[go: up one dir, main page]

CN103835566A - 可扩展多回路进线门型杆塔 - Google Patents

可扩展多回路进线门型杆塔 Download PDF

Info

Publication number
CN103835566A
CN103835566A CN201410125855.7A CN201410125855A CN103835566A CN 103835566 A CN103835566 A CN 103835566A CN 201410125855 A CN201410125855 A CN 201410125855A CN 103835566 A CN103835566 A CN 103835566A
Authority
CN
China
Prior art keywords
cross
cross arm
tower
upper ends
ground wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410125855.7A
Other languages
English (en)
Other versions
CN103835566B (zh
Inventor
杨军永
李岩
孙斌
王玥
王珅
亓淑华
王洋
欧振峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Kaiyuan Electric Power Survey And Design Co ltd
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Laiwu Kaiyuan Electric Power Survey And Design Co ltd
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Kaiyuan Electric Power Survey And Design Co ltd, Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Laiwu Kaiyuan Electric Power Survey And Design Co ltd
Priority to CN201610191507.9A priority Critical patent/CN105781207B/zh
Priority to CN201410125855.7A priority patent/CN103835566B/zh
Publication of CN103835566A publication Critical patent/CN103835566A/zh
Application granted granted Critical
Publication of CN103835566B publication Critical patent/CN103835566B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了可扩展多回路进线门型杆塔,包括横担、杆身和地线支架,在横担上设有挂线板,其特征在于:所述的杆身平行、并等高的设有两根,在两根杆身的上端固定设有地线支架;所述的横担设有三根,分别通过相应的法兰盘固定连接在两根垂杆身上端之间和两根杆身的上端外侧,而且三根横担在一条直线上;在两侧的横担外端部设有再扩展法兰盘。该可扩展多回路进线门型杆塔,由于横担可根据需要扩展,所以能在不增设杆塔的情况下,通过横担扩展实现多回架空出线或进线,能够降低工程造价、便于施工、出线方式简化,而且安全,在同塔双回线路交叉跨越时,不需要额外加设杆塔。可广泛适用于变电站多回线路的进出线。

Description

可扩展多回路进线门型杆塔
技术领域
本发明涉及一种变电站电缆进出线杆塔的改进,具体地说是一种可扩展多回路进线门型杆塔。
背景技术
现阶段,国家基础设施电力建设,高压电网随着经济的发展,也迅猛发展起来。为缩小变电站占地面积及节省线路走廊,变电站大多采用电缆进出线;在城市内,要求电力线路在地下敷设,至变电站后再通过杆塔架空电力线路进入变电站。目前变电站外常用的杆塔大都为双回线路杆塔或单回线路杆塔,包括塔身和横担构成,横担架设在塔身上端的两侧,通过两侧的横担承载导线重量及满足电气距离要求。这种杆塔的不足在于:一是在变电站外侧无法兼顾多回架空出线或进线;二是杆塔布置较多,且一基杆塔架设完成后,无法进行扩展,若想再出线只能再新建一基杆塔,增加了工程投资,且造成了浪费。通过检索可知,目前尚未见在不增设杆塔的情况下,通过横担扩展实现多回架空出线或进线的杆塔的报道。
发明内容
本发明的目的在于提供一种在不增设杆塔的情况下,通过横担扩展实现多回架空出线或进线,降低工程造价、便于施工、出线方式简化,而且结构安全的可扩展多回路进线门型杆塔。
为了达到以上目的,本发明所采用的技术方案是:该可扩展多回路进线门型杆塔,包括横担、杆身和地线支架,在横担侧壁设有等距离排列的三个挂线板,其特征在于:所述的杆身平行、并等高的设有两根,在两根杆身的上端通过相对应的法兰盘固定上地线支架,使两根杆身和地线支架组成门形;所述的横担设有三根,分别通过相应的法兰盘固定连接在两根杆身上端之间和两根杆身的上端的外侧,而且三根横担在一条直线上,并与地线支架平行;在两侧的横担外端部设有再扩展法兰盘。
本发明还通过如下措施实施:所述的横担通过斜拉杆与杆身固定连接。
所述的横担与地线支架的距离为3-5m,横担的长度为6-9m,外直径为0.2—0.3m,其长度和线间距离可根据电压等级调整确定;所述的杆身的高度为13-17m,底端外直径为0.7—0.9 m,顶端外直径为0.4—0.5m, 可根据需要进行调整。
所述的杆身采用厚度为8mm的Q345B钢板绕制焊接而成,呈锥管状。
所述的横担和地线支架均采用厚度为8mm的Q345B钢板制成管状;地线支架的外直径为0.1—0.2m。
本发明的有益效果在于:该可扩展多回路进线门型杆塔,由于横担可根据需要扩展,所以能在不增设杆塔的情况下,通过横担扩展实现多回架空出线或进线,能够降低工程造价、便于施工、出线方式简化,而且结构安全,在同塔双回线路交叉跨越时,不需要额外增加杆塔和占用走廊。可广泛适用于变电站多回线路的进出线。
附图说明
图1为本发明的结构主视示意图。
图中:1、横担;2、杆身;3、地线支架;4、法兰盘;5、再扩展法兰盘;6、挂线板;7、斜拉杆。
具体实施方式
参照图1制作本发明。该可扩展多回路进线门型杆塔,包括横担1、杆身2和地线支架3,在横担1侧壁设有等距离排列的三个挂线板6,其特征在于:所述的杆身2平行、并等高的设有两根,在两根杆身2的上端通过相对应的法兰盘固定上地线支架3,使两根杆身2和地线支架3组成门形;所述的横担1设有三根,分别通过相应的法兰盘4固定连接在两根杆身2上端之间和两根杆身2的上端的外侧,而且三根横担1在一条直线上,并与地线支架3平行;在两侧的横担1外端部设有再扩展法兰盘5,通过再扩展法兰盘5可再向外扩展连接相同的杆身2和横担1,以满足多回架空出线或进线的扩展需求。
作为本发明的改进:所述的横担1的上壁通过斜拉杆7与杆身2固定连接,以提高横担1的承载力。
所述的横担1与地线支架3的距离为3-5m,横担1的长度为6-9m,外直径为0.2—0.3m,其长度和线间距离可根据电压等级调整确定;所述的杆身2的高度为13-17m,底端外直径为0.7—0.9 m,顶端外直径为0.4—0.5m, 可根据需要进行调整。
所述的杆身2采用厚度为8mm的Q345B钢板绕制焊接而成,呈锥管状,以便于安装及运输;同时,采用锥状钢管,所占地面积小,结构美观,能用于平地、市区等。
所述的横担1和地线支架3均采用厚度为8mm的Q345B钢板制成管状;地线支架3的外直径为0.1—0.2m。
使用本发明时时,将本发明组立于变电站出线侧,通过耐张连接,使变电站进出线统一、规划。

Claims (3)

1.可扩展多回路进线门型杆塔,包括横担(1)、杆身(2)和地线支架(3),在横担(1)侧壁设有等距离排列的三个挂线板(6),其特征在于:所述的杆身(2)平行、并等高的设有两根,在两根杆身(2)的上端通过相对应的法兰盘固定上地线支架(3);所述的横担(1)设有三根,分别通过相应的法兰盘(4)固定连接在两根杆身(2)上端之间和两根杆身(2)的上端的外侧,而且三根横担(1)在一条直线上,并与地线支架(3)平行;在两侧的横担(1)外端部设有再扩展法兰盘(5)。
2.根据权利要求1所述的可扩展多回路进线门型杆塔,其特征在于:所述的横担(1)通过斜拉杆(7)与杆身(2)固定连接。
3.根据权利要求1或2所述的可扩展多回路进线门型杆塔,其特征在于:所述的横担(1)与地线支架(3)的距离为3-5m,横担(1)的长度为6-9m,外直径为0.2——0.3m;所述的杆身(2)的高度为13-17m,底端外直径为0.7—0.9 m,顶端外直径为0.4—0.5m。
CN201410125855.7A 2014-04-01 2014-04-01 可扩展多回路进线门型杆塔 Active CN103835566B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610191507.9A CN105781207B (zh) 2014-04-01 2014-04-01 一种多回路进线门型杆塔
CN201410125855.7A CN103835566B (zh) 2014-04-01 2014-04-01 可扩展多回路进线门型杆塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410125855.7A CN103835566B (zh) 2014-04-01 2014-04-01 可扩展多回路进线门型杆塔

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201610191507.9A Division CN105781207B (zh) 2014-04-01 2014-04-01 一种多回路进线门型杆塔

Publications (2)

Publication Number Publication Date
CN103835566A true CN103835566A (zh) 2014-06-04
CN103835566B CN103835566B (zh) 2016-05-11

Family

ID=50799423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410125855.7A Active CN103835566B (zh) 2014-04-01 2014-04-01 可扩展多回路进线门型杆塔

Country Status (1)

Country Link
CN (1) CN103835566B (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003018731A (ja) * 2001-06-28 2003-01-17 Souki Kk 伸縮式電柱、ケーブル架設方法
CN201372598Y (zh) * 2009-03-17 2009-12-30 李云龙 一种钢筋混凝土结构的超高压线塔
CN202493068U (zh) * 2012-03-12 2012-10-17 昆明维峰电气技术开发有限公司 一种高压输电线架
CN202611306U (zh) * 2012-05-07 2012-12-19 云南电网公司昆明供电局 输电线路多功能组合式铝合金抢修塔
CN203113867U (zh) * 2013-02-01 2013-08-07 山东电力集团公司莱芜供电公司 直线电缆t接钢管杆塔
CN203352100U (zh) * 2013-05-15 2013-12-18 新疆电力设计院 输电线路防风拉线横担装置
CN203441149U (zh) * 2013-07-15 2014-02-19 中国能源建设集团安徽省电力设计院 一种双回路三角形直线钢管杆塔
CN203475926U (zh) * 2013-09-28 2014-03-12 成都星河科技产业有限公司 扩展型杆塔绝缘横担组合体
CN203846839U (zh) * 2014-04-01 2014-09-24 国家电网公司 可扩展多回路进线门型杆塔

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003018731A (ja) * 2001-06-28 2003-01-17 Souki Kk 伸縮式電柱、ケーブル架設方法
CN201372598Y (zh) * 2009-03-17 2009-12-30 李云龙 一种钢筋混凝土结构的超高压线塔
CN202493068U (zh) * 2012-03-12 2012-10-17 昆明维峰电气技术开发有限公司 一种高压输电线架
CN202611306U (zh) * 2012-05-07 2012-12-19 云南电网公司昆明供电局 输电线路多功能组合式铝合金抢修塔
CN203113867U (zh) * 2013-02-01 2013-08-07 山东电力集团公司莱芜供电公司 直线电缆t接钢管杆塔
CN203352100U (zh) * 2013-05-15 2013-12-18 新疆电力设计院 输电线路防风拉线横担装置
CN203441149U (zh) * 2013-07-15 2014-02-19 中国能源建设集团安徽省电力设计院 一种双回路三角形直线钢管杆塔
CN203475926U (zh) * 2013-09-28 2014-03-12 成都星河科技产业有限公司 扩展型杆塔绝缘横担组合体
CN203846839U (zh) * 2014-04-01 2014-09-24 国家电网公司 可扩展多回路进线门型杆塔

Also Published As

Publication number Publication date
CN103835566B (zh) 2016-05-11

Similar Documents

Publication Publication Date Title
CN203531485U (zh) 高压输电电缆终端杆
CN204386221U (zh) 一种用于220kV户外GIS变电站的三层联合式出线架构
CN203846839U (zh) 可扩展多回路进线门型杆塔
CN105064759B (zh) 一种gfrp管钢筋混凝土组合构件多回路输电杆
CN205172066U (zh) 一种模块式加电站
CN203846844U (zh) 双回线路同杆架设交叉换位杆塔
CN201574616U (zh) 35千伏四回路钢管杆
CN205153669U (zh) 一种无跨越架跨越架线的双回路转角塔
CN205089029U (zh) 多功能输电线路钢管杆
CN103835566B (zh) 可扩展多回路进线门型杆塔
CN105781207B (zh) 一种多回路进线门型杆塔
CN203891557U (zh) 紧凑型绝缘支架
CN204299268U (zh) 一种混压三回路钢管塔
CN203334758U (zh) π接异形钢管杆
CN206707383U (zh) 一种输电线路y型横担倒角双回钢管杆
CN210105440U (zh) 一种电杆加高装置
CN201927979U (zh) 66千伏架空多棱钢管杆
CN203312636U (zh) 一种220千伏户外gis双飞蜓出线布置结构
CN201605864U (zh) 输电线路用的窄基塔
CN203905578U (zh) 一种能够提高35kV线路高度的桁架梁
CN205502702U (zh) 一种750kV与330kV混压四回路直线塔
CN207194595U (zh) 一种复合绝缘材料的正三角形配电装置构架型式
CN204152289U (zh) 带避雷针的双层架构终端钢管杆塔
CN203924856U (zh) 一种1000kV/500kV耐张钢管塔
CN203707722U (zh) 变电站避雷装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant