CN102977900B - 一种焦炉集气管压力数据测量装置和方法 - Google Patents
一种焦炉集气管压力数据测量装置和方法 Download PDFInfo
- Publication number
- CN102977900B CN102977900B CN201210552541.6A CN201210552541A CN102977900B CN 102977900 B CN102977900 B CN 102977900B CN 201210552541 A CN201210552541 A CN 201210552541A CN 102977900 B CN102977900 B CN 102977900B
- Authority
- CN
- China
- Prior art keywords
- collecting pipe
- measuring
- gas collecting
- point
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Measuring Fluid Pressure (AREA)
Abstract
本发明涉及焦炉领域,特别涉及一种焦炉集气管压力数据测量装置和方法,包括测点,其特征在于,该测点的设置个数为3个或3个以上的奇数个,其中一个设置在集气管的中部连接吸气管的位置处,其他测点对称均匀布置在集气管的中心点的两侧。对每一测点的测量结果进行平均加权,由各测点拟合后的平均值代表整个集气管的压力,并以此为依据实现集气管压力调节系统、放散点火自动放散系统和鼓风机吸力调节系统的实时自动调节。与现有技术相比,本发明的有益效果是:从根本上解决了由于焦炉的产气量不同,而引起的测点压力值波动问题,通过焦炉DCS系统编程并将准确的计算结果发送到放散点火系统和鼓风机控制系统,能更好地控制集气管的压力稳定。
Description
技术领域
本发明涉及焦炉领域,特别涉及顶装焦炉炉型和捣固焦炉炉型中不同推焦串序和炉孔数的焦炉集气管压力数据测量装置和方法。
背景技术
焦炉集气管压力调节是保障焦炉稳定生产的重要调节方式之一,是防止焦炉冒烟的和化产流程正常工作的重要手段,所以在焦化生产中起着重要的作用。在过去的设计中,在整段集气管上只取一个测点,代表整个集气管的压力,并以此为依据通过调节阀实行集气管的自动调节。
当焦炉在不同炉孔进行推焦装煤操作时和焦炉处于不同的结焦阶段时,由于焦炉的产气量不同,引起单点的压力测点的压力值也随之引起波动,某一点压力值不能在整个周转时间内代表整段集气管的压力,这样的测量方式显示整段集气管的压力波动很大,同时也可能由于压力过大引起集气管放散系统误动作,造成生产紊乱。
发明内容
本发明的目的是提供一种焦炉集气管压力数据测量装置和方法,通过焦炉DCS系统编程并将准确的计算结果发送到放散点火系统和鼓风机控制系统,从根本上解决上述问题,更好的控制集气管的压力。
为了达到上述目的,本发明采用如下技术方案实现:
一种焦炉集气管压力数据测量装置,包括测点,该测点的设置个数为3个或3个以上的奇数个,其中一个设置在集气管的中部连接吸气管的位置处,其他测点对称均匀布置在集气管的中心点的两侧。
所述测点位于距离集气管两端2个或3个炉孔的位置。
使用上述装置的一种焦炉集气管压力数据测量方法,对每一测点的测量结果进行平均加权,由各测点拟合后的平均值代表整个集气管的压力,并以此为依据实现集气管压力调节系统、放散点火自动放散系统和鼓风机吸力调节系统的实时自动调节。
所述平均加权处理时,某测点的权值可为0。
所述平均加权处理包括三种计算模式,分别为:实时模式,周期模式和手动模式;实时模式是各测点参加拟合计算的均压值参数根据该点之前的测量值而实时改变;周期模式是各测点参加拟合计算的均压值参数在某周期内保持不变;手动模式是人为根据一段时间内的良好表现而将这一段时间内所采用的各测点参加拟合计算的均压值参数作为日后固定的均压值参数。
与现有技术相比,本发明的有益效果是:焦炉集气管内多测点压力平均加权处理方法,从根本上解决了由于焦炉的产气量不同,而引起的测点压力值波动问题,通过焦炉DCS系统编程并将准确的计算结果发送到放散点火系统和鼓风机控制系统,能更好地控制集气管的压力稳定,防止由于压力过大引起集气管放散系统的误动作,对焦炉的稳定生产提供了保证。
附图说明
图1是本发明实施例一测点分布结构示意图;
图2是本发明实施例二测点分布结构示意图。
图中:1-测点 2-集气管 3-上升管 4-焦炉 5-放散点火自动放散系统 6-鼓风机吸力调节系统
具体实施方式
下面结合附图对本发明的具体实施方式作进一步说明:
如图1,是本发明一种焦炉集气管压力数据测量装置实施例一测点分布结构示意图,测点1的设置个数为三个,其中一个设置在集气管2的中部连接吸气管的位置处,其他测点对称均匀布置在集气管2的中心点的两侧,位于距离集气管两端2个或3个炉孔的位置,集气管2经上升管3与焦炉4相连。如图2,是本发明一种焦炉集气管压力数据测量装置实施例二测点分布结构示意图,测点1的设置个数为五个,其中一个设置在集气管2的中部连接吸气管的位置处,其他测点对称均匀布置在集气管2的中心点的两侧,集气管2经上升管3与焦炉4相连。
本发明一种焦炉集气管压力数据测量方法,焦炉DCS系统对每一测点的测量结果进行平均加权,由各测点拟合后的平均值代表整个集气管的压力,并以此为依据实现集气管压力调节以及放散点火自动放散系统5和鼓风机吸力调节系统6的实时自动调节。
平均加权处理时,并不是所有测点得值都是有效值,以三个测点情况为例,可能三个测点都是有效测点,也可能只有两个测点是有效测点,其中的某个点不参与计算,其权值为0。
若在集气管中心两侧取一点P2,集气管中心测压点为P1,则有:
P2=P1+ΔP
此ΔP既为要求的P2点的均压值参数,ΔP的值可根据多次采样值,由最小二乘法,按如下公式计算:
首先定义函数:
F(ΔP)=Σ(P1-P′1)2
其中P1为P2对P1点压力的拟合值,则有:
P′1=P2-ΔP
F(ΔP)+Σ(P1-P2+ΔP)2
ΔP的值应满足F(ΔP)取最小值,对F(ΔP)求导数,并令导数等于零,则有:
2Σ(P1-P2+ΔP)=0
所以:
ΣΔP=(ΣP2-ΣP1)
如采样次数为n次则有:
ΔP=(ΣP2-ΣP1)/n
本发明平均加权处理中主要的算法在于各测点均压值参数的设定,根据采样方式的不同包括三种计算模式,分别为:实时模式,周期模式和手动模式;实时模式是各测点参加拟合计算的均压值参数根据该点之前的测量值而实时改变;周期模式是各测点参加拟合计算的均压值参数在某周期内保持不变;手动模式是人为根据一段时间内的良好表现而将这一段时间内所采用的各测点参加拟合计算的均压值参数作为日后固定的均压值参数。
实施例1中,测点个数为3个,5个测压点的情况可以此类推,具体计算步骤如下:
1)设定采样周期T采和测点个数;
2)确定工作模式,实时,周期还是手动;
3)在实时模式下,首先选择每次参加迭代的采样次数n,计算公式如下:
ΔP2=(ΣP′2-ΣP′1)/n
ΔP3=(ΣP′3-ΣP′1)/n
其中:P2表示第二点过去的采样值,ΣP2表示第二点过去前n次的采样值之和,ΣP1表示第一点过去前n次的采样值之和,ΣP3表示第三点过去前n次的采样值之和,均压值参数ΔP2和ΔP3在每次采样周期结束时更新一次。再由公式:
4)在定周期模式下,首先选择周期的长度T和参加每周期内均压值参数计算的采样次数n,每周期结束前开始计算下一周期的均压值参数,计算均压值参数时,每次采样触发一次运算,运算公式如下:
ΔP′2=ΔP′2+P′2-P′1
ΔP′3=ΔP′3+P′3-P′1
其中:P2表示第二点本次的采样值,P1表示第一点本次的采样值,P3表示第三点本次的采样值,ΔP2和ΔP3均为中间变量,每周期内重复运算n次后,由公式:
ΔP2=ΔP′2/n
ΔP3=ΔP′3/n
得到均压值参数ΔP2和ΔP3。均压值参数ΔP2和ΔP3在一个周期内保持不变。再由公式:
5)在手动模式下,选取一个时间段,由公式:
ΔP2=(ΣP′2-ΣP′1)/n
ΔP3=(ΣP′3-ΣP′1)/n
计算出固定的均压值参数ΔP2和ΔP3。其中ΣP1表示在此时间段内第一点的所有采样值之和,ΣP2表示在此时间段内第二点的所有采样值之和,ΣP3表示在此时间段内第三点的所有采样值之和,n为此时间段内的总采样次数。再由公式:
6)加权值Q1、Q2、Q3的计算,对于第一点的加权值,作如下判断,若
则Q1=0,否则Q1=1。对于第二点的加权值,作如下判断,若
则Q2=0,否则Q2=1。对于第三点的加权值,作如下判断,若
则Q3=0,否则Q3=1。
7)多点所测的集气管实时压力P的计算,由公式:
实时压力P分别送至集气管压力调节系统、放散点火自动放散系统和鼓风机吸力调节系统以进行实时调节。
Claims (1)
1.一种焦炉集气管压力数据测量方法,其特征在于,包括以下内容:
1)设置3个或3个以上的奇数个测点,其中一个设置在集气管的中部连接吸气管的位置处,其他测点对称均匀布置在集气管的中心点的两侧;所述测点位于距离集气管两端2个或3个炉孔的位置;
2)对每一测点的测量结果进行平均加权,由各测点拟合后的平均值代表整个集气管的压力,并以此为依据实现集气管压力调节系统、放散点火自动放散系统和鼓风机吸力调节系统的实时自动调节;
3)所述平均加权处理时,某测点的权值可为0;
4)所述平均加权处理包括三种计算模式,分别为:实时模式,周期模式和手动模式;实时模式是各测点参加拟合计算的均压值参数根据该点之前的测量值而实时改变;周期模式是各测点参加拟合计算的均压值参数在某周期内保持不变;手动模式是人为根据一段时间内的良好表现而将这一段时间内所采用的各测点参加拟合计算的均压值参数作为日后固定的均压值参数。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210552541.6A CN102977900B (zh) | 2012-12-18 | 2012-12-18 | 一种焦炉集气管压力数据测量装置和方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210552541.6A CN102977900B (zh) | 2012-12-18 | 2012-12-18 | 一种焦炉集气管压力数据测量装置和方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102977900A CN102977900A (zh) | 2013-03-20 |
| CN102977900B true CN102977900B (zh) | 2014-04-30 |
Family
ID=47852245
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210552541.6A Active CN102977900B (zh) | 2012-12-18 | 2012-12-18 | 一种焦炉集气管压力数据测量装置和方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102977900B (zh) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108120594B (zh) * | 2017-12-22 | 2019-10-18 | 中冶焦耐(大连)工程技术有限公司 | 一种焦炉集气管煤气安全放散水封阀门部分行程测试方法 |
| CN110540844A (zh) * | 2019-09-16 | 2019-12-06 | 唐山钢铁集团有限责任公司 | 集气管压力自动调节控制方法 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102004029A (zh) * | 2010-09-21 | 2011-04-06 | 江苏宏康节能服务有限公司 | 光源参数测试方法以及用于测试光源参数的设备 |
| CN202033058U (zh) * | 2011-04-15 | 2011-11-09 | 华北电力大学 | 一种锅炉送风流量实时测量装置 |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0756026B2 (ja) * | 1990-01-24 | 1995-06-14 | 新日本製鐵株式会社 | コークス乾式冷却装置のボイラーチューブの破孔防止方法 |
| KR100959017B1 (ko) * | 2003-12-23 | 2010-05-24 | 재단법인 포항산업과학연구원 | 코크스 오븐 탄화실의 카본 부착 방지방법 |
| DE102007014711A1 (de) * | 2007-03-23 | 2008-09-25 | Mettler-Toledo Ag | Verfahren zur Überwachung und/oder Bestimmung des Zustandes einer Kraftmessvorrichtung und Kraftmessvorrichtung |
| KR101246329B1 (ko) * | 2007-11-07 | 2013-03-21 | 주식회사 포스코 | 코크스 오븐의 압력 조정장치 |
| CN102433134B (zh) * | 2011-10-08 | 2013-12-25 | 莱芜钢铁集团电子有限公司 | 一种焦炉集气管压力的控制方法及系统 |
| CN203021506U (zh) * | 2012-12-18 | 2013-06-26 | 中冶焦耐工程技术有限公司 | 一种焦炉集气管压力数据测量装置 |
-
2012
- 2012-12-18 CN CN201210552541.6A patent/CN102977900B/zh active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102004029A (zh) * | 2010-09-21 | 2011-04-06 | 江苏宏康节能服务有限公司 | 光源参数测试方法以及用于测试光源参数的设备 |
| CN202033058U (zh) * | 2011-04-15 | 2011-11-09 | 华北电力大学 | 一种锅炉送风流量实时测量装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102977900A (zh) | 2013-03-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106636606B (zh) | 一种基于仿真模型的加热炉炉温控制方法 | |
| CN104504292A (zh) | 基于bp神经网络预测循环流化床锅炉最佳工作温度的方法 | |
| CN112129537B (zh) | 一种定功率模式汽轮机组调门流量特性试验方法 | |
| CN105697074B (zh) | 一种汽轮机组高压调门流量优化装置及其优化方法 | |
| CN102977900B (zh) | 一种焦炉集气管压力数据测量装置和方法 | |
| CN112016754A (zh) | 基于神经网络的电站锅炉排烟温度超前预测系统及方法 | |
| CN201476905U (zh) | 神经网络pid控温的热电偶自动检定系统 | |
| CN114488807B (zh) | 基于工作点线性化建模的chp机组变负荷动态过程特性分析方法 | |
| CN109086949B (zh) | 基于煤气成份变化的高炉煤气发生量及其热值预测方法 | |
| CN203021506U (zh) | 一种焦炉集气管压力数据测量装置 | |
| JP3905829B2 (ja) | ガスタービンの燃料ガスカロリー推定装置およびガスタービン | |
| CN102000814A (zh) | 钢包烘烤控制中可变双限幅温度串级调节控制系统及方法 | |
| CN103816987A (zh) | 一种双进双出磨煤机出粉量的计算方法 | |
| CN107420880B (zh) | 基于一级过热器全负荷段特性的汽温控制系统参数整定方法 | |
| CN105552934A (zh) | 时滞分布依赖的网络化电力系统负荷频率控制方法 | |
| CN114692961B (zh) | 一种用于甲醇生产的粉煤气化炉用优化配煤系统 | |
| CN104460653B (zh) | 一种加热炉监控系统评价方法 | |
| CN112379650B (zh) | 一种渐变约束的燃煤机组热值校正方法 | |
| CN108169013A (zh) | 一种适用于多钉连接试件的疲劳寿命校准方法 | |
| CN103701119B (zh) | 一种基于无功功率调整的不收敛潮流数据的处理方法 | |
| CN113806929B (zh) | 蒸汽电动调节阀的控制方法、装置、电子设备及存储介质 | |
| CN106764445A (zh) | 一种压缩空气工业系统的节能优化控制方法及装置 | |
| CN107992130B (zh) | 焦炉炉温调整方法 | |
| CN101520642B (zh) | 火电厂单元机组协调控制系统被控对象动态参数整定方法 | |
| CN116293623A (zh) | 一种基于能效曲线的锅炉负荷分配方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20180725 Address after: 116085 128 high energy street, Qixian Ling high tech Industrial Park, Dalian, Liaoning Patentee after: ACRE Coking And Refractory (Dalian) Engineering Consulting Corp., MCC Address before: 116085 128 high energy street, Qixian Ling high tech Industrial Park, Dalian, Liaoning Patentee before: ACRE Coking and Refractory Engineering Consulting Corporation, MCC |
|
| TR01 | Transfer of patent right |