CN103074909B - 风电场风机基础单桩竖向抗压承载力静载试验方法 - Google Patents
风电场风机基础单桩竖向抗压承载力静载试验方法 Download PDFInfo
- Publication number
- CN103074909B CN103074909B CN201310030298.6A CN201310030298A CN103074909B CN 103074909 B CN103074909 B CN 103074909B CN 201310030298 A CN201310030298 A CN 201310030298A CN 103074909 B CN103074909 B CN 103074909B
- Authority
- CN
- China
- Prior art keywords
- pile
- test
- bearing capacity
- compressive bearing
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310030298.6A CN103074909B (zh) | 2013-01-28 | 2013-01-28 | 风电场风机基础单桩竖向抗压承载力静载试验方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310030298.6A CN103074909B (zh) | 2013-01-28 | 2013-01-28 | 风电场风机基础单桩竖向抗压承载力静载试验方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103074909A CN103074909A (zh) | 2013-05-01 |
| CN103074909B true CN103074909B (zh) | 2015-10-28 |
Family
ID=48151598
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310030298.6A Active CN103074909B (zh) | 2013-01-28 | 2013-01-28 | 风电场风机基础单桩竖向抗压承载力静载试验方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103074909B (zh) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103938660B (zh) * | 2014-04-14 | 2015-12-09 | 天津大学 | 确定溜桩之后桩基承载力的方法 |
| CN106120880A (zh) * | 2016-08-31 | 2016-11-16 | 长江三峡生态园林有限公司 | 一种海上风电单桩基础抗压承载力试验装置 |
| PL3584371T3 (pl) * | 2018-06-18 | 2022-12-19 | Vallourec Deutschland Gmbh | Urządzenie do sprawdzania nośności pala w konstrukcji fundamentu morskiego |
| CN112459140A (zh) * | 2020-11-24 | 2021-03-09 | 深圳智润新能源电力勘测设计院有限公司 | 一种基桩静载试验布桩方法 |
| CN119885392B (zh) * | 2025-03-25 | 2025-06-06 | 江西省港航设计院有限公司 | 一种用于港口大面积堆载环境的桩基优化设计方法及系统 |
| CN120046225B (zh) * | 2025-04-24 | 2025-07-15 | 农业农村部成都沼气科学研究所 | 一种用于沼气发酵罐的复合桩基础设计方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2905910Y (zh) * | 2005-09-01 | 2007-05-30 | 赵海生 | 基桩静载试验反力装置 |
| WO2007068903A1 (en) * | 2005-12-12 | 2007-06-21 | Terrain Geotechnical Consultants Limited | A pile test apparatus |
| CN201857620U (zh) * | 2010-11-05 | 2011-06-08 | 中国科学院武汉岩土力学研究所 | 一种输变电铁塔桩板基础进行竖向抗拔静载实验的装置 |
| CN102828533A (zh) * | 2012-09-17 | 2012-12-19 | 中国建筑第八工程局有限公司 | 灌注桩竖向抗压静载试验桩头超前处理节点及施工方法 |
-
2013
- 2013-01-28 CN CN201310030298.6A patent/CN103074909B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2905910Y (zh) * | 2005-09-01 | 2007-05-30 | 赵海生 | 基桩静载试验反力装置 |
| WO2007068903A1 (en) * | 2005-12-12 | 2007-06-21 | Terrain Geotechnical Consultants Limited | A pile test apparatus |
| CN201857620U (zh) * | 2010-11-05 | 2011-06-08 | 中国科学院武汉岩土力学研究所 | 一种输变电铁塔桩板基础进行竖向抗拔静载实验的装置 |
| CN102828533A (zh) * | 2012-09-17 | 2012-12-19 | 中国建筑第八工程局有限公司 | 灌注桩竖向抗压静载试验桩头超前处理节点及施工方法 |
Non-Patent Citations (1)
| Title |
|---|
| 大唐吉林向阳风电场一期150MW工程风机桩基础设计分析;刘蔚等;《西北水电》;20091031(第5期);期刊第91- 99页第3-5、8节及图1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103074909A (zh) | 2013-05-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103074909B (zh) | 风电场风机基础单桩竖向抗压承载力静载试验方法 | |
| CN104110039B (zh) | 具有压力分散型布置高强预应力锚杆(索)的风机基础 | |
| CN103046585B (zh) | 风电场风机基础单桩水平力承载力静载试验方法 | |
| CN204370431U (zh) | 一种咬合长短桩围护结构 | |
| CN205857223U (zh) | 一种螺旋直桩型海上风机承台式基础结构 | |
| CN103866817B (zh) | 取水泵站 | |
| JP3230883U (ja) | 洋上風力発電用組み合せ単杭基礎構造 | |
| CN105862907A (zh) | 环形组合式超大直径海上风电单桩基础及其施工工艺 | |
| CN102852156A (zh) | 一种复合桩基础结构 | |
| CN110206038A (zh) | 一种凹型基坑阳角处的支护结构及施工方法 | |
| CN103046575B (zh) | 一种陆上四叶梅型的风机扩展基础结构 | |
| KR101342445B1 (ko) | 해상풍력발전기의 하이브리드 지지구조 | |
| CN105421477A (zh) | 一种塔吊基础的施工方法 | |
| CN103074903B (zh) | 滩涂流沙软弱地基风机基础护筒型混凝土灌注桩 | |
| CN203238642U (zh) | 基坑支护挡墙 | |
| CN110792095A (zh) | 一种多桩承台-螺旋锚复合基础 | |
| CN203960942U (zh) | 取水泵站 | |
| CN103046584B (zh) | 风机基础护筒型混凝土灌注桩竖向抗拔承载力试桩结构 | |
| CN103046574B (zh) | 一种软基础风机四叶梅型混凝土承台预应力管基础结构 | |
| CN102808419B (zh) | 一种组合桩基础结构 | |
| CN203782733U (zh) | 预留基础环孔和桩窝孔的预制混凝土承台 | |
| CN102852154A (zh) | 一种复合桩基 | |
| CN206503157U (zh) | 海上风电嵌岩混合桩基础 | |
| CN206887980U (zh) | 一种防冻桩柱的一体式支架基础 | |
| CN203361209U (zh) | 风电场风机基础单桩水平力承载力静载试验装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent of invention or patent application | ||
| CB02 | Change of applicant information |
Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd. Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Applicant before: Northwest Hydro Consulting Engineers, CHECC |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING TO: HYDROCHINA XIBEI ENGINEERING CORPORATION Free format text: CORRECT: APPLICANT; FROM: HYDROCHINA XIBEI ENGINEERING CORPORATION TO: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20170615 Address after: 710065, No. eight, No. 18 East Road, Yanta District, Shaanxi, Xi'an Patentee after: NORTHWEST WATER CONSERVANCY & HYDROPOWER ENGINEERING CO.,LTD. Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 survey and Design Institute of the northwest department of science and technology Patentee before: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd. |