Budget data processing method and system Download PDFInfo
- Publication number
- CN103729404B CN103729404B CN201310655927.4A CN201310655927A CN103729404B CN 103729404 B CN103729404 B CN 103729404B CN 201310655927 A CN201310655927 A CN 201310655927A CN 103729404 B CN103729404 B CN 103729404B
- Authority
- CN
- China
- Prior art keywords
- budget
- state
- instruction
- service data
- cost service
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of budget data processing method, methods described includes:The budget application for receiving corresponding upstream cost service data takes instruction;Taken and instructed according to the budget application, the state for generating corresponding assigned budget project records for the budget control of budget seizure condition, and the budget control record includes the occupancy amount of money that the Fee Amount according to corresponding to the upstream cost service data generates;The budget for receiving corresponding downstream cost service data takes completion instruction;Taken according to the budget and complete instruction, the state of the budget control record corresponding to the assigned budget project is changed into budget reduces state.Budget data processing method provided by the invention, reducing the budget control of state according to budget, record can accurately computation budget be actual reduces, budget balances that are occupied but not reducing actually can be calculated according to the budget control of budget seizure condition record, the budget data for calculating acquisition is accurate.Present invention also offers a kind of budgetary data processing system.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of budget data processing method and system.
Background technology
It is the important content that budget control is realized in budgetary control system that budget, which is reduced,.Budget, which is reduced, to be referred to budget
The estimate for a project remaining sum is reduced, and wherein the budget balances of budget items subtract actual number equal to pre- count of budget items.In advance
Count the budget program expense rating for referring to set in budget compilation, and actual number is the reality occurred in some budget items
Border expense, actual number can be accordingly updated when producing expense, therefore as the increase of actual number, budget balances are then accordingly continuous
Reduce.
Realize that budget is reduced in conventional art, budget balances are directly reduced, however it is upper for existing in expense
The upstream and downstream document of downstream relationship is carried out in the business scenario that budget is reduced, if directly being entered according to the document expense of upstream and downstream document
Row budget is reduced inaccurate when can cause to handle budget data.It is such as single borrowing money(Upstream document)In applied for an expense,
Budget is now carried out to reduce, but actually now this expense has not been used, and in expenses claim sheer(Downstream document)Middle reimbursement
The expense just represents that the expense has occurred and that, that is this expense is being reduced before actually occurring from budget balances
, because budget data processing is inaccurate, have impact on the accuracy that the control system that passes budgets carries out budget control.
The content of the invention
Based on this, it is necessary to buckled for carrying out budget according to the document expense of upstream and downstream cost service data in conventional art
Subtracting causes to handle the inaccurate technical problem of budget data, there is provided a kind of budget data processing method and system.
A kind of budget data processing method, methods described include:
The budget application for receiving corresponding upstream cost service data takes instruction;
Taken and instructed according to the budget application, the state for generating corresponding assigned budget project is the pre- of budget seizure condition
Control record is calculated, the budget control record accounts for including what the Fee Amount according to corresponding to the upstream cost service data generated
Use the amount of money;
The budget for receiving corresponding downstream cost service data takes completion instruction;
Taken according to the budget and complete instruction, by the shape of the budget control record corresponding to the assigned budget project
State is changed to budget and reduces state.
A kind of budgetary data processing system, the system include command reception module, application take command process module and
Take and complete command process module;
The budget application that the command reception module is used to receive corresponding upstream cost service data takes instruction;
The application takes command process module and is used to take instruction according to the budget application, generates corresponding assigned budget
The state of project records for the budget control of budget seizure condition, and the budget control record is included according to the upstream expense industry
The occupancy amount of money of Fee Amount generation corresponding to data of being engaged in;
The budget that the command reception module is additionally operable to receive corresponding downstream cost service data takes completion instruction;
Described take completes command process module for taking completion instruction according to the budget, by the assigned budget item
The state of the budget control record is changed to budget and reduces state corresponding to mesh.
Above-mentioned budget data processing method and system, the budget application occupancy for first receiving corresponding upstream cost service data refer to
Order, recorded so as to take instruction generation state according to this application for the budget control of budget seizure condition;Then receive under corresponding to
The budget for swimming cost service data takes completion instruction, is changed according to the state that occupancy completion instruction records the budget control
State is reduced for budget, so as to finally realize that budget is reduced.According to state be budget reduce the budget control record of state can be with
The budget balances actually reduced accurately are calculated, can be calculated according to the budget control record that state is budget seizure condition occupied
But the budget balances do not reduced actually also, the budget data for calculating acquisition are accurate.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of budget data processing method in one embodiment;
Fig. 2 is to be taken to complete instruction according to budget in one embodiment, and budget control corresponding to assigned budget project is remembered
The state of record is changed to the schematic flow sheet for the step of state is reduced in budget;
Fig. 3 is the schematic flow sheet that the budget data processing method is applied in a concrete application scene;
Fig. 4 is the structured flowchart of budgetary data processing system in one embodiment.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
It is appreciated that term " first " used in the present invention, " second " etc. can be used to describe various elements herein,
But these elements should not be limited by these terms.These terms are only used for distinguishing first element and another element.Do not taking off
In the case of from the scope of the present invention, " first " can exchange with " second ".
The description of specific distinct unless the context otherwise, the present invention in element and component, quantity both can be with single shape
Formula is present, and form that can also be multiple is present, and the present invention is defined not to this.Although the step in the present invention is entered with label
Arrangement is gone, but is not used to limit the precedence of step, unless expressly stated the order of step or holding for certain step
Based on row needs other steps, otherwise the relative rank of step is adjustable.It is it is appreciated that used herein
Term "and/or" is related to and covers one of associated Listed Items or one or more of any and all possible group
Close.
As shown in figure 1, in one embodiment, there is provided a kind of budget data processing method, this method include:
Step 102, the budget application for receiving corresponding upstream cost service data takes instruction.
Cost service data refer to the business datum for carrying cost information, such as digitized single, expenses claim sheer of borrowing money
Or refund single etc..Upstream cost service data and downstream cost service data refer to mutual cost information exist correlation and its
The cost service data with sequencing occur, upstream cost service data occur prior to downstream cost service data.Such as
Loaning bill has singly applied for an expense, and the loaning bill list is upstream cost service data, submits an expense account expense report when this takes expense and is then
Downstream cost service data.
Terminal can correspond to upstream cost service data and show multiple buttons, and user, which clicks on wherein to correspond to budget application and take, to be referred to
The button of order, instruction is taken so as to trigger budget application.Instruction type corresponding to the predeterminable upstream cost service data of terminal
Take and instruct for budget application, so as to which when the upstream cost service data enter next service link, triggering budget application accounts for
With instruction.Terminal receives the budget application and takes instruction.
Step 104, taken and instructed according to budget application, the state for generating corresponding assigned budget project is budget seizure condition
Budget control record, budget control record include according to corresponding to the cost service data of upstream Fee Amount generate occupancy gold
Volume.
After terminal receives budget application occupancy instruction, example corresponding to instruction acquisition can be taken according to the budget application,
For example definition to the processing mode of data, terminal can be according to the budget items mark in the case-based system upstream cost service data
Know, the budget items are identified to determine assigned budget project, so as to generate corresponding assigned budget the estimate for a project control record.
The budget control of terminal generation records the change for computation budget remaining sum.
Budget control record has a status attribute, state be budget seizure condition represent the budget control record occupy it is pre-
A part of amount of money in remaining sum is calculated, but the partial amount, also without determining to be fallen by use, a part of amount of money is remembered with budget control
The included occupancy amount of money of record represents.Budget control record in the occupancy amount of money according to corresponding to the cost service data of upstream expense
The amount of money generates, Fee Amount corresponding to the cost service data of upstream can according to the document that the upstream cost service data include or
The amount of money in authority determines.Budget control record can also include record identification, the terminal storage upstream cost service data with
The corresponding relation of record identification, terminal can control note according to corresponding to corresponding relation inquiry obtains the upstream cost service data
Record.
Step 106, the budget for receiving corresponding downstream cost service data takes completion instruction.
The cost information of downstream cost service data is related to the cost information of upstream cost service data, downstream expense industry
The generation of business data depends on upstream cost service data.Terminal can correspond to downstream cost service data and show multiple buttons, use
Family is clicked on and wherein corresponds to the button that budget takes completion instruction, and instruction is completed so as to trigger budget occupancy.Terminal is predeterminable under this
It is that budget takes completion instruction to swim instruction type corresponding to cost service data, under entering in the downstream cost service data
During one service link, triggering budget, which takes, completes instruction.Budget, which takes, to be completed the corresponding budget application of instruction and takes instruction, for will
According to budget application take instruction from budget balances application take the occupancy amount of money be converted to actually reduce reduce the amount of money.Eventually
End receives the budget and takes completion instruction.
Step 108, taken according to budget and complete instruction, the state that budget control corresponding to assigned budget project is recorded is more
It is changed to budget and reduces state.
Terminal can prestore the corresponding relation of upstream cost service data and downstream cost service data, so as to locate
Inquiry obtains budget control record corresponding to the cost service data of upstream when managing downstream cost service data.Or it can take in upstream
After with business data processing, the record identification that budget control records is passed into downstream cost service data, so that
Terminal can record in budget control when swimming cost service data under treatment according to corresponding to obtaining the record identification.
, can be by changing budget control after budget shared in the processing of upstream cost service data is determined use
The state of record is reduced state for budget and reduced so as to complete budget.It is the budget control record that state is reduced in budget by state
Actual number can be calculated, situation is actually reduced so as to accurate computation budget remaining sum.
Above-mentioned budget data processing method, the budget application for first receiving corresponding upstream cost service data take instruction, from
And instruction generation state is taken according to this application and recorded for the budget control of budget seizure condition;Then corresponding downstream expense is received
The budget of business datum, which takes, completes instruction, and complete instruction according to the occupancy is changed to budget by the state that the budget control records
State is reduced, so as to realize that budget is reduced.Reality can accurately be calculated by reducing the budget control record of state for budget according to state
The budget balances that border is reduced, it can be calculated according to the budget control record that state is budget seizure condition occupied but also unactual
The budget balances reduced, the budget data for calculating acquisition are accurate.
As shown in Fig. 2 in one embodiment, step 108 includes:
Step 202, taken according to budget and complete instruction, judge Fee Amount corresponding to the cost service data of downstream with taking
Whether the amount of money is equal, if then turning to step 204, such as otherwise turns to step 206.
The Fee Amount that downstream cost service data actually occur may expense gold corresponding with upstream cost service data
Volume is not consistent, may be more than Fee Amount corresponding to the cost service data of upstream or few, now needs terminal to judge downstream expense
Whether the occupancy amount of money during Fee Amount corresponding to business datum records with budget control is equal, so as to be made according to judged result
Different processing.
Step 204, the state that budget control corresponding to assigned budget project records is changed to budget and reduces state.
If terminal judges that Fee Amount corresponding to the cost service data of downstream is equal with taking the amount of money, need not now change
The occupancy amount of money in budget control record, directly the state that budget control corresponding to assigned budget project records can be changed to pre-
State is reduced in calculation, is completed budget and is reduced.
Step 206, Fee Amount modification takes the amount of money according to corresponding to the cost service data of downstream, and by assigned budget item
The state that budget control corresponding to mesh records is changed to budget and reduces state.
If terminal judges that Fee Amount corresponding to the cost service data of downstream is unequal with taking the amount of money, now terminal needs
The occupancy amount of money in budget control record is changed, the state for then again recording budget control corresponding to assigned budget project is changed
State is reduced for budget, budget is completed and reduces.
In the present embodiment, by judging whether Fee Amount corresponding to the cost service data of downstream is equal with taking the amount of money,
So as to make different processing according to judged result so that the processing that data are reduced to budget is more accurate and efficient.
In one embodiment, the budget data processing method also includes step 11)~step 12):
Step 11), the budget of the corresponding cost service data of reception, which is reduced, applies for instruction.
The cost service data can be upstream cost service data or downstream cost service data or not have
The cost service data of upstream-downstream relationship.
Step 12), application instruction is reduced according to budget, generates including according to cost service number for corresponding assigned budget project
According to the state of the amount of money of reducing that generates of Fee Amount reduce for budget the budget control of state and record.
Terminal generates corresponding assigned budget the estimate for a project control record after receiving budget and reducing application instruction, should
Control record includes reducing the amount of money, represents the equal amount of money of the value directly reduced from budget balances with reduce the amount of money.The button
Subtract the amount of money to be generated according to the Fee Amount of cost service data.The state of budget control record reduces state for budget, represents
It is the Fee Amount actually occurred to reduce the amount of money corresponding to budget control record.It is understood that terminal generation state is
The budget control record of budget seizure condition, then the state that budget control is recorded are changed to budget and reduce record, with directly life
It is the budget control record that state is reduced in budget into state, is equivalent when calculating actual number, budget balances.
In the present embodiment, by step 11)~step 12), it is that the pre- of state is reduced in budget that terminal, which can directly generate state,
Control record is calculated, so as to reduce business scene suitable for various budgets, is improved using the pre- of the budget data processing method
Calculate the compatibility of control system.
In one embodiment, the budget data processing method also includes step 21)~step 22):
Step 21), receive the budget return instruction of corresponding cost service data.
The cost service data can be upstream cost service data or downstream cost service data or not have
The cost service data of upstream-downstream relationship.
Step 22), returned and instructed according to budget, generate including according to cost service data for corresponding assigned budget project
The state of the return amount of money of Fee Amount generation records for the budget control of budget return state.
Terminal generates corresponding assigned budget the estimate for a project control record after receiving budget and returning instruction.The control
Record includes returning the amount of money, and the return amount of money generates according to the Fee Amount of cost service data.The shape of budget control record
State is that state is reduced in budget, represents that the budget control is recorded for increasing by one equal with the value for returning the amount of money in budget balances
Partial amount.
In the present embodiment, by step 21)~step 22), terminal can return to instruct according to the budget received generates shape
State records for the budget control of budget return state, so as to correct budget balances using budget control record, ensures budget
Reduce the accuracy of data processing.
In one embodiment, the budget data processing method also includes:Workflow interfacing is provided, workflow interfacing is used for
The instruction of budget application occupancy is received by workflow interfacing and budget takes and completes to instruct, and sends and is made according to the instruction of reception
Response instruction.
Workflow(Workflow)Refer to automation of a part or whole part of business procedure under computer application environment, lead to
The workflow interfacing of terminal offer is crossed, terminal can receive the instruction of budget application occupancy and budget takes and completes to instruct, and can also connect
Receive budget and reduce application instruction and budget return instruction, terminal can also send the instruction according to reception by the workflow interfacing
The response instruction made.
In the present embodiment, by providing workflow interfacing, can easily and flexibly by workflow interfacing configuration work stream,
It is quick to carry out secondary development, so as to reduce development cost.
Illustrate the principle of above-mentioned budget data processing method with a concrete application scene below.As shown in figure 3, terminal
Receive and instruct, decision instruction type is that budget application takes instruction, budget takes completion instruction, application instruction or pre- is reduced in budget
Calculate and return instruction, so as to the example according to corresponding to different instruction type acquisitions, so as to be operated accordingly according to the example.
When the budget application that terminal receives corresponding upstream cost service data takes instruction, the shape of corresponding assigned budget project is generated
State records for the budget control of budget seizure condition, and budget control record includes the expense according to corresponding to the cost service data of upstream
The occupancy amount of money of amount of money generation;When the budget that terminal receives corresponding downstream cost service data takes completion instruction, will refer to
Determine the state that budget control corresponding to budget items records and be changed to budget to reduce state, reduced so as to complete budget.Terminal is also
Application instruction is reduced in the budget that corresponding cost service data can be received, so as to which generate corresponding assigned budget project includes basis
The state for reducing the amount of money of the Fee Amount generation of cost service data reduces the budget control record of state for budget, completes pre-
Reduce.Instruction is returned in the budget that terminal can also receive corresponding cost service data, so as to generate corresponding assigned budget project
Include according to the Fee Amount of cost service data generate return the amount of money state be budget return state budget control
Record, completes the amendment to budget balances.
As shown in figure 4, in one embodiment, there is provided a kind of budgetary data processing system, including command reception mould
Block 402, application, which take command process module 404 and taken, completes command process module 406.
The budget application that command reception module 402 is used to receive corresponding upstream cost service data takes instruction.
Application takes command process module 404 and is used to take instruction according to budget application, generates corresponding assigned budget project
State for budget seizure condition budget control record, budget control record include according to corresponding to the cost service data of upstream
The occupancy amount of money of Fee Amount generation.
The budget that command reception module 402 is additionally operable to receive corresponding downstream cost service data takes completion instruction.
Take and complete command process module 406 for taking completion instruction according to budget, by corresponding to assigned budget project
The state of budget control record is changed to budget and reduces state.
In one embodiment, taking completion command process module 406 includes judge module 406a, first state change mould
Block 406b and the second state change module 406c.
Judge module 406a, which is used to be taken according to budget, completes instruction, judges expense gold corresponding to the cost service data of downstream
Whether volume is equal with taking the amount of money.
If first state change module 406b is used for Fee Amount corresponding to the cost service data of downstream with taking amount of money phase
Deng being then changed to budget by the state that budget control corresponding to assigned budget project records and reduce state.
If the second state change module 406c is used for Fee Amount corresponding to the cost service data of downstream with taking the amount of money not
Equal, then Fee Amount modification takes the amount of money according to corresponding to the cost service data of downstream, and by corresponding to assigned budget project
The state of budget control record is changed to budget and reduces state.
In one embodiment, command reception module 402 is additionally operable to receive the budgets of corresponding cost service data and reduces Shen
It please instruct.
The budgetary data processing system also includes reducing application command process module 408, for reducing application according to budget
Instruction, generate the state for reducing the amount of money for including generating according to the Fee Amount of cost service data of corresponding assigned budget project
The budget control record of state is reduced for budget.
In one embodiment, command reception module 402 is additionally operable to receive the budget for corresponding to cost service data and return to refer to
Order.
The budgetary data processing system also includes budget and returns command process module 410, is instructed for being returned according to budget,
The state of the return amount of money for including being generated according to the Fee Amount of cost service data of the corresponding assigned budget project of generation is pre-
Calculate the budget control record of return state.
In one embodiment, command reception module 402 also provides for workflow interfacing, and workflow interfacing is used to pass through
Workflow interfacing receives the instruction of budget application occupancy and budget takes and completes to instruct, and sends the sound made according to the instruction of reception
It should instruct.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of budget data processing method, methods described include:
The budget application for receiving corresponding upstream cost service data takes instruction, and the cost service data are carrying cost informations
Business datum;
Taken and instructed according to the budget application, the state for generating corresponding assigned budget project is the budget control of budget seizure condition
System record, the budget control record include the occupancy gold that the Fee Amount according to corresponding to the upstream cost service data generates
Volume, the amount of money that takes is the amount of money that is being taken from budget balances but not reduced from the budget balances;
The budget for receiving corresponding downstream cost service data takes completion instruction;
Taken according to the budget and complete instruction, judge Fee Amount corresponding to the downstream cost service data and the occupancy
Whether the amount of money is equal, if so, the state of the budget control record corresponding to the assigned budget project then is changed into budget
Reduce state;If it is not, then the Fee Amount according to corresponding to the downstream cost service data changes the occupancy amount of money, and by institute
The state for stating budget control record corresponding to assigned budget project is changed to budget and reduces state.
2. according to the method for claim 1, it is characterised in that methods described also includes:
Application instruction is reduced in the budget for receiving corresponding cost service data;
Application instruction is reduced according to the budget, the corresponding assigned budget project of generation is included according to the cost service number
According to the state of the amount of money of reducing that generates of Fee Amount reduce for budget the budget control of state and record.
3. according to the method for claim 1, it is characterised in that methods described also includes:
Instruction is returned in the budget for receiving corresponding cost service data;
Returned and instructed according to the budget, the corresponding assigned budget project of generation is included according to the cost service data
The state of the return amount of money of Fee Amount generation records for the budget control of budget return state.
4. according to the method for claim 1, it is characterised in that methods described also includes:
Workflow interfacing is provided, the workflow interfacing is used to receive the budget application by the workflow interfacing and take to refer to
Order and the budget, which take, completes instruction, and sends the response made according to the instruction of the reception and instruct.
5. a kind of budgetary data processing system, it is characterised in that the system includes command reception module, application is taken at instruction
Manage module, judge module, first state change module and the second state change module;
The budget application that the command reception module is used to receive corresponding upstream cost service data takes instruction, the expense industry
Business data are to carry the business datum of cost information;
The application takes command process module and is used to take instruction according to the budget application, generates corresponding assigned budget project
State recorded for the budget control of budget seizure condition, budget control record is included according to the upstream cost service number
According to corresponding Fee Amount generate the occupancy amount of money, it is described take the amount of money be taken from budget balances but not from described pre-
Calculate the amount of money reduced in remaining sum;
The budget that the command reception module is additionally operable to receive corresponding downstream cost service data takes completion instruction;
The judge module, instruction is completed for being taken according to the budget, is judged corresponding to the downstream cost service data
Whether Fee Amount and the occupancy amount of money are equal;
The first state changes module, if taking gold with described for Fee Amount corresponding to the downstream cost service data
Volume is equal, then the state of the budget control record corresponding to the assigned budget project is changed into budget reduces state;
Second state change module, if taking gold with described for Fee Amount corresponding to the downstream cost service data
Volume is unequal, then the Fee Amount according to corresponding to the downstream cost service data changes the occupancy amount of money, and by the finger
The state for determining budget control record corresponding to budget items is changed to budget and reduces state.
6. system according to claim 5, it is characterised in that the command reception module is additionally operable to receive the corresponding expense
Application instruction is reduced with the budget of business datum;
The system also reduces application command process module including budget, for reducing application instruction, generation according to the budget
The state for reducing the amount of money for including being generated according to the Fee Amount of the cost service data of the corresponding assigned budget project
The budget control record of state is reduced for budget.
7. system according to claim 5, it is characterised in that the command reception module is additionally operable to receive corresponding expense industry
Instruction is returned in the budget for data of being engaged in;
The system also returns command process module including budget, is instructed for being returned according to the budget, generates described in corresponding to
The state of the return amount of money for including being generated according to the Fee Amount of the cost service data of assigned budget project is returned for budget
The also budget control record of state.
8. system according to claim 5, it is characterised in that the command reception module also provides for workflow and connect
Mouthful, the workflow interfacing is used to receive the budget application occupancy instruction by the workflow interfacing and the budget takes
Instruction is completed, and sends the response made according to the instruction of the reception and instructs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310655927.4A CN103729404B (en) | 2013-12-05 | 2013-12-05 | Budget data processing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310655927.4A CN103729404B (en) | 2013-12-05 | 2013-12-05 | Budget data processing method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103729404A CN103729404A (en) | 2014-04-16 |
CN103729404B true CN103729404B (en) | 2018-01-12 |
Family
ID=50453478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310655927.4A Active CN103729404B (en) | 2013-12-05 | 2013-12-05 | Budget data processing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103729404B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107644291A (en) * | 2017-09-08 | 2018-01-30 | 新智云数据服务有限公司 | Budget information management-control method and device |
CN109614388B (en) * | 2018-11-14 | 2023-07-14 | 创新先进技术有限公司 | A budget deduction method and device |
CN111582829A (en) * | 2020-05-11 | 2020-08-25 | 携程商旅信息服务(上海)有限公司 | Budget data updating processing method, system, electronic device and storage medium |
CN112990871A (en) * | 2021-03-16 | 2021-06-18 | 金蝶软件(中国)有限公司 | Document processing method and related equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101374056A (en) * | 2007-08-23 | 2009-02-25 | 华为技术有限公司 | A method and system for opening billing and accounting data capabilities |
CN102270226A (en) * | 2011-06-28 | 2011-12-07 | 用友软件股份有限公司 | Budget data summarization system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090112691A1 (en) * | 2007-10-30 | 2009-04-30 | Yahoo! Inc. | System and method for scheduling online keyword auctions over multiple time periods subject to budget and query volume constraints |
CN101251913A (en) * | 2008-04-10 | 2008-08-27 | 华为技术有限公司 | Self-service reimbursement management system and method |
US20090326988A1 (en) * | 2008-06-26 | 2009-12-31 | Robert Barth | Managing consistent interfaces for business objects across heterogeneous systems |
CN101694707A (en) * | 2009-11-09 | 2010-04-14 | 金蝶软件(中国)有限公司 | Method and device for budget control |
CN102567824A (en) * | 2010-12-10 | 2012-07-11 | 金蝶软件(中国)有限公司 | Budget control method, device and system |
-
2013
- 2013-12-05 CN CN201310655927.4A patent/CN103729404B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101374056A (en) * | 2007-08-23 | 2009-02-25 | 华为技术有限公司 | A method and system for opening billing and accounting data capabilities |
CN102270226A (en) * | 2011-06-28 | 2011-12-07 | 用友软件股份有限公司 | Budget data summarization system |
Also Published As
Publication number | Publication date |
---|---|
CN103729404A (en) | 2014-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103729404B (en) | Budget data processing method and system | |
JP6680902B2 (en) | Settlement processing method, settlement processing device, terminal device and storage medium | |
CN110060139B (en) | Accounting processing method and device | |
US20220284429A1 (en) | System, method, and recording medium having recorded thereon a program | |
CN111178623A (en) | A method for predicting the remaining time of business processes based on multi-layer machine learning | |
JPWO2010010654A1 (en) | Usage estimation device | |
CN113869602A (en) | Method and system for predicting demand of spare parts of nuclear power plant, computer equipment and storage medium | |
CN103189857A (en) | Performing what-if analysis | |
CN108694603A (en) | A kind of method and apparatus of advertisement price | |
CN110213071A (en) | Verification of data method, apparatus, system, computer equipment and storage medium | |
CN107038607A (en) | A kind of pricing method and system | |
CN115357629A (en) | Processing method, system, electronic device and storage medium for financial data stream | |
CN111291936B (en) | Product life cycle prediction model generation method and device and electronic equipment | |
HK1220791A1 (en) | Calculating a probability of a business being delinquent | |
US7904481B1 (en) | Workforce management system | |
JP4973738B2 (en) | Business flow processing program, method and apparatus | |
CN103679355A (en) | Method and device for controlling operation flow | |
CN109658082A (en) | A kind of recognition methods and equipment of charging exception | |
CN103955854B (en) | A kind of account management device and method | |
Buell et al. | Transaction level economics of cloud applications | |
CN110348983A (en) | Transaction Information management method and device, electronic equipment and non-transient storage media | |
CN109741047A (en) | Charging system on a kind of line | |
CN110148044A (en) | A kind of buffer threshold setting method and device for book keeping operation | |
US20060175393A1 (en) | Analysis technique of computer system | |
CN107092599A (en) | A kind of method and apparatus for being used to provide the user knowledge information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |