CN114663069B - Engineering project contract full-process management method and system - Google Patents
Engineering project contract full-process management method and system Download PDFInfo
- Publication number
- CN114663069B CN114663069B CN202210374442.7A CN202210374442A CN114663069B CN 114663069 B CN114663069 B CN 114663069B CN 202210374442 A CN202210374442 A CN 202210374442A CN 114663069 B CN114663069 B CN 114663069B
- Authority
- CN
- China
- Prior art keywords
- contract
- project
- data
- party platform
- classification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/24—Classification techniques
- G06F18/241—Classification techniques relating to the classification model, e.g. parametric or non-parametric approaches
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Life Sciences & Earth Sciences (AREA)
- Evolutionary Computation (AREA)
- Evolutionary Biology (AREA)
- Bioinformatics & Computational Biology (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Artificial Intelligence (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a full-process management method for an engineering project contract, which comprises the following steps: s1, establishing basic classification of a project contract; s2, establishing contract list classification; s3, setting a contract control switch; s4, setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold; s5, the system regularly pulls project data of the third-party platform from the third-party platform, and after the data enter the system, one-to-one mapping is established between the pulled project and a project of a system organization architecture; s6, receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, automatically matching contract categories, and forming informal data; s7, completing basic information and detailed information of the contract; and S8, after the contract is filled with information, initiating a secondary approval process for the contract, and after the secondary approval is finished, converting the contract data into formal data for a subsequent contract template to use.
Description
Technical Field
The invention relates to the technical field of engineering project management, in particular to a method and a system for managing a full process of an engineering project contract.
Background
For engineering project management, contracts are important modules of the whole system and are preconditions and bases for many subsequent jobs. If the contract is managed well, the following budget, settlement, cost and the like have the possibility of tracking and managing. Because of the industry, there are many categories of contracts, and each category, although paying attention to price and volume, has different calculation methods and statistical methods. At present, each project of each company needs to be managed with a large number of contracts and complex conditions, and the workload is large if manual management is adopted; due to the difference of personnel ability and understanding, the problem of inconsistent specific management easily occurs in each company; each project and each contract may have special situations, which easily causes management difficulties.
The system used by the current contract management is not fine enough for the contract management, so that various analyses on the same specific conditions are not counted well, and the control on the same stages cannot be reflected.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information forms the prior art that is already known to a person skilled in the art.
Disclosure of Invention
The invention aims to provide a method and a system for managing the whole process of a project contract, which aim to solve the problems in the background technology.
In order to achieve the purpose, the invention provides a full-process management method for an engineering project contract, which comprises the following steps:
s1, establishing basic classification of a project contract and setting corresponding operator authority;
s2, establishing contract list classification based on the basic classification, and setting operator permission, wherein the list classification corresponds to the basic classification, so that each type of contract can only select a list of a corresponding type to be detailed;
s3, setting a contract control switch, and independently setting the on or off of the contract control switch for each project;
s4, setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold;
s5, the system regularly pulls project data of the third-party platform from the third-party platform, and after the data enter the system, one-to-one mapping is established between the pulled project and a project of a system organization architecture;
s6, receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, automatically matching contract categories, and forming informal data;
s7, based on the informal data, perfecting basic information and detailed information of the contract;
and S8, after the contract is filled with information, initiating a secondary approval process for the contract, and after the secondary approval is finished, converting the contract data into formal data for a subsequent contract template to use.
In a preferred embodiment, in step S1, the basic classification includes labor, specialization, machine rental and material purchase, and assigns operator rights to business personnel; in step S2, the list classification includes labor, specialization, mechanical leasing and material purchasing, and the operator authority is distributed to business personnel.
In a preferred embodiment, in step S4, setting a total budget threshold of the project, and verifying the total amount of each type of contract based on the total budget threshold of the project includes the following steps: setting a total budget threshold of a project, starting a contract control switch, verifying the total amount of each type of contract, if the total amount of the type of contract exceeds 80% of the total budget threshold, storing data but generating early warning prompt, if the total amount of the type of contract exceeds the total budget threshold, the data cannot be stored, and a company is required to designate responsible personnel to carry out contract amount checking or total budget supplement; and controlling the total amount of the contract by using the total budget corresponding to the subject of each type of contract, wherein the total amount of the contract is controlled by extracting the contract identifications of the corresponding types, and the sum of the contract amounts with the same contract identifications is matched to serve as the total amount of the contract.
In a preferred embodiment, in step S5, the system periodically pulls the project data of the third-party platform from the third-party platform, and after the data enters the system, the establishing a one-to-one mapping between the pulled project and the project of the system organization architecture includes: the system regularly pulls the project data of the third-party platform from the third-party platform, if the project data is newly added, the project data is newly added in the system, if the project data is modified, the project data is synchronously modified in the system, after the data enters the system, a company level manager establishes one-to-one mapping for the pulled project and the project in the system organization structure, and if the project data is repeatedly mapped, the project data cannot be stored.
In a preferred embodiment, in step S7, based on the informal data, the basic information and the detailed information for perfecting the contract include: after receiving informal data, the system perfects contract names, sub-suppliers, contract amounts, signing dates and account opening rows, wherein the contract types and the contract amounts are subject to the pushed data, and modification operation is not allowed; after the basic information is completed, the contract detail is selected from the corresponding contract list library, and the unit price and the quantity are filled in each contract list.
In a preferred embodiment, the method further comprises the following steps: and after the contract data becomes formal data, if the later contract has modification content, the project is supplemented or changed aiming at the contract, wherein the modification content comprises the change of contract amount and the increase of a contract list, and if the contract is a contract pushed by a third-party platform, the contract is supplemented or changed by the third-party platform and then pushed again.
The invention also provides a full-process management system of the engineering project contract, which comprises the following steps:
the classification management module is used for establishing basic classification of the engineering project contract;
the list classification management module is used for establishing contract list classification based on the basic classification, and the list classification corresponds to the basic classification, so that each type of contract can only select a list of the corresponding category for contract detail;
the organization architecture mapping module is used for regularly pulling project data of a third-party platform from the third-party platform, and after the data enters a system, one-to-one mapping is established between the pulled project and a project of a system organization architecture;
the contract management and control switch setting module is used for independently setting the on or off of the contract management and control switch for each project; and
a contract management module for performing the following operations:
setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold;
receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, matching contract categories, and forming informal data;
perfecting basic information and detailed information of a contract based on the informal data;
after the contract filling information is completed, the contract initiates a secondary approval process, and after the secondary approval is completed, the contract data becomes formal data for use of a subsequent contract template.
In a preferred embodiment, the basic categories include labor, specialization, machine rental, and material procurement, and assign operator privileges to business personnel; the inventory classification includes labor, specialty, machinery rental, and material procurement, and assigns operator privileges to business personnel.
In a preferred embodiment, the step of setting a project total budget threshold value, and verifying the total amount of each type of contract based on the project total budget threshold value comprises the following steps: setting a total budget threshold of a project, starting a contract control switch, verifying the total amount of each type of contract, if the total amount of the type of contract exceeds 80% of the total budget threshold, storing data but generating early warning prompt, if the total amount of the type of contract exceeds the total budget threshold, the data cannot be stored, and a company is required to designate responsible personnel to carry out contract amount checking or total budget supplement; the total amount of the contract is controlled by the total budget corresponding to the subject of each type of contract, the contract identification of the corresponding type is extracted, and the sum of the contract amounts with the same contract identification is matched to serve as the total amount of the type of contract;
based on the informal data, the basic information and the detailed information for perfecting the contract comprise: after receiving informal data, the system perfects contract names, sub-suppliers, contract amounts, signing dates and account opening rows, wherein the contract types and the contract amounts are subject to the pushed data, and modification operation is not allowed; after the basic information is completed, the contract detail is selected from the corresponding contract list library, and unit price and quantity are filled in each contract list.
In a preferred embodiment, the step of regularly pulling project data of a third-party platform from the third-party platform, and after the data enters a system, the step of establishing one-to-one mapping between the pulled project and a project of a system organizational structure comprises: the system regularly pulls the project data of the third-party platform from the third-party platform, if a new project is added, the project data is added in the system, if the new project is modified, the project data is synchronously modified in the system, after the data enters the system, a company level manager establishes one-to-one mapping for the pulled project and the project in the system organizational structure, and if repeated mapping is generated, the project data cannot be stored.
Compared with the prior art, the invention has the beneficial effects that: in order to solve the complexity of the contracts, the method firstly establishes the basic classification of the contracts of the engineering projects, correspondingly establishes the contract lists of each classification respectively, ensures that all the lists are responsible for the follow-up maintenance by companies, and ensures that the projects have no right to increase or decrease the list items. When the item creates detail for the contract, the content must be selected from the list, so that the data can be analyzed conveniently and the contract content can be normalized. And each type of contract can respectively control the total amount by using the total budget corresponding to the subject, and the total budget controls the amount by using a subject summarizing mode, so that the contract is better controlled, and subsequent confusion is avoided. The project can not establish a contract by itself, the project establishment contract can be pushed to a system or contacts a company only through a third-party platform, and the company establishes a new contract on the project, so that the problem that the project establishment contract is not controlled is solved.
Drawings
FIG. 1 is a process flow diagram of a preferred embodiment of the present invention.
Fig. 2 is a block diagram of the preferred embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention, and all other embodiments obtained by a person of ordinary skill in the art without any inventive work, belong to the scope of protection of the present invention.
Example 1
As shown in fig. 1, the method for managing the whole process of the engineering project contract according to the preferred embodiment of the present invention includes the following steps:
s1, contract classification management: establishing basic classification of a project contract, setting corresponding operator rights, specifically, the basic classification comprises labor, profession, mechanical lease and material purchase, and distributing the operator rights to business personnel, and other personnel can not operate. Under the basic classification, lower classes can be established, and the classes under each large class correspond to the corresponding contracts for use.
Step S2, contract list management: and establishing contract list classification based on the basic classification, and setting the authority of an operator, wherein the list classification corresponds to the basic classification, and specifically, the list classification also comprises labor service, specialization, mechanical lease and material purchase. Each list function sets the list under the classification by selecting the list classification set before, and each type of contract can only select the list under the corresponding type to be detailed. And the operator authority can only be allocated to business personnel, and other personnel can not operate.
Step S3, contract management and control switch: and setting a contract management and control switch, and independently setting the on or off of the contract management and control switch for each project. The function can also be used for special conditions of some projects, particularly for old projects which are close to the completion before the system is installed, and whether management and control are needed or not due to incomplete data in the system. The function is only opened to a company business manager, and other personnel have no right to check and operate.
S4, establishing and verifying total budget: and setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold.
The basic classification of the contracts comprises labor contracts, professional contracts, mechanical leasing contracts and material purchasing contracts, in each contract, the first group is distinguished, the first group is supplied, overseas contracts are equal, the total amount of the contracts is controlled by the subjects corresponding to the total budget respectively for each type of the contracts, corresponding types of contract identifications are extracted, and the sum of the contract amounts with the same contract identifications is matched to serve as the total amount of the contracts. The control rule for associating the total budget subject and the contract amount is as follows, for example:
1) Self-operation purchasing: matching the sum of the contract sum of all materials (except the contract with the 'first supply' mark);
2) A, providing a material: matching all material contracts with the first finger;
3) Labor cost: matching the sum of the contract amounts of all labor subcontracts (except for the contract with the 'temporary construction' mark);
4) A, subpackaging: matching all the professional subcontracts with the 'first finger' marks;
5) Professional subpackaging: matching the sum of the contract amounts of all professional subcontracts (except for the contracts with the 'first finger' and 'temporary construction' marks);
6) Mechanical cost: matching the sum of mechanical leasing contract sum;
7) The temporary construction expenditure: and matching the sum of all contract amounts with the 'construction temporary' marks.
Specifically, the step of setting a total budget threshold of the project and verifying the total amount of each type of contract based on the total budget threshold of the project comprises the following steps: setting a total budget threshold of a project, starting a contract control switch, verifying the total amount of each type of contract, and if the total amount of the type of contract exceeds 80% of the total budget threshold, storing data but generating early warning prompt, and if the total amount of the type of contract exceeds the total budget threshold, the data cannot be stored, and a company is required to designate a responsible person to perform contract amount verification or total budget supplement, so that the project cannot be operated without authorization; and closing the contract management and control switch, wherein the contract is not limited by the contract management and control switch.
S5, organization architecture pulling and organization architecture mapping: the system regularly pulls the project data of the third-party platform from the third-party platform, and after the data enter the system, one-to-one mapping is established between the pulled project and the project of the system organization architecture. Specifically, the method comprises the following steps: the system regularly pulls the project data of the third-party platform from the third-party platform, if a new project is added, the project data is added in the system, if the new project is modified, the project data is synchronously modified in the system, after the data enters the system, a company level manager establishes one-to-one mapping for the pulled project and the project in the system organizational structure, and if repeated mapping is generated, the project data cannot be stored. After the one-to-one mapping is established, the system can match out which item the pushed contract belongs to. If a certain item of the third-party platform is not in one-to-one association with the system, the pushed contract cannot enter the contract plate, and only the pushing record can be inquired.
And S6, receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, automatically matching contract categories, and forming informal data.
And S7, perfecting the basic information and the detailed information of the contract based on the informal data. Specifically, the method comprises the following steps: and after receiving informal data, the system perfects contract names, sub-suppliers, contract amounts, signing dates and account opening rows. Sensitive information such as contract category, contract amount and the like is subject to the pushed data, and modification operation is not allowed. When the information of the branch supplier is perfected in the project, the branch supplier can match the existing enterprise information of the system from the input name of the branch supplier. If the corresponding enterprise information already exists, directly establishing a relation with the current contract; if not, the enterprise information is automatically created and then associated with the current contract. After the basic information is completed, the contract detail is selected from the corresponding contract list library, and unit price and quantity are filled in each contract list, so that detailed analysis, budget estimation and settlement control are performed later.
And S8, after the contract filling information is completed, initiating a secondary approval process for the contract, and after the secondary approval is completed, enabling the contract data to become formal data for a subsequent contract template to use.
In a preferred embodiment, the method further comprises the following steps: after the contract data becomes formal data, if the later contract has the condition of modifying contents (such as change of contract amount, increase of a list and the like), the item is supplemented or changed for the contract, wherein the modifying contents comprise the change of the contract amount and the increase of the contract list, if the contract is the contract pushed by the third-party platform, the contract can only be supplemented or pushed again after being modified by the third-party platform. If the contract is established by the company, the contract can be manually supplemented or the function can be changed by the company to do corresponding operation.
Example 2
The invention also provides a whole process management system 200 for the engineering project contract, which comprises the following steps: the system comprises a classification management module 201, a list classification management module 202, an organization structure mapping module 203, a contract management switch setting module 204 and a contract management module 205.
Specifically, the classification management module 201 is configured to establish a basic classification of the engineering project contract. The list classification management module 202 is configured to establish a contract list classification based on the basic classification, where the list classification corresponds to the basic classification, so that each type of contract can only select a list of the corresponding type for contract specification. The organizational structure mapping module 203 is configured to pull the project data of the third-party platform from the third-party platform at regular time, and after the data enters the system, establish one-to-one mapping between the pulled project and the project of the system organizational structure. The contract management switch setting module 204 is used to individually set on or off of the contract management switch for each item.
The contract management module 205 is configured to perform the following operations: setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold; receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, matching contract categories, and forming informal data; based on informal data, perfecting basic information and detailed information of the contract; after the contract filling information is completed, the contract initiates a secondary approval process, and after the secondary approval is completed, the contract data becomes formal data for use of a subsequent contract template.
Further, the basic classification comprises labor service, specialization, mechanical lease and material purchase, and the authority of the operator is distributed to business personnel; the inventory classification includes labor, specialty, machinery rental, and material procurement, and assigns operator privileges to business personnel.
Further, setting a total budget threshold of the project, and verifying the total amount of each type of contract based on the total budget threshold of the project comprises the following steps: setting a total budget threshold of a project, starting a contract control switch, verifying the total amount of each type of contract, if the total amount of the type of contract exceeds 80% of the total budget threshold, storing data but generating early warning reminding, if the total amount of the type of contract exceeds the total budget threshold, the data cannot be stored, and a company is required to designate responsible personnel to carry out contract amount checking or total budget supplement. And controlling the total amount of the contracts by using subjects corresponding to the total budget respectively for each type of contracts, wherein the steps of extracting contract identifications of corresponding types and matching the sum of the contract amounts with the same contract identifications as the total amount of the type of contracts are included. Based on informal data, the basic information and detail information for perfecting the contract comprise: after receiving informal data, the system perfects contract names, sub-suppliers, contract amounts, signing dates and account opening rows, wherein the contract types and the contract amounts are subject to the pushed data, and modification operation is not allowed; after the basic information is completed, the contract detail is selected from the corresponding contract list library, and the unit price and the quantity are filled in each contract list.
Further, the method for establishing a one-to-one mapping between the pulled item and the item of the system organization architecture includes the steps of pulling item data of the third party platform from the third party platform at regular time, and after the data enters the system: the system regularly pulls the project data of the third-party platform from the third-party platform, if the project data is newly added, the project data is newly added in the system, if the project data is modified, the project data is synchronously modified in the system, after the data enters the system, a company level manager establishes one-to-one mapping for the pulled project and the project in the system organization structure, and if the project data is repeatedly mapped, the project data cannot be stored.
It should be noted that, according to the embodiments of the present disclosure, the processes described above with reference to the flowcharts may be implemented as computer software programs. The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to various embodiments of the present disclosure. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
The units described in the embodiments of the present disclosure may be implemented by software or hardware. It should be understood that portions of the present disclosure may be implemented in hardware, software, firmware, or a combination thereof.
The above description is only for the specific embodiments of the present disclosure, but the scope of the present disclosure is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present disclosure should be covered within the scope of the present disclosure. Therefore, the protection scope of the present disclosure shall be subject to the protection scope of the claims.
Claims (9)
1. A full-process management method for an engineering project contract is characterized by comprising the following steps: the method comprises the following steps:
s1, establishing basic classification of a project contract and setting corresponding operator authority;
s2, establishing contract list classification based on the basic classification, and setting operator authority, wherein the list classification corresponds to the basic classification, so that each type of contract can only select a list of a corresponding type to be detailed;
s3, setting a contract control switch, and independently setting the on or off of the contract control switch for each project;
s4, setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold;
s5, the system regularly pulls the project data of the third-party platform from the third-party platform, and after the data enter the system, one-to-one mapping is established between the pulled project and the project of the system organization architecture;
s6, receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, automatically matching contract categories, and forming informal data;
s7, based on the informal data, perfecting basic information and detailed information of the contract;
s8, after the contract is filled with information, initiating a secondary approval process for the contract, and after the secondary approval is finished, converting contract data into formal data for a subsequent contract template to use;
in step S4, setting a total budget threshold of the project, and verifying the total amount of each type of contract based on the total budget threshold of the project includes the following steps: setting a project total budget threshold, starting a contract control switch, verifying the total amount of each type of contract, if the total amount of each type of contract exceeds 80% of the total budget threshold, storing data but generating early warning reminding, and if the total amount of each type of contract exceeds the total budget threshold, not storing the data, and requiring a company to designate responsible personnel to carry out checking of the contract amount or supplement the total budget; and controlling the total amount of the contract by using the total budget corresponding to the subject of each type of contract, wherein the total amount of the contract is controlled by extracting the contract identifications of the corresponding types, and the sum of the contract amounts with the same contract identifications is matched to serve as the total amount of the contract.
2. The engineering project contract full-process management method according to claim 1, characterized in that: in the step S1, the basic classification comprises labor service, specialization, mechanical leasing and material purchasing, and the authority of an operator is distributed to business personnel; in step S2, the list classification includes labor, specialization, mechanical leasing and material purchasing, and the operator authority is distributed to business personnel.
3. The project contract full-process management method according to claim 2, characterized in that: in step S5, the system periodically pulls the project data of the third party platform from the third party platform, and after the data enters the system, the establishing of one-to-one mapping between the pulled project and the project of the system organization architecture includes: the system regularly pulls the project data of the third-party platform from the third-party platform, if the project data is newly added, the project data is newly added in the system, if the project data is modified, the project data is synchronously modified in the system, after the data enters the system, a company level manager establishes one-to-one mapping for the pulled project and the project in the system organization structure, and if the project data is repeatedly mapped, the project data cannot be stored.
4. The engineering project contract full-flow management method according to claim 3, characterized in that: in step S7, based on the informal data, the basic information and detail information for perfecting the contract include: after receiving informal data, the system perfects contract names, sub-suppliers, contract amounts, signing dates and account opening rows, wherein the contract types and the contract amounts are subject to the pushed data, and modification operation is not allowed; after the basic information is completed, the contract detail is selected from the corresponding contract list library, and the unit price and the quantity are filled in each contract list.
5. The project contract full-process management method according to claim 4, characterized in that: also comprises the following steps: and after the contract data becomes formal data, if the later contract has modification content, the project is supplemented or changed aiming at the contract, wherein the modification content comprises the change of contract amount and the increase of a contract list, and if the contract is a contract pushed by a third-party platform, the contract is supplemented or changed by the third-party platform and then pushed again.
6. A full-process management system for engineering project contracts is characterized in that: the method comprises the following steps:
a classification management module (201) for establishing a base classification of the project contract;
a list classification management module (202) for establishing a contract list classification based on the base classification, the list classification corresponding to the base classification, so that each type of contract can only select a list of the corresponding category for contract detail;
the organization architecture mapping module (203) is used for regularly pulling the project data of the third-party platform from the third-party platform, and after the data enters the system, one-to-one mapping is established between the pulled project and the project of the system organization architecture;
a contract management switch setting module (204) for individually setting on or off of the contract management switch for each item; and
a contract management module (205) for performing the following operations:
setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold;
receiving contract data information which is pushed by a third-party platform and completes contract basic information entry and one-time approval, matching contract categories, and forming informal data;
perfecting the basic information and detailed information of the contract based on the informal data;
after the contract filling information is completed, a secondary approval process is initiated for the contract, and after the secondary approval is completed, the contract data becomes formal data for a subsequent contract template to use;
the method comprises the following steps of setting a project total budget threshold, and verifying the total amount of each type of contract based on the project total budget threshold, wherein the steps of: setting a project total budget threshold, starting a contract control switch, verifying the total amount of each type of contract, if the total amount of each type of contract exceeds 80% of the total budget threshold, storing data but generating early warning prompt, and if the total amount of each type of contract exceeds the total budget threshold, not storing the data, and requiring a company to designate responsible personnel to carry out contract amount checking or total budget supplement; and controlling the total amount of the contracts by using subjects corresponding to the total budget respectively for each type of contracts, wherein the steps of extracting contract identifications of corresponding types and matching the sum of the contract amounts with the same contract identifications as the total amount of the type of contracts are included.
7. The project contract overall process management system of claim 6, wherein: the basic classification comprises labor service, specialization, mechanical lease and material purchase, and the authority of an operator is distributed to business personnel; the inventory classification includes labor, specialty, machinery rental, and material procurement, and assigns operator privileges to business personnel.
8. The project contract overall process management system of claim 7, wherein:
based on the informal data, the basic information and detailed information for perfecting the contract comprise: after receiving informal data, the system perfects contract names, sub-suppliers, contract amounts, signing dates and account opening rows, wherein the contract types and the contract amounts are subject to the pushed data, and modification operation is not allowed; after the basic information is completed, the contract detail is selected from the corresponding contract list library, and the unit price and the quantity are filled in each contract list.
9. The project contract overall process management system of claim 8, wherein: the method comprises the following steps of regularly pulling project data of a third-party platform from the third-party platform, and after the data enter a system, establishing one-to-one mapping between the pulled project and a project of a system organization architecture, wherein the one-to-one mapping comprises the following steps: the system regularly pulls the project data of the third-party platform from the third-party platform, if the project data is newly added, the project data is newly added in the system, if the project data is modified, the project data is synchronously modified in the system, after the data enters the system, a company level manager establishes one-to-one mapping for the pulled project and the project in the system organization structure, and if the project data is repeatedly mapped, the project data cannot be stored.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210374442.7A CN114663069B (en) | 2022-04-11 | 2022-04-11 | Engineering project contract full-process management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210374442.7A CN114663069B (en) | 2022-04-11 | 2022-04-11 | Engineering project contract full-process management method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114663069A CN114663069A (en) | 2022-06-24 |
CN114663069B true CN114663069B (en) | 2022-12-23 |
Family
ID=82035926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210374442.7A Active CN114663069B (en) | 2022-04-11 | 2022-04-11 | Engineering project contract full-process management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114663069B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117236880B (en) * | 2023-09-06 | 2024-05-17 | 河北建筑工程学院 | Method and system for whole-process management of construction project contract |
CN118863788A (en) * | 2024-07-04 | 2024-10-29 | 和创(北京)科技股份有限公司 | aPaaS business data control method and system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107977790A (en) * | 2017-12-05 | 2018-05-01 | 广州发展集团股份有限公司 | A kind of group enterprise technology innovation management information system |
CN108629650A (en) * | 2017-12-05 | 2018-10-09 | 南京天朝机网络科技有限公司 | Method and device for intelligent Matching leasing of construction machinery electronic contract |
CN109903148A (en) * | 2019-01-31 | 2019-06-18 | 平安科技(深圳)有限公司 | Contract cost calculation method, device and computer equipment based on classification model |
CN111160345A (en) * | 2019-12-31 | 2020-05-15 | 重庆木舌科技有限公司 | Intelligent enterprise contract generation system and method |
CN112036806A (en) * | 2020-07-15 | 2020-12-04 | 远光软件股份有限公司 | Project full life cycle approximate calculation management method, device, equipment and storage medium |
KR20200139008A (en) * | 2019-06-03 | 2020-12-11 | 박병훈 | User intention-analysis based contract recommendation and autocomplete service using deep learning |
CN112365233A (en) * | 2020-11-10 | 2021-02-12 | 中远海运科技股份有限公司 | Project cost informatization management method |
CN113610486A (en) * | 2021-07-05 | 2021-11-05 | 中交二公局第三工程有限公司 | Project cost accounting method |
CN114021544A (en) * | 2021-11-19 | 2022-02-08 | 上海国泰君安证券资产管理有限公司 | Intelligent extraction and verification method and system for product contract elements |
JP2022041148A (en) * | 2020-08-31 | 2022-03-11 | 株式会社オービック | Individual billing management device, individual billing management method, and individual billing management program |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10930389B2 (en) * | 2016-01-20 | 2021-02-23 | Change Healthcare Holdings, Llc | Systems and methods for the classification and indexing of contract documentation |
CN109902288A (en) * | 2019-01-17 | 2019-06-18 | 深圳壹账通智能科技有限公司 | Intelligent clause analysis method, device, computer equipment and storage medium |
-
2022
- 2022-04-11 CN CN202210374442.7A patent/CN114663069B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107977790A (en) * | 2017-12-05 | 2018-05-01 | 广州发展集团股份有限公司 | A kind of group enterprise technology innovation management information system |
CN108629650A (en) * | 2017-12-05 | 2018-10-09 | 南京天朝机网络科技有限公司 | Method and device for intelligent Matching leasing of construction machinery electronic contract |
CN109903148A (en) * | 2019-01-31 | 2019-06-18 | 平安科技(深圳)有限公司 | Contract cost calculation method, device and computer equipment based on classification model |
KR20200139008A (en) * | 2019-06-03 | 2020-12-11 | 박병훈 | User intention-analysis based contract recommendation and autocomplete service using deep learning |
CN111160345A (en) * | 2019-12-31 | 2020-05-15 | 重庆木舌科技有限公司 | Intelligent enterprise contract generation system and method |
CN112036806A (en) * | 2020-07-15 | 2020-12-04 | 远光软件股份有限公司 | Project full life cycle approximate calculation management method, device, equipment and storage medium |
JP2022041148A (en) * | 2020-08-31 | 2022-03-11 | 株式会社オービック | Individual billing management device, individual billing management method, and individual billing management program |
CN112365233A (en) * | 2020-11-10 | 2021-02-12 | 中远海运科技股份有限公司 | Project cost informatization management method |
CN113610486A (en) * | 2021-07-05 | 2021-11-05 | 中交二公局第三工程有限公司 | Project cost accounting method |
CN114021544A (en) * | 2021-11-19 | 2022-02-08 | 上海国泰君安证券资产管理有限公司 | Intelligent extraction and verification method and system for product contract elements |
Non-Patent Citations (4)
Title |
---|
Contractor management performance evaluation model at prequalification stage;Pooria Rashvand 等;《Expert Systems with Applications》;20150228;第42卷(第12期);第5087-5101页 * |
HW公司研发项目成本管理研究;左栋;《中国优秀硕士学位论文全文数据库 经济与管理科学辑》;20160715(第7期);第J163-12页 * |
基于管理流程的工程项目合同管理信息化设计;张峰;《中国高新技术企业》;20160824(第24期);第179-180页 * |
工程总承包项目的全过程合同管理;周玉娟;《建筑》;20120620(第12期);第79,81页 * |
Also Published As
Publication number | Publication date |
---|---|
CN114663069A (en) | 2022-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114663069B (en) | Engineering project contract full-process management method and system | |
US7319971B2 (en) | System for managing risk | |
US20190220936A1 (en) | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods | |
US20110184771A1 (en) | Implementation resource project management | |
WO2020244387A1 (en) | Equipment ledger management method and system | |
JP5905146B2 (en) | Project progress management system and computer program | |
KR102213465B1 (en) | Apparatus and method for managing information security | |
US12327097B2 (en) | Dependency management in software development | |
US20070174100A1 (en) | Method and apparatus for synchronizing a scheduler with a financial reporting system | |
CN113793135A (en) | Project process management method and system | |
CN117151598A (en) | Material changing processing method, material management system, storage medium and processor | |
US20100205225A1 (en) | Method and Apparatus for Transforming a Process | |
US20210158264A1 (en) | Automated system for tracking progress of operations deliverables | |
US20020055832A1 (en) | Structured system for the planning, integration, analysis and management of new product development on a real-time, enterprise-wide basis | |
US20230078389A1 (en) | Computer Systems and Methods for Generating Predictive Change Events | |
US20140278639A1 (en) | System and method for interface management | |
CN111915278A (en) | Intelligent personnel management system and method | |
CN114819761B (en) | Processing method and system of IT service work order | |
JP2004054785A (en) | Project information management system | |
CN110826834B (en) | Comparison method and device between different responsibility separation rule sets | |
Rozum | Defining and understanding software measurement data | |
CN113887996A (en) | Business activity risk control method, storage medium and electronic equipment | |
KR102792423B1 (en) | Method for Providing an Expert Consulting and Safety Management Platform for Small and Medium-Sized Construction Sites | |
O'connor et al. | MX Resident Engineer Networking Guide. | |
TWM631452U (en) | Electronical signature case automated assignment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |