CN115629722A - Test method and device for 3D printing manufacturing, storage medium and electronic device - Google Patents
Test method and device for 3D printing manufacturing, storage medium and electronic device Download PDFInfo
- Publication number
- CN115629722A CN115629722A CN202211186262.2A CN202211186262A CN115629722A CN 115629722 A CN115629722 A CN 115629722A CN 202211186262 A CN202211186262 A CN 202211186262A CN 115629722 A CN115629722 A CN 115629722A
- Authority
- CN
- China
- Prior art keywords
- test
- station
- tested
- terminal
- printing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1202—Dedicated interfaces to print systems specifically adapted to achieve a particular effect
- G06F3/121—Facilitating exception or error detection and recovery, e.g. fault, media or consumables depleted
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/32—Monitoring with visual or acoustical indication of the functioning of the machine
- G06F11/324—Display of status information
- G06F11/325—Display of status information by lamps or LED's
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1223—Dedicated interfaces to print systems specifically adapted to use a particular technique
- G06F3/1229—Printer resources management or printer maintenance, e.g. device status, power levels
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Human Computer Interaction (AREA)
- Quality & Reliability (AREA)
Abstract
Description
技术领域technical field
本申请涉及3D打印制造领域,具体而言,涉及一种3D打印制造的测试方法、装置、存储介质及电子装置。The present application relates to the field of 3D printing manufacturing, in particular, to a test method, device, storage medium and electronic device for 3D printing manufacturing.
背景技术Background technique
3D制造的测试技术流程是,组装成本进入测试区域进行测试: Zoffset—X、Yoffset—双色方块的打印—立柱打印测试—双色蛋糕打印测试,每个测试环节通过流程单打勾操作。但是,由于每个测试环节都是通过测试人员人为的对流程单进行打勾操作实现测试过程监控,容易在赶进度的时候造成漏测试、直接跳过某个或多个环节测试而下机的风险,操作较为繁琐,测试效果很差,且智能化水平低。The testing process of 3D manufacturing is that the assembly cost enters the test area for testing: Zoffset—X, Yoffset—printing of two-color squares—post printing test—two-color cake printing test, and each test link is operated by ticking the process list. However, since each test link is manually ticked by the tester to realize the test process monitoring, it is easy to miss the test when the progress is in progress, skip one or more links directly and get off the machine Risks, cumbersome operation, poor test results, and low level of intelligence.
针对相关技术中由于测试过程均为人为监控造成的操作繁琐,测试效果差,且智能化水平低的问题,目前尚未提出有效的解决方案。Aiming at the problems of cumbersome operation, poor test effect, and low level of intelligence in the related technology due to the fact that the test process is all manually monitored, no effective solution has been proposed yet.
发明内容Contents of the invention
本申请的主要目的在于提供一种3D打印制造的测试方法、装置、存储介质及电子装置,以解决由于测试过程中各环节均为人为监控造成的操作繁琐,测试效果差,且智能化水平低的问题。The main purpose of this application is to provide a test method, device, storage medium and electronic device manufactured by 3D printing to solve the cumbersome operation, poor test effect and low level of intelligence due to the fact that all links in the test process are manually monitored. The problem.
为了实现上述目的,根据本申请的一个方面,提供了一种3D打印制造的测试方法。In order to achieve the above object, according to one aspect of the present application, a test method for 3D printing manufacturing is provided.
根据本申请的3D打印制造的测试方法包括:终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试。The test method of 3D printing manufacturing according to the present application includes: the terminal detects whether there is a scanning event on the identification code on the station to be tested in the printing test area; if the terminal detects that the identification code on the station to be tested in the printing test area exists scan event, then output a test page on the terminal; complete the test of the station to be tested according to the test content confirmed by the user in the test page.
进一步的,如果检测到打印测试区域中的待测试工位上的识别码存在终端扫描事件之后,且在终端输出测试页面之前还包括:终端判断待测试工位上的3D打印机是否存在故障;如果终端判断待测试工位上的3D打印机存在故障,则向待测试工位上的灯报发出第一控制指令,其中,所述第一控制指令用于控制灯报显示红色;如果终端判断待测试工位上的3D打印机不存在故障,则在终端输出测试页面。Further, if it is detected that the identification code on the station to be tested in the print test area exists after the terminal scanning event, and before the terminal outputs the test page, it also includes: the terminal judges whether the 3D printer on the station to be tested has a fault; if The terminal judges that there is a fault in the 3D printer on the station to be tested, and then sends a first control instruction to the lamp on the station to be tested, wherein the first control instruction is used to control the lamp to display red; if the terminal judges that the lamp to be tested If there is no fault with the 3D printer on the workstation, a test page is output on the terminal.
进一步的,如果检测到打印测试区域中的待测试工位上的识别码存在终端扫描事件,则在终端输出测试页面之后还包括:终端向待测试工位上的灯报发出第二控制指令,其中,所述第二控制指令用于控制灯报显示绿色。Further, if it is detected that there is a terminal scanning event on the identification code on the station to be tested in the printing test area, after the terminal outputs the test page, it also includes: the terminal sends a second control instruction to the lamp on the station to be tested, Wherein, the second control instruction is used to control the indicator light to display green.
进一步的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:终端向待测试工位上的灯报和3D打印机发出第三控制指令,其中,所述第三控制指令用于控制灯报显示黄色,且控制3D打印机停止测试。Further, after the test of the station to be tested is completed according to the test content confirmed by the user on the test page, it also includes: the terminal sends a third control instruction to the lamp and the 3D printer on the station to be tested, wherein, The third control instruction is used to control the indicator light to display yellow, and control the 3D printer to stop testing.
进一步的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:终端接收测试前和测试后产生的测试信息,其中,所述测试信息包括:测试机器编号、测试人员编号和测试状态;按测试状态对所述测试信息分类;给每一类分类结果计数,统计出各测试状态下的机器数量;将各测试状态下的机器数量和对应的机器编号输出至显示屏显示。Further, after the test of the station to be tested is completed according to the test content confirmed by the user on the test page, it also includes: the terminal receives test information generated before and after the test, wherein the test information includes: test Machine number, tester number and test status; classify the test information according to the test status; count the classification results of each category, and count the number of machines in each test status; compare the number of machines in each test status with the corresponding machine The number is output to the display for display.
进一步的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:终端接收测试前和测试后产生的测试信息,其中,所述测试信息包括:测试机器编号、测试人员编号和测试状态;按测试人员编号对所述测试信息分类;给每一类分类结果计数,统计出各测试人员编号下的测试数量;根据测试数量和预设的标准数量计算得到测试人员的效率值;将各测试人员编号下的测试数量和对应的效率值输出至显示屏显示。Further, after the test of the station to be tested is completed according to the test content confirmed by the user on the test page, it also includes: the terminal receives test information generated before and after the test, wherein the test information includes: test Machine number, tester number and test status; classify the test information according to the tester number; count the results of each category, and count the number of tests under each tester number; calculate according to the number of tests and the preset standard quantity Get the efficiency value of the tester; output the test quantity and the corresponding efficiency value under each tester number to the display screen for display.
进一步的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试包括:根据用户在所述测试页面中确认的测试内容,完成对所述待测试工位的Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试。Further, completing the test of the station to be tested according to the test content confirmed by the user on the test page includes: completing the Z test of the station to be tested according to the test content confirmed by the user on the test page. Axis, X and Y axis, two-color square print, column print and two-color cake print test.
为了实现上述目的,根据本申请的另一方面,提供了一种3D打印制造的测试装置。In order to achieve the above purpose, according to another aspect of the present application, a test device manufactured by 3D printing is provided.
根据本申请的3D打印制造的测试装置包括:扫描模块,用于终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;输出模块,用于如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;测试模块,用于根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试。The test device manufactured by 3D printing according to the present application includes: a scanning module, used for the terminal to detect whether there is a scanning event on the identification code on the station to be tested in the printing test area; If there is a scanning event on the identification code on the station to be tested, a test page is output at the terminal; the test module is configured to complete the test on the station to be tested according to the test content confirmed by the user in the test page.
为了实现上述目的,根据本申请的另一方面,提供了一种计算机可读存储介质。In order to achieve the above purpose, according to another aspect of the present application, a computer-readable storage medium is provided.
根据本申请的计算机可读存储介质,所述计算机可读存储介质中存储有计算机程序,其中,所述计算机程序被设置为运行时执行所述的3D打印制造的测试方法。According to the computer-readable storage medium of the present application, a computer program is stored in the computer-readable storage medium, wherein the computer program is configured to execute the test method for 3D printing manufacturing during operation.
为了实现上述目的,根据本申请的另一方面,提供了一种电子装置。In order to achieve the above object, according to another aspect of the present application, an electronic device is provided.
根据本申请的电子装置,包括:存储器和处理器,所述存储器中存储有计算机程序,其中,所述处理器被设置为运行所述计算机程序以执行所述的3D打印制造的测试方法。The electronic device according to the present application includes: a memory and a processor, wherein a computer program is stored in the memory, wherein the processor is configured to run the computer program to execute the test method for 3D printing manufacturing.
在本申请实施例中,采用终端配合二维码进行3D打印制造测试的方式,通过终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试;达到了测试过程中各环节采用机器监控替代人为监控的目的,从而实现了操作简单,测试效果好,且智能化水平高的技术效果,进而解决了由于测试过程中各环节均为人为监控造成的操作繁琐,测试效果差,且智能化水平低的技术问题。In the embodiment of the present application, the terminal cooperates with the two-dimensional code to carry out the 3D printing manufacturing test, and the terminal detects whether there is a scanning event on the identification code on the station to be tested in the printing test area; If there is a scanning event on the identification code on the station to be tested, a test page is output at the terminal; the test of the station to be tested is completed according to the test content confirmed by the user in the test page; each link in the test process is reached The purpose of machine monitoring is used to replace human monitoring, so as to realize the technical effect of simple operation, good test effect and high level of intelligence, and then solve the cumbersome operation and poor test effect caused by human monitoring in all aspects of the test process. And technical problems with low level of intelligence.
附图说明Description of drawings
构成本申请的一部分的附图用来提供对本申请的进一步理解,使得本申请的其它特征、目的和优点变得更明显。本申请的示意性实施例附图及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The accompanying drawings, which constitute a part of this application, are included to provide a further understanding of the application and make other features, objects and advantages of the application apparent. The drawings and descriptions of the schematic embodiments of the application are used to explain the application, and do not constitute an improper limitation to the application. In the attached picture:
图1是根据本申请实施例的3D打印制造的测试方法的流程示意图;Fig. 1 is a schematic flow chart of a test method manufactured by 3D printing according to an embodiment of the present application;
图2是根据本申请实施例的3D打印制造的测试装置的结构示意图;Fig. 2 is a schematic structural view of a test device manufactured by 3D printing according to an embodiment of the present application;
图3是根据本申请实施例的打印测试区域的结构示意图。Fig. 3 is a schematic structural diagram of a printing test area according to an embodiment of the present application.
具体实施方式Detailed ways
为了使本技术领域的人员更好地理解本申请方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分的实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiment of the application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiment of the application. Obviously, the described embodiment is only It is an embodiment of a part of the application, but not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the scope of protection of this application.
需要说明的是,本申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本申请的实施例。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first" and "second" in the description and claims of the present application and the above drawings are used to distinguish similar objects, but not necessarily used to describe a specific sequence or sequence. It should be understood that the data so used may be interchanged under appropriate circumstances for the embodiments of the application described herein. Furthermore, the terms "comprising" and "having", as well as any variations thereof, are intended to cover a non-exclusive inclusion, for example, a process, method, system, product or device comprising a sequence of steps or elements is not necessarily limited to the expressly listed instead, may include other steps or elements not explicitly listed or inherent to the process, method, product or apparatus.
在本申请中,术语“上”、“下”、“左”、“右”、“前”、“后”、“顶”、“底”、“内”、“外”、“中”、“竖直”、“水平”、“横向”、“纵向”等指示的方位或位置关系为基于附图所示的方位或位置关系。这些术语主要是为了更好地描述本发明及其实施例,并非用于限定所指示的装置、元件或组成部分必须具有特定方位,或以特定方位进行构造和操作。In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", The orientations or positional relationships indicated by "vertical", "horizontal", "horizontal", and "longitudinal" are based on the orientations or positional relationships shown in the drawings. These terms are mainly used to better describe the present invention and its embodiments, and are not intended to limit that the indicated device, element or component must have a specific orientation, or be constructed and operated in a specific orientation.
并且,上述部分术语除了可以用于表示方位或位置关系以外,还可能用于表示其他含义,例如术语“上”在某些情况下也可能用于表示某种依附关系或连接关系。对于本领域普通技术人员而言,可以根据具体情况理解这些术语在本发明中的具体含义。Moreover, some of the above terms may be used to indicate other meanings besides orientation or positional relationship, for example, the term "upper" may also be used to indicate a certain attachment relationship or connection relationship in some cases. Those skilled in the art can understand the specific meanings of these terms in the present invention according to specific situations.
此外,术语“安装”、“设置”、“设有”、“连接”、“相连”、“套接”应做广义理解。例如,可以是固定连接,可拆卸连接,或整体式构造;可以是机械连接,或电连接;可以是直接相连,或者是通过中间媒介间接相连,又或者是两个装置、元件或组成部分之间内部的连通。对于本领域普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。Furthermore, the terms "installed", "disposed", "provided", "connected", "connected", "socketed" are to be interpreted broadly. For example, it may be a fixed connection, a detachable connection, or an integral structure; it may be a mechanical connection or an electrical connection; it may be a direct connection or an indirect connection through an intermediary; internal connectivity. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.
需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本申请。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and embodiments.
根据本发明实施例,提供了一种种3D打印制造的测试方法,如图1、3所示,该方法包括如下的步骤S101至步骤S103:According to an embodiment of the present invention, a test method for 3D printing manufacturing is provided, as shown in Figures 1 and 3, the method includes the following steps S101 to S103:
步骤S101、终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;Step S101, the terminal detects whether there is a scanning event on the identification code on the station to be tested in the printing test area;
打印测试区域内有多个待测试工位,按照如图3所示的号码给每个待测试工位编号,而且在每个待测试工位上布置一个识别码,即为二维码,同时将测试工位编号和处于该位置的二维码构建关联关系,如此,在二维码被手机、平板等终端设备扫描后,终端可以识别出是哪个编号的工位被扫描了,从而为后续的测试提供了触发条件;通过扫描触发替代在流程单上人为给各个测试环节打勾触发,仅需要一次扫描即可,有效简化了操作,也能够一定程度的提升智能化水平。There are multiple stations to be tested in the printing test area, number each station to be tested according to the number shown in Figure 3, and arrange an identification code on each station to be tested, which is a two-dimensional code, and at the same time Build an association relationship between the test station number and the QR code at this position, so that after the QR code is scanned by mobile phones, tablets and other terminal devices, the terminal can identify which numbered station was scanned, so as to provide future The test provides trigger conditions; instead of manually ticking each test link on the process sheet, it only needs one scan, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent.
步骤S102、如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;Step S102, if the terminal detects that there is a scanning event on the identification code on the station to be tested in the print test area, output a test page on the terminal;
当终端检测到某工位的二维码存在扫描事件时,终端对扫描到的二维码进行识别,可以识别出其中的工位编号,存入存储器待后续使用;然后通过终端与调用测试页面并显示,测试页面中包含了多项测试内容,供后续测试人员进行确认。When the terminal detects that there is a scanning event in the QR code of a station, the terminal recognizes the scanned QR code, can identify the station number, and store it in the memory for subsequent use; then call the test page through the terminal It also shows that the test page contains multiple test contents for subsequent testers to confirm.
步骤S103、根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试。Step S103, complete the test of the station to be tested according to the test content confirmed by the user on the test page.
测试内容可以由测试人员直接确认,后续则按照默认的测试内容进行测试,也可以由测试人员从中选择添加或删除一项或多项测试内容,后续则按照增加或删除后的测试内容进行测试。不需要人员再人为逐个进行测试内容的勾选,有效简化了操作,也能够一定程度的提升智能化水平。测试人员确认后只需要点击界面中的确认按键,就可以按照确认的测试内容完成对所述待测试工位的测试。The test content can be directly confirmed by the tester, and the subsequent test will be carried out according to the default test content, or the tester can choose to add or delete one or more test content, and the subsequent test will be carried out according to the added or deleted test content. There is no need for personnel to manually check the test content one by one, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent. After confirmation, the tester only needs to click the confirmation button in the interface, and the test of the station to be tested can be completed according to the confirmed test content.
在一种具体的实施方式中,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试包括:In a specific implementation manner, completing the test of the station to be tested according to the test content confirmed by the user on the test page includes:
根据用户在所述测试页面中确认的测试内容,完成对所述待测试工位的Z轴、 X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试。According to the test content confirmed by the user on the test page, the Z-axis, X and Y-axis, two-color square printing, column printing and two-color cake printing tests of the station to be tested are completed.
Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试的测试流程预先配置在终端上,本实施例中,默认所有测试流程都会默认按以上的顺序执行,除非测试人员在测试之前删除一个或多个。以上的每个测试流程均可以获得一个测试状态,即为Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试状态。The test procedures for Z axis, X and Y axes, two-color square printing, column printing and two-color cake printing tests are pre-configured on the terminal. In this embodiment, all test procedures will be executed in the above order by default unless the tester is testing Delete one or more before. Each of the above test processes can obtain a test state, which is the test state of Z axis, X and Y axis, two-color square printing, column printing and two-color cake printing.
优选的,测试状态分为测试失败和测试成功,预先在每个流程中,均设置了一个测试时间阈值,当然不同的测试流程所需的测试时间不一样。当测试中的动作开始时开始计时,直至动作结束,停止计时,得到的实际时间如果超出测试时间阈值,则认为测试失败;反之,则认为是测试成功。Preferably, the test status is divided into test failure and test success. In each process, a test time threshold is set in advance. Of course, the test time required by different test processes is different. Start timing when the action in the test starts, and stop timing until the end of the action. If the actual time obtained exceeds the test time threshold, the test is considered to have failed; otherwise, the test is considered to be successful.
比如:立柱打印测试流程中,得到的实际立柱打印时间如果超出立柱打印测试时间阈值,则认为立柱打印测试失败;反之,则认为立柱打印测试成功。For example: in the column printing test process, if the actual column printing time obtained exceeds the column printing test time threshold, the column printing test is considered to have failed; otherwise, the column printing test is considered to be successful.
如此,无需测试人员人为关注某个测试环节是否完成,不需要人员再人为逐个进行测试内容完成的勾选,有效简化了操作,也能够一定程度的提升智能化水平。另外,由于不需要在人为进行流程单勾选,即使在赶进度时,也不会造成漏测试、直接跳过某个或多个环节测试而下机的风险,也就有效提升了测试效果。In this way, there is no need for testers to manually pay attention to whether a certain test link is completed, and no need for personnel to manually check the completion of the test content one by one, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent. In addition, since there is no need to manually check the process list, even when the progress is being rushed, there will be no risk of missing a test, skipping one or more links of the test and getting off the machine, which effectively improves the test effect.
从以上的描述中,可以看出,本发明实现了如下技术效果:From the above description, it can be seen that the present invention achieves the following technical effects:
在本申请实施例中,采用终端配合二维码进行3D打印制造测试的方式,通过终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试;达到了测试过程中各环节采用机器监控替代人为监控的目的,从而实现了操作简单,测试效果好,且智能化水平高的技术效果,进而解决了由于测试过程中各环节均为人为监控造成的操作繁琐,测试效果差,且智能化水平低的技术问题。In the embodiment of the present application, the terminal cooperates with the two-dimensional code to carry out the 3D printing manufacturing test, and the terminal detects whether there is a scanning event on the identification code on the station to be tested in the printing test area; If there is a scanning event on the identification code on the station to be tested, a test page is output at the terminal; the test of the station to be tested is completed according to the test content confirmed by the user in the test page; each link in the test process is reached The purpose of machine monitoring is used to replace human monitoring, so as to realize the technical effect of simple operation, good test effect and high level of intelligence, and then solve the cumbersome operation and poor test effect caused by human monitoring in all aspects of the test process. And technical problems with low level of intelligence.
根据本发明实施例,优选的,如果检测到打印测试区域中的待测试工位上的识别码存在终端扫描事件之后,且在终端输出测试页面之前还包括:According to the embodiment of the present invention, preferably, if it is detected that the identification code on the station to be tested in the printing test area exists after the terminal scanning event, and before the terminal outputs the test page, it also includes:
终端判断待测试工位上的3D打印机是否存在故障;The terminal judges whether there is a fault in the 3D printer on the station to be tested;
如果终端判断待测试工位上的3D打印机存在故障,则向待测试工位上的灯报发出第一控制指令,其中,所述第一控制指令用于控制灯报显示红色;If the terminal judges that there is a fault in the 3D printer on the station to be tested, it sends a first control instruction to the light alarm on the station to be tested, wherein the first control command is used to control the light alarm to display red;
如果终端判断待测试工位上的3D打印机不存在故障,则在终端输出测试页面。If the terminal judges that there is no fault in the 3D printer on the station to be tested, a test page is output on the terminal.
扫描之后先需要确认清楚3D打印机是否能够进行正常测试,也就是3D打印机如果存在故障,将无法正常进行测试。因此,设置了一个判断流程,判断某个测试工位上的3D打印机是否存在故障,具体可以根据先前生成的打印信息进行判断,比如,打印信息中具有多次打印失败的信息,则认为是出现了故障,此时终端向待测试工位上的灯报发出第一控制指令,通过第一控制指令控制灯报显示红色,以提醒人员该工位的打印机故障,需要维修,从而避免人员再进行后续测试操作,提升了作业效率。另外,由于有红灯警报,也避免其他测试人员对此进行重复操作,节省了人力。After scanning, it is necessary to confirm whether the 3D printer can perform a normal test, that is, if the 3D printer is faulty, it will not be able to test normally. Therefore, a judgment process is set up to judge whether there is a fault in the 3D printer on a certain test station. Specifically, it can be judged according to the previously generated printing information. For example, if the printing information contains multiple printing failure information, it is considered to be If a fault occurs, the terminal sends the first control command to the light alarm on the station to be tested, and the light alarm is controlled to display red through the first control command to remind the personnel that the printer at the station is faulty and needs to be repaired, so as to avoid personnel from further testing. Subsequent test operations improved operational efficiency. In addition, since there is a red light alarm, other testers are also prevented from performing repeated operations, which saves manpower.
如果没有故障,则认为3D打印机可以进行正常测试,在终端输出测试页面。If there is no fault, it is considered that the 3D printer can perform a normal test, and the test page will be output on the terminal.
根据本发明实施例,优选的,如果检测到打印测试区域中的待测试工位上的识别码存在终端扫描事件,则在终端输出测试页面之后还包括:According to the embodiment of the present invention, preferably, if it is detected that there is a terminal scanning event on the identification code on the station to be tested in the printing test area, after the terminal outputs the test page, it also includes:
终端向待测试工位上的灯报发出第二控制指令,其中,所述第二控制指令用于控制灯报显示绿色。The terminal sends a second control instruction to the light alarm on the station to be tested, wherein the second control command is used to control the light alarm to display green.
测试开始之后,3D打印机进入Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试状态,为了提醒测试人员此时处于的测试中状态,终端向该工位的灯报发出一个第二控制指令,通过第二控制指令控制灯报显示绿色,以提醒人员该工位的打印机正处于测试中状态,从避免其他测试人员对此进行重复操作,节省了人力。After the test starts, the 3D printer enters the test state of Z axis, X and Y axis, two-color square printing, column printing and two-color cake printing. The second control command controls the indicator to display green to remind the personnel that the printer at this station is in the testing state, thereby avoiding repeated operations by other test personnel and saving manpower.
根据本发明实施例,优选的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:According to an embodiment of the present invention, preferably, after completing the test of the station to be tested according to the test content confirmed by the user on the test page, further includes:
终端向待测试工位上的灯报和3D打印机发出第三控制指令,其中,所述第三控制指令用于控制灯报显示黄色,且控制3D打印机停止测试。The terminal sends a third control command to the light indicator and the 3D printer on the station to be tested, wherein the third control command is used to control the light indicator to display yellow, and control the 3D printer to stop the test.
测试结束之后,3D打印机进入测试结束状态,为了提醒测试人员此时处于的测试结束状态,终端向该工位的灯报发出一个第三控制指令,通过第三控制指令控制灯报显示黄色,以提醒人员该工位的打印机正处于测试结束状态,从避免其他测试人员对此进行重复操作,节省了人力。另外,无需人员人为关注整个测试是否完成,不需要人员再人进行测试完成的勾选,有效简化了操作,也能够一定程度的提升智能化水平。After the test is over, the 3D printer enters the test end state. In order to remind the tester that the test is in the end state at this time, the terminal sends a third control command to the light report of the station, and the light report is controlled to display yellow through the third control command. Remind the personnel that the printer at this station is in the end of the test, which saves manpower by avoiding repeated operations by other test personnel. In addition, there is no need for personnel to pay attention to whether the entire test is completed, and no need for personnel to check the completion of the test, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent.
根据本发明实施例,优选的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:According to an embodiment of the present invention, preferably, after completing the test of the station to be tested according to the test content confirmed by the user on the test page, further includes:
终端接收测试前和测试后产生的测试信息,其中,所述测试信息包括:测试机器编号、测试人员编号和测试状态;The terminal receives the test information generated before and after the test, wherein the test information includes: test machine number, tester number and test status;
按测试状态对所述测试信息分类;classifying the test information according to test status;
给每一类分类结果计数,统计出各测试状态下的机器数量;Count each category of classification results, and count the number of machines in each test state;
将各测试状态下的机器数量和对应的机器编号输出至显示屏显示。Output the number of machines in each test state and the corresponding machine numbers to the display screen for display.
打印测试区域内还设置了显示屏,显示屏与终端通信连接,通过终端的软件可以对测试信息进行分类,从而统计出各测试状态下的机器数量,并且在显示屏显示,为后续调整测试失败处的打印机提供了支持,人员可以通过编号迅速定位失败的打印机,也实现下机数量的智能统计,科学的预测每日可下机数量,保证产品的出货需求。There is also a display screen in the printing test area, and the display screen is connected to the terminal for communication. The test information can be classified through the terminal software, so as to count the number of machines in each test state, and display it on the display screen, indicating that the test fails for subsequent adjustments. The printers at the office provide support. The personnel can quickly locate the failed printers through the number, and also realize the intelligent statistics of the number of off-machines, scientifically predict the daily number of off-machines, and ensure the demand for product shipments.
根据本发明实施例,优选的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:According to an embodiment of the present invention, preferably, after completing the test of the station to be tested according to the test content confirmed by the user on the test page, further includes:
终端接收测试前和测试后产生的测试信息,其中,所述测试信息包括:测试机器编号、测试人员编号和测试状态;The terminal receives the test information generated before and after the test, wherein the test information includes: test machine number, tester number and test status;
按测试人员编号对所述测试信息分类;Classify the test information according to the tester number;
给每一类分类结果计数,统计出各测试人员编号下的测试数量;Count each category of classification results, and count the number of tests under each tester number;
根据测试数量和预设的标准数量计算得到测试人员的效率值;Calculate the efficiency value of testers according to the number of tests and the number of preset standards;
将各测试人员编号下的测试数量和对应的效率值输出至显示屏显示。Output the number of tests under each tester number and the corresponding efficiency value to the display screen for display.
通过终端的软件可以对测试信息进行分类,从而统计出各测试人员编号下的测试数量,并且在显示屏显示,为评估人员效率提供了支持,根据每个人操作APP 账号确认到每名测试员的执行效率,找到优秀员工进行经验总结,作业优化。The software of the terminal can classify the test information, so as to count the number of tests under each tester number, and display it on the display screen, which provides support for evaluating the efficiency of the tester, and confirms the number of each tester according to each person's operation APP account Execution efficiency, finding excellent employees for experience summary, operation optimization.
需要说明的是,在附图的流程图示出的步骤可以在诸如一组计算机可执行指令的计算机系统中执行,并且,虽然在流程图中示出了逻辑顺序,但是在某些情况下,可以以不同于此处的顺序执行所示出或描述的步骤。It should be noted that the steps shown in the flowcharts of the accompanying drawings may be performed in a computer system, such as a set of computer-executable instructions, and that although a logical order is shown in the flowcharts, in some cases, The steps shown or described may be performed in an order different than here.
根据本发明实施例,还提供了一种用于实施上述3D打印制造的测试方法的装置,如图2、3所示,该装置包括:According to an embodiment of the present invention, a device for implementing the above-mentioned 3D printing manufacturing test method is also provided, as shown in Figures 2 and 3, the device includes:
扫描模块10,用于终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;The
打印测试区域内有多个待测试工位,按照如图3所示的号码给每个待测试工位编号,而且在每个待测试工位上布置一个识别码,即为二维码,同时将测试工位编号和处于该位置的二维码构建关联关系,如此,在二维码被手机、平板等终端设备扫描后,终端可以识别出是哪个编号的工位被扫描了,从而为后续的测试提供了触发条件;通过扫描触发替代在流程单上人为给各个测试环节打勾触发,仅需要一次扫描即可,有效简化了操作,也能够一定程度的提升智能化水平。There are multiple stations to be tested in the printing test area, number each station to be tested according to the number shown in Figure 3, and arrange an identification code on each station to be tested, which is a two-dimensional code, and at the same time Build an association relationship between the test station number and the QR code at this position, so that after the QR code is scanned by mobile phones, tablets and other terminal devices, the terminal can identify which numbered station was scanned, so as to provide future The test provides trigger conditions; instead of manually ticking each test link on the process sheet, it only needs one scan, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent.
输出模块20,用于如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;The output module 20 is used to output a test page at the terminal if the terminal detects that there is a scanning event on the identification code on the station to be tested in the print test area;
当终端检测到某工位的二维码存在扫描事件时,终端对扫描到的二维码进行识别,可以识别出其中的工位编号,存入存储器待后续使用;然后通过终端与调用测试页面并显示,测试页面中包含了多项测试内容,供后续测试人员进行确认。When the terminal detects that there is a scanning event in the QR code of a station, the terminal recognizes the scanned QR code, can identify the station number, and store it in the memory for subsequent use; then call the test page through the terminal It also shows that the test page contains multiple test contents for subsequent testers to confirm.
测试模块30,用于根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试。The
测试内容可以由测试人员直接确认,后续则按照默认的测试内容进行测试,也可以由测试人员从中选择添加或删除一项或多项测试内容,后续则按照增加或删除后的测试内容进行测试。不需要人员再人为逐个进行测试内容的勾选,有效简化了操作,也能够一定程度的提升智能化水平。测试人员确认后只需要点击界面中的确认按键,就可以按照确认的测试内容完成对所述待测试工位的测试。The test content can be directly confirmed by the tester, and the subsequent test will be carried out according to the default test content, or the tester can choose to add or delete one or more test content, and the subsequent test will be carried out according to the added or deleted test content. There is no need for personnel to manually check the test content one by one, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent. After confirmation, the tester only needs to click the confirmation button in the interface, and the test of the station to be tested can be completed according to the confirmed test content.
在一种具体的实施方式中,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试包括:In a specific implementation manner, completing the test of the station to be tested according to the test content confirmed by the user on the test page includes:
根据用户在所述测试页面中确认的测试内容,完成对所述待测试工位的Z轴、 X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试。According to the test content confirmed by the user on the test page, the Z-axis, X and Y-axis, two-color square printing, column printing and two-color cake printing tests of the station to be tested are completed.
Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试的测试流程预先配置在终端上,本实施例中,默认所有测试流程都会默认按以上的顺序执行,除非测试人员在测试之前删除一个或多个。以上的每个测试流程均可以获得一个测试状态,即为Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试状态。The test procedures for Z axis, X and Y axes, two-color square printing, column printing and two-color cake printing tests are pre-configured on the terminal. In this embodiment, all test procedures will be executed in the above order by default unless the tester is testing Delete one or more before. Each of the above test processes can obtain a test state, which is the test state of Z axis, X and Y axis, two-color square printing, column printing and two-color cake printing.
优选的,测试状态分为测试失败和测试成功,预先在每个流程中,均设置了一个测试时间阈值,当然不同的测试流程所需的测试时间不一样。当测试中的动作开始时开始计时,直至动作结束,停止计时,得到的实际时间如果超出测试时间阈值,则认为测试失败;反之,则认为是测试成功。Preferably, the test status is divided into test failure and test success. In each process, a test time threshold is set in advance. Of course, the test time required by different test processes is different. Start timing when the action in the test starts, and stop timing until the end of the action. If the actual time obtained exceeds the test time threshold, the test is considered to have failed; otherwise, the test is considered to be successful.
比如:立柱打印测试流程中,得到的实际立柱打印时间如果超出立柱打印测试时间阈值,则认为立柱打印测试失败;反之,则认为立柱打印测试成功。For example: in the column printing test process, if the actual column printing time obtained exceeds the column printing test time threshold, the column printing test is considered to have failed; otherwise, the column printing test is considered to be successful.
如此,无需测试人员人为关注某个测试环节是否完成,不需要人员再人为逐个进行测试内容完成的勾选,有效简化了操作,也能够一定程度的提升智能化水平。另外,由于不需要在人为进行流程单勾选,即使在赶进度时,也不会造成漏测试、直接跳过某个或多个环节测试而下机的风险,也就有效提升了测试效果。In this way, there is no need for testers to manually pay attention to whether a certain test link is completed, and no need for personnel to manually check the completion of the test content one by one, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent. In addition, since there is no need to manually check the process list, even when the progress is being rushed, there will be no risk of missing a test, skipping one or more links of the test and getting off the machine, which effectively improves the test effect.
从以上的描述中,可以看出,本发明实现了如下技术效果:From the above description, it can be seen that the present invention achieves the following technical effects:
在本申请实施例中,采用终端配合二维码进行3D打印制造测试的方式,通过终端检测打印测试区域中的待测试工位上的识别码是否存在扫描事件;如果终端检测到打印测试区域中的待测试工位上的识别码存在扫描事件,则在终端输出测试页面;根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试;达到了测试过程中各环节采用机器监控替代人为监控的目的,从而实现了操作简单,测试效果好,且智能化水平高的技术效果,进而解决了由于测试过程中各环节均为人为监控造成的操作繁琐,测试效果差,且智能化水平低的技术问题。In the embodiment of the present application, the terminal cooperates with the two-dimensional code to carry out the 3D printing manufacturing test, and the terminal detects whether there is a scanning event on the identification code on the station to be tested in the printing test area; If there is a scanning event on the identification code on the station to be tested, a test page is output at the terminal; according to the test content confirmed by the user in the test page, the test to the station to be tested is completed; each link in the test process is reached The purpose of machine monitoring is used to replace human monitoring, so as to realize the technical effect of simple operation, good test effect and high level of intelligence, and then solve the cumbersome operation and poor test effect caused by human monitoring in all aspects of the test process. And technical problems with low level of intelligence.
根据本发明实施例,优选的,如果检测到打印测试区域中的待测试工位上的识别码存在终端扫描事件之后,且在终端输出测试页面之前还包括:According to the embodiment of the present invention, preferably, if it is detected that the identification code on the station to be tested in the printing test area exists after the terminal scanning event, and before the terminal outputs the test page, it also includes:
终端判断待测试工位上的3D打印机是否存在故障;The terminal judges whether there is a fault in the 3D printer on the station to be tested;
如果终端判断待测试工位上的3D打印机存在故障,则向待测试工位上的灯报发出第一控制指令,其中,所述第一控制指令用于控制灯报显示红色;If the terminal judges that there is a fault in the 3D printer on the station to be tested, it sends a first control instruction to the light alarm on the station to be tested, wherein the first control command is used to control the light alarm to display red;
如果终端判断待测试工位上的3D打印机不存在故障,则在终端输出测试页面。If the terminal judges that there is no fault in the 3D printer on the station to be tested, a test page is output on the terminal.
扫描之后先需要确认清楚3D打印机是否能够进行正常测试,也就是3D打印机如果存在故障,将无法正常进行测试。因此,设置了一个判断流程,判断某个测试工位上的3D打印机是否存在故障,具体可以根据先前生成的打印信息进行判断,比如,打印信息中具有多次打印失败的信息,则认为是出现了故障,此时终端向待测试工位上的灯报发出第一控制指令,通过第一控制指令控制灯报显示红色,以提醒人员该工位的打印机故障,需要维修,从而避免人员再进行后续测试操作,提升了作业效率。另外,由于有红灯警报,也避免其他测试人员对此进行重复操作,节省了人力。After scanning, it is necessary to confirm whether the 3D printer can perform a normal test, that is, if the 3D printer is faulty, it will not be able to test normally. Therefore, a judgment process is set up to judge whether there is a fault in the 3D printer on a certain test station. Specifically, it can be judged according to the previously generated printing information. For example, if the printing information contains multiple printing failure information, it is considered to be If a fault occurs, the terminal sends the first control command to the light alarm on the station to be tested, and the light alarm is controlled to display red through the first control command to remind the personnel that the printer at the station is faulty and needs to be repaired, so as to avoid personnel from further testing. Subsequent test operations improved operational efficiency. In addition, since there is a red light alarm, other testers are also prevented from performing repeated operations, which saves manpower.
如果没有故障,则认为3D打印机可以进行正常测试,在终端输出测试页面。If there is no fault, it is considered that the 3D printer can perform a normal test, and the test page will be output on the terminal.
根据本发明实施例,优选的,如果检测到打印测试区域中的待测试工位上的识别码存在终端扫描事件,则在终端输出测试页面之后还包括:According to the embodiment of the present invention, preferably, if it is detected that there is a terminal scanning event on the identification code on the station to be tested in the printing test area, after the terminal outputs the test page, it also includes:
终端向待测试工位上的灯报发出第二控制指令,其中,所述第二控制指令用于控制灯报显示绿色。The terminal sends a second control instruction to the light alarm on the station to be tested, wherein the second control command is used to control the light alarm to display green.
测试开始之后,3D打印机进入Z轴、X和Y轴、双色方块打印、立柱打印和双色蛋糕打印测试状态,为了提醒测试人员此时处于的测试中状态,终端向该工位的灯报发出一个第二控制指令,通过第二控制指令控制灯报显示绿色,以提醒人员该工位的打印机正处于测试中状态,从避免其他测试人员对此进行重复操作,节省了人力。After the test starts, the 3D printer enters the test state of Z axis, X and Y axis, two-color square printing, column printing and two-color cake printing. The second control command controls the indicator to display green to remind the personnel that the printer at this station is in the testing state, thereby avoiding repeated operations by other test personnel and saving manpower.
根据本发明实施例,优选的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:According to an embodiment of the present invention, preferably, after completing the test of the station to be tested according to the test content confirmed by the user on the test page, further includes:
终端向待测试工位上的灯报和3D打印机发出第三控制指令,其中,所述第三控制指令用于控制灯报显示黄色,且控制3D打印机停止测试。The terminal sends a third control command to the light indicator and the 3D printer on the station to be tested, wherein the third control command is used to control the light indicator to display yellow, and control the 3D printer to stop the test.
测试结束之后,3D打印机进入测试结束状态,为了提醒测试人员此时处于的测试结束状态,终端向该工位的灯报发出一个第三控制指令,通过第三控制指令控制灯报显示黄色,以提醒人员该工位的打印机正处于测试结束状态,从避免其他测试人员对此进行重复操作,节省了人力。另外,无需人员人为关注整个测试是否完成,不需要人员再人进行测试完成的勾选,有效简化了操作,也能够一定程度的提升智能化水平。After the test is over, the 3D printer enters the test end state. In order to remind the tester that the test is in the end state at this time, the terminal sends a third control command to the light report of the station, and the light report is controlled to display yellow through the third control command. Remind the personnel that the printer at this station is in the end of the test, which saves manpower by avoiding repeated operations by other test personnel. In addition, there is no need for personnel to pay attention to whether the entire test is completed, and no need for personnel to check the completion of the test, which effectively simplifies the operation and can also improve the level of intelligence to a certain extent.
根据本发明实施例,优选的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:According to an embodiment of the present invention, preferably, after completing the test of the station to be tested according to the test content confirmed by the user on the test page, further includes:
终端接收测试前和测试后产生的测试信息,其中,所述测试信息包括:测试机器编号、测试人员编号和测试状态;The terminal receives the test information generated before and after the test, wherein the test information includes: test machine number, tester number and test status;
按测试状态对所述测试信息分类;classifying the test information according to test status;
给每一类分类结果计数,统计出各测试状态下的机器数量;Count each category of classification results, and count the number of machines in each test state;
将各测试状态下的机器数量和对应的机器编号输出至显示屏显示。Output the number of machines in each test state and the corresponding machine numbers to the display screen for display.
打印测试区域内还设置了显示屏,显示屏与终端通信连接,通过终端的软件可以对测试信息进行分类,从而统计出各测试状态下的机器数量,并且在显示屏显示,为后续调整测试失败处的打印机提供了支持,人员可以通过编号迅速定位失败的打印机,也实现下机数量的智能统计,科学的预测每日可下机数量,保证产品的出货需求。There is also a display screen in the printing test area, and the display screen is connected to the terminal for communication. The test information can be classified through the terminal software, so as to count the number of machines in each test state, and display it on the display screen, indicating that the test fails for subsequent adjustments. The printers at the office provide support. The personnel can quickly locate the failed printers through the number, and also realize the intelligent statistics of the number of off-machines, scientifically predict the daily number of off-machines, and ensure the demand for product shipments.
根据本发明实施例,优选的,根据用户在所述测试页面中确认的测试内容完成对所述待测试工位的测试之后还包括:According to an embodiment of the present invention, preferably, after completing the test of the station to be tested according to the test content confirmed by the user on the test page, further includes:
终端接收测试前和测试后产生的测试信息,其中,所述测试信息包括:测试机器编号、测试人员编号和测试状态;The terminal receives the test information generated before and after the test, wherein the test information includes: test machine number, tester number and test status;
按测试人员编号对所述测试信息分类;Classify the test information according to the tester number;
给每一类分类结果计数,统计出各测试人员编号下的测试数量;Count each category of classification results, and count the number of tests under each tester number;
根据测试数量和预设的标准数量计算得到测试人员的效率值;Calculate the efficiency value of testers according to the number of tests and the number of preset standards;
将各测试人员编号下的测试数量和对应的效率值输出至显示屏显示。Output the number of tests under each tester number and the corresponding efficiency value to the display screen for display.
通过终端的软件可以对测试信息进行分类,从而统计出各测试人员编号下的测试数量,并且在显示屏显示,为评估人员效率提供了支持,根据每个人操作APP 账号确认到每名测试员的执行效率,找到优秀员工进行经验总结,作业优化。The software of the terminal can classify the test information, so as to count the number of tests under each tester number, and display it on the display screen, which provides support for evaluating the efficiency of the tester, and confirms the number of each tester according to each person's operation APP account Execution efficiency, finding excellent employees for experience summary, operation optimization.
显然,本领域的技术人员应该明白,上述的本发明的各模块或各步骤可以用通用的计算装置来实现,它们可以集中在单个的计算装置上,或者分布在多个计算装置所组成的网络上,可选地,它们可以用计算装置可执行的程序代码来实现,从而,可以将它们存储在存储装置中由计算装置来执行,或者将它们分别制作成各个集成电路模块,或者将它们中的多个模块或步骤制作成单个集成电路模块来实现。这样,本发明不限制于任何特定的硬件和软件结合。Obviously, those skilled in the art should understand that each module or each step of the above-mentioned present invention can be realized by a general-purpose computing device, and they can be concentrated on a single computing device, or distributed in a network formed by multiple computing devices Optionally, they can be implemented with program codes executable by a computing device, so that they can be stored in a storage device and executed by a computing device, or they can be made into individual integrated circuit modules, or they can be integrated into Multiple modules or steps are fabricated into a single integrated circuit module to realize. As such, the present invention is not limited to any specific combination of hardware and software.
以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above descriptions are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, various modifications and changes may be made to the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included within the protection scope of this application.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211186262.2A CN115629722A (en) | 2022-09-27 | 2022-09-27 | Test method and device for 3D printing manufacturing, storage medium and electronic device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202211186262.2A CN115629722A (en) | 2022-09-27 | 2022-09-27 | Test method and device for 3D printing manufacturing, storage medium and electronic device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115629722A true CN115629722A (en) | 2023-01-20 |
Family
ID=84905141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202211186262.2A Pending CN115629722A (en) | 2022-09-27 | 2022-09-27 | Test method and device for 3D printing manufacturing, storage medium and electronic device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115629722A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030033042A1 (en) * | 2001-05-04 | 2003-02-13 | Martin Haller | Production machine with capability for transmitting production information |
CN104808095A (en) * | 2015-04-27 | 2015-07-29 | 深圳市共进电子股份有限公司 | Automatic production testing system and product testing method thereof |
CN109130191A (en) * | 2018-07-27 | 2019-01-04 | 北京鉴衡认证中心有限公司 | Test method, device and the computer equipment of 3D printer performance |
CN112067329A (en) * | 2020-08-25 | 2020-12-11 | 共享智能铸造产业创新中心有限公司 | 3D printer delivery detection system, printer, detection method and storage medium |
CN113589075A (en) * | 2021-07-21 | 2021-11-02 | 四川虹美智能科技有限公司 | WiFi and display integrated intelligent air conditioner detection system |
CN114880216A (en) * | 2022-04-25 | 2022-08-09 | 统信软件技术有限公司 | Test method, test device, computing equipment and storage medium |
-
2022
- 2022-09-27 CN CN202211186262.2A patent/CN115629722A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030033042A1 (en) * | 2001-05-04 | 2003-02-13 | Martin Haller | Production machine with capability for transmitting production information |
CN104808095A (en) * | 2015-04-27 | 2015-07-29 | 深圳市共进电子股份有限公司 | Automatic production testing system and product testing method thereof |
CN109130191A (en) * | 2018-07-27 | 2019-01-04 | 北京鉴衡认证中心有限公司 | Test method, device and the computer equipment of 3D printer performance |
CN112067329A (en) * | 2020-08-25 | 2020-12-11 | 共享智能铸造产业创新中心有限公司 | 3D printer delivery detection system, printer, detection method and storage medium |
CN113589075A (en) * | 2021-07-21 | 2021-11-02 | 四川虹美智能科技有限公司 | WiFi and display integrated intelligent air conditioner detection system |
CN114880216A (en) * | 2022-04-25 | 2022-08-09 | 统信软件技术有限公司 | Test method, test device, computing equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102616617B (en) | A kind of elevator monitoring method | |
CN107015991A (en) | Self checking method, device, system and the service apparatus of data consistency | |
CN107140589B (en) | Lifting machine use information statistical method, system and computer readable storage medium | |
CN106646057A (en) | Power-off and power-on active judgment method | |
CN114217209B (en) | Multi-station PCBA board detection method | |
CN107561379A (en) | The method of testing and system of a kind of electronic product | |
CN106488033A (en) | The display packing of mobile terminal WIFI signal intensity, system and mobile terminal | |
CN112203316A (en) | Method and device for recovering network abnormity, electronic equipment and storage medium | |
CN105279919A (en) | Electricity utilization information acquiring system | |
US10719669B2 (en) | System, method, and apparatus for realizing a virtual SIM card | |
CN101247617B (en) | Apparatus and method for automatic detection of mobile communication service fault | |
CN115629722A (en) | Test method and device for 3D printing manufacturing, storage medium and electronic device | |
CN108182195A (en) | A kind of loading method of data, device, terminal and storage medium | |
CN103336241B (en) | A kind of method and system thereof of testing Modem module on embedded PCB A | |
US12392364B2 (en) | Device and method for diagnosing and configuring a hydraulic device based on wireless local area network | |
CN105280966B (en) | The detection diagnosis that multiple battery unit sensing board communications are lost | |
CN115328018A (en) | Complete machine detection equipment and method for camera | |
CN108362322B (en) | Sensor testing method and device and readable storage medium | |
CN108169591B (en) | Frequency converter keyboard, frequency converter and frequency converter identification method | |
CN111352763B (en) | Information processing method and related product | |
CN202475549U (en) | A device for online input and checking of mobile phone IMEI number | |
CN113434394B (en) | Software exception handling method and device, storage medium and electronic device | |
CN109451485A (en) | Moade setting method, information write-in method, device, terminal and storage medium | |
CN115086463A (en) | Product automatic testing method and device and storage medium | |
CN111585847B (en) | Detection system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |