[go: up one dir, main page]

CN116811819A - Locomotive braking control system and control method - Google Patents

Locomotive braking control system and control method Download PDF

Info

Publication number
CN116811819A
CN116811819A CN202310909035.6A CN202310909035A CN116811819A CN 116811819 A CN116811819 A CN 116811819A CN 202310909035 A CN202310909035 A CN 202310909035A CN 116811819 A CN116811819 A CN 116811819A
Authority
CN
China
Prior art keywords
valve
pressure
control
inlet
brake cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310909035.6A
Other languages
Chinese (zh)
Inventor
任向杰
王帅帅
纪奕沛
朱冠汶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Brake System Co Ltd
Original Assignee
CRRC Brake System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Brake System Co Ltd filed Critical CRRC Brake System Co Ltd
Priority to CN202310909035.6A priority Critical patent/CN116811819A/en
Publication of CN116811819A publication Critical patent/CN116811819A/en
Priority to AU2023378543A priority patent/AU2023378543B2/en
Priority to PCT/CN2023/132602 priority patent/WO2024099461A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T13/00Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems
    • B60T13/10Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems with fluid assistance, drive, or release
    • B60T13/66Electrical control in fluid-pressure brake systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T13/00Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems
    • B60T13/10Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems with fluid assistance, drive, or release
    • B60T13/66Electrical control in fluid-pressure brake systems
    • B60T13/68Electrical control in fluid-pressure brake systems by electrically-controlled valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T17/00Component parts, details, or accessories of power brake systems not covered by groups B60T8/00, B60T13/00 or B60T15/00, or presenting other characteristic features
    • B60T17/18Safety devices; Monitoring
    • B60T17/22Devices for monitoring or checking brake systems; Signal devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61HBRAKES OR OTHER RETARDING DEVICES SPECIALLY ADAPTED FOR RAIL VEHICLES; ARRANGEMENT OR DISPOSITION THEREOF IN RAIL VEHICLES
    • B61H11/00Applications or arrangements of braking or retarding apparatus not otherwise provided for; Combinations of apparatus of different kinds or types
    • B61H11/06Applications or arrangements of braking or retarding apparatus not otherwise provided for; Combinations of apparatus of different kinds or types of hydrostatic, hydrodynamic, or aerodynamic brakes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Braking Systems And Boosters (AREA)
  • Valves And Accessory Devices For Braking Systems (AREA)

Abstract

The application provides a locomotive braking control system and a locomotive braking control method, wherein the system comprises an average pipe control module, a brake cylinder control module and total wind; when the air charging and discharging electromagnetic valve or the second relay valve of the control brake cylinder fails, multiple redundancies such as a mechanical three-way valve, an average pipe pressure, an emergency booster valve and the like can be used to realize redundancy control of the pressure of the brake cylinder.

Description

机车制动控制系统及控制方法Locomotive braking control system and control method

技术领域Technical field

本申请属于机车制动控制领域,具体地涉及一种机车制动控制系统及控制方法。The present application belongs to the field of locomotive braking control, and specifically relates to a locomotive braking control system and a control method.

背景技术Background technique

机车制动控制系统是机车最重要的核心系统之一,该系统的一项关键功能是控制制动缸的压力,机车制动控制系统通过控制制动缸压力值来实现机车的制动和缓解功能。制动缸压力控制采用的常规做法是通过高频电磁阀控制预控压力,然后经过中继阀输出与预控压力一致的制动缸压力,为了避免制动缸控制失效对机车运行造成影响,通常对易出现故障的预控压力控制部分进行备份。The locomotive brake control system is one of the most important core systems of the locomotive. One of the key functions of the system is to control the pressure of the brake cylinder. The locomotive brake control system achieves braking and relief of the locomotive by controlling the pressure value of the brake cylinder. Function. The conventional method used for brake cylinder pressure control is to control the pre-control pressure through a high-frequency solenoid valve, and then output the brake cylinder pressure consistent with the pre-control pressure through the relay valve. In order to avoid the impact of brake cylinder control failure on the operation of the locomotive, Usually the pre-control pressure control part that is prone to failure is backed up.

现有机车制动控制系统主要有克诺尔公司开发的CCBII系统和法维莱公司开发的Eurotrol系统,这两种制动控制系统均采用机械空气分配阀对制动缸压力预控部分进行冗余,这种冗余控制方式一方面在机械阀类冗余控制时大幅降低了制动缸的压力控制精度,另一方面在制动缸中继阀发生故障时无法实现制动缸压力控制。The existing locomotive brake control systems mainly include the CCBII system developed by Knorr-Bremse and the Eurotrol system developed by Favelay. Both brake control systems use mechanical air distribution valves to redundant the brake cylinder pressure pre-control part. On the one hand, this redundant control method greatly reduces the pressure control accuracy of the brake cylinder during redundant control of mechanical valves. On the other hand, when the brake cylinder relay valve fails, the brake cylinder pressure control cannot be achieved.

CN111634304A公开了一种机车制动控制系统及控制方法,包括平均管控制系统和制动缸控制系统,其中,平均管控制系统可以比较制动缸预控压力和平均管预控压力,并输出较大压力作为平均管压力;制动缸控制系统可以比较制动缸预控压力和平均管压力,并输出较大压力作为制动缸压力,去实现制动;可以实现两个控制系统的冗余。CN111634304A discloses a locomotive brake control system and a control method, including an average tube control system and a brake cylinder control system. The average tube control system can compare the brake cylinder pre-control pressure and the average tube pre-control pressure, and output a relatively The maximum pressure is used as the average pipe pressure; the brake cylinder control system can compare the brake cylinder pre-control pressure and the average pipe pressure, and output the larger pressure as the brake cylinder pressure to achieve braking; the redundancy of the two control systems can be achieved .

发明内容Contents of the invention

针对现有技术中存在的一些问题,本申请提供了一种机车制动控制系统及控制方法;可以实现多重冗余,提高系统的可靠性。In view of some problems existing in the prior art, this application provides a locomotive braking control system and control method; it can achieve multiple redundancies and improve the reliability of the system.

本申请第一方面提供的机车制动控制系统,包括平均管控制模块,制动缸控制模块和总风;其中:The locomotive brake control system provided in the first aspect of this application includes an average tube control module, a brake cylinder control module and a total airflow; wherein:

所述平均管控制模块包括与总风相连的第一充气电磁阀和第一排气电磁阀,二者能够通过充气动作和排气动作将输入的总风的压力控制输出为所需的第一预控压力P1。The average pipe control module includes a first charging solenoid valve and a first exhaust solenoid valve connected to the total air, both of which can control and output the input total air pressure to the required first through the charging action and the exhaust action. Pre-control pressure P1.

所述平均管控制模块还包括第一中继阀和第一切换阀;其中,第一预控压力P1到达第一中继阀的控制端口;第一中继阀的入口连接至总风,第一中继阀的出口输出放大后的第一预控压力作为平均管压力PA。The average pipe control module also includes a first relay valve and a first switching valve; wherein the first pre-control pressure P1 reaches the control port of the first relay valve; the inlet of the first relay valve is connected to the total air, and the first relay valve The outlet of a relay valve outputs the amplified first pre-control pressure as the average pipe pressure PA.

平均管压力PA的第一分支PA1通过管路连接至制动缸控制模块的第一双向阀的第一入口;平均管压力PA的第二分支PA2通过管路连接至所述的第一切换阀的入口;第二切换阀的出口能够输出第二分支PA2到达制动缸控制模块的第三双向阀的第一入口。The first branch PA1 of the average pipe pressure PA is connected to the first inlet of the first two-way valve of the brake cylinder control module through a pipeline; the second branch PA2 of the average pipe pressure PA is connected to the first switching valve through a pipeline The inlet of the second switching valve can output the second branch PA2 to the first inlet of the third two-way valve of the brake cylinder control module.

所述制动缸控制模块包括与总风相连的第二充气电磁阀和第二排气电磁阀,二者能够通过充气动作和排气动作将输入的总风的压力控制输出为所需的第二预控压力P2。The brake cylinder control module includes a second charging solenoid valve and a second exhaust solenoid valve connected to the total air, both of which can control and output the input total air pressure to the required third through charging and exhausting actions. 2. Pre-control pressure P2.

所述制动缸控制模块还包括第二切换阀、机械三通阀和第一双向阀;其中,第二预控压力P2连接至第二切换阀的第一入口。The brake cylinder control module also includes a second switching valve, a mechanical three-way valve and a first two-way valve; wherein the second pre-control pressure P2 is connected to the first inlet of the second switching valve.

所述机械三通阀为能够输出第三预控压力P3的机械阀。所述机械三通阀的第一入口连接列车管,以提供风源;所述机械三通阀的出口连接至第二切换阀的第二入口,以输出第三预控压力P3。The mechanical three-way valve is a mechanical valve capable of outputting the third pre-control pressure P3. The first inlet of the mechanical three-way valve is connected to the train pipe to provide an air source; the outlet of the mechanical three-way valve is connected to the second inlet of the second switching valve to output the third pre-control pressure P3.

第二切换阀能够在第一入口和第二入口之间切换,以选择第二预控压力P2或第三预控压力P3,第二切换阀的出口连通至第一双向阀的第二入口。The second switching valve can switch between the first inlet and the second inlet to select the second pre-control pressure P2 or the third pre-control pressure P3. The outlet of the second switching valve is connected to the second inlet of the first two-way valve.

第一双向阀的出口连接至第二中继阀的控制端口,以选择第一双向阀的第一入口和第二入口中的压力较大者作为第四预控压力P4输出至第二中继阀的控制端口。The outlet of the first two-way valve is connected to the control port of the second relay valve to select the larger pressure of the first inlet and the second inlet of the first two-way valve as the fourth pre-control pressure P4 and output it to the second relay. Valve control port.

所述第二中继阀的入口连接总风,其出口连接至第三双向阀的第二入口,以将放大后的第四预控压力作为第一制动缸压力PB1输出至第三双向阀的第二入口。The inlet of the second relay valve is connected to the total air, and its outlet is connected to the second inlet of the third two-way valve to output the amplified fourth pre-control pressure as the first brake cylinder pressure PB1 to the third two-way valve. the second entrance.

第三双向阀的出口连接至制动缸,以选择第三双向阀的第一入口和第二入口中的压力较大者作为第二制动缸压力PB2输出至制动缸,以进行制动。The outlet of the third two-way valve is connected to the brake cylinder to select the larger pressure of the first inlet and the second inlet of the third two-way valve as the second brake cylinder pressure PB2 and output it to the brake cylinder for braking. .

本申请的一些实施例中,所述制动缸控制模块还包括第二双向阀、减压阀和紧急增压阀;其中,In some embodiments of the present application, the brake cylinder control module also includes a second two-way valve, a pressure reducing valve and an emergency boosting valve; wherein,

第一双向阀的出口连接至第二双向阀的第一入口,以选择第一双向阀的第一入口和第二入口中的压力较大者作为第四预控压力P4输出至第二双向阀的第一入口;The outlet of the first two-way valve is connected to the first inlet of the second two-way valve to select the larger pressure of the first inlet and the second inlet of the first two-way valve as the fourth pre-control pressure P4 and output it to the second two-way valve. the first entrance;

减压阀的入口连接至总风,减压阀的出口连接至紧急增压阀的入口;所述紧急增压阀的出口输出第五预控压力P5至第二双向阀的第二入口;所述紧急增压阀的控制端口连接列车管,以提供控制风源,用于打开或关闭减压阀至第二双向阀的第二入口之间的管路,以开启或切断第五预控压力P5的输出;The inlet of the pressure reducing valve is connected to the main air, and the outlet of the pressure reducing valve is connected to the inlet of the emergency boosting valve; the outlet of the emergency boosting valve outputs the fifth pre-control pressure P5 to the second inlet of the second two-way valve; so The control port of the emergency boosting valve is connected to the train pipe to provide a control air source for opening or closing the pipeline between the pressure reducing valve and the second inlet of the second two-way valve to open or cut off the fifth pre-control pressure. P5 output;

第二双向阀的出口连接至第二中继阀的控制端口,以选择第二双向阀的第一入口和第二入口中的压力较大者作为第六预控压力P6(代替没有第二双向阀时的第四预控压力P4)输出至第二中继阀的控制端口。The outlet of the second two-way valve is connected to the control port of the second relay valve to select the larger pressure of the first inlet and the second inlet of the second two-way valve as the sixth pre-control pressure P6 (instead of not having the second two-way valve) The fourth pre-control pressure P4) of the valve is output to the control port of the second relay valve.

本申请的一些实施例中,所述机械三通阀选择调节型三通阀;所述机械三通阀的第二入口连接工作风缸,当列车管的压力变化时,列车管与工作风缸实现动平衡。In some embodiments of the present application, the mechanical three-way valve selects a regulating three-way valve; the second inlet of the mechanical three-way valve is connected to the working air cylinder. When the pressure of the train pipe changes, the train pipe and the working air cylinder Achieve dynamic balance.

本申请的一些实施例中,第一预控压力P1所在管路上设置有第一预控风缸,能够储存压缩空气,以提供风源作为第一预控压力P1。In some embodiments of the present application, a first pre-control air cylinder is provided on the pipeline where the first pre-control pressure P1 is located, which can store compressed air to provide an air source as the first pre-control pressure P1.

本申请的一些实施例中,第六预控压力P6所在的管路上设置有第二预控风缸,用于储存压缩空气,以提供风源作为第六预控压力P6。In some embodiments of the present application, a second pre-control air cylinder is provided on the pipeline where the sixth pre-control pressure P6 is located, for storing compressed air to provide an air source as the sixth pre-control pressure P6.

本申请的一些实施例中,第三预控压力P3所在的管路上设置有作用风缸,用于储存压缩空气,以提供风源作为第三预控压力P3。In some embodiments of the present application, an active air cylinder is provided on the pipeline where the third pre-control pressure P3 is located, which is used to store compressed air to provide an air source as the third pre-control pressure P3.

本申请的一些实施例中,所述第二切换阀为具有控制端口的机械切换阀;当其控制端口有风源时,连通第二预控压力P2;当其控制端口没有风源时,切换至连通第三预控压力P3。In some embodiments of the present application, the second switching valve is a mechanical switching valve with a control port; when its control port has an air source, it is connected to the second pre-control pressure P2; when its control port does not have an air source, it switches to connect to the third pre-control pressure P3.

本申请的一些实施例中,所述制动缸控制模块中设置有用于控制第二切换阀在第二预控压力P2和第三预控压力P3之间进行切换的电控阀,其中,所述电控阀的入口与总风相连,其出口与第二切换阀的控制端口相连;其中所述电控阀配置为:得电时,连通总风和第二切换阀的控制端口,以使第二切换阀连通第二预控压力P2;失电时,切断总风和第二切换阀的控制端口,以使第二切换阀连通第三预控压力P3。In some embodiments of the present application, the brake cylinder control module is provided with an electronically controlled valve for controlling the second switching valve to switch between the second pre-control pressure P2 and the third pre-control pressure P3, wherein, The inlet of the electric control valve is connected to the main air, and its outlet is connected to the control port of the second switching valve; wherein the electric control valve is configured to: when powered, connect the main air and the control port of the second switching valve, so that The second switching valve is connected to the second pre-control pressure P2; when power is lost, the total air and the control port of the second switching valve are cut off so that the second switching valve is connected to the third pre-control pressure P3.

本申请第二方面提供的机车制动控制方法,可以采用前文任意实施例所述的机车制动控制系统,包括以下三种状态中的至少一种:The locomotive braking control method provided in the second aspect of this application can adopt the locomotive braking control system described in any of the previous embodiments, including at least one of the following three states:

(1)正常工作状态:(1)Normal working status:

在平均管控制模块中:In the averaging tube control module:

所述第一充气电磁阀和第一排气电磁阀通过充气动作和排气动作将输入的总风的压力控制输出为所需的第一预控压力P1,作用在第一中继阀的控制端口,第一中继阀的入口输入总风,经过流量放大后,第一中继阀的出口输出平均管压力PA,该平均管压力的第一分支PA1到达制动缸控制模块的第一双向阀的第一入口。The first charging solenoid valve and the first exhaust solenoid valve control and output the input total air pressure to the required first pre-control pressure P1 through charging and exhausting actions, which act on the control of the first relay valve. Port, the inlet of the first relay valve inputs the total air. After flow amplification, the outlet of the first relay valve outputs the average pipe pressure PA, and the first branch PA1 of the average pipe pressure reaches the first bidirectional port of the brake cylinder control module. The first inlet of the valve.

所述第一切换阀处于关闭状态,不提供平均管压力的第二分支PA2至第三双向阀的第一入口。The first switching valve is in a closed state and does not provide the second branch PA2 of the average pipe pressure to the first inlet of the third two-way valve.

在制动缸控制模块中:In the brake cylinder control module:

所述第二充气电磁阀和第二排气电磁阀通过充气动作和排气动作将输入的总风的压力控制输出为所需的第二预控压力P2。The second charging solenoid valve and the second exhaust solenoid valve control and output the input total air pressure to the required second pre-control pressure P2 through charging actions and exhaust actions.

电控阀得电,总风到达第二切换阀的控制端口,使得所述第二预控压力P2进入第二切换阀并到达第一双向阀的第二入口。When the electronically controlled valve is energized, the total air reaches the control port of the second switching valve, causing the second pre-control pressure P2 to enter the second switching valve and reach the second inlet of the first two-way valve.

所述第一双向阀在平均管压力的第一分支PA1和第二预控压力P2中取大,输出第四预控压力P4作用在第二中继阀的控制端口,第二中继阀的入口输入总风,经过流量放大后,第二中继阀的出口输出第一制动缸压力PB1至第三双向阀的第二入口。The first two-way valve takes the larger of the first branch PA1 of the average pipe pressure and the second pre-control pressure P2, and outputs the fourth pre-control pressure P4 to act on the control port of the second relay valve. The inlet inputs the total air, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third two-way valve.

所述第三双向阀将第一制动缸压力PB1输出为第二制动缸压力PB2,并到达制动缸,以实现制动。The third two-way valve outputs the first brake cylinder pressure PB1 as the second brake cylinder pressure PB2 and reaches the brake cylinder to achieve braking.

(2)制动缸控制模块故障状态(2) Brake cylinder control module fault status

在平均管控制模块中:In the averaging tube control module:

所述第一充气电磁阀和第一排气电磁阀通过充气动作和排气动作将输入的总风的压力控制输出为所需的第一预控压力P1,并作用在第一中继阀的控制端口,第一中继阀的入口输入总风,经过流量放大后,第一中继阀的出口输出平均管压力PA,该平均管压力的第一分支PA1到达制动缸控制模块的第一双向阀的第一入口。The first charging solenoid valve and the first exhaust solenoid valve control and output the input total air pressure to the required first pre-control pressure P1 through the charging and exhausting actions, and act on the first relay valve Control port, the inlet of the first relay valve inputs total air. After flow amplification, the outlet of the first relay valve outputs the average pipe pressure PA, and the first branch PA1 of the average pipe pressure reaches the first branch of the brake cylinder control module. The first inlet of the two-way valve.

所述第一切换阀处于关闭状态,无法提供平均管压力的第二分支PA2至第三双向阀的第一入口。The first switching valve is in a closed state and cannot provide the second branch PA2 of the average pipe pressure to the first inlet of the third two-way valve.

在制动缸控制模块中:In the brake cylinder control module:

所述制动缸控制模块中无法正常地输出第二预控压力P2。The brake cylinder control module cannot normally output the second pre-control pressure P2.

电控阀失电,没有风源到达第二切换阀的控制端口,使得第二切换阀切换至连接机械三通阀,所述机械三通阀根据列车管的压力变化产生第三预控压力P3,并输出至第一双向阀的第二入口。The electronic control valve loses power and no air source reaches the control port of the second switching valve, causing the second switching valve to switch to the mechanical three-way valve. The mechanical three-way valve generates the third pre-control pressure P3 according to the pressure change of the train pipe. , and output to the second inlet of the first two-way valve.

所述第一双向阀在平均管压力的第一分支PA1和第三预控压力P3中取大,输出第四预控压力P4,并作用在第二中继阀的控制端口,第二中继阀的入口输入总风,经过流量放大后,第二中继阀的出口输出第一制动缸压力PB1至第三双向阀的第二入口。The first two-way valve takes the larger of the first branch PA1 of the average pipe pressure and the third pre-control pressure P3, outputs the fourth pre-control pressure P4, and acts on the control port of the second relay valve. The inlet of the valve inputs the total air, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third two-way valve.

所述第三双向阀将第一制动缸压力PB1输出为第二制动缸压力PB2,并到达制动缸,以实现制动。The third two-way valve outputs the first brake cylinder pressure PB1 as the second brake cylinder pressure PB2 and reaches the brake cylinder to achieve braking.

(3)第二中继阀故障状态(3) Second relay valve fault status

在平均管控制模块中:In the averaging tube control module:

所述第一充气电磁阀和第一排气电磁阀通过充气动作和排气动作将输入的总风的压力控制输出为所需的第一预控压力P1,并作用在第一中继阀的控制端口,第一中继阀的入口输入总风,经过流量放大后,第一中继阀的出口输出平均管压力PA。The first charging solenoid valve and the first exhaust solenoid valve control and output the input total air pressure to the required first pre-control pressure P1 through the charging and exhausting actions, and act on the first relay valve The control port, the inlet of the first relay valve inputs total air, and after flow amplification, the outlet of the first relay valve outputs the average pipe pressure PA.

其中,平均管压力的第一分支PA1到达制动缸控制模块的第一双向阀的第一入口;所述第一切换阀处于开启状态,将平均管压力的第二分支PA2提供至第三双向阀的第一入口。Among them, the first branch PA1 of the average pipe pressure reaches the first inlet of the first two-way valve of the brake cylinder control module; the first switching valve is in an open state and provides the second branch PA2 of the average pipe pressure to the third two-way valve. The first inlet of the valve.

在制动缸控制模块中:In the brake cylinder control module:

第二中继阀故障,第一制动缸压力PB1无法有效输出。The second relay valve is faulty and the first brake cylinder pressure PB1 cannot be effectively output.

所述第三双向阀将平均管压力的第二分支PA2输出为第二制动缸压力PB2,并到达制动缸,以实现制动。The third two-way valve outputs the second branch PA2 of the average pipe pressure as the second brake cylinder pressure PB2 and reaches the brake cylinder to achieve braking.

本申请的一些实施例中,当制动缸控制模块具有第二双向阀、减压阀和紧急增压阀时:In some embodiments of the present application, when the brake cylinder control module has a second two-way valve, a pressure reducing valve and an emergency boosting valve:

对于(1)正常工作状态:For (1) normal working status:

所述第一双向阀在平均管压力的第一分支PA1和第二预控压力P2中取大,输出第四预控压力P4至第二双向阀的第一入口。The first two-way valve takes the larger of the first branch PA1 of the average pipe pressure and the second pre-control pressure P2, and outputs the fourth pre-control pressure P4 to the first inlet of the second two-way valve.

当列车管的压力降低至阈值时,紧急增压阀导通,输出第五预控压力P5至第二双向阀的第二入口。所述第二双向阀在第四预控压力P4和第五预控压力P5中取大,输出第六预控压力P6,并作用在第二中继阀的控制端口,第二中继阀的入口输入总风,经过流量放大后,第二中继阀的出口输出第一制动缸压力PB1至第三双向阀的第二入口。When the pressure of the train pipe decreases to the threshold value, the emergency boost valve is turned on and outputs the fifth pre-control pressure P5 to the second inlet of the second two-way valve. The second two-way valve takes the larger of the fourth pre-control pressure P4 and the fifth pre-control pressure P5, outputs the sixth pre-control pressure P6, and acts on the control port of the second relay valve. The inlet inputs the total air, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third two-way valve.

当列车管的压力高于阈值时,紧急增压阀为关闭状态;此时,所述第二双向阀仅获取第四预控压力P4,输出第六预控压力P6,并作用在第二中继阀的控制端口,第二中继阀的入口输入总风,经过流量放大后,第二中继阀的出口输出第一制动缸压力PB1至第三双向阀的第二入口。When the pressure of the train pipe is higher than the threshold, the emergency boosting valve is in a closed state; at this time, the second two-way valve only obtains the fourth pre-control pressure P4, outputs the sixth pre-control pressure P6, and acts on the second The control port of the relay valve and the inlet of the second relay valve input the total air. After flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third two-way valve.

对于(2)制动缸控制模块故障状态:For (2) brake cylinder control module fault status:

所述第一双向阀在平均管压力的第一分支PA1和第三预控压力P3中取大,输出第四预控压力P4至第二双向阀的第一入口。The first two-way valve takes the larger of the first branch PA1 of the average pipe pressure and the third pre-control pressure P3, and outputs the fourth pre-control pressure P4 to the first inlet of the second two-way valve.

当列车管的压力降低至阈值时,紧急增压阀导通,输出第五预控压力P5至第二双向阀的第二入口。所述第二双向阀在第四预控压力P4和第五预控压力P5中取大,输出第六预控压力P6,并作用在第二中继阀的控制端口,第二中继阀的入口输入总风,经过流量放大后,第二中继阀的出口输出第一制动缸压力PB1至第三双向阀的第二入口。When the pressure of the train pipe decreases to the threshold value, the emergency boost valve is turned on and outputs the fifth pre-control pressure P5 to the second inlet of the second two-way valve. The second two-way valve takes the larger of the fourth pre-control pressure P4 and the fifth pre-control pressure P5, outputs the sixth pre-control pressure P6, and acts on the control port of the second relay valve. The inlet inputs the total air, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third two-way valve.

当列车管的压力高于阈值时,紧急增压阀为关闭状态;此时,所述第二双向阀仅获取第四预控压力P4,输出第六预控压力P6,并作用在第二中继阀的控制端口,第二中继阀的入口输入总风,经过流量放大后,第二中继阀的出口输出第一制动缸压力PB1至第三双向阀的第二入口。When the pressure of the train pipe is higher than the threshold, the emergency boosting valve is in a closed state; at this time, the second two-way valve only obtains the fourth pre-control pressure P4, outputs the sixth pre-control pressure P6, and acts on the second The control port of the relay valve and the inlet of the second relay valve input the total air. After flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third two-way valve.

与现有技术相比,本申请的有益效果为:本申请至少一种实施方式提供的机车制动控制系统,当控制制动缸的充排气电磁阀或第二中继阀故障时,可以使用机械三通阀、平均管压力、紧急增压阀等多重冗余,实现对制动缸压力的冗余控制。Compared with the existing technology, the beneficial effects of this application are: the locomotive brake control system provided by at least one embodiment of this application can, when the charging and exhausting solenoid valve or the second relay valve that controls the brake cylinder fail, can Use multiple redundancies such as mechanical three-way valves, average pipe pressure, and emergency boost valves to achieve redundant control of brake cylinder pressure.

附图说明Description of the drawings

图1是一种实施方式的正常工作状态下的示意图;Figure 1 is a schematic diagram of an embodiment in a normal working state;

图2是一种实施方式的制动缸控制模块故障状态下的示意图;Figure 2 is a schematic diagram of a brake cylinder control module in a fault state according to an embodiment;

图3是一种实施方式的第二中继阀故障状态下的示意图;Figure 3 is a schematic diagram of the second relay valve in a fault state according to an embodiment;

图中编号:1平均管控制模块,101第一充气电磁阀,102第一排气电磁阀,103第一中继阀,104第一切换阀,105第一预控风缸;2制动缸控制模块,201第二充气电磁阀,202第二排气电磁阀,203第二切换阀,204机械三通阀,205第一双向阀,206工作风缸,207作用风缸,208电控阀,209第二双向阀,210减压阀,211紧急增压阀,212第二中继阀,213第二预控风缸,214第三双向阀,215制动缸;3总风;4列车管。Numbers in the figure: 1 average tube control module, 101 first charging solenoid valve, 102 first exhaust solenoid valve, 103 first relay valve, 104 first switching valve, 105 first pre-control air cylinder; 2 brake cylinder Control module, 201 second charging solenoid valve, 202 second exhaust solenoid valve, 203 second switching valve, 204 mechanical three-way valve, 205 first two-way valve, 206 working air cylinder, 207 acting air cylinder, 208 electronic control valve , 209 second two-way valve, 210 pressure reducing valve, 211 emergency boost valve, 212 second relay valve, 213 second pre-control air cylinder, 214 third two-way valve, 215 brake cylinder; 3 main air; 4 trains Tube.

具体实施方式Detailed ways

以下结合具体实施方式对本申请的技术方案进行详实的阐述,然而应当理解,在没有进一步叙述的情况下,一个实施方式中的元件、结构和特征也可以有益地结合到其他实施方式中。The technical solutions of the present application are described in detail below in conjunction with specific embodiments. However, it should be understood that the elements, structures and features in one embodiment can also be beneficially combined into other embodiments without further description.

在本申请的描述中,需要理解的是,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。In the description of the present application, it should be understood that the terms “first” and “second” are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Therefore, features defined as "first" and "second" may explicitly or implicitly include one or more of these features.

在本申请的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should be noted that, unless otherwise clearly stated and limited, the terms "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection. Ground connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood on a case-by-case basis.

本申请中的中继阀具有流量放大功能,通过入口提供风源,使得出口输出气体的压力与控制端口提供的压力一致。本申请中的双向阀具有压力比较选择功能,会自动比较两个入口的压力大小,并选择压力高者从出口输出。中继阀和双向阀均选择机械阀,可以有效地应对失电状态。The relay valve in this application has a flow amplification function and provides an air source through the inlet so that the pressure of the output gas at the outlet is consistent with the pressure provided by the control port. The two-way valve in this application has a pressure comparison selection function, which will automatically compare the pressures of the two inlets and select the one with the higher pressure to output from the outlet. Both relay valves and two-way valves choose mechanical valves, which can effectively cope with power loss conditions.

本申请的第一种实施方式提供了一种机车制动控制系统,如图1-3所示,包括平均管控制模块1,制动缸控制模块2和总风3。其中:The first embodiment of the present application provides a locomotive brake control system, as shown in Figures 1-3, including an average pipe control module 1, a brake cylinder control module 2 and a total air flow 3. in:

(1)平均管控制模块(1)Averaging tube control module

所述平均管控制模块1包括与总风3相连的第一充气电磁阀101和第一排气电磁阀102,二者能够通过充气动作和排气动作将输入的总风3的压力控制输出为所需的第一预控压力P1。此处的总风、第一充气电磁阀和第一排气电磁阀的设置属于本领域的常规技术方案,可以采用现有技术中的技术方案实现,例如采用CN111634304A中的第一总风,第一电磁阀和第二电磁阀。The average pipe control module 1 includes a first charging solenoid valve 101 and a first exhaust solenoid valve 102 connected to the total air 3, both of which can control and output the input pressure of the total air 3 through charging and exhausting actions as The required first pre-control pressure P1. The settings of the total air, the first charging solenoid valve and the first exhaust solenoid valve here belong to conventional technical solutions in the field and can be implemented using technical solutions in the prior art. For example, the first total air in CN111634304A is used, and the first exhaust solenoid valve is used. a solenoid valve and a second solenoid valve.

所述平均管控制模块1还包括第一中继阀103和第一切换阀104。所述第一预控压力P1连接至第一中继阀103的控制端口,第一中继阀103的入口连接至总风3,其出口输出放大后的第一预控压力作为平均管压力PA。该平均管压力PA的第一分支PA1通过管路连接至制动缸控制模块2的第一双向阀205的第一入口;该平均管压力PA的第二分支PA2(作为备用)通过管路连接至所述的第一切换阀104的入口;当第一切换阀104打开时,经过第一切换阀104的出口输出的第二分支PA2到达制动缸控制模块2的第三双向阀214的第一入口。所述第一切换阀104可为电磁阀,得电时打开,失电时关闭。The averaging tube control module 1 also includes a first relay valve 103 and a first switching valve 104 . The first pre-control pressure P1 is connected to the control port of the first relay valve 103. The inlet of the first relay valve 103 is connected to the total air 3, and its outlet outputs the amplified first pre-control pressure as the average pipe pressure PA. . The first branch PA1 of the average pipe pressure PA is connected to the first inlet of the first two-way valve 205 of the brake cylinder control module 2 through a pipeline; the second branch PA2 (as a backup) of the average pipe pressure PA is connected through a pipeline to the inlet of the first switching valve 104; when the first switching valve 104 is opened, the second branch PA2 outputted through the outlet of the first switching valve 104 reaches the third two-way valve 214 of the brake cylinder control module 2. One entrance. The first switching valve 104 may be a solenoid valve, which is opened when powered and closed when powered off.

第一预控压力P1所在管路上还设置有第一预控风缸105,该第一预控风缸105可以储存压缩空气,以提供风源作为第一预控压力P1。A first pre-control air cylinder 105 is also provided on the pipeline where the first pre-control pressure P1 is located. The first pre-control air cylinder 105 can store compressed air to provide an air source as the first pre-control pressure P1.

(2)制动缸控制模块(2) Brake cylinder control module

所述制动缸控制模块2包括与总风3相连的第二充气电磁阀201和第二排气电磁阀202,二者能够通过充气动作和排气动作将输入的总风3的压力控制输出为所需的第二预控压力P2。此处的总风、第二充气电磁阀和第二排气电磁阀的设置也属于本领域的常规技术方案,也可以采用现有技术中的技术方案实现,例如采用CN111634304A中的第二总风,第三电磁阀和第四电磁阀。The brake cylinder control module 2 includes a second charging solenoid valve 201 and a second exhaust solenoid valve 202 connected to the total air 3, both of which can control and output the input pressure of the total air 3 through charging actions and exhaust actions. is the required second pre-control pressure P2. The settings of the total air, the second charging solenoid valve and the second exhaust solenoid valve here also belong to conventional technical solutions in this field, and can also be implemented using technical solutions in the prior art, for example, using the second total air in CN111634304A. , the third solenoid valve and the fourth solenoid valve.

所述制动缸控制模块2还包括第二切换阀203、机械三通阀204和第一双向阀205。其中,第二预控压力P2连接至第二切换阀203的第一入口。The brake cylinder control module 2 also includes a second switching valve 203 , a mechanical three-way valve 204 and a first two-way valve 205 . Wherein, the second pre-control pressure P2 is connected to the first inlet of the second switching valve 203 .

所述机械三通阀204为能够输出第三预控压力P3的机械阀,其可选择调节型三通阀。The mechanical three-way valve 204 is a mechanical valve capable of outputting the third pre-control pressure P3, and an adjustable three-way valve can be selected.

调节型三通阀工作原理是通过改变阀芯的位置来改变流体渠道的方向和大小。阀芯可以通过手动装置或自动控制来改变其位置。如果需要增加流量,阀芯会移向入口,使流体更容易通过流道。相反,如果需要减少流量,阀芯会移向出口,覆盖一部分管道,减少流量。The working principle of the regulating three-way valve is to change the direction and size of the fluid channel by changing the position of the valve core. The spool can change its position by manual means or automatic control. If increased flow is required, the spool moves toward the inlet, making it easier for fluid to pass through the flow channel. On the contrary, if the flow needs to be reduced, the valve core will move toward the outlet, covering a portion of the pipe and reducing the flow.

所述机械三通阀204的第一入口连接列车管4(也叫制动管),由其提供风源;所述机械三通阀204的第二入口连接工作风缸206,当列车管4压力变化时,列车管4与工作风缸206实现动平衡。机械三通阀204的出口连接至第二切换阀203的第二入口,以输出第三预控压力P3。The first inlet of the mechanical three-way valve 204 is connected to the train pipe 4 (also called the brake pipe), which provides the air source; the second inlet of the mechanical three-way valve 204 is connected to the working air cylinder 206. When the train pipe 4 When the pressure changes, the train pipe 4 and the working air cylinder 206 achieve dynamic balance. The outlet of the mechanical three-way valve 204 is connected to the second inlet of the second switching valve 203 to output the third pre-control pressure P3.

第三预控压力P3所在的管路上还可以设置作用风缸207,用于储存压缩空气,以提供风源作为第三预控压力P3。The pipeline where the third pre-control pressure P3 is located can also be provided with an active air cylinder 207 for storing compressed air to provide an air source as the third pre-control pressure P3.

机械三通阀204使用列车管4的压力充风至工作风缸206。当列车管4的压力下降后,工作风缸206的压力会与作用风缸207导通,控制作用风缸207产生相应压力。当列车减压后,机械三通阀204将列车管压力控制输出为所需的第三预控压力P3。The mechanical three-way valve 204 uses the pressure of the train pipe 4 to charge air to the working air cylinder 206. When the pressure of the train pipe 4 decreases, the pressure of the working air cylinder 206 will be connected to the working air cylinder 207, and the working air cylinder 207 will be controlled to generate corresponding pressure. When the train is depressurized, the mechanical three-way valve 204 controls the train pipe pressure output to the required third pre-control pressure P3.

所述第二切换阀203的第一入口连通第二预控压力P2,其第二入口连通第三预控压力P3,出口连通至第一双向阀205的第二入口;用于切换连接第二预控压力P2或第三预控压力P3,并输出至第一双向阀205的第二入口。The first inlet of the second switching valve 203 is connected to the second pre-control pressure P2, the second inlet is connected to the third pre-control pressure P3, and the outlet is connected to the second inlet of the first two-way valve 205; used to switch and connect the second The pre-controlled pressure P2 or the third pre-controlled pressure P3 is output to the second inlet of the first two-way valve 205 .

在一种实施方式中,所述第二切换阀203为具有控制端口的机械切换阀,当其控制端口有风源时,连通第二预控压力P2;当其控制端口没有风源时,切换至连通第三预控压力P3。更具体地,所述制动缸控制模块2中还设置有用于控制第二切换阀203在第二预控压力P2(第一入口)和第三预控压力P3(第二入口)之间进行切换的电控阀208,其中,所述电控阀208的入口与总风3相连,其出口与第二切换阀203的控制端口相连。所述电控阀208得电时,连通总风3和第二切换阀203的控制端口,使得第二切换阀203的第一入口连通第二预控压力P2,并输出至第一双向阀205;所述电控阀208失电时,切断总风3和第二切换阀203的控制端口,使得第二切换阀203的第二入口连通第三预控压力P3,并输出至第一双向阀205。即当失电时,第二切换阀203会自动切换到连通其第二入口。In one embodiment, the second switching valve 203 is a mechanical switching valve with a control port. When its control port has an air source, it is connected to the second pre-control pressure P2; when its control port does not have an air source, it switches to connect to the third pre-control pressure P3. More specifically, the brake cylinder control module 2 is also configured to control the second switching valve 203 between the second pre-control pressure P2 (first inlet) and the third pre-control pressure P3 (second inlet). Switching electronically controlled valve 208, wherein the inlet of the electronically controlled valve 208 is connected to the main air 3, and its outlet is connected to the control port of the second switching valve 203. When the electric control valve 208 is powered on, it connects the main air 3 and the control port of the second switching valve 203, so that the first inlet of the second switching valve 203 is connected to the second pre-control pressure P2, and is output to the first two-way valve 205. ; When the electric control valve 208 loses power, the control port of the main air 3 and the second switching valve 203 is cut off, so that the second inlet of the second switching valve 203 is connected to the third pre-control pressure P3 and output to the first two-way valve 205. That is, when power is lost, the second switching valve 203 will automatically switch to connect its second inlet.

如前所述,第一双向阀205的第一入口连接第一中继阀103的出口(即连接平均管压力PA的第一分支PA1),第一双向阀205的第二入口连接第二切换阀203的出口。此外,第一双向阀205的出口连接至第二双向阀209的第一入口,以选择第一双向阀205的第一入口和第二入口中的压力较大者作为第四预控压力P4(即:P4为PA1和P2之中压力较大者,或P4为PA1和P3之中压力较大者)输出至第二双向阀209的第一入口。As mentioned above, the first inlet of the first two-way valve 205 is connected to the outlet of the first relay valve 103 (that is, connected to the first branch PA1 of the average pipe pressure PA), and the second inlet of the first two-way valve 205 is connected to the second switch The outlet of valve 203. In addition, the outlet of the first two-way valve 205 is connected to the first inlet of the second two-way valve 209 to select the larger pressure of the first inlet and the second inlet of the first two-way valve 205 as the fourth pre-control pressure P4 ( That is: P4 is the one with the higher pressure among PA1 and P2, or P4 is the one with the higher pressure among PA1 and P3) and is output to the first inlet of the second two-way valve 209.

作为一种应急的手段,所述制动缸控制模块2还设置有减压阀210和紧急增压阀211;其中,减压阀210的入口连接至总风3,其出口连接至紧急增压阀211的入口;所述紧急增压阀211的出口输出第五预控压力P5至第二双向阀209的第二入口;所述紧急增压阀211的控制端口由来自列车管4的风源控制,以打开或关闭减压阀210至第二双向阀209的第二入口之间的管路,以开启或切断第五预控压力P5的输出。当列车管4的风源的压力足够时,紧急增压阀211被控制为关闭状态;当列车管的风源的压力下降至阈值时,紧急增压阀211被控制为打开状态,使得来自减压阀210的风源到达第二双向阀209,作为第五预控压力P5。As an emergency measure, the brake cylinder control module 2 is also provided with a pressure reducing valve 210 and an emergency boosting valve 211; wherein, the inlet of the pressure reducing valve 210 is connected to the total air 3, and its outlet is connected to the emergency boosting valve. The inlet of the valve 211; the outlet of the emergency boost valve 211 outputs the fifth pre-control pressure P5 to the second inlet of the second two-way valve 209; the control port of the emergency boost valve 211 is controlled by the air source from the train pipe 4 Control to open or close the pipeline between the pressure reducing valve 210 and the second inlet of the second two-way valve 209 to open or cut off the output of the fifth pre-control pressure P5. When the pressure of the air source of the train duct 4 is sufficient, the emergency boost valve 211 is controlled to a closed state; when the pressure of the air source of the train duct drops to a threshold value, the emergency boost valve 211 is controlled to an open state, so that the pressure from the air source of the train duct 4 decreases. The air source of the pressure valve 210 reaches the second two-way valve 209 as the fifth pre-control pressure P5.

如前所述,第二双向阀209的第一入口连接第一双向阀205的出口,第二双向阀209的第二入口连接紧急增压阀211的出口;此外,第二双向阀209的出口连接至第二中继阀212的控制端口;以选择第二双向阀209的第一入口和第二入口中的压力较大者作为第六预控压力P6(即:P6为P4和P5之中压力较大者)输出至第二中继阀212的控制端口。第六预控压力P6所在的管路上还可以设置第二预控风缸213,用于储存压缩空气,以提供风源作为第六预控压力P6。As mentioned above, the first inlet of the second two-way valve 209 is connected with the outlet of the first two-way valve 205, and the second inlet of the second two-way valve 209 is connected with the outlet of the emergency boost valve 211; in addition, the outlet of the second two-way valve 209 Connect to the control port of the second relay valve 212; to select the larger pressure of the first inlet and the second inlet of the second two-way valve 209 as the sixth pre-control pressure P6 (ie: P6 is among P4 and P5 The one with the higher pressure) is output to the control port of the second relay valve 212. A second pre-control air cylinder 213 may also be provided on the pipeline where the sixth pre-control pressure P6 is located, for storing compressed air to provide an air source as the sixth pre-control pressure P6.

所述第二中继阀212的入口连接总风3,其出口连接至第三双向阀214的第二入口,以将放大后的第六预控压力作为第一制动缸压力PB1输出至第三双向阀214的第二入口。第三双向阀214的第一入口连接第一切换阀104的出口(即平均管压力PA的第二分支PA2),第三双向阀214的出口连接至制动缸215,以选择第三双向阀214的第一入口和第二入口中的压力较大者作为第二制动缸压力PB2(即:PB2为PB1和PA2之中压力较大者)输出至制动缸,以进行制动。The inlet of the second relay valve 212 is connected to the total air 3, and its outlet is connected to the second inlet of the third two-way valve 214 to output the amplified sixth pre-control pressure as the first brake cylinder pressure PB1 to the third brake cylinder pressure PB1. The second inlet of the three-way valve 214. The first inlet of the third two-way valve 214 is connected to the outlet of the first switching valve 104 (ie, the second branch PA2 of the average pipe pressure PA), and the outlet of the third two-way valve 214 is connected to the brake cylinder 215 to select the third two-way valve. The larger pressure between the first inlet and the second inlet of 214 is output to the brake cylinder as the second brake cylinder pressure PB2 (that is, PB2 is the larger pressure among PB1 and PA2) to the brake cylinder for braking.

值得理解的是,本申请中的总风可以指同一处的总风,也可以是不同处的总风(例如总风的分支),均可指来自总风缸的总风。本申请中的控制系统中还可以设置多个传感器,尤其是压力传感器,用于测量不同部位的压力,以增压或减压,或进行预警等,这是本领域的技术人员可以理解的。此外,本申请中的各种电控阀门,例如各种电磁阀等,其得电或失电等状态,以及前述的各种传感器可以由控制单元来进行控制,所述控制单元可以采用各种能够满足条件的处理器,例如CPU,PLC等等,通过编程的方式,实现上述功能,这是所能够想到的常规的控制手段,也是本领域的技术人员可以理解的。It is worth understanding that the total wind in this application can refer to the total wind at the same place, or it can be the total wind at different places (for example, a branch of the total wind), or it can all refer to the total wind from the total air cylinder. The control system in this application can also be provided with multiple sensors, especially pressure sensors, for measuring pressure at different locations to increase or decrease pressure, or to provide early warning, etc. This is understandable to those skilled in the art. In addition, various electronically controlled valves in this application, such as various solenoid valves, etc., their power-on or power-off status, as well as the aforementioned various sensors can be controlled by a control unit, and the control unit can adopt various A processor that can meet the conditions, such as CPU, PLC, etc., can realize the above functions through programming. This is a conventional control method that can be thought of and can be understood by those skilled in the art.

本申请的第二种实施方式提供了一种机车制动控制方法,采用前文任意实施方式所述的机车制动控制系统,包括以下状态中的至少一种:The second embodiment of the present application provides a locomotive braking control method, using the locomotive braking control system described in any of the previous embodiments, including at least one of the following states:

(1)正常工作状态(如图1所示):(1) Normal working status (as shown in Figure 1):

在平均管控制模块中:In the averaging tube control module:

所述第一充气电磁阀101和第一排气电磁阀102通过充气动作和排气动作将输入的总风3的压力控制输出为所需的第一预控压力P1,并输出至第一预控风缸105。The first charging solenoid valve 101 and the first exhaust solenoid valve 102 control and output the input pressure of the total air 3 to the required first pre-control pressure P1 through the charging action and the exhaust action, and output it to the first pre-control pressure P1. Air control cylinder 105.

所述第一预控压力P1还作用在第一中继阀103的控制端口,第一中继阀103的入口输入总风3,经过流量放大后,第一中继阀103的出口输出平均管压力PA,该平均管压力的第一分支PA1到达制动缸控制模块2的第一双向阀205的第一入口。The first pre-control pressure P1 also acts on the control port of the first relay valve 103. The inlet of the first relay valve 103 inputs the total air 3. After flow amplification, the outlet of the first relay valve 103 outputs the average pipe. The pressure PA, the first branch PA1 of this average pipe pressure reaches the first inlet of the first two-way valve 205 of the brake cylinder control module 2 .

所述第一切换阀104失电,处于关闭状态,不提供平均管压力的第二分支PA2至第三双向阀214。The first switching valve 104 is de-energized and is in a closed state, and does not provide the second branch PA2 to the third two-way valve 214 of the average pipe pressure.

在制动缸控制模块中:In the brake cylinder control module:

所述第二充气电磁阀201和第二排气电磁阀202通过充气动作和排气动作将输入的总风3的压力控制输出为所需的第二预控压力P2。The second charging solenoid valve 201 and the second exhaust solenoid valve 202 control and output the input pressure of the total air 3 to the required second pre-control pressure P2 through charging actions and exhaust actions.

电控阀208得电,总风3到达第二切换阀203的控制端口,使得所述第二预控压力P2进入第二切换阀203并到达第一双向阀205的第二入口。When the electronically controlled valve 208 is powered, the total air 3 reaches the control port of the second switching valve 203, so that the second pre-control pressure P2 enters the second switching valve 203 and reaches the second inlet of the first two-way valve 205.

所述第一双向阀205在平均管压力的第一分支PA1和第二预控压力P2中取大,输出第四预控压力P4至第二双向阀209的第一入口。The first two-way valve 205 takes the larger of the first branch PA1 of the average pipe pressure and the second pre-control pressure P2, and outputs the fourth pre-control pressure P4 to the first inlet of the second two-way valve 209.

当列车管4的压力降低至阈值时,紧急增压阀211导通,输出第五预控压力P5至第二双向阀209的第二入口。所述第二双向阀209在第四预控压力P4和第五预控压力P5中取大,输出第六预控压力P6至第二预控风缸213。When the pressure of the train pipe 4 decreases to the threshold value, the emergency boost valve 211 is turned on and outputs the fifth pre-control pressure P5 to the second inlet of the second two-way valve 209 . The second two-way valve 209 takes the larger of the fourth pre-control pressure P4 and the fifth pre-control pressure P5, and outputs the sixth pre-control pressure P6 to the second pre-control air cylinder 213.

当列车管4的压力高于阈值时,紧急增压阀211为关闭状态;此时,所述第二双向阀209仅获取第四预控压力P4,输出第六预控压力P6至第二预控风缸213。When the pressure of the train pipe 4 is higher than the threshold value, the emergency boosting valve 211 is in a closed state; at this time, the second two-way valve 209 only obtains the fourth pre-control pressure P4 and outputs the sixth pre-control pressure P6 to the second pre-control pressure. Air control cylinder 213.

第六预控压力P6还作用在第二中继阀212的控制端口,第二中继阀212的入口输入总风3,经过流量放大后,第二中继阀212的出口输出第一制动缸压力PB1至第三双向阀214的第二入口。The sixth pre-control pressure P6 also acts on the control port of the second relay valve 212. The inlet of the second relay valve 212 inputs the total air 3. After the flow is amplified, the outlet of the second relay valve 212 outputs the first brake. Cylinder pressure PB1 to the second inlet of the third two-way valve 214.

所述第三双向阀214将第一制动缸压力PB1输出为第二制动缸压力PB2,并到达制动缸215,以实现制动。The third two-way valve 214 outputs the first brake cylinder pressure PB1 as the second brake cylinder pressure PB2 and reaches the brake cylinder 215 to achieve braking.

(2)制动缸控制模块故障状态(如图2所示)(2) Brake cylinder control module fault status (as shown in Figure 2)

当制动缸控制模块中出现故障时,例如第二充气电磁阀201,第二排气电磁阀202故障,或者制动缸失电等。When a fault occurs in the brake cylinder control module, for example, the second charging solenoid valve 201, the second exhaust solenoid valve 202 fails, or the brake cylinder loses power, etc.

在平均管控制模块中:In the averaging tube control module:

所述第一充气电磁阀101和第一排气电磁阀102通过充气动作和排气动作将输入的总风3的压力控制输出为所需的第一预控压力P1,并输出至第一预控风缸105。The first charging solenoid valve 101 and the first exhaust solenoid valve 102 control and output the input pressure of the total air 3 to the required first pre-control pressure P1 through the charging action and the exhaust action, and output it to the first pre-control pressure P1. Air control cylinder 105.

所述第一预控压力P1还作用在第一中继阀103的控制端口,第一中继阀103的入口输入总风3,经过流量放大后,第一中继阀103的出口输出平均管压力PA,该平均管压力的第一分支PA1到达制动缸控制模块2的第一双向阀205的第一入口。The first pre-control pressure P1 also acts on the control port of the first relay valve 103. The inlet of the first relay valve 103 inputs the total air 3. After flow amplification, the outlet of the first relay valve 103 outputs the average pipe. The pressure PA, the first branch PA1 of this average pipe pressure reaches the first inlet of the first two-way valve 205 of the brake cylinder control module 2 .

所述第一切换阀104失电,处于关闭状态,无法提供平均管压力的第二分支PA2至第三双向阀214。The first switching valve 104 is de-energized and is in a closed state, and cannot provide the second branch PA2 to the third two-way valve 214 of the average pipe pressure.

本实施方式中平均管控制模块的工作方式与正常工作状态下的平均管控制模块的工作方式是相似或相同的。The working mode of the average tube control module in this embodiment is similar or the same as the working mode of the average tube control module under normal working conditions.

在制动缸控制模块中:In the brake cylinder control module:

所述第二充气电磁阀201和第二排气电磁阀202故障,无法正常地输出第二预控压力P2。The second charging solenoid valve 201 and the second exhaust solenoid valve 202 are faulty and cannot normally output the second pre-control pressure P2.

此时,电控阀208失电,没有风源到达第二切换阀203的控制端口,使得第二切换阀203切换至连接机械三通阀204,所述机械三通阀204根据列车管4的压力变化产生第三预控压力P3,并输出至第一双向阀205的第二入口。At this time, the electronically controlled valve 208 loses power and no air source reaches the control port of the second switching valve 203 , causing the second switching valve 203 to switch to the mechanical three-way valve 204 . The mechanical three-way valve 204 is connected to the train pipe 4 according to the The pressure change generates a third pre-control pressure P3, which is output to the second inlet of the first two-way valve 205.

所述第一双向阀205在平均管压力的第一分支PA1和第三预控压力P3中取大,输出第四预控压力P4至第二双向阀209的第一入口。The first two-way valve 205 takes the larger of the first branch PA1 of the average pipe pressure and the third pre-control pressure P3, and outputs the fourth pre-control pressure P4 to the first inlet of the second two-way valve 209.

当列车管4的压力降低至阈值时,紧急增压阀211导通,输出第五预控压力P5至第二双向阀209的第二入口。所述第二双向阀209在第四预控压力P4和第五预控压力P5中取大,输出第六预控压力P6至第二预控风缸213。When the pressure of the train pipe 4 decreases to the threshold value, the emergency boost valve 211 is turned on and outputs the fifth pre-control pressure P5 to the second inlet of the second two-way valve 209 . The second two-way valve 209 takes the larger of the fourth pre-control pressure P4 and the fifth pre-control pressure P5, and outputs the sixth pre-control pressure P6 to the second pre-control air cylinder 213.

当列车管4的压力高于阈值时,紧急增压阀211为关闭状态;此时,所述第二双向阀209仅获取第四预控压力P4,输出第六预控压力P6至第二预控风缸213。When the pressure of the train pipe 4 is higher than the threshold value, the emergency boosting valve 211 is in a closed state; at this time, the second two-way valve 209 only obtains the fourth pre-control pressure P4 and outputs the sixth pre-control pressure P6 to the second pre-control pressure. Air control cylinder 213.

第六预控压力P6还作用在第二中继阀212的控制端口,第二中继阀212的入口输入总风3,经过流量放大后,第二中继阀212的出口输出第一制动缸压力PB1至第三双向阀214的第二入口。The sixth pre-control pressure P6 also acts on the control port of the second relay valve 212. The inlet of the second relay valve 212 inputs the total air 3. After the flow is amplified, the outlet of the second relay valve 212 outputs the first brake. Cylinder pressure PB1 to the second inlet of the third two-way valve 214.

所述第三双向阀214将第一制动缸压力PB1输出为第二制动缸压力PB2,并到达制动缸215,以实现制动。The third two-way valve 214 outputs the first brake cylinder pressure PB1 as the second brake cylinder pressure PB2 and reaches the brake cylinder 215 to achieve braking.

在该情况下,平均管控制模块可以继续提供平均管压力的第一分支PA1;同时,机械三通阀204也可以输出第三预控压力P3,从而可以实现双保险。In this case, the average pipe control module can continue to provide the first branch PA1 of the average pipe pressure; at the same time, the mechanical three-way valve 204 can also output the third pre-control pressure P3, thereby achieving double insurance.

(3)第二中继阀故障状态(如图3所示)(3) Second relay valve fault status (shown in Figure 3)

当第二中继阀212故障时,无法将前文所述的第六预控压力P6输出为第一制动缸压力PB1,此时,平均管控制模块1控制第一切换阀104得电,将平均管压力的第二分支PA2直接输出至第三双向阀214,提供制动缸压力。具体实现如下:When the second relay valve 212 fails, the sixth pre-control pressure P6 mentioned above cannot be output as the first brake cylinder pressure PB1. At this time, the averaging pipe control module 1 controls the first switching valve 104 to be energized. The second branch PA2 of the average pipe pressure is directly output to the third two-way valve 214 to provide brake cylinder pressure. The specific implementation is as follows:

在平均管控制模块中:In the averaging tube control module:

所述第一充气电磁阀101和第一排气电磁阀102通过充气动作和排气动作将输入的总风3的压力控制输出为所需的第一预控压力P1,并输出至第一预控风缸105。The first charging solenoid valve 101 and the first exhaust solenoid valve 102 control and output the input pressure of the total air 3 to the required first pre-control pressure P1 through the charging action and the exhaust action, and output it to the first pre-control pressure P1. Air control cylinder 105.

所述第一预控压力P1还作用在第一中继阀103的控制端口,第一中继阀103的入口输入总风3,经过流量放大后,第一中继阀103的出口输出平均管压力PA。The first pre-control pressure P1 also acts on the control port of the first relay valve 103. The inlet of the first relay valve 103 inputs the total air 3. After flow amplification, the outlet of the first relay valve 103 outputs the average pipe. Pressure PA.

其中,平均管压力的第一分支PA1到达制动缸控制模块2的第一双向阀205的第一入口。所述第一切换阀104得电,处于开启状态,将平均管压力的第二分支PA2提供至第三双向阀214的第一入口。The first branch PA1 of the average pipe pressure reaches the first inlet of the first two-way valve 205 of the brake cylinder control module 2 . The first switching valve 104 is powered and is in an open state, providing the second branch PA2 of the average pipe pressure to the first inlet of the third two-way valve 214 .

在制动缸控制模块中:In the brake cylinder control module:

第二中继阀212故障,第一制动缸压力PB1无法有效输出。The second relay valve 212 fails and the first brake cylinder pressure PB1 cannot be effectively output.

所述第三双向阀214将平均管压力的第二分支PA2输出为第二制动缸压力PB2,并到达制动缸215,以实现制动。The third two-way valve 214 outputs the second branch PA2 of the average pipe pressure as the second brake cylinder pressure PB2, and reaches the brake cylinder 215 to achieve braking.

本实施方式中所述步骤的顺序仅仅为描述顺序,在实际操作中,可以根据实际需求进行调整,因此该描述顺序并不构成对本申请的绝对限制。The order of the steps described in this embodiment is only the order of description. In actual operation, it can be adjusted according to actual needs. Therefore, the order of description does not constitute an absolute limitation on the present application.

本实施方式通过上述的系统设置和控制设置,本申请至少可以实现以下功能:In this embodiment, through the above system settings and control settings, this application can achieve at least the following functions:

(1)当制动缸控制模块中第二充气和第二排气电磁阀出现压力控制故障时,可自动切换平均管压力的第一分支PA1进行冗余控制,也可以自动切换机械三通阀204进行冗余控制。(1) When a pressure control failure occurs in the second charging and second exhaust solenoid valves in the brake cylinder control module, the first branch PA1 of the average pipe pressure can be automatically switched for redundant control, or the mechanical three-way valve can be automatically switched. 204 for redundancy control.

(2)制动缸控制模块中,电控阀208正常工作时得电,冗余工作时失电;当制动缸控制模块失电时,同样可以实现机械三通阀冗余控制制动缸的压力。(2) In the brake cylinder control module, the electronic control valve 208 is powered when working normally and is powered off when working redundantly; when the brake cylinder control module is powered off, the mechanical three-way valve can also be used to redundantly control the brake cylinder. pressure.

(3)紧急增压阀211控制风源使用列车管压力,当列车管压力排空后,紧急增压阀211自动导通输出第五预控压力P5至第二双向阀209,为制动缸控制模块提供预控压力。(3) The emergency boosting valve 211 controls the air source using the train pipe pressure. When the train pipe pressure is exhausted, the emergency boosting valve 211 automatically conducts and outputs the fifth pre-control pressure P5 to the second two-way valve 209, which is the brake cylinder. The control module provides pre-controlled pressure.

(4)当第二中继阀212故障时,无法将第六预控压力P6输出为第一制动缸压力PB1,通过平均管控制模块控制第一切换阀104得电,将平均管的分支压力直接输出至制动缸,提供制动缸压力。(4) When the second relay valve 212 fails, the sixth pre-control pressure P6 cannot be output as the first brake cylinder pressure PB1. The averaging pipe control module controls the first switching valve 104 to be energized, and the branches of the averaging pipe are The pressure is output directly to the brake cylinder, providing brake cylinder pressure.

(5)本申请中功能模块分区处理,制动缸控制模块中进行制动缸压力相关功能控制,平均管控制模块中进行平均管压力功能控制。当一个模块出现故障时,另一个功能模块进行冗余控制,制动系统功能正常使用,提高了系统的可用性。当一个模块故障时,待具备检修条件后,再进行对应模块的更换处理,提高了系统的可维护性。(5) In this application, the functional modules are partitioned. The brake cylinder control module controls the brake cylinder pressure-related functions, and the average tube control module controls the average tube pressure function. When one module fails, the other functional module performs redundant control and the braking system functions normally, improving system availability. When a module fails, the corresponding module will be replaced after maintenance conditions are met, which improves the maintainability of the system.

所述的实施方式仅仅是对本申请的优选实施方式进行描述,并非对本申请的范围进行限定,在不脱离本申请设计精神的前提下,本领域普通技术人员对本申请的技术方案作出的各种变形和改进,均应落入本申请权利要求书确定的保护范围内。The described embodiments are only descriptions of the preferred embodiments of the present application and do not limit the scope of the present application. Without departing from the design spirit of the present application, those of ordinary skill in the art may make various modifications to the technical solutions of the present application. and improvements shall fall within the protection scope determined by the claims of this application.

Claims (10)

1. The locomotive braking control system is characterized by comprising an average pipe control module, a brake cylinder control module and total wind; wherein:
The average pipe control module comprises a first inflation electromagnetic valve and a first exhaust electromagnetic valve which are connected with the total wind, and the first inflation electromagnetic valve and the first exhaust electromagnetic valve can control and output the pressure of the inputted total wind to a required first pre-control pressure P1 through inflation action and exhaust action;
the average pipe control module further comprises a first relay valve and a first switching valve; wherein the first pre-control pressure P1 reaches the control port of the first relay valve; the inlet of the first relay valve is connected to the total wind, and the outlet of the first relay valve outputs the amplified first pre-control pressure as an average pipe pressure PA; the first branch PA1 of the average line pressure PA is connected by a line to a first inlet of a first two-way valve of the brake cylinder control module; the second branch PA2 of the average pipe pressure PA is connected to the inlet of said first switching valve by a pipe; the outlet of the second switching valve is capable of outputting the second branch PA2 to the first inlet of the third two-way valve of the brake cylinder control module;
the brake cylinder control module comprises a second inflation electromagnetic valve and a second exhaust electromagnetic valve which are connected with the total wind, and the second inflation electromagnetic valve and the second exhaust electromagnetic valve can control and output the pressure of the inputted total wind to a required second pre-control pressure P2 through inflation action and exhaust action;
The brake cylinder control module further comprises a second switching valve, a mechanical three-way valve and a first two-way valve; wherein the second pilot pressure P2 is connected to the first inlet of the second switching valve;
the mechanical three-way valve is a mechanical valve capable of outputting a third pre-control pressure P3; a first inlet of the mechanical three-way valve is connected with a train pipe to provide a wind source; the outlet of the mechanical three-way valve is connected to the second inlet of the second switching valve to output a third pre-control pressure P3;
the second switching valve is configured to be switchable between its first and second inlets to select the second or third pilot pressure P2, P3, the outlet of the second switching valve being connected to the second inlet of the first bi-directional valve;
the outlet of the first bi-directional valve is connected to the control port of the second relay valve to select the larger of the pressures in the first inlet and the second inlet of the first bi-directional valve as the fourth pre-control pressure P4 to be output to the control port of the second relay valve;
the inlet of the second relay valve is connected with total wind, and the outlet of the second relay valve is connected with the second inlet of the third bi-directional valve so as to output the amplified fourth pre-control pressure as the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve;
The outlet of the third two-way valve is connected to the brake cylinder to select the larger of the pressures in the first and second inlets of the third two-way valve as the second brake cylinder pressure PB2 to be output to the brake cylinder for braking.
2. The locomotive brake control system of claim 1, wherein the brake cylinder control module further comprises a second two-way valve, a pressure relief valve, and an emergency pressure boost valve; wherein,,
the outlet of the first bi-directional valve is connected to the first inlet of the second bi-directional valve to select the larger of the pressures in the first and second inlets of the first bi-directional valve as the fourth pre-control pressure P4 to output to the first inlet of the second bi-directional valve;
the inlet of the pressure reducing valve is connected to the total wind, and the outlet of the pressure reducing valve is connected to the inlet of the emergency pressure increasing valve; the outlet of the emergency booster valve outputs a fifth pre-control pressure P5 to the second inlet of the second two-way valve; the control port of the emergency booster valve is connected with the train pipe to provide a control wind source for opening or closing the emergency booster valve;
the outlet of the second bi-directional valve is connected to the control port of the second relay valve to select the larger of the pressures in the first and second inlets of the second bi-directional valve as the sixth pre-control pressure P6 to be output to the control port of the second relay valve.
3. The locomotive brake control system of claim 2, wherein the mechanical three-way valve is a selectively adjustable three-way valve; and a second inlet of the mechanical three-way valve is connected with the working air cylinder, and when the pressure of the train pipe changes, the train pipe and the working air cylinder realize dynamic balance.
4. A locomotive brake control system according to any one of claims 1-3 wherein the second switching valve is a mechanical switching valve having a control port; when the control port of the air conditioner is provided with an air source, the second pre-control pressure P2 is communicated; when the control port has no wind source, the third pre-control pressure P3 is switched to be communicated.
5. A locomotive brake control system according to any one of claims 1-3, wherein an electrically controlled valve is provided in the brake cylinder control module for controlling the second switching valve to switch between the second pre-control pressure P2 and the third pre-control pressure P3; the inlet of the electric control valve is connected with the total wind, and the outlet of the electric control valve is connected with the control port of the second switching valve; wherein the electrically controlled valve is configured to: when power is obtained, the control port of the total wind and the control port of the second switching valve are communicated, so that the second switching valve is communicated with the second pre-control pressure P2; when power is lost, the control ports of the total wind and the second switching valve are cut off, so that the second switching valve is communicated with the third pre-control pressure P3.
6. A locomotive brake control system according to any one of claims 1-3 wherein a first pilot reservoir is provided on the line at which the first pilot pressure P1 is located, capable of storing compressed air to provide a source of air as the first pilot pressure P1.
7. A locomotive brake control system according to claim 2 or claim 3 wherein a second pre-control reservoir is provided in the line at which the sixth pre-control pressure P6 is located for storing compressed air to provide a source of air as the sixth pre-control pressure P6.
8. A locomotive brake control system according to any one of claims 1-3 wherein an active reservoir is provided in the line at which the third pre-control pressure P3 is located for storing compressed air to provide a source of air as the third pre-control pressure P3.
9. A method of locomotive brake control employing the locomotive brake control system of any one of claims 1-8, the method comprising at least one of the following three conditions:
(1) Normal operating state:
in the average pipe control module:
the first inflation electromagnetic valve and the first exhaust electromagnetic valve control and output the pressure of the input total wind to be required first pre-control pressure P1 through inflation action and exhaust action, the pressure is acted on a control port of the first relay valve, the total wind is input into an inlet of the first relay valve, and after the flow is amplified, the average pipe pressure PA is output from an outlet of the first relay valve; the first branch PA1 of the average line pressure reaches the first inlet of the first two-way valve of the brake cylinder control module;
The first switching valve is in a closed state, and does not provide the first inlets of the second branch PA2 to the third two-way valve of the average pipe pressure;
in the brake cylinder control module:
the second inflation electromagnetic valve and the second exhaust electromagnetic valve control and output the pressure of the input total wind to a required second pre-control pressure P2 through inflation action and exhaust action;
the total wind reaches a control port of the second switching valve, so that the second pre-control pressure P2 enters the second switching valve and reaches a second inlet of the first bi-directional valve;
the first two-way valve is used for taking the large value in a first branch PA1 and a second pre-control pressure P2 of the average pipe pressure, outputting a fourth pre-control pressure P4 and acting on a control port of the second relay valve; the inlet of the second relay valve inputs total wind, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve;
the third bi-directional valve outputs the first brake cylinder pressure PB1 as the second brake cylinder pressure PB2 and reaches the brake cylinder to realize braking;
(2) Brake cylinder control module fault status
In the average pipe control module:
the first inflation electromagnetic valve and the first exhaust electromagnetic valve control and output the pressure of the input total wind into a required first pre-control pressure P1 through inflation action and exhaust action, the required first pre-control pressure P1 acts on a control port of the first relay valve, the total wind is input into an inlet of the first relay valve, after the flow is amplified, an average pipe pressure PA is output from an outlet of the first relay valve, and a first branch PA1 of the average pipe pressure reaches a first inlet of a first bi-directional valve of the brake cylinder control module;
The first switching valve is in a closed state, and cannot provide the first inlets of the second branch PA2 to the third two-way valve with average pipe pressure;
in the brake cylinder control module:
the brake cylinder control module cannot normally output a second pre-control pressure P2;
no wind source reaches a control port of the second switching valve, so that the second switching valve is switched to be connected with a mechanical three-way valve, and the mechanical three-way valve generates third pre-control pressure P3 according to pressure change of a train pipe and outputs the third pre-control pressure P3 to a second inlet of the first two-way valve;
the first two-way valve is used for taking the large value in the first branch PA1 and the third pre-control pressure P3 of the average pipe pressure, outputting the fourth pre-control pressure P4 and acting on a control port of the second relay valve; the inlet of the second relay valve inputs total wind, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve;
the third bi-directional valve outputs the first brake cylinder pressure PB1 as the second brake cylinder pressure PB2 and reaches the brake cylinder to realize braking;
(3) Second relay valve failure state
In the average pipe control module:
the first inflation electromagnetic valve and the first exhaust electromagnetic valve control and output the pressure of the input total wind to be required first pre-control pressure P1 through inflation action and exhaust action, the pressure is acted on a control port of the first relay valve, the total wind is input into an inlet of the first relay valve, and after the flow is amplified, the average pipe pressure PA is output from an outlet of the first relay valve; wherein the first branch PA1 of the average line pressure reaches the first inlet of the first two-way valve of the brake cylinder control module; the first switching valve is in an open state, and provides a second branch PA2 of average pipe pressure to a first inlet of a third two-way valve;
In the brake cylinder control module:
the second relay valve malfunctions, and the first brake cylinder pressure PB1 cannot be effectively output; at this time, the third two-way valve outputs the second branch PA2 of the average pipe pressure as the second brake cylinder pressure PB2 and reaches the brake cylinder to achieve braking.
10. The locomotive brake control method of claim 9, wherein when the brake cylinder control module has a second two-way valve, a pressure relief valve, and an emergency pressure boost valve:
for (1) normal operating conditions:
the first bi-directional valve takes a large value in a first branch PA1 and a second pre-control pressure P2 of average pipe pressure and outputs a fourth pre-control pressure P4 to a first inlet of the second bi-directional valve;
when the pressure of the train pipe is reduced to the threshold value, the emergency booster valve is conducted, and a fifth pre-control pressure P5 is output to a second inlet of the second two-way valve; the second bi-directional valve takes a large value in the fourth pre-control pressure P4 and the fifth pre-control pressure P5, outputs a sixth pre-control pressure P6 and acts on a control port of the second relay valve; the inlet of the second relay valve inputs total wind, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve;
when the pressure of the train pipe is higher than the threshold value, the emergency booster valve is closed; at this time, the second bi-directional valve acquires only the fourth pilot pressure P4, outputs the sixth pilot pressure P6, and acts on the control port of the second relay valve; the inlet of the second relay valve inputs total wind, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve;
For (2) brake cylinder control module failure state:
the first bi-directional valve takes a large value in a first branch PA1 and a third pre-control pressure P3 of average pipe pressure and outputs a fourth pre-control pressure P4 to a first inlet of the second bi-directional valve;
when the pressure of the train pipe is reduced to the threshold value, the emergency booster valve is conducted, and a fifth pre-control pressure P5 is output to a second inlet of the second two-way valve; the second bi-directional valve takes a large value in the fourth pre-control pressure P4 and the fifth pre-control pressure P5, outputs a sixth pre-control pressure P6 and acts on a control port of the second relay valve; the inlet of the second relay valve inputs total wind, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve;
when the pressure of the train pipe is higher than the threshold value, the emergency booster valve is closed; at this time, the second bi-directional valve acquires only the fourth pilot pressure P4, outputs the sixth pilot pressure P6, and acts on the control port of the second relay valve; the inlet of the second relay valve inputs total wind, and after flow amplification, the outlet of the second relay valve outputs the first brake cylinder pressure PB1 to the second inlet of the third bi-directional valve.
CN202310909035.6A 2023-07-24 2023-07-24 Locomotive braking control system and control method Pending CN116811819A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202310909035.6A CN116811819A (en) 2023-07-24 2023-07-24 Locomotive braking control system and control method
AU2023378543A AU2023378543B2 (en) 2023-07-24 2023-11-20 Locomotive brake control system and control method
PCT/CN2023/132602 WO2024099461A1 (en) 2023-07-24 2023-11-20 Locomotive brake control system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310909035.6A CN116811819A (en) 2023-07-24 2023-07-24 Locomotive braking control system and control method

Publications (1)

Publication Number Publication Date
CN116811819A true CN116811819A (en) 2023-09-29

Family

ID=88118474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310909035.6A Pending CN116811819A (en) 2023-07-24 2023-07-24 Locomotive braking control system and control method

Country Status (3)

Country Link
CN (1) CN116811819A (en)
AU (1) AU2023378543B2 (en)
WO (1) WO2024099461A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024099461A1 (en) * 2023-07-24 2024-05-16 中车制动系统有限公司 Locomotive brake control system and control method
CN118478851A (en) * 2024-06-04 2024-08-13 中车制动系统有限公司 Emergency braking cylinder pressure control system, control method and locomotive
CN118810713A (en) * 2024-07-19 2024-10-22 中车制动系统有限公司 Locomotive brake control system and control method with fire-free return function

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119796269B (en) * 2025-01-02 2025-11-25 中国神华能源股份有限公司神朔铁路分公司 Brake cylinder pressure control device, method, equipment, medium and procedure for repair locomotives

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005042673A1 (en) * 2005-09-08 2007-03-15 Man Nutzfahrzeuge Ag Compressed-air brake system for e.g. commercial vehicle, has redundancy line provided, where connection element is partially suppliable with compressed air by line and brake element is temporarily suppliable with compressed air by line
US9868454B2 (en) * 2013-09-26 2018-01-16 FAIVELEY TRANSPORT ITALIA S. p. A. Pneumatic brake system redundancy in locomotive consists
CN109383554B (en) * 2017-08-03 2020-05-19 中车唐山机车车辆有限公司 Centralized brake control system and method for control train and brake control system for motor train unit
CN111634304B (en) * 2019-03-01 2021-02-19 中车青岛四方车辆研究所有限公司 Locomotive brake control system and control method
US20220105917A1 (en) * 2019-03-01 2022-04-07 Crrc Qingdao Sifang Rolling Stock Research Institute Co., Ltd. Locomotive braking control system and control method
CN212796891U (en) * 2020-05-29 2021-03-26 中车株洲电力机车有限公司 Emergency braking control system of straight-through brake for urban rail vehicle
CN113002584B (en) * 2021-03-31 2022-06-03 中车青岛四方车辆研究所有限公司 Locomotive brake cylinder and mean pipe pressure control system and control method
CN113212405A (en) * 2021-06-01 2021-08-06 中车青岛四方车辆研究所有限公司 Locomotive backup brake device, control method thereof and locomotive
CN114750737B (en) * 2022-05-30 2023-01-20 中车制动系统有限公司 Locomotive brake control system and control method
CN115675563B (en) * 2022-09-27 2025-01-28 中车制动系统有限公司 A non-powered return control system suitable for EMUs and locomotives and its vehicle
CN116811819A (en) * 2023-07-24 2023-09-29 中车制动系统有限公司 Locomotive braking control system and control method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024099461A1 (en) * 2023-07-24 2024-05-16 中车制动系统有限公司 Locomotive brake control system and control method
CN118478851A (en) * 2024-06-04 2024-08-13 中车制动系统有限公司 Emergency braking cylinder pressure control system, control method and locomotive
CN118478851B (en) * 2024-06-04 2025-09-09 中车制动系统有限公司 Emergency braking cylinder pressure control system, control method and locomotive
CN118810713A (en) * 2024-07-19 2024-10-22 中车制动系统有限公司 Locomotive brake control system and control method with fire-free return function

Also Published As

Publication number Publication date
AU2023378543B2 (en) 2025-12-11
WO2024099461A1 (en) 2024-05-16
AU2023378543A1 (en) 2025-10-23

Similar Documents

Publication Publication Date Title
CN116811819A (en) Locomotive braking control system and control method
WO2019238138A1 (en) Locomotive braking control system and control method
CN102963347B (en) Air brake system for automatic program management (APM) vehicle
CN113002584B (en) Locomotive brake cylinder and mean pipe pressure control system and control method
EP3636504B1 (en) A system for controlling backup air brake for a locomotive
CN102770318B (en) Compressed air preparation device for motor vehicles
CN113104058B (en) Air brake control unit, brake control device and method for railway vehicle
US8544491B2 (en) Compressed air supply system for a commercial vehicle, and method for operating a compressed air supply system
US20090091181A1 (en) Electronic equalizing reservoir controller with pneumatic penalty override and reduction limiting
CN209921327U (en) Rail train braking system
CN108657218A (en) A kind of auxiliary braking control device and method for magnetic-levitation train
CN115009246B (en) Microcomputer controlled air brake device adapted to existing rail engineering vehicle brake system
CN114750737B (en) Locomotive brake control system and control method
US11738730B2 (en) Vehicle braking system
CN209671463U (en) A clutch and brake air circuit protection device
US9140411B2 (en) Compressed air supply device for commercial vehicles
CN111661025B (en) Method and device for controlling average pipe pressure of locomotive brake
CN118810713B (en) Locomotive brake control system and control method with fire-free return function
CN100389034C (en) Electronic compressed air system
CN114126936B (en) Parking brake device
CN111520198A (en) DEH system emergency interrupt control mechanism
US20220105917A1 (en) Locomotive braking control system and control method
US20240149856A1 (en) Redundant governor apparatus for a vehicle air brake charging system
CN115214583A (en) Control system of railway freight car electro-pneumatic brake valve
CN210971035U (en) Train system and train

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination