CN117000924A - An online production process for forged steel balls with high hardness and high attack toughness - Google Patents

An online production process for forged steel balls with high hardness and high attack toughness Download PDF

Info

Publication number
CN117000924A
CN117000924A CN202310958308.6A CN202310958308A CN117000924A CN 117000924 A CN117000924 A CN 117000924A CN 202310958308 A CN202310958308 A CN 202310958308A CN 117000924 A CN117000924 A CN 117000924A
Authority
CN
China
Prior art keywords
forging
ball
steel
hardness
toughness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310958308.6A
Other languages
Chinese (zh)
Inventor
贾伯山
王炳生
于晓刚
姜磊
曹晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhao Jin New Wear Resistant Material Co ltd
Original Assignee
Shandong Zhao Jin New Wear Resistant Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhao Jin New Wear Resistant Material Co ltd filed Critical Shandong Zhao Jin New Wear Resistant Material Co ltd
Priority to CN202310958308.6A priority Critical patent/CN117000924A/en
Publication of CN117000924A publication Critical patent/CN117000924A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/08Cleaning involving contact with liquid the liquid having chemical or dissolving effect
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/10Cleaning involving contact with liquid with additional treatment of the liquid or of the object being cleaned, e.g. by heat, by electricity or by vibration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/02Die forging; Trimming by making use of special dies ; Punching during forging
    • B21J5/025Closed die forging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/02Making machine elements balls, rolls, or rollers, e.g. for bearings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B27/00Other grinding machines or devices
    • B24B27/033Other grinding machines or devices for grinding a surface for cleaning purposes, e.g. for descaling or for grinding off flaws in the surface
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/36Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for balls; for rollers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Forging (AREA)

Abstract

本发明公开了一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺,涉及钢球锻造生产技术领域,为解决现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题。所述步骤一:首先准备原材料,钢球的主要原材料是碳素钢、合金钢、不锈钢金属材料,材料经过加工,将其变成符合要求的钢棒;步骤二:钢棒经过切削加工,将其削成一定长度的小块,这些小块进一步加工,将其变成符合要求的钢球;步骤三:经过切削加工后的小块经过热处理,热处理改善钢球的性能,提高其硬度、强度和韧性。

The invention discloses an online production process for forging steel balls with high hardness and high attack toughness, and relates to the technical field of steel ball forging production. In order to solve the problem that the steel ball forging device in the prior art uses a mold when performing hot forging operations. To realize hot pressing shaping, because it is round, if only one side is hot pressed, it is easy for the surface of other end faces to be uneven and rounded, thus affecting the molding quality. The step one: first prepare the raw materials. The main raw materials of the steel ball are carbon steel, alloy steel, and stainless steel metal materials. The materials are processed and turned into steel rods that meet the requirements; step two: the steel rods are cut and processed. It is cut into small pieces of a certain length, and these small pieces are further processed to turn them into steel balls that meet the requirements; Step 3: The cut small pieces are heat treated, and the heat treatment improves the performance of the steel ball and increases its hardness and strength. and resilience.

Description

一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺An online production process for forged steel balls with high hardness and high attack toughness

技术领域Technical field

本发明涉及钢球锻造生产技术领域,具体为一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺。The invention relates to the technical field of steel ball forging production, and is specifically an online production process for forging steel balls with high hardness and high attack toughness.

背景技术Background technique

钢球根据生产加工工艺分为研磨钢球,锻造钢球,铸造钢球。根据加工材料分为轴承钢球,不锈钢球,碳钢球,铜轴承钢球球合金球等,其中轴承钢球为工业的重要基础零部件,合金钢球是以碳、铬、锰、钼等为主要添加金属元素,并通过锻打、旋压、轧制和铸造等方式生成的一种球状形铁合金耐磨体;Steel balls are divided into grinding steel balls, forged steel balls and cast steel balls according to the production and processing technology. According to the processing materials, they are divided into bearing steel balls, stainless steel balls, carbon steel balls, copper bearing steel balls, alloy balls, etc. Among them, bearing steel balls are important basic parts of the industry. Alloy steel balls are made of carbon, chromium, manganese, molybdenum, etc. It is a spherical iron alloy wear-resistant body that mainly adds metal elements and is produced by forging, spinning, rolling and casting;

例如公告号为CN108188316A的中国授权专利(一种锻造钢球的制造设备系统及生产工艺):包括数控模锻锤;所述数控模锻锤包括锤头、机身、滑块、上砧座、下砧座、钢球模具;所述上砧座和下砧座分别安装在锤头和机身上;所述钢球模具包括上卡胎、下卡胎、上模芯、下模芯;所述上卡胎和下卡胎分别安装在上砧座和下砧座上;所述上模芯和下模芯安装在上卡胎和下卡胎上;在所述下卡胎和下模芯的中心开有通孔,在所述通孔内安装有所述出料杆和顶料杆;所述钢球模具为闭式模锻钢球模具,生产线主要设备包括加热炉、棒料剪切机、移载装置、数控模锻锤、滚圆机和等温淬火机,由数控模锻锤和该生产线设备生产的锻造钢球具有钢球圆度好、钢球质量高、生产效率高等优点。For example, the Chinese authorized patent with announcement number CN108188316A (a manufacturing equipment system and production process for forging steel balls) includes a CNC die forging hammer; the CNC die forging hammer includes a hammer head, a body, a slider, an upper anvil, The lower anvil and the steel ball mold; the upper anvil and the lower anvil are respectively installed on the hammer head and the fuselage; the steel ball mold includes an upper tire clamp, a lower tire clamp, an upper mold core and a lower mold core; The upper tire clamp and the lower tire clamp are installed on the upper anvil and the lower anvil respectively; the upper mold core and the lower mold core are installed on the upper tire clamp and the lower tire clamp; the lower tire clamp and the lower mold core There is a through hole in the center, and the discharge rod and the ejector rod are installed in the through hole; the steel ball mold is a closed die forging steel ball mold, and the main equipment of the production line includes a heating furnace, bar shearing machine, transfer device, CNC die forging hammer, rolling machine and isothermal quenching machine. The forged steel balls produced by CNC die forging hammer and this production line equipment have the advantages of good steel ball roundness, high steel ball quality and high production efficiency.

但是上述现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题;因此,不满足现有的需求,对此我们提出了一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺。However, when the steel ball forging device in the above-mentioned prior art performs hot forging operations, it uses a mold to achieve hot pressing shaping. Since it is round, only one side of the ball forging device is hot pressed, and the other end faces are prone to uneven and rounded surfaces. situation, thereby affecting its forming quality; therefore, it does not meet the existing needs. For this reason, we have proposed an online production process for forged steel balls with high hardness and high attack toughness.

发明内容Contents of the invention

本发明的目的在于提供一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺,以解决上述背景技术中提出的现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题。The object of the present invention is to provide an online production process for forging steel balls with high hardness and high attack toughness, so as to solve the problem that the steel ball forging device in the prior art proposed in the above background technology uses a mold during the hot forging operation. To realize hot pressing shaping, because it is round, if only one side is hot pressed, it is easy for the surface of other end faces to be uneven and rounded, thus affecting the molding quality.

为实现上述目的,本发明提供如下技术方案:一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺,包括以下步骤:In order to achieve the above object, the present invention provides the following technical solution: an online production process for forged steel balls with high hardness and high attack toughness, including the following steps:

步骤一:首先准备原材料,钢球的主要原材料是碳素钢、合金钢、不锈钢金属材料,材料经过加工,将其变成符合要求的钢棒;Step 1: First prepare the raw materials. The main raw materials of the steel ball are carbon steel, alloy steel, and stainless steel metal materials. The materials are processed and turned into steel rods that meet the requirements;

步骤二:钢棒经过切削加工,将其削成一定长度的小块,这些小块进一步加工,将其变成符合要求的钢球;Step 2: The steel rod is cut into small pieces of a certain length, and these small pieces are further processed to turn them into steel balls that meet the requirements;

步骤三:经过切削加工后的小块经过热处理,热处理改善钢球的性能,提高其硬度、强度和韧性,将球装入热处理炉内加以渗碳后淬火再回火使球具有渗碳层及硬度,韧性和压碎负荷;Step 3: The small pieces after cutting are heat treated. The heat treatment improves the performance of the steel ball and increases its hardness, strength and toughness. The ball is put into a heat treatment furnace, carburized, quenched and then tempered to make the ball have a carburized layer and Hardness, toughness and crushing load;

步骤四:经过热处理后的小块进行球形加工,球形加工将小块加工成符合要求的钢球,通过热锻对球形进行加工,热锻将钢材加热至高温,然后使用锤击或压力将其塑形,之后进行研磨,研磨机内的砂轮圆板将热处理球胚加压磨削,以去除球表面的黑色氧化层及修正球的精度;Step 4: After heat treatment, the small pieces are processed into spherical shapes. In spherical processing, the small pieces are processed into steel balls that meet the requirements. The spherical shape is processed through hot forging. Hot forging heats the steel to a high temperature, and then uses hammering or pressure to crush it. Shaping and then grinding, the grinding wheel disc in the grinding machine presses and grinds the heat-treated ball embryo to remove the black oxide layer on the ball surface and correct the accuracy of the ball;

步骤五:经过球形加工后的钢球进行抛光处理,抛光处理提高钢球的表面光洁度和精度,将研磨球胚在精研机内精研磨,使球达到成品所需要的精度和光洁度,之后将球倒入抛光滚桶内转动并用抛光清洗剂加水清洗使球面清洁光亮;Step 5: The spherically processed steel ball is polished to improve the surface finish and precision of the steel ball. The ground ball embryo is finely ground in a precision grinding machine to make the ball reach the precision and finish required for the finished product. Pour the ball into the polishing drum, rotate it and clean it with polishing cleaning agent and water to make the surface of the ball clean and bright;

还包括:锻压台,所述锻压台底部的两侧均设置有滑座,所诉锻压台的上表面设置有固定台,所述固定台上设置有固定座,所述固定台的上表面设置有连接槽,且所述连接槽设置有六个。It also includes: a forging platform, with sliding seats provided on both sides of the bottom of the forging platform, a fixed platform provided on the upper surface of the forging platform, a fixed seat provided on the fixed platform, and a fixed seat provided on the upper surface of the fixed platform. There are connecting slots, and there are six connecting slots.

优选的,所述滑座的内部设置有滑槽,所述滑座上表面的前后端均设置有挡板,且所述锻压台通过滑槽与滑座滑动连接,所述滑座的两侧均设置有底座。Preferably, a chute is provided inside the slide seat, and baffles are provided at the front and rear ends of the upper surface of the slide seat, and the forging table is slidably connected to the slide seat through the chute, and both sides of the slide seat are All are provided with bases.

优选的,所述底座上表面的前后端均设置有限位杆,所述限位杆的顶部安装有顶座,所述限位杆上安装有锻压板,所述底座的上表面、顶座的下表面和锻压板的上下端面均设置有限位套。Preferably, the front and rear ends of the upper surface of the base are provided with limit rods, the top of the limit rod is equipped with a top seat, the limit rod is equipped with a forged plate, and the upper surface of the base and the top seat are Limit sleeves are provided on the lower surface and the upper and lower end surfaces of the forged plate.

优选的,所述顶座上表面的四周均设置有顶套,所述顶座的上表面设置有气缸,且所述气缸设置有三个,所述顶座的下表面安装有气动伸缩杆,且所述气动伸缩杆设置有三个,所述锻压板的下表面设置有模具座,所述模具座的底部安装有第一锻压模具。Preferably, top sleeves are provided around the upper surface of the top base, air cylinders are provided on the upper surface of the top base, and there are three cylinders, and a pneumatic telescopic rod is installed on the lower surface of the top base, and There are three pneumatic telescopic rods, a mold seat is provided on the lower surface of the forging plate, and a first forging die is installed on the bottom of the mold seat.

优选的,所述固定座的前后端均设置有连接块,且所述连接块设置有四个,所述连接块上安装有第一固定板,所述固定座上设置有第二锻压模具。Preferably, the front and rear ends of the fixed base are provided with connecting blocks, and there are four connecting blocks. A first fixing plate is installed on the connecting block, and a second forging die is installed on the fixed base.

优选的,所述第二锻压模具上设置有第一限位块,且所述第一限位块设置有两个,两个所述第一限位块上均设置有第二限位块,所述第一限位块的前后端均设置有第二固定板。Preferably, the second forging die is provided with a first limiting block, and there are two first limiting blocks, and the two first limiting blocks are each provided with a second limiting block, The front and rear ends of the first limiting block are both provided with second fixing plates.

优选的,所述第二锻压模具的两侧端面均安装有电机,所述第二限位块的内壁上设置有第一移动带。Preferably, motors are installed on both sides of the second forging die, and a first moving belt is provided on the inner wall of the second limiting block.

优选的,所述锻压台的后端设置有清理机构,所述清理机构的顶部设置有吹扫机,所述吹扫机的前端面设置有吹扫口。Preferably, the rear end of the forging table is provided with a cleaning mechanism, the top of the cleaning mechanism is provided with a purging machine, and the front end of the purging machine is provided with a purging port.

优选的,所述清理机构的前端面设置有第二移动带,所述第二移动带上设置有安装杆,所述安装杆上设置有清扫杆。Preferably, the front end surface of the cleaning mechanism is provided with a second moving belt, the second moving belt is provided with an installation rod, and the installation rod is provided with a cleaning rod.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

1、本发明通过在第二锻压模具的第二限位块的内壁上设置第一移动带,利用电机驱动第一移动带进行左右位移,当进行锻压时,气缸驱动气动伸缩杆使得锻压板向下进行锻压,同时第一移动带带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压,并且在锻压时其表面产生的碎渣会被清理机构上的清扫杆和吹扫口吹落,避免残渣在球体表面影响锻压质量,解决了现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题,在锻压将球装入热处理炉内加以渗碳后淬火再回火使球具有渗碳层及硬度,韧性和压碎负荷。1. In the present invention, a first moving belt is provided on the inner wall of the second limiting block of the second forging die, and a motor is used to drive the first moving belt to move left and right. When forging is performed, the cylinder drives the pneumatic telescopic rod to move the forging plate toward the forging plate. Forging is carried out while the first moving belt drives the ball to rotate, so that during forging, the surface of the ball can be evenly pressed, and the debris generated on the surface during forging will be cleaned by the cleaning rod on the mechanism. and blowing off the purge port to prevent residue from affecting the forging quality on the surface of the ball, and solve the problem that the steel ball forging device in the prior art uses the mold to achieve hot press shaping during the hot forging operation. Since it is round, a single When one side is hot-pressed, the surface of the other end face may easily become uneven and rounded, thus affecting its molding quality. After forging, the ball is loaded into a heat treatment furnace, carburized, quenched and then tempered to make the ball have a carburized layer and Hardness, toughness and crushing load.

2、通过设置滑座使得锻压台可以进行位移,锻压结束后,方便进行取料操作,同时固定台上设置了多个连接槽,可以通过连接槽将固定座安装固定在锻压台上,且方便多个锻压模具的放置与安装,同时方便模具位置的摆放。2. By setting the sliding seat, the forging table can be displaced. After the forging is completed, it is convenient to unload the material. At the same time, there are multiple connecting grooves on the fixed table. The fixed seat can be installed and fixed on the forging table through the connecting grooves, which is convenient and convenient. The placement and installation of multiple forging molds also facilitates the positioning of the molds.

3、通过锻压后进行研磨,利用研磨机内的砂轮圆板将热处理球胚加压磨削,以去除球表面的黑色氧化层及修正球的精度,之后将研磨球胚在精研机内精研磨,使球达到成品所需要的精度和光洁度,之后将球倒入抛光滚桶内转动并用抛光清洗剂加水清洗使球面清洁光亮,从而保证钢球的成品质量。3. After forging and grinding, use the grinding wheel disc in the grinding machine to grind the heat-treated ball embryo under pressure to remove the black oxide layer on the ball surface and correct the accuracy of the ball. After that, the ground ball embryo is refined in the grinding machine. Grind the ball to the required precision and smoothness of the finished product, then pour the ball into a polishing barrel, rotate it, and use polishing detergent and water to clean the ball surface to make the ball surface clean and bright, thereby ensuring the quality of the finished steel ball.

附图说明Description of the drawings

图1为本发明的钢球热锻油压装置整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the steel ball hot forging hydraulic device of the present invention;

图2为本发明的钢球热锻油压装置局部结构放大示意图;Figure 2 is an enlarged schematic diagram of the partial structure of the steel ball hot forging hydraulic device of the present invention;

图3为本发明的钢球热锻油压固定模具座结构放大示意图;Figure 3 is an enlarged schematic diagram of the structure of the steel ball hot forging hydraulically fixed mold seat of the present invention;

图4为本发明的热锻清理机构结构放大示意图;Figure 4 is an enlarged schematic diagram of the structure of the hot forging cleaning mechanism of the present invention;

图5为本发明的钢球热锻生产步骤示意图;Figure 5 is a schematic diagram of the production steps of hot forging of steel balls according to the present invention;

图中:1、底座;2、顶座;3、锻压板;4、气缸;5、顶套;6、限位杆;7、限位套;8、气动伸缩杆;9、模具座;10、第一锻压模具;11、滑座;12、滑槽;13、挡板;14、锻压台;15、固定台;16、连接槽;17、固定座;18、第二锻压模具;19、连接块;20、第一固定板;21、第一限位块;22、第二限位块;23、电机;24、第二固定板;25、第一移动带;26、清理机构;27、吹扫机;28、吹扫口;29、第二移动带;30、安装杆;31、清扫杆。In the picture: 1. Base; 2. Top seat; 3. Forged plate; 4. Cylinder; 5. Top sleeve; 6. Limit rod; 7. Limit sleeve; 8. Pneumatic telescopic rod; 9. Mold seat; 10 , the first forging die; 11. sliding seat; 12. chute; 13. baffle; 14. forging table; 15. fixed table; 16. connecting groove; 17. fixed seat; 18. second forging die; 19. Connecting block; 20. First fixed plate; 21. First limiting block; 22. Second limiting block; 23. Motor; 24. Second fixed plate; 25. First moving belt; 26. Cleaning mechanism; 27 , purge machine; 28, purge port; 29, second moving belt; 30, installation rod; 31, cleaning rod.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them.

请参阅图1-5,本发明提供的一种实施例:一种在线式高硬度、高攻击韧性的锻造钢球的生产工艺,包括以下步骤:Please refer to Figures 1-5, an embodiment provided by the present invention: an online production process for forged steel balls with high hardness and high attack toughness, including the following steps:

步骤一:首先准备原材料,钢球的主要原材料是碳素钢、合金钢、不锈钢金属材料,材料经过加工,将其变成符合要求的钢棒;Step 1: First prepare the raw materials. The main raw materials of the steel ball are carbon steel, alloy steel, and stainless steel metal materials. The materials are processed and turned into steel rods that meet the requirements;

步骤二:钢棒经过切削加工,将其削成一定长度的小块,这些小块进一步加工,将其变成符合要求的钢球;Step 2: The steel rod is cut into small pieces of a certain length, and these small pieces are further processed to turn them into steel balls that meet the requirements;

步骤三:经过切削加工后的小块经过热处理,热处理改善钢球的性能,提高其硬度、强度和韧性,将球装入热处理炉内加以渗碳后淬火再回火使球具有渗碳层及硬度,韧性和压碎负荷;Step 3: The small pieces after cutting are heat treated. The heat treatment improves the performance of the steel ball and increases its hardness, strength and toughness. The ball is put into a heat treatment furnace, carburized, quenched and then tempered to make the ball have a carburized layer and Hardness, toughness and crushing load;

步骤四:经过热处理后的小块进行球形加工,球形加工将小块加工成符合要求的钢球,通过热锻对球形进行加工,热锻将钢材加热至高温,然后使用锤击或压力将其塑形,之后进行研磨,研磨机内的砂轮圆板将热处理球胚加压磨削,以去除球表面的黑色氧化层及修正球的精度;Step 4: After heat treatment, the small pieces are processed into spherical shapes. In spherical processing, the small pieces are processed into steel balls that meet the requirements. The spherical shape is processed through hot forging. Hot forging heats the steel to a high temperature, and then uses hammering or pressure to crush it. Shaping and then grinding, the grinding wheel disc in the grinding machine presses and grinds the heat-treated ball embryo to remove the black oxide layer on the ball surface and correct the accuracy of the ball;

步骤五:经过球形加工后的钢球进行抛光处理,抛光处理提高钢球的表面光洁度和精度,将研磨球胚在精研机内精研磨,使球达到成品所需要的精度和光洁度,之后将球倒入抛光滚桶内转动并用抛光清洗剂加水清洗使球面清洁光亮;Step 5: The spherically processed steel ball is polished to improve the surface finish and precision of the steel ball. The ground ball embryo is finely ground in a precision grinding machine to make the ball reach the precision and finish required for the finished product. Pour the ball into the polishing drum, rotate it and clean it with polishing cleaning agent and water to make the surface of the ball clean and bright;

还包括:锻压台14,锻压台14底部的两侧均设置有滑座11,所诉锻压台14的上表面设置有固定台15,固定台15上设置有固定座17,固定台15的上表面设置有连接槽16,且连接槽16设置有六个,利用电机23驱动第一移动带25进行左右位移,当进行锻压时,气缸4驱动气动伸缩杆8使得锻压板3向下进行锻压,同时第一移动带25带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压,并且在锻压时其表面产生的碎渣会被清理机构26上的清扫杆31和吹扫口28吹落,避免残渣在球体表面影响锻压质量,解决了现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题。It also includes: a forging table 14. Slide seats 11 are provided on both sides of the bottom of the forging table 14. A fixed table 15 is provided on the upper surface of the forging table 14. A fixed base 17 is provided on the fixed table 15. The upper surface of the fixed table 15 is The surface is provided with connecting grooves 16, and there are six connecting grooves 16. The motor 23 is used to drive the first moving belt 25 to move left and right. When forging is performed, the cylinder 4 drives the pneumatic telescopic rod 8 to cause the forging plate 3 to be forged downwards. At the same time, the first moving belt 25 drives the ball to rotate, so that during forging, uniform pressure can be applied to the surface of the ball, and the debris generated on the surface during forging will be removed by the cleaning rod 31 and 31 of the cleaning mechanism 26 The purge port 28 is blown off to prevent residue from affecting the forging quality on the surface of the ball. This solves the problem that the steel ball forging device in the prior art uses a mold to achieve hot press shaping during the hot forging operation. Since it is round and single, When one side is hot-pressed, it is easy for the surface of the other end face to be uneven and rounded, thus affecting its molding quality.

请参阅图1和图2,滑座11的内部设置有滑槽12,滑座11上表面的前后端均设置有挡板13,且锻压台14通过滑槽12与滑座11滑动连接,滑座11的两侧均设置有底座1,使得锻压台14可以进行位移,锻压结束后,方便进行取料操作,同时固定台15上的多个连接槽16,可以通过连接槽16将固定座17安装固定在锻压台14上,且方便多个锻压模具的放置与安装,同时方便模具位置的摆放。Please refer to Figures 1 and 2. A slide groove 12 is provided inside the slide seat 11. Baffles 13 are provided at the front and rear ends of the upper surface of the slide seat 11, and the forging table 14 is slidingly connected to the slide seat 11 through the slide groove 12. Bases 1 are provided on both sides of the base 11 so that the forging table 14 can be displaced. After the forging is completed, it is convenient to carry out the material removal operation. At the same time, multiple connecting grooves 16 on the fixed table 15 can be used to secure the fixed base 17 through the connecting grooves 16. It is installed and fixed on the forging table 14, and facilitates the placement and installation of multiple forging dies, and also facilitates the positioning of the dies.

请参阅图1,底座1上表面的前后端均设置有限位杆6,限位杆6的顶部安装有顶座2,限位杆6上安装有锻压板3,底座1的上表面、顶座2的下表面和锻压板3的上下端面均设置有限位套7,通过锻压后进行研磨,利用研磨机内的砂轮圆板将热处理球胚加压磨削,以去除球表面的黑色氧化层及修正球的精度,之后将研磨球胚在精研机内精研磨,使球达到成品所需要的精度和光洁度,之后将球倒入抛光滚桶内转动并用抛光清洗剂加水清洗使球面清洁光亮,从而保证钢球的成品质量。Please refer to Figure 1. Limiting rods 6 are provided at the front and rear ends of the upper surface of the base 1. A top seat 2 is installed on the top of the limiting rod 6. A forged plate 3 is installed on the limiting rod 6. The upper surface of the base 1 and the top seat The lower surface of 2 and the upper and lower end surfaces of the forging plate 3 are provided with limit sleeves 7, which are ground after forging. The heat-treated ball blank is pressure-grinded using the grinding wheel disc in the grinding machine to remove the black oxide layer and Correct the accuracy of the ball, and then finely grind the ball embryo in a grinding machine to make the ball reach the accuracy and smoothness required for the finished product. Then pour the ball into a polishing drum and rotate it, and then use polishing detergent and water to clean the ball surface to make the ball surface clean and bright. Thereby ensuring the finished product quality of steel balls.

请参阅图1,顶座2上表面的四周均设置有顶套5,顶座2的上表面设置有气缸4,且气缸4设置有三个,顶座2的下表面安装有气动伸缩杆8,且气动伸缩杆8设置有三个,锻压板3的下表面设置有模具座9,模具座9的底部安装有第一锻压模具10,利用电机23驱动第一移动带25进行左右位移,当进行锻压时,气缸4驱动气动伸缩杆8使得锻压板3向下进行锻压,同时第一移动带25带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压,并且在锻压时其表面产生的碎渣会被清理机构26上的清扫杆31和吹扫口28吹落,避免残渣在球体表面影响锻压质量,解决了现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题,通过热锻对球形进行加工,热锻将钢材加热至高温,然后使用锤击或压力将其塑形,之后进行研磨,研磨机内的砂轮圆板将热处理球胚加压磨削,以去除球表面的黑色氧化层及修正球的精度。Please refer to Figure 1. Top sleeves 5 are provided around the upper surface of the top base 2. There are three cylinders 4 installed on the upper surface of the top base 2. A pneumatic telescopic rod 8 is installed on the lower surface of the top base 2. There are three pneumatic telescopic rods 8. A mold base 9 is provided on the lower surface of the forging plate 3. A first forging die 10 is installed at the bottom of the mold base 9. The motor 23 is used to drive the first moving belt 25 to move left and right. When forging is performed, When forging, the cylinder 4 drives the pneumatic telescopic rod 8 to make the forging plate 3 downward for forging, and at the same time, the first moving belt 25 drives the ball to rotate, so that during forging, it can ensure that the surface of the ball can be evenly pressed, and during forging The debris generated on the surface will be blown off by the cleaning rod 31 and the purge port 28 on the cleaning mechanism 26 to prevent the debris from affecting the forging quality on the surface of the ball, and solve the problem of the hot forging operation of the steel ball forging device in the prior art. When the mold is used to achieve hot pressing shaping, because it is round, hot pressing only one side, it is easy to have uneven and rounded surfaces on other end faces, which affects the molding quality. The spherical shape is processed through hot forging. Processing, hot forging heats the steel to a high temperature, then uses hammering or pressure to shape it, and then grinds it. The grinding wheel disc in the grinder presses and grinds the heat-treated ball blank to remove the black oxide layer on the ball surface and Correct ball accuracy.

请参阅图1和图2,固定座17的前后端均设置有连接块19,且连接块19设置有四个,连接块19上安装有第一固定板20,固定座17上设置有第二锻压模具18,利用电机23驱动第一移动带25进行左右位移,当进行锻压时,气缸4驱动气动伸缩杆8使得锻压板3向下进行锻压,同时第一移动带25带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压,并且在锻压时其表面产生的碎渣会被清理机构26上的清扫杆31和吹扫口28吹落,避免残渣在球体表面影响锻压质量,解决了现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题。Referring to Figures 1 and 2, connecting blocks 19 are provided at the front and rear ends of the fixed base 17, and there are four connecting blocks 19. A first fixing plate 20 is installed on the connecting block 19, and a second fixing plate 20 is installed on the connecting block 17. The forging die 18 uses the motor 23 to drive the first moving belt 25 to move left and right. When forging is performed, the cylinder 4 drives the pneumatic telescopic rod 8 to make the forging plate 3 downward for forging. At the same time, the first moving belt 25 drives the ball to rotate, so that During forging, it can be ensured that the surface of the sphere can be evenly pressed, and the debris generated on the surface of the sphere during forging will be blown off by the cleaning rod 31 and the purge port 28 on the cleaning mechanism 26 to prevent the residue from being left on the surface of the sphere. It affects the quality of forging and solves the problem that when the steel ball forging device in the prior art performs hot forging operations, the mold is used to achieve hot press shaping. Since it is round, only one side is hot pressed, and other end surfaces are prone to appear. The unevenness and roundness will affect the molding quality.

请参阅图1-图3,第二锻压模具18上设置有第一限位块21,且第一限位块21设置有两个,两个第一限位块21上均设置有第二限位块22,第一限位块21的前后端均设置有第二固定板24,在锻压前,将切削加工后的小块经过热处理,热处理改善钢球的性能,提高其硬度、强度和韧性,将球装入热处理炉内加以渗碳后淬火再回火使球具有渗碳层及硬度,韧性和压碎负荷。Referring to Figures 1 to 3, the second forging die 18 is provided with a first limiting block 21, and there are two first limiting blocks 21. The two first limiting blocks 21 are both provided with second limiting blocks. The front and rear ends of the position block 22 and the first limit block 21 are provided with second fixing plates 24. Before forging, the cut small pieces are heat treated. The heat treatment improves the performance of the steel ball and increases its hardness, strength and toughness. , put the ball into a heat treatment furnace, carburize, quench and then temper to make the ball have a carburized layer and hardness, toughness and crushing load.

请参阅图1-图3,第二锻压模具18的两侧端面均安装有电机23,第二限位块22的内壁上设置有第一移动带25,利用电机23驱动第一移动带25进行左右位移,当进行锻压时,气缸4驱动气动伸缩杆8使得锻压板3向下进行锻压,同时第一移动带25带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压。Please refer to Figures 1 to 3. Motors 23 are installed on both sides of the second forging die 18. A first moving belt 25 is provided on the inner wall of the second limiting block 22. The motor 23 is used to drive the first moving belt 25. When forging, the cylinder 4 drives the pneumatic telescopic rod 8 to make the forging plate 3 move downward, and at the same time, the first moving belt 25 drives the ball to rotate, so that during forging, the surface of the ball can be evenly pressed. Apply pressure.

请参阅图4,锻压台14的后端设置有清理机构26,清理机构26的顶部设置有吹扫机27,吹扫机27的前端面设置有吹扫口28,利用电机23驱动第一移动带25进行左右位移,当进行锻压时,气缸4驱动气动伸缩杆8使得锻压板3向下进行锻压,同时第一移动带25带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压,并且在锻压时其表面产生的碎渣会被清理机构26上的清扫杆31和吹扫口28吹落,避免残渣在球体表面影响锻压质量,解决了现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题。Please refer to Figure 4. The rear end of the forging table 14 is provided with a cleaning mechanism 26. The top of the cleaning mechanism 26 is provided with a purging machine 27. The front end of the purging machine 27 is provided with a purging port 28. The motor 23 is used to drive the first movement. The belt 25 moves left and right. When forging, the cylinder 4 drives the pneumatic telescopic rod 8 to make the forging plate 3 downward for forging. At the same time, the first moving belt 25 drives the ball to rotate, so that during forging, the surface of the ball can be ensured. The pressure is applied evenly, and the debris generated on the surface during forging will be blown off by the cleaning rod 31 and the purge port 28 on the cleaning mechanism 26 to prevent the debris from affecting the forging quality on the surface of the sphere and solve the problems in the prior art. When the steel ball forging device performs hot forging operations, it uses a mold to achieve hot press shaping. Since it is round, hot pressing only one side will easily cause uneven and rounded surfaces on other end faces, thus affecting its molding quality. The problem.

请参阅图4,清理机构26的前端面设置有第二移动带29,第二移动带29上设置有安装杆30,安装杆30上设置有清扫杆31,利用电机23驱动第一移动带25进行左右位移,当进行锻压时,气缸4驱动气动伸缩杆8使得锻压板3向下进行锻压,同时第一移动带25带动球体进行转动,使得在锻压时,可以保证对球体的表面能够进行均匀的施压,并且在锻压时其表面产生的碎渣会被清理机构26上的清扫杆31和吹扫口28吹落,避免残渣在球体表面影响锻压质量,解决了现有技术中的钢球锻造装置在进行热锻操作时,利用模具实现热压塑形,由于其为圆形,单一的对一面进行热压,容易出现其他端面的表面不平整圆润的情况,从而影响其成型质量的问题。Please refer to Figure 4. The front end surface of the cleaning mechanism 26 is provided with a second moving belt 29. The second moving belt 29 is provided with a mounting rod 30. The mounting rod 30 is provided with a cleaning rod 31. The motor 23 is used to drive the first moving belt 25. When forging, the cylinder 4 drives the pneumatic telescopic rod 8 to cause the forging plate 3 to be forged downwards. At the same time, the first moving belt 25 drives the ball to rotate, so that during forging, the surface of the ball can be evenly pressed. Pressure is exerted, and the debris generated on the surface during forging will be blown off by the cleaning rod 31 and the purge port 28 on the cleaning mechanism 26 to prevent the debris from affecting the forging quality on the surface of the sphere and solve the problem of steel balls in the prior art. When the forging device performs hot forging operations, it uses a mold to achieve hot press shaping. Since it is round, hot pressing only one side will easily cause the other end surfaces to be uneven and rounded, thus affecting the molding quality. .

对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments should be regarded as illustrative and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is therefore intended that all claims falling within the claims All changes within the meaning and scope of equivalent elements are included in the present invention. Any reference signs in the claims shall not be construed as limiting the claim in question.

Claims (9)

1. A production process of an online forging steel ball with high hardness and high attack toughness comprises the following steps:
step one: firstly, preparing raw materials, wherein the main raw materials of the steel ball are carbon steel, alloy steel and stainless steel metal materials, and the materials are processed into steel bars meeting the requirements;
step two: cutting the steel bar into small blocks with a certain length, and further processing the small blocks to change the small blocks into steel balls meeting the requirements;
step three: the small blocks after cutting are subjected to heat treatment, the heat treatment improves the performance of the steel ball, the hardness, the strength and the toughness of the steel ball, the ball is placed into a heat treatment furnace for carburizing, quenching and tempering, so that the ball has a carburized layer, the hardness, the toughness and the crushing load;
step four: processing the small blocks after heat treatment into steel balls meeting requirements, processing the balls through hot forging, heating the steel materials to high temperature through hot forging, shaping the steel materials by hammering or pressure, grinding the steel materials, and pressurizing and grinding the heat-treated ball blanks through a grinding wheel circular plate in a grinder to remove black oxide layers on the surfaces of the balls and correct the accuracy of the balls;
step five: polishing the ball after ball processing, improving the surface finish and precision of the ball, finely grinding the grinding ball embryo in a lapping machine to ensure that the ball reaches the precision and finish required by a finished product, pouring the ball into a polishing roller for rotation, and adding water for cleaning by a polishing cleaning agent to ensure that the ball is clean and bright;
further comprises: the forging press bench (14), both sides of forging press bench (14) bottom all are provided with slide (11), the upper surface of forging press bench (14) of complaining is provided with fixed station (15), be provided with fixing base (17) on fixed station (15), the upper surface of fixed station (15) is provided with spread groove (16), just spread groove (16) are provided with six.
2. The production process of the online high-hardness high-attack-toughness forged steel ball, which is disclosed in claim 1, is characterized in that: the inside of slide (11) is provided with spout (12), the front and back end of slide (11) upper surface all is provided with baffle (13), just forging and pressing platform (14) are through spout (12) and slide (11) sliding connection, the both sides of slide (11) all are provided with base (1).
3. The production process of the online high-hardness high-attack-toughness forged steel ball, which is characterized by comprising the following steps of: the novel forging press is characterized in that limit rods (6) are arranged at the front end and the rear end of the upper surface of the base (1), an ejector seat (2) is arranged at the top of the limit rods (6), a forging press plate (3) is arranged on the limit rods (6), and limit sleeves (7) are arranged on the upper surface of the base (1), the lower surface of the ejector seat (2) and the upper end face and the lower end face of the forging press plate (3).
4. The production process of the online high-hardness and high-attack-toughness forged steel ball, which is characterized in that: the novel forging press is characterized in that the periphery of the upper surface of the top seat (2) is provided with a top sleeve (5), the upper surface of the top seat (2) is provided with an air cylinder (4), the air cylinder (4) is provided with three, the lower surface of the top seat (2) is provided with a pneumatic telescopic rod (8), the pneumatic telescopic rod (8) is provided with three, the lower surface of the forging press plate (3) is provided with a die seat (9), and the bottom of the die seat (9) is provided with a first forging press die (10).
5. The production process of the online high-hardness and high-attack-toughness forged steel ball, which is disclosed in claim 4, is characterized in that: the novel forging press is characterized in that connecting blocks (19) are arranged at the front end and the rear end of the fixing base (17), four connecting blocks (19) are arranged, a first fixing plate (20) is arranged on each connecting block (19), and a second forging press die (18) is arranged on the fixing base (17).
6. The production process of the online high-hardness and high-attack-toughness forged steel ball, which is disclosed in claim 5, is characterized in that: the forging and pressing die comprises a first forging and pressing die (18), wherein first limiting blocks (21) are arranged on the second forging and pressing die, two first limiting blocks (21) are arranged, second limiting blocks (22) are arranged on the first limiting blocks (21), and second fixing plates (24) are arranged at the front end and the rear end of the first limiting blocks (21).
7. The production process of the online high-hardness and high-attack-toughness forged steel ball, which is disclosed in claim 6, is characterized in that: the motor (23) is installed on the both sides terminal surface of second forging mould (18), be provided with first movable belt (25) on the inner wall of second stopper (22).
8. The production process of the online high-hardness and high-attack-toughness forged steel ball, which is disclosed in claim 7, is characterized in that: the rear end of forging and pressing platform (14) is provided with clearance mechanism (26), the top of clearance mechanism (26) is provided with sweeps machine (27), the preceding terminal surface of sweeping machine (27) is provided with sweeps mouth (28).
9. The production process of the online high-hardness and high-attack-toughness forged steel ball, which is disclosed in claim 8, is characterized in that: the cleaning mechanism is characterized in that a second movable belt (29) is arranged on the front end face of the cleaning mechanism (26), a mounting rod (30) is arranged on the second movable belt (29), and a cleaning rod (31) is arranged on the mounting rod (30).
CN202310958308.6A 2023-08-01 2023-08-01 An online production process for forged steel balls with high hardness and high attack toughness Pending CN117000924A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310958308.6A CN117000924A (en) 2023-08-01 2023-08-01 An online production process for forged steel balls with high hardness and high attack toughness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310958308.6A CN117000924A (en) 2023-08-01 2023-08-01 An online production process for forged steel balls with high hardness and high attack toughness

Publications (1)

Publication Number Publication Date
CN117000924A true CN117000924A (en) 2023-11-07

Family

ID=88570481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310958308.6A Pending CN117000924A (en) 2023-08-01 2023-08-01 An online production process for forged steel balls with high hardness and high attack toughness

Country Status (1)

Country Link
CN (1) CN117000924A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191317388A (en) * 1913-07-29 1913-11-20 Carl Hanke Improvements in or relating to Machines for Forging Balls.
WO2010021118A1 (en) * 2008-08-22 2010-02-25 Ntn株式会社 Wheel bearing device
CN107514425A (en) * 2017-08-25 2017-12-26 无锡南理工科技发展有限公司 The preparation method of bearing ball
CN209077692U (en) * 2018-11-21 2019-07-09 河北新运电力设备有限公司 Bulb ring main body forging press
CN209597952U (en) * 2019-02-19 2019-11-08 苏州宝罗机械工程有限公司 A kind of press machine being convenient to clean
CN112775371A (en) * 2020-12-18 2021-05-11 山东东铁铸锻有限公司 High-automation forged ball production process
CN213794040U (en) * 2020-10-30 2021-07-27 济南众维铸锻钢球有限公司 Automatic ball rotating device for steel ball forging and pressing
CN114632859A (en) * 2022-03-03 2022-06-17 陈伟强 Stamping die and using method thereof
CN218079976U (en) * 2022-08-08 2022-12-20 浙江印象电器科技股份有限公司 Safe type electric chafing dish processing stamping die

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191317388A (en) * 1913-07-29 1913-11-20 Carl Hanke Improvements in or relating to Machines for Forging Balls.
WO2010021118A1 (en) * 2008-08-22 2010-02-25 Ntn株式会社 Wheel bearing device
CN107514425A (en) * 2017-08-25 2017-12-26 无锡南理工科技发展有限公司 The preparation method of bearing ball
CN209077692U (en) * 2018-11-21 2019-07-09 河北新运电力设备有限公司 Bulb ring main body forging press
CN209597952U (en) * 2019-02-19 2019-11-08 苏州宝罗机械工程有限公司 A kind of press machine being convenient to clean
CN213794040U (en) * 2020-10-30 2021-07-27 济南众维铸锻钢球有限公司 Automatic ball rotating device for steel ball forging and pressing
CN112775371A (en) * 2020-12-18 2021-05-11 山东东铁铸锻有限公司 High-automation forged ball production process
CN114632859A (en) * 2022-03-03 2022-06-17 陈伟强 Stamping die and using method thereof
CN218079976U (en) * 2022-08-08 2022-12-20 浙江印象电器科技股份有限公司 Safe type electric chafing dish processing stamping die

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周佩锋: "锻工操作技术要领图解", vol. 1, 31 August 2004, 山东科学技术出版社, pages: 187 *
夏巨谌等: "中国模具设计大典 第4卷 锻模与粉末冶金模设计", vol. 1, 31 January 2003, 江西科学技术出版社, pages: 759 *
晁建兵, 符寒光: "低铬铸铁磨球的研究及应用", 矿冶, no. 04, 30 December 2004 (2004-12-30), pages 54 - 56 *

Similar Documents

Publication Publication Date Title
CN103302226B (en) Precise forging process for front upper arm part of car chassis suspension system
CN105695873B (en) Semi-high speed steel BD rollers and its manufacture method
CN107282839A (en) A kind of forging technology of forging
CN101799048B (en) Manufacturing process of high-speed precision bearing steel ball
CN110722079B (en) Preparation process of vertical forged shaft forging
CN111203504B (en) Forging production method of large-size track shoe
CN106544671A (en) A kind of renovation technique of automobile die
CN113843384A (en) Forging process for eliminating stress concentration for steel ball production
CN108857274B (en) Double-channel diamond roller grinding method
CN105840659A (en) Bearing ball machining method
CN114574669A (en) Through shaft and preparation method thereof
CN117000924A (en) An online production process for forged steel balls with high hardness and high attack toughness
CN107514425A (en) The preparation method of bearing ball
CN102380920A (en) Air valve forming die and machining method thereof
CN204308054U (en) A kind of bender bending lower die tool
CN101568396A (en) Method for prolonging service life of metal die for hot forging or warm forging
CN107058934A (en) A kind of method that use composite coating improves service life of cold-stamping mould of automobile
KR100308696B1 (en) A manufacturing process of pinion shaft for an auto steering mechanism
CN108751691B (en) Production process method of multi-face trimming prism
CN102950442B (en) Machining process for extrusion die
CN117696825A (en) Forming method of TA3 titanium alloy three-way pipe joint forging
CN215279410U (en) Long-life automatic trimming die with anticollision board
CN105127679B (en) A kind of processing technology of valve body
CN110125609A (en) A kind of improvement method again of aircraft sliding rail support forging part die life
CN104722688B (en) A kind of die forging production method of coal machine connector of hydraulic support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20231107