CN102996135B - 超深覆土盾构穿越复杂地层施工方法 - Google Patents

超深覆土盾构穿越复杂地层施工方法 Download PDF

Info

Publication number
CN102996135B
CN102996135B CN201210529268.5A CN201210529268A CN102996135B CN 102996135 B CN102996135 B CN 102996135B CN 201210529268 A CN201210529268 A CN 201210529268A CN 102996135 B CN102996135 B CN 102996135B
Authority
CN
China
Prior art keywords
shield
shield machine
construction method
construction
deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210529268.5A
Other languages
English (en)
Other versions
CN102996135A (zh
Inventor
张子敏
李峰
顾解桢
朱文良
黄平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201210529268.5A priority Critical patent/CN102996135B/zh
Publication of CN102996135A publication Critical patent/CN102996135A/zh
Application granted granted Critical
Publication of CN102996135B publication Critical patent/CN102996135B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种超深覆土盾构穿越复杂地层施工方法,其具体步骤:1、盾构正面土压力设定;2、盾构正面土体改良;3、盾构姿态控制;4、盾尾同步注浆控制。本发明的施工方法能解决诸多复杂地层中盾构施工中难点及问题,形成成熟的砂性土承压含水层中超深盾构法隧道掘进施工工艺、施工技术,为今后地下空间开发向深层发展打下基础,解决了盾构工程在地下设施较多区域的局限性,保障地下盾构隧道工程开发的可持续发展和应用的广泛性。

Description

超深覆土盾构穿越复杂地层施工方法
技术领域
本发明涉及一种盾构穿越复杂地层施工方法,尤其是一种超深覆土盾构穿越复杂地层施工方法。
背景技术
盾构法隧道作为城市轨道交通建设的重要施工方法,在上海、北京等国内城市的轨道交通建设的应用已有20余年的历史,经过20余年的发展,施工技术日趋成熟,但此前由于城市地下空间的利用率不高,地下空间开发的条件相对较好,此前的盾构法隧道的施工绝大部分位于浅层地下空间内,城市轨道交通建设中涉及的盾构法隧道其埋深普遍不超过30m。而对于隧道埋深超过30m的超深盾构法隧道,无论是掘进设备还是施工技术,对于国内的盾构法隧道施工企业,均还在探索阶段。
本发明针对隧道超大埋深、饱和砂性土和承压水层中掘进、小半径曲线段掘进的特点,针对盾构施工设备对超大埋深、饱和砂性土和承压水层的适应性、饱和砂性土和承压水层中盾构法隧道的施工技术、不利地质条件下小曲率隧道的施工技术进行研究,目标是形成一套针对类似条件的施工技术,提高企业的技术储备,为以后类似工程的施工提供经验。
发明内容
本发明是要提供一种超深覆土下盾构穿越复杂地层施工方法。
为实现上述目的,本发明采用的技术方案是:一种超深覆土盾构穿越复杂土层施工方法,具体步骤如下:
1)盾构头部的土压力设定
根据盾构机正面土体的上软下硬的复杂地层,设定盾构头部正面土压力;
2)盾构机正面土体改良
盾构穿越硬土层及承压水层时,采取辅助方法改良盾构机正面土体,便于正确建立盾构机正面土压力;
3)盾构姿态控制
    盾构机在软硬不均地层中施工时,对盾构姿态进行控制,用于防止盾构机的管片碎裂、轴线偏差;
4) 盾尾同步注浆控制
    盾构机在砂性土层中施工时,控制同步注浆量,用于防止同步注浆量不足引起地表后期沉降及管片脱出盾尾后下沉造成盾构姿态恶化。
盾构机正面土体改良。
盾构头部的土压力设定的具体设定方法:
利用门式起重机对每斗泥的满箱重量及空箱重量进行称重,计算每推进一环实际出土的重量,并换算成方量,得到每环实际出土量及土压力;或者记录盾构机每推进一环的螺旋机实际转数并进行比较,推断每一环出土量及土压力;或者根据地质报告情况计算出理论土压力。
盾构机正面土体改良的具体方法:
1)硬土层采用刀盘加水方式进行改良:
① 寻找不同推进速度下的加水平衡点,保证螺旋机连续出土;
② 刀盘应保持持续加水,避免土仓内形成夹层;
2)承压水层采用加注泡沫剂及聚合物等方式进行土体改良。
盾构姿态控制具体方法:
① 减低盾构机总推力:使用超挖刀、盾壳触壁减摩注浆、使用泡沫剂改良正面土体;
② 注浆环箍:托出脱出盾尾的管片;
③ 采用软木材质的贴片材料。
本发明的有益效果是:
本发明的施工方法结合隧道超大埋深、饱和砂性土和承压水层中掘进、小半径曲线段掘进的特点,针对盾构施工设备对超大埋深、饱和砂性土和承压水层的适应性、饱和砂性土和承压水层中盾构法隧道的施工技术,解决了不利地质条件下小曲率隧道的施工技术难题,形成了一套针对类似条件的施工方法。
本发明的施工方法能解决诸多复杂地层中盾构施工中难点及问题,形成成熟的砂性土承压含水层中超深盾构法隧道掘进施工工艺、施工技术,为今后地下空间开发向深层发展打下基础,解决了盾构工程在地下设施较多区域的局限性,保障地下盾构隧道工程开发的可持续发展和应用的广泛性。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
 本发明在上海市轨道交通12号线26标工程超深覆土盾构穿越复杂地层的施工技术,所要施工的隧道,具体的施工措施是:
1)盾构头部的土压力设定
土压力设定方法:
① 利用门式起重机对每斗泥的满箱重量及空箱重量进行称重,计算每推进一环实际出土的重量,并换算成方量,得到每环实际出土量及土压力,与理论出土量进行比较。
② 记录盾构机每推进一环的螺旋机实际转数并进行比较,推断每一环出土量及土压力是否合理。
③ 根据地质报告情况计算理论土压力。
2)  盾构机正面土体改良
第⑥层硬土层采用刀盘加水方式进行改良:
① 寻找不同推进速度下的加水平衡点,保证螺旋机连续出土;
② 刀盘应保持持续加水,避免土仓内形成夹层;
第⑦1、⑦2层承压水层采用加注泡沫剂及聚合物等方式进行土体改良
3)盾构姿态控制
盾构机在软硬不均地层中施工时,盾构姿态控制不佳容易引起管片碎裂、轴线偏差等问题,采取措施如下:
① 减低总推力:使用超挖刀、盾壳触壁减摩注浆、使用泡沫剂改良正面土体;
② 注浆环箍:托出脱出盾尾的管片;
③ 采用软木材质的贴片材料,抗压缩性好,提高总推力达到3500t时的管片纠偏效果明显。
4) 盾尾同步注浆控制
    盾构机在砂性土层中施工时同步注浆量与粘土层中施工时有较大不同,同步注浆量不足可能引起地表后期沉降及管片脱出盾尾后下沉造成盾构姿态恶化。砂性土内同步注浆量每环需达到约4m3

Claims (3)

1.一种超深覆土盾构穿越复杂土层施工方法,其特征在于,具体步骤如下:
1)盾构头部的土压力设定
根据盾构机正面土体的上软下硬的复杂地层,设定盾构头部正面土压力:利用门式起重机对每斗泥的满箱重量及空箱重量进行称重,计算每推进一环实际出土的重量,并换算成方量,得到每环实际出土量及土压力;或者记录盾构机每推进一环的螺旋机实际转数并进行比较,推断每一环出土量及土压力;或者根据地质报告情况计算出理论土压力;
2)盾构机正面土体改良
盾构穿越硬土层及承压水层时,采取辅助方法改良盾构机正面土体,便于正确建立盾构机正面土压力;
3)盾构姿态控制
    盾构机在软硬不均地层中施工时,对盾构姿态进行控制,用于防止盾构机的管片碎裂、轴线偏差;
4) 盾尾同步注浆控制
    盾构机在砂性土层中施工时,控制同步注浆量,用于防止同步注浆量不足引起地表后期沉降及管片脱出盾尾后下沉造成盾构姿态恶化。
2.根据权利要求1所述的超深覆土盾构穿越复杂土层施工方法,其特征在于:所述盾构机正面土体改良的具体方法:
1)硬土层采用刀盘加水方式进行改良:
① 寻找不同推进速度下的加水平衡点,保证螺旋机连续出土;
② 刀盘应保持持续加水,避免土仓内形成夹层;
2)承压水层采用加注泡沫剂及聚合物方式进行土体改良。
3.根据权利要求1所述的超深覆土盾构穿越复杂土层施工方法,其特征在于:所述盾构姿态控制具体方法:
① 减低盾构机总推力:使用超挖刀、盾壳触壁减摩注浆、使用泡沫剂改良正面土体;
② 注浆环箍:托出脱出盾尾的管片;
③ 采用软木材质的贴片材料。
CN201210529268.5A 2012-12-11 2012-12-11 超深覆土盾构穿越复杂地层施工方法 Active CN102996135B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210529268.5A CN102996135B (zh) 2012-12-11 2012-12-11 超深覆土盾构穿越复杂地层施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210529268.5A CN102996135B (zh) 2012-12-11 2012-12-11 超深覆土盾构穿越复杂地层施工方法

Publications (2)

Publication Number Publication Date
CN102996135A CN102996135A (zh) 2013-03-27
CN102996135B true CN102996135B (zh) 2015-06-24

Family

ID=47925180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210529268.5A Active CN102996135B (zh) 2012-12-11 2012-12-11 超深覆土盾构穿越复杂地层施工方法

Country Status (1)

Country Link
CN (1) CN102996135B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422864B (zh) * 2013-08-21 2016-01-06 国家电网公司 电力隧道穿越已有建筑过程微扰动施工控制方法
CN103603670B (zh) * 2013-11-21 2019-03-05 上海市基础工程集团有限公司 超深覆土盾构穿越复杂地层施工方法
CN104389613B (zh) * 2014-09-26 2016-04-13 上海隧道工程有限公司 泥水平衡盾构穿越危险地下管线的施工方法
CN104533432A (zh) * 2014-12-25 2015-04-22 上海市基础工程集团有限公司 盾构在复杂地层中穿越市中心老城区建筑物施工方法
CN104912565B (zh) * 2015-05-05 2017-05-10 上海隧道工程股份有限公司 一种土量压力平衡盾构控制的方法及系统
CN105525925B (zh) * 2015-10-30 2017-09-29 中铁十六局集团北京轨道交通工程建设有限公司 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法
CN105257307B (zh) * 2015-10-30 2017-09-29 上海交通大学 一种在上软下硬地层中减小盾构机刀具损坏的施工方法
CN109723447A (zh) * 2018-11-21 2019-05-07 上海市基础工程集团有限公司 盾构连续密集穿越不同类型轨交设施的施工方法
CN109707385B (zh) * 2018-12-18 2021-05-28 上海隧道工程有限公司 盾构施工智能同步注浆控制方法及控制系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2079349A (en) * 1980-06-30 1982-01-20 Iseki Kaihatsu Koki Shield tunnelling method and machine therefor
CN1614196A (zh) * 2004-10-14 2005-05-11 上海隧道工程股份有限公司 双圆盾构穿越软土地层的地面变形控制方法
CN1932244A (zh) * 2006-09-28 2007-03-21 上海隧道工程股份有限公司 双圆盾构近距离穿越建筑物或构筑物的施工方法
CN101126319A (zh) * 2007-10-09 2008-02-20 中铁二局股份有限公司 盾构隧道侧向穿越桩基施工方法
CN101294496A (zh) * 2008-06-25 2008-10-29 上海隧道工程股份有限公司 注浆控制盾构姿态和纠偏的施工方法
CN101749025A (zh) * 2009-12-24 2010-06-23 上海隧道工程股份有限公司 软土地层超大直径土压平衡盾构土体改良施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2079349A (en) * 1980-06-30 1982-01-20 Iseki Kaihatsu Koki Shield tunnelling method and machine therefor
CN1614196A (zh) * 2004-10-14 2005-05-11 上海隧道工程股份有限公司 双圆盾构穿越软土地层的地面变形控制方法
CN1932244A (zh) * 2006-09-28 2007-03-21 上海隧道工程股份有限公司 双圆盾构近距离穿越建筑物或构筑物的施工方法
CN101126319A (zh) * 2007-10-09 2008-02-20 中铁二局股份有限公司 盾构隧道侧向穿越桩基施工方法
CN101294496A (zh) * 2008-06-25 2008-10-29 上海隧道工程股份有限公司 注浆控制盾构姿态和纠偏的施工方法
CN101749025A (zh) * 2009-12-24 2010-06-23 上海隧道工程股份有限公司 软土地层超大直径土压平衡盾构土体改良施工方法

Also Published As

Publication number Publication date
CN102996135A (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102996135B (zh) 超深覆土盾构穿越复杂地层施工方法
CN103089275B (zh) 富水极破碎围岩隧道塌方段围岩控制方法
WO2020248596A1 (zh) 防止隧道注浆加固引起地表隆起的防护结构及注浆方法
CN104343455B (zh) 长距离曲线顶管及管幕施工工艺
CN105804761B (zh) 适用于液化砂土地层盾构近距离穿越建筑物的施工方法
CN104633996B (zh) 一种水源热泵回灌技术方法
CN105804754B (zh) 一种煤层为主含水层矿井井筒揭煤方法
CN103603670A (zh) 超深覆土盾构穿越复杂地层施工方法
CN102330423B (zh) 一种采空区上新建铁路地基稳定性的评价方法
CN104455726A (zh) 一种管道底部注浆加固的顶管施工方法
CN110043312B (zh) 一种注浆充填地表沉降范围的控制方法
CN106246188B (zh) 地层沉降变形协调的防治煤矿立井井筒变形破坏的系统及方法
CN203487528U (zh) 串珠式岩溶地区水中墩钻孔桩施工用暗河溶洞处理结构
CN106948843A (zh) 一种双层多分支顺层钻孔注浆改造顶底板双重灰岩含水层方法
CN104500082A (zh) 矿山法隧道内盾构接收施工方法
CN103696775A (zh) 大段高多组含水层分段下行注浆法
CN102926759A (zh) 大直径泥水盾构水下浅覆土长距离掘进施工方法
CN104234062A (zh) 一种离子型稀土原地浸矿采场滑坡防治的方法
CN101781991A (zh) 盾构接收或始发端头的双井式加固方法及双井式盾构接收方法
CN111156010B (zh) 膨胀土地层盾构穿越既有火车站房的施工方法
CN103527209A (zh) 富水软弱地层盾构下穿建筑物微扰动掘进方法
WO2020087880A1 (zh) 基于露天矿坑的半地下抽水蓄能电站及其形成方法
CN105064335A (zh) 适用于砂卵石地层盾构端头井加固的超高压旋喷注浆方法
WO2020087881A1 (zh) 基于塌陷区的半地下抽水蓄能电站及其形成方法
WO2020087883A1 (zh) 一种梯级抽水蓄能电站及其形成方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 200433 Yangpu District, Shanghai Star Road, No. 231

Applicant after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200433 Yangpu District, Shanghai Star Road, No. 231

Applicant before: Shanghai Foundation Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI FOUNDATION ENGINEERING CO., LTD. TO: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant