CN103388469B - filling tool - Google Patents
filling tool Download PDFInfo
- Publication number
- CN103388469B CN103388469B CN201310325547.4A CN201310325547A CN103388469B CN 103388469 B CN103388469 B CN 103388469B CN 201310325547 A CN201310325547 A CN 201310325547A CN 103388469 B CN103388469 B CN 103388469B
- Authority
- CN
- China
- Prior art keywords
- unicom
- pipe
- outer tube
- joint
- piston
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joints Allowing Movement (AREA)
Abstract
Description
技术领域technical field
本发明是油田地层防砂用的井下工具,是一种充填工具。The invention is a downhole tool used for sand control in oilfield formations, and is a filling tool.
背景技术Background technique
在油井防砂中,有化学防砂和机械防砂两种类型,向井筒内充填特制的砂粒,靠这种特制的砂粒阻挡油层里的砂子进入井内的方法就是一种机械防砂。这种机械防砂需要防砂充填工具,现有的防砂充填工具结构不合理,充填成功率低,作业工序多,作业时间长,费用高。如专利号200420096658.9防砂充填工具,丢手短节5与悬挂接头6靠液压实现脱离,当液压脱离不可靠时,丢手短节5与悬挂接头6无法脱离,工具不能丢手,防砂工作就会失败,发生重大工程事故,需要对油井进行大修作业才能将其捞出后重新进行防砂,增加作业工序,大大增加作业费用,油井防砂时间延长,产油量减少,油井经济效益下降。There are two types of sand control in oil wells: chemical sand control and mechanical sand control. Filling the wellbore with special sand particles, and relying on this special sand particles to prevent sand in the oil layer from entering the well is a kind of mechanical sand control. This kind of mechanical sand control requires sand control filling tools. The existing sand control filling tools have unreasonable structure, low filling success rate, many operation procedures, long operation time and high cost. For example, in the patent No. 200420096658.9 sand control filling tool, the drop-off sub joint 5 and the suspension joint 6 are separated by hydraulic pressure. When the hydraulic pressure is unreliable, the drop-out sub joint 5 and the suspension joint 6 cannot be separated, and the tool cannot be lost, and the sand control work will fail. In the event of a major engineering accident, it is necessary to overhaul the oil well to remove it and then perform sand control again. This will increase the operating procedures and greatly increase the operating costs. The sand control time of the oil well will be prolonged, the oil production will decrease, and the economic benefits of the oil well will decline.
发明内容Contents of the invention
本发明的目的是设计一种充填工具,留井部分与提出部分通过旋转油管实现脱离,提高工具可靠性,增加油井防砂成功率,减少作业工序,缩短作业时间,节省作业费用。The purpose of the present invention is to design a filling tool, the well-staying part and the lifting part are separated by rotating the oil pipe, improving tool reliability, increasing the success rate of oil well sand control, reducing operating procedures, shortening operating time, and saving operating costs.
本发明的目的是这样实现的:包括上接头、活塞、液缸、丢手接头、打捞接头、座封销钉、单向锁环、外管、内管、解封销钉、锁环座管、锥体、胶筒、锚定总成、联通外管、卡环、销钉、关闭套、拉断销钉、球罩、堵球、滤砂管接头、冲管接头、投球、滑套、联通内管,上接头下部的内螺纹与丢手接头的上部连接,上接头下部的外螺纹与液缸的上部连接,液缸与丢手接头之间安装活塞,活塞处于丢手接头上部的联通孔之下,丢手接头下部的左旋外螺纹与外管的上部的左旋内螺纹连接,活塞内安装打捞接头,打捞接头座在外管上,活塞由座封销钉连接在打捞接头上,活塞的下部与锁环座管的上部连接,锁环座管内部安装单向锁环,打捞接头由解封销钉连接在外管上,锁环座管的下部与锥体连接,锥体外套装胶筒,胶筒套装在锚定总成的上部,锚定总成悬挂在锥体上,丢手接头的下部内螺纹与内管的上部连接,内管上有联通槽,滑套从内管的内部覆盖内管上的联通槽,滑套由销钉连接在内管上,投球座在滑套的上端口上,内管外套装关闭套,关闭套由拉断销钉连接在内管上,联通内管套装在关闭套外,关闭套的上部安装卡环,联通外管套装在联通内管外,联通外管的上部与锚定总成的下部连接,联通外管的下部与滤砂管接头连接,内管的下部与球罩的上部连接,球罩的下部与冲管接头连接,堵球座在冲管接头的内孔上,活塞上有洗井通孔,外管与内管之间有环空,联通外管与联通内管之间有竖向流道,球罩上有通槽,洗井通孔、环空、竖向流道、通槽相通,联通外管有过砂槽,内管上的联通槽通过关闭套、联通内管上的联通槽与联通外管上的过砂槽相通。The purpose of the present invention is achieved in this way: including the upper joint, piston, liquid cylinder, hand-drop joint, salvage joint, seat seal pin, one-way lock ring, outer tube, inner tube, unsealing pin, lock ring seat tube, cone Body, rubber cartridge, anchoring assembly, Unicom outer tube, snap ring, pin, closing sleeve, pull-off pin, ball cover, blocking ball, filter sand pipe joint, flushing pipe joint, pitching ball, sliding sleeve, Unicom inner tube, The inner thread at the lower part of the upper joint is connected with the upper part of the hand-off joint, the outer thread at the lower part of the upper joint is connected with the upper part of the hydraulic cylinder, and a piston is installed between the liquid cylinder and the hand-away joint, and the piston is under the communication hole at the upper part of the hand-away joint. The left-handed external thread on the lower part of the drop-off joint is connected with the left-handed internal thread on the upper part of the outer pipe. A fishing joint is installed inside the piston. The fishing joint is seated on the outer pipe. The piston is connected to the fishing joint by a seat seal pin. The upper part of the tube is connected, and a one-way lock ring is installed inside the lock ring seat tube. The salvage joint is connected to the outer tube by an unsealing pin, and the lower part of the lock ring seat tube is connected to the cone. The upper part of the assembly, the anchor assembly is suspended on the cone, the lower internal thread of the drop joint is connected with the upper part of the inner pipe, there is a communication groove on the inner pipe, and the sliding sleeve covers the communication groove on the inner pipe from the inside of the inner pipe , the sliding sleeve is connected to the inner tube by a pin, the pitching seat is on the upper port of the sliding sleeve, the inner tube is covered with a closing sleeve, the closing sleeve is connected to the inner tube by a breaking pin, the Unicom inner tube is set outside the closing sleeve, closed The upper part of the sleeve is installed with a snap ring, and the Unicom outer tube is set outside the Unicom inner tube. The upper part of the ball cover is connected with the flushing pipe joint, the plugging ball seat is on the inner hole of the flushing pipe joint, the piston has a well flushing through hole, and there is an annular space between the outer pipe and the inner pipe, which connects the outer pipe with the Unicom There is a vertical flow channel between the inner pipes, and there is a through groove on the ball cover. The well washing through hole, the annulus, the vertical flow channel, and the through groove are connected. The outer pipe has a sand groove, and the communication groove on the inner pipe is closed by The Unicom groove on the sleeve and the Unicom inner pipe communicates with the sand passing groove on the Unicom outer pipe.
本发明的有益效果是:液压封隔套管,液压锚定,地面旋转油管,丢手接头下部的左旋外螺纹与外管的上部的左旋内螺纹连接处脱开,这三步工作可靠,能确保油井防砂成功,减少作业工序,缩短作业时间,节省作业费用,提高防砂井的经济效益。The beneficial effects of the present invention are: the hydraulic isolation casing, the hydraulic anchoring, the oil pipe rotating on the ground, the left-handed external thread at the lower part of the hand-off joint and the left-handed internal thread at the upper part of the outer pipe are disengaged. These three steps work reliably and can Ensure the success of oil well sand control, reduce operating procedures, shorten operating time, save operating costs, and improve the economic benefits of sand control wells.
附图说明Description of drawings
附图是本发明实施例的装配图。Accompanying drawing is the assembly drawing of the embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图对本发明的实施例进行说明。Embodiments of the present invention will be described below in conjunction with the accompanying drawings.
由图可知,本发明的实施例包括上接头1、活塞2、液缸3、丢手接头4、打捞接头6、座封销钉7、单向锁环8、外管9、内管10、解封销钉11、锁环座管12、锥体13、胶筒14、锚定总成15、联通外管17、卡环18、销钉20、关闭套21、拉断销钉22、球罩24、堵球25、滤砂管接头26、冲管接头27、投球28、导流套29、滑套31、联通内管32,上接头1下部的内螺纹与丢手接头4的上部连接,上接头1下部的外螺纹与液缸3的上部连接,液缸3与丢手接头4之间安装活塞2,活塞2处于丢手接头4上部的联通孔之下,丢手接头4下部的左旋外螺纹与外管9的上部的左旋内螺纹连接,活塞2内安装打捞接头6,打捞接头6座在外管9上,活塞2由座封销钉7连接在打捞接头6上,活塞2的下部与锁环座管12的上部连接,锁环座管12内部安装单向锁环8,打捞接头6由解封销钉11连接在外管9上,锁环座管12的下部与锥体13连接,锥体13外套装胶筒14,胶筒14套装在锚定总成15的上部,锚定总成15悬挂在锥体13上,丢手接头4的下部内螺纹与内管10的上部连接,内管10上有联通槽,滑套31从内管10的内部覆盖内管10上的联通槽,滑套31由销钉20连接在内管10上,投球28座在滑套31的上端口上,内管10外套装关闭套21,关闭套21由拉断销钉22连接在内管10上,联通内管32套装在关闭套21外,关闭套21的上部安装卡环18,联通外管17套装在联通内管32外,联通外管17的上部与锚定总成15的下部连接,联通外管17的下部与滤砂管接头26连接,内管10的下部与球罩24的上部连接,球罩24的下部与冲管接头27连接,堵球25座在冲管接头27的内孔上,堵球25被限制在球罩24内活动,活塞2上有洗井通孔5,外管9与内管10之间有环空16,联通外管17与联通内管32之间有竖向流道19,球罩24上有通槽23,洗井通孔5、环空16、竖向流道19、通槽23相通,联通外管17有过砂槽30,内管10上的联通槽通过关闭套21、联通内管32上的联通槽与联通外管17上的过砂槽30相通。导流套29连接在联通外管17上,导流套29的喇叭口向下,导流套29处于联通外管17上的过砂槽30处,使砂液从过砂槽30流出后向下流动,避免冲损套管。As can be seen from the figure, the embodiment of the present invention includes an upper joint 1, a piston 2, a liquid cylinder 3, a hands-off joint 4, a fishing joint 6, a seat pin 7, a one-way lock ring 8, an outer pipe 9, an inner pipe 10, a Sealing pin 11, lock ring seat tube 12, cone 13, rubber tube 14, anchor assembly 15, Unicom outer tube 17, snap ring 18, pin 20, closing sleeve 21, breaking pin 22, ball cover 24, plug Ball 25, filter sand pipe joint 26, flushing pipe joint 27, pitching ball 28, diversion sleeve 29, sliding sleeve 31, Unicom inner pipe 32, the inner thread of the lower part of the upper joint 1 is connected with the upper part of the hand-off joint 4, and the upper joint 1 The external thread at the lower part is connected to the upper part of the liquid cylinder 3, and the piston 2 is installed between the liquid cylinder 3 and the hands-free joint 4. The upper part of the outer tube 9 is connected with a left-handed internal thread, and a salvage joint 6 is installed in the piston 2. The salvage joint 6 is seated on the outer tube 9. The piston 2 is connected to the salvage joint 6 by a seat pin 7. The lower part of the piston 2 is connected to the lock ring seat. The upper part of the tube 12 is connected, and the one-way lock ring 8 is installed inside the lock ring seat tube 12, and the salvage joint 6 is connected on the outer tube 9 by the unsealing pin 11, and the lower part of the lock ring seat tube 12 is connected with the cone 13, and the outside of the cone 13 Set the rubber sleeve 14, the rubber sleeve 14 is set on the upper part of the anchor assembly 15, the anchor assembly 15 is suspended on the cone 13, the lower internal thread of the drop joint 4 is connected with the upper part of the inner pipe 10, and the upper part of the inner pipe 10 There is a communication groove, the sliding sleeve 31 covers the communication groove on the inner tube 10 from the inside of the inner tube 10, the sliding sleeve 31 is connected on the inner tube 10 by the pin 20, the ball 28 is seated on the upper port of the sliding sleeve 31, and the inner tube 10 Outer set closing sleeve 21, closing sleeve 21 is connected on inner tube 10 by breaking pin 22, Unicom inner tube 32 is set outside closing sleeve 21, snap ring 18 is installed on the top of closing sleeve 21, Unicom outer tube 17 is sleeved in Unicom Outside the pipe 32, the upper part of the Unicom outer pipe 17 is connected with the lower part of the anchor assembly 15, the lower part of the Unicom outer pipe 17 is connected with the filter sand pipe joint 26, the lower part of the inner pipe 10 is connected with the upper part of the spherical cover 24, and the spherical cover 24 The bottom of the piston 2 is connected with the flushing pipe joint 27, and the blocking ball 25 is seated on the inner hole of the flushing pipe joint 27, and the blocking ball 25 is limited to move in the ball cover 24, and the well flushing through hole 5 is arranged on the piston 2, and the outer pipe 9 and the inner There is an annulus 16 between the tubes 10, a vertical flow channel 19 between the Unicom outer tube 17 and the Unicom inner tube 32, a through groove 23 on the ball cover 24, a well washing through hole 5, an annulus 16, and a vertical flow channel 19, the passage groove 23 communicates, and the Unicom outer pipe 17 has a sand groove 30, and the Unicom groove on the inner pipe 10 communicates with the sand groove 30 on the Unicom outer pipe 17 by closing the cover 21, the Unicom groove on the Unicom inner pipe 32. The diversion sleeve 29 is connected on the Unicom outer pipe 17, the bell mouth of the diversion sleeve 29 is downward, and the diversion sleeve 29 is located at the sand passage 30 on the Unicom outer pipe 17, so that the sand liquid flows out from the sand passage 30 to flow down to avoid damage to the casing.
本发明连接在充填管柱之下防砂管之上,下入时投球28不放入,下到设计位置后再投入投球28,然后打压,液压从丢手接头4上部的联通孔进入到活塞2的上部,使座封销钉7被剪断,活塞2下行,锚定总成15锚定在套管上,锥体13使胶筒14向外胀大密封套管,单向锁环8将锚定状态和密封状态固定下来。继续升压,销钉20被剪断,滑套31下行,滑套31不再覆盖内管10上的联通槽,本发明可以进行防砂冲填,砂液从内管10经过砂槽30充填到地层。充填结束后反洗,洗井液从套管打入经洗井通孔5、环空16、竖向流道19、通槽23、内管10向上流出,实现循环洗井。洗井结束后正转油管,丢手接头4与外管9的连接螺纹脱扣,使留井部分与提出部分脱离,上提油管,内管10带动关闭套21上行被阻后拉断销钉22被拉断,充填通道被关闭,卡环18卡住关闭套21不下落,提出部分可以全部提出。下次作业需要捞出留井部分时,下入打捞工具与打捞接头6上部的内螺纹对扣上提,解封销钉11被拉断,锚定总成15解锚,锥体13从胶筒14内退出,留井部分就可全部提出。The present invention is connected to the sand control pipe under the filling pipe string, the ball 28 is not put in when it is lowered, and the ball 28 is put in after it is lowered to the design position, and then pressed, and the hydraulic pressure enters the piston 2 from the communication hole on the upper part of the drop joint 4 The upper part of the seat seal pin 7 is cut off, the piston 2 goes down, the anchor assembly 15 is anchored on the sleeve, the cone 13 makes the rubber tube 14 expand outward to seal the sleeve, and the one-way lock ring 8 will anchor The state and sealing state are fixed. Continue to increase the pressure, the pin 20 is cut off, the sliding sleeve 31 descends, the sliding sleeve 31 no longer covers the communication groove on the inner pipe 10, the present invention can carry out sand-proof flushing, and the sand liquid is filled into the formation from the inner pipe 10 through the sand groove 30. After backwashing after filling, the well flushing fluid is poured into the casing through the well flushing through hole 5, the annular space 16, the vertical flow channel 19, the channel 23, and the inner pipe 10 and flows out upwards to realize circular well flushing. After the well flushing is completed, the tubing is rotated forward, and the connecting thread of the drop joint 4 and the outer pipe 9 is released, so that the well-staying part is separated from the lifting part, and the tubing is lifted up, and the inner pipe 10 drives the closing sleeve 21 to go up and is blocked, and then the pin 22 is broken is pulled off, the filling channel is closed, the snap ring 18 blocks the closing sleeve 21 and does not fall, and the proposed part can be fully proposed. When the next operation needs to fish out the part of the well, the fishing tool is lowered and the internal thread buckle on the upper part of the fishing joint 6 is lifted up, the unsealing pin 11 is pulled off, the anchor assembly 15 is unanchored, and the cone 13 is released from the rubber tube. If you withdraw within 14 days, all the remaining parts can be raised.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310325547.4A CN103388469B (en) | 2013-07-22 | 2013-07-22 | filling tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310325547.4A CN103388469B (en) | 2013-07-22 | 2013-07-22 | filling tool |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103388469A CN103388469A (en) | 2013-11-13 |
| CN103388469B true CN103388469B (en) | 2015-09-09 |
Family
ID=49532878
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310325547.4A Active CN103388469B (en) | 2013-07-22 | 2013-07-22 | filling tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103388469B (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106567692A (en) * | 2016-11-14 | 2017-04-19 | 王延睿 | Dual-control filling device and method for oil exploitation |
| CN110735619B (en) * | 2018-07-19 | 2021-08-10 | 中国石油化工股份有限公司 | Single-layer extrusion filling pipe column in multiple oil layers |
| CN109209286A (en) * | 2018-10-20 | 2019-01-15 | 东营百华石油技术开发有限公司 | A kind of packer of oil well filling sand control |
| CN109296346A (en) * | 2018-10-21 | 2019-02-01 | 东营百华石油技术开发有限公司 | A kind of sand control pack device that can be anti-sticking |
| CN112502675B (en) * | 2021-02-09 | 2021-06-11 | 山东高盛石油科技有限公司 | Forward filling tool |
| CN115030683A (en) * | 2022-07-29 | 2022-09-09 | 武昌理工学院 | A New Two-Stage Wedge Type Long Rubber Drum Packer |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201013326Y (en) * | 2006-11-01 | 2008-01-30 | 刘炳松 | High-pressure once extruding circulation packing tool |
| CN201068789Y (en) * | 2007-02-14 | 2008-06-04 | 中国石化集团胜利石油管理局井下作业公司 | Fracturing sand-proof filling tool |
| CN201092850Y (en) * | 2007-09-13 | 2008-07-30 | 冯永平 | Once packing high-low pressure filling device |
| CN103075131A (en) * | 2012-12-12 | 2013-05-01 | 山东瑞丰石油技术有限责任公司 | Open hole gravel packing tool and open hole gravel packing method for horizontal well |
| CN203374259U (en) * | 2013-07-22 | 2014-01-01 | 东营百华石油技术开发有限公司 | Filling tool |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6286598B1 (en) * | 1999-09-29 | 2001-09-11 | Halliburton Energy Services, Inc. | Single trip perforating and fracturing/gravel packing |
-
2013
- 2013-07-22 CN CN201310325547.4A patent/CN103388469B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201013326Y (en) * | 2006-11-01 | 2008-01-30 | 刘炳松 | High-pressure once extruding circulation packing tool |
| CN201068789Y (en) * | 2007-02-14 | 2008-06-04 | 中国石化集团胜利石油管理局井下作业公司 | Fracturing sand-proof filling tool |
| CN201092850Y (en) * | 2007-09-13 | 2008-07-30 | 冯永平 | Once packing high-low pressure filling device |
| CN103075131A (en) * | 2012-12-12 | 2013-05-01 | 山东瑞丰石油技术有限责任公司 | Open hole gravel packing tool and open hole gravel packing method for horizontal well |
| CN203374259U (en) * | 2013-07-22 | 2014-01-01 | 东营百华石油技术开发有限公司 | Filling tool |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103388469A (en) | 2013-11-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103388469B (en) | filling tool | |
| CN103133340B (en) | Gas well automatic drain plunger | |
| CN102606107B (en) | Halfway cementing well completion tube column and halfway cementing method | |
| CN104121001A (en) | Drilling-free cement injecting device for horizontal well | |
| CN107829778B (en) | An integral layered filling device | |
| CN104514529B (en) | Rotary gas nozzle automatically adjusts downhole throttle | |
| CN202249946U (en) | Intelligent float valve | |
| CN201627572U (en) | Underground throttle | |
| CN206917631U (en) | Can bore can drag for the anti-pollution packer of horizontal well | |
| CN107654220B (en) | Construction method of an integral layered filling device | |
| CN103422839A (en) | Stepless adjustable water nozzle plug | |
| CN206329307U (en) | New water injection through tubing and casing back flushing packer | |
| CN204126591U (en) | Complete set of equipment for tailpipe circulation plugging under pressure | |
| CN204386577U (en) | The protective jacket in sliding sleeve fracturing hole and sliding sleeve | |
| CN204371262U (en) | A Balanced Throttle | |
| CN204082115U (en) | Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure | |
| CN105298443A (en) | Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending | |
| CN203285391U (en) | Pressure-differential oil jacket communication valve | |
| CN205297515U (en) | A hydraulic jet fracturing device driven by coiled tubing | |
| CN204984379U (en) | It fills sand control device to lift backwash formula | |
| CN202745834U (en) | Pre-loaded downhole chokes without wireline delivery | |
| CN210396710U (en) | An oil-water well anti-break-off filling tool | |
| CN203374259U (en) | Filling tool | |
| CN202402003U (en) | Lead sealing sand control packer for 4-inch small holes | |
| CN201486542U (en) | Separable separate-layer fracturing process pipe column |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Lining used on gravel filling tools Effective date of registration: 20170811 Granted publication date: 20150909 Pledgee: China Co. truction Bank Corp Dongying Shengda subbranch Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: 2017990000739 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200630 Granted publication date: 20150909 Pledgee: China Co. truction Bank Corp Dongying Shengda subbranch Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: 2017990000739 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Open hole gravel packing tool and open hole gravel packing method for horizontal well Effective date of registration: 20200630 Granted publication date: 20150909 Pledgee: Dongying rural commercial bank Limited by Share Ltd. West City Branch Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: Y2020980003663 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20211223 Granted publication date: 20150909 Pledgee: Dongying rural commercial bank Limited by Share Ltd. West City Branch Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: Y2020980003663 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Filling tool Effective date of registration: 20211229 Granted publication date: 20150909 Pledgee: Dongying rural commercial bank Limited by Share Ltd. West City Branch Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: Y2021980016908 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230116 Granted publication date: 20150909 Pledgee: Dongying rural commercial bank Limited by Share Ltd. West City Branch Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: Y2021980016908 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Filling tool Granted publication date: 20150909 Pledgee: Dongying Rural Commercial Bank Co.,Ltd. Pledgor: DONGYING BAIHUA PETROLEUM TECHNOLOGY DEVELOPMENT Co.,Ltd. Registration number: Y2024980056269 |