CN103908009B - The adjustment of blade charging system feed liquid flow and verification method - Google Patents
The adjustment of blade charging system feed liquid flow and verification method Download PDFInfo
- Publication number
- CN103908009B CN103908009B CN201210594671.6A CN201210594671A CN103908009B CN 103908009 B CN103908009 B CN 103908009B CN 201210594671 A CN201210594671 A CN 201210594671A CN 103908009 B CN103908009 B CN 103908009B
- Authority
- CN
- China
- Prior art keywords
- flow
- valve
- feed liquid
- switch
- fluid path
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000007788 liquid Substances 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 41
- 238000012795 verification Methods 0.000 title claims description 10
- 239000012530 fluid Substances 0.000 claims abstract description 35
- 230000000694 effects Effects 0.000 abstract description 3
- 241000208125 Nicotiana Species 0.000 description 4
- 235000002637 Nicotiana tabacum Nutrition 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 235000019504 cigarettes Nutrition 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
- Measuring Volume Flow (AREA)
Abstract
The present invention discloses the feed liquid flow inflation method of a kind of blade charging system, comprises the steps: according to target flow Q0Size setting toothed gear pump electric machine frequency f0Then step () and step (two) is performed respectively: (one), open described first switch-valve, perform following described step S1-S42:(bis-when described first fluid path being adjusted), open described 2nd switch-valve, adopt and with the identical method that described first fluid path is adjusted, described 2nd fluid path adjusted. The useful effect of the present invention is: by regularly charging system being adjusted and verify after adopting this invention, stopped the shutdown that blade charging process causes because of feed liquid flow rate fluctuation.
Description
Technical field
The present invention relates to a kind of new blade charging system feed liquid flow adjustment of Primary processing shop charging process in production of cigarettes and verification method.
Background technology
Blade charging process belongs to the special procedure of fiber tow production, plays an important role to improving the aesthetic quality of tobacco leaf, igniting and sucking quality and physical property. Tobacco leaf is after this operation is processed, temperature and the water ratio of blade can be adjusted on the one hand further, to meet the requirement of chopping, on the other hand by by technical recipe requirement and usage ratio, feed liquid is applied on blade uniformly, improve the suction taste of tobacco leaf, ensure that reinforced precision and homogeneity are then the important leverages ensureing that this process goal realizes. During blade charging system is produced, adopting liquid-way system as shown in Figure 1, feed liquid is delivered to first jet 61 and the second nozzle 62 of two respectively by feed liquid from feed liquid pond 1 by toothed gear pump 2 as power by two pipelines through parallel connection after strainer 3, under meter 4. First jet 61 controls its break-make by the first switch-valve 71, adjusts its flow by the first variable valve 51; Second nozzle 62 controls its break-make by the 2nd switch-valve 72, adjusts its flow by the 2nd variable valve 52. Due to feed liquid character and the difference applying ratio, the running frequency of the motor 21 of toothed gear pump 2 is different, and corresponding change also can occur feed liquid flow. There is certain proportionlity in running frequency and the feed liquid flow of the motor 21 of toothed gear pump 2; and the running frequency of the motor 21 of toothed gear pump 2; should remaining on a suitable scope, if when electric machine frequency is less, reinforced process variation is big; easily cause reinforced exceeding standard; otherwise, if electric machine frequency is relatively big, feeds in raw material and easily reach peak value; feed liquid does not catch up with, and easily causes shutdown. The two all can cause unstable product quality, and quality product homogeneity is poor, and enterprise's competitiveness of product in market is brought disadvantageous effect. In addition, the blocking that the place such as pipeline, the first variable valve 51, the 2nd variable valve 52, first jet 61 and second nozzle 62 is possible also can cause the instability of feed liquid flow, it is necessary to carries out checking and regulating.
The control objectives of this feed liquid pipeline is exactly according to feed liquid character and the difference applying ratio, by adjusting the running frequency of motor 21, by feed liquid stability of flow near target value. According to Theoretical Calculation and experiment, when first jet 61 and second nozzle 62 are opened simultaneously, if wishing that feed liquid stability of flow is at Q0Time neighbouring, the running frequency of motor 21 should be set as f0. The running frequency keeping motor 21 is f0When constant, if total flux when opening first jet 61 and second nozzle 62 is Q simultaneously0, flow when only opening in first jet 61 and second nozzle 62 is respectively Q1And Q2, then there is following experimental formula Q0��(Q1+Q2) x0.7. Further, if at Q1=Q2When, there is Q0��1.4Q1Relation.
Summary of the invention
The present invention is directed to charging system feed liquid flow in tobacco industry blade charging process production process and apply the phenomenon of stability difference, it is proposed to a kind of blade charging system feed liquid flow adjustment and verification method.
In order to solve the problems of the technologies described above, the present invention provides the feed liquid flow inflation method of a kind of blade charging system, described charging system comprises first, second nozzle and is respectively first, second fluid path of the parallel connection of first, second nozzle feed described, described first fluid path is provided with the first switch-valve and the first variable valve, and described 2nd fluid path is provided with the 2nd switch-valve and the 2nd variable valve; Described feed liquid flow inflation method comprises the steps: according to target flow Q0Size setting toothed gear pump electric machine frequency f0, then perform step () and step (two) respectively:
(1), open described first switch-valve, when described first fluid path being adjusted, perform following described step S1-S42:
(2), open described 2nd switch-valve, adopt and with the identical method that described first fluid path is adjusted, described 2nd fluid path is adjusted;
Wherein, described step S1-S42 is:
S1: close the 2nd switch-valve when opening described first switch-valve, adjust the aperture of described first variable valve, check flow;
S2: the flow Q of described first fluid path1Whether about equal K*Q0, wherein, K is the coefficient relevant with feed liquid character with pipeline, if flow Q1About equal K*Q0, perform step S32, otherwise, perform step S31;
S31: adjust the aperture of described first variable valve and check flow, and then perform step S2;
S32: check whether flow is stablized, if it does, perform step S41; If not, then step S42 is performed;
S41: keep the aperture of described first variable valve constant, close described first switch-valve;
S42: shut down, clear up described first switch-valve, the first variable valve, first jet and pipeline, then performs step S1.
As preferably, first, second variable valve described is needle type valve.
Present invention also offers a kind of feed liquid flow verification method of blade charging system, comprise the steps: S100: adopt feed liquid flow inflation method as above to be adjusted by the flow of described first jet and second nozzle;
S200: open first, second switch-valve described, keeps the aperture of first, second variable valve described, observes flow;
S300: whether flow is target flow Q0If flow is not equal to Q0, perform S401; If flow equals Q0, perform step S402,
S401: the aperture of fine setting first, second variable valve described, and make it consistent;
S402: observe whether flow is stablized, if stability of flow, illustrative system is stablized, and carries out step S501, continues to run; If instability of flow, then carry out step S502;
S501: continue to run;
S502: adopt feed liquid flow inflation method as above to be readjusted by the flow of described first jet and the fluid path of second nozzle.
Compared with prior art; the useful effect of the present invention is: by regularly charging system being adjusted and verify after adopting this invention; having stopped the shutdown that blade charging process causes because of feed liquid flow rate fluctuation, the mean value of reinforced feed liquid flow standard deviation have dropped 52% before relatively adopting this invention.
Accompanying drawing explanation
Fig. 1 is the fluid path structural representation of the blade charging system that feed liquid flow adjusts and verification method is applied of the embodiment of the present invention.
Fig. 2 is the schema during feed liquid flow inflation method adjustment first jet flow of the embodiment of the present invention.
Fig. 3 is the schema of the feed liquid flow verification method of inventive embodiment.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail, but not as a limitation of the invention.
First stating, in the specification sheets and claim book of present patent application, " about equaling " such description occur, " about equaling " implication is the difference those skilled in the art of the two is acceptable limit of error, such as, and " flow Q1Whether about equal 0.71*Q0" such description, refer to flow Q1With 0.71*Q0Difference less, if its difference is Q01-3% between, according to reality require difference, this difference can also be relaxed to 5%, requires to be as the criterion to meet follow-up feed in a word, hereby illustrates.
Please refer to the feed liquid flow inflation method that the blade charging system of the present invention understood by the fluid path schematic diagram of the feed liquid of the blade charging system shown in Fig. 1, as shown in Figure 1, described blade charging system comprises first jet 61, second nozzle 62 and is respectively the first fluid path and the 2nd fluid path of the parallel connection of described first jet 61, second nozzle 62 feed, and described first fluid path and the 2nd fluid path are respectively equipped with the first switch-valve 71, the 2nd switch-valve 72 and the first variable valve 51, the 2nd variable valve 52. The toothed gear pump 2 that described first fluid path and the 2nd fluid path are driven by motor 21 provides power. As shown in Figure 2, described feed liquid flow inflation method comprises the steps:
Target flow Q when all opening according to first jet 61, second nozzle 620Size setting toothed gear pump electric machine frequency f0, its concrete numerical value can adjust according to reality. Such as, two pipelines being all in opened condition, when reinforced target flow is 175L/h, electric machine frequency is 30HZ simultaneously. Perform step () and step (two) respectively:
(1), open the first switch-valve 71, the first fluid path adjusted, perform following described step S1-S42:
(2), open the 2nd switch-valve 72, adopt and with the identical method that the first fluid path is adjusted, the 2nd fluid path is adjusted;
Wherein, step S1-S42 is:
S1: close the 2nd switch-valve 72, open the first switch-valve 71, adjust the aperture of the first variable valve 51, check flow;
S2: flow Q1Whether about equal K*Q0If, flow Q1About equal K*Q0Perform step S32, otherwise, performing step S31, obtain its flow by observing the reading of under meter 4, COEFFICIENT K wherein is according to summary of experience out, can according to the different in kind of pipeline and feed liquid medium, revising this coefficient, in the blade charging system that the present embodiment is applied, the value of K is taken as 0.71;
S31: adjust the aperture of the first variable valve 51 and check flow, and then perform step S2;
S32: check whether flow is stablized, if it does, perform step S41; If not, then step S42 is performed;
S41: keep the aperture of the first variable valve 51 constant, close the first switch-valve 71;
S42: shut down, clear up the first switch-valve 71, first variable valve 51, first jet 61 and pipeline, then performs step S1, then readjusts. The process 2nd fluid path adjusted is identical with the process the first fluid path adjusted, and does not repeat to describe. It is to be noted, in above-mentioned steps, " whether flow is stablized " refers in specific time, and whether flow is stablized, whether interval of its variation is within acceptable scope, and the numerical value of concrete acceptable flow variation is determined according to different need of productions. In the above-described embodiments, described first switch-valve 71, the 2nd switch-valve 72, first variable valve 51, the 2nd variable valve 52 are needle type valve, and it is good that needle type valve has stopping property, it may also be useful to the advantage of life-span length.
For the blade charging system the first fluid path and the 2nd fluid path adjusted respectively, also need to verify, with reference to Fig. 3, the present invention discloses a kind of feed liquid flow verification method of blade charging system, comprise the steps: S100: adopt feed liquid flow inflation method as above to be adjusted by the flow of first jet and second nozzle;
S200: open first, second switch-valve, keeps the aperture of first, second variable valve, observes flow, namely in Fig. 1, and the reading of under meter 4;
S300: whether flow is Q0If flow is not equal to Q0, perform S401; If flow equals Q0, perform step S402;
S401: the aperture finely tuning first, second variable valve, and make it consistent;
S402: observe whether flow is stablized, if stability of flow, illustrative system is stablized, then carrying out step S501, step S501 is: continue to run. If instability of flow, then need further adjustment, carry out step S502. Step S502 is: adopt feed liquid flow inflation method as above the fluid path of first jet 61 and second nozzle 62 to be readjusted.
By above-mentioned flow inflation method and verification method; by regularly charging system being adjusted and verifies; having stopped the shutdown that blade charging process causes because of feed liquid flow rate fluctuation, the mean value of reinforced feed liquid flow standard deviation, compared with this prior art, have dropped 52%.
Above embodiment is only the exemplary embodiment of the present invention, is not used in restriction the present invention, and protection scope of the present invention is defined by the claims. The present invention in the essence of the present invention and protection domain, can be made various amendment or equivalent replacement by those skilled in the art, and this kind of amendment or equivalent replacement also should be considered as dropping in protection scope of the present invention.
Claims (3)
1. the feed liquid flow inflation method of blade charging system, described charging system comprises first, second nozzle and is respectively first, second fluid path of the parallel connection of first, second nozzle feed described, described first fluid path is provided with the first switch-valve and the first variable valve, and described 2nd fluid path is provided with the 2nd switch-valve and the 2nd variable valve; It is characterized in that, described feed liquid flow inflation method comprises the steps:
According to target flow Q0Size setting toothed gear pump electric machine frequency f0, then perform step () and step (two) respectively:
(1), open described first switch-valve, when described first fluid path being adjusted, perform following described step S1-S42:
(2), open described 2nd switch-valve, adopt and with the identical method that described first fluid path is adjusted, described 2nd fluid path is adjusted;
Wherein, described step S1-S42 is:
S1: close the 2nd switch-valve when opening described first switch-valve, adjust the aperture of described first variable valve, check flow;
S2: the flow Q of described first fluid path1Whether about equal K*Q0, wherein, K is the coefficient relevant with feed liquid character with pipeline, if flow Q1About equal K*Q0, perform step S32, otherwise, perform step S31;
S31: adjust the aperture of described first variable valve and check flow, and then perform step S2;
S32: check whether flow is stablized, if it does, perform step S41; If not, then step S42 is performed;
S41: keep the aperture of described first variable valve constant, close described first switch-valve;
S42: shut down, clear up described first switch-valve, the first variable valve, first jet and pipeline, then performs step S1.
2. the feed liquid flow inflation method of blade charging system according to claim 1, it is characterised in that, first, second variable valve described is needle type valve.
3. the feed liquid flow verification method of blade charging system, it is characterised in that, comprise the steps: S100: adopt feed liquid flow inflation method as claimed in claim 1 to be adjusted by the flow of described first jet and second nozzle;
S200: open first, second switch-valve described, keeps the aperture of first, second variable valve described, observes flow;
S300: whether flow is target flow Q0If flow is not equal to Q0, perform S401; If flow equals Q0, perform step S402,
S401: the aperture of fine setting first, second variable valve described, and make it consistent;
S402: observe whether flow is stablized, if stability of flow, illustrative system is stablized, and carries out step S501, continues to run; If instability of flow, then carry out step S502;
S501: continue to run;
S502: adopt feed liquid flow inflation method as claimed in claim 1 to be readjusted by the flow of described first jet and the fluid path of second nozzle.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210594671.6A CN103908009B (en) | 2012-12-31 | 2012-12-31 | The adjustment of blade charging system feed liquid flow and verification method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210594671.6A CN103908009B (en) | 2012-12-31 | 2012-12-31 | The adjustment of blade charging system feed liquid flow and verification method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103908009A CN103908009A (en) | 2014-07-09 |
| CN103908009B true CN103908009B (en) | 2016-06-01 |
Family
ID=51034278
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210594671.6A Expired - Fee Related CN103908009B (en) | 2012-12-31 | 2012-12-31 | The adjustment of blade charging system feed liquid flow and verification method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103908009B (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4054145A (en) * | 1971-07-16 | 1977-10-18 | Hauni-Werke Korber & Co., Kg | Method and apparatus for conditioning tobacco |
| WO1994023597A1 (en) * | 1993-04-20 | 1994-10-27 | Comas - Costruzioni Macchine Speciali - S.P.A. | Process for flavouring shredded tobacco and apparatus for implementing the process |
| CN101551676A (en) * | 2008-03-31 | 2009-10-07 | 株式会社山武 | Flow control system |
| CN201820157U (en) * | 2009-07-24 | 2011-05-04 | 上海海事大学 | Mixed fluid temperature flow control device |
| CN102599632A (en) * | 2012-03-25 | 2012-07-25 | 红云红河烟草(集团)有限责任公司 | Method for compositely applying fragrant sugar materials |
| CN202525063U (en) * | 2012-05-07 | 2012-11-14 | 江苏中烟工业有限责任公司南京卷烟厂 | Diversified tobacco feeding system |
-
2012
- 2012-12-31 CN CN201210594671.6A patent/CN103908009B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4054145A (en) * | 1971-07-16 | 1977-10-18 | Hauni-Werke Korber & Co., Kg | Method and apparatus for conditioning tobacco |
| WO1994023597A1 (en) * | 1993-04-20 | 1994-10-27 | Comas - Costruzioni Macchine Speciali - S.P.A. | Process for flavouring shredded tobacco and apparatus for implementing the process |
| CN101551676A (en) * | 2008-03-31 | 2009-10-07 | 株式会社山武 | Flow control system |
| CN201820157U (en) * | 2009-07-24 | 2011-05-04 | 上海海事大学 | Mixed fluid temperature flow control device |
| CN102599632A (en) * | 2012-03-25 | 2012-07-25 | 红云红河烟草(集团)有限责任公司 | Method for compositely applying fragrant sugar materials |
| CN202525063U (en) * | 2012-05-07 | 2012-11-14 | 江苏中烟工业有限责任公司南京卷烟厂 | Diversified tobacco feeding system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103908009A (en) | 2014-07-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102403530B1 (en) | Method for stabilizing reaction chamber pressure | |
| TWI620831B (en) | Hybrid pulsing plasma processing methods | |
| WO2011137070A3 (en) | Methods and apparatus for reducing flow splitting errors using orifice ratio conductance control | |
| HK1257093A1 (en) | Adjusting insulin delivery rates | |
| US20090319071A1 (en) | Methods for controlling time scale of gas delivery into a processing chamber | |
| CN104190597A (en) | Quantitative gluing amount control device | |
| CN102147626A (en) | Feedforward temperature control method for cleaning liquid | |
| CN103908009B (en) | The adjustment of blade charging system feed liquid flow and verification method | |
| US10861675B2 (en) | Plasma processing apparatus and plasma processing method | |
| KR20140027202A (en) | Improved method of controlling lithium uniformity | |
| US11331684B2 (en) | Controlled material combination and delivery in ultra-variable advanced manufacturing systems | |
| KR101513910B1 (en) | Sputtering system for deposition rate control | |
| CN106918954A (en) | A kind of orientation membrane preparation method, display base plate and display panel | |
| CN103745902A (en) | PECVD processing device and method for carrying out PECVD processing on substrate | |
| DE102013109210A1 (en) | Evacuable chamber, in particular with a purge gas flushable loading sluice | |
| US10589233B2 (en) | Foam mixing system and methods | |
| CN102677024A (en) | Cavity pressure adjustment method and cavity pressure adjustment device | |
| CN203835687U (en) | Material buffer system | |
| CN109667973B (en) | High-precision flow valve control system | |
| CN104651796B (en) | The resistance adjustment method of ito thin film | |
| CN202778868U (en) | Coating flow control device | |
| EP2319707A1 (en) | Device for applying adhesive to the back of a book transported in a transport clamp of an adhesive binder device with a coating spray nozzle | |
| KR101652469B1 (en) | Method for multi-supplying gas and apparatus for multi-supplying gas | |
| EP1706803B1 (en) | Pressure control method | |
| CN105397613A (en) | Method for maintaining balance of grinding rate of grinding machine table |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160601 Termination date: 20161231 |