B (en) | Trackless construction method for urban rail | |
| CN109281320B (en) | Shotcrete slip film construction device and method for construction of foundation pit side wall leveling layer | |
| CN209144821U (en) | Gunite concrete synovial membrane constructing device for foundation pit side wall construction of leveling blanket | |
| CN211221301U (en) | Prefabricated slidable formwork system for concrete bridge deck | |
| CN103806374A (en) | Assembled road steel bridge overall track erection and push system and process | |
| CN207536659U (en) | A kind of novel piping lane movement equipment | |
| CN115522749B (en) | A track construction platform used for binding reinforcement bars on the top slab of prefabricated box beams | |
| CN202730648U (en) | Rotary lifting maintenance platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Country or region after: China Address after: 250200 Shandong Province Jinan City Zhangqiu District Shengjing High-tech Industrial Park Applicant after: Shandong Jinyue Transportation Development Group Co.,Ltd. Address before: 250200 Shandong Province Jinan City Zhangqiu District Shengjing High-tech Industrial Park Applicant before: JINAN KINGYUE HIGHWAY ENGINEERING Co.,Ltd. Country or region before: China |