CN116002502A - Material lifting equipment for construction site - Google Patents

Material lifting equipment for construction site Download PDF

Info

Publication number
CN116002502A
CN116002502A CN202211525867.XA CN202211525867A CN116002502A CN 116002502 A CN116002502 A CN 116002502A CN 202211525867 A CN202211525867 A CN 202211525867A CN 116002502 A CN116002502 A CN 116002502A
Authority
CN
China
Prior art keywords
top plate
rod
construction site
material hoisting
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211525867.XA
Other languages
Chinese (zh)
Inventor
韩虎军
张兆泽
周富虎
欧阳军
周睿
康文辉
苗永刚
郭海龙
王定刚
成锋
张凯
贺延峰
周帆
郜晔昌
王晓旭
冯磊
马天东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Transmission & Substation Engineering Co ltd
Original Assignee
Gansu Transmission & Substation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Transmission & Substation Engineering Co ltd filed Critical Gansu Transmission & Substation Engineering Co ltd
Priority to CN202211525867.XA priority Critical patent/CN116002502A/en
Publication of CN116002502A publication Critical patent/CN116002502A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of construction of power distribution stations, and discloses a construction site material hoisting device, which comprises a lifting hook, wherein the lower end of the lifting hook is provided with a hanging component, the lower end of the hanging component is provided with a stabilizing component, the stabilizing component comprises a top plate, support columns, a bottom plate and a clamping unit, the top plate is arranged right below the lifting hook, the upper end of the top plate is fixedly connected with the tail end of a steel wire rope, four support columns are uniformly arranged at the lower end of the top plate, the bottom ends of the support columns are jointly provided with a bottom plate, and the upper end of the top plate is also provided with the clamping unit.

Description

一种施工现场物料吊装设备A construction site material hoisting equipment

技术领域technical field

本发明涉及配电站施工的领域,尤其是涉及一种施工现场物料吊装设备。The invention relates to the field of substation construction, in particular to a material hoisting device at a construction site.

背景技术Background technique

配电站,将电送到用电设备或用户的站点。位于电网的末端,是放射形网络上的一个点,上连变电站,下连各用电设备,在配电站的施工过程中,如变电箱等大型物料都需要利用装吊车进行吊装。Distribution station, the station that sends electricity to electrical equipment or users. Located at the end of the power grid, it is a point on the radial network. It is connected to the substation and connected to the electrical equipment. During the construction of the distribution station, large materials such as transformer boxes need to be hoisted by a crane.

但是现有的吊装设备在吊装变电箱等物料时,通常都是采用四根绳子加挂钩或者吸盘进行悬挂吊装,固定方式比较简单,所以在此过程中,由于变电箱较重,若速度太快则会发生半空中晃动比较剧烈的情形,十分容易发生掉落的危险。However, the existing hoisting equipment usually uses four ropes plus hooks or suction cups for hoisting when lifting materials such as transformer boxes. The fixing method is relatively simple. If it is too fast, there will be severe shaking in mid-air, and the danger of falling is very easy to occur.

针对上述中的相关技术问题,发明人提出一种施工现场物料吊装设备。In view of the related technical problems mentioned above, the inventor proposes a construction site material hoisting equipment.

发明内容Contents of the invention

为了解决上述提出的问题,本发明提供一种施工现场物料吊装设备。In order to solve the above-mentioned problems, the present invention provides a construction site material hoisting device.

本发明提供的一种施工现场物料吊装设备采用如下的技术方案:A construction site material hoisting equipment provided by the present invention adopts the following technical scheme:

一种施工现场物料吊装设备,包括吊钩,所述吊钩的下端设置有悬挂组件,所述悬挂组件的下端设置有稳固组件。A material hoisting device on a construction site includes a hook, a suspension component is provided at the lower end of the suspension hook, and a stabilizing component is provided at the lower end of the suspension component.

所述悬挂组件包括铁环、收卷盘和钢丝绳,所述铁环悬挂在吊钩上,所述铁环的左右两端对称转动安装有收卷盘,所述收卷盘上缠绕有钢丝绳,所述钢丝绳前后两两对称排布。The suspension assembly includes an iron hoop, a reel and a steel wire rope, the hoop is suspended on the hook, the left and right ends of the hoop are symmetrically rotated and installed with a reel, and the reel is wound with a wire rope. The steel wire ropes are symmetrically arranged in pairs front and back.

所述稳固组件包括顶板、支撑柱、底板和夹持单元,所述顶板设置在所述吊钩的正下方,且顶板的上端与所述钢丝绳的末端固定连接,所述顶板的下端均匀安装有四个支撑柱,所述支撑柱的底端共同安装有底板,且顶板的上端还设置有夹持单元。The stable component includes a top plate, a support column, a bottom plate and a clamping unit, the top plate is arranged directly below the hook, and the upper end of the top plate is fixedly connected to the end of the wire rope, and the lower end of the top plate is evenly installed with Four support columns, the bottom ends of the support columns are jointly installed with a bottom plate, and the upper end of the top plate is also provided with a clamping unit.

优选的,所述夹持单元包括齿轮、齿条、驱动手柄和夹持杆,所述齿轮通过转轴转动设置在所述顶板的上端,所述齿轮的左右两端均啮合有齿条,两个所述齿条前后交错分布,任一齿条的一个末端安装有夹持杆。Preferably, the clamping unit includes a gear, a rack, a drive handle and a clamping rod, the gear is arranged on the upper end of the top plate through a rotating shaft, the left and right ends of the gear are meshed with racks, and the two The racks are staggered forward and backward, and a clamping rod is installed at one end of any rack.

优选的,所述铁环的内侧端与所述吊钩之间通过磁性物质相互吸引。Preferably, the inner end of the iron ring and the hook are attracted to each other through a magnetic substance.

优选的,所述齿条的下端固定安装有导向块,所述导向块滑动设置在开设于所述顶板上端面的导向槽内。Preferably, a guide block is fixedly installed on the lower end of the rack, and the guide block is slidably arranged in a guide groove opened on the upper surface of the top plate.

优选的,所述夹持杆由主杆、副杆和挤压块组成,所述主杆的上端与所述齿条的底端固定连接,所述副杆固定在所述主杆的一侧端,且副杆从上至下均匀分布,所述副杆靠近所述齿轮的一端均匀安装有若干挤压块。Preferably, the clamping rod is composed of a main rod, an auxiliary rod and an extrusion block, the upper end of the main rod is fixedly connected with the bottom end of the rack, and the auxiliary rod is fixed on one side of the main rod end, and the sub-rod is evenly distributed from top to bottom, and the end of the sub-rod close to the gear is evenly equipped with several extrusion blocks.

优选的,所述挤压块由绝缘材料制成。Preferably, the extrusion block is made of insulating material.

优选的,所述支撑柱由芯柱和套杆构成,所述芯柱的顶端与所述顶板的下端固定连接,所述套杆的下端与所述底板的上端固定连接,所述芯柱的下端滑动设置在所述套杆内,且芯柱的底部与所述套杆的内底壁之间固定连接有支撑弹簧。Preferably, the support column is composed of a core column and a sleeve rod, the top end of the core column is fixedly connected to the lower end of the top plate, the lower end of the sleeve rod is fixedly connected to the upper end of the bottom plate, and the core column The lower end is slidingly arranged in the sleeve rod, and a support spring is fixedly connected between the bottom of the stem and the inner bottom wall of the sleeve rod.

综上所述,本发明包括以下至少一种有益技术效果:In summary, the present invention includes at least one of the following beneficial technical effects:

1.本方案通过人工方式旋转手柄驱动,接着通过手柄驱动转动齿轮,使得齿轮转动,在导向块与导向槽的配合下,齿轮带动两个齿条一前一后地直线移动,齿条带动夹杆做同步直线运动,从而使得夹杆带动挤压块对配线箱或者变电箱的两端进行夹持固定,达到了稳固的效果。1. This scheme is driven by rotating the handle manually, and then the gear is driven by the handle to make the gear rotate. With the cooperation of the guide block and the guide groove, the gear drives the two racks to move linearly one after the other, and the rack drives the clip. The rods do synchronous linear motion, so that the clamping rod drives the extrusion block to clamp and fix the two ends of the wiring box or the transformer box, achieving a stable effect.

附图说明Description of drawings

图1是发明实施例的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the embodiment of the invention;

图2是发明实施例的前视图;Figure 2 is a front view of an embodiment of the invention;

图3是发明实施例的左视图;Fig. 3 is the left view of invention embodiment;

图4是发明实施例的局部立体图。Fig. 4 is a partial perspective view of an embodiment of the invention.

附图标记说明:1、吊钩;2、悬挂组件;20、铁环;21、收卷盘;22、钢丝绳;30、顶板;31、支撑柱;32、底板;33、夹持单元;330、齿轮;331、齿条;332、驱动手柄;333、夹持杆;334、导向块;335、主杆;336、副杆;337、挤压块;310、芯柱;311、套杆;312、支撑弹簧。Description of Reference Signs: 1. Hook; 2. Suspension assembly; 20. Iron ring; 21. Reel; 22. Steel wire rope; 30. Top plate; 31. Support column; 32. Bottom plate; 33. Clamping unit; 330 , gear; 331, rack; 332, driving handle; 333, clamping rod; 334, guide block; 335, main rod; 336, auxiliary rod; 337, extruding block; 312, support spring.

具体实施方式Detailed ways

以下结合附图1-4对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with accompanying drawings 1-4.

本发明实施例公开一种施工现场物料吊装设备。参照图1至图4,一种施工现场物料吊装设备,包括吊钩1,吊钩1的下端设置有悬挂组件2,悬挂组件2的下端设置有稳固组件3。The embodiment of the invention discloses a construction site material hoisting device. Referring to FIGS. 1 to 4 , a construction site material hoisting device includes a hook 1 , a suspension component 2 is provided at the lower end of the hook 1 , and a stabilizing component 3 is provided at the lower end of the suspension component 2 .

悬挂组件2包括铁环20、收卷盘21和钢丝绳22,铁环20悬挂在吊钩1上,铁环20的左右两端对称转动安装有收卷盘21,收卷盘21上缠绕有钢丝绳22,钢丝绳22前后两两对称排布,铁环20的内侧端与吊钩1之间通过磁性物质相互吸引。Suspension assembly 2 comprises hoop 20, take-up reel 21 and steel wire rope 22, hoop 20 is suspended on the hook 1, and the left and right ends of hoop 20 are symmetrically rotated and are installed with take-up reel 21, and rewind reel 21 is wound with wire rope 22. The steel wire ropes 22 are symmetrically arranged in pairs front and back, and the inner end of the hoop 20 and the hook 1 are attracted to each other through magnetic substances.

稳固组件3包括顶板30、支撑柱31、底板32和夹持单元33,顶板30设置在吊钩1的正下方,且顶板30的上端与钢丝绳22的末端固定连接,顶板30的下端均匀安装有四个支撑柱31,支撑柱31的底端共同安装有底板32,且顶板30的上端还设置有夹持单元33,支撑柱31由芯柱310和套杆311构成,芯柱310的顶端与顶板30的下端固定连接,套杆311的下端与底板32的上端固定连接,芯柱310的下端滑动设置在套杆311内,且芯柱310的底部与套杆311的内底壁之间固定连接有支撑弹簧312。The stabilization component 3 includes a top plate 30, a support column 31, a bottom plate 32 and a clamping unit 33. The top plate 30 is arranged directly below the hook 1, and the upper end of the top plate 30 is fixedly connected to the end of the wire rope 22. The lower end of the top plate 30 is evenly installed with Four supporting columns 31, the bottom of the supporting columns 31 are equipped with a bottom plate 32, and the upper end of the top plate 30 is also provided with a clamping unit 33, the supporting columns 31 are composed of a core column 310 and a sleeve rod 311, the top of the core column 310 is connected to the The lower end of the top plate 30 is fixedly connected, the lower end of the sleeve rod 311 is fixedly connected with the upper end of the bottom plate 32, the lower end of the stem 310 is slidably arranged in the sleeve rod 311, and the bottom of the stem 310 is fixed to the inner bottom wall of the sleeve rod 311. A supporting spring 312 is connected.

夹持单元33包括齿轮330、齿条331、驱动手柄332和夹持杆333,齿轮330通过转轴转动设置在顶板30的上端,齿轮330的左右两端均啮合有齿条331,两个齿条331前后交错分布,任一齿条331的一个末端安装有夹持杆333,齿条331的下端固定安装有导向块334,导向块334滑动设置在开设于顶板30上端面的导向槽内,夹持杆333由主杆335、副杆336和挤压块337组成,主杆335的上端与齿条331的底端固定连接,副杆336固定在主杆335的一侧端,且副杆336从上至下均匀分布,副杆336靠近齿轮330的一端均匀安装有若干挤压块337,挤压块337由绝缘材料制成。The clamping unit 33 includes a gear 330, a rack 331, a drive handle 332 and a clamping rod 333. The gear 330 is arranged on the upper end of the top plate 30 through the rotation of the rotating shaft. The left and right ends of the gear 330 are engaged with the rack 331. The two racks 331 are staggered front and back, one end of any rack 331 is equipped with a clamping rod 333, and the lower end of the rack 331 is fixedly equipped with a guide block 334, and the guide block 334 is slidably arranged in the guide groove on the upper end surface of the top plate 30. Holding rod 333 is made up of main rod 335, auxiliary rod 336 and extruding block 337, and the upper end of main rod 335 is fixedly connected with the bottom end of rack 331, and auxiliary rod 336 is fixed on one side end of main rod 335, and auxiliary rod 336 Evenly distributed from top to bottom, a plurality of extruding blocks 337 are evenly installed on the end of the auxiliary rod 336 close to the gear 330, and the extruding blocks 337 are made of insulating materials.

本发明实施例一种施工现场物料吊装设备的实施原理为:先通过吊车工人控制吊钩1将悬挂组件2以及稳固组件3移动至合适位置和地点并摆正,接着通过人工方式将配电箱或者变电箱放置到顶板30与底板32之间,在此过程中,在支撑弹簧312的作用下,顶板30的位置随着配电箱的高度自适应变化,最后通过人工方式旋转手柄驱动,接着通过手柄驱动转动齿轮330,使得齿轮330转动,在导向块334与导向槽的配合下,齿轮330带动两个齿条331一前一后地直线移动,齿条331带动夹杆做同步直线运动,从而使得夹杆带动挤压块337对配线箱或者变电箱的两端进行夹持固定,达到了稳固的效果,可避免配线箱或者变电箱在半空中剧烈晃动而发生掉落的危险。The implementation principle of a construction site material hoisting equipment in an embodiment of the present invention is as follows: first, the crane worker controls the hook 1 to move the suspension component 2 and the stabilization component 3 to a suitable position and place and align them, and then manually lift the distribution box Or the transformer box is placed between the top plate 30 and the bottom plate 32. During this process, under the action of the support spring 312, the position of the top plate 30 changes adaptively with the height of the distribution box, and finally the handle is manually rotated to drive. Then the gear 330 is driven by the handle to rotate the gear 330. Under the cooperation of the guide block 334 and the guide groove, the gear 330 drives the two racks 331 to move linearly one after the other, and the rack 331 drives the clamp bar to perform synchronous linear motion. , so that the clamping bar drives the extrusion block 337 to clamp and fix the two ends of the wiring box or the transformer box, achieving a stable effect, which can prevent the wiring box or the transformer box from falling violently in mid-air danger.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (7)

1.一种施工现场物料吊装设备,包括吊钩(1),其特征在于:所述吊钩(1)的下端设置有悬挂组件(2),所述悬挂组件(2)的下端设置有稳固组件(3);1. A construction site material hoisting device, comprising a suspension hook (1), characterized in that: the lower end of the suspension hook (1) is provided with a suspension assembly (2), and the lower end of the suspension assembly (2) is provided with a firm component(3); 所述悬挂组件(2)包括铁环(20)、收卷盘(21)和钢丝绳(22),所述铁环(20)悬挂在吊钩(1)上,所述铁环(20)的左右两端对称转动安装有收卷盘(21),所述收卷盘(21)上缠绕有钢丝绳(22),所述钢丝绳(22)前后两两对称排布;Described suspension assembly (2) comprises hoop (20), take-up reel (21) and steel wire rope (22), and described hoop (20) is suspended on the suspension hook (1), and the hoop (20) The left and right ends are symmetrically rotated and installed with a winding reel (21), and the rewinding reel (21) is wound with a steel wire rope (22), and the two steel wire ropes (22) are symmetrically arranged front and back; 所述稳固组件(3)包括顶板(30)、支撑柱(31)、底板(32)和夹持单元(33),所述顶板(30)设置在所述吊钩(1)的正下方,且顶板(30)的上端与所述钢丝绳(22)的末端固定连接,所述顶板(30)的下端均匀安装有四个支撑柱(31),所述支撑柱(31)的底端共同安装有底板(32),且顶板(30)的上端还设置有夹持单元(33)。The stabilizing component (3) includes a top plate (30), a support column (31), a bottom plate (32) and a clamping unit (33), the top plate (30) is arranged directly under the hook (1), And the upper end of the top plate (30) is fixedly connected with the end of the steel wire rope (22), the lower end of the top plate (30) is evenly equipped with four support columns (31), and the bottom ends of the support columns (31) are installed together There is a bottom plate (32), and the upper end of the top plate (30) is also provided with a clamping unit (33). 2.根据权利要求1所述的一种施工现场物料吊装设备,其特征在于:所述夹持单元(33)包括齿轮(330)、齿条(331)、驱动手柄(332)和夹持杆(333),所述齿轮(330)通过转轴转动设置在所述顶板(30)的上端,所述齿轮(330)的左右两端均啮合有齿条(331),两个所述齿条(331)前后交错分布,任一齿条(331)的一个末端安装有夹持杆(333)。2. A construction site material hoisting device according to claim 1, characterized in that: the clamping unit (33) includes a gear (330), a rack (331), a driving handle (332) and a clamping rod (333), the gear (330) is arranged on the upper end of the top plate (30) through the rotation of the rotating shaft, the left and right ends of the gear (330) are meshed with racks (331), and the two racks ( 331) front and rear staggered distribution, and one end of any rack (331) is equipped with a clamping rod (333). 3.根据权利要求1所述的一种施工现场物料吊装设备,其特征在于:所述铁环(20)的内侧端与所述吊钩(1)之间通过磁性物质相互吸引。3. The material hoisting equipment at the construction site according to claim 1, characterized in that: the inner end of the hoop (20) and the hook (1) are attracted to each other by magnetic substances. 4.根据权利要求2所述的一种施工现场物料吊装设备,其特征在于:所述齿条(331)的下端固定安装有导向块(334),所述导向块(334)滑动设置在开设于所述顶板(30)上端面的导向槽内。4. A construction site material hoisting device according to claim 2, characterized in that: a guide block (334) is fixedly installed on the lower end of the rack (331), and the guide block (334) is slidably arranged on the opening In the guide groove on the upper end surface of the top plate (30). 5.根据权利要求2所述的一种施工现场物料吊装设备,其特征在于:所述夹持杆(333)由主杆(335)、副杆(336)和挤压块(337)组成,所述主杆(335)的上端与所述齿条(331)的底端固定连接,所述副杆(336)固定在所述主杆(335)的一侧端,且副杆(336)从上至下均匀分布,所述副杆(336)靠近所述齿轮(330)的一端均匀安装有若干挤压块(337)。5. A construction site material hoisting device according to claim 2, characterized in that: the clamping rod (333) is composed of a main rod (335), an auxiliary rod (336) and an extrusion block (337), The upper end of the main rod (335) is fixedly connected with the bottom end of the rack (331), the auxiliary rod (336) is fixed on one side end of the main rod (335), and the auxiliary rod (336) Evenly distributed from top to bottom, a number of extruding blocks (337) are evenly installed on the end of the auxiliary rod (336) close to the gear (330). 6.根据权利要求5所述的一种施工现场物料吊装设备,其特征在于:所述挤压块(337)由绝缘材料制成。6. The construction site material hoisting equipment according to claim 5, characterized in that: the extrusion block (337) is made of insulating material. 7.根据权利要求2所述的一种施工现场物料吊装设备,其特征在于:所述支撑柱(31)由芯柱(310)和套杆(311)构成,所述芯柱(310)的顶端与所述顶板(30)的下端固定连接,所述套杆(311)的下端与所述底板(32)的上端固定连接,所述芯柱(310)的下端滑动设置在所述套杆(311)内,且芯柱(310)的底部与所述套杆(311)的内底壁之间固定连接有支撑弹簧(312)。7. A construction site material hoisting device according to claim 2, characterized in that: the support column (31) is composed of a core column (310) and a sleeve rod (311), and the core column (310) The top end is fixedly connected to the lower end of the top plate (30), the lower end of the sleeve rod (311) is fixedly connected to the upper end of the bottom plate (32), and the lower end of the stem (310) is slidably arranged on the sleeve rod (311), and a support spring (312) is fixedly connected between the bottom of the stem (310) and the inner bottom wall of the sleeve rod (311).
CN202211525867.XA 2022-12-01 2022-12-01 Material lifting equipment for construction site Pending CN116002502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211525867.XA CN116002502A (en) 2022-12-01 2022-12-01 Material lifting equipment for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211525867.XA CN116002502A (en) 2022-12-01 2022-12-01 Material lifting equipment for construction site

Publications (1)

Publication Number Publication Date
CN116002502A true CN116002502A (en) 2023-04-25

Family

ID=86018415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211525867.XA Pending CN116002502A (en) 2022-12-01 2022-12-01 Material lifting equipment for construction site

Country Status (1)

Country Link
CN (1) CN116002502A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118083794A (en) * 2024-04-28 2024-05-28 河南省第二建筑工程发展有限公司 Steel construction hoist device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100732366B1 (en) * 2007-04-12 2007-06-27 주식회사 도화종합기술공사 Hanger device for steel tower assembly
KR20090124410A (en) * 2008-05-30 2009-12-03 현대중공업 주식회사 Multi purpose lifting jig
JP2012076888A (en) * 2010-10-01 2012-04-19 Mitsubishi Motors Corp Hanging type conveyor
CN215854757U (en) * 2021-10-12 2022-02-18 四川轻化工大学 A lifting device for prefabricated concrete members

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100732366B1 (en) * 2007-04-12 2007-06-27 주식회사 도화종합기술공사 Hanger device for steel tower assembly
KR20090124410A (en) * 2008-05-30 2009-12-03 현대중공업 주식회사 Multi purpose lifting jig
JP2012076888A (en) * 2010-10-01 2012-04-19 Mitsubishi Motors Corp Hanging type conveyor
CN215854757U (en) * 2021-10-12 2022-02-18 四川轻化工大学 A lifting device for prefabricated concrete members

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118083794A (en) * 2024-04-28 2024-05-28 河南省第二建筑工程发展有限公司 Steel construction hoist device

Similar Documents

Publication Publication Date Title
CN106315302A (en) Automatic winding device for cable
CN116002502A (en) Material lifting equipment for construction site
CN210417108U (en) Outer surface packaging equipment for cable processing
CN107720356A (en) A kind of reel-off gear
CN107500019B (en) Warehouse automatic pay-off rack
CN211224674U (en) Supporting device for building assembly type wall
CN211078209U (en) Quick hoisting equipment for crane
CN208981895U (en) A hoisting and self-climbing combined mechanism for power transmission tower erection
CN112811346A (en) Totally closed installation device for sound barrier
CN218809510U (en) Cable pay-off device
CN218313884U (en) Pyrocondensation pipe loading attachment
CN206811037U (en) A kind of electric pole wound machine
CN217264258U (en) Bagged concrete lifting frame device
CN209190740U (en) A pipe fitting rack for civil engineering
CN213707320U (en) Winding mechanism for winding machine
CN211731473U (en) Cable drum carrier
CN213735751U (en) A equipment for packing for electric wire production and processing
CN212245925U (en) A fast moving device for energy-saving building materials
CN212174088U (en) Novel lifting wire arranging machine
CN210825172U (en) Hoist device is used in engineering machine tool maintenance
CN218879246U (en) Double-arm beam crane
CN219507456U (en) Raw material storage device
CN221216723U (en) Cable production pay-off rack
CN218778667U (en) Lifting and hoisting device for liquid cooling cabinet
CN212769121U (en) Cable production pay off rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination