[go: up one dir, main page]

CN116510817A - Assembled crushing station - Google Patents

Assembled crushing station Download PDF

Info

Publication number
CN116510817A
CN116510817A CN202310525672.3A CN202310525672A CN116510817A CN 116510817 A CN116510817 A CN 116510817A CN 202310525672 A CN202310525672 A CN 202310525672A CN 116510817 A CN116510817 A CN 116510817A
Authority
CN
China
Prior art keywords
plate
crushing
frame
connecting plate
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310525672.3A
Other languages
Chinese (zh)
Inventor
王春仁
赵迎贵
陈海
陈洪
刘金龙
孙立君
余敏
宣良瑞
王博
张若信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Masteel Design & Research Institute Co ltd
Original Assignee
Masteel Design & Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Masteel Design & Research Institute Co ltd filed Critical Masteel Design & Research Institute Co ltd
Priority to CN202310525672.3A priority Critical patent/CN116510817A/en
Publication of CN116510817A publication Critical patent/CN116510817A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/02Crushing or disintegrating by roller mills with two or more rollers
    • B02C4/08Crushing or disintegrating by roller mills with two or more rollers with co-operating corrugated or toothed crushing-rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/28Details
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/62Plastics recycling; Rubber recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Crushing And Grinding (AREA)

Abstract

The invention discloses an assembled crushing station, and belongs to the technical field of mine crushing. The invention comprises a crushing platform and a crusher arranged on the crushing platform, wherein the crushing platform is positioned and installed through a plurality of fixed piers, and the side surface of the crushing platform is connected with a box body; the box body comprises a frame and a first connecting plate positioned at the end part of the frame, and a supporting component is arranged between the first connecting plate and the other end part of the frame; the supporting component comprises a second connecting plate connected with the frame end plate and a supporting plate connected with the second connecting plate, and the other end of the supporting plate is connected with the first connecting plate. According to the assembled crushing station, the crushing platform, the fixed piers and the box body are assembled in a detachable mode, so that the problems that the existing reinforced concrete retaining wall and the foundation are difficult to disassemble are solved, the crushing platform and the box body can be reused, and the construction cost can be saved.

Description

一种装配式破碎站An assembled crushing station

技术领域technical field

本发明属于矿山破碎技术领域,更具体地说,涉及一种装配式破碎站。The invention belongs to the technical field of mine crushing, and more specifically relates to an assembled crushing station.

背景技术Background technique

矿山用破碎站主要用于矿山开采时,对矿石进行破碎加工处理。目前,国内外矿山固定式、半固定式及移动式破碎站结构配件、挡墙和基础,存在安装复杂、施工工期长、造价高和移动困难等缺点。其中,破碎站挡墙和基础中的钢筋混凝土大块式挡墙和基础最为常见,当破碎站随着采场工作面的变化而需要拆移时,已建钢筋混凝土挡墙和基础的拆除困难及不能重复使用,新建钢筋混凝土挡墙和基础的高造价,都会影响工程项目的施工进度并造成费用的增加。而高效灵活的装配式破碎站的研发和应用,既能减少减少投资,又能保证工程施工进度。因此,该领域市场推广应用前景广泛。Mining crushing station is mainly used for crushing ore during mining. At present, the structural accessories, retaining walls and foundations of fixed, semi-fixed and mobile crushing stations in mines at home and abroad have disadvantages such as complicated installation, long construction period, high cost and difficult movement. Among them, the reinforced concrete block retaining wall and foundation in the crushing station retaining wall and foundation are the most common. When the crushing station needs to be dismantled with the change of the stope working face, it is difficult to dismantle the existing reinforced concrete retaining wall and foundation And can not be reused, the high cost of new reinforced concrete retaining walls and foundations will affect the construction progress of the project and cause an increase in costs. The development and application of efficient and flexible prefabricated crushing stations can not only reduce investment, but also ensure the construction progress of the project. Therefore, the market promotion and application prospect in this field is broad.

经检索,中国专利申请号为202111061154.8的申请案,公开了一种小型矿山用移动式破碎站。该申请案包括破碎站主体、料斗、第二支架、支撑壳体、第二传输带装置、第五传输带装置和第七传输带装置,所述破碎站主体上设置有处理箱,且处理箱上端设置有风机,所述风机与连接管相连接,且连接管与吸管相连接,所述吸管远离连接管一端设置有反击式破碎机上,且反击式破碎机设置在破碎站主体上,同时反击式破碎机设置在处理箱右侧,所述第二传输带装置设置在破碎站主体上。After retrieval, the Chinese patent application number 202111061154.8 discloses a mobile crushing station for small mines. The application includes a crushing station main body, a hopper, a second bracket, a supporting shell, a second conveyor belt device, a fifth conveyor belt device, and a seventh conveyor belt device. The crushing station main body is provided with a treatment box, and the treatment box The upper end is provided with a fan, the fan is connected to the connecting pipe, and the connecting pipe is connected to the suction pipe. The type crusher is arranged on the right side of the processing box, and the second conveyor belt device is arranged on the main body of the crushing station.

又如,中国专利申请号为202210671896.0的申请案,公开了一种移动式破碎站。该申请案包括履带行走组件、安装架、进料组件、破碎组件和出料组件,所述履带行走组件包括行走架,所述行走架中部设置有支柱,所述支柱下端与行走架固定连接、上端与安装架中部铰接,所述安装架后端下方设置有后支撑组件,所述后支撑组件包括后支撑板和后液压组件,所述后液压组件设置于后支撑板与安装架之间,后液压组件上端连接至安装架、下端将后支撑板抵至地面,两组所述后液压组件分别设置于安装架两侧。Another example is the Chinese patent application No. 202210671896.0, which discloses a mobile crushing station. The application includes a crawler walking assembly, a mounting frame, a feeding assembly, a crushing assembly and a discharging assembly. The crawler walking assembly includes a walking frame, a pillar is arranged in the middle of the walking frame, and the lower end of the pillar is fixedly connected to the walking frame. The upper end is hinged with the middle part of the installation frame, and a rear support assembly is arranged under the rear end of the installation frame. The rear support assembly includes a rear support plate and a rear hydraulic assembly, and the rear hydraulic assembly is arranged between the rear support plate and the installation frame. The upper end of the rear hydraulic assembly is connected to the installation frame, and the lower end pushes the rear support plate to the ground. The two groups of rear hydraulic assemblies are respectively arranged on both sides of the installation frame.

上述两篇对比文件中,针对更换工作场所时,已建钢筋混凝土挡墙和基础的拆除困难及不能重复使用的问题,依然没有的到有效解决。In the above-mentioned two comparative documents, there is still no effective solution to the problems of difficult demolition and non-reusability of the existing reinforced concrete retaining walls and foundations when the workplace is replaced.

发明内容Contents of the invention

1、要解决的问题1. Problems to be solved

针对以上现有技术中存在的至少一些问题,本发明提出一种装配式破碎站,其目的在于解决现有的破碎站在拆移时,钢筋混凝土挡墙和基础的拆除困难及不能重复使用的问题。Aiming at at least some problems existing in the above prior art, the present invention proposes a prefabricated crushing station, the purpose of which is to solve the difficulty in dismantling the reinforced concrete retaining wall and foundation and the problem that it cannot be reused when the existing crushing station is dismantled. question.

2、技术方案2. Technical solution

为了解决上述问题,本发明所采用的技术方案如下:In order to solve the above problems, the technical scheme adopted in the present invention is as follows:

本发明的一种装配式破碎站,包括破碎平台以及设置在该破碎平台上破碎机,所述的破碎平台通过多个固定墩进行定位安装,该破碎平台的侧面连接有箱体;所述的箱体包括框架以及位于该框架端部的第一连接板,所述第一连接板与框架另一端部之间设有支撑组件;所述的支撑组件包括与框架端板连接的第二连接板,以及与该第二连接板相连接的支撑板,所述支撑板的另一端连接第一连接板。An assembled crushing station of the present invention includes a crushing platform and a crusher arranged on the crushing platform, the crushing platform is positioned and installed through a plurality of fixed piers, and a box is connected to the side of the crushing platform; The box body includes a frame and a first connecting plate located at the end of the frame, a supporting assembly is provided between the first connecting plate and the other end of the frame; the supporting assembly includes a second connecting plate connected to the end plate of the frame , and a support plate connected to the second connection plate, the other end of the support plate is connected to the first connection plate.

进一步地,所述的第二连接板上设有供支撑板端部的连接块插入的第二安装槽,且该第二安装槽远离第一连接板的一侧设有倒钩。Further, the second connecting plate is provided with a second installation groove for inserting the connecting block at the end of the support plate, and a barb is provided on the side of the second installation groove away from the first connecting plate.

进一步地,所述支撑板的端部设有与第一连接板上的第一安装槽相配合的钩舌。Further, the end of the supporting plate is provided with a knuckle matched with the first installation groove on the first connecting plate.

进一步地,所述支撑板的端部与连接块连接的折弯处均设有第一引流板,第二连接板的端部设有第二引流板,所述框架远离第一连接板的端板设有第三引流板。Further, a first flow guide plate is provided at the bend where the end of the support plate is connected to the connection block, a second flow guide plate is provided at the end of the second connection plate, and the end of the frame is far away from the first connection plate. The plate is provided with a third baffle.

进一步地,所述框架的端板上设有用于连接第一连接板的第二立柱,且该第二立柱与框架的侧板之间设有支撑板。Further, a second column for connecting the first connecting plate is provided on the end plate of the frame, and a supporting plate is provided between the second column and the side plate of the frame.

进一步地,所述的第一连接板上连接有盖板,该盖板上设有与第二立柱顶部开设有的卡槽相配合的挂钩。Further, a cover plate is connected to the first connecting plate, and the cover plate is provided with a hook matching with the slot provided on the top of the second column.

进一步地,所述的固定墩包括基础墩以及插装在该基础墩内的顶柱,该顶柱上开设有供破碎平台卡入的槽口。Further, the fixed pier includes a foundation pier and a top column inserted into the foundation pier, and the top column is provided with a notch for the crushing platform to snap into.

进一步地,所述顶柱通过铰杆铰接有夹爪,基础墩内开设有用于容纳夹爪的活动腔;且该顶柱的底部连接有弹性件。Further, the top column is hinged with jaws through a hinge rod, and a movable cavity for accommodating the jaws is opened in the foundation pier; and the bottom of the top column is connected with an elastic member.

进一步地,所述的破碎平台包括相互连接的平台板和基础架,其中,所述的基础架上设有与第一连接板相连接的第一立柱。Further, the crushing platform includes a platform plate and a base frame connected to each other, wherein the base frame is provided with a first column connected to the first connecting plate.

进一步地,所述的破碎机连接有搭接板,该搭接板搭接在第一立柱上,且该破碎机的出料口处连接有输送带,破碎机的进料口低于第一连接板的顶部。Further, the crusher is connected with a lapping plate, and the lapping plate is lapped on the first column, and the discharge port of the crusher is connected with a conveyor belt, and the feed port of the crusher is lower than the first column. Connect the top of the board.

3、有益效果3. Beneficial effects

相比于现有技术,本发明的有益效果为:Compared with the prior art, the beneficial effects of the present invention are:

(1)本发明的一种装配式破碎站,包括破碎平台以及设置在该破碎平台上破碎机,所述的破碎平台通过多个固定墩进行定位安装,该破碎平台的侧面连接有箱体;其中,所述的箱体整体呈三角形,通过在该三角形区域内填充碎石,形成供输运车行走的坡面,以完成碎石的转运加工;同时,本发明的破碎平台与固定墩、破碎机以及箱体之间均采用可拆卸连接,相比于传统的钢筋混凝土挡墙和基础,本发明的装配式破碎站,减少了破碎站的拆移时间,且可对破碎平台及三角形箱体进行重复利用。(1) An assembled crushing station of the present invention, comprising a crushing platform and a crusher arranged on the crushing platform, the crushing platform is positioned and installed through a plurality of fixed piers, and a box is connected to the side of the crushing platform; Wherein, the box body as a whole is triangular in shape, and by filling the triangular area with crushed stones, a slope for the transport vehicle to walk is formed to complete the transfer processing of crushed stones; meanwhile, the crushing platform of the present invention and the fixed pier, Both the crusher and the box are detachably connected. Compared with the traditional reinforced concrete retaining wall and foundation, the assembled crushing station of the present invention reduces the dismantling time of the crushing station, and can be used for the crushing platform and the triangular box. body for reuse.

(2)本发明的一种装配式破碎站,通过对三角形箱体的结构进一步优化设计,其包括框架、第一连接板以及支撑组件,所述的支撑组件包括第二连接板和支撑板;其中,所述的支撑板与第一连接板之间通过第一安装槽、钩舌相互连接,第二连接板与支撑板之间通过连接块、第二安装槽进行连接,且第二安装槽的端部设有倒钩,以保证整个箱体结构的稳固性;同时,在支撑板与连接块连接的折弯处设有第一引流板,第二连接板的端部设有第二引流板,框架端部设有第三引流板,通过多个引流板的设置,以减少箱体在移动时受到碎石的阻力,更加方便对三角形箱体进行整体拆移。(2) An assembled crushing station of the present invention, by further optimizing the structure of the triangular box, it includes a frame, a first connecting plate and a support assembly, and the support assembly includes a second connecting plate and a supporting plate; Wherein, the support plate and the first connection plate are connected to each other through the first installation groove and the knuckle, the second connection plate and the support plate are connected through the connection block and the second installation groove, and the second installation groove Barbs are provided at the end of the box to ensure the stability of the entire box structure; at the same time, a first drainage plate is provided at the bend where the support plate and the connecting block are connected, and a second drainage is provided at the end of the second connecting plate. Plate, the end of the frame is provided with a third drainage plate, through the setting of multiple drainage plates, to reduce the resistance of the box when it is moving, and it is more convenient to dismantle the triangular box as a whole.

(3)本发明的一种装配式破碎站,所述的固定墩包括基础墩以及插装在该基础墩内的顶柱,其中,所述顶柱通过铰杆铰接有夹爪,基础墩内开设有用于容纳夹爪的活动腔,且该顶柱的底部连接有弹性件;这种设计使得基础墩和顶柱之间同样为可拆卸设计,使用时,将破碎平台放置在顶柱上,利用破碎平台自身重量将夹爪卡入基础墩的活动腔内,以完成两者间的装配,此时弹性件被压缩;当需要拆卸时,先移除破碎平台,在弹性件的恢复力的作用下,顶柱带动夹爪从活动腔内弹出,从而可实现顶柱的重复利用。(3) In an assembled crushing station of the present invention, the fixed pier includes a foundation pier and a top column inserted into the foundation pier, wherein the top column is hinged with jaws through a hinge rod, and the inside of the foundation pier There is an active cavity for holding the jaws, and the bottom of the top column is connected with an elastic piece; this design makes the base pier and the top column also detachable. When in use, the crushing platform is placed on the top column. Utilize the weight of the crushing platform itself to clamp the jaws into the movable cavity of the foundation pier to complete the assembly between the two. At this time, the elastic part is compressed; when it needs to be disassembled, first remove the crushing platform. Under the action, the ejector column drives the jaws to pop out from the movable cavity, so that the ejector column can be reused.

附图说明Description of drawings

图1为本发明的一种装配式破碎站的整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of a prefabricated crushing station of the present invention;

图2为本发明中基础架与固定墩的装配示意图;Fig. 2 is the assembling schematic diagram of base frame and fixed pier among the present invention;

图3为本发明中平台板与破碎机的连接示意图;Fig. 3 is the connection schematic diagram of platform plate and crusher among the present invention;

图4为本发明中搭接板的结构示意图;Fig. 4 is the structural representation of overlapping plate among the present invention;

图5为本发明中箱体的整体结构示意图;Fig. 5 is a schematic diagram of the overall structure of the casing in the present invention;

图6为本发明中框架与第一连接板的装配示意图;Figure 6 is a schematic diagram of the assembly of the frame and the first connecting plate in the present invention;

图7为本发明中支撑组件的结构示意图;Fig. 7 is a structural schematic diagram of a support assembly in the present invention;

图8为本发明中支撑板与连接块之间的连接示意图;Figure 8 is a schematic diagram of the connection between the support plate and the connecting block in the present invention;

图9为本发明中固定墩的结构示意图。Fig. 9 is a schematic structural view of the fixed pier in the present invention.

图中:1、破碎平台;11、平台板;12、基础架;13、第一立柱;In the figure: 1. Crushing platform; 11. Platform board; 12. Foundation frame; 13. First column;

2、破碎机;21、搭接板;22、输送带;23、固定杆;2. Crusher; 21. Lap joint plate; 22. Conveyor belt; 23. Fixed rod;

3、固定墩;31、基础墩;32、顶柱;33、夹爪;34、弹性件;3. Fixed pier; 31. Foundation pier; 32. Top column; 33. Claw; 34. Elastic part;

4、箱体;41、框架;42、第一连接板;421、第一安装槽;43、支撑组件;431、第二连接板;432、支撑板;433、第二安装槽;434、倒钩;435、钩舌;44、连接块;451、第一引流板;452、第二引流板;453、第三引流板;46、第二立柱;461、卡槽;47、盖板。4, box body; 41, frame; 42, first connecting plate; 421, first installation groove; 43, support assembly; 431, second connecting plate; 432, supporting plate; 433, second installing groove; 434, inverted Hook; 435, knuckle tongue; 44, connection block; 451, first drainage plate; 452, second drainage plate; 453, third drainage plate; 46, second column; 461, draw-in groove; 47, cover plate.

具体实施方式Detailed ways

下面结合具体实施例对本发明进一步进行描述。The present invention will be further described below in conjunction with specific embodiments.

实施例1Example 1

如图1所示,本实施例的一种装配式破碎站,包括破碎平台1以及设置在该破碎平台1上,用于对矿石进行破碎处理的破碎机2,所述的破碎平台1通过多个固定墩3进行定位安装,该破碎平台1的侧面连接有箱体4。As shown in Figure 1, an assembled crushing station in this embodiment includes a crushing platform 1 and a crusher 2 arranged on the crushing platform 1 for crushing ore. The crushing platform 1 passes multiple A fixed pier 3 is positioned and installed, and the side of the crushing platform 1 is connected with a box 4.

具体地,参考图2、图3、图4所示,所述的破碎平台1包括相互连接的平台板11和基础架12,所述的基础架12上设有的第一立柱13,该第一立柱13用于连接箱体4。其中,所述的平台板11、基础架12以及第一立柱13均采用钢材质,基础架12与平台板11以及第一立柱13之间均采用螺栓进行连接,以方便安装,拆卸操作。Specifically, as shown in Fig. 2, Fig. 3 and Fig. 4, the crushing platform 1 includes a platform plate 11 and a base frame 12 connected to each other, the first column 13 is provided on the base frame 12, the first A column 13 is used for connecting the box body 4 . Wherein, the platform plate 11, the base frame 12 and the first column 13 are all made of steel, and the base frame 12, the platform plate 11 and the first column 13 are connected by bolts to facilitate installation and disassembly.

所述的破碎机2设置于平台板11上,该破碎机2与第一立柱13之间设有搭接板21。所述搭接板21的一端与破碎机2连接,另一端搭接在第一立柱13上。所述破碎机2的两侧还设有固定杆23,该固定杆23的一端固定于平台板11上,另一端与破碎机2相连接。通过搭接板21和固定杆23的设置,可进一步保证破碎机2与平台板11之间连接的稳固性。The crusher 2 is arranged on the platform board 11 , and an overlapping plate 21 is provided between the crusher 2 and the first column 13 . One end of the overlapping plate 21 is connected to the crusher 2 , and the other end is overlapped on the first column 13 . Both sides of the crusher 2 are also provided with a fixed rod 23 , one end of the fixed rod 23 is fixed on the platform plate 11 , and the other end is connected with the crusher 2 . The stability of the connection between the crusher 2 and the platform plate 11 can be further ensured through the setting of the overlapping plate 21 and the fixing rod 23 .

所述破碎机2的出料口处连接有输送带22,同于对破碎后的矿石进行转运操作;另外,为了方便运输车将矿石转运至破碎机2内,所述破碎机2的进料口低于箱体4的第一连接板42的顶部。The discharge port of the crusher 2 is connected with a conveyor belt 22, which is the same as the transshipment operation of the crushed ore; in addition, in order to facilitate the transport vehicle to transfer the ore to the crusher 2, the feed of the crusher 2 The opening is lower than the top of the first connection plate 42 of the box body 4 .

如图5、图6所示,所述的箱体4包括框架41、第一连接板42以及第二立柱46。其中,所述的框架41整体呈方形,其包括两个端板和两个侧板。所述的第二立柱46设置在框架41的端板上,第一连接板42通过该第二立柱46与框架41相连接,且该第二立柱46的顶部开设有卡槽461。As shown in FIGS. 5 and 6 , the box body 4 includes a frame 41 , a first connecting plate 42 and a second column 46 . Wherein, the frame 41 has a square shape as a whole, which includes two end plates and two side plates. The second column 46 is disposed on the end plate of the frame 41 , the first connecting plate 42 is connected to the frame 41 through the second column 46 , and the top of the second column 46 is provided with a slot 461 .

所述的第一连接板42上设有盖板47,该盖板47上设有与第二立柱46顶部卡槽461相配合的挂钩,以保证第一连接板42与第二立柱46之间连接的稳固性。The first connecting plate 42 is provided with a cover plate 47, and the cover plate 47 is provided with a hook matching with the slot 461 on the top of the second column 46, so as to ensure the connection between the first connecting plate 42 and the second column 46. The stability of the connection.

为进一步加强第一连接板42与框架41的连接强度,所述的第一连接板42与框架41另一端部之间设有支撑组件43。In order to further strengthen the connection strength between the first connecting plate 42 and the frame 41 , a support assembly 43 is provided between the first connecting plate 42 and the other end of the frame 41 .

参考图7、图8所示,所述的支撑组件43包括第二连接板431和支撑板432。其中,所述第二连接板431的端部与框架41的端板相连接。所述支撑板432的一端与第一连接板42相连接,另一端与第二连接板431相连接。优选地,所述的支撑板432设置有2组,且平行设置。Referring to FIG. 7 and FIG. 8 , the support assembly 43 includes a second connecting plate 431 and a supporting plate 432 . Wherein, the end of the second connecting plate 431 is connected with the end plate of the frame 41 . One end of the supporting plate 432 is connected to the first connecting plate 42 , and the other end is connected to the second connecting plate 431 . Preferably, the support plates 432 are provided in two groups and arranged in parallel.

具体地,所述的第一连接板42上开设有第一安装槽421,第二连接板431上开设有第二安装槽433。所述支撑板432的一端设有钩舌435,该钩舌435与第一安装槽421相互配合,完成支撑板432与第一连接板42之间的连接。Specifically, the first connecting plate 42 is provided with a first installation slot 421 , and the second connection plate 431 is provided with a second installation slot 433 . One end of the supporting plate 432 is provided with a knuckle 435 , and the knuckle 435 cooperates with the first installation groove 421 to complete the connection between the supporting plate 432 and the first connecting plate 42 .

所述支撑板432的另一端设有连接块44,该连接块44卡入第二安装槽433内,完成支撑板432与第二连接板431之间的连接。同时,所述第二安装槽433远离第一连接板42的一侧设有倒钩434,用于加强对连接块44的限位效果。The other end of the supporting plate 432 is provided with a connecting block 44 , and the connecting block 44 is snapped into the second installation groove 433 to complete the connection between the supporting plate 432 and the second connecting plate 431 . At the same time, a barb 434 is provided on the side of the second installation groove 433 far away from the first connecting plate 42 to strengthen the limiting effect on the connecting block 44 .

所述支撑板432的端部与连接块44连接的折弯处均设有第一引流板451,第二连接板431靠近第一连接板42的端部设有第二引流板452,所述框架41远离第一连接板42的端板内侧设有第三引流板453。其中,所述的第一引流板451为半圆筒状,第二引流板452为竖直设置的圆弧板,第三引流板453为的截面形状为弧形。通过多个引流板的设置,可有效减少框架41在移动过程中受到的来自碎石的阻力。The end of the support plate 432 is connected with the connecting block 44 at the bend where a first flow guide plate 451 is provided, and the end of the second connection plate 431 close to the first connection plate 42 is provided with a second flow guide plate 452. A third flow guide plate 453 is provided on the inner side of the end plate of the frame 41 away from the first connecting plate 42 . Wherein, the first diversion plate 451 is semi-cylindrical, the second diversion plate 452 is a vertical arc plate, and the third diversion plate 453 is arc-shaped in cross section. Through the arrangement of a plurality of flow guide plates, the resistance from gravel that the frame 41 receives during the moving process can be effectively reduced.

另外,所述的第二立柱46与框架41的侧板之间同样可设有支撑板432。该支撑板432与第二立柱46、框架41之间连接可采用上述的连接方式。In addition, a support plate 432 may also be provided between the second column 46 and the side plate of the frame 41 . The connection between the support plate 432 and the second column 46 and the frame 41 can adopt the above connection method.

本实施例的一种装配式破碎站,使用时,首先,在选定的预埋点设置多个固定墩3,将基础架12卡设在固定墩3上;接着,将平台板11以及第一立柱13安装在基础架12上,同时,将破碎机2安装在平台板11上。An assembled crushing station of this embodiment, when in use, first, set a plurality of fixed piers 3 at the selected pre-embedded points, and clamp the foundation frame 12 on the fixed piers 3; then, install the platform board 11 and the first A column 13 is installed on the base frame 12, and at the same time, the crusher 2 is installed on the platform board 11.

接着,将框架41放置在预定的碎石平台位置处,将两组第二立柱46安装在框架41的端板上;随后将第一连接板42安装在第二立柱46上,将盖板47安装在第一连接板42上,并保证盖板47上的挂钩与第二立柱46卡槽461相互卡合。同时,将第一连接板42与第一立柱13进行连接。Then, the frame 41 is placed on the predetermined gravel platform position, and two groups of second columns 46 are installed on the end plates of the frame 41; then the first connecting plate 42 is installed on the second column 46, and the cover plate 47 It is installed on the first connecting plate 42 and ensures that the hook on the cover plate 47 is engaged with the slot 461 of the second column 46 . At the same time, the first connecting plate 42 is connected to the first column 13 .

然后,将第二连接板431安装在框架41的端板上;接着将支撑板432一端的钩舌435卡入第一连接板42上的第一安装槽421内,支撑板432另一端的连接块44卡入第二连接板431上的第二安装槽433内。以同样的方法安装其它的支撑板。Then, the second connection plate 431 is installed on the end plate of the frame 41; then the knuckle tongue 435 at one end of the support plate 432 is inserted into the first installation groove 421 on the first connection plate 42, and the connection of the other end of the support plate 432 The block 44 snaps into the second installation groove 433 on the second connecting plate 431 . Install other support plates in the same way.

接着,在框架41上安装第三引流板453,完成整个箱体4的装配工作。需要注意的是,第一引流板451和第二引流板452可在箱体4装配前预先完成。Next, the third flow guide plate 453 is installed on the frame 41 to complete the assembly work of the entire box body 4 . It should be noted that the first flow guide plate 451 and the second flow guide plate 452 can be pre-finished before the box body 4 is assembled.

待箱体4的装配完成后,在三角形箱体4的内侧堆放碎石,直至碎石形成一坡面,且坡面的最高处与第一连接板42的顶部齐平,以形成一可供输送车行走的坡道。After the assembly of the box body 4 is completed, gravel is piled up on the inside of the triangular box body 4 until the gravel forms a slope, and the highest point of the slope is flush with the top of the first connecting plate 42 to form a The ramp on which the transport vehicle travels.

本实施例的一种装配式破碎站,各部件之间可采用螺纹进行连接,当该破碎站需要搬运移动时,可先将破碎机2、破碎平台1进行拆除并转运,以暴露出箱体4。然后可通过拖车将整个箱体4从碎石中拖出,随后将整个箱体4进行吊运转移至下一施工点。这种操作,不仅可节约拆除破碎站所需要的时间,还可以对破碎平台1以及箱体4进行重复利用,大大节约了施工的成本。当然,箱体4也根据实际情况需要,拆解后再进行转运。In the assembled crushing station of this embodiment, the parts can be connected by threads. When the crushing station needs to be transported and moved, the crusher 2 and the crushing platform 1 can be dismantled and transported to expose the box. 4. Then the whole box body 4 can be dragged out from the gravel by a trailer, and then the whole box body 4 can be hoisted and transferred to the next construction site. This kind of operation can not only save the time required for dismantling the crushing station, but also can reuse the crushing platform 1 and the box body 4, which greatly saves the construction cost. Of course, the box body 4 is also disassembled and then transported according to the needs of the actual situation.

实施例2Example 2

本实施例的一种装配式破碎站,在实施例1的基础上,对固定墩3的具体结构进一步优化设计,以实现对固定墩3的重复利用,从而可进一步提高拆卸效率及降低施工成本。In the prefabricated crushing station of this embodiment, on the basis of Embodiment 1, the specific structure of the fixed pier 3 is further optimized to realize the repeated use of the fixed pier 3, thereby further improving disassembly efficiency and reducing construction costs .

具体地,参考图2、图9所示,所述的固定墩3包括基础墩31以及插装在该基础墩31内的顶柱32,该顶柱32上开设有供基础架12卡入的槽口。Specifically, as shown in FIG. 2 and FIG. 9 , the fixed pier 3 includes a foundation pier 31 and a top column 32 inserted in the foundation pier 31 , and the top column 32 is provided with a hole for the base frame 12 to snap into. notch.

所述顶柱32通过铰杆铰接有夹爪33,基础墩31内开设有用于容纳夹爪33的活动腔,且该夹爪33的自由端可贯穿至基础墩31的外壁;所述顶柱32的底部连接有弹性件34。其中,夹爪33可选用钢材质,弹性件34可选用弹簧。具体到本实施例中,所述的固定墩3、夹爪33均设有4个,且基础墩31为混凝土墩。The top column 32 is hinged with a jaw 33 through a hinge rod, and a movable cavity for accommodating the jaw 33 is provided in the foundation pier 31, and the free end of the jaw 33 can penetrate to the outer wall of the foundation pier 31; The bottom of 32 is connected with elastic member 34. Wherein, the jaw 33 can be made of steel, and the elastic member 34 can be made of spring. Specifically in this embodiment, there are four fixed piers 3 and four clamping jaws 33, and the foundation piers 31 are concrete piers.

使用时,将基础架12卡装在顶柱32上的槽口内。同时,利用基础架12的自重,能够将夹爪33由基础墩31内开设的活动腔中推出,且夹爪33的自由端沿着至基础墩31外,使得被埋设在地下的基础墩31具有更强的抓地力。During use, the base frame 12 is clamped in the notch on the top post 32 . Simultaneously, utilizing the self-weight of the foundation frame 12, the jaws 33 can be pushed out from the movable cavity provided in the foundation pier 31, and the free ends of the jaws 33 are along the outside of the foundation pier 31, so that the foundation pier 31 buried in the ground Has a stronger grip.

当需要拆卸基固定墩3时,通过取出卡装在顶柱32顶部的基础架12,在弹簧的弹力作用下,将夹爪33回收至活动腔中。即使在弹簧的弹力作用下,无法将夹爪33完全收回到活动腔中,也可通过吊车将顶柱32从基础墩31的活动腔中抽出。When the base fixed pier 3 needs to be disassembled, the jaws 33 are recovered into the movable cavity by taking out the base frame 12 clamped on the top of the top column 32 under the elastic force of the spring. Even under the action of the elastic force of the spring, the jaws 33 cannot be completely retracted into the movable cavity, but the jack column 32 can be drawn out from the movable cavity of the foundation pier 31 by a crane.

本实施例的一种装配式破碎站,通过舍弃基础墩31,抽取顶柱32以及其底部安装弹簧和夹爪33的方式,实现顶柱32的循环利用。下次使用时,只需要重新预制基础墩31即可,实现破碎站可移动重复使用功能的同时,将移动破碎站的成本降到最低。In the assembled crushing station of this embodiment, the recycling of the top post 32 is realized by discarding the foundation pier 31, extracting the top post 32 and installing springs and jaws 33 at the bottom thereof. When it is used next time, it is only necessary to prefabricate the foundation pier 31 again, so as to realize the movable and reusable function of the crushing station, and at the same time minimize the cost of the mobile crushing station.

以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的结构并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。The above schematically describes the present invention and its implementation, which is not restrictive, and what is shown in the drawings is only one of the implementations of the present invention, and the actual structure is not limited thereto. Therefore, if a person of ordinary skill in the art is inspired by it, without departing from the inventive concept of the present invention, without creatively designing a structural mode and embodiment similar to the technical solution, it shall all belong to the protection scope of the present invention .

Claims (10)

1.一种装配式破碎站,包括破碎平台(1)以及设置在该破碎平台(1)上破碎机(2),其特征在于:所述的破碎平台(1)通过多个固定墩(3)进行定位安装,该破碎平台(1)的侧面连接有箱体(4);1. An assembled crushing station, comprising a crushing platform (1) and a crusher (2) arranged on the crushing platform (1), characterized in that: the crushing platform (1) passes through a plurality of fixed piers (3 ) for positioning and installation, the side of the crushing platform (1) is connected with a box (4); 所述的箱体(4)包括框架(41)以及位于该框架(41)端部的第一连接板(42),所述第一连接板(42)与框架(41)另一端部之间设有支撑组件(43);The box (4) includes a frame (41) and a first connecting plate (42) located at the end of the frame (41), between the first connecting plate (42) and the other end of the frame (41) A supporting component (43) is provided; 所述的支撑组件(43)包括与框架(41)端板连接的第二连接板(431),以及与该第二连接板(431)相连接的支撑板(432),所述支撑板(432)的另一端连接第一连接板(42)。Described support assembly (43) comprises the second connection plate (431) that is connected with frame (41) end plate, and the support plate (432) that is connected with this second connection plate (431), and described support plate ( 432) is connected to the first connecting plate (42). 2.根据权利要求1所述的一种装配式破碎站,其特征在于:所述的第二连接板(431)上设有供支撑板(432)端部的连接块(44)插入的第二安装槽(433),且该第二安装槽(433)远离第一连接板(42)的一侧设有倒钩(434)。2. An assembled crushing station according to claim 1, characterized in that: the second connecting plate (431) is provided with a first connecting block (44) inserted into the end of the supporting plate (432) Two installation grooves (433), and the side of the second installation groove (433) away from the first connecting plate (42) is provided with a barb (434). 3.根据权利要求2所述的一种装配式破碎站,其特征在于:所述支撑板(432)的端部设有与第一连接板(42)上的第一安装槽(421)相配合的钩舌(435)。3. An assembled crushing station according to claim 2, characterized in that: the end of the support plate (432) is provided with the first installation groove (421) on the first connecting plate (42) Mating knuckle (435). 4.根据权利要求3所述的一种装配式破碎站,其特征在于:所述支撑板(432)的端部与连接块(44)连接的折弯处均设有第一引流板(451),第二连接板(431)的端部设有第二引流板(452),所述框架(41)远离第一连接板(42)的端板设有第三引流板(453)。4. A prefabricated crushing station according to claim 3, characterized in that: a first drainage plate (451 ), the end of the second connecting plate (431) is provided with a second draining plate (452), and the end plate of the frame (41) away from the first connecting plate (42) is provided with a third draining plate (453). 5.根据权利要求4所述的一种装配式破碎站,其特征在于:所述框架(41)的端板上设有用于连接第一连接板(42)的第二立柱(46),且该第二立柱(46)与框架(41)的侧板之间设有支撑板(432)。5. An assembled crushing station according to claim 4, characterized in that: the end plate of the frame (41) is provided with a second column (46) for connecting the first connecting plate (42), and A support plate (432) is provided between the second column (46) and the side plate of the frame (41). 6.根据权利要求5所述的一种装配式破碎站,其特征在于:所述的第一连接板(42)上连接有盖板(47),该盖板(47)上设有与第二立柱(46)顶部开设有的卡槽(461)相配合的挂钩。6. An assembled crushing station according to claim 5, characterized in that: the first connecting plate (42) is connected with a cover plate (47), and the cover plate (47) is provided with the second The hook that the draw-in groove (461) that two column (46) tops are provided with cooperates. 7.根据权利要求1-6中任一项所述的一种装配式破碎站,其特征在于:所述的固定墩(3)包括基础墩(31)以及插装在该基础墩(31)内的顶柱(32),该顶柱(32)上开设有供破碎平台(1)卡入的槽口。7. An assembled crushing station according to any one of claims 1-6, characterized in that: the fixed pier (3) includes a foundation pier (31) and is inserted into the foundation pier (31) Inside the top column (32), the top column (32) is provided with a notch for the broken platform (1) to snap into. 8.根据权利要求7所述的一种装配式破碎站,其特征在于:所述顶柱(32)通过铰杆铰接有夹爪(33),基础墩(31)内开设有用于容纳夹爪(33)的活动腔;且该顶柱(32)的底部连接有弹性件(34)。8. An assembled crushing station according to claim 7, characterized in that: the top column (32) is hinged with a jaw (33) through a hinge rod, and there is an opening in the foundation pier (31) for accommodating the jaw (33) movable cavity; and the bottom of this top post (32) is connected with elastic member (34). 9.根据权利要求8所述的一种装配式破碎站,其特征在于:所述的破碎平台(1)包括相互连接的平台板(11)和基础架(12),其中,所述的基础架(12)上设有与第一连接板(42)相连接的第一立柱(13)。9. A prefabricated crushing station according to claim 8, characterized in that: said crushing platform (1) comprises interconnected platform boards (11) and foundation frames (12), wherein said foundation The frame (12) is provided with a first column (13) connected with the first connecting plate (42). 10.根据权利要求9所述的一种装配式破碎站,其特征在于:所述的破碎机(2)连接有搭接板(21),该搭接板(21)搭接在第一立柱(13)上,且该破碎机(2)的出料口处连接有输送带(22),破碎机(2)的进料口低于第一连接板(42)的顶部。10. An assembled crushing station according to claim 9, characterized in that: said crusher (2) is connected with a lap plate (21), and the lap plate (21) is lapped on the first column (13), and the discharge port of the crusher (2) is connected with a conveyor belt (22), and the feed port of the crusher (2) is lower than the top of the first connecting plate (42).
CN202310525672.3A 2023-05-10 2023-05-10 Assembled crushing station Pending CN116510817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310525672.3A CN116510817A (en) 2023-05-10 2023-05-10 Assembled crushing station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310525672.3A CN116510817A (en) 2023-05-10 2023-05-10 Assembled crushing station

Publications (1)

Publication Number Publication Date
CN116510817A true CN116510817A (en) 2023-08-01

Family

ID=87397426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310525672.3A Pending CN116510817A (en) 2023-05-10 2023-05-10 Assembled crushing station

Country Status (1)

Country Link
CN (1) CN116510817A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6238162B1 (en) * 2000-03-09 2001-05-29 Putz Heister, Inc. Transportable apparatus for unloading material from a dump truck
CN101265709A (en) * 2008-04-25 2008-09-17 中信重工机械股份有限公司 Integral steel box foundation capable of moving following crushing station
US20110174907A1 (en) * 2008-09-17 2011-07-21 Flsmidth A/S Mobile Crushing Station
CN215682647U (en) * 2021-08-30 2022-01-28 厦门直播星股份有限公司 Waterproof and salt-fog-proof 5G700 million CPE terminal device for marine operation ship
CN216973482U (en) * 2022-02-24 2022-07-15 塔克拉夫采矿技术(北京)有限公司 Steel retaining wall of semi-mobile crushing station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6238162B1 (en) * 2000-03-09 2001-05-29 Putz Heister, Inc. Transportable apparatus for unloading material from a dump truck
CN101265709A (en) * 2008-04-25 2008-09-17 中信重工机械股份有限公司 Integral steel box foundation capable of moving following crushing station
US20110174907A1 (en) * 2008-09-17 2011-07-21 Flsmidth A/S Mobile Crushing Station
CN215682647U (en) * 2021-08-30 2022-01-28 厦门直播星股份有限公司 Waterproof and salt-fog-proof 5G700 million CPE terminal device for marine operation ship
CN216973482U (en) * 2022-02-24 2022-07-15 塔克拉夫采矿技术(北京)有限公司 Steel retaining wall of semi-mobile crushing station

Similar Documents

Publication Publication Date Title
CN102425433B (en) Minus-ring-free originating construction method for constructing sectional shield tunnel
CN103016029B (en) Grouped second liner construction method for large cross-section tunnel
CN101413393B (en) Gob-side entry retaining side support method of coal bed fully mechanized caving face
CN106150511A (en) Shield driving formula sky pushes through ground fissure bored tunnel construction method
CN113216990A (en) Starting and rapid slag discharging method in limited space of shield tunneling machine
CN116510817A (en) Assembled crushing station
CN213967081U (en) Impact crushing station convenient to transport and provided with material returning mechanism
CN108590746A (en) A kind of foundation-free installation system for fixing ribbon conveyer
CN120291891A (en) A method and device for cleaning slag at the bottom of a TBM tunnel
CN210527600U (en) Concrete gravel conveyer belt
CN206092014U (en) Interim support system transfer table car suitable for multi -pilot is wide open and digs
CN217378901U (en) Subway steel encloses purlin backfill device behind one's back
CN202832586U (en) Hydraulic support dismantling device
CN208364171U (en) It is a kind of for fixing the foundation-free installation system of belt conveyor
CN218522680U (en) Portable coal mine tunnel supporting device
CN218235129U (en) Originating slag discharging device of shield machine
CN207537980U (en) For building the template construction of tidal channel machinery
CN211201971U (en) Shield constructs top machine receiving arrangement that digs
CN212237425U (en) Waste material transportation equipment for construction
CN213967082U (en) Semi-fixed jaw crushing station convenient to transport
CN115522569A (en) A construction method for dismantling the shared enclosure structure of a subway station
CN209523123U (en) A working platform for construction
CN213799642U (en) Mine car loading flashboard device in pit
CN215760795U (en) Short-term detachable aggregate bin
CN223190432U (en) A slag storage and transportation trough for a shield machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination