CN116006024A
CN116006024A CN202310147484.1A CN202310147484A CN116006024A CN 116006024 A CN116006024 A CN 116006024A CN 202310147484 A CN202310147484 A CN 202310147484A CN 116006024 A CN116006024 A CN 116006024A
Authority
CN
China
Prior art keywords
net
protection
protection device
reinforcing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202310147484.1A
Other languages
Chinese (zh)
Inventor
田志勇
白红山
白宁山
王青丽
董卫珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University of Industrial Technology
Original Assignee
Zhengzhou University of Industrial Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University of Industrial Technology filed Critical Zhengzhou University of Industrial Technology
Priority to CN202310147484.1A priority Critical patent/CN116006024A/en
Publication of CN116006024A publication Critical patent/CN116006024A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a safety construction limb protection device which comprises two protection upright posts, wherein the bottoms of the protection upright posts are provided with supporting seats, a rolling mechanism is arranged between the two supporting seats, a covering net is rolled on the rolling mechanism and is laid on the ground or slope surface of the construction limb, a reinforcing mechanism is laid on the top of the covering net, connecting rods are arranged at the upper end and the lower end between the two protection upright posts, two connecting rods are arranged, a middle cross rod is arranged on the two protection upright posts between the two connecting rods, and a protection net is arranged between the middle cross rod and the connecting rods. The invention is used for the isolation protection of the construction border, the assembly between the protection units is convenient and reliable, the covering net can be used for covering soil layers of the construction border plane or slope surface, the construction border dust emission is prevented, the rolling and the laying are convenient, the leveling of the covering net laid on the soil layer surface is enhanced, the falling of broken stone and soil on the slope surface is prevented, and the laying is convenient.

Description

一种安全施工临边防护装置A safety construction edge protection device

技术领域technical field

本发明涉及施工防护技术领域,具体为用于安全施工的临边防护装置。The invention relates to the technical field of construction protection, in particular to a border protection device for safe construction.

背景技术Background technique

施工护栏是一种铁管制成,经过无缝铁管折弯,焊接,打磨抛光,高压烤漆,贴膜等层层工艺加工制成。一般被广泛应用于施工场所的隔离与警示,施工护栏一般常用于普通道路,高速公路还有各级公路十字路口、收费站、桥梁、停车场、车站、码头、危险地区和道路施工地段,集会地点临时隔离栏等场所作为道路分道、区域围蔽安全隔离、分流、导向或用在一些提书的庆祝活动场合、或体育娱乐等竞技表演场合的秩序维护,亦可作工厂、车间、仓库、停车场、商业区、公共场所等场合中对设备与设施的保护与防护等。The construction guardrail is made of iron pipe, which is processed by layers of seamless iron pipe bending, welding, grinding and polishing, high-pressure baking paint, and filming. It is generally widely used in the isolation and warning of construction sites. Construction guardrails are generally used on ordinary roads, highways and road crossroads at all levels, toll stations, bridges, parking lots, stations, docks, dangerous areas and road construction sites, assemblies Places such as temporary fences are used as road lanes, area enclosures, safety isolation, diversion, guidance, or used in some celebration occasions for mentioning books, or order maintenance in sports and entertainment and other competitive performance occasions, and can also be used as factories, workshops, warehouses Protection and protection of equipment and facilities in parking lots, commercial areas, public places, etc.

目前施工用的临边防护的护栏仅能够达到线状区域内空间的隔离防护,对于施工临边的斜坡面,斜坡面上的土层易出现滑落,进而导致一些危险事故的发生。此外,施工临边土层扬尘大,污染严重,如果单纯的采用隔离防护网来对边坡进行防护处理,本身无法起到很好的避免扬尘的效果,实际使用效果较差。The current border protection guardrails used for construction can only achieve the isolation and protection of the space in the linear area. For the slope surface near the construction side, the soil layer on the slope surface is prone to slipping, which will lead to some dangerous accidents. In addition, the soil layer near the construction has a lot of dust and serious pollution. If the isolation protection net is simply used to protect the slope, it cannot achieve a good effect of avoiding dust, and the actual use effect is poor.

发明内容Contents of the invention

本发明的目的在于提供一种安全施工临边防护装置,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a safe construction edge protection device to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本发明提供如下技术方案:一种安全施工临边防护装置,包括防护立柱,所述防护立柱的底部设有支撑座,所述防护立柱和支撑座均设有两个,两个所述支撑座之间设有收卷机构,所述收卷机构上收卷设有遮盖网,所述遮盖网平铺设于施工临边的地面或坡面上,所述遮盖网的顶部铺设有加固机构,两个所述防护立柱之间的上端和下端均设有连接杆,所述连接杆设有两个,两个所述连接杆之间的两个防护立柱上设有中横杆,所述中横杆和连接杆之间设有防护网,两个所述支撑座的底部均设有安装板,两个所述防护立柱的顶部均设有灯罩,所述灯罩的内部设有警示灯,所述灯罩的顶部设有太阳能电池板,所述防护立柱远离防护网的一侧设有连接机构。In order to achieve the above object, the present invention provides the following technical solutions: a safety construction border protection device, including a protective column, the bottom of the protective column is provided with a support seat, and the protective column and the support seat are each provided with two, two A roll-up mechanism is arranged between the two support seats, and a cover net is rolled up on the roll-up mechanism, and the cover net is laid flat on the ground or slope near the construction side, and the top of the cover net is laid There is a reinforcement mechanism, and the upper and lower ends between the two protective columns are provided with connecting rods. , a protective net is provided between the middle cross bar and the connecting rod, a mounting plate is provided at the bottom of the two support bases, a lampshade is provided at the top of the two protective columns, and a lampshade is provided inside the lampshade. As for the warning light, a solar panel is arranged on the top of the lampshade, and a connection mechanism is arranged on the side of the protective column away from the protective net.

优选的,所述收卷机构包括收卷辊、涡轮、蜗杆和收卷手轮,两个支撑座之间转动设有收卷辊,收卷辊上收卷设有遮盖网,支撑座的内部转动设有涡轮,涡轮上方的支撑座内部转动设有蜗杆,涡轮和蜗杆之间啮合设置,涡轮的一侧通过连接轴与收卷辊的一端连接,蜗杆的一端贯穿支撑座与收卷手轮连接。Preferably, the rewinding mechanism includes a rewinding roller, a worm gear, a worm and a rewinding hand wheel, a rewinding roller is rotated between the two support seats, and a covering net is arranged on the rewinding roller, and the inside of the support seat There is a worm wheel for rotation, and a worm is installed inside the support base above the worm gear, and the worm gear and the worm screw are meshed. One side of the worm gear is connected to one end of the winding roller through a connecting shaft, and one end of the worm screw runs through the support seat and the winding handwheel. connect.

优选的,所述加固机构包括加固网和U型卡件,遮盖网由收卷辊上拉伸平铺在施工临边的地面或坡面上,遮盖网上铺设有加固网,加固网上设有U型卡件,U型卡件贯穿加固网、遮盖网插入在地面土层中。Preferably, the reinforcement mechanism includes a reinforcement net and a U-shaped clip. The cover net is stretched and spread on the ground or slope near the construction edge by the winding roller, and the reinforcement net is laid on the cover net. U-shaped fasteners and U-shaped fasteners penetrate the reinforcement net and cover net and are inserted into the ground soil layer.

优选的,所述加固网由第一网条和第二网条组成,第一网条和第二网条之间呈垂直交错编织成网状结构的加固网。Preferably, the reinforcement net is composed of first mesh strips and second mesh strips, and the first mesh strips and the second mesh strips are vertically interlaced to form a mesh-like reinforcement mesh.

优选的,所述第一网条和第二网条之间的交错处形成交织点,U型卡件插入在加固网交织点的对角线上,相邻两个U型卡件之间间隔一个交织点设置。Preferably, the intersection between the first mesh strip and the second mesh strip forms an interweaving point, the U-shaped clip is inserted on the diagonal of the interweaving point of the reinforcement mesh, and the interval between two adjacent U-shaped clips is An interleaving point setting.

优选的,所述第一网条和第二网条采用钢筋条设置,所述U型卡件采用U型钢筋设置,所述U型卡件的下端呈圆锥体结构设置。Preferably, the first mesh bars and the second mesh bars are arranged with steel bars, the U-shaped clips are arranged with U-shaped steel bars, and the lower ends of the U-shaped clips are arranged in a conical structure.

优选的,所述安装板和支撑座之间呈T型结构设置,所述支撑座相对两侧的安装板均设有固定螺杆,所述安装板的底部设有锚杆。Preferably, the mounting plate and the support base are arranged in a T-shaped structure, the mounting plates on opposite sides of the support base are provided with fixing screws, and the bottom of the mounting plate is provided with anchor rods.

优选的,所述连接机构包括连接插槽、连接插块和装配螺栓,其中一个防护立柱远离防护网的一侧设有连接插槽,另一个防护立柱远离防护网的一侧设有与连接插槽对应的连接插块,连接插槽相对两侧的防护立柱上、及连接插块上均设有装配孔,连接插块插入在连接插槽内通过装配孔内的装配螺栓固定。Preferably, the connecting mechanism includes connecting slots, connecting plugs and assembly bolts, wherein one protective column is provided with a connecting slot on the side away from the protective net, and the other protective column is provided with a connecting plug on the side far away from the protective net. The connecting plug corresponding to the groove is equipped with assembly holes on the protective columns on the opposite sides of the connecting slot and the connecting plug, and the connecting plug is inserted in the connecting slot and fixed by the mounting bolts in the mounting holes.

与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:

1、本安全施工临边防护装置,通过设置的防护立柱、支撑座和防护网组成施工临边防护单元,用于施工临边的隔离防护,防护单元之间组装方便、可靠,支撑座上设置的收卷机构和遮盖网配合,遮盖网可用于施工临边平面或斜坡面的土层遮盖,可防止施工临边扬尘,收卷、铺设方便。1. This safety construction border protection device is composed of a construction border protection unit through the set protection column, support seat and protective net, which is used for isolation and protection of the construction border. The assembly between the protection units is convenient and reliable. The advanced winding mechanism is matched with the cover net, and the cover net can be used to cover the soil layer on the construction border plane or slope surface, which can prevent the construction border from raising dust, and is convenient for winding and laying.

2、本安全施工临边防护装置,通过设置的加固机构,由第一网条和第二网条编织组成的网状结构加固网,加固网铺设在遮盖网上,加固网和遮盖网通过交织点对角线上插入的U型卡件与施工临边平面或斜坡面的土层固定,可以加强遮盖网在土层面上铺设的平整,防止斜坡面碎石、土壤的滑落,加固网铺设方便。2. This safety construction border protection device, through the reinforcement mechanism set, is composed of the mesh structure reinforcement net composed of the first mesh strip and the second mesh strip, the reinforcement net is laid on the cover net, and the reinforcement net and the cover net pass through the interweaving point The U-shaped clip inserted on the diagonal is fixed to the soil layer of the construction border plane or slope surface, which can strengthen the smoothness of the covering net laid on the soil layer, prevent the falling of gravel and soil on the slope surface, and facilitate the laying of the reinforcement net.

附图说明Description of drawings

图1为本发明的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present invention;

图2为本发明中防护立柱的结构示意图;Fig. 2 is the structural representation of protective column among the present invention;

图3为本发明中支撑座的结构示意图;Fig. 3 is the structural representation of support base among the present invention;

图4为本发明中加固网的结构示意图;Fig. 4 is the structural representation of reinforcing net among the present invention;

图5为本发明中加固机构的结构示意图;Fig. 5 is the structural representation of reinforcing mechanism among the present invention;

图6为本发明图5中A的局部放大图。Fig. 6 is a partially enlarged view of A in Fig. 5 of the present invention.

图中:1、防护立柱;2、支撑座;3、收卷机构;31、收卷辊;32、涡轮;33、蜗杆;34、收卷手轮;4、遮盖网;5、加固机构;51、加固网;511、第一网条;512、第二网条;52、U型卡件;6、连接杆;61、中横杆;62、防护网;7、安装板;71、固定螺杆;72、锚杆;8、灯罩;81、警示灯;9、太阳能电池板;10、连接机构;101、连接插槽;102、连接插块;103、装配螺栓。In the figure: 1. Protection column; 2. Support seat; 3. Rewinding mechanism; 31. Rewinding roller; 32. Turbine; 33. Worm; 34. Rewinding handwheel; 4. Covering net; 5. Reinforcement mechanism; 51. Reinforcement net; 511. First mesh bar; 512. Second mesh bar; 52. U-shaped clip; 6. Connecting rod; Screw rod; 72, anchor rod; 8, lampshade; 81, warning light; 9, solar panel; 10, connecting mechanism; 101, connecting slot;

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

如图1至图6所示,本实施例安全施工临边防护装置,包括防护立柱1,防护立柱1的底部设有支撑座2,防护立柱1和支撑座2均设有两个,两个支撑座2之间设有收卷机构3,收卷机构3上收卷设有遮盖网4,遮盖网4平铺设于施工临边的地面或坡面上,遮盖网4的顶部铺设有加固机构5,两个防护立柱1之间的上端和下端均设有连接杆6,连接杆6设有两个,两个连接杆6之间的两个防护立柱1上设有中横杆61,中横杆61和连接杆6之间设有防护网62,两个支撑座2的底部均设有安装板7,两个防护立柱1的顶部均设有灯罩8,灯罩8的内部设有警示灯81,灯罩8的顶部设有太阳能电池板9,防护立柱1远离防护网62的一侧设有连接机构10,设置的防护立柱1、支撑座2和防护网62组成施工临边防护单元,用于施工临边的隔离防护,临边防护单元之间组装方便、可靠,支撑座2上设置的收卷机构3和遮盖网4配合,遮盖网4可用于施工临边平面或斜坡面的土层遮盖,可防止施工临边扬尘,收卷、铺设方便。As shown in Figures 1 to 6, the safety construction border protection device of this embodiment includes a protective column 1, and the bottom of the protective column 1 is provided with a support seat 2, and the protective column 1 and the support seat 2 are provided with two, two A winding mechanism 3 is provided between the supporting bases 2, and a covering net 4 is arranged on the winding mechanism 3, and the covering net 4 is laid flat on the ground or slope near the construction side, and a reinforcement mechanism is laid on the top of the covering net 4 5. The upper and lower ends between the two protective columns 1 are provided with connecting rods 6, two connecting rods 6 are provided, and the two protective columns 1 between the two connecting rods 6 are provided with a middle horizontal bar 61. A protective net 62 is provided between the crossbar 61 and the connecting rod 6, the bottoms of the two support bases 2 are provided with mounting plates 7, the tops of the two protective columns 1 are provided with a lampshade 8, and a warning light is provided inside the lampshade 8. 81, the top of the lampshade 8 is provided with a solar panel 9, and the side of the protective column 1 away from the protective net 62 is provided with a connecting mechanism 10, and the set protective column 1, the support seat 2 and the protective net 62 form a construction border protection unit. For the isolation and protection of the construction border, the assembly between the border protection units is convenient and reliable. The winding mechanism 3 set on the support seat 2 cooperates with the covering net 4. The covering net 4 can be used for the soil layer of the construction border plane or slope surface Covering can prevent dust from being raised on the construction side, and it is convenient for rolling and laying.

具体的,收卷机构3包括收卷辊31、涡轮32、蜗杆33和收卷手轮34,两个支撑座2之间转动设有收卷辊31,收卷辊31上收卷设有遮盖网4,支撑座2的内部转动设有涡轮32,涡轮32上方的支撑座2内部转动设有蜗杆33,涡轮32和蜗杆33之间啮合设置,涡轮32的一侧通过连接轴与收卷辊31的一端连接,蜗杆33的一端贯穿支撑座2与收卷手轮34连接,蜗杆33、涡轮32的转动驱动收卷辊31转动,实现两个支撑座2之间收卷辊31上遮盖网4的收、放,且涡轮32、蜗杆33的啮合具有自锁性能,使得收卷机构3对铺设在地面上的遮盖网4均匀牵引固定的作用。Specifically, the winding mechanism 3 includes a winding roller 31, a worm gear 32, a worm 33 and a winding handwheel 34, and a winding roller 31 is arranged to rotate between the two supporting bases 2, and a cover is provided for winding on the winding roller 31. Net 4, the internal rotation of the support base 2 is provided with a turbine 32, the internal rotation of the support base 2 above the turbine 32 is provided with a worm 33, the engagement between the turbine 32 and the worm 33 is set, and one side of the turbine 32 is connected to the winding roller through the connecting shaft. One end of the worm 31 is connected, and one end of the worm 33 runs through the support seat 2 and is connected with the winding hand wheel 34. The rotation of the worm 33 and the turbine 32 drives the winding roller 31 to rotate, so that the covering net on the winding roller 31 between the two support seats 2 is realized. 4, and the engagement of the worm gear 32 and the worm screw 33 has self-locking performance, so that the winding mechanism 3 can evenly traction and fix the covering net 4 laid on the ground.

进一步的,加固机构5包括加固网51和U型卡件52,遮盖网4由收卷辊31上拉伸平铺在施工临边的地面或坡面上,遮盖网4上铺设有加固网51,加固网51上设有U型卡件52,U型卡件52贯穿加固网51、遮盖网4插入在地面土层中,加固网51和U型卡件52用于对遮盖网4铺设固定。Further, the reinforcement mechanism 5 includes a reinforcement net 51 and a U-shaped clip 52. The cover net 4 is stretched by the winding roller 31 and laid flat on the ground or slope near the construction, and the cover net 4 is laid with a reinforcement net 51. , the reinforcement net 51 is provided with a U-shaped clip 52, the U-shaped clip 52 runs through the reinforcement net 51, and the cover net 4 is inserted into the ground soil layer, and the reinforcement net 51 and the U-shaped clip 52 are used to lay and fix the cover net 4 .

进一步的,加固网51由第一网条511和第二网条512组成,第一网条511和第二网条512之间呈垂直交错编织成网状结构的加固网51,第一网条511和第二网条512之间的交错处形成交织点,U型卡件52插入在加固网51交织点的对角线上,相邻两个U型卡件52之间间隔一个交织点设置,加固网51和遮盖网4通过交织点对角线上插入的U型卡件52与施工临边平面或斜坡面的土层固定,加固机构5可以加强遮盖网4在土层面上铺设的平整,防止斜坡面碎石、土壤的滑落,加固网51铺设方便。Further, the reinforcement mesh 51 is composed of a first mesh strip 511 and a second mesh strip 512, and the first mesh strip 511 and the second mesh strip 512 are vertically staggered to form a mesh-like reinforcement mesh 51, the first mesh strip 511 and the second mesh bar 512 form an interweaving point, the U-shaped clip 52 is inserted on the diagonal of the interweaving point of the reinforcing mesh 51, and an interweaving point is set between two adjacent U-shaped clips 52 , the reinforcement net 51 and the cover net 4 are fixed to the soil layer on the construction edge plane or slope surface through the U-shaped clip 52 inserted on the diagonal line of the interweaving point, and the reinforcement mechanism 5 can strengthen the laying of the cover net 4 on the soil layer. , to prevent the sliding of gravel and soil on the slope surface, and the reinforcement net 51 is convenient for laying.

进一步的,第一网条511和第二网条512采用钢筋条设置,U型卡件52采用U型钢筋设置,U型卡件52的下端呈圆锥体结构设置,U型卡件52插入土层方便。Further, the first mesh bar 511 and the second mesh bar 512 are provided with steel bars, and the U-shaped clip 52 is provided with U-shaped steel bars. The lower end of the U-shaped clip 52 is arranged in a cone structure, and the U-shaped clip 52 is inserted into the soil. Layers are convenient.

进一步的,安装板7和支撑座2之间呈T型结构设置,支撑座2相对两侧的安装板7均设有固定螺杆71,安装板7的底部设有锚杆72,方便对防护立柱1固定安装。Further, the mounting plate 7 and the support base 2 are arranged in a T-shaped structure, the mounting plates 7 on opposite sides of the support base 2 are provided with fixed screw rods 71, and the bottom of the mounting plate 7 is provided with an anchor rod 72, which is convenient for the protection column 1 fixed installation.

更进一步的,连接机构10包括连接插槽101、连接插块102和装配螺栓103,其中一个防护立柱1远离防护网62的一侧设有连接插槽101,另一个防护立柱1远离防护网62的一侧设有与连接插槽101对应的连接插块102,连接插槽101相对两侧的防护立柱1上、及连接插块102上均设有装配孔,连接插块102插入在连接插槽101内通过装配孔内的装配螺栓103固定,方便临边防护单元之间的组装、拆卸。Furthermore, the connecting mechanism 10 includes a connecting slot 101, a connecting plug 102 and an assembly bolt 103, wherein one protective column 1 is provided with a connecting slot 101 on the side away from the protective net 62, and the other protective column 1 is far away from the protective net 62. One side of the connection slot 101 is provided with a connection plug 102 corresponding to the connection slot 101, and the protective column 1 on the opposite side of the connection slot 101 and the connection plug 102 are provided with assembly holes, and the connection plug 102 is inserted into the connection plug. The slot 101 is fixed by the assembly bolt 103 in the assembly hole, which facilitates the assembly and disassembly of the edge protection units.

本实施例的使用方法为:首先将由防护立柱1、支撑座2和防护网62组成的施工临边防护单元放置在施工临边处,安装板7上的锚杆72插入在地下,通过固定螺杆71对安装板7固定,将临边防护单元安装在施工场所,通过防护立柱1上的连接杆6、中横杆61和防护网62,用于施工临边的隔离防护,相邻两个临边防护单元组装时,将其中一个临边防护单元防护立柱1上的连接插块102插入在另一个临边防护单元防护立柱1的连接插槽101中,装配螺栓103对相邻两个临边防护单元的防护立柱1进行固定,临边防护单元之间组装方便、可靠,当需要对临边防护单元处的地面进行扬尘覆盖时,通过收卷机构3上的收卷手轮34转动带动支撑座2内的蜗杆33转动,蜗杆33的转动驱动与其啮合的涡轮32转动,涡轮32的转动通过连接轴带动两个支撑座2之间的收卷辊31转动,实现两个支撑座2之间收卷辊31上遮盖网4的收、放,可以将遮盖网4平铺在临边防护单元处用于施工临边平面或斜坡面的土层遮盖,可防止施工临边扬尘,收卷、铺设方便,当临边防护单元安装在斜坡面的边缘时(如图2),临边防护单元上的遮盖网4铺设在斜坡面上,然后将由一号网条511和二号网条512编织组成网状结构的加固网51铺设在遮盖网4上,加固网51和遮盖网4通过交织点对角线上插入的U型卡件52与施工临边平面或斜坡面的土层固定,加固机构5可以加强遮盖网4在土层面上铺设的平整,防止斜坡面碎石、土壤的滑落,加固网51铺设方便,当施工临边防护需要拆除时,将加固网51由遮盖网4上拆下,再通过收卷机构3将遮盖网4收卷,由于收卷通过涡轮32、蜗杆33啮合驱动,涡轮32、蜗杆33啮合的自锁,使得收卷机构3上的遮盖网4收、放紧固,当施工临边防护作为斜坡面上长久防护使用时,铺设在斜坡面上的遮盖网4和加固网51、U型卡件52可作为护坡结构铺设在斜坡面上用于加固斜坡坡面的稳定性。The use method of this embodiment is: firstly, the construction border protection unit composed of the protective column 1, the support base 2 and the protective net 62 is placed on the construction border, the anchor rod 72 on the mounting plate 7 is inserted into the ground, and the fixed screw rod 71 is fixed to the installation plate 7, and the border protection unit is installed on the construction site, and the connecting rod 6, the middle cross bar 61 and the protective net 62 on the protective column 1 are used for the isolation and protection of the construction border. When the edge protection unit is assembled, insert the connection insert 102 on one of the edge protection unit protective columns 1 into the connection slot 101 of the other edge protection unit protective column 1, and assemble the bolts 103 on the adjacent two adjacent edges. The protective column 1 of the protection unit is fixed, and the assembly between the border protection units is convenient and reliable. When it is necessary to cover the ground at the border protection unit with dust, the winding handwheel 34 on the winding mechanism 3 is rotated to drive the support The worm screw 33 in the seat 2 rotates, and the rotation of the worm screw 33 drives the worm gear 32 meshed with it to rotate, and the rotation of the worm screw 32 drives the winding roller 31 between the two support bases 2 to rotate through the connecting shaft, so as to realize the rotation between the two support bases 2. The cover net 4 on the rewinding roller 31 is retracted and released, and the cover net 4 can be tiled at the edge protection unit for covering the soil layer of the construction edge plane or slope surface, which can prevent the construction edge from raising dust, rewinding, It is convenient to lay. When the edge protection unit is installed on the edge of the slope surface (as shown in Figure 2), the cover net 4 on the edge protection unit is laid on the slope surface, and then will be woven by No. 1 mesh strip 511 and No. 2 mesh strip 512. The reinforcement net 51 forming the network structure is laid on the cover net 4, and the reinforcement net 51 and the cover net 4 are fixed to the soil layer of the construction edge plane or slope surface through the U-shaped clip 52 inserted on the diagonal line of the interweaving point, and the reinforcement net Mechanism 5 can strengthen the laying of cover net 4 on the soil level, prevent slope gravel and soil from slipping, and the reinforcement net 51 is easy to lay. When the construction border protection needs to be removed, the reinforcement net 51 is removed from the cover net 4 Next, the cover net 4 is rolled up by the roll-up mechanism 3, because the roll-up is driven by the engagement of the worm gear 32 and the worm screw 33, and the self-locking of the worm screw 32 and the worm screw 33 engages, so that the cover net 4 on the roll-up mechanism 3 is retracted and released. Fastening, when the construction border protection is used as long-term protection on the slope surface, the covering net 4, reinforcement net 51 and U-shaped clip 52 laid on the slope surface can be laid on the slope surface as a slope protection structure to reinforce the slope surface stability.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (8)

1. The utility model provides a security construction face limit protection device, includes protection stand (1), its characterized in that: the utility model discloses a solar energy protection device, including protection stand (1), support seat (2), rolling mechanism (3), shielding net (4) tiling is located on the ground or the domatic on limit, reinforcing mechanism (5) have been laid at the top of shielding net (4), two upper end and lower extreme between protection stand (1) all are equipped with connecting rod (6), connecting rod (6) are equipped with two, two be equipped with well horizontal pole (61) on two protection stand (1) between connecting rod (6), be equipped with protection net (62) between well horizontal pole (61) and connecting rod (6), two the bottom of support seat (2) all is equipped with mounting panel (7), two the top of protection stand (1) all is equipped with lamp shade (8), the inside of lamp shade (8) is equipped with warning light (81), the top of lamp shade (8) is equipped with solar cell panel (9), protection net (10) are kept away from to be equipped with between protection stand (6).
2. The safety construction edge protection device according to claim 1, wherein: winding mechanism (3) are including wind-up roll (31), turbine (32), worm (33) and rolling hand wheel (34), rotate between two supporting seat (2) and are equipped with wind-up roll (31), the rolling is equipped with on wind-up roll (31) covers net (4), the inside rotation of supporting seat (2) is equipped with turbine (32), the inside rotation of supporting seat (2) of turbine (32) top is equipped with worm (33), the meshing sets up between turbine (32) and worm (33), one side of turbine (32) is connected with the one end of wind-up roll (31) through the connecting axle, one end of worm (33) runs through supporting seat (2) and is connected with rolling hand wheel (34).
3. The safety construction edge protection device according to claim 2, wherein: the reinforcing mechanism (5) comprises a reinforcing net (51) and U-shaped clamping pieces (52), the covering net (4) is stretched and tiled on the ground or slope surface of a construction limb by the wind-up roller (31), the reinforcing net (51) is paved on the covering net (4), the U-shaped clamping pieces (52) are arranged on the reinforcing net (51), and the U-shaped clamping pieces (52) penetrate through the reinforcing net (51) and are inserted into a ground soil layer.
4. A safety construction edge protection device according to claim 3, wherein: the reinforcing net (51) consists of a first net strip (511) and a second net strip (512), and the first net strip (511) and the second net strip (512) are vertically and alternately woven into the reinforcing net (51) with a net structure.
5. The safety construction edge protection device according to claim 4, wherein: the staggered parts between the first net strips (511) and the second net strips (512) form staggered points, the U-shaped clamping pieces (52) are inserted into diagonal lines of the staggered points of the reinforcing net (51), and one staggered point is arranged between every two adjacent U-shaped clamping pieces (52).
6. The safety construction edge protection device according to claim 4, wherein: the first net strip (511) and the second net strip (512) are arranged by adopting reinforcing ribs, the U-shaped clamping piece (52) is arranged by adopting U-shaped reinforcing ribs, and the lower end of the U-shaped clamping piece (52) is arranged in a cone structure.
7. The safety construction edge protection device according to claim 1, wherein: the T-shaped structure is arranged between the mounting plate (7) and the supporting seat (2), the mounting plates (7) on two opposite sides of the supporting seat (2) are respectively provided with a fixing screw (71), and the bottoms of the mounting plates (7) are provided with anchor rods (72).
8. The safety construction edge protection device according to claim 1, wherein: coupling mechanism (10) are including connecting slot (101), connect inserted block (102) and assembly bolt (103), one of them protection stand (1) is kept away from one side of protection network (62) and is equipped with connecting slot (101), and another protection stand (1) is kept away from one side of protection network (62) and is equipped with on protection stand (1) and the connection inserted block (102) of connecting slot (101) both sides relatively and all are equipped with the pilot hole on connecting inserted block (102), and connecting inserted block (102) are inserted in connecting slot (101) and are fixed through assembly bolt (103) in the pilot hole.
CN202310147484.1A 2023-02-22 2023-02-22 A safety construction edge protection device Withdrawn CN116006024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310147484.1A CN116006024A (en) 2023-02-22 2023-02-22 A safety construction edge protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310147484.1A CN116006024A (en) 2023-02-22 2023-02-22 A safety construction edge protection device

Publications (1)

Publication Number Publication Date
CN116006024A true CN116006024A (en) 2023-04-25

Family

ID=86023263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310147484.1A Withdrawn CN116006024A (en) 2023-02-22 2023-02-22 A safety construction edge protection device

Country Status (1)

Country Link
CN (1) CN116006024A (en)

Similar Documents

Publication Publication Date Title
CN210618150U (en) Ground hardening of composite material trackside signal equipment
CN212867098U (en) Security fence for building construction management
CN116006024A (en) A safety construction edge protection device
AU2007264408B2 (en) Extendible roof
CN212773769U (en) Municipal works are with portable protection rail
US9909272B2 (en) Crash guard
CN108316087B (en) Movable road of wading
CN215714626U (en) Bridge railing installation connecting device
RU85492U1 (en) Sidewalk
CN216641510U (en) Novel a safety protection for construction device
WO2002092938A1 (en) Roofing with adjustable spring supporting shafts
CN212027382U (en) Electric power construction rail guard
CN219412165U (en) Combined net piece isolation guardrail
CN213329010U (en) Municipal works are with pile device
CN209891816U (en) Protective fence for construction building
CN222991270U (en) A protective fence for construction engineering
CN215212703U (en) A kind of protective guardrail for civil engineering construction
CN222924225U (en) Building construction fence
RU221866U1 (en) Road Screen Barrier
CN107780327B (en) Assembled dual-control road protective cover for road maintenance
CN214576218U (en) Novel a safety protection for construction device
RU228589U1 (en) COVERED GAZEBOS
CN112482879A (en) Safety barrier for construction
CN210797148U (en) Highway road
CH706951A2 (en) Photovoltaic system for construction over e.g. four lane motorway, has conveyer rails attached on inner or outer steel columns and functioning as wind bracing for longitudinal stiffener during construction period of system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20230425

WW01 Invention patent application withdrawn after publication