[go: up one dir, main page]

CN103011032A - Lifting platform for underground cable construction - Google Patents

Lifting platform for underground cable construction Download PDF

Info

Publication number
CN103011032A
CN103011032A CN2012105503421A CN201210550342A CN103011032A CN 103011032 A CN103011032 A CN 103011032A CN 2012105503421 A CN2012105503421 A CN 2012105503421A CN 201210550342 A CN201210550342 A CN 201210550342A CN 103011032 A CN103011032 A CN 103011032A
Authority
CN
China
Prior art keywords
platform
fixed
support
line roller
lifting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105503421A
Other languages
Chinese (zh)
Other versions
CN103011032B (en
Inventor
冯迎春
王震
洪源
李守金
杨晓滨
卢志海
张伟
李超
李伟
乔耀华
马玮杰
王洪川
陈培峰
王安山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch of State Grid Shandong Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority to CN201210550342.1A priority Critical patent/CN103011032B/en
Publication of CN103011032A publication Critical patent/CN103011032A/en
Application granted granted Critical
Publication of CN103011032B publication Critical patent/CN103011032B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

地下电缆施工用升降平台,包括四个支腿,四个支腿上安装支架,支架上安装横管,横管两端分别设置一个吊绳,吊绳上端固定在横管上,吊绳下端设置手扳葫芦,手扳葫芦上端与吊绳连接,手扳葫芦下端设置两段固定绳,两段固定绳下端设置平台架,所述支架的四个连接节点上分别设置一个拉绳,拉绳上端与支架连接,拉绳下端与平台架相连,平台架上安装平台板,平台板上开设吊装口,平台板上设置支撑板,支撑板设置水平的固定轴,固定轴上套装线辊,线辊的端部安装圆形,摇动连接板的圆心与线辊重合,摇动连接板的边沿处设置摇柄,线辊上安装吊绳,吊绳上端固定连接线辊,吊绳下端固定连接挂钩,线辊位于吊装口上部。

Figure 201210550342

The lifting platform for underground cable construction includes four outriggers, brackets are installed on the four outriggers, horizontal tubes are installed on the brackets, a suspension rope is installed at both ends of the horizontal tube, the upper end of the suspension rope is fixed on the horizontal tube, and the lower end of the suspension rope is set Lever hoist, the upper end of the lever hoist is connected with the suspension rope, two fixed ropes are arranged at the lower end of the lever hoist, the platform frame is arranged at the lower end of the two fixed ropes, a pull rope is respectively arranged on the four connection nodes of the support, and the upper end of the pull rope Connect with the support, the lower end of the pull rope is connected with the platform frame, the platform plate is installed on the platform frame, the platform plate is provided with a hoisting port, the platform plate is provided with a support plate, the support plate is provided with a horizontal fixed shaft, and the fixed shaft is equipped with wire rollers and wire rollers. The end of the sling is installed with a circle, the center of the swaying connecting plate coincides with the line roller, a rocking handle is set on the edge of the swaying connecting plate, a sling is installed on the sling, the upper end of the sling is fixed to connect the line roller, and the lower end of the sling is fixed to connect to the hook. The roller is located on the upper part of the hoisting port.

Figure 201210550342

Description

地下电缆施工用升降平台Lifting platform for underground cable construction

技术领域 technical field

本发明涉及一种升降平台,尤其是地下电缆施工用升降平台。 The invention relates to a lifting platform, in particular to a lifting platform for underground cable construction.

背景技术 Background technique

现有的地下电缆铺设过程中使用的升降平台有的使用时搭建,用完再拆,反复拆建,过程繁琐,耗费大量人力;有的采用电动升降平台,噪声极大,而且偏远地区的供电不稳定,容易造成突然断电引发的平台坠落,有重大安全隐患。对于大型装置在地上和地下的运送过程中,需要搬运至升降平台,搬运过程消耗人力,工作效率低。 Some of the lifting platforms used in the existing underground cable laying process are built when they are used, and then dismantled after use, and repeatedly dismantled and built. The process is cumbersome and consumes a lot of manpower; Unstable, it is easy to cause the platform to fall due to sudden power failure, and there is a major safety hazard. For the transportation process of large-scale devices on the ground and underground, it needs to be transported to the lifting platform, which consumes manpower and low work efficiency.

发明内容 Contents of the invention

为了解决上述问题,本发明提出了一种地下电缆施工用升降平台。  In order to solve the above problems, the present invention proposes a lifting platform for underground cable construction. the

本发明解决其技术问题所采用的技术方案是:地下电缆施工用升降平台,包括四个支腿,四个支腿上安装支架,支架上安装横管,横管两端分别设置一个吊绳,吊绳上端固定在横管上,吊绳下端设置手扳葫芦,手扳葫芦上端与吊绳连接,手扳葫芦下端设置两段固定绳,两段固定绳下端设置平台架,所述支架的四个连接节点上分别设置一个拉绳,拉绳上端与支架连接,拉绳下端与平台架相连,平台架上安装平台板,平台板上开设吊装口,平台板上设置支撑板,支撑板设置水平的固定轴,固定轴上套装线辊,线辊的端部安装圆形,摇动连接板的圆心与线辊重合,摇动连接板的边沿处设置摇柄,线辊上安装吊绳,吊绳上端固定连接线辊,吊绳下端固定连接挂钩,线辊位于吊装口上部。 The technical solution adopted by the present invention to solve the technical problem is: the lifting platform for underground cable construction includes four legs, on which four legs are mounted brackets, on which a horizontal tube is installed, and a suspension rope is respectively arranged at both ends of the horizontal tube, The upper end of the lifting rope is fixed on the horizontal pipe, the lower end of the lifting rope is provided with a lever block, the upper end of the lever block is connected with the lifting rope, the lower end of the lever block is provided with two sections of fixed rope, and the lower end of the two sections of fixed rope is provided with a platform frame. A pull rope is respectively set on each connection node, the upper end of the pull rope is connected with the support, the lower end of the pull rope is connected with the platform frame, the platform plate is installed on the platform frame, the lifting port is opened on the platform plate, the support plate is set on the platform plate, and the support plate is set horizontally The fixed shaft is fitted with a line roller on the fixed shaft. The end of the line roller is installed with a circular shape. The center of the oscillating connecting plate coincides with the line roller. The wire roller is fixedly connected, the lower end of the sling is fixedly connected with the hook, and the wire roller is located at the upper part of the hoisting port.

为了进一步实现本发明的目的,所述四个支腿下端分别安装支脚,支脚的外径大于支腿的外径。所述拉绳上设置护套,护套套在拉绳上,护套上端设置连接绳,连接绳与支架相连。所述摇动连接板边沿处设置配重块,配重块与摇柄的连线穿过摇动连接板的圆心。所述的固定轴上安装固定支架,固定支架上安装固定杆一端,固定杆另一端固定连接支撑板。所述的固定支架上设置定位销,线辊上开设数个定位孔,定位孔以线辊的圆心为中心环形分布,定位销与定位孔相配合。 In order to further realize the purpose of the present invention, the lower ends of the four supporting legs are respectively equipped with supporting feet, and the outer diameter of the supporting feet is larger than that of the supporting legs. A sheath is arranged on the stay rope, the sheath is covered on the stay rope, and a connecting rope is arranged on the upper end of the sheath, and the connecting rope is connected with the support. A counterweight is arranged at the edge of the oscillating connecting plate, and the connection line between the counterweight and the rocking handle passes through the center of the oscillating connecting plate. A fixed bracket is installed on the fixed shaft, one end of a fixed rod is installed on the fixed bracket, and the other end of the fixed rod is fixedly connected to the support plate. Positioning pins are arranged on the fixed bracket, and several positioning holes are opened on the wire roller, and the positioning holes are distributed circularly around the center of the wire roller, and the positioning pins cooperate with the positioning holes.

本发明的有益效果是搭建方便,方便立即投入使用,提高了施工效率,人力控制平台升降,避免了突然断电引发的平台坠落事故,平台四角有绳固定,绳与桩孔处设置护套,保证人们在平稳,安全的平台上施工。对于大型装置在地上和地下的运送过程中,采用吊装,直接将设备吊起,避免搬卸过程。 The beneficial effect of the present invention is that it is convenient to build, convenient to put into use immediately, improves the construction efficiency, manpower controls the lifting of the platform, and avoids the platform falling accident caused by sudden power failure. Ensure that people are working on a stable and safe platform. For the transportation of large devices on the ground and underground, hoisting is used to directly lift the equipment to avoid the process of unloading.

附图说明 Description of drawings

图1是本发明结构示意图;图2是图1的俯视放大结构示意图;图3是图1中Ⅰ局部放大结构示意图。 Fig. 1 is a schematic diagram of the structure of the present invention; Fig. 2 is a schematic diagram of a top view enlarged structure of Fig. 1; Fig. 3 is a schematic diagram of a partial enlarged structure of I in Fig. 1 .

附图标记:1支架 2横管 3吊绳 4拉绳 5手扳葫芦 6固定绳 7平台架 8平台板 9支腿 10护套 11支脚 12连接绳 13挂钩 14固定支架 15定位销 16固定杆 17线辊 18配重块 19摇柄 20摇动连接板 21支撑板 22固定轴 23吊绳 24吊装口。 Reference signs: 1 bracket 2 horizontal pipe 3 suspension rope 4 pull rope 5 lever hoist 6 fixed rope 7 platform frame 8 platform board 9 outrigger 10 sheath 11 foot 12 connecting rope 13 hook 14 fixed bracket 15 positioning pin 16 fixing rod 17 Wire Roller 18 Counterweight 19 Rocking Handle 20 Shaking Connection Plate 21 Support Plate 22 Fixed Shaft 23 Suspension Rope 24 Hoisting Port.

具体实施方式 Detailed ways

地下电缆施工用升降平台,包括四个支腿9,四个支腿9上安装支架1,支架1上安装横管2,横管2两端分别设置一个吊绳3,吊绳3上端固定在横管2上,吊绳3下端设置手扳葫芦5,手扳葫芦5上端与吊绳3连接,手扳葫芦5下端设置两段固定绳6,两段固定绳6下端设置平台架7,所述支架1的四个连接节点上分别设置一个拉绳4,拉绳4上端与支架1连接,拉绳4下端与平台架7相连,拉绳4将平台架7与支架1相连,使升降平台更加平稳,不易产生剧烈晃动,大大增加了施工人员的安全性;为增加四个支腿9的稳定性、使支腿9不会产生剧烈晃动,所述四个支腿9下端分别安装支脚11,支脚11的外径大于支腿9的外径;为了防止出现拉绳4与桩孔接触处磨损导致的拉绳4强度降低甚至断裂的现象,所述拉绳4上设置护套10,护套10套在拉绳4上,护套10上端设置连接绳12,为使护套10能一直处于拉绳4和桩孔内壁之间而不产生脱落,连接绳12上端与支架1相连;所述平台架7上安装平台板8,起到承载和保护人体的作用。使用本发明施工时,将四个支腿9与支脚11固定在桩孔四周,再将支架1安装在四个支腿9上,将横管2固定在支架1上,横管2上固定吊绳3,再将平台架7和平台板8通过吊绳3和手扳葫芦5下降到桩孔的作业位置,最后用拉绳4将支架1与平台架7相连。平台架7上安装平台板(8),平台板8上开设吊装口24,平台板8上设置支撑板21,支撑板21设置水平的固定轴22,固定轴22上套装线辊17,线辊17的端部安装圆形,摇动连接板20的圆心与线辊17重合,摇动连接板20的边沿处设置摇柄19,线辊17上安装吊绳23,吊绳23上端固定连接线辊17,吊绳23下端固定连接挂钩13,线辊17位于吊装口24上部。将挂钩13与被运送装置连接,被运送装置与平台一并升降,单独输送被运送装置时,摇动摇柄19,完成操作。对于大型装置在地上和地下的运送过程中,采用吊装,直接将设备吊起,避免搬卸过程。施工完毕后将平台架7用手扳葫芦5升上来,再将整套装置抬至下一处施工地点即可立即投入使用,从而大大增加设备利用率,减少拆装设备时间,提高了施工效率。摇动连接板20边沿处设置配重块18,配重块18与摇柄19的连线穿过摇动连接板20的圆心,配重块18降低摇动过程的用力,同时对摇动过程起到平衡作用。为了进一步提高稳定性,所述的固定轴22上安装固定支架14,固定支架14上安装固定杆16一端,固定杆16另一端固定连接支撑板21。固定板21能够与固定支架14连接更加牢固。固定支架14上设置定位销15,线辊17上开设数个定位孔,定位孔以线辊17的圆心为中心环形分布,定位销15与定位孔相配合,定位销15能够随时固定线辊17,避免线辊17倒转损坏设备和装置。 The lifting platform for underground cable construction includes four outriggers 9, a bracket 1 is installed on the four outriggers 9, a horizontal tube 2 is installed on the bracket 1, a suspension rope 3 is respectively arranged at both ends of the horizontal tube 2, and the upper end of the suspension rope 3 is fixed on On the horizontal pipe 2, a lever hoist 5 is arranged at the lower end of the suspension rope 3, and the upper end of the lever hoist 5 is connected with the suspension rope 3, and the lower end of the lever hoist 5 is provided with two sections of fixed ropes 6, and the lower end of the two sections of fixed ropes 6 is provided with a platform frame 7. A stay rope 4 is respectively arranged on the four connection nodes of the support 1, the upper end of the stay rope 4 is connected with the support 1, the lower end of the stay rope 4 is connected with the platform frame 7, and the stay rope 4 connects the platform frame 7 with the support 1, so that the lifting platform It is more stable and less prone to violent shaking, which greatly increases the safety of construction personnel; in order to increase the stability of the four legs 9 and prevent the legs from shaking violently, the lower ends of the four legs 9 are respectively equipped with legs 11 , the outer diameter of the support leg 11 is greater than the outer diameter of the support leg 9; in order to prevent the phenomenon that the strength of the stay cord 4 is reduced or even broken due to the wear and tear of the contact between the stay cord 4 and the pile hole, a sheath 10 is arranged on the stay cord 4, and the sheath The cover 10 is set on the stay cord 4, and the upper end of the sheath 10 is provided with a connecting rope 12. In order to keep the sheath 10 between the stay cord 4 and the inner wall of the pile hole without falling off, the upper end of the connecting rope 12 is connected to the support 1; A platform plate 8 is installed on the platform frame 7 to play the role of carrying and protecting the human body. When using the present invention for construction, four supporting legs 9 and supporting feet 11 are fixed around the pile hole, then the bracket 1 is installed on the four supporting legs 9, the horizontal tube 2 is fixed on the bracket 1, and the horizontal tube 2 is fixed to hang Rope 3, platform frame 7 and platform plate 8 are dropped to the operation position of pile hole by suspension rope 3 and lever block 5 again, support 1 is connected with platform frame 7 with stay rope 4 at last. A platform plate (8) is installed on the platform frame 7, a hoisting opening 24 is provided on the platform plate 8, a support plate 21 is arranged on the platform plate 8, and a horizontal fixed shaft 22 is arranged on the support plate 21, and the line roller 17 and the line roll are set on the fixed shaft 22. The end of 17 is installed with a circle, the center of circle of the shaking connecting plate 20 coincides with the line roller 17, the edge of the shaking connecting plate 20 is provided with a rocking handle 19, a suspension rope 23 is installed on the line roller 17, and the upper end of the suspension rope 23 is fixedly connected to the line roller 17 , the lower end of the suspension rope 23 is fixedly connected to the hook 13, and the line roller 17 is located at the top of the hoisting port 24. The hook 13 is connected with the conveyed device, and the conveyed device and the platform are raised and lowered together. When the conveyed device is transported separately, the rocking handle 19 is shaken to complete the operation. For the transportation of large devices on the ground and underground, hoisting is used to directly lift the equipment to avoid the process of unloading. After the construction is completed, lift the platform frame 7 up with the lever hoist 5, and then lift the whole device to the next construction site and put it into use immediately, thereby greatly increasing the utilization rate of the equipment, reducing the time for disassembling and assembling the equipment, and improving the construction efficiency. A counterweight 18 is arranged at the edge of the shaking connecting plate 20, and the connection line between the counterweight 18 and the rocking handle 19 passes through the center of the circle of the shaking connecting plate 20, and the counterweight 18 reduces the force of the shaking process, and at the same time plays a balancing role in the shaking process . In order to further improve the stability, a fixed bracket 14 is installed on the fixed shaft 22 , one end of a fixed rod 16 is installed on the fixed bracket 14 , and the other end of the fixed rod 16 is fixedly connected to the support plate 21 . The fixing plate 21 can be connected more firmly with the fixing bracket 14 . Positioning pin 15 is arranged on the fixed bracket 14, and several positioning holes are offered on the wire roller 17, and the positioning holes are distributed circularly around the center of the circle of the wire roller 17, and the positioning pin 15 cooperates with the positioning hole, and the positioning pin 15 can fix the wire roller 17 at any time , to prevent the line roller 17 from inverting and damaging the equipment and devices.

通过本发明,在对抗滑桩施工时使用的升降平台搭建方便,方便立即投入使用,提高了施工效率,本发明使用人力控制平台升降,避免了突然断电引发的平台坠落事故,平台四角有绳固定,绳与桩孔处设置护套,保证人们在平稳,安全的平台上施工。 Through the present invention, the lifting platform used in the construction of anti-sliding piles is convenient to build, convenient to put into use immediately, and improves the construction efficiency. The present invention uses manpower to control the lifting of the platform, avoiding the platform falling accident caused by sudden power failure. There are ropes at the four corners of the platform. Fixed, the rope and the pile hole are provided with a sheath to ensure that people can work on a stable and safe platform.

以上结合附图对本发明的具体实施方式作了说明,但这些说明不能被理解为限制了本发明的范围,本发明未详尽描述的技术内容均为公知技术。 The specific embodiments of the present invention have been described above in conjunction with the accompanying drawings, but these descriptions should not be construed as limiting the scope of the present invention, and the technical contents not described in detail in the present invention are all known technologies.

Claims (6)

1. ground cable elevating platform for construction use, it is characterized in that: comprise four supporting legs (9), the upper mounting bracket (1) of four supporting legs (9), the upper transverse tube (2) of installing of support (1), transverse tube (2) two ends arrange respectively a lifting rope (3), lifting rope (3) upper end is fixed on the transverse tube (2), lifting rope (3) lower end arranges Lever Blocks (5), Lever Blocks (5) upper end is connected with lifting rope (3), Lever Blocks (5) lower end arranges two sections static lines (6), two sections static lines (6) lower end arranges paralell (7), on four connecting joint of described support (1) stay cord (4) is set respectively, stay cord (4) upper end is connected with support (1), stay cord (4) lower end links to each other with paralell (7), the upper erecting stage plate (8) of paralell (7), offer hoisting port (24) on the landing slab (8), stay bearing plate (21) is set on the landing slab (8), stay bearing plate (21) arranges the anchor shaft (22) of level, the upper cover of anchor shaft (22) wiring roller (17), the end of line roller (17) is installed circular, the center of circle of shaking connecting panel (20) overlaps with line roller (17), the edge of shaking connecting panel 20 arranges rocking handle (19), the upper lifting rope (23) of installing of line roller (17), lifting rope (23) upper end captive joint line roller (17), lifting rope (23) lower end captive joint hook (13), line roller (17) is positioned at hoisting port (24) top.
2. ground cable elevating platform for construction use according to claim 1, it is characterized in that: leg (11) is installed respectively in described four supporting legs (9) lower end, and the external diameter of leg (11) is greater than the external diameter of supporting leg (9).
3. ground cable elevating platform for construction use according to claim 1, it is characterized in that: sheath (10) is set on the described stay cord (4), sheath (10) is enclosed within on the stay cord (4), and sheath (10) upper end arranges connection cord (12), and connection cord (12) links to each other with support (1).
4. ground cable elevating platform for construction use according to claim 1, it is characterized in that: described connecting panel (20) edge of shaking arranges clump weight (18), and clump weight (18) passes the center of circle of shaking connecting panel (20) with the line of rocking handle (19).
5. ground cable elevating platform for construction use according to claim 1, it is characterized in that: the upper mounting and fixing bracket (14) of described anchor shaft (22), upper fixed link (16) one ends, fixed link (16) other end captive joint stay bearing plate (21) installed of fixed support (14).
6. ground cable elevating platform for construction use according to claim 5, it is characterized in that: locating dowel pin (15) is set on the described fixed support (14), the line roller is offered several knock holees on (17), knock hole is annular spread centered by the center of circle of line roller (17), and locating dowel pin (15) matches with knock hole.
CN201210550342.1A 2012-12-18 2012-12-18 Lifting platform for underground cable construction Expired - Fee Related CN103011032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210550342.1A CN103011032B (en) 2012-12-18 2012-12-18 Lifting platform for underground cable construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210550342.1A CN103011032B (en) 2012-12-18 2012-12-18 Lifting platform for underground cable construction

Publications (2)

Publication Number Publication Date
CN103011032A true CN103011032A (en) 2013-04-03
CN103011032B CN103011032B (en) 2015-01-07

Family

ID=47960222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210550342.1A Expired - Fee Related CN103011032B (en) 2012-12-18 2012-12-18 Lifting platform for underground cable construction

Country Status (1)

Country Link
CN (1) CN103011032B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107963545A (en) * 2017-11-24 2018-04-27 中国二冶集团有限公司 Installation method, method for dismounting and the mast-up of vertical storage tank
KR101979236B1 (en) * 2019-01-08 2019-05-16 삼성엔지니어링 주식회사 Gondola for ascending and descending worker in water bath

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2657573A1 (en) * 1976-12-18 1978-06-22 Gewerk Eisenhuette Westfalia DEVICE FOR EXTENDING SHAFT OR DGL.
US5507596A (en) * 1993-10-15 1996-04-16 The United States Of America As Represented By The Secretary Of Commerce Underwater work platform support system
CN2263646Y (en) * 1995-09-08 1997-10-01 中国京冶建设工程承包公司地基及地下工程部 Foundation piles holing windlass
JPH09269393A (en) * 1996-04-02 1997-10-14 Toshiba Corp Multi-point hanging jig device
JPH11229799A (en) * 1998-02-16 1999-08-24 Hitachi Constr Mach Co Ltd Traveling type gondola
CN201406296Y (en) * 2009-04-10 2010-02-17 任元志 Chain hoist
CN201587828U (en) * 2010-01-26 2010-09-22 葛洲坝集团机电建设有限公司 Gantry crane
CN202337668U (en) * 2011-12-12 2012-07-18 中国三冶集团有限公司机械安装工程公司 Device for transporting equipment
CN202968040U (en) * 2012-12-18 2013-06-05 山东电力集团公司检修公司 Lifting platform for construction of underground cable

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2657573A1 (en) * 1976-12-18 1978-06-22 Gewerk Eisenhuette Westfalia DEVICE FOR EXTENDING SHAFT OR DGL.
US5507596A (en) * 1993-10-15 1996-04-16 The United States Of America As Represented By The Secretary Of Commerce Underwater work platform support system
CN2263646Y (en) * 1995-09-08 1997-10-01 中国京冶建设工程承包公司地基及地下工程部 Foundation piles holing windlass
JPH09269393A (en) * 1996-04-02 1997-10-14 Toshiba Corp Multi-point hanging jig device
JPH11229799A (en) * 1998-02-16 1999-08-24 Hitachi Constr Mach Co Ltd Traveling type gondola
CN201406296Y (en) * 2009-04-10 2010-02-17 任元志 Chain hoist
CN201587828U (en) * 2010-01-26 2010-09-22 葛洲坝集团机电建设有限公司 Gantry crane
CN202337668U (en) * 2011-12-12 2012-07-18 中国三冶集团有限公司机械安装工程公司 Device for transporting equipment
CN202968040U (en) * 2012-12-18 2013-06-05 山东电力集团公司检修公司 Lifting platform for construction of underground cable

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107963545A (en) * 2017-11-24 2018-04-27 中国二冶集团有限公司 Installation method, method for dismounting and the mast-up of vertical storage tank
KR101979236B1 (en) * 2019-01-08 2019-05-16 삼성엔지니어링 주식회사 Gondola for ascending and descending worker in water bath

Also Published As

Publication number Publication date
CN103011032B (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN101357739B (en) Column crane special for movable arm type group tower
CN102359303B (en) UHV ordinary line iron tower assembly method
CN102877547B (en) Steel net rack installation method for integrally improving high-altitude moving and positioning
CN209601999U (en) A kind of packaged type power-assisted pipeline boom hoisting
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN205688774U (en) A kind of electric bridge scaffold
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN201214598Y (en) Column crane special for movable arm type tower erection
CN105271024B (en) Tower crane with windproof structure
CN203128099U (en) Slipping type pipeline lifting device
CN103011032B (en) Lifting platform for underground cable construction
CN105293301B (en) Windproof tower crane
CN205241084U (en) Lifting machine
CN105293311B (en) A kind of tower crane with wind-shielding function
CN202968040U (en) Lifting platform for construction of underground cable
CN105293299B (en) Windproof derrick crane for building
CN110697585A (en) A mechanism for self-detaching attachment device
CN219031629U (en) Lifting equipment for indoor plate installation
CN105293302B (en) Tower crane with wind-shielding function
CN211473336U (en) Attached lifting scaffold with stable stress
CN202754777U (en) Slide-resistant pile lifting construction platform
CN209210183U (en) fixed system
CN105293300B (en) Can be with the tower crane of fast assembling-disassembling balancing weight
CN206940317U (en) A kind of hanger structure for rack upper air installing
CN207361640U (en) A kind of simple and easy hoisting equipment for large diameter pipeline welding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

CF01 Termination of patent right due to non-payment of annual fee