CN103245884A
CN103245884A CN2013101520263A CN201310152026A CN103245884A CN 103245884 A CN103245884 A CN 103245884A CN 2013101520263 A CN2013101520263 A CN 2013101520263A CN 201310152026 A CN201310152026 A CN 201310152026A CN 103245884 A CN103245884 A CN 103245884A
Authority
CN
China
Prior art keywords
fault
user
answering system
breakdown repair
judgment method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101520263A
Other languages
Chinese (zh)
Inventor
王立峰
陈东
顾黎强
王沁
徐芳敏
骆亮
袁一鸣
盛佳蓉
张麟
胡年平
吴世敏
沈祝萍
贾优
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Electric Power Co
State Grid Corp of China SGCC
Original Assignee
Shanghai Municipal Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co, State Grid Corp of China SGCC filed Critical Shanghai Municipal Electric Power Co
Priority to CN2013101520263A priority Critical patent/CN103245884A/en
Publication of CN103245884A publication Critical patent/CN103245884A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开一种基于故障抢修应答系统的中低压故障判断方法,包含以下步骤:1、接收故障报修信息,判断接收到用户报修信息的开关数量;2、判断收到报修信息的一个开关下控制杆变的数量;3、判断发出报修信息的用户所连接的开关下是否所有杆变所连接的用户都发出报修信息;根据上述判断,确定故障点位置。本发明通过相应拓扑逻辑关系,对停电范围进行一定的判断,实现公司非电网故障抢修的自动登记、过程管理,实现跨系统、跨部门的故障抢修信息集成和流程贯通。

The invention discloses a method for judging a medium-low voltage fault based on a fault emergency repair response system, which includes the following steps: 1. receiving fault repair information, and judging the number of switches that have received the user repair report information; The number of poles; 3. Judging whether all the users connected to the poles have sent repair information under the switch connected to the user who sent the maintenance report; according to the above judgment, determine the location of the fault point. The invention judges the scope of power outage through the corresponding topological logic relationship, realizes the automatic registration and process management of the company's non-power grid fault repair, and realizes the cross-system and cross-department fault repair information integration and flow through.

Description

Mesolow fault judgment method based on the breakdown repair answering system
Technical field
The present invention relates to a kind of power grid fault judgment method, be specifically related to a kind of mesolow fault judgment method based on the breakdown repair answering system.
Background technology
TCM is the abbreviation of the English Trouble Call Management of fault repairing answering system, be to be based upon grid safety monitoring and data acquisition system (DAS) (SCADA, DSCADA)), on the basis of power transmission and distribution production management system (PMS), controller switching equipment overhaul management system and customer information control system (CMS) etc., real-time information, overhaul of the equipments information, user profile and the geography information etc. of power distribution network operation are carried out the data platform of analysis-by-synthesis.On the business specifically, TCM reports the management of the process of accepting for repairment except comprising the user, comprising also that power supply enterprise's internal fault is reported for repairment manages business and the management of workflow, further also comprise report for repairment, fault, repairing process information be in user, field staff, commanding, managerial personnel's information sharing and transparent.
Territory, Utilities Electric Co. area under one's jurisdiction scope is big, device distribution is wide, the grid structure complexity, the user is to the requirement height of power supply reliability and the quality of power supply, distribution management and dispatcher need more supplementary means to guarantee distribution operation level and power supply quality, TCM builds the development of the intelligent grid of combining closely, to improving the electric network fault responding ability, ensureing that power supply reliability is significant.Foreign advanced experience shows that fault is reported the foundation of management system for repairment, comprises the foundation of perfect institutional framework, operation flow and management system on the one hand, comprises also that on the other hand a cover reports the enforcement that management is the information management platform of core for repairment with fault.
Under large tracts of land electric network fault situation, the user reports address complex distribution, location difficulty for repairment, and the electric network fault zone is indeterminate, and the work that repeats worker's list to merger all causes difficulty.In addition, the repairing flow process is rushed to repair the result and is shared for realizing closed-loop control, and hot line can not judge accurately that for reporting long repair call of the time interval for repairment it is single that initiation repeats the worker easily.In the time can't judging this fault type, usually all can send social breakdown gang to rush towards the scene at first, if belong to electric network fault, then social breakdown gang is again after the yardman reports, send the repairing class in work area to go to the trouble spot repairing again by the yardman, whole flow process is consuming time long, causes the waste of repairing resource, causes the serious discontented of user sometimes and complains.
The breakdown repair management system has now become the indispensable application system of Shanghai Electric Power Co breakdown repair business processing, can handle the fault that derives from hot line, scheduling registration, covers the full voltage grade.Wherein the high-voltage fence fault can be gathered and automatically reports to the police by acquisition system (SCADA), and the low voltage electric network fault mainly depends on hot line and connects and report the worker single after the user reports for repairment, fails to realize the fault anticipation of reporting for repairment prior to the user at present.Along with the continuous propelling of state's net intelligent grid engineering, intelligent electric meter has collected widespread use in the user side metering.Intelligent electric meter possesses the electricity consumption situation of collection, supervisory user, and can in time these information be reported the power information acquisition system.How the user power utilization event information being inserted the TCM system in real time, realize user power utilization information sharing in breakdown repair relevant information system, is a problem demanding prompt solution.
Exploitation TCM fault assistant analysis function by power network topology information and geographical location information, can be used as effective foundation of fault type.Rely on the TCM system simultaneously, the electricity consumption Information Monitoring that intelligence table meter is provided inserts, thereby grasp user's side electricity consumption situation, auxiliary holding ask or the dispatcher carries out the quick anticipation of fault, accurate location, and the repairing procedural information is carried out automatic information insert, can increase work efficiency and breakdown repair speed, reduce and repeat to send worker's situation, improving power supply quality and customer satisfaction, is effective support of TCM being handled the low-pressure side fault.Comprehensive various information is accurately carried out localization of fault, effectively shortens fault handling time, promotes the breakdown repair work efficiency.And can assist to form fault handling subplan, the processing scheme optimization is provided, the very first time sends work area repairing class to go to repairing when electric network fault, has significantly reduced the flow process time, promotes service level.
Summary of the invention
The invention provides a kind of mesolow fault judgment method based on the breakdown repair answering system, by breakdown repair answering system information integrated with existing grid safety monitoring and data acquisition system (DAS), power transmission and distribution production management system, customer information system etc., automated topology goes out the power failure scope.
For achieving the above object, the invention provides a kind of mesolow fault judgment method based on the breakdown repair answering system, be provided with a bus in the power network line, be connected with one or several switches under the bus, be connected with one or several bars under each switch and become, each bar variation does not connect a user;
Be characterized in that fault judgment method comprises following steps:
Step 1, breakdown repair answering system receive fault repairing information, judge the number of switches that receives user's repairing information, if a switch is arranged, then jump to step 2, if several switches are arranged, then jump to step 1.1;
Step 1.1, the localization of faults of breakdown repair answering system are the bus failure that sends the power network line that the repairing information user connects, and fault is judged and finished;
Step 2, breakdown repair answering system are judged the quantity of a switch lower control arm change of receiving repairing information, if there are several bars to become, then jump to step 3, if there is a bar to become, then jump to step 2.1;
Step 2.1, the localization of faults of breakdown repair answering system be send that bar that the user of repairing information connects becomes switch or bar becomes and switch between circuit, fault is judged and is finished;
Step 3, breakdown repair answering system judge whether all bars become the user who connects under the switch that the user that sends repairing information connects and all send repairing information, if, then jump to step 4, if not, then jump to step 5;
Step 4, the localization of faults of breakdown repair answering system are positioned at the switch that the user that sends repairing information connects, and fault is judged and finished;
Step 5, the localization of faults of breakdown repair answering system send that bar that the repairing information user connects becomes or bar becomes and the user between circuit pack, fault is judged and is finished.
Above-mentioned fault judgment method also comprises: with the increase that receives repairing information, the breakdown repair answering system needs the trouble spot of anticipation is adjusted.
Above-mentioned fault judgment method also comprises: when the anticipation trouble spot is adjusted, adjust corresponding fault incidence.
Above-mentioned adjustment fault incidence comprise following steps:
Determine the power network line that the anticipation trouble spot influences earlier, then according to the interconnected definite fault incidence of low pressure.
The mesolow fault judgment method that the present invention is based on the breakdown repair answering system is compared with existing fault anticipation technology, and its advantage is that the present invention carries out certain judgement by corresponding topological logic relation to the power failure scope.Simultaneously there is not aut.eq. at part distribution and low pressure, be the construction object by power information acquisition system and breakdown repair management system, the development data interface, the electricity consumption event information that intelligent electric meter is monitored, for example: dead electricity, dead electricity involution, decompression, decompression involution, the phase failure, phase failure involution, send to the breakdown repair management system in real time, automatic registration, the process management of the non-electric network fault repairing of realization company realize interdepartmental system, interdepartmental breakdown repair information is integrated and flow process connects.
Description of drawings
Fig. 1 is the process flow diagram that the present invention is based on the mesolow fault judgment method of breakdown repair answering system;
Fig. 2 is the circuit diagram of the embodiment of the suitable power network line of mesolow fault judgment method that the present invention is based on the breakdown repair answering system.
Embodiment
Below in conjunction with accompanying drawing, further specify specific embodiments of the invention.
As shown in Figure 1, the present invention discloses a kind of mesolow fault judgment method based on the breakdown repair answering system, this fault judgment method comprises applicable to following power network line, be provided with a bus in this power network line, be connected with one or several switches under the bus, be connected with one or several bars under each switch and become, each bar variation does not connect a user.
The mesolow fault judgment method that the present invention is based on the breakdown repair answering system comprises following steps:
Step 1, breakdown repair answering system receive fault repairing information, judge the number of switches that receives user's repairing information, if a switch is arranged, then jump to step 2, if several switches are arranged, then jump to step 1.1.
Step 1.1, the localization of faults of breakdown repair answering system are the bus failure that sends the power network line that the repairing information user connects, and fault is judged and finished.
Step 2, breakdown repair answering system are judged the quantity of a switch lower control arm change of receiving repairing information, if there are several bars to become, then jump to step 3, if there is a bar to become, then jump to step 2.1.
Step 2.1, the localization of faults of breakdown repair answering system be send that bar that the user of repairing information connects becomes switch or bar becomes and switch between circuit, fault is judged and is finished.
Step 3, breakdown repair answering system judge whether all bars become the user who connects under the switch that the user that sends repairing information connects and all send repairing information, if, then jump to step 4, if not, then jump to step 5.
Step 4, the localization of faults of breakdown repair answering system are positioned at the switch that the user that sends repairing information connects, and fault is judged and finished.
Step 5, the localization of faults of breakdown repair answering system send that bar that the repairing information user connects becomes or bar becomes and the user between circuit pack, fault is judged and is finished.
Above-mentioned fault judgment method also comprises: with the increase that receives repairing information, the breakdown repair answering system needs the trouble spot of anticipation is adjusted.When the anticipation trouble spot is adjusted, adjust corresponding fault incidence.Adjust the following steps that comprise of fault incidence: determine the power network line that the anticipation trouble spot influences earlier, then according to the interconnected definite fault incidence of low pressure.
As Fig. 2 and in conjunction with shown in Figure 1, the present invention is based on a kind of embodiment of the mesolow fault judgment method practical application of breakdown repair answering system.
When Sec1 user sends repairing information, then there is the trouble spot between breakdown repair answering system judgement K switch 2, the bar change T1.
When Set2 user sends repairing information, and Sec3 user does not send repairing information, and then the breakdown repair answering system judges that bar becomes T2 and is the trouble spot.
When Set2 user sends repairing information, Sec3 user also sends repairing information simultaneously, and then the breakdown repair answering system judges that K switch 3 is the trouble spot.
When Set6, Set8, Set2 with sending repairing information per family, then the breakdown repair answering system judges that K switch 6 is the trouble spot.Again for example: Set4, Set7, Set3 are with sending repairing information per family, and then the breakdown repair answering system judges that K switch 1 is the trouble spot.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (4)

1. the mesolow fault judgment method based on the breakdown repair answering system is provided with a bus in the power network line, is connected with one or several switches under the bus, is connected with one or several bars under each switch and becomes, and each bar variation does not connect a user;
It is characterized in that described fault judgment method comprises following steps:
Step 1, breakdown repair answering system receive fault repairing information, judge the number of switches that receives user's repairing information, if a switch is arranged, then jump to step 2, if several switches are arranged, then jump to step 1.1;
Step 1.1, the localization of faults of breakdown repair answering system are the bus failure that sends the power network line that the repairing information user connects, and fault is judged and finished;
Step 2, breakdown repair answering system are judged the quantity of a switch lower control arm change of receiving repairing information, if there are several bars to become, then jump to step 3, if there is a bar to become, then jump to step 2.1;
Step 2.1, the localization of faults of breakdown repair answering system be send that bar that the user of repairing information connects becomes switch or bar becomes and switch between circuit, fault is judged and is finished;
Step 3, breakdown repair answering system judge whether all bars become the user who connects under the switch that the user that sends repairing information connects and all send repairing information, if, then jump to step 4, if not, then jump to step 5;
Step 4, the localization of faults of breakdown repair answering system are positioned at the switch that the user that sends repairing information connects, and fault is judged and finished;
Step 5, the localization of faults of breakdown repair answering system send that bar that the repairing information user connects becomes or bar becomes and the user between circuit pack, fault is judged and is finished.
2. the mesolow fault judgment method based on the breakdown repair answering system as claimed in claim 1, it is characterized in that, described fault judgment method also comprises: with the increase that receives repairing information, the breakdown repair answering system needs the trouble spot of anticipation is adjusted.
3. the mesolow fault judgment method based on the breakdown repair answering system as claimed in claim 2 is characterized in that described fault judgment method also comprises: when the anticipation trouble spot is adjusted, adjust corresponding fault incidence.
4. the mesolow fault judgment method based on the breakdown repair answering system as claimed in claim 3 is characterized in that, described adjustment fault incidence comprise following steps:
Determine the power network line that the anticipation trouble spot influences earlier, then according to the interconnected definite fault incidence of low pressure.
CN2013101520263A 2013-04-27 2013-04-27 Medium and low voltage failure judgment method based on trouble call management system Pending CN103245884A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101520263A CN103245884A (en) 2013-04-27 2013-04-27 Medium and low voltage failure judgment method based on trouble call management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101520263A CN103245884A (en) 2013-04-27 2013-04-27 Medium and low voltage failure judgment method based on trouble call management system

Publications (1)

Publication Number Publication Date
CN103245884A true CN103245884A (en) 2013-08-14

Family

ID=48925527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101520263A Pending CN103245884A (en) 2013-04-27 2013-04-27 Medium and low voltage failure judgment method based on trouble call management system

Country Status (1)

Country Link
CN (1) CN103245884A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1255639A (en) * 1998-11-12 2000-06-07 日本高压电气株式会社 Positioning system of fault point
IE990326A1 (en) * 1999-04-19 2000-11-01 Lakefield Etechnologies Group A cable network repair control system
CN102222907A (en) * 2011-06-09 2011-10-19 重庆大学 Distribution network reliability evaluation method applicable to multi-circuit identical-pole line construction
CN202041559U (en) * 2011-04-22 2011-11-16 上海市电力公司 A signal source device used for an automatic location device for transmission line ground faults
CN202159369U (en) * 2011-06-08 2012-03-07 上海市电力公司 Information processing device for improving fault repairing work order merging rate of electrical power system
CN102565572A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Platform and method for judging fault of match power grid
CN102636731A (en) * 2012-04-12 2012-08-15 上海交通大学 Power distribution network single-phase disconnection judging and addressing method based on load measuring and recording system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1255639A (en) * 1998-11-12 2000-06-07 日本高压电气株式会社 Positioning system of fault point
IE990326A1 (en) * 1999-04-19 2000-11-01 Lakefield Etechnologies Group A cable network repair control system
CN202041559U (en) * 2011-04-22 2011-11-16 上海市电力公司 A signal source device used for an automatic location device for transmission line ground faults
CN202159369U (en) * 2011-06-08 2012-03-07 上海市电力公司 Information processing device for improving fault repairing work order merging rate of electrical power system
CN102222907A (en) * 2011-06-09 2011-10-19 重庆大学 Distribution network reliability evaluation method applicable to multi-circuit identical-pole line construction
CN102565572A (en) * 2011-12-04 2012-07-11 江苏省电力公司南京供电公司 Platform and method for judging fault of match power grid
CN102636731A (en) * 2012-04-12 2012-08-15 上海交通大学 Power distribution network single-phase disconnection judging and addressing method based on load measuring and recording system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曾立华等: "基于粗糙集理论的农村配电网故障定位", 《农机化研究》, no. 8, 31 August 2008 (2008-08-31) *
许童羽等: "配网故障定位系统的粗糙集改进算法研究", 《微计算机信息(测控自动化)》, vol. 25, no. 91, 31 December 2009 (2009-12-31) *

Similar Documents

Publication Publication Date Title
CN106990328B (en) Distribution network emergency repair abnormal data analysis, fault location system and method
CN103501050B (en) Power distribution network fault integrated treatment platform
CN105305393A (en) Distribution network emergency repair commanding system and method based on marketing and distribution communication
CN104091231A (en) Distribution network fault repairing commanding and processing system and method
CN103488138B (en) Generate the method and system that scheduling makes operation order item by item
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN106872856B (en) Active repair system and method for distribution network faults based on multiple fault acquisition
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN107506849A (en) A kind of intelligent optimization distribution transforming, which has a power failure, studies and judges system
CN103490523B (en) Intelligent power distribution network fault treatment system
CN106875114A (en) The SMS platform optimization system and method for distribution repairing maneuvering platform
CN107147215A (en) Distribution network fault location system and method combined with line overload data analysis
CN103761625A (en) Outage management system based on information exchange bus and data processing method thereof
CN104360208A (en) Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN104240139A (en) Multi-service system information fusion power grid comprehensive visualization method based on three-dimensional GIS
CN104751305A (en) Trouble analysis and repair-based intelligent interaction system and control method thereof
CN103683511A (en) Method and system for processing fault of integrated monitoring platform based on power distribution network
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN109345786A (en) An automatic alarm system for abnormal electricity consumption of low-voltage non-resident users
CN103501052A (en) Comprehensive fault handling method for power distribution and consumption network
CN103490522A (en) Intelligent power distribution network fault treatment method
CN105048630A (en) Intelligent scheduling control system and method based on data automatic analysis system
CN114139742A (en) A kind of distribution network management and control system and management and control method
CN103501053A (en) Comprehensive fault handling system for power distribution and consumption network
CN104237735A (en) Modeling and fault analysis method combining fault indicator and power distribution terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814