[go: up one dir, main page]

CN103729404B - Budget data processing method and system - Google Patents

Budget data processing method and system Download PDF

Info

Publication number
CN103729404B
CN103729404B CN201310655927.4A CN201310655927A CN103729404B CN 103729404 B CN103729404 B CN 103729404B CN 201310655927 A CN201310655927 A CN 201310655927A CN 103729404 B CN103729404 B CN 103729404B
Authority
CN
China
Prior art keywords
budget
state
instruction
service data
cost service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310655927.4A
Other languages
Chinese (zh)
Other versions
CN103729404A (en
Inventor
欧阳勇华
杨桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kingdee Software China Co Ltd
Original Assignee
Kingdee Software China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kingdee Software China Co Ltd filed Critical Kingdee Software China Co Ltd
Priority to CN201310655927.4A priority Critical patent/CN103729404B/en
Publication of CN103729404A publication Critical patent/CN103729404A/en
Application granted granted Critical
Publication of CN103729404B publication Critical patent/CN103729404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of budget data processing method, methods described includes:The budget application for receiving corresponding upstream cost service data takes instruction;Taken and instructed according to the budget application, the state for generating corresponding assigned budget project records for the budget control of budget seizure condition, and the budget control record includes the occupancy amount of money that the Fee Amount according to corresponding to the upstream cost service data generates;The budget for receiving corresponding downstream cost service data takes completion instruction;Taken according to the budget and complete instruction, the state of the budget control record corresponding to the assigned budget project is changed into budget reduces state.Budget data processing method provided by the invention, reducing the budget control of state according to budget, record can accurately computation budget be actual reduces, budget balances that are occupied but not reducing actually can be calculated according to the budget control of budget seizure condition record, the budget data for calculating acquisition is accurate.Present invention also offers a kind of budgetary data processing system.

Description

Budget data processing method and system
Technical field
The present invention relates to field of computer technology, more particularly to a kind of budget data processing method and system.
Background technology
It is the important content that budget control is realized in budgetary control system that budget, which is reduced,.Budget, which is reduced, to be referred to budget The estimate for a project remaining sum is reduced, and wherein the budget balances of budget items subtract actual number equal to pre- count of budget items.In advance Count the budget program expense rating for referring to set in budget compilation, and actual number is the reality occurred in some budget items Border expense, actual number can be accordingly updated when producing expense, therefore as the increase of actual number, budget balances are then accordingly continuous Reduce.
Realize that budget is reduced in conventional art, budget balances are directly reduced, however it is upper for existing in expense The upstream and downstream document of downstream relationship is carried out in the business scenario that budget is reduced, if directly being entered according to the document expense of upstream and downstream document Row budget is reduced inaccurate when can cause to handle budget data.It is such as single borrowing money(Upstream document)In applied for an expense, Budget is now carried out to reduce, but actually now this expense has not been used, and in expenses claim sheer(Downstream document)Middle reimbursement The expense just represents that the expense has occurred and that, that is this expense is being reduced before actually occurring from budget balances , because budget data processing is inaccurate, have impact on the accuracy that the control system that passes budgets carries out budget control.
The content of the invention
Based on this, it is necessary to buckled for carrying out budget according to the document expense of upstream and downstream cost service data in conventional art Subtracting causes to handle the inaccurate technical problem of budget data, there is provided a kind of budget data processing method and system.
A kind of budget data processing method, methods described include:
The budget application for receiving corresponding upstream cost service data takes instruction;
Taken and instructed according to the budget application, the state for generating corresponding assigned budget project is the pre- of budget seizure condition Control record is calculated, the budget control record accounts for including what the Fee Amount according to corresponding to the upstream cost service data generated Use the amount of money;
The budget for receiving corresponding downstream cost service data takes completion instruction;
Taken according to the budget and complete instruction, by the shape of the budget control record corresponding to the assigned budget project State is changed to budget and reduces state.
A kind of budgetary data processing system, the system include command reception module, application take command process module and Take and complete command process module;
The budget application that the command reception module is used to receive corresponding upstream cost service data takes instruction;
The application takes command process module and is used to take instruction according to the budget application, generates corresponding assigned budget The state of project records for the budget control of budget seizure condition, and the budget control record is included according to the upstream expense industry The occupancy amount of money of Fee Amount generation corresponding to data of being engaged in;
The budget that the command reception module is additionally operable to receive corresponding downstream cost service data takes completion instruction;
Described take completes command process module for taking completion instruction according to the budget, by the assigned budget item The state of the budget control record is changed to budget and reduces state corresponding to mesh.
Above-mentioned budget data processing method and system, the budget application occupancy for first receiving corresponding upstream cost service data refer to Order, recorded so as to take instruction generation state according to this application for the budget control of budget seizure condition;Then receive under corresponding to The budget for swimming cost service data takes completion instruction, is changed according to the state that occupancy completion instruction records the budget control State is reduced for budget, so as to finally realize that budget is reduced.According to state be budget reduce the budget control record of state can be with The budget balances actually reduced accurately are calculated, can be calculated according to the budget control record that state is budget seizure condition occupied But the budget balances do not reduced actually also, the budget data for calculating acquisition are accurate.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of budget data processing method in one embodiment;
Fig. 2 is to be taken to complete instruction according to budget in one embodiment, and budget control corresponding to assigned budget project is remembered The state of record is changed to the schematic flow sheet for the step of state is reduced in budget;
Fig. 3 is the schematic flow sheet that the budget data processing method is applied in a concrete application scene;
Fig. 4 is the structured flowchart of budgetary data processing system in one embodiment.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
It is appreciated that term " first " used in the present invention, " second " etc. can be used to describe various elements herein, But these elements should not be limited by these terms.These terms are only used for distinguishing first element and another element.Do not taking off In the case of from the scope of the present invention, " first " can exchange with " second ".
The description of specific distinct unless the context otherwise, the present invention in element and component, quantity both can be with single shape Formula is present, and form that can also be multiple is present, and the present invention is defined not to this.Although the step in the present invention is entered with label Arrangement is gone, but is not used to limit the precedence of step, unless expressly stated the order of step or holding for certain step Based on row needs other steps, otherwise the relative rank of step is adjustable.It is it is appreciated that used herein Term "and/or" is related to and covers one of associated Listed Items or one or more of any and all possible group Close.
As shown in figure 1, in one embodiment, there is provided a kind of budget data processing method, this method include:
Step 102, the budget application for receiving corresponding upstream cost service data takes instruction.
Cost service data refer to the business datum for carrying cost information, such as digitized single, expenses claim sheer of borrowing money Or refund single etc..Upstream cost service data and downstream cost service data refer to mutual cost information exist correlation and its The cost service data with sequencing occur, upstream cost service data occur prior to downstream cost service data.Such as Loaning bill has singly applied for an expense, and the loaning bill list is upstream cost service data, submits an expense account expense report when this takes expense and is then Downstream cost service data.
Terminal can correspond to upstream cost service data and show multiple buttons, and user, which clicks on wherein to correspond to budget application and take, to be referred to The button of order, instruction is taken so as to trigger budget application.Instruction type corresponding to the predeterminable upstream cost service data of terminal Take and instruct for budget application, so as to which when the upstream cost service data enter next service link, triggering budget application accounts for With instruction.Terminal receives the budget application and takes instruction.
Step 104, taken and instructed according to budget application, the state for generating corresponding assigned budget project is budget seizure condition Budget control record, budget control record include according to corresponding to the cost service data of upstream Fee Amount generate occupancy gold Volume.
After terminal receives budget application occupancy instruction, example corresponding to instruction acquisition can be taken according to the budget application, For example definition to the processing mode of data, terminal can be according to the budget items mark in the case-based system upstream cost service data Know, the budget items are identified to determine assigned budget project, so as to generate corresponding assigned budget the estimate for a project control record. The budget control of terminal generation records the change for computation budget remaining sum.
Budget control record has a status attribute, state be budget seizure condition represent the budget control record occupy it is pre- A part of amount of money in remaining sum is calculated, but the partial amount, also without determining to be fallen by use, a part of amount of money is remembered with budget control The included occupancy amount of money of record represents.Budget control record in the occupancy amount of money according to corresponding to the cost service data of upstream expense The amount of money generates, Fee Amount corresponding to the cost service data of upstream can according to the document that the upstream cost service data include or The amount of money in authority determines.Budget control record can also include record identification, the terminal storage upstream cost service data with The corresponding relation of record identification, terminal can control note according to corresponding to corresponding relation inquiry obtains the upstream cost service data Record.
Step 106, the budget for receiving corresponding downstream cost service data takes completion instruction.
The cost information of downstream cost service data is related to the cost information of upstream cost service data, downstream expense industry The generation of business data depends on upstream cost service data.Terminal can correspond to downstream cost service data and show multiple buttons, use Family is clicked on and wherein corresponds to the button that budget takes completion instruction, and instruction is completed so as to trigger budget occupancy.Terminal is predeterminable under this It is that budget takes completion instruction to swim instruction type corresponding to cost service data, under entering in the downstream cost service data During one service link, triggering budget, which takes, completes instruction.Budget, which takes, to be completed the corresponding budget application of instruction and takes instruction, for will According to budget application take instruction from budget balances application take the occupancy amount of money be converted to actually reduce reduce the amount of money.Eventually End receives the budget and takes completion instruction.
Step 108, taken according to budget and complete instruction, the state that budget control corresponding to assigned budget project is recorded is more It is changed to budget and reduces state.
Terminal can prestore the corresponding relation of upstream cost service data and downstream cost service data, so as to locate Inquiry obtains budget control record corresponding to the cost service data of upstream when managing downstream cost service data.Or it can take in upstream After with business data processing, the record identification that budget control records is passed into downstream cost service data, so that Terminal can record in budget control when swimming cost service data under treatment according to corresponding to obtaining the record identification.
, can be by changing budget control after budget shared in the processing of upstream cost service data is determined use The state of record is reduced state for budget and reduced so as to complete budget.It is the budget control record that state is reduced in budget by state Actual number can be calculated, situation is actually reduced so as to accurate computation budget remaining sum.
Above-mentioned budget data processing method, the budget application for first receiving corresponding upstream cost service data take instruction, from And instruction generation state is taken according to this application and recorded for the budget control of budget seizure condition;Then corresponding downstream expense is received The budget of business datum, which takes, completes instruction, and complete instruction according to the occupancy is changed to budget by the state that the budget control records State is reduced, so as to realize that budget is reduced.Reality can accurately be calculated by reducing the budget control record of state for budget according to state The budget balances that border is reduced, it can be calculated according to the budget control record that state is budget seizure condition occupied but also unactual The budget balances reduced, the budget data for calculating acquisition are accurate.
As shown in Fig. 2 in one embodiment, step 108 includes:
Step 202, taken according to budget and complete instruction, judge Fee Amount corresponding to the cost service data of downstream with taking Whether the amount of money is equal, if then turning to step 204, such as otherwise turns to step 206.
The Fee Amount that downstream cost service data actually occur may expense gold corresponding with upstream cost service data Volume is not consistent, may be more than Fee Amount corresponding to the cost service data of upstream or few, now needs terminal to judge downstream expense Whether the occupancy amount of money during Fee Amount corresponding to business datum records with budget control is equal, so as to be made according to judged result Different processing.
Step 204, the state that budget control corresponding to assigned budget project records is changed to budget and reduces state.
If terminal judges that Fee Amount corresponding to the cost service data of downstream is equal with taking the amount of money, need not now change The occupancy amount of money in budget control record, directly the state that budget control corresponding to assigned budget project records can be changed to pre- State is reduced in calculation, is completed budget and is reduced.
Step 206, Fee Amount modification takes the amount of money according to corresponding to the cost service data of downstream, and by assigned budget item The state that budget control corresponding to mesh records is changed to budget and reduces state.
If terminal judges that Fee Amount corresponding to the cost service data of downstream is unequal with taking the amount of money, now terminal needs The occupancy amount of money in budget control record is changed, the state for then again recording budget control corresponding to assigned budget project is changed State is reduced for budget, budget is completed and reduces.
In the present embodiment, by judging whether Fee Amount corresponding to the cost service data of downstream is equal with taking the amount of money, So as to make different processing according to judged result so that the processing that data are reduced to budget is more accurate and efficient.
In one embodiment, the budget data processing method also includes step 11)~step 12):
Step 11), the budget of the corresponding cost service data of reception, which is reduced, applies for instruction.
The cost service data can be upstream cost service data or downstream cost service data or not have The cost service data of upstream-downstream relationship.
Step 12), application instruction is reduced according to budget, generates including according to cost service number for corresponding assigned budget project According to the state of the amount of money of reducing that generates of Fee Amount reduce for budget the budget control of state and record.
Terminal generates corresponding assigned budget the estimate for a project control record after receiving budget and reducing application instruction, should Control record includes reducing the amount of money, represents the equal amount of money of the value directly reduced from budget balances with reduce the amount of money.The button Subtract the amount of money to be generated according to the Fee Amount of cost service data.The state of budget control record reduces state for budget, represents It is the Fee Amount actually occurred to reduce the amount of money corresponding to budget control record.It is understood that terminal generation state is The budget control record of budget seizure condition, then the state that budget control is recorded are changed to budget and reduce record, with directly life It is the budget control record that state is reduced in budget into state, is equivalent when calculating actual number, budget balances.
In the present embodiment, by step 11)~step 12), it is that the pre- of state is reduced in budget that terminal, which can directly generate state, Control record is calculated, so as to reduce business scene suitable for various budgets, is improved using the pre- of the budget data processing method Calculate the compatibility of control system.
In one embodiment, the budget data processing method also includes step 21)~step 22):
Step 21), receive the budget return instruction of corresponding cost service data.
The cost service data can be upstream cost service data or downstream cost service data or not have The cost service data of upstream-downstream relationship.
Step 22), returned and instructed according to budget, generate including according to cost service data for corresponding assigned budget project The state of the return amount of money of Fee Amount generation records for the budget control of budget return state.
Terminal generates corresponding assigned budget the estimate for a project control record after receiving budget and returning instruction.The control Record includes returning the amount of money, and the return amount of money generates according to the Fee Amount of cost service data.The shape of budget control record State is that state is reduced in budget, represents that the budget control is recorded for increasing by one equal with the value for returning the amount of money in budget balances Partial amount.
In the present embodiment, by step 21)~step 22), terminal can return to instruct according to the budget received generates shape State records for the budget control of budget return state, so as to correct budget balances using budget control record, ensures budget Reduce the accuracy of data processing.
In one embodiment, the budget data processing method also includes:Workflow interfacing is provided, workflow interfacing is used for The instruction of budget application occupancy is received by workflow interfacing and budget takes and completes to instruct, and sends and is made according to the instruction of reception Response instruction.
Workflow(Workflow)Refer to automation of a part or whole part of business procedure under computer application environment, lead to The workflow interfacing of terminal offer is crossed, terminal can receive the instruction of budget application occupancy and budget takes and completes to instruct, and can also connect Receive budget and reduce application instruction and budget return instruction, terminal can also send the instruction according to reception by the workflow interfacing The response instruction made.
In the present embodiment, by providing workflow interfacing, can easily and flexibly by workflow interfacing configuration work stream, It is quick to carry out secondary development, so as to reduce development cost.
Illustrate the principle of above-mentioned budget data processing method with a concrete application scene below.As shown in figure 3, terminal Receive and instruct, decision instruction type is that budget application takes instruction, budget takes completion instruction, application instruction or pre- is reduced in budget Calculate and return instruction, so as to the example according to corresponding to different instruction type acquisitions, so as to be operated accordingly according to the example. When the budget application that terminal receives corresponding upstream cost service data takes instruction, the shape of corresponding assigned budget project is generated State records for the budget control of budget seizure condition, and budget control record includes the expense according to corresponding to the cost service data of upstream The occupancy amount of money of amount of money generation;When the budget that terminal receives corresponding downstream cost service data takes completion instruction, will refer to Determine the state that budget control corresponding to budget items records and be changed to budget to reduce state, reduced so as to complete budget.Terminal is also Application instruction is reduced in the budget that corresponding cost service data can be received, so as to which generate corresponding assigned budget project includes basis The state for reducing the amount of money of the Fee Amount generation of cost service data reduces the budget control record of state for budget, completes pre- Reduce.Instruction is returned in the budget that terminal can also receive corresponding cost service data, so as to generate corresponding assigned budget project Include according to the Fee Amount of cost service data generate return the amount of money state be budget return state budget control Record, completes the amendment to budget balances.
As shown in figure 4, in one embodiment, there is provided a kind of budgetary data processing system, including command reception mould Block 402, application, which take command process module 404 and taken, completes command process module 406.
The budget application that command reception module 402 is used to receive corresponding upstream cost service data takes instruction.
Application takes command process module 404 and is used to take instruction according to budget application, generates corresponding assigned budget project State for budget seizure condition budget control record, budget control record include according to corresponding to the cost service data of upstream The occupancy amount of money of Fee Amount generation.
The budget that command reception module 402 is additionally operable to receive corresponding downstream cost service data takes completion instruction.
Take and complete command process module 406 for taking completion instruction according to budget, by corresponding to assigned budget project The state of budget control record is changed to budget and reduces state.
In one embodiment, taking completion command process module 406 includes judge module 406a, first state change mould Block 406b and the second state change module 406c.
Judge module 406a, which is used to be taken according to budget, completes instruction, judges expense gold corresponding to the cost service data of downstream Whether volume is equal with taking the amount of money.
If first state change module 406b is used for Fee Amount corresponding to the cost service data of downstream with taking amount of money phase Deng being then changed to budget by the state that budget control corresponding to assigned budget project records and reduce state.
If the second state change module 406c is used for Fee Amount corresponding to the cost service data of downstream with taking the amount of money not Equal, then Fee Amount modification takes the amount of money according to corresponding to the cost service data of downstream, and by corresponding to assigned budget project The state of budget control record is changed to budget and reduces state.
In one embodiment, command reception module 402 is additionally operable to receive the budgets of corresponding cost service data and reduces Shen It please instruct.
The budgetary data processing system also includes reducing application command process module 408, for reducing application according to budget Instruction, generate the state for reducing the amount of money for including generating according to the Fee Amount of cost service data of corresponding assigned budget project The budget control record of state is reduced for budget.
In one embodiment, command reception module 402 is additionally operable to receive the budget for corresponding to cost service data and return to refer to Order.
The budgetary data processing system also includes budget and returns command process module 410, is instructed for being returned according to budget, The state of the return amount of money for including being generated according to the Fee Amount of cost service data of the corresponding assigned budget project of generation is pre- Calculate the budget control record of return state.
In one embodiment, command reception module 402 also provides for workflow interfacing, and workflow interfacing is used to pass through Workflow interfacing receives the instruction of budget application occupancy and budget takes and completes to instruct, and sends the sound made according to the instruction of reception It should instruct.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of budget data processing method, methods described include:
The budget application for receiving corresponding upstream cost service data takes instruction, and the cost service data are carrying cost informations Business datum;
Taken and instructed according to the budget application, the state for generating corresponding assigned budget project is the budget control of budget seizure condition System record, the budget control record include the occupancy gold that the Fee Amount according to corresponding to the upstream cost service data generates Volume, the amount of money that takes is the amount of money that is being taken from budget balances but not reduced from the budget balances;
The budget for receiving corresponding downstream cost service data takes completion instruction;
Taken according to the budget and complete instruction, judge Fee Amount corresponding to the downstream cost service data and the occupancy Whether the amount of money is equal, if so, the state of the budget control record corresponding to the assigned budget project then is changed into budget Reduce state;If it is not, then the Fee Amount according to corresponding to the downstream cost service data changes the occupancy amount of money, and by institute The state for stating budget control record corresponding to assigned budget project is changed to budget and reduces state.
2. according to the method for claim 1, it is characterised in that methods described also includes:
Application instruction is reduced in the budget for receiving corresponding cost service data;
Application instruction is reduced according to the budget, the corresponding assigned budget project of generation is included according to the cost service number According to the state of the amount of money of reducing that generates of Fee Amount reduce for budget the budget control of state and record.
3. according to the method for claim 1, it is characterised in that methods described also includes:
Instruction is returned in the budget for receiving corresponding cost service data;
Returned and instructed according to the budget, the corresponding assigned budget project of generation is included according to the cost service data The state of the return amount of money of Fee Amount generation records for the budget control of budget return state.
4. according to the method for claim 1, it is characterised in that methods described also includes:
Workflow interfacing is provided, the workflow interfacing is used to receive the budget application by the workflow interfacing and take to refer to Order and the budget, which take, completes instruction, and sends the response made according to the instruction of the reception and instruct.
5. a kind of budgetary data processing system, it is characterised in that the system includes command reception module, application is taken at instruction Manage module, judge module, first state change module and the second state change module;
The budget application that the command reception module is used to receive corresponding upstream cost service data takes instruction, the expense industry Business data are to carry the business datum of cost information;
The application takes command process module and is used to take instruction according to the budget application, generates corresponding assigned budget project State recorded for the budget control of budget seizure condition, budget control record is included according to the upstream cost service number According to corresponding Fee Amount generate the occupancy amount of money, it is described take the amount of money be taken from budget balances but not from described pre- Calculate the amount of money reduced in remaining sum;
The budget that the command reception module is additionally operable to receive corresponding downstream cost service data takes completion instruction;
The judge module, instruction is completed for being taken according to the budget, is judged corresponding to the downstream cost service data Whether Fee Amount and the occupancy amount of money are equal;
The first state changes module, if taking gold with described for Fee Amount corresponding to the downstream cost service data Volume is equal, then the state of the budget control record corresponding to the assigned budget project is changed into budget reduces state;
Second state change module, if taking gold with described for Fee Amount corresponding to the downstream cost service data Volume is unequal, then the Fee Amount according to corresponding to the downstream cost service data changes the occupancy amount of money, and by the finger The state for determining budget control record corresponding to budget items is changed to budget and reduces state.
6. system according to claim 5, it is characterised in that the command reception module is additionally operable to receive the corresponding expense Application instruction is reduced with the budget of business datum;
The system also reduces application command process module including budget, for reducing application instruction, generation according to the budget The state for reducing the amount of money for including being generated according to the Fee Amount of the cost service data of the corresponding assigned budget project The budget control record of state is reduced for budget.
7. system according to claim 5, it is characterised in that the command reception module is additionally operable to receive corresponding expense industry Instruction is returned in the budget for data of being engaged in;
The system also returns command process module including budget, is instructed for being returned according to the budget, generates described in corresponding to The state of the return amount of money for including being generated according to the Fee Amount of the cost service data of assigned budget project is returned for budget The also budget control record of state.
8. system according to claim 5, it is characterised in that the command reception module also provides for workflow and connect Mouthful, the workflow interfacing is used to receive the budget application occupancy instruction by the workflow interfacing and the budget takes Instruction is completed, and sends the response made according to the instruction of the reception and instructs.
CN201310655927.4A 2013-12-05 2013-12-05 Budget data processing method and system Active CN103729404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310655927.4A CN103729404B (en) 2013-12-05 2013-12-05 Budget data processing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310655927.4A CN103729404B (en) 2013-12-05 2013-12-05 Budget data processing method and system

Publications (2)

Publication Number Publication Date
CN103729404A CN103729404A (en) 2014-04-16
CN103729404B true CN103729404B (en) 2018-01-12

Family

ID=50453478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310655927.4A Active CN103729404B (en) 2013-12-05 2013-12-05 Budget data processing method and system

Country Status (1)

Country Link
CN (1) CN103729404B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107644291A (en) * 2017-09-08 2018-01-30 新智云数据服务有限公司 Budget information management-control method and device
CN109614388B (en) * 2018-11-14 2023-07-14 创新先进技术有限公司 A budget deduction method and device
CN111582829A (en) * 2020-05-11 2020-08-25 携程商旅信息服务(上海)有限公司 Budget data updating processing method, system, electronic device and storage medium
CN112990871A (en) * 2021-03-16 2021-06-18 金蝶软件(中国)有限公司 Document processing method and related equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101374056A (en) * 2007-08-23 2009-02-25 华为技术有限公司 A method and system for opening billing and accounting data capabilities
CN102270226A (en) * 2011-06-28 2011-12-07 用友软件股份有限公司 Budget data summarization system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090112691A1 (en) * 2007-10-30 2009-04-30 Yahoo! Inc. System and method for scheduling online keyword auctions over multiple time periods subject to budget and query volume constraints
CN101251913A (en) * 2008-04-10 2008-08-27 华为技术有限公司 Self-service reimbursement management system and method
US20090326988A1 (en) * 2008-06-26 2009-12-31 Robert Barth Managing consistent interfaces for business objects across heterogeneous systems
CN101694707A (en) * 2009-11-09 2010-04-14 金蝶软件(中国)有限公司 Method and device for budget control
CN102567824A (en) * 2010-12-10 2012-07-11 金蝶软件(中国)有限公司 Budget control method, device and system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101374056A (en) * 2007-08-23 2009-02-25 华为技术有限公司 A method and system for opening billing and accounting data capabilities
CN102270226A (en) * 2011-06-28 2011-12-07 用友软件股份有限公司 Budget data summarization system

Also Published As

Publication number Publication date
CN103729404A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN103729404B (en) Budget data processing method and system
JP6680902B2 (en) Settlement processing method, settlement processing device, terminal device and storage medium
CN110060139B (en) Accounting processing method and device
US20220284429A1 (en) System, method, and recording medium having recorded thereon a program
CN111178623A (en) A method for predicting the remaining time of business processes based on multi-layer machine learning
JPWO2010010654A1 (en) Usage estimation device
CN113869602A (en) Method and system for predicting demand of spare parts of nuclear power plant, computer equipment and storage medium
CN103189857A (en) Performing what-if analysis
CN108694603A (en) A kind of method and apparatus of advertisement price
CN110213071A (en) Verification of data method, apparatus, system, computer equipment and storage medium
CN107038607A (en) A kind of pricing method and system
CN115357629A (en) Processing method, system, electronic device and storage medium for financial data stream
CN111291936B (en) Product life cycle prediction model generation method and device and electronic equipment
HK1220791A1 (en) Calculating a probability of a business being delinquent
US7904481B1 (en) Workforce management system
JP4973738B2 (en) Business flow processing program, method and apparatus
CN103679355A (en) Method and device for controlling operation flow
CN109658082A (en) A kind of recognition methods and equipment of charging exception
CN103955854B (en) A kind of account management device and method
Buell et al. Transaction level economics of cloud applications
CN110348983A (en) Transaction Information management method and device, electronic equipment and non-transient storage media
CN109741047A (en) Charging system on a kind of line
CN110148044A (en) A kind of buffer threshold setting method and device for book keeping operation
US20060175393A1 (en) Analysis technique of computer system
CN107092599A (en) A kind of method and apparatus for being used to provide the user knowledge information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant