[go: up one dir, main page]

CN116161116A - Cab mounting frame structure of cement crushing vehicle - Google Patents

Cab mounting frame structure of cement crushing vehicle Download PDF

Info

Publication number
CN116161116A
CN116161116A CN202310046996.9A CN202310046996A CN116161116A CN 116161116 A CN116161116 A CN 116161116A CN 202310046996 A CN202310046996 A CN 202310046996A CN 116161116 A CN116161116 A CN 116161116A
Authority
CN
China
Prior art keywords
square tube
rectangular
plate
cab
rectangular square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310046996.9A
Other languages
Chinese (zh)
Inventor
吕胜权
钟飞
王龙
段俊杰
邵发展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou XCMG Road Construction Machinery Co Ltd
Original Assignee
Xuzhou XCMG Road Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou XCMG Road Construction Machinery Co Ltd filed Critical Xuzhou XCMG Road Construction Machinery Co Ltd
Priority to CN202310046996.9A priority Critical patent/CN116161116A/en
Publication of CN116161116A publication Critical patent/CN116161116A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D21/00Understructures, i.e. chassis frame on which a vehicle body may be mounted
    • B62D21/09Means for mounting load bearing surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D33/00Superstructures for load-carrying vehicles
    • B62D33/077Superstructures for load-carrying vehicles characterised by the connection of the superstructure to the vehicle frame
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/12Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for taking-up, tearing-up, or full-depth breaking-up paving, e.g. sett extractor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

The invention discloses a cab mounting frame structure of a cement crushing vehicle, which comprises two cab mounting frame components which are fixedly connected and arranged in a mirror image manner; the cab mounting frame assembly comprises a rectangular square tube I and a trapezoid frame arranged at one end of the rectangular square tube I, wherein the two trapezoid frames are vertically arranged, and the two trapezoid frames are jointly connected and supported with a cab mounting frame and are used for supporting the rear part of a cab; the other end of the rectangular square tube I is respectively provided with a rectangular frame and a mounting plate assembly, the rectangular frames are horizontally arranged, and the rectangular frames and the mounting plate assembly are used for supporting the front part in the cab. According to the invention, according to the transmission route of the gravity of the cab and the impact load of the frame, the designable space is fully utilized, the mechanical property of each part of material is fully exerted, and the high use efficiency of the material, the space arrangement and the mechanical transmission property is finally realized, and the uniform distribution and the stability of the load transmission are good.

Description

一种水泥破碎车驾驶室安装车架结构A cement crushing vehicle cab installation frame structure

技术领域technical field

本发明涉及一种水泥破碎车驾驶室安装车架结构,属于工程机械技术领域。The invention relates to a cab installation frame structure of a cement crushing vehicle, which belongs to the technical field of engineering machinery.

背景技术Background technique

对于水泥破碎车驾驶室安装车架。水泥破碎车是将水泥石、沥青块破碎及再生功能的工程车辆。For the cab of the cement crushing truck, the frame is installed. The cement crushing vehicle is an engineering vehicle for crushing and regenerating cement stones and asphalt blocks.

水泥破碎车为新开发车辆,车架结构为全新设计结构,车架上布局有水箱、油箱、散热器、发动机、行走组件结构安装或功能性设计。由于行走及转向机构、驾驶室方式安装布置原因,使得车架的驾驶室安装部分设计方式受限、空间布局受限,要实现承载能力、空间布置、美观性均满足要求,具有较大的挑战性。The cement crushing truck is a newly developed vehicle. The frame structure is a newly designed structure. The frame is equipped with water tanks, fuel tanks, radiators, engines, and walking components for structural installation or functional design. Due to the installation and layout of the walking and steering mechanism and the cab, the design method and space layout of the cab installation part of the frame are limited. It is a big challenge to meet the requirements of carrying capacity, space layout, and aesthetics. sex.

发明内容Contents of the invention

本发明所要解决的技术问题是克服现有技术的缺陷,提供一种水泥破碎车驾驶室安装车架结构,本发明根据驾驶室重力和车架出冲击载荷的传递路线,充分利用可设计空间、充分发挥每部分材料应有的力学性能,最终实现材料、空间布置和力学传递性能均具有较高的使用效率,载荷传递的均布性、稳定性较好。The technical problem to be solved by the present invention is to overcome the defects of the prior art and provide a cement crushing vehicle cab installation frame structure. The present invention makes full use of the designable space, Give full play to the mechanical properties of each part of the material, and finally achieve high efficiency in the use of materials, space layout, and mechanical transmission properties, and the uniformity and stability of load transmission.

为达到上述目的,本发明提供一种水泥破碎车驾驶室安装车架结构,包括固连的两镜像设置的驾驶室安装车架组件;In order to achieve the above object, the present invention provides a cab mounting frame structure of a cement crushing vehicle, which includes two fixedly connected cab mounting frame components arranged in mirror images;

所述驾驶室安装车架组件包括矩形方管一和设置于矩形方管一端的梯形框架,两所述梯形框架竖直设置,两所述梯形框架共同连接支撑有驾驶室安装架,用于支撑驾驶室的后部;The cab installation frame assembly includes a rectangular square tube and a trapezoidal frame arranged at one end of the rectangular square tube. The two trapezoidal frames are vertically arranged, and the two trapezoidal frames are jointly connected and supported by a cab mounting frame for supporting the rear of the cab;

两所述矩形方管一的另一端分别设置有矩形框架和安装板组件,所述矩形框架水平设置,所述矩形框架和安装板组件用于支撑驾驶室内的前部。The other ends of the two rectangular square tubes are respectively provided with a rectangular frame and a mounting plate assembly, the rectangular frames are arranged horizontally, and the rectangular frame and the mounting plate assembly are used to support the front part of the cab.

进一步地,两所述驾驶室安装车架组件之间设置加强横梁。Further, a reinforcing beam is arranged between the two cab installation frame assemblies.

进一步地,所述梯形框架包括矩形方管三和右方管,所述矩形方管三与矩形方管一垂直设置,所述右方管包括连接矩形方管三的A段和连接矩形方管一的B段,所述A段与B段连接,且夹角为钝角,所述A段与矩形方管一平行设置。Further, the trapezoidal frame includes a rectangular square tube three and a right square tube, the rectangular square tube three is perpendicular to the rectangular square tube one, and the right square tube includes a section A connecting the rectangular square tube three and a connecting rectangular square tube In section B of one, section A is connected to section B, and the included angle is an obtuse angle, and section A is arranged parallel to the rectangular square tube.

进一步地,所述驾驶室安装架包括前侧板、后侧板和下弯板,所述前侧板和后侧板平行设置,所述前侧板和后侧板之间设置下弯板;Further, the cab installation frame includes a front side plate, a rear side plate and a lower bent plate, the front side plate and the rear side plate are arranged in parallel, and a lower bent plate is arranged between the front side plate and the rear side plate;

所述梯形框架所在平面与前侧板垂直,所述右方管的A段穿过前侧板,所示矩形方管三的端部固连下弯板,所述矩形方管三的一侧面固连后侧板;The plane where the trapezoidal frame is located is perpendicular to the front side plate, section A of the right square tube passes through the front side plate, the end of the rectangular square tube three shown is fixedly connected to the lower bent plate, and one side of the rectangular square tube three Fasten the rear side panel;

所述前侧板上设置驾驶室安装板,所述驾驶室安装板位于与下弯板相对的一面,所述驾驶室安装板的板面与右方管A的上表面平行。A cab mounting plate is arranged on the front side plate, the cab mounting plate is located on the side opposite to the lower bent plate, and the board surface of the cab mounting plate is parallel to the upper surface of the right pipe A.

进一步地,所述矩形方管三的外壁设置筋板,所述筋板与位于与梯形框架相对的一侧,所述筋板固连有底板。Further, the outer wall of the rectangular square tube 3 is provided with ribs, the ribs are located on the side opposite to the trapezoidal frame, and the ribs are fixedly connected to the bottom plate.

进一步地,所述A段、B段、矩形方管一和矩形方管三围城的区域内设置三角形框架。Further, a triangular frame is set in the area surrounded by section A, section B, rectangular square tube one and rectangular square tube three.

进一步地,所述三角形框架包括右方管一和右方管二,所述右方管二的两端分别连接矩形方管一和矩形方管三,将梯形框架内部空间划分为三角形空间和菱形空间;Further, the triangular frame includes right square tube 1 and right square tube 2, the two ends of the right square tube 2 are respectively connected to rectangular square tube 1 and rectangular square tube 3, and the internal space of the trapezoidal frame is divided into triangular space and rhombus space. space;

所述右方管一的两端分别连接菱形空间的两个对角,将菱形空间划分为两个三角形空间。The two ends of the right tube one are respectively connected to two opposite corners of the rhombus space, and the rhombus space is divided into two triangular spaces.

进一步地,所述矩形框架包括侧板和连接杆,所述侧板包括垂直连接的第一侧板和第二侧板,所述第一侧板的自由端连接矩形方管一的端部,并与矩形方管垂直连接,所述第二侧板的自由端与连接杆垂直连接,所述连接杆与矩形方管一垂直连接;Further, the rectangular frame includes a side plate and a connecting rod, the side plate includes a first side plate and a second side plate connected vertically, the free end of the first side plate is connected to the end of the rectangular square tube 1, And vertically connected to the rectangular square tube, the free end of the second side plate is vertically connected to the connecting rod, and the connecting rod is vertically connected to the rectangular square tube;

所述第一侧板位于矩形框架内部的一侧设置前滑轨安装板,用于通过减震器连接于驾驶室底座上,完成驾驶室安装车架和驾驶室的装配。A front slide rail mounting plate is provided on the side of the first side plate located inside the rectangular frame, which is used to connect to the cab base through a shock absorber to complete the assembly of the cab installation frame and the cab.

进一步地,所述矩形框架的一组对角之间连接有加强杆。Further, reinforcing rods are connected between a group of diagonal corners of the rectangular frame.

进一步地,所述安装板组件包括牵引座安装板和安装板,所述牵引座安装板设置于矩形方管一的端部,且板面与矩形方管一的长度方向垂直;Further, the mounting plate assembly includes a fifth wheel mounting plate and a mounting plate, the fifth wheel mounting plate is arranged at the end of the rectangular square tube 1, and the plate surface is perpendicular to the length direction of the rectangular square tube 1;

所述安装板设置于矩形方管一的外表面,且与牵引座安装板位于矩形方管一的同一端。The mounting plate is arranged on the outer surface of the rectangular square tube 1, and is located at the same end of the rectangular square tube 1 as the fifth wheel mounting plate.

本发明所达到的有益效果:The beneficial effect that the present invention reaches:

本发明提供一种水泥破碎车驾驶室安装车架结构,本发明设计右方管、矩形方管三和筋板的连接位置和形状设计,使得重力和冲击力可分为多条道路进行传递,右方管一和右方管二的形状设计和连接点设计可时刻调整各个受力点的平衡,保证整个驾驶室安装结构受力传递的平稳性,同时充分利用可设计空间、结构形状设计和连接方式的布置,提高了材料的利用率和结构的可靠性。The invention provides a frame structure for installing the cab of a cement crushing vehicle. The invention designs the connection position and shape of the right square tube, the rectangular square tube three and the rib plate, so that the gravity and impact force can be divided into multiple roads for transmission. The shape design and connection point design of the right square pipe 1 and right square pipe 2 can adjust the balance of each stress point at all times to ensure the stability of the force transmission of the entire cab installation structure, and at the same time make full use of the designable space, structural shape design and The arrangement of the connection method improves the utilization rate of the material and the reliability of the structure.

附图说明Description of drawings

图1是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中矩形方管三的立体图;Fig. 1 is a perspective view of a rectangular square tube 3 in a cab-mounted frame structure of a cement crushing vehicle provided by an embodiment of the present invention;

图2是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中矩形方管一的立体图;Fig. 2 is a perspective view of a rectangular square tube 1 in the cab installation frame structure of a cement crushing vehicle provided by an embodiment of the present invention;

图3是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中右方管二的立体图;Fig. 3 is a perspective view of the second right pipe in the cab installation frame structure of a cement crushing truck provided by an embodiment of the present invention;

图4是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中右方管一的立体图;Fig. 4 is a perspective view of the right side tube 1 in the cab installation frame structure of a cement crushing vehicle provided by the embodiment of the present invention;

图5是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中右方管的立体图;Fig. 5 is a perspective view of the right side pipe in the cab installation frame structure of a cement crushing vehicle provided by the embodiment of the present invention;

图6是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中加强横梁的立体图图;Fig. 6 is a perspective view of a reinforcing crossbeam in a frame structure installed in a cab of a cement crushing vehicle provided by an embodiment of the present invention;

图7是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中筋板的立体图;Fig. 7 is a perspective view of the rib plate in the frame structure of the cab of a cement crushing vehicle provided by the embodiment of the present invention;

图8是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中矩形框架组件的立体图;Fig. 8 is a perspective view of a rectangular frame assembly in a cab-mounted frame structure of a cement crushing vehicle provided by an embodiment of the present invention;

图9是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中右方管一和右方管二的结构立体示意图;Fig. 9 is a three-dimensional schematic diagram of the structure of the right square pipe 1 and the right square pipe 2 in the cab installation frame structure of a cement crushing vehicle provided by the embodiment of the present invention;

图10是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中驾驶室安装车架组件、矩形框架组件和安装板组件的第一结构立体图;Fig. 10 is a first structural perspective view of a cab-mounted frame assembly, a rectangular frame assembly, and a mounting plate assembly in a cement crushing vehicle cab-mounted frame structure provided by an embodiment of the present invention;

图11是本发明实施例提供的一种水泥破碎车驾驶室安装车架结构中驾驶室安装车架组件、矩形框架组件和安装板组件的第二结构立体图;Fig. 11 is a second structural perspective view of a cab-mounted frame assembly, a rectangular frame assembly, and a mounting plate assembly in a cab-mounted frame structure of a cement crushing vehicle provided by an embodiment of the present invention;

图12是驾驶室装配组成图;Fig. 12 is an assembly diagram of the cab;

图中:1、矩形方管三;2、矩形方管一;3、右方管二;4、右方管一;5、右方管;6、筋板;7、加强横梁;8、牵引座安装板;9、安装板;10、矩形框架;11、底板;12、驾驶室安装板;15、前滑轨安装板;16、下弯板;18、前侧板;19、后侧板。In the figure: 1. Rectangular square tube three; 2. Rectangular square tube one; 3. Right tube two; 4. Right tube one; 5. Right tube; Seat mounting plate; 9, mounting plate; 10, rectangular frame; 11, bottom plate; 12, cab mounting plate; 15, front slide rail mounting plate; 16, lower curved plate; 18, front side plate; 19, rear side plate .

具体实施方式Detailed ways

下面结合附图对本发明作进一步描述。以下实施例仅用于更加清楚地说明本发明的技术方案,而不能以此来限制本发明的保护范围。The present invention will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

本发明的实施例提供一种水泥破碎车驾驶室安装车架结构,如图1至图12所示,包括固连的两镜像设置的驾驶室安装车架组件;所述驾驶室安装车架组件包括矩形方管一2和设置于矩形方管一2一端的梯形框架,两所述梯形框架竖直设置,两所述梯形框架共同连接支撑有驾驶室安装架,用于支撑驾驶室的后部;两所述矩形方管一2的另一端分别设置有矩形框架10和安装板组件,所述矩形框架10水平设置,所述矩形框架10和安装板组件用于支撑驾驶室的前部,同时本发明设计右方管5、矩形方管三1和筋板6,使得重力和冲击力可分为多条道路进行传递,右方管一4和右方管二3的形状设计和连接点设计可时刻调整各个受力点的平衡,保证整个驾驶室安装结构受力传递的平稳性,同时充分利用可设计空间、结构形状设计和连接方式的布置,提高了材料的利用率和结构的可靠性。An embodiment of the present invention provides a cab mounting frame structure of a cement crushing vehicle, as shown in Figures 1 to 12, comprising two fixedly connected cab mounting frame assemblies arranged in mirror images; the cab mounting frame assembly It includes a rectangular square tube 12 and a trapezoidal frame arranged at one end of the rectangular square tube 12 , the two trapezoidal frames are vertically arranged, and the two trapezoidal frames are jointly connected and supported by a cab mounting frame for supporting the rear of the cab The other end of two described rectangular square tubes one 2 is respectively provided with rectangular frame 10 and mounting plate assembly, and described rectangular frame 10 is horizontally arranged, and described rectangular frame 10 and mounting plate assembly are used to support the front portion of cab, simultaneously The present invention designs the right square pipe 5, the rectangular square pipe three 1 and the rib plate 6, so that the gravity and impact force can be divided into multiple roads for transmission, the shape design and connection point design of the right square pipe one 4 and the right square pipe two 3 The balance of each force point can be adjusted at any time to ensure the stability of force transmission of the entire cab installation structure, and at the same time make full use of the designable space, structural shape design and connection arrangement, improving the utilization rate of materials and the reliability of the structure .

在具体设计时,为将两驾驶室安装车架组件进行固连,本发明在两驾驶室安装车架组件之间设置若干加强横梁7,本发明在两矩形方管一2之间均布焊接三个加强横梁7,同时在两梯形框架之间设置一个加强横梁7。In the specific design, in order to securely connect the frame assemblies of the two cabs, the present invention arranges a number of reinforcing beams 7 between the two cabs, and the present invention welds them evenly between the two rectangular square tubes. Three reinforcing beams 7 are provided, and one reinforcing beam 7 is set between the two trapezoidal frames.

在具体设计梯形框架时,在矩形方管一2的端部设置矩形方管三1,矩形方管三1与矩形方管一2垂直设置,在焊接固定时,将矩形方管三1的外表面焊接在矩形方管一2的端面;同时,在矩形方管一2和矩形方管三1之间设置右方管5,右方管5由两段弯折的管路焊接而成,分别为A段和B段,A段和B段呈钝角连接,且开口朝向矩形方管一2和矩形方管三1的连接处,在具体设置A段时,A段焊接连接矩形方管三1,同时A段与矩形方管一2平行设置;在具体设置B段时,B段焊接连接矩形方管一2;通过矩形方管一2、矩形方管三1和右方管5的设计构成梯形空间。When specifically designing the trapezoidal frame, a rectangular square tube 3 1 is arranged at the end of the rectangular square tube 1 2, and the rectangular square tube 3 1 is vertically arranged with the rectangular square tube 1 2. When welding and fixing, the outside of the rectangular square tube 3 1 The surface is welded on the end face of the rectangular square tube 1 2; at the same time, the right square tube 5 is set between the rectangular square tube 1 2 and the rectangular square tube 3 1, and the right square tube 5 is welded by two sections of bent pipelines, respectively It is section A and section B, section A and section B are connected at an obtuse angle, and the opening faces the junction of rectangular square tube 1 2 and rectangular square tube 3 1, when specifically setting section A, section A is welded and connected to rectangular square tube 3 1 , and at the same time section A is set in parallel with rectangular square tube 1; when specifically setting section B, section B is welded and connected to rectangular square tube 1; through the design of rectangular square tube 1 2, rectangular square tube 3 1 and right square tube 5 trapezoidal space.

在具体设计驾驶室安装架时,通过右方管5和矩形方管三1将驾驶室安装架支撑固定,为实现可靠连接,驾驶室安装架包括前侧板18、后侧板19和下弯板16,前侧板18和后侧板19平行设计,右方管5的A段穿过前侧板18,并与前侧板18焊接固定,同时后侧板19的端部焊接下弯板16,后侧板19的外表面焊接连接后侧板19,通过上述连接利用梯形框架固定驾驶室安装架;在支撑架构设置完成后,为方便为驾驶室后部提供承托面,在前侧板18上设置驾驶室安装板129,所述驾驶室安装板129位于与下弯板16相对的一面,所述驾驶室安装板129的板面与右方管5的A段的上表面平行。When specifically designing the cab mounting frame, the cab mounting frame is supported and fixed by the right square tube 5 and the rectangular square tube 31. In order to realize reliable connection, the cab mounting frame includes a front side plate 18, a rear side plate 19 and a bent down Plate 16, front side plate 18 and rear side plate 19 are designed in parallel, section A of the right pipe 5 passes through the front side plate 18, and is welded and fixed with the front side plate 18, and the end of the rear side plate 19 is welded with a lower bent plate 16. The outer surface of the rear side plate 19 is welded and connected to the rear side plate 19. Through the above connection, the cab mounting frame is fixed with a trapezoidal frame; A cab mounting plate 129 is arranged on the plate 18, and the cab mounting plate 129 is positioned on the side opposite to the lower curved plate 16, and the board surface of the cab mounting plate 129 is parallel to the upper surface of the A section of the right side pipe 5.

为方便支撑梯形框架并进行外力分解,在梯形框架内部设置三角形框架,三角形框架主要包括右方管一4和右方管二3,在设置右方管二3时,将右方管二3的两个端部分别连接矩形方管一2和矩形方管三1,使得矩形方管一2、矩形方管三1和右方管二3之间形成一个三角形,右方管二3、右方管5和矩形方管一2之间形成一个菱形空间;在设置右方管一4时,右方管一4的两端连接菱形空间的两个对角,将菱形空间划分为两个三角形空间;通过上述设置将梯形框架内部空间分为三个三角形空间,以便传递外部重力和冲击。In order to support the trapezoidal frame conveniently and carry out external force decomposition, a triangular frame is set inside the trapezoidal frame. The triangular frame mainly includes the right tube 1 4 and the right tube 2 3. When setting the right tube 2 3, the right tube 2 3 The two ends are respectively connected to the rectangular square tube one 2 and the rectangular square tube three 1, so that a triangle is formed between the rectangular square tube one 2, the rectangular square tube three 1 and the right square tube two 3, the right square tube two 3, the right side A diamond-shaped space is formed between the pipe 5 and the rectangular square pipe-2; when the right square pipe-4 is set, the two ends of the right square pipe-4 are connected to two opposite corners of the rhombus space, and the rhombus space is divided into two triangular spaces ; The internal space of the trapezoidal frame is divided into three triangular spaces through the above settings, so as to transmit external gravity and impact.

为方便支撑驾驶室前部,在两所述矩形方管一2的一端分别设置矩形框架10和安装板组,所述矩形框架10包括两条相邻边构成的侧板,分别包括第一侧板和第二侧板,所述第一侧板和第二侧板垂直设置,所述第一侧板的自由端连接矩形方管一2的端部,并与矩形方管一2垂直设置,第一侧板的板面焊接连接矩形方管一2的端面;所述第二侧板与第一侧板垂直设置,所述第二侧板与矩形方管一2平行设置,所述第二侧板的一端连接第一侧板,另一端连接有连接杆,连接杆连接矩形方管一2,连接杆与第一侧板平行设置,连接杆与第二侧板和矩形方管一2垂直设置,连接杆的一个端面焊接连接第二侧板的板面,另一个端面焊接连接矩形方管一2的外表面;通过上述侧板、连接杆和矩形方管一2的设置构成矩形框架10。For the convenience of supporting the front of the driver's cab, a rectangular frame 10 and a mounting plate group are respectively arranged at one end of the two rectangular square tubes-2. plate and the second side plate, the first side plate and the second side plate are vertically arranged, the free end of the first side plate is connected to the end of the rectangular square tube 12, and is vertically arranged with the rectangular square tube 12, The plate surface of the first side plate is welded and connected to the end face of the rectangular square tube-2; the second side plate is vertically arranged with the first side plate, and the second side plate is arranged parallel to the rectangular square tube-2, and the second side plate is arranged in parallel with the rectangular square tube-2. One end of the side plate is connected to the first side plate, and the other end is connected to a connecting rod, the connecting rod is connected to the rectangular square tube 12, the connecting rod is arranged parallel to the first side plate, and the connecting rod is perpendicular to the second side plate and the rectangular square tube 12 Setting, one end face of the connecting rod is welded to connect the plate surface of the second side plate, and the other end face is welded to connect the outer surface of the rectangular square tube-2; the rectangular frame 10 is formed by the setting of the above-mentioned side plate, the connecting rod and the rectangular square tube-2 .

在矩形框架10的中,在其中一组对角线之间设置加强杆,加强杆的两端分别焊接在矩形框架10的对角线处,以将矩形框架10内部空间分为两个三角形,以提高矩形框架10的强度。In the rectangular frame 10, reinforcing rods are arranged between one group of diagonal lines, and the two ends of the reinforcing rods are respectively welded to the diagonal lines of the rectangular frame 10, so as to divide the internal space of the rectangular frame 10 into two triangles, To improve the strength of the rectangular frame 10 .

在第一侧板上设置前滑轨安装板15,所述前滑轨安装板15位于矩形框架10内侧,并与矩形框架10所在平面平行设置,以用于承载减震器并连接驾驶室底座,以完成驾驶室安装车架和驾驶室的装配。A front slide rail mounting plate 15 is arranged on the first side plate, and the front slide rail mounting plate 15 is located inside the rectangular frame 10 and arranged parallel to the plane of the rectangular frame 10, so as to carry the shock absorber and connect the cab base , to complete the cab mounting frame and cab assembly.

所述安装板组件包括牵引座安装板8,所述牵引座安装板8的板面焊接在矩形方管一2的端面,所述牵引座安装板8的板面与矩形方管的长度方向垂直设置;所述安装板组件还包括安装板9,所述安装板9设置在矩形方管一2的管壁上,所述安装板9位于矩形方管一2设置牵引座安装板8的一侧,所述安装板9焊接连接矩形方管一2。The mounting plate assembly includes a fifth wheel mounting plate 8, the plate surface of the fifth wheel mounting plate 8 is welded on the end face of the rectangular square tube 2, and the plate surface of the fifth wheel mounting plate 8 is perpendicular to the length direction of the rectangular square tube Setting; the mounting plate assembly also includes a mounting plate 9, the mounting plate 9 is arranged on the tube wall of the rectangular square tube-2, and the mounting plate 9 is located on the side where the traction seat mounting plate 8 is arranged on the rectangular square tube-2 , the mounting plate 9 is welded and connected to the rectangular square tube 1-2.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the technical principle of the present invention, some improvements and modifications can also be made. It should also be regarded as the protection scope of the present invention.

Claims (10)

1. The utility model provides a cement crushing car driver's cabin installation frame structure which characterized in that:
comprises two fixedly connected cab mounting frame components which are arranged in a mirror image manner;
the cab mounting frame assembly comprises a rectangular square tube I (2) and a trapezoid frame arranged at one end of the rectangular square tube I (2), wherein the two trapezoid frames are vertically arranged, and the two trapezoid frames are jointly connected and supported with a cab mounting frame and are used for supporting the rear part of a cab;
the other ends of the rectangular square tubes (2) are respectively provided with a rectangular frame (10) and a mounting plate assembly, the rectangular frames (10) are horizontally arranged, and the rectangular frames (10) and the mounting plate (9) assemblies are used for supporting the front part in a cab.
2. The cement crushing vehicle cab mounting frame structure according to claim 1, wherein:
and a reinforcing cross beam (7) is arranged between the two cab mounting frame components.
3. The cement crushing vehicle cab mounting frame structure according to claim 1, wherein:
the trapezoid frame comprises a rectangular square tube three (1) and a right square tube (5), the rectangular square tube three (1) and the rectangular square tube one (2) are vertically arranged, the right square tube (5) comprises an A section connected with the rectangular square tube three (1) and a B section connected with the rectangular square tube one (2), the A section is connected with the B section, an included angle is an obtuse angle, and the A section and the rectangular square tube one (2) are arranged in parallel.
4. A cement crushing vehicle cab mounting frame structure according to claim 3, wherein:
the cab mounting frame comprises a front side plate (18), a rear side plate (19) and a lower bending plate (16), wherein the front side plate (18) and the rear side plate (19) are arranged in parallel, and the lower bending plate (16) is arranged between the front side plate (18) and the rear side plate (19);
the plane of the trapezoid frame is perpendicular to the front side plate (18), the section A of the right square tube (5) penetrates through the front side plate (18), the end part of the rectangular square tube III (1) is fixedly connected with the lower bent plate (16), and one side surface of the rectangular square tube III (1) is fixedly connected with the rear side plate (19);
the front side plate (18) is provided with a cab mounting plate (12), the cab mounting plate (12) is positioned on one surface opposite to the lower bending plate (16), and the surface of the cab mounting plate (12) is parallel to the upper surface of the section A of the right square tube (5).
5. The cement crushing vehicle cab mounting frame structure according to claim 4, wherein:
the outer wall of the rectangular square tube III is provided with a rib plate, the rib plate is positioned on one side opposite to the trapezoid frame, and the rib plate is fixedly connected with a bottom plate.
6. A cement crushing vehicle cab mounting frame structure according to claim 3, wherein:
and triangular frames are arranged in the areas of the sections A, B, the rectangular square tube I (2) and the rectangular square tube III (1) surrounding areas.
7. The cement crushing vehicle cab mounting frame structure according to claim 6, wherein:
the triangular frame comprises a right square tube I (4) and a right square tube II (3), wherein two ends of the right square tube II (3) are respectively connected with a rectangular square tube I (2) and a rectangular square tube III (1), and the internal space of the trapezoidal frame is divided into a triangular space and a diamond space;
two ends of the right square tube I (4) are respectively connected with two opposite angles of the diamond-shaped space, and the diamond-shaped space is divided into two triangular spaces.
8. The cement crushing vehicle cab mounting frame structure according to claim 1, wherein:
the rectangular frame (10) comprises side plates and connecting rods, wherein the side plates comprise a first side plate and a second side plate which are vertically connected, the free end of the first side plate is connected with the end part of the rectangular square tube I (2) and is vertically connected with the rectangular square tube, the free end of the second side plate is vertically connected with the connecting rods, and the connecting rods are vertically connected with the rectangular square tube I (2);
one side of the first side plate, which is positioned inside the rectangular frame (10), is provided with a front sliding rail mounting plate (15) which is used for being connected to a cab base through a shock absorber to complete the assembly of a cab mounting frame and a cab.
9. The cement crushing vehicle cab mounting frame structure according to claim 8, wherein:
reinforcing rods are connected between a group of opposite angles of the rectangular frame (10).
10. The cement crushing vehicle cab mounting frame structure according to claim 1, wherein:
the mounting plate assembly comprises a traction seat mounting plate (8) and a mounting plate (9), wherein the traction seat mounting plate (8) is arranged at the end part of the rectangular square tube I (2), and the plate surface is perpendicular to the length direction of the rectangular square tube I (2); the mounting plate (9) is arranged on the outer surface of the rectangular square tube I (2) and is positioned at the same end of the rectangular square tube I (2) as the traction seat mounting plate (8).
CN202310046996.9A 2023-01-31 2023-01-31 Cab mounting frame structure of cement crushing vehicle Pending CN116161116A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310046996.9A CN116161116A (en) 2023-01-31 2023-01-31 Cab mounting frame structure of cement crushing vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310046996.9A CN116161116A (en) 2023-01-31 2023-01-31 Cab mounting frame structure of cement crushing vehicle

Publications (1)

Publication Number Publication Date
CN116161116A true CN116161116A (en) 2023-05-26

Family

ID=86414242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310046996.9A Pending CN116161116A (en) 2023-01-31 2023-01-31 Cab mounting frame structure of cement crushing vehicle

Country Status (1)

Country Link
CN (1) CN116161116A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6325449B1 (en) * 2000-06-08 2001-12-04 Deere & Company ROPS structure for work vehicle
CN1506258A (en) * 2002-12-11 2004-06-23 ��ʽ����С�������� Cab supporting structure
US20100290881A1 (en) * 2007-05-26 2010-11-18 Michael J Koss Retrofitable ROPS Reinforcement Structure for Cab Raiser Interface
CN103158792A (en) * 2011-12-12 2013-06-19 现代自动车株式会社 Cab mounting apparatus
WO2021060317A1 (en) * 2019-09-27 2021-04-01 いすゞ自動車株式会社 Vehicle cab structure
CN112829839A (en) * 2021-03-15 2021-05-25 东风汽车股份有限公司 Light truck cab and optimization method thereof
CN115384636A (en) * 2022-08-08 2022-11-25 徐州徐工筑路机械有限公司 Cab frame and cold recycling machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6325449B1 (en) * 2000-06-08 2001-12-04 Deere & Company ROPS structure for work vehicle
CN1506258A (en) * 2002-12-11 2004-06-23 ��ʽ����С�������� Cab supporting structure
US20100290881A1 (en) * 2007-05-26 2010-11-18 Michael J Koss Retrofitable ROPS Reinforcement Structure for Cab Raiser Interface
CN103158792A (en) * 2011-12-12 2013-06-19 现代自动车株式会社 Cab mounting apparatus
WO2021060317A1 (en) * 2019-09-27 2021-04-01 いすゞ自動車株式会社 Vehicle cab structure
CN112829839A (en) * 2021-03-15 2021-05-25 东风汽车股份有限公司 Light truck cab and optimization method thereof
CN115384636A (en) * 2022-08-08 2022-11-25 徐州徐工筑路机械有限公司 Cab frame and cold recycling machine

Similar Documents

Publication Publication Date Title
CN101559775A (en) Car body structure
CN213292296U (en) Railway vehicle, underframe and side beam of railway vehicle
CN102328615B (en) Concrete mixer truck
CN108657202B (en) train center car
CN107972476A (en) Radiator frame assembly
CN211684976U (en) A front lower protection assembly with bumper installation function
CN105857398B (en) A kind of general-purpose type pure electric coach Undercarriage structure
CN116161116A (en) Cab mounting frame structure of cement crushing vehicle
CN213566135U (en) An automobile and its front cabin body structure
CN206678992U (en) Car among train
CN108657212B (en) Underframe of train and train head car
CN210971078U (en) Vehicle chassis forming member, vehicle chassis and rail vehicle
CN220031684U (en) Side-mounted power battery frame of commercial vehicle
CN203268131U (en) All-bearing commercial vehicle platform and commercial vehicle adopting same
CN117401035A (en) Subframe and vehicle
CN117048655A (en) Rail vehicle end chassis and rail vehicle
CN205220811U (en) Preceding end support with clad structure
CN201530417U (en) Vehicle frame for hinge type vehicle and hinged type vehicle
CN116279808A (en) Subframe assembly and vehicle
CN212220143U (en) Rear protection device for cargo vehicle
CN207825865U (en) The front air suspension structure of gas spring is emptied for affixed side
CN223702722U (en) Front overhang longitudinal pushing support, off-highway mining dumper frame and off-highway mining dumper
CN202449080U (en) Strengthening structure for automobile floor framework
CN223072252U (en) Rear suspension thrust rod fixing seat installation structure based on 10.5m full-load city bus
CN207843172U (en) Body frame structure for automotive

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20230526