CN102967400A - 一种复杂地形下的风电机组功率特性曲线测试方法 - Google Patents
一种复杂地形下的风电机组功率特性曲线测试方法 Download PDFInfo
- Publication number
- CN102967400A CN102967400A CN2012105278090A CN201210527809A CN102967400A CN 102967400 A CN102967400 A CN 102967400A CN 2012105278090 A CN2012105278090 A CN 2012105278090A CN 201210527809 A CN201210527809 A CN 201210527809A CN 102967400 A CN102967400 A CN 102967400A
- Authority
- CN
- China
- Prior art keywords
- wind
- electricity generation
- powered electricity
- generation unit
- wind speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title abstract description 19
- 230000005611 electricity Effects 0.000 claims description 100
- 238000010998 test method Methods 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 15
- 230000001360 synchronised effect Effects 0.000 claims description 9
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 3
- 230000007935 neutral effect Effects 0.000 claims description 2
- 238000002360 preparation method Methods 0.000 claims description 2
- 238000013519 translation Methods 0.000 claims description 2
- 241001269238 Data Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Images
Landscapes
- Wind Motors (AREA)
Abstract
本发明公开了一种复杂地形下的风电机组功率特性曲线测试方法,包括:步骤1:选择一台和待测风电机组B同型号的风电机组A,风电机组A周围场地能够通过IEC-61400-12-1中的场地评估条件;步骤2:多次同步记录风电机组A风轮前的风速V前和风轮后的风速V后;步骤3:做V前和V后的线性拟合式,记为V前=aV后+b;步骤4:多次同步记录风电机组B的风轮后的风速V后和出口净功率P;步骤5:利用V前=aV后+b及步骤4中的V后计算风电机组B风轮前的风速V前;步骤6:使用风电机组B出口净功率P和V前计算风电机组B的功率特性曲线。本发明的测试方法可以在场地评估不合格的情况下应用,测试成本低。
Description
技术领域
本发明涉及风电机组型式认证领域,具体地,涉及一种复杂地形下的风电机组功率特性曲线测试方法。
背景技术
IEC标准:IEC61400-12-1:2005《风力发电机组功率特性测试》详细规定了对单台风电机组进行功率特性测试的办法,用于测试风电机组的发电能力。此方法适用于所有类型和容量的并网风电机组。这种统一的方法,可以保证风电机组功率特性测试和分析的一致性、准确性和可重复性。对风电机组进行功率特性测试,可以证实风电机组运营商所购买的新的或维修好的机组满足风电机组生产厂家所陈述的功率特性的技术条件。公平、明确、客观的评价风电机组的功率特性。
IEC标准:IEC61400-12-1:2005《风力发电机组功率特性测试》详细规定了待测风机周围场地的条件,场地评估方法极为严格,极少风场能够达到要求。若通不过场地评估,进行此项测试必须首先进行场地标定,场地标定需要很高的成本。
发明内容
本发明的目的在于提供一种复杂地形下的风电机组功率特性曲线测试方法,可以在在场地评估不合格的情况下进行测试,且测试成本低。
为了实现上述目的,本发明采用以下技术方案:
一种复杂地形下的风电机组功率特性曲线测试方法,包括:
步骤1:确认待测风电机组B的型号,选择一台和待测风电机组B同型号的风电机组A,且所述风电机组A周围场地能够通过IEC-61400-12-1中的场地评估条件。
步骤2:多次同步记录风电机组A风轮前的风速V前和风轮后的风速V后。
步骤3:做V前和V后的线性拟合式,记为V前=aV后+b,其中a,b都是常数,由V前和V后确定。
步骤4:多次同步记录风电机组B的风轮后的风速V后和风电机组B出口净功率P。
步骤5:利用步骤3中确定的线性拟合式V前=aV后+b及步骤4中的V后计算风电机组B风轮前的风速V前。
步骤6:使用风电机组B出口净功率P和风电机组B风轮前的风速V前并结合IEC61400-12-1规定的算法计算风电机组B的功率特性曲线。
进一步地,步骤2及步骤4中所述的风轮前的风速V前和风轮后的V后均为折算到标准空气密度下的n分钟平均值风速。
进一步地,所述步骤2及步骤4中,通过风速计获得风电机组A的风轮前的风速V前n分钟平均值,再将其折算到标准空气密度下,通过风电机组的监控系统获得风电机组A、B的风轮后的风速V后n分钟平均值,再将其折算到标准空气密度下;且通过风速计获得的风电机组A风轮前的风速V前n分钟平均值和通过风电机组B获得的风轮后的风速V后n分钟平均值,都必须涵盖风电机组切入风速到切出风速区间段的所有风速,具体涵盖方式为:切入风速作为起点,以0.5m/s间隔做bin区间,每个bin区间内不少于5个n分钟平均值风速;对应地,所述步骤3和步骤5中,每个0.5m/s的风速间隔内都存在一个不同的线性拟合式V前=aV后+b,都独立计算线性拟合式V前=aV后+b。
进一步地,在步骤2中,所述风电机组A的风轮前的风速V前获得方法为:在风电机组A的主风向上距离风电机组A2.5倍风轮直径处竖立气象桅杆,所述风速计设置在气象桅杆上,且所述气象桅杆上还设置有气温传感器、气压传感器,安装高度为轮毂高度,风速计测得的数据为V前n分钟 平均值;使用气温传感器测得气温数据T和气压传感器测得气压数据B,再结合气体常数R计算空气密度ρn分钟平均值:
根据不同空气密度下的风速折算公式,将风速计测得的V前n分钟平均值数据折算到标准空气密度下,折算公式为:
所述步骤2及步骤4中的通过风电机组的监控系统获得的风电机组A、B的风轮后的风速V后n分钟平均值,也按上述折算方法折算成标准空气密度下的风速。
进一步地,所述n取10。
进一步地,所述步骤2及步骤4中均采用秒级同步记录。
进一步地,所述步骤3中线性拟合式中系数a和b的确定基于最小二乘法。
进一步地,所述步骤4中获得风电机组B出口净功率P的方法为在风电机组B的箱变低压侧安装电流互感器和电压互感器。
本发明的测试方法可以在场地评估不合格的情况下应用,通过去除场地标定这个环节,可以节省时间和成本,能够经济、准确的完成测试。
下面通过附图和实施例,对本发明的技术方案做进一步的详细描述。
附图说明
图1为本发明的复杂地形下的风电机组功率特性曲线测试方法流程图。
具体实施方式
以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。
结合图1所示,本发明的一种复杂地形下的风力发电机组功率特性测试方法,包括:
步骤1:确认待测风电机组B的型号,选择一台和待测风电机组B同型号的风电机组A,风电机组A周围场地能够通过IEC-61400-12-1中的场地评估条件。
步骤1.1:确定待测风电机组B的型号,继而选择同一型号风电机组A,A与B的风轮具有完全一致性,以保证同一风速经过A风轮后的V后和经过B风轮后的V后相同。
步骤1.2:保证风电机组A周围场地能够通过IEC61400-12-1中的场地评估。
步骤2:多次同步记录风电机组A风轮前的风速V前和风轮后的风速V后,风轮前的风速V前和风轮后的V后均为折算到标准空气密度下的10分钟平均值风速。在风电机组A的主风向上距离风电机组A2.5倍风轮直径处竖立气象桅杆。风速计、气温传感器、气压传感器设置在气象桅杆上,安装高度为轮毂高度。通过风速计获得风电机组A的风轮前的风速V前10min平 均值,再将其折算到标准空气密度下,通过风电机组的监控系统获得风电机组A的风轮后的风速V后10min平均值,再将其折算到标准空气密度下。
风速计和风电机组A监控系统中的风速10min平均值数据的记录应做到秒级同步。且可在一天时间内进行记录,可记录一系列风速10min平均值数据。
风速计的10min平均值数据应涵盖风电机组A切入风速至切出风速区间内的所有风速。具体涵盖方式为:切入风速作为起点,以0.5m/s间隔做bin区间,每个bin区间内不少于5个10min平均值数值。
步骤2.1:使用GPS卫星授时系统确保风速计和风电机组A监控系统中的风速秒级同步。
步骤2.2:使用气温传感器测得气温数据T和气压传感器测得气压数据B,再结合气体常数R计算空气密度ρ10min平均值:
步骤2.3:根据不同空气密度下的风速折算公式,将测得风速10min平均值数据折算到标准空气密度(1.225kg/m3)下,折算公式为:
步骤3:计算V前和V后的线性拟合式,记为V前=aV后+b,其中a,b都是常数,由V前和V后确定。
线性拟合式中常数a和b,由最小二乘法确定。
步骤4:多次同步记录风电机组B的监控系统中的风轮后的风速V后和风电机组B出口净功率P。
风电机组B出口净功率P记录分辨率为1s,记录的数据为10min平均值数据。
风电机组B的监控系统中的风轮后的风速10min平均值数据V后应涵盖风电机组B切入风速至切出风速区间内的所有风速。具体涵盖方式为:切入风速作为起点,以0.5m/s间隔做bin区间,每个bin区间内不少于5个风速10min平均值数值。
风电机组B的监控系统中的风速10min平均值数据应按公式折算到标准空气密度下。
步骤5:利用步骤3中确定的线性拟合式V前=aV后+b及步骤4中的V后计算风电机组B风轮前的风速V前(距离风电机组B2.5倍风轮直径处轮毂高度的风速)。
步骤6:使用风电机组B出口净功率P和步骤5中的风电机组B风轮前的风速V前并结合IEC61400-12-1规定的算法计算风电机组B的功率特性曲线。
风电机组的功率特性曲线测试过程中,地形畸变导致气流畸变引起测试结果产生较大误差,不能反映风电机组真实的发电能力,所以IEC61400-12-1规定对于复杂地形下的风电机组功率特性测试,应首先进行场地标定。场地标定将产生较多费用。本发明避开场地标定的过程,提出一种基于风速线性拟合方法的复杂地形下的风电机组功率特性曲线测试方法。能够经济,准确的完成测试。
以上所述,仅为本发明较佳的实施方式,但本发明的保护范围并不局限于此。任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求的保护范围为准。
Claims (8)
1.一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,包括:
步骤1:确认待测风电机组B的型号,选择一台和待测风电机组B同型号的风电机组A,且所述风电机组A周围场地能够通过IEC-61400-12-1中的场地评估条件;
步骤2:多次同步记录风电机组A风轮前的风速V前和风轮后的风速V后;
步骤3:做V前和V后的线性拟合式,记为V前=aV后+b,其中a,b都是常数,由V前和V后确定;
步骤4:多次同步记录风电机组B的风轮后的风速V后和风电机组B出口净功率P;
步骤5:利用步骤3中确定的线性拟合式V前=aV后+b及步骤4中的V后计算风电机组B风轮前的风速V前;
步骤6:使用风电机组B出口净功率P和风电机组B风轮前的风速V前并结合IEC61400-12-1规定的算法计算风电机组B的功率特性曲线。
2.根据权利要求1所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,步骤2及步骤4中所述的风轮前的风速V前和风轮后的V后均为折算到标准空气密度下的n分钟平均值风速。
3.根据权利要求2所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,所述步骤2及步骤4中,通过风速计获得风电机组A的风轮前的风速V前n分钟平均值,再将其折算到标准空气密度下,通过风电机组的监控系统获得风电机组A、B的风轮后的风速V后n分钟平均值,再将其折算到标准空气密度下;且通过风速计获得的风电机组A风轮前的风速V前n分钟平均值和通过风电机组B获得的风轮后的风速V后n分钟平均值,都必须涵盖风电机组切入风速到切出风速区间段的所有风速,具体涵盖方式为:切入风速作为起点,以0.5m/s间隔做bin区间,每个bin区间内不少于5个n分钟平均值风速;
对应地,所述步骤3和步骤5中,每个0.5m/s的风速间隔内都存在一个不同的线性拟合式V前=aV后+b,都独立计算线性拟合式V前=aV后+b。
4.根据权利要求3所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,在步骤2中,所述风电机组A的风轮前的风速V前获得方法为:在风电机组A的主风向上距离风电机组A2.5倍风轮直径处竖立气象桅杆,所述风速计设置在气象桅杆上,且所述气象桅杆上还设置有气温传感器、气压传感器,安装高度为轮毂高度,风速计测得的数据为V前n分钟平均值;使用气温传感器测得气温数据T和气压传感器测得气压数据B,再结合气体常数R计算空气密度ρn分钟平均值;
根据不同空气密度下的风速折算公式,将风速计测得的V前n分钟平均值数据折算到标准空气密度下,折算公式为:
所述步骤2及步骤4中的通过风电机组的监控系统获得的风电机组A、B的风轮后的风速V后n分钟平均值,也按上述折算方法折算成标准空气密度下的风速。
5.根据权利要求2、3或4所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,所述n取10。
6.根据权利要求1所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,所述步骤2及步骤4中均采用秒级同步记录。
7.根据权利要求1所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,所述步骤3中线性拟合式中系数a和b的确定基于最小二乘法。
8.根据权利要求1所述的一种复杂地形下的风电机组功率特性曲线测试方法,其特征在于,所述步骤4中获得风电机组B出口净功率P的方法为在风电机组B的箱变低压侧安装电流互感器和电压互感器。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210527809.0A CN102967400B (zh) | 2012-12-10 | 2012-12-10 | 一种复杂地形下的风电机组功率特性曲线测试方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210527809.0A CN102967400B (zh) | 2012-12-10 | 2012-12-10 | 一种复杂地形下的风电机组功率特性曲线测试方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102967400A true CN102967400A (zh) | 2013-03-13 |
| CN102967400B CN102967400B (zh) | 2015-09-02 |
Family
ID=47797695
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210527809.0A Expired - Fee Related CN102967400B (zh) | 2012-12-10 | 2012-12-10 | 一种复杂地形下的风电机组功率特性曲线测试方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102967400B (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104747367A (zh) * | 2013-12-31 | 2015-07-01 | 华能新能源股份有限公司 | 风力发电机组功率曲线特性检测系统 |
| CN106707166A (zh) * | 2017-01-05 | 2017-05-24 | 云南电网有限责任公司电力科学研究院 | 一种风电场出力特性评估方法 |
| WO2017092297A1 (zh) * | 2015-12-02 | 2017-06-08 | 中国电力科学研究院 | 风电机组功率特性评价方法及装置、存储介质 |
| CN110486225A (zh) * | 2019-09-05 | 2019-11-22 | 国电联合动力技术有限公司 | 风电机组功率曲线的计算方法及装置 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070125165A1 (en) * | 2005-12-05 | 2007-06-07 | Ormel Frank T | Method, system and computer program product for nacelle wind speed correction |
| US20080307853A1 (en) * | 2007-06-18 | 2008-12-18 | Thomas Siebers | Anemometer calibration method and wind turbine |
| CN101493379A (zh) * | 2008-01-17 | 2009-07-29 | 通用电气公司 | 风力涡轮机风速测定补偿 |
| US20090241659A1 (en) * | 2008-03-27 | 2009-10-01 | Fuji Jukogyo Kabushiki Kaisha | Method for measuring the turbulence intensity of a horizontal axis wind turbine |
-
2012
- 2012-12-10 CN CN201210527809.0A patent/CN102967400B/zh not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070125165A1 (en) * | 2005-12-05 | 2007-06-07 | Ormel Frank T | Method, system and computer program product for nacelle wind speed correction |
| US20080307853A1 (en) * | 2007-06-18 | 2008-12-18 | Thomas Siebers | Anemometer calibration method and wind turbine |
| CN101493379A (zh) * | 2008-01-17 | 2009-07-29 | 通用电气公司 | 风力涡轮机风速测定补偿 |
| US20090241659A1 (en) * | 2008-03-27 | 2009-10-01 | Fuji Jukogyo Kabushiki Kaisha | Method for measuring the turbulence intensity of a horizontal axis wind turbine |
Non-Patent Citations (3)
| Title |
|---|
| 李倩倩: "《风力发电机组的功率特性测试与研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, no. 11, 15 November 2011 (2011-11-15), pages 042 - 109 * |
| 杨天时: "《大型风电机组综合性能评估系统研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, no. 08, 15 August 2011 (2011-08-15), pages 042 - 42 * |
| 蔡纯,张秋生: "《风力发电机组功率曲线的修正》", 《广东电力》, vol. 16, no. 1, 28 February 2003 (2003-02-28), pages 17 - 19 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104747367A (zh) * | 2013-12-31 | 2015-07-01 | 华能新能源股份有限公司 | 风力发电机组功率曲线特性检测系统 |
| CN104747367B (zh) * | 2013-12-31 | 2017-08-11 | 华能新能源股份有限公司 | 风力发电机组功率曲线特性检测系统 |
| WO2017092297A1 (zh) * | 2015-12-02 | 2017-06-08 | 中国电力科学研究院 | 风电机组功率特性评价方法及装置、存储介质 |
| CN106707166A (zh) * | 2017-01-05 | 2017-05-24 | 云南电网有限责任公司电力科学研究院 | 一种风电场出力特性评估方法 |
| CN106707166B (zh) * | 2017-01-05 | 2019-08-06 | 云南电网有限责任公司电力科学研究院 | 一种风电场出力特性评估方法 |
| CN110486225A (zh) * | 2019-09-05 | 2019-11-22 | 国电联合动力技术有限公司 | 风电机组功率曲线的计算方法及装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102967400B (zh) | 2015-09-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Li et al. | LiDAR technology for wind energy potential assessment: Demonstration and validation at a site around Lake Erie | |
| KR101215503B1 (ko) | 풍력발전기의 나셀 풍속 보정 시스템 및 그 방법 | |
| GB2477968A (en) | Method of operating a wind turbine to provide a corrected power curve | |
| CN105911467B (zh) | 复杂地形下的风电机组功率曲线考核评估方法 | |
| CN102566435A (zh) | 一种光伏电站的性能预报及故障报警方法 | |
| DK2981711T3 (en) | PROCEDURE FOR EFFICIENCY MONITORING OF A WINDOW ENERGY PARK | |
| CN101592128A (zh) | 确定和/或提供风力涡轮电场功率输出信息的方法和设备 | |
| EP3859149A1 (en) | Turbulence intensity estimation | |
| CN104747367A (zh) | 风力发电机组功率曲线特性检测系统 | |
| Demurtas et al. | Calibration of a spinner anemometer for wind speed measurements | |
| CN102967400A (zh) | 一种复杂地形下的风电机组功率特性曲线测试方法 | |
| Veldhuis et al. | An empirical model for rack-mounted PV module temperatures for Southeast Asian locations evaluated for minute time scales | |
| JP6054998B2 (ja) | 逸失エネルギの決定方法 | |
| CN104653410A (zh) | 基于激光雷达测风仪的风电机组运行功率特性测试系统及方法 | |
| Mendoza et al. | Power performance test report for the US department of energy 1.5-megawatt wind turbine | |
| KR20110112680A (ko) | 풍력발전용 전력품질 모니터링 시스템 | |
| Antoniou et al. | Influence of wind characteristics on turbine performance | |
| CN114880841B (zh) | 一种风电机组的scada风速矫正方法及系统 | |
| CN118568920A (zh) | 在役风电机组风速修正方法、装置、存储介质及电子设备 | |
| CN214836884U (zh) | 一种用于海上风电机组功率特性测量的装置 | |
| CN214273866U (zh) | 基于海拔高度的风力发电机组功率特性检测装置 | |
| Al-Ghamdi | Analysis of wind power and wind power characteristics: Al-Aqiq City, Saudi Arabia | |
| JP7781801B2 (ja) | 情報処理装置、情報処理方法、プログラムおよび情報処理システム | |
| Ziter et al. | Predicting hub-height wind speed for small wind turbine performance evaluation using tower-mounted cup anemometers | |
| Schneider et al. | Available active power estimation for the provision of control reserve by wind turbines |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150902 Termination date: 20161210 |