CN102999801A - Municipal road and bridge common management platform - Google Patents
Municipal road and bridge common management platform Download PDFInfo
- Publication number
- CN102999801A CN102999801A CN2012103319664A CN201210331966A CN102999801A CN 102999801 A CN102999801 A CN 102999801A CN 2012103319664 A CN2012103319664 A CN 2012103319664A CN 201210331966 A CN201210331966 A CN 201210331966A CN 102999801 A CN102999801 A CN 102999801A
- Authority
- CN
- China
- Prior art keywords
- platform
- wyq
- road
- city
- revises
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 claims abstract description 90
- 238000012986 modification Methods 0.000 claims abstract description 7
- 230000004048 modification Effects 0.000 claims abstract description 7
- 238000012545 processing Methods 0.000 claims abstract description 5
- 238000004891 communication Methods 0.000 claims abstract description 3
- 238000005516 engineering process Methods 0.000 claims description 17
- 230000006870 function Effects 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 5
- 238000005192 partition Methods 0.000 claims description 2
- 238000004171 remote diagnosis Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 7
- 238000009434 installation Methods 0.000 description 6
- 230000002354 daily effect Effects 0.000 description 5
- 239000003502 gasoline Substances 0.000 description 5
- 239000000446 fuel Substances 0.000 description 4
- 239000002737 fuel gas Substances 0.000 description 4
- 230000002349 favourable effect Effects 0.000 description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical group [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 2
- 238000003915 air pollution Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000006855 networking Effects 0.000 description 2
- 206010002820 Antisocial behaviour Diseases 0.000 description 1
- 101100136092 Drosophila melanogaster peng gene Proteins 0.000 description 1
- 244000046101 Sophora japonica Species 0.000 description 1
- 235000010586 Sophora japonica Nutrition 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 208000024891 symptom Diseases 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A municipal road and bridge common management platform is characterized in that the platform can be used for mutual contact and communication, reediting, additional establishment, content modification, additional establishment and modification of 15 main menus and setting different editors at each level according to different editing contents so that users edit according to needs; special editors are used for special specific drawings such as urban road planning drawings, urban area maps, planning drawings, deployment diagrams, state-owned asset equipment distribution drawings, engineering drawings and the like: taking east longitude and northern latitude as datum lines, classifying by class roads and streets and defining by starting and ending points, turns and slant roads; annotations are written randomly at any time; characters and forms of the municipal road and bridge common management platform are processed by 'word' and 'excel' respectively, paging adopts general specification of A4 paper, the resolution ratio of general images of the municipal road and bridge common management platform is smaller than 300, and the page specification adopts A4 paper specification, and jpg and bmt file formats are adopted; files enter the platform by file processing modes of copying, uploading and the like; and the users can edit according to wishes thereof.
Description
Technical field
Municipal administration road and bridge management common platform is Municipal administrative skill field new product, is specialty products information-based, intelligent, the robotization security protection; Competitive strength is strong, and its information owning rate is strong, and intelligent functions is powerful, and automaticity is high, is informationization, intellectuality, the robotization scientific payoffs of a high-end science and technology.Allow city road and bridge management common platform be that the government department in big or middle city increases economic benefit, for municipal administration and public transport field unimpeded made larger contribution.
Background technology.
Development along with modern society, people's living condition generally improves, and general people wants owning a car, takes a bus instead of walking, automobile is expanded in the city, obstruction is caused in the place of city prosperity, has a strong impact on traffic, reduces the speed of vehicle, the increase of Fuel Consumption, the automobile fuel gas discharge capacity increases, and the air pollution in city has a strong impact on bad border, city.Present traffic administration police carries camera and takes a picture everywhere, imposes a fine, and cures the symptoms, not the disease;
We think this in the world mayor in each city, sincere will plan attentively, the space that planning is out stopped, set up public parking lay-by, import the technical background of city road and bridge management common platform, allow the driver place of having stopped, make parking of automobile convenient, the driver gains time and money, and urban road is unimpeded, and car speed increases, automobile reduces fuel consumption, each automotive average can be saved 2 liters in gasoline in one day, and there are 200,000 automobiles in your city, can save the gasoline of 200,000 liters in gasoline in one day, every liter of gasoline calculates by 7 yuan can save 1,400,000 yuan of Renminbi in one day, reduce the automobile fuel gas discharge capacity, reduce urban air pollution, improve bad border, city;
Some cities have been arranged at present; Planned the parking space of the public curb parking in city, set up public parking lay-by, adopt traditional manually collecting money " to receive the service fee of parking of automobile ", the parking service expense rate of collecting allow the staff put into he individual's oneself purse, corrupt, cause the fund loss serious, because receive the fiscal revenue that the money that comes is country, the toll collector does not receive that his parking money is unimportant, irresponsibility, pay such as the car owner and to have no relations, it doesn't matter.Weak effect can only be received 15% parking rate of parking service expense rate, has had a strong impact on the economic benefit of Public Parking;
Traditional labor management charge only has and strengthens the concept that financial management is served as theme, and can not satisfy human nature service.How fully to hold demand, obtain user's satisfaction, satisfy modern comprehensive regulatory requirement; Will be by the parking BPR (Business Process Reengineering), optimize the parking of automobile industry value chain, imported the management that enters informationization, intellectuality, robotization behind the technical background of municipal road and bridge management common platform;
Some cities have been arranged now, and they realize unmanned after having imported the technical background of city road and bridge management common platform, and automatic charging is realized automatic management; Curb parking position parking of automobile, temporary parking is free of charge, and stop more than 15 minutes (time is fixed from the owner) collects money, surpass 15 minutes, received 10 yuan of parking fees to 1 hour, average parking fee stopped in one day 11 hours, 110 yuan of the incomes of each parking stall every day can be taken in 3300 yuan per month; 39600 yuan of annual parking potential energy incomes, if 100000 parking stalls of your city planning, increase income per month 33,000 ten thousand yuan, increased annual fiscal revenue: 3,960,000,000 yuan, this has reduced random parking phenomenon, the transport solution problem, improve the urban air environment, increase considerably fiscal revenue, you are sitting in the ruuning situation of the municipal road and bridge management common platform that can both know whole city in the office Messrs mayor, very clear, why not do it;
There is now increasing city to import the technical background of city road and bridge management common platform, effect is remarkable, the money of the parking service expense rate of collecting manys receipts more than 600% than original, it is better that traffic becomes, air quality also improves gasoline and has also saved, the driver has local the parking, and the driver saves time and money; The more important thing is the air ambient that has improved this city, also increased people's the bad border of living; Road and bridge management common platform in city is the full automatic public curb parking lock in a city, manage management platform in one with the road and bridge in a city, to be tackled according to the complex situations in public roadside by my Mr. Wang Yanqing of company to design, night, public roadside did not affect normal automobile driving, can tackle the complex situations in public roadside.The degree of his informationization, intellectuality, robotization is high, powerful new product.It is a high-end scientific and technological achievement.He adopts powerful high-end huge computer networking technology, in conjunction with huge " racle " database, in conjunction with touch-screen automatic charging machine technology, in conjunction with singlechip technology, the combining wireless transmit-receive technology, in conjunction with autonomous information, the high-end technology of intelligence, robotization is in the new electromechanical integrated product of one.The software knot adopts the huge computer networking technology of structure and huge " racle " database, adding the C/S framework programmes, the system software called after: " wyq-DSlbtcsxt " with a city " [automatic charging public curb parking lock] links together, and realizes whole city's system integration, automatic management; Also listing the management of citywide road and bridge in platform, is the scientific payoffs of a high-end technology science and technology
Summary of the invention
1, general introduction
A, platform and system are any differences
" platform " and " system " are that what difference is that the implication of the application of " platform " and her word is more extensive, the scope of her performance function is wider, she namely can carry out each other contact, link up, update, set up in addition, content modification, flexible;
System: she is confined to the scope that native system is planned, the difference of her performance function and platform is fully different;
B, the description of city road and bridge management common platform
She is that 1 implication is more extensive for municipal administration road and bridge management common platform, the scope of her performance function is wider, she namely can carry out each other contact, link up, update, set up in addition, content modification, the platform in flexible whole city city, she has set up other sub secondary menu of 5 levels of 15 master menus, the user can arbitrarily momentarily set up in addition, content modification, flexible, divide different content of edit to set up each rank to set up different editing machines, road and bridge management common platform in city allows the user edit according to his needs; Adopt special editing machine for special specific figure such as urban road planning chart, map of the city, planning chart, enforcement figure, state-owned assets device distribution figure, engineering drawings: footpath, north latitude are datum line to the east of her, take grade as the road, the street is as classification, with terminal, turning, wrong path have been set up definition; Mark is followed one's inclinations at any time and is optionally write into; " word " " excel " adopted in the literal of city road and bridge management common platform, the processing of form, the specification of general A4 paper is adopted in paging, the general image of city road and bridge management common platform: adopt resolution below 300, the specification of a page or leaf specification A4 paper adopts jpg and bmt file layout; City road and bridge management common platform file processing adopts and copies, uploads, copies, etc. mode advance platform; Also can directly edit at platform; Direct and the broad masses' communication in the homepage interface of platform, the user can edit according to the wish of oneself;
Server has high stability, and in order to realize high speed to satisfy numerous users' demand, server comes assurance work by adopting symmetric multi processor (smp) to install, insert a large amount of high-speed internal memory; It is strong that its mainboard is installed two cpu server processors, stability, reliability, security, extensibility, manageability simultaneously, and powerful external data handling capacity is arranged;
Server is in order to guarantee enough securities, redundancy, system backup, online diagnosing technique of support shaft, Fault pre-warning technology, internal memory error correcting technique, hot plug technology and remote Diagnosis Technology etc. have also been adopted, most faults can be repaired in non-stop-machine situation timely, have extremely strong manageability; This Platform Designing is of superb skills, complicated, uses simply, and the people of general culture can both use;
C, the function of city road and bridge management common platform
This Platform Designing engineering is huge, and is of superb skills, complicated, uses simply, and the people of general culture can both use, and is an applicability, the platform of practicality, versatility; Her utility function is widely, all include municipal administration parking lock and road and bridge management in management: the management of (1) town road, submenu: (A) town road planning (B) town road management: submenu: (a) the municipal bridge management submenu of municipal external road management (c) engineering management (d) the road file administration (2) of civic center road management (b): (A) municipal science of bridge building management (D) the municipal bridge file administration of the municipal bridge management of municipal bridge planning (B) (C) (3) municipal parking lay-by management, submenu: (A) whole city's parking area planning (B) whole city's parking lot management (C) parking lot, whole city file administration (D) whole city parking lot fee collection management, submenu: each district sets up a sub-directory, by the server in each district with the pay imformation timed sending to this sub-directory, whole sub-directory is kept accounts, gather, list daily paper, monthly magazine, annual report; Touch-screen automatic charge device below the server lower partition domain server in each district, the region server is kept accounts, and gathers, and lists daily paper, monthly magazine, annual report; The touch-screen automatic charge device to region server, region server, is kept accounts the pay imformation timed sending, gathers, and lists daily paper, monthly magazine, annual report; Region server region server, is kept accounts the server of pay imformation timed sending to the district, gathers, and lists daily paper, monthly magazine, annual report; From bottom to up, automatically keep accounts layer by layer, gather, list daily paper, monthly magazine, annual report; Autoreport from bottom to up is in full accord, and is accurate;
(E) the parking lot intercourse platform is each other communicate information common platforms of parking lot management personnel, the direct intercommunication of information between at different levels as whole platform, interconnected, communicate with each other etc...
Backstage management of platform is with grade, and by professional's management, each grade is set up different administrator passwords, and the user can increase arbitrarily menu directory (master menu Set arbitrarily, the endless setting of submenu);
D, server
*
, municipal road and bridge management common platform city-level server adopts IBM x3850/x3950, and two path processor CPU are 2, the maximum 1TB of internal memory;
*,
District's level server of municipal administration road and bridge management common platform adopts: IBM x3850/x3950 one path processor CPU is 1, the maximum 1TB of internal memory;
*,
The region class server of municipal administration road and bridge management common platform is at will just passable with common computer;
E, municipal road and bridge management common platform software
*,
Municipal administration road and bridge management common platform city-level platform application software oneself programming: adopt huge database " racle " database, add the C/S framework and programme, platform application software called after: wyq-dscpparpl;
*,
District's level platform application software oneself of municipal administration road and bridge management common platform programmes: name and be wyq-dqcpparpl;
*,
City-level platform operating software is selected the pageadmin system;
*,
City-level platform application software and subordinate's platform application software adopt the continuity operation of root directory;
2, municipal road and bridge the public operation platform "
*, municipal operating platform uses huge database " racle ";
*, City-level workshation resource " wyq-Clwtrs " is arranged, revises;
*, district's level system resource " wyq-dsrs " is arranged, revises;
*, district's level work station resource " wyq-WTRS " is arranged, revises;
*, district system resource " wyq-ristrs " is arranged, revises;
*, regional work station resource " wyq-riwtrs " is arranged, revises;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged, revises;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged, revises;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged, revises;
3, district's level is stopped and is locked the public operation platform
*, the region operation platform uses huge database " racle "
*, the region operation platform arranges, revises district's level system resource " wyq-dsrs ";
*, district's level work station resource " wyq-WTRS " is arranged, revises;
*, district system resource " wyq-ristrs " arranges, revises;
*, regional work station resource " wyq-riwtrs " is arranged, revises;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged, revises;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged, revises;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged, revises;
4, lock public operation platform stops in the zone
A, CPP zone public operation platform
*, regional public operation platform uses huge database " racle "
*, district system resource " wyq-ristrs " arranges, revises;
*, regional work station resource " wyq-riwtrs " is arranged, revises;
B, the touch-screen automatic charge device
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged, revises;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged, revises;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged, revises;
5, municipal road and bridge management common platform, it is characterized in that: (1) software configuration is to adopt " racle " huge database, adds the c/s framework and programmes; (2) network structure adopts huge network management pattern, adopts microcomputer huge network and singlechip technology, and (Shanghai Yanqing Electronics Co., Ltd. produces patent of invention product, the patent No.: 201110332481.2 in conjunction with the touch-screen automatic charge device; ) (Shanghai Yanqing Electronics Co., Ltd. produces patent of invention product, the patent No.: 201210242868.3 to lock system in conjunction with public curb parking; ) it is the new product of modern electromechanical integration; (3) practical function: public curb parking is carried out unmanned, automatic charging, self-service management; (4) system architecture: system establishes the city-level director server, establish arbitrarily workstation, if district's level server, establish arbitrarily workstation, the charging machine management server is established arbitrarily workstation, and charging machine links together with " ARPL – RD " [the public curb parking lock of automatic charging], (every charging machine can connect at most 160 " ARPL – RD " and link together) fully automatic working.System is take subregion as unit, and subregion is established the touch-screen automatic charge device and carried out automatic charging (managing arbitrarily several subregions according to touch-screen automatic charge device of user's needs); Each subregion fills 32 automatic charging for parking locks, control (endless) individual parking stall, a city, adopt a cover software administration, the City-level server system is included the road and bridge management in city in the common platform management, the intercourse platform with the masses has also been set up at the platform interface, and system can keep the data in 2 years;
*, system selects public curb parking lock system to see (Shanghai Yanqing Electronics Co., Ltd.'s patent of invention product, the patent No.: 201210242868.3; )
*, system selects the touch-screen automatic charge device to see that (Shanghai Yanqing Electronics Co., Ltd. produces patent of invention product, the patent No.: 201110332481.2; )
Four, description of drawings
6, Fig. 1 is: municipal road and bridge management common platform network connection figure;
Fig. 2 is: the automatic charging for parking lock network network connection layout of municipal road and bridge management common platform;
Five, embodiment
7, the construction wiring
7 .1, system network winding thread are with eight core category-5 cables, and the parking grid line is with 2X1 copper core multiply flexible cord, power lead 2X1.5, copper core multiply flexible cord, the lock supply lines usefulness of stopping 2X2.5 copper core multiply flexible cord, grooving on concrete floor, pipe laying, wiring;
8, environment
In order to ensure network system can be steady in a long-term normal operation, we install an air-conditioner, should use independently air-conditioning system the rainproof booth of touch-screen automatic fee charging management system of the lock that stops, fire-fighting, assemble automatic Smoke prevention and fire alarm system by regulations for fire fighting, the requirement of illumination, temperature, humidity, relatively require as follows: 30 – 35oC during the temperature operation; 8 %-80 % during the humidity operation; Antistatic floor is adopted on the floor, is beneficial to distribution and cleaning;
9, system power supply
*, the power supply switch can not be controlled by total power switch, and the independent air switch of installing is controlled;
*, as usual work of power supply back-up system uninterrupted power source online (UPS) power failure;
*, panel box should place in the main equipment room;
*, equipment needs the independent grounding protection: ground wire, and ground wire requires as follows:
A, ground voltage: ground wire should be less than 0.5 volt to power center line voltage;
B, stake resistance: should be less than 5 ohm;
*, battery is installed wiring:
Two ends of whole subregion parking lock are installed two maintenance-free batteries as line build-out, and red point is anodal, and stain is negative pole.The Battery Interconnecting Cables red line connects anodal, and black line connects negative pole, and wiring can not be anti-, the remote-control receiving circuit plate will be burnt such as reversal connection;
Battery can not overdischarge during use, and overdischarge will reduce the life-span of battery;
*, the installation of system software
A installs
City-level platform operating software pageadmin system;
*, " racle " huge database is installed;
*, city-level application software: wyq-dscpparpl is installed;
10, municipal road and bridge management common platform software is installed
A, city-level road and bridge management common platform software is installed
*, the city operating platform is installed to City-level database " racle ";
*, City-level workshation resource " wyq-dClwtrs " is arranged;
*, district's level system resource " wyq-dsrs " is checked setting;
*, district's level work station resource " wyq-WTRS " is checked setting;
*, district system resource " wyq-ristrs " is checked setting;
*, regional work station resource " wyq-riwtrs " is checked setting;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is checked setting;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is checked setting;
*, automatic stopping lock resource " wyq-aplrsrs " is checked setting;
B, district's level public operation platform
*, installing zone level platform application software: wyq-dqcpparpl;
*, " racle " huge database is installed;
*, district's level work station resource " wyq-WTRS " arranges;
*, district's level system resource " wyq-dsrs " is arranged;
*, district's level work station resource " wyq-WTRS " is arranged;
*, district system resource " wyq-ristrs " checks setting;
*, regional work station resource " wyq-riwtrs " is checked setting;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is checked setting;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is checked setting;
*, automatic stopping lock resource " wyq-aplrsrs " is checked setting;
C, regional public operation platform
*, " racle " huge database is installed;
*, district system resource " wyq-ristrs " arranges;
*, regional work station resource " wyq-riwtrs " is arranged;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is checked setting;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is checked setting;
*, automatic stopping lock resource " wyq-aplrsrs " is checked setting;
D, the touch-screen automatic charge device
*, " racle " huge database is installed;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged;
*, install and grind the board voice system, ARPL application software wyq-Slbtcsxt is installed;
11, the installation of system hardware
The city-level server at first is installed is adopted IBM x3850/x3950, two path processor CPU are 2, the maximum 1TB of internal memory;
Hard disk relies configuration, installation load balanced device, installment work station computer according to user's platform consumption; Workstation computer is connected to load equalizer, is connected to server
*,
District's level server adopts: IBM x3850/x3950 one path processor CPU is 1, the maximum 1TB of internal memory; Hard disk relies configuration, installation load balanced device, installment work station computer according to user's platform consumption; Workstation computer is connected to load equalizer, is connected to server
*,
The region class server is at will just passable with common computer; Install router, with the outer net couple in router, other all facilities are couple in router all; The microcomputer server of again user being had by oneself checks, installs again; The microcomputer workstation of again user being had by oneself checks, installs again, and trial run powers on.
12, the installation of touch-screen automatic charge device
The touch-screen automatic charge device is fixed on the antistatic floor with two swell fixtures, and back-up source is installed in following face, installs TV monitoring and controlling, installs an air-conditioner, and trial run powers on;
The installation of [the public curb parking lock of automatic charging]
The base of [automatic charging public curb parking lock] rises with Peng, and to be installed on the concrete floor plane earth flat for screw, the silk mouth of a screw struck hair fall, and allows the people not tear open;
Armamentarium installs the trial run that powers on fully;
Above equipment installs, try out separately complete, the debug system that formally puts into operation, complete being delivered for use of operation debugging;
13, performance:
Chongqing City Jiangjin District Urban Council is to come into effect in May, 2012, and the road sets up five automatic charging zones, high honour road to set up two automatic charging zones, Bei Gumen to set up an automatic charging zone near a river.Preliminary 8 subregions in three highway sections of implementing altogether, 260 " SY-APRLS-K " [the public curb parking lock of automatic charging], the automatic charging of the lock that stops: the June begins charge, and time of existing 3 months so far, system run all right, effect are remarkable.The charge achievement had increased by 630% than former manual toll collection; The roads were clear of traffic, improved vehicle driving speed, lowered the fuel material consumption, and the automobile fuel gas discharge capacity has reduced, and the air quality in city has also improved, and improved simultaneously the bad border of life in city;
Parking management institute of Jinhua, Zhejiang Province city Urban Council has installed 64 " SY-APRLS-DK " [public curb parking lock of automatic charging in March, 2012, be installed in two roadsides, imperial North Street Public Parking, so far used five months, system run all right, effect are remarkable, the charge achievement had increased by 570% than former manual toll collection, the roads were clear of traffic, obtains user's favorable comment;
Parking management institute of Wenzhou City, Zhejiang Province Urban Council has installed 96 " SY-APRLS-DK " [the public curb parking lock of automatic charging system] in February, 2012, be installed in the square road and Qian Lu roadside, mansion Public Parking used six months so far, system run all right, effect are remarkable; The charge achievement had increased by 550% than former manual toll collection, and the roads were clear of traffic, obtained user's favorable comment;
Huai Yin district, Jinan, Shandong Province city traffic police team has installed 64 " SY-APRLS-DRW " [the public curb parking lock of automatic charging system] in March, 2012, be installed in the Jingshi Road and roadside, two Chinese scholartree West Roads Public Parking used five months so far, system run all right, effect are remarkable; The charge achievement had increased by 430% than former manual toll collection, and the roads were clear of traffic, obtained user's favorable comment;Improved vehicle driving speed, lowered the increase of fuel material consumption, the automobile fuel gas discharge capacity has reduced, and the air quality in city has also improved, and has improved simultaneously the bad border of life in city;
Claims (6)
1. a municipal road and bridge management common platform is characterized in that: her implication is more extensive, the scope of her performance function is wider, she namely can carry out each other contact, link up, update, set up in addition content modification, the platform in flexible whole city city; She has set up other sub secondary menu of 5 levels of 15 master menus, the user can arbitrarily momentarily set up in addition, content modification, flexible, divide different content of edit to set up each rank to set up different editing machines, road and bridge management common platform in city allows the user edit according to his needs; Adopt special editing machine for special specific figure such as urban road planning chart, map of the city, planning chart, enforcement figure, state-owned assets device distribution figure, engineering drawings: footpath, north latitude are datum line to the east of her, take grade as the road, the street is as classification, with terminal, turning, wrong path have been set up definition; Mark is followed one's inclinations at any time and is optionally write into; " word " " excel " adopted in the literal of city road and bridge management common platform, the processing of form, the specification of general A4 paper is adopted in paging, the general image of city road and bridge management common platform: adopt resolution below 300, the specification of a page or leaf specification A4 paper adopts jpg and bmt file layout; City road and bridge management common platform file processing adopts and copies, uploads, copies, etc. mode advance platform; Also can directly edit at platform; Direct and the broad masses' communication in the homepage interface of platform, the user can edit according to the wish of oneself.
2. server is characterized in that shown in claim 1: server has high stability, and in order to realize high speed to satisfy numerous users' demand, server comes assurance work by adopting symmetric multi processor (smp) to install, insert a large amount of high-speed internal memory; It is strong that its mainboard is installed two cpu server processors, stability, reliability, security, extensibility, manageability simultaneously, and powerful external data handling capacity is arranged;
Server is in order to guarantee enough securities, redundancy, system backup, online diagnosing technique of support shaft, Fault pre-warning technology, internal memory error correcting technique, hot plug technology and remote Diagnosis Technology etc. have also been adopted, most faults can be repaired in non-stop-machine situation timely, have extremely strong manageability; This Platform Designing is of superb skills, complicated, uses simply, and the people of general culture can both use;
*, municipal road and bridge management common platform city-level server adopts IBM x3850/x3950, and two path processor CPU are 2, the maximum 1TB of internal memory;
*, district's level server of municipal road and bridge management common platform adopts: IBM x3850/x3950 one path processor CPU is 1, the maximum 1TB of internal memory;
*, the region class server of municipal road and bridge management common platform is at will just passable with common computer.
3. the function of city road and bridge management common platform is characterized in that shown in claim 1: this Platform Designing engineering is huge, and is of superb skills, complicated, uses simply, and the people of general culture can both use, and is an applicability, the platform of practicality, versatility; Her utility function is widely, all include municipal administration parking lock and road and bridge management in management: the management of (1) town road, submenu: (A) town road planning (B) town road management: submenu: (a) the municipal bridge management submenu of municipal external road management (c) engineering management (d) the road file administration (2) of civic center road management (b): (A) municipal science of bridge building management (D) the municipal bridge file administration of the municipal bridge management of municipal bridge planning (B) (C) (3) municipal parking lay-by management, submenu: (A) whole city's parking area planning (B) whole city's parking lot management (C) parking lot, whole city file administration (D) whole city parking lot fee collection management, submenu: each district sets up a sub-directory, by the server in each district with the pay imformation timed sending to this sub-directory, whole sub-directory is kept accounts, gather, list daily paper, monthly magazine, annual report; Touch-screen automatic charge device below the server lower partition domain server in each district, the region server is kept accounts, and gathers, and lists daily paper, monthly magazine, annual report; The touch-screen automatic charge device to region server, region server, is kept accounts the pay imformation timed sending, gathers, and lists daily paper, monthly magazine, annual report; Region server region server, is kept accounts the server of pay imformation timed sending to the district, gathers, and lists daily paper, monthly magazine, annual report; From bottom to up, automatically keep accounts layer by layer, gather, list daily paper, monthly magazine, annual report; Autoreport from bottom to up is in full accord, and is accurate;
The parking lot intercourse platform is each other communicate information common platforms of parking lot management personnel, the direct intercommunication of information between at different levels as whole platform, interconnected, communicate with each other etc...
Backstage management of platform is with grade, and by professional's management, each grade is set up different administrator passwords, and the user can increase arbitrarily menu directory (master menu Set arbitrarily, the endless setting of submenu).
4. municipal road and bridge management common platform software is characterized in that shown in claim 1:
*, municipal road and bridge management common platform city-level platform application software oneself programming: adopt huge database " racle " database, add the C/S framework and programme, platform application software called after: wyq-dscpparpl.
5.* district's level platform application software oneself of municipal road and bridge management common platform is programmed: name and be wyq-dqcpparpl;
*, city-level platform operating software is selected the pageadmin system.
6. municipal road and bridge management common platform application software is characterized in that shown in claim 1:
*, city-level platform application software and subordinate's platform application software adopt the continuity operation of root directory;
*, municipal operating platform uses huge database " racle ";
*, City-level workshation resource " wyq-Clwtrs " is arranged, revises;
*, district's level system resource " wyq-dsrs " is arranged, revises;
*, district's level work station resource " wyq-WTRS " is arranged, revises;
*, district system resource " wyq-ristrs " is arranged, revises;
*, regional work station resource " wyq-riwtrs " is arranged, revises;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged, revises;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged, revises;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged, revises;
District's level is stopped and is locked the public operation platform
*, the region operation platform uses huge database " racle "
*, the region operation platform arranges, revises district's level system resource " wyq-dsrs ";
*, district's level work station resource " wyq-WTRS " is arranged, revises;
*, district system resource " wyq-ristrs " arranges, revises;
*, regional work station resource " wyq-riwtrs " is arranged, revises;
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged, revises;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged, revises;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged, revises;
Lock public operation platform stops in the zone
A, CPP zone public operation platform
*, regional public operation platform uses huge database " racle "
*, district system resource " wyq-ristrs " arranges, revises;
*, regional work station resource " wyq-riwtrs " is arranged, revises;
B, the touch-screen automatic charge device
*, touch-screen automatic charge device system resource " wyq-tsacmwtrs " is arranged, revises;
*, touch-screen automatic charge device workshation resource " wyq-tsacmwtrs " is arranged, revises;
*, automatic stopping lock resource " wyq-aplrsrs " is arranged, revises.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012103319664A CN102999801A (en) | 2012-09-11 | 2012-09-11 | Municipal road and bridge common management platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012103319664A CN102999801A (en) | 2012-09-11 | 2012-09-11 | Municipal road and bridge common management platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102999801A true CN102999801A (en) | 2013-03-27 |
Family
ID=47928345
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012103319664A Pending CN102999801A (en) | 2012-09-11 | 2012-09-11 | Municipal road and bridge common management platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102999801A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108132748A (en) * | 2017-11-28 | 2018-06-08 | 浙江工业大学 | Urban planning method, apparatus and electronic equipment |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090113292A1 (en) * | 2007-10-26 | 2009-04-30 | Microsoft Corporation | Flexibly editing heterogeneous documents |
| CN101661650A (en) * | 2008-08-28 | 2010-03-03 | 厦门君合科技有限公司 | Digital urban parking method and digital urban parking system |
| CN201444276U (en) * | 2005-12-01 | 2010-04-28 | 华为技术有限公司 | a server |
| CN201532657U (en) * | 2009-06-29 | 2010-07-21 | 深圳市华路德电子技术开发有限公司 | Urban road parking management system |
| CN101916267A (en) * | 2010-08-03 | 2010-12-15 | 南京中图数码科技有限公司 | Intelligent spatial data object modeling method applied to management of spatial data resource of road system |
-
2012
- 2012-09-11 CN CN2012103319664A patent/CN102999801A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201444276U (en) * | 2005-12-01 | 2010-04-28 | 华为技术有限公司 | a server |
| US20090113292A1 (en) * | 2007-10-26 | 2009-04-30 | Microsoft Corporation | Flexibly editing heterogeneous documents |
| CN101661650A (en) * | 2008-08-28 | 2010-03-03 | 厦门君合科技有限公司 | Digital urban parking method and digital urban parking system |
| CN201532657U (en) * | 2009-06-29 | 2010-07-21 | 深圳市华路德电子技术开发有限公司 | Urban road parking management system |
| CN101916267A (en) * | 2010-08-03 | 2010-12-15 | 南京中图数码科技有限公司 | Intelligent spatial data object modeling method applied to management of spatial data resource of road system |
Non-Patent Citations (1)
| Title |
|---|
| 朱俊毅: "常州市道桥管理信息系统的设计与实现", 《中国市政工程》, no. 5, 12 November 2010 (2010-11-12) * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108132748A (en) * | 2017-11-28 | 2018-06-08 | 浙江工业大学 | Urban planning method, apparatus and electronic equipment |
| CN108132748B (en) * | 2017-11-28 | 2020-06-02 | 浙江工业大学 | City planning method and device and electronic equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102999801A (en) | Municipal road and bridge common management platform | |
| CN102903158A (en) | City public platform (CPP)-automatic roadside parking lock (ARPL)-road (RD) roadside parking lock city public platform | |
| Dogru et al. | Parking management policies based on behavior analysis at Fatih district in Istanbul, Turkey | |
| CN102982618A (en) | CPP-ARPL-K roadside parking lock urban common platform | |
| Alghais et al. | Evaluating and improving on the development plan of South Saad Al Abdullah as a smart city in Kuwai | |
| Mosha | An Evaluation of Botswana's strategies to regularize informal settlements | |
| TWI673688B (en) | Facility inspection system | |
| Noland et al. | Residential property values and New Jersey transit village program | |
| Von Einsiedel et al. | The challenge of urban redevelopment in disaster-affected communities | |
| Zealand | Safety Audit Procedures for Existing Roads | |
| Sierpiński et al. | Big data concerning travel preferences as a means to support decision making in the field of environmentally friendly urban development | |
| Ochieng | Planned housing in Koma Rock Nairobi-changes due to ten years of illegal densification | |
| Tipple | The low-cost housing market in Kitwe, Zambia | |
| CN110827568A (en) | Parking space management center based on Beidou navigation | |
| Akeley | A Compact Region: Ramapo and Beyond | |
| Chen et al. | Optimal Layout of Charging Stations based on Intelligent Traffic Flow Research and Data Analysis | |
| Visser, Alex T. & Joubert | Specialists find considerable common ground at Urban Division/Afrotech initiative | |
| Brinkman et al. | Offstreet parking | |
| Kaur et al. | Sustainable Approach for Slum Redevelopment in Ludhiana | |
| VALLEY | CITY OF GRASS VALLEY | |
| Landívar | Contribution for BRT Design in Developing-Nation Cities | |
| Coaker et al. | An Evaluation of US City Government Wireless Networks for Mobile Internet Access | |
| Bauer | Creation of land information system for Milwaukee County, Wisconsin | |
| Nkambwe | Change in Urban Areas in Nigeria | |
| Odell | School Buildings: Planning, Design, and Construction Series 1-8. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: Yueqing City Industrial Zone 325600 Zhejiang province Yuecheng town salt pan Tian Yangcun Friendship Road No. 3 Applicant after: Shanghai Yan Qing Electronic Co., Ltd. Address before: 200070 Shanghai city Zhabei District Datong Road No. 988 building A room 317 Applicant before: Shanghai Yan Qing Electronic Co., Ltd. |
|
| COR | Change of bibliographic data | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130327 |