CN114142477B - Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation - Google Patents

Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation Download PDF

Info

Publication number
CN114142477B
CN114142477B CN202111406078.XA CN202111406078A CN114142477B CN 114142477 B CN114142477 B CN 114142477B CN 202111406078 A CN202111406078 A CN 202111406078A CN 114142477 B CN114142477 B CN 114142477B
Authority
CN
China
Prior art keywords
voltage
fitting
current
positive sequence
function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111406078.XA
Other languages
Chinese (zh)
Other versions
CN114142477A (en
Inventor
李理
贺晨
洪权
刘伟良
熊尚峰
蔡昱华
吴晋波
刘志豪
龚禹生
肖俊先
李林山
陈胜春
曾林俊
牟秀君
吴雪琴
张伦
肖纳敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Training Center of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Training Center of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, State Grid Hunan Electric Power Co Ltd, Training Center of State Grid Hunan Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority to CN202111406078.XA priority Critical patent/CN114142477B/en
Publication of CN114142477A publication Critical patent/CN114142477A/en
Application granted granted Critical
Publication of CN114142477B publication Critical patent/CN114142477B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The application discloses a three-phase zero voltage ride through reactive current calculation method and a system based on voltage section prolongation, wherein the method comprises the steps of obtaining test data of an energy storage power station three-phase zero voltage ride through test; positioning a voltage drop section according to the test data, taking three-phase balanced voltage data with specified duration before the voltage drop section as a fitting data source, and performing function fitting according to the fitting data source to obtain a positive sequence voltage fitting function; positioning a current surge section according to the test data, taking current data of the current surge section as a fitting data source, and performing function fitting according to the fitting data source to obtain a positive sequence current fitting function; and in the voltage drop section, projecting the fitted positive sequence current in the positive sequence current fitting function to the fitted positive sequence voltage in the positive sequence voltage fitting function to obtain the positive sequence reactive current, so that the positive sequence reactive current quantitative calculation of the three-phase zero voltage ride through test of the energy storage station can be realized, and the result of the three-phase zero voltage ride through test is quantitatively analyzed.

Description

基于电压区段延拓的三相零电压穿越无功电流计算方法及 系统Calculation method of three-phase zero-voltage ride-through reactive current based on voltage section continuation and its system

技术领域technical field

本发明涉及电力系统技术领域,具体涉及一种基于电压区段延拓的三相零电压穿越无功电流计算方法及系统。The invention relates to the technical field of power systems, in particular to a three-phase zero-voltage ride-through reactive current calculation method and system based on voltage section extension.

背景技术Background technique

电化学储能大规模发展对控制设备功能提出了越来越高的要求,现行国家标准及行业标准要求当电网电压跌落时,储能电站应具有低电压穿越能力,即保证电网跌落过程中,储能站功率变换系统(PCS)应按要求不脱网运行,同时为电网提供无功电流支撑。因此在低电压穿越过程中,出现的主要现象是电压的跌落,同时伴随着电流突增。对于储能站而言,低电压穿越能力是所必须的核心功能,低电压穿越试验是检验PCS性能的关键性试验。目前标准要求计算低电压穿越过程中正序无功电流来评估无功支撑能力,但是对于三相零电压穿越情况下的正序无功电流的计算方法未进行明确说明。在非零电压穿越时,电压跌落程度不深,常规的电压互感器能够准确的计算电压幅值和相位,但是在三相零电压穿越时,三相电压幅值已经跌落至零值附近,电网电压波形已经失真变形,无法根据电压互感器的测量值进行相位计算。从电网侧来看,发电机的出口电压幅值及相位是保持稳定的,三相零电压穿越过程仅改变了跌落点处的电压,跌落时电网中发电机输出电压和跌落前相同,因此可以将发电机出口电压作为电压基准。对于PCS而言,由于在三相零电压跌落区段采样不到实际的电压,在控制算法中将保持故障前的电压信息,并且延拓至故障区段,根据故障区段拟合的正常电压计算无功电流的控制量。因此根据跌落前后发电机输出电压一致的事实,以及实际PCS的控制算法实施情况,可以利用跌落前的电压区段延拓后虚拟跌落后的电压区段为正常电压区段,用于正序无功电流的计算。The large-scale development of electrochemical energy storage has put forward higher and higher requirements for the functions of control equipment. The current national standards and industry standards require that when the grid voltage drops, the energy storage power station should have low voltage ride-through capability, that is, to ensure that during the grid drop, The power conversion system (PCS) of the energy storage station should not run off the grid as required, and at the same time provide reactive current support for the grid. Therefore, in the process of low voltage ride through, the main phenomenon is the drop of voltage, accompanied by the sudden increase of current. For energy storage stations, low-voltage ride-through capability is a necessary core function, and low-voltage ride-through test is a key test to test the performance of PCS. The current standard requires the calculation of positive-sequence reactive current during low-voltage ride-through to evaluate the reactive power support capability, but there is no clear statement on the calculation method of positive-sequence reactive current in the case of three-phase zero-voltage ride-through. During non-zero voltage crossing, the voltage drop is not deep, and conventional voltage transformers can accurately calculate the voltage amplitude and phase, but during three-phase zero voltage crossing, the three-phase voltage amplitude has dropped to near zero, and the power grid The voltage waveform has been distorted, and the phase calculation cannot be performed based on the measured value of the voltage transformer. From the perspective of the grid side, the output voltage amplitude and phase of the generator remain stable. The three-phase zero voltage ride through process only changes the voltage at the point of drop. When the drop occurs, the output voltage of the generator in the grid is the same as before the drop. Use the generator outlet voltage as the voltage reference. For PCS, since the actual voltage cannot be sampled in the three-phase zero voltage drop section, the voltage information before the fault will be kept in the control algorithm and extended to the fault section, and the normal voltage fitted according to the fault section Calculate the control quantity of reactive current. Therefore, according to the fact that the generator output voltage is consistent before and after the drop, and the implementation of the actual PCS control algorithm, the voltage section before the drop can be extended and the voltage section after the virtual drop can be used as a normal voltage section for positive sequence Calculation of work current.

因此,根据储能站零电压穿越中对正序无功电流计算的要求,需要一种基于电压区段延拓的三相零电压穿越无功电流计算方法,保证能够对储能站低电压穿越试验中的三相零电压穿越结果进行定量计算,为评判设备具体性能提供准确的参考。目前,相关的现有技术有:现有技术[1]:李佳曼,万文军,苏伟,等.大容量储能移动并网测试装置设计及试验[J].广东电力.2020,33(10):9-15.现有技术[2]:曹磊,秦筱迪,夏烈,等.基于虚拟仪器技术的光伏逆变器低电压穿越测试系统[J].电测与仪表.2015,52(14):71-75.其中,现有技术[1]设计了适用于大容量储能系统并网检测的移动测试装置,现场进行了低电压穿越测试,设计的装置能够虽然能够模拟不同故障类型,完成低电压穿越的各种试验,但是未能阐述三相零电压穿越时结果的分析方法。现有技术[2]设计了一种基于虚拟仪器技术的光伏逆变器低电压穿越测试系统,实现光伏逆变器在低电压穿越测试过程中交流侧电压与电流的实时监测以及测试结果评价,研究了光伏逆变器低电压穿越测试有功功率恢复和动态无功支撑等关键指标计算方法,但是对于三相零电压穿越的测量分析未进行阐述。Therefore, according to the requirements for positive sequence reactive current calculation in energy storage station zero voltage ride through, a three-phase zero voltage ride through reactive current calculation method based on voltage section continuation is needed to ensure the low voltage ride through energy storage station. The three-phase zero voltage crossing results in the test are quantitatively calculated to provide an accurate reference for judging the specific performance of the equipment. At present, the relevant existing technologies are: Existing technology [1]: Li Jiaman, Wan Wenjun, Su Wei, etc. Design and test of large-capacity energy storage mobile grid-connected test device [J]. Guangdong Electric Power. 2020, 33(10):9-15. Existing technology [2]: Cao Lei, Qin Xiaodi, Xia Lie, etc. Photovoltaic inverter low-voltage ride-through test system based on virtual instrument technology [J]. Electric Measurement and Instrumentation. 2015, 52(14):71-75. Among them, the prior art [1] designed a mobile test device suitable for grid-connected detection of large-capacity energy storage systems, and carried out low-voltage ride-through tests on site. The designed device can simulate different Fault type, completed various tests of low voltage ride through, but failed to explain the analysis method of the results of three-phase zero voltage ride through. Existing technology [2] designed a photovoltaic inverter low-voltage ride-through test system based on virtual instrument technology to realize real-time monitoring of AC side voltage and current and evaluation of test results during the low-voltage ride-through test process of photovoltaic inverters. The calculation method of key indicators such as active power recovery and dynamic reactive power support of photovoltaic inverter low-voltage ride-through test is studied, but the measurement and analysis of three-phase zero-voltage ride-through is not elaborated.

发明内容Contents of the invention

本发明要解决的技术问题:针对现有技术的上述问题,提供一种基于电压区段延拓的三相零电压穿越无功电流计算方法及系统,本发明可实现储能站三相零电压穿越试验的正序无功电流定量计算,对三相零电压穿越试验的结果进行定量分析。Technical problem to be solved by the present invention: Aiming at the above-mentioned problems of the prior art, a three-phase zero-voltage ride-through reactive current calculation method and system based on voltage section extension is provided. The present invention can realize three-phase zero-voltage in energy storage stations Quantitative calculation of the positive sequence reactive current of the ride-through test, and quantitative analysis of the results of the three-phase zero-voltage ride-through test.

为了解决上述技术问题,本发明采用的技术方案为:In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:

一种基于电压区段延拓的三相零电压穿越无功电流计算方法,包括:A three-phase zero-voltage ride-through reactive current calculation method based on voltage section extension, including:

1)获取储能电站三相零电压穿越试验的试验数据;1) Obtain the test data of the three-phase zero-voltage ride-through test of the energy storage power station;

2)根据试验数据定位电压跌落区段,取电压跌落区段前指定时长的三相平衡的电压数据作为拟合数据源,根据拟合数据源进行函数拟合得到正序电压拟合函数;根据试验数据定位电流突增区段,取电流突增区段的电流数据作为拟合数据源,根据拟合数据源进行函数拟合得到正序电流拟合函数;2) Locate the voltage drop section according to the test data, take the three-phase balanced voltage data of the specified time before the voltage drop section as the fitting data source, and perform function fitting according to the fitting data source to obtain the positive sequence voltage fitting function; The test data locates the current sudden increase section, takes the current data of the current sudden increase section as the fitting data source, and performs function fitting according to the fitting data source to obtain the positive sequence current fitting function;

3)在电压跌落区段,将正序电流拟合函数中的拟合正序电流向正序电压拟合函数中的拟合正序电压投影,得到正序无功电流。3) In the voltage drop section, project the fitted positive-sequence current in the positive-sequence current fitting function to the fitting positive-sequence voltage in the positive-sequence voltage fitting function to obtain the positive-sequence reactive current.

可选地,步骤1)之前还包括对储能电站进行三相零电压穿越试验以得到三相零电压穿越试验的试验数据的步骤。Optionally, before step 1), a step of performing a three-phase zero-voltage ride-through test on the energy storage power station to obtain test data of the three-phase zero-voltage ride-through test is also included.

可选地,步骤2)中指定时长的取值范围为0.5~1.5s。Optionally, the value range of the specified duration in step 2) is 0.5-1.5s.

可选地,步骤2)中指定时长的取值为1s。Optionally, the value of the duration specified in step 2) is 1s.

可选地,所述三相零电压穿越试验的试验数据包括电压数据和电流数据。Optionally, the test data of the three-phase zero-voltage ride-through test includes voltage data and current data.

可选地,步骤2)中根据拟合数据源进行函数拟合得到正序电压拟合函数包括:将作为拟合数据源的电压数据进行快速傅里叶变换FFT获得主导频率,将时间、电压之间的映射关系进行函数拟合,从而得到正序电压拟合函数。Optionally, performing function fitting according to the fitting data source in step 2) to obtain the positive sequence voltage fitting function includes: performing fast Fourier transform FFT on the voltage data as the fitting data source to obtain the dominant frequency, and combining time, voltage The mapping relationship between them is used for function fitting, so as to obtain the positive sequence voltage fitting function.

可选地,步骤2)中根据拟合数据源进行函数拟合得到正序电流拟合函数包括:将作为拟合数据源的电流数据进行快速傅里叶变换FFT获得主导频率,将时间、电流之间的映射关系进行函数拟合,从而得到正序电流拟合函数。Optionally, performing function fitting according to the fitting data source in step 2) to obtain the positive sequence current fitting function includes: performing fast Fourier transform FFT on the current data as the fitting data source to obtain the dominant frequency, and combining time, current The mapping relationship between them is used for function fitting, so as to obtain the positive sequence current fitting function.

可选地,所述拟合函数参数包括正弦波的幅值Amp、频率f以及初相位φ。Optionally, the fitting function parameters include amplitude Amp, frequency f and initial phase φ of the sine wave.

此外,本实施例还提供一种基于电压区段延拓的三相零电压穿越无功电流计算系统,包括相互连接的微处理器和存储器,该微处理器被编程或配置以执行所述基于电压区段延拓的三相零电压穿越无功电流计算方法的步骤。In addition, this embodiment also provides a three-phase zero-voltage ride-through reactive current calculation system based on voltage section extension, which includes interconnected microprocessors and memories, and the microprocessor is programmed or configured to perform the calculation based on Steps of the three-phase zero-voltage ride-through reactive current calculation method for voltage section extension.

此外,本实施例还提供一种计算机可读存储介质,该计算机可读存储介质中存储有用于被计算机设备执行以实施所述基于电压区段延拓的三相零电压穿越无功电流计算方法的计算机程序。In addition, this embodiment also provides a computer-readable storage medium, which is stored in the computer-readable storage medium for being executed by a computer device to implement the three-phase zero-voltage ride-through reactive current calculation method based on voltage section extension computer program.

和现有技术相比,本发明主要具有下述优点:本发明包括获取储能电站三相零电压穿越试验的试验数据;根据试验数据定位电压跌落区段,取电压跌落区段前指定时长的三相平衡的电压数据作为拟合数据源,根据拟合数据源进行函数拟合得到正序电压拟合函数;根据试验数据定位电流突增区段,取电流突增区段的电流数据作为拟合数据源,根据拟合数据源进行函数拟合得到正序电流拟合函数;在电压跌落区段,将正序电流拟合函数中的拟合正序电流向正序电压拟合函数中的拟合正序电压投影,得到正序无功电流,可实现储能站三相零电压穿越试验的正序无功电流定量计算,对三相零电压穿越试验的结果进行定量分析。Compared with the prior art, the present invention mainly has the following advantages: the present invention includes obtaining the test data of the three-phase zero-voltage ride-through test of the energy storage power station; locating the voltage drop section according to the test data, and taking the specified time before the voltage drop section The voltage data of the three-phase balance is used as the fitting data source, and the positive sequence voltage fitting function is obtained by performing function fitting according to the fitting data source; the current sudden increase section is located according to the test data, and the current data of the current sudden increase section is used as the fitting function. According to the fitting data source, the function fitting is performed according to the fitting data source to obtain the positive sequence current fitting function; in the voltage drop section, the fitting positive sequence current in the positive sequence current fitting function is transferred to the positive sequence voltage fitting function Fitting the positive-sequence voltage projection to obtain the positive-sequence reactive current can realize the quantitative calculation of the positive-sequence reactive current in the three-phase zero-voltage ride-through test of the energy storage station, and quantitatively analyze the results of the three-phase zero-voltage ride-through test.

附图说明Description of drawings

图1为本发明实施例方法的基本流程示意图。Fig. 1 is a schematic flow diagram of the basic process of the method of the embodiment of the present invention.

图2为本发明实施例方法的拟合波形示意图。Fig. 2 is a schematic diagram of the fitting waveform of the method of the embodiment of the present invention.

具体实施方式Detailed ways

下文将以对某一储能电站进行三相零电压穿越正序无功电流计算为例,对本发明基于电压区段延拓的三相零电压穿越无功电流计算方法及系统进行进一步的详细说明。本实施例中,储能电站规模为20MW/40MWh,采用电化学储能技术,电池选用磷酸铁锂电池。The following will take the calculation of three-phase zero-voltage ride-through positive-sequence reactive current for an energy storage power station as an example, and further describe the three-phase zero-voltage ride-through reactive current calculation method and system based on voltage section extension of the present invention in detail. . In this embodiment, the scale of the energy storage power station is 20MW/40MWh, the electrochemical energy storage technology is adopted, and the battery is lithium iron phosphate battery.

如图1所示,本实施例基于电压区段延拓的三相零电压穿越无功电流计算方法包括:As shown in Figure 1, the three-phase zero-voltage ride-through reactive current calculation method based on voltage section extension in this embodiment includes:

1)获取储能电站三相零电压穿越试验的试验数据;1) Obtain the test data of the three-phase zero-voltage ride-through test of the energy storage power station;

2)根据试验数据定位电压跌落区段,取电压跌落区段前指定时长的三相平衡的电压数据作为拟合数据源,根据拟合数据源进行函数拟合得到正序电压拟合函数;根据试验数据定位电流突增区段,取电流突增区段的电流数据作为拟合数据源,根据拟合数据源进行函数拟合得到正序电流拟合函数;2) Locate the voltage drop section according to the test data, take the three-phase balanced voltage data of the specified time before the voltage drop section as the fitting data source, and perform function fitting according to the fitting data source to obtain the positive sequence voltage fitting function; The test data locates the current sudden increase section, takes the current data of the current sudden increase section as the fitting data source, and performs function fitting according to the fitting data source to obtain the positive sequence current fitting function;

3)在电压跌落区段,将正序电流拟合函数中的拟合正序电流向正序电压拟合函数中的拟合正序电压投影,得到正序无功电流。3) In the voltage drop section, project the fitted positive-sequence current in the positive-sequence current fitting function to the fitting positive-sequence voltage in the positive-sequence voltage fitting function to obtain the positive-sequence reactive current.

本实施例中,步骤1)之前还包括对储能电站进行三相零电压穿越试验以得到三相零电压穿越试验的试验数据的步骤。In this embodiment, before step 1), there is also a step of performing a three-phase zero-voltage ride-through test on the energy storage power station to obtain test data of the three-phase zero-voltage ride-through test.

步骤2)中指定时长的取值范围为0.5~1.5s。The value range of the specified duration in step 2) is 0.5-1.5s.

作为一种具体的实施方式,本实施例中指定时长的取值为1s。As a specific implementation manner, the value of the specified duration in this embodiment is 1s.

本实施例中,三相零电压穿越试验的试验数据包括电压数据和电流数据。In this embodiment, the test data of the three-phase zero-voltage ride-through test includes voltage data and current data.

本实施例中,步骤2)中根据拟合数据源进行函数拟合得到正序电压拟合函数包括:将作为拟合数据源的电压数据进行快速傅里叶变换FFT获得主导频率,将时间、电压之间的映射关系进行函数拟合,从而得到正序电压拟合函数。本实施例中,拟合函数的参数包括电压数据的正弦波的幅值Amp、频率f以及初相位φ,得到的正序电压拟合函数的函数表达式为:In this embodiment, performing function fitting according to the fitting data source in step 2) to obtain the positive sequence voltage fitting function includes: performing fast Fourier transform (FFT) on the voltage data as the fitting data source to obtain the dominant frequency, time, The mapping relationship between the voltages is used for function fitting, so as to obtain the positive sequence voltage fitting function. In this embodiment, the parameters of the fitting function include the amplitude Amp, the frequency f, and the initial phase φ of the sine wave of the voltage data, and the function expression of the obtained positive sequence voltage fitting function is:

本实施例中,步骤2)中根据拟合数据源进行函数拟合得到正序电流拟合函数包括:将作为拟合数据源的电流数据进行快速傅里叶变换FFT获得主导频率,将时间、电流之间的映射关系进行函数拟合,从而得到正序电流拟合函数。本实施例中,拟合函数的参数包括电流数据的正弦波的幅值Amp、频率f以及初相位φ,得到的正序电流拟合函数的函数表达式为:In this embodiment, performing function fitting according to the fitting data source in step 2) to obtain the positive sequence current fitting function includes: performing fast Fourier transform (FFT) on the current data as the fitting data source to obtain the dominant frequency, time, The mapping relationship between the currents is used for function fitting, so as to obtain the positive sequence current fitting function. In this embodiment, the parameters of the fitting function include the amplitude Amp of the sine wave of the current data, the frequency f and the initial phase φ, and the function expression of the obtained positive sequence current fitting function is:

本实施例中的计算结果见图2,在低电压穿越过程中,零电压穿越区段出现的现象主要特征是电压的跌落,同时伴随着电流突增,即分别出现电压跌落区段和电流突增区段。其中:a为零电压穿越区段A相电压UA原始波形与UA拟合电压的波形对比,故障发生在17.70秒,故障前的电压波形是对称稳定的,通过故障前的电压得到电压拟合函数,将电压拟合函数延拓后虚拟跌落后的电压区段为正常电压区段。b为零电压穿越区段A相电流IA原始波形与IA拟合电流的波形对比,故障发生在17.70秒,故障中的电流波形是对称稳定的,通过故障中的电流得到电流拟合函数。c为零电压穿越区段A相电流IA拟合波形与A相电压UA拟合波形对比,可见两者相位相差大约为90°,与三相零电压穿越时有功功率输出被抑制为0,主要输出为无功功率的事实基本相符。d为在电压跌落区间,正序拟合电流向正序拟合电压投影,得到相位差Δφ及正序无功电流IQ。根据计算结果可知,相位差Δφ大约为87°,与主要输出无功功率相符,通过Δφ计算IQ为147A左右,该值可用于定量评判PCS三相零电压穿越性能。The calculation results in this embodiment are shown in Figure 2. During the low-voltage ride-through process, the main feature of the phenomenon in the zero-voltage ride-through section is a voltage drop, accompanied by a sudden increase in current, that is, a voltage drop section and a current sudden increase. Add section. Among them: a is the comparison between the original waveform of UA phase voltage UA in the zero voltage crossing section and the waveform of UA fitting voltage. The fault occurred at 17.70 seconds. The voltage waveform before the fault is symmetrical and stable. The voltage fitting function is obtained by the voltage before the fault , the voltage range after the virtual drop after extending the voltage fitting function is the normal voltage range. b is the comparison between the original waveform of phase A current IA and the IA fitting current waveform in the zero voltage crossing section. The fault occurred at 17.70 seconds. The current waveform in the fault is symmetrical and stable, and the current fitting function is obtained through the current in the fault. c is the comparison between the fitting waveform of phase A current IA and the fitting waveform of phase A voltage UA in the zero-voltage crossing section. It can be seen that the phase difference between the two is about 90°, and the active power output is suppressed to 0 during three-phase zero-voltage crossing, mainly The fact that the output is reactive power is basically consistent. d is the projection of the positive-sequence fitting current to the positive-sequence fitting voltage in the voltage drop interval to obtain the phase difference Δφ and the positive-sequence reactive current IQ. According to the calculation results, the phase difference Δφ is about 87°, which is consistent with the main output reactive power. The IQ calculated by Δφ is about 147A. This value can be used to quantitatively evaluate the PCS three-phase zero voltage ride-through performance.

此外,本实施例还提供一种基于电压区段延拓的三相零电压穿越无功电流计算系统,包括相互连接的微处理器和存储器,该微处理器被编程或配置以执行前述基于电压区段延拓的三相零电压穿越无功电流计算方法的步骤。此外,本实施例还提供一种计算机可读存储介质,该计算机可读存储介质中存储有用于被计算机设备执行以实施前述基于电压区段延拓的三相零电压穿越无功电流计算方法的计算机程序。In addition, this embodiment also provides a three-phase zero-voltage ride-through reactive current calculation system based on voltage section extension, which includes interconnected microprocessors and memories, and the microprocessor is programmed or configured to perform the aforementioned voltage-based The steps of the three-phase zero-voltage ride-through reactive current calculation method for section extension. In addition, this embodiment also provides a computer-readable storage medium, which is stored in the computer-readable storage medium to be executed by a computer device to implement the aforementioned three-phase zero-voltage ride-through reactive current calculation method based on voltage segment extension Computer program.

本领域内的技术人员应明白,本申请的实施例可提供为方法、系统、或计算机程序产品。因此,本申请可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本申请可采用在一个或多个其中包含有计算机可用程序代码的计算机可读存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的计算机程序产品的形式。本申请是参照根据本申请实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。Those skilled in the art should understand that the embodiments of the present application may be provided as methods, systems, or computer program products. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) having computer-usable program code embodied therein. The present application is described with reference to flowcharts and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the present application. It should be understood that each procedure and/or block in the flowchart and/or block diagram, and a combination of procedures and/or blocks in the flowchart and/or block diagram can be realized by computer program instructions. These computer program instructions may be provided to a general purpose computer, special purpose computer, embedded processor, or processor of other programmable data processing equipment to produce a machine such that the instructions executed by the processor of the computer or other programmable data processing equipment produce a An apparatus for realizing the functions specified in one or more procedures of the flowchart and/or one or more blocks of the block diagram. These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing apparatus to operate in a specific manner, such that the instructions stored in the computer-readable memory produce an article of manufacture comprising instruction means, the instructions The device realizes the function specified in one or more procedures of the flowchart and/or one or more blocks of the block diagram. These computer program instructions can also be loaded onto a computer or other programmable data processing device, causing a series of operational steps to be performed on the computer or other programmable device to produce a computer-implemented process, thereby The instructions provide steps for implementing the functions specified in the flow chart or blocks of the flowchart and/or the block or blocks of the block diagrams.

以上所述仅是本发明的优选实施方式,本发明的保护范围并不仅局限于上述实施例,凡属于本发明思路下的技术方案均属于本发明的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理前提下的若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above descriptions are only preferred implementations of the present invention, and the scope of protection of the present invention is not limited to the above examples, and all technical solutions that fall under the idea of the present invention belong to the scope of protection of the present invention. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention should also be regarded as the protection scope of the present invention.

Claims (7)

1. The three-phase zero voltage ride through reactive current calculation method based on voltage section extension is characterized by comprising the following steps of:
1) Acquiring test data of a three-phase zero-voltage ride through test of an energy storage power station, wherein the test data of the three-phase zero-voltage ride through test comprises voltage data and current data;
2) Positioning a voltage drop section according to the test data, taking three-phase balanced voltage data with specified duration before the voltage drop section as a fitting data source, and performing function fitting according to the fitting data source to obtain a positive sequence voltage fitting function; positioning a current surge section according to the test data, taking current data of the current surge section as a fitting data source, and performing function fitting according to the fitting data source to obtain a positive sequence current fitting function; the step of performing function fitting according to the fitting data source to obtain a positive sequence voltage fitting function comprises the following steps: performing Fast Fourier Transform (FFT) on voltage data serving as a fitting data source to obtain dominant frequency, and performing function fitting on the mapping relation between time and voltage to obtain a positive sequence voltage fitting function; the step of performing function fitting according to the fitting data source to obtain a positive sequence current fitting function comprises the following steps: carrying out Fast Fourier Transform (FFT) on current data serving as a fitting data source to obtain dominant frequency, and carrying out function fitting on the mapping relation between time and current so as to obtain a positive sequence current fitting function;
3) And in the voltage drop section, projecting the fitted positive sequence current in the positive sequence current fitting function to the fitted positive sequence voltage in the positive sequence voltage fitting function to obtain the positive sequence reactive current.
2. The method for calculating three-phase zero voltage ride through reactive current based on voltage segment extension according to claim 1, further comprising the step of performing a three-phase zero voltage ride through test on the energy storage power station to obtain test data of the three-phase zero voltage ride through test before the step 1).
3. The three-phase zero voltage ride through reactive current calculation method based on voltage section extension according to claim 1, wherein the value range of the specified duration in step 2) is 0.5-1.5 s.
4. The voltage segment continuation-based three-phase zero voltage ride through reactive current calculation method of claim 3, wherein the value of the specified duration in step 2) is 1s.
5. The method for calculating the three-phase zero voltage crossing reactive current based on the voltage section extension according to claim 4, wherein after the fast fourier transform FFT is performed to obtain the dominant frequency of the fitting waveform, further comprising fitting to obtain the amplitude Amp, the frequency f and the initial phase phi of the fitting function.
6. A voltage segment continuation-based three-phase zero voltage ride through reactive current calculation system comprising a microprocessor and a memory connected to each other, characterized in that the microprocessor is programmed or configured to perform the steps of the voltage segment continuation-based three-phase zero voltage ride through reactive current calculation method of any one of claims 1 to 5.
7. A computer-readable storage medium, in which a computer program for execution by a computer device to implement the three-phase zero voltage ride through reactive current calculation method based on voltage segment continuation of any one of claims 1 to 5 is stored.
CN202111406078.XA 2021-11-24 2021-11-24 Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation Active CN114142477B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111406078.XA CN114142477B (en) 2021-11-24 2021-11-24 Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111406078.XA CN114142477B (en) 2021-11-24 2021-11-24 Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation

Publications (2)

Publication Number Publication Date
CN114142477A CN114142477A (en) 2022-03-04
CN114142477B true CN114142477B (en) 2023-08-15

Family

ID=80391316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111406078.XA Active CN114142477B (en) 2021-11-24 2021-11-24 Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation

Country Status (1)

Country Link
CN (1) CN114142477B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1914877A2 (en) * 2006-10-20 2008-04-23 General Electric Company Method and apparatus for operating electrical machines
CN103560523A (en) * 2013-11-18 2014-02-05 国家电网公司 Photovoltaic generator set low-voltage ride-through supporting system based on DVR
CN104101801A (en) * 2014-06-20 2014-10-15 国家电网公司 Photovoltaic solar one-stop grid-connected detection system
CN105717379A (en) * 2014-12-04 2016-06-29 国家电网公司 Method for testing fault ride-through of high-low voltage continuous process
CN106897514A (en) * 2017-02-21 2017-06-27 华北电力大学 A kind of method for building up of the calculation of short-circuit current model of total power changing type new energy station
CN109327031A (en) * 2018-09-30 2019-02-12 国网湖南省电力有限公司 Power coordinated control method and system for direct-drive wind power multi-machine system based on battery energy storage
CN109494755A (en) * 2019-01-09 2019-03-19 东北大学 A kind of virtual synchronous generator no-voltage passes through control system and control method
CN110672938A (en) * 2019-09-19 2020-01-10 南方电网科学研究院有限责任公司 Method and system for testing low voltage ride through characteristics of photovoltaic inverter and storage medium

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1914877A2 (en) * 2006-10-20 2008-04-23 General Electric Company Method and apparatus for operating electrical machines
CN103560523A (en) * 2013-11-18 2014-02-05 国家电网公司 Photovoltaic generator set low-voltage ride-through supporting system based on DVR
CN104101801A (en) * 2014-06-20 2014-10-15 国家电网公司 Photovoltaic solar one-stop grid-connected detection system
CN105717379A (en) * 2014-12-04 2016-06-29 国家电网公司 Method for testing fault ride-through of high-low voltage continuous process
CN106897514A (en) * 2017-02-21 2017-06-27 华北电力大学 A kind of method for building up of the calculation of short-circuit current model of total power changing type new energy station
CN109327031A (en) * 2018-09-30 2019-02-12 国网湖南省电力有限公司 Power coordinated control method and system for direct-drive wind power multi-machine system based on battery energy storage
CN109494755A (en) * 2019-01-09 2019-03-19 东北大学 A kind of virtual synchronous generator no-voltage passes through control system and control method
CN110672938A (en) * 2019-09-19 2020-01-10 南方电网科学研究院有限责任公司 Method and system for testing low voltage ride through characteristics of photovoltaic inverter and storage medium

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
光伏逆变器的低电压穿越特性分析与参数测试方法;葛路明等;《电力系统自动化》;第42卷(第18期);第149-156页 *

Also Published As

Publication number Publication date
CN114142477A (en) 2022-03-04

Similar Documents

Publication Publication Date Title
CN107132450B (en) A method for early fault identification of inter-turn short circuit in stator windings of offshore doubly-fed generators
CN103529418B (en) Synchronous phase measuring in power system device dynamic testing method and device
CN103176142B (en) A kind of photovoltaic electric station grid connection adaptive testing method
CN107797023B (en) Three-phase voltage unbalanced source location method, device and system
WO2015061227A1 (en) Performance analysis of power grid monitors
CN104215881A (en) Voltage sag source locating method based on sequence disturbing active current direction
CN117929888A (en) Full-network synchronization error testing method for power distribution automation terminal
CN104007408B (en) Method and device for on-line detection of dynamic performance of PMU
CN110346656B (en) A method and device for determining the three-phase voltage unbalance degree of a wind turbine
CN108896944A (en) A kind of synchronous measuring apparatus laboratory investment instrument and its synchronous phasor measuring method
CN114142477B (en) Three-phase zero voltage ride through reactive current calculation method and system based on voltage section prolongation
CN109342815B (en) Transformer substation harmonic source positioning method and system
CN104502877A (en) Automatic detection system and method of synchronous phasor measurement device
CN113848508B (en) A method for locating single-point grounding fault on the AC side of a battery energy storage system based on leakage current
Asprou et al. The use of a PMU-based state estimator for tracking power system dynamics
CN108982954B (en) Method and system for calculating phase voltage amplitude and phase suitable for feeder line terminal
CN108536116A (en) A kind of test method and system of governing system
CN118914918B (en) Methods, electronic equipment and media for detecting leakage current on the DC side of three-phase grid-connected inverters
CN114460359A (en) Method, device, equipment and storage medium for eliminating harmonic voltage measurement error of power grid
CN104267243A (en) Method and device for measuring parameters of inner potential and reactance of synchronous generator
CN118731495A (en) A method and device for online identification of power grid impedance
CN110348152A (en) A kind of wind power generating set test method based on Matlab/Simulink simulation model
CN108459219A (en) A kind of method and system for testing excitation system
Rafikov et al. Development of a Tool for Automated Verification of a Synchronous Generator Models Together with Turbine and Excitation System Using PMU Technology
CN117477592A (en) Method for inverting power grid actual measurement frequency signal into voltage signal based on sine fitting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant