CN102917404A - Method and device for pre-processing cell switch - Google Patents
Method and device for pre-processing cell switch Download PDFInfo
- Publication number
- CN102917404A CN102917404A CN2012103248245A CN201210324824A CN102917404A CN 102917404 A CN102917404 A CN 102917404A CN 2012103248245 A CN2012103248245 A CN 2012103248245A CN 201210324824 A CN201210324824 A CN 201210324824A CN 102917404 A CN102917404 A CN 102917404A
- Authority
- CN
- China
- Prior art keywords
- load
- adjacent area
- base station
- neighborhood region
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000007781 pre-processing Methods 0.000 title abstract 2
- 230000005540 biological transmission Effects 0.000 claims description 51
- 238000012217 deletion Methods 0.000 claims description 18
- 230000037430 deletion Effects 0.000 claims description 18
- 238000005259 measurement Methods 0.000 claims description 8
- 238000001514 detection method Methods 0.000 claims description 5
- 239000002699 waste material Substances 0.000 description 3
- 238000005303 weighing Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000012467 final product Substances 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The application provides a method and a device for pre-processing cell switch to solve the problem of unbalanced load capacity of a cell. The method comprises the steps of: configuring an adjacent region as a load capacity threshold of a target cell, wherein the load capacity threshold is the maximal load capacity of the target cell; obtaining load information of each adjacent region in an adjacent region correlation table of a base station, wherein the adjacent region correlation table comprises the cell belonging to the base station, and the adjacent regions of the cell; when detecting that the load information of the adjacent region is larger than the load capacity threshold, deleting the adjacent region from the adjacent region correlation table, forming an updated adjacent region correlation table, and issuing the updated adjacent region correlation table through a broadcast message.
Description
Technical field
The application relates to the communication technology, particularly relates to preprocess method and the device that switch a kind of residential quarter.
Background technology
Wireless network provides a movably environment for the user, and in order to guarantee the quality of service in the user moves, wireless network need to possess handoff functionality.
In Long Term Evolution (Long Term Evolution, the LTE) network, can according to the geographical position of base station assigns, by the neighborhood region correlation chart of each residential quarter in this base station of site survey preliminary planning, comprise each adjacent area of described residential quarter in the described neighborhood region correlation chart.Subscriber equipment (User Equipment, UE) can obtain by broadcast message the neighborhood region correlation chart of the residential quarter at described UE place.When needs carried out the residential quarter switching, subscriber equipment can be measured each adjacent area of residential quarter, place by neighborhood region correlation chart, consisted of measurement report and reported the base station, and then switch as Target cell by adjacent area of certain rules selection the base station.
But, because there is unbalanced phenomenon in the load of each residential quarter in the LTE network, resident subscriber equipment in a large number in some residential quarter, only resident subscriber equipment seldom in some residential quarter.This has just caused the unbalanced of resource distribution, the residential quarter possibility inadequate resource that resident subscriber equipment is too much, and a lot of resources have been wasted in the very few residential quarter of resident subscriber equipment.
Subscriber equipment is not paid close attention to the load of residential quarter, as long as described residential quarter is in the neighborhood region correlation chart of residential quarter, subscriber equipment place, subscriber equipment will be measured and report, if the too much residential quarter of base station selected resident subscriber equipment this moment is as Target cell, then subscriber equipment is when switching, because the inadequate resource of residential quarter, handoff failure possibly, the success rate of switching is lower.And, even handover success, because the inadequate resource of residential quarter, the quality of service of subscriber equipment also is difficult to be guaranteed.
Summary of the invention
Preprocess method and device that the application provides a kind of residential quarter to switch are to solve the unbalanced problem of load of residential quarter.
In order to address the above problem, the application discloses the preprocess method that switch a kind of residential quarter, it is characterized in that, comprising:
Configuring adjacent cell is as the load thresholding of Target cell, and wherein, described load thresholding is the maximal workload of Target cell;
Obtain the information on load of each adjacent area in the neighborhood region correlation chart of base station, wherein, comprise the residential quarter that belongs to this base station in the described neighborhood region correlation chart, and the adjacent area of described residential quarter;
When the information on load that detects the adjacent area during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades;
Neighborhood region correlation chart by broadcast message issue renewal.
Preferably, described information on load comprises: resource utilization and transmission load, then described load thresholding comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.
Preferably, the information on load of each adjacent area in the described neighborhood region correlation chart that obtains the base station, comprising: the adjacent area that belongs to this base station in the neighborhood region correlation chart to the base station is measured; Obtain resource utilization and the transmission load of this adjacent area, consist of information on load and the storage of described adjacent area.
Preferably, the information on load of each adjacent area comprises: to not belonging to the adjacent area of this base station in the neighborhood region correlation chart of base station, inquire about the base station at this place, adjacent area in the described neighborhood region correlation chart that obtains the base station; The base station obtains resource utilization and the transmission load of this adjacent area to the base station at this place, adjacent area, consist of information on load and the storage of this adjacent area.
Preferably, described information on load when detecting the adjacent area is during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and the neighborhood region correlation chart that consist of to upgrade, comprising: when resource utilization in the information on load that detects the adjacent area greater than based on the load thresholding of resource utilization the time; And/or, when transmission load in the information on load that detects the adjacent area greater than based on the load thresholding of transmission load the time; The described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.
Accordingly, disclosed herein as well is the pretreatment unit that switch a kind of residential quarter, comprising:
Configuration module is used for configuring adjacent cell as the load thresholding of Target cell, and wherein, described load thresholding is the maximal workload of Target cell;
Acquisition module, the information on load for each adjacent area of neighborhood region correlation chart that obtains the base station wherein, comprises the residential quarter that belongs to this base station in the described neighborhood region correlation chart, and the adjacent area of described residential quarter;
Update module is used for when the information on load that detects the adjacent area during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart of renewal;
Release module is used for the neighborhood region correlation chart that upgrades by the broadcast message issue.
Preferably, described information on load comprises: resource utilization and transmission load, then described load thresholding comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.
Preferably, described acquisition module comprises: measurement module, and the adjacent area that belongs to this base station for the neighborhood region correlation chart to the base station is measured; The first acquisition module is used for obtaining resource utilization and the transmission load of this adjacent area, consists of information on load and the storage of described adjacent area.
Preferably, described acquisition module comprises: enquiry module, for the adjacent area that the neighborhood region correlation chart of base station is not belonged to this base station, inquire about the base station at this place, adjacent area; The second acquisition module is used for the base station obtains resource utilization from this adjacent area to the base station at this place, adjacent area and transmission load, consists of information on load and the storage of this adjacent area.
Preferably, described update module, be used for when the information on load resource utilization of detection adjacent area greater than based on the load thresholding of resource utilization the time; And/or, when transmission load in the information on load that detects the adjacent area greater than based on the load thresholding of transmission load the time; The described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.
Compared with prior art, the application comprises following advantage:
At first, the application has configured the load thresholding of adjacent area as Target cell, and can described load thresholding be become one of standard of Target cell as weighing the adjacent area.Then obtain the information on load of each adjacent area in the neighborhood region correlation chart of residential quarter, subscriber equipment place, at the information on load of adjacent area during greater than described load thresholding, the described adjacent area of deletion from described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.Therefore do not comprise information on load greater than the adjacent area of load thresholding in the neighborhood region correlation chart that upgrades, subsequent user equipment is when measuring the neighborhood region correlation chart of the renewal by broadcast message issue, can not measure information on load greater than the adjacent area of load thresholding, thus can be in the burden that increases the larger adjacent area of load.And then so that each cell load in the network is relatively balanced, deleted the adjacent area of information on load greater than the load thresholding in the neighborhood region correlation chart simultaneously after, has reduced the adjacent area that subscriber equipment will be measured, and has also just reduced simultaneously the waste of resource.
Secondly, the application's information on load comprises: resource utilization and transmission load, then corresponding load thresholding comprises: based on the load thresholding of resource utilization with based on the load thresholding that transmits load.When any one in the information on load of adjacent area surpasses corresponding load thresholding, just this adjacent area is deleted from neighborhood region correlation chart, thereby so that stricter to the detection of information on load, thereby guarantee better the load balancing of each residential quarter in the network, improve the success rate of follow-up switching, guarantee the quality of service of subscriber equipment in the residential quarter
Again, the application is when obtaining the information on load of adjacent area, the adjacent area that belongs to this base station in the neighborhood region correlation chart to the base station, the base station can directly obtain the information on load of this adjacent area, to not belonging to the adjacent area of this base station in the neighborhood region correlation chart of base station, the base station can by mutual with the base station at this place, adjacent area, get access to the information on load of this adjacent area.Therefore the application can get access to the information on load of each adjacent area, is conducive to realize load balancing.
Description of drawings
Fig. 1 is the preprocess method flow chart that switch the described a kind of residential quarter of the embodiment of the present application;
Fig. 2 is that information on load obtains flow chart in the preprocess method that switches of the described a kind of residential quarter of the application's preferred embodiment;
Fig. 3 is the pretreatment unit structure chart that switch the described a kind of residential quarter of the embodiment of the present application;
Fig. 4 is acquisition module structure chart in the pretreatment unit that switches of the described a kind of residential quarter of the application's preferred embodiment.
Embodiment
For above-mentioned purpose, the feature and advantage that make the application can become apparent more, below in conjunction with the drawings and specific embodiments the application is described in further detail.
When prior art was carried out the residential quarter switching at needs, subscriber equipment can be measured each adjacent area of residential quarter, place by neighborhood region correlation chart.But, because there is unbalanced phenomenon in the load of each residential quarter in the LTE network, resident subscriber equipment in a large number in some residential quarter, only resident subscriber equipment seldom in some residential quarter.This has just caused the unbalanced of resource distribution, the residential quarter possibility inadequate resource that resident subscriber equipment is too much, and a lot of resources have been wasted in the very few residential quarter of resident subscriber equipment.
Subscriber equipment is not paid close attention to the load of residential quarter, as long as described residential quarter is in the neighborhood region correlation chart of residential quarter, subscriber equipment place, subscriber equipment will be measured and report, if the too much residential quarter of base station selected resident subscriber equipment this moment is as Target cell, then subscriber equipment is when switching, because the inadequate resource of residential quarter, handoff failure possibly, the success rate of switching is lower.And, even handover success, because the inadequate resource of residential quarter, the quality of service of subscriber equipment also is difficult to be guaranteed.
Based on the problems referred to above, the preprocess method that the application provides a kind of residential quarter to switch, can from described neighborhood region correlation chart, delete the adjacent area that load is excessive, when subsequent user equipment is measured the adjacent area in the described neighborhood region correlation chart, can not measure the excessive adjacent area of load, then the excessive adjacent area of load can not become Target cell, thereby has improved the success rate of switching, and load that can balanced each residential quarter guarantees carrying out professional in the residential quarter.
With reference to Fig. 1, provided the preprocess method flow chart that switch the described a kind of residential quarter of the embodiment of the present application.
Because there is unbalanced phenomenon in the load of each residential quarter, resident subscriber equipment in a large number in some residential quarter, only resident subscriber equipment seldom in some residential quarter.For this kind phenomenon, in order to make the cell load in the network balanced as far as possible, guarantee the success rate when switch the residential quarter, the application has configured the load thresholding of adjacent area as Target cell, and can described load thresholding be become one of standard of Target cell as weighing the adjacent area.
Wherein, described load thresholding is the maximal workload of Target cell, and namely when the load of adjacent area surpassed described load thresholding, described adjacent area can not be as Target cell.
In the LTE network, there is neighborhood region correlation chart the base station, has identified the relation of LTE network small area in the described neighborhood region correlation chart, comprising: belong to the residential quarter of this base station, and the adjacent area of described residential quarter.Described is the residential quarter adjacent with this residential quarter, as adjacent on the geographical position.
Therefore, can then obtain the neighborhood region correlation chart of this base station for the base station of residential quarter, subscriber equipment place, then the base station obtains each adjacent area of the residential quarter of this base station from described neighborhood region correlation chart, then measures the information on load of described adjacent area.Wherein, described information on load comprises resource utilization and transmission load etc.
Whether step 103 detects the information on load of adjacent area greater than described load thresholding;
After obtaining the information on load of adjacent area, just the information on load of adjacent area can be compared in described load thresholding, can become Target cell to judge described adjacent area.
Therefore need whether to detect the information on load of adjacent area greater than described load thresholding, if not, the information on load that is the adjacent area is not more than described load thresholding, then the information on load of described adjacent area does not surpass the maximal workload of Target cell, described adjacent area can be used as Target cell, and need not carry out any operation this moment.
If namely the information on load of adjacent area is greater than described load thresholding, then the information on load of described adjacent area has surpassed the maximal workload of Target cell, and described adjacent area can not be as Target cell, follow-up execution in step 14.
Because the base station be measured and be reported to subscriber equipment need to each adjacent area in the neighborhood region correlation chart when carrying out the residential quarter switching, the base station further selects an adjacent area as Target cell according to preset rules again.After judging that the adjacent area can not be as Target cell, for the load of balanced each residential quarter, described adjacent area can be deleted from neighborhood region correlation chart, subsequent user equipment just can not measured described adjacent area carrying out the residential quarter when switching, and described adjacent area just can not become Target cell.
After above-mentioned measurement, detecting, can not be as the adjacent area of Target cell.From neighborhood region correlation chart, after the deletion, just consist of the neighborhood region correlation chart that upgrades this moment, do not comprised information on load in the neighborhood region correlation chart of described renewal greater than the adjacent area of load thresholding.
After having consisted of the neighborhood region correlation chart that upgrades, can be by the neighborhood region correlation chart of broadcast message issue renewal.Subscriber equipment during follow-up the switching, can not measured information on load greater than the adjacent area of load thresholding after receiving the neighborhood region correlation chart of renewal, thereby can be in the burden that increases the larger adjacent area of load.And then so that each cell load in the network is relatively balanced, deleted the adjacent area of information on load greater than the load thresholding in the neighborhood region correlation chart simultaneously after, has reduced the adjacent area that subscriber equipment will be measured, and has also just reduced simultaneously the waste of resource.
In sum, the application has configured the load thresholding of adjacent area as Target cell, and can described load thresholding be become one of standard of Target cell as weighing the adjacent area.Then obtain the information on load of each adjacent area in the neighborhood region correlation chart of residential quarter, subscriber equipment place, at the information on load of adjacent area during greater than described load thresholding, the described adjacent area of deletion from described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.Therefore do not comprise information on load greater than the adjacent area of load thresholding in the neighborhood region correlation chart that upgrades, subsequent user equipment is when measuring the neighborhood region correlation chart of the renewal by broadcast message issue, can not measure information on load greater than the adjacent area of load thresholding, thus can be in the burden that increases the larger adjacent area of load.And then so that each cell load in the network is relatively balanced, deleted the adjacent area of information on load greater than the load thresholding in the neighborhood region correlation chart simultaneously after, has reduced the adjacent area that subscriber equipment will be measured, and has also just reduced simultaneously the waste of resource.
Preferably, described information on load comprises: resource utilization and transmission load, wherein, described resource utilization is the resource utilization of residential quarter, comprises Physical Resource Block (Physical Resource Block, PRB) accounting, number of users etc.Described transmission load is the transmission load condition of residential quarter, such as S1 bandwidth occupancy ratio.Certainly, described information on load comprises that also hardware resource takies situation, CPU running rate etc., and the application does not do restriction to this.
Wherein, described PRB accounting can be divided into two kinds of uplink and downlink, and the radix of up PRB accounting is generally 96prb, if wherein take 10prb, then the PRB accounting is 10/96; The radix of descending PRB accounting is generally 100prb, even wherein take 10prb, then the PRB accounting is 10/100=10%.
Certainly, the radix of PRB accounting is variable, and in the implementation, the radix of described PRB accounting can be configured according to the resource of system.
Described S1 is the initial bandwidth of setting up, or is called the bandwidth of planning.
Because can described load thresholding be to weigh the adjacent area become one of standard of Target cell, therefore corresponding to the information on load of adjacent area, described load thresholding also comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.
Adjacent area in the neighborhood region correlation chart can obtain by modes such as physics and logics, as, the adjacent area of residential quarter, subscriber equipment place may be the residential quarter geographically adjacent with residential quarter, subscriber equipment place, also may be the residential quarter of repeatedly communicating by letter with residential quarter, subscriber equipment place.Therefore, a residential quarter and his adjacent area may belong to same base station in the neighborhood region correlation chart, also may belong to different base station, and the below discusses in two kinds of situation:
1, the adjacent area in the neighborhood region correlation chart belongs to this base station;
The information on load of each adjacent area in the described neighborhood region correlation chart that obtains the base station comprises:
The adjacent area that belongs to this base station in the neighborhood region correlation chart to the base station is measured; Obtain resource utilization and the transmission load of this adjacent area, consist of information on load and the storage of described adjacent area.
There is neighborhood region correlation chart each base station, before the adjacent area in the neighborhood region correlation chart is measured, at first detects certain adjacent area in the described neighborhood region correlation chart, whether belongs to base station corresponding to described neighborhood region correlation chart.
If belong to, described adjacent area is one of residential quarter of this base station, and then this base station just can be measured the adjacent area that belongs to this base station in the neighborhood region correlation chart, obtains this adjacent area resource utilization and transmission load by measurement, consist of the information on load of described adjacent area, and be stored in the base station.
2, the adjacent area in the neighborhood region correlation chart does not belong to this base station;
The information on load of each adjacent area in the described neighborhood region correlation chart that obtains the base station comprises:
To not belonging to the adjacent area of this base station in the neighborhood region correlation chart of base station, inquire about the base station at this place, adjacent area; The base station obtains resource utilization and the transmission load of this adjacent area to the base station at this place, adjacent area, consist of information on load and the storage of this adjacent area.
Detect certain adjacent area in the described neighborhood region correlation chart, whether belong to base station corresponding to described neighborhood region correlation chart.If do not belong to, described adjacent area is not the residential quarter of this base station, and then this base station cannot directly be measured described adjacent area, need at first detect the base station at place, adjacent area.Then the request of measuring can be initiated to the base station at place, adjacent area in this base station, and the base station measurement at place, adjacent area can feed back to the base station of request, i.e. base station corresponding to described neighborhood region correlation chart to resource utilization and the transmission load of this adjacent area.The base station can consist of the information on load of this adjacent area, and be stored in this base station behind the resource utilization of obtaining the adjacent area that does not belong to this base station and transmission load.
In the actual treatment, can pass through X2 interface message between the base station, periodically carry out the mutual of information on load, namely X2 interface message can be passed through in each base station, gets access to fast the information on load of the adjacent area that needs, so that obtaining of measurement and information on load is quicker.
With reference to Fig. 2, provided that information on load obtains flow chart in the preprocess method that switches the described a kind of residential quarter of the application preferred embodiment.
In the actual treatment, the base station obtains the method for the information on load of adjacent area can be as follows:
If, execution in step 202, if not, execution in step 204.
Step 203 is obtained resource utilization and the transmission load of this adjacent area, consists of information on load and the storage of described adjacent area;
Step 204 to not belonging to the adjacent area of this base station in the neighborhood region correlation chart of base station, is obtained the base station at this place, adjacent area;
Preferably, described information on load when detecting the adjacent area is during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades, comprising:
When resource utilization in the information on load that detects the adjacent area greater than based on the load thresholding of resource utilization the time; And/or, when transmission load in the information on load that detects the adjacent area greater than based on the load thresholding of transmission load the time; The described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.
When whether the information on load of adjacent area is detected greater than described load thresholding, because information on load comprises multinomial, therefore when the Arbitrary Term when detecting information on load in is greater than the load thresholding of correspondence, all this adjacent area can be deleted from described neighborhood region correlation chart, specifically as:
When resource utilization in the information on load of adjacent area greater than based on the load thresholding of resource utilization the time; Perhaps, when transmission load in the information on load of adjacent area greater than based on the load thresholding of transmission load the time; Or, in the information on load of adjacent area resource utilization greater than the load thresholding based on resource utilization, and in the information on load of adjacent area transmission load greater than based on the load thresholding of transmission load the time.
When above-mentioned situation, can think that the load of this adjacent area is excessive, can not therefore this adjacent area can be deleted from described neighborhood region correlation chart as Target cell, and consist of the neighborhood region correlation chart that upgrades.
In the actual treatment, because the difference of the number of cells of each base station, bearing capacity etc., the load thresholding that different base stations configures can be identical, also can be different, and concrete configuration is decided with actual conditions.
And, the load thresholding of cell-of-origin can also be set, i.e. the maximal workload of cell-of-origin.Its China, described cell-of-origin is the residential quarter at subscriber equipment place, then when the residential quarter at subscriber equipment place, when namely the information on load of cell-of-origin surpasses the load thresholding of cell-of-origin, some equipment in the cell-of-origin is carried out the residential quarter switch.Specifically can in the operation management Operation and Maintenance platform of base station, increase by two parameters, be used for configuring adjacent cell as the load thresholding of Target cell, and the load thresholding of cell-of-origin, wherein, the configuration of base station can be as shown in table 1:
| Parameter | Parameter is introduced |
| S enbloadthr | The load thresholding of cell-of-origin, unit: % |
| T enbloadthr | The load thresholding of Target cell, unit: % |
Table 1
In sum, the application's information on load comprises: resource utilization and transmission load, then corresponding load thresholding comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.When any one in the information on load of adjacent area surpasses corresponding load thresholding, just this adjacent area is deleted from neighborhood region correlation chart, thereby so that stricter to the detection of information on load, thereby guarantee better the load balancing of each residential quarter in the network, improve the success rate of follow-up switching, guarantee the quality of service of subscriber equipment in the residential quarter.
Secondly, the application is when obtaining the information on load of adjacent area, the adjacent area that belongs to this base station in the neighborhood region correlation chart to the base station, the base station can directly obtain the information on load of this adjacent area, to not belonging to the adjacent area of this base station in the neighborhood region correlation chart of base station, the base station can by mutual with the base station at this place, adjacent area, get access to the information on load of this adjacent area.Therefore the application can get access to the information on load of each adjacent area, is conducive to realize load balancing.
With reference to Fig. 3, provided the pretreatment unit structure chart that switch the described a kind of residential quarter of the embodiment of the present application.
Accordingly, the pretreatment unit that the application also provides a kind of residential quarter to switch comprises: configuration module 11, acquisition module 12, update module 13 and release module 14, wherein:
Preferably, described information on load comprises: resource utilization and transmission load, then described load thresholding comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.
With reference to Fig. 4, provided acquisition module structure chart in the pretreatment unit that switches the described a kind of residential quarter of the application's preferred embodiment.
Preferably, described acquisition module 12 comprises:
The first acquisition module 122 is used for obtaining resource utilization and the transmission load of this adjacent area, consists of information on load and the storage of described adjacent area.
The second acquisition module 124 is used for the base station obtains resource utilization from this adjacent area to the base station at this place, adjacent area and transmission load, consists of information on load and the storage of this adjacent area.
Preferably, described update module 13, be used for when the information on load resource utilization of detection adjacent area greater than based on the load thresholding of resource utilization the time; And/or, when transmission load in the information on load that detects the adjacent area greater than based on the load thresholding of transmission load the time; The described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.
For device embodiment because itself and embodiment of the method basic simlarity, so describe fairly simple, relevant part gets final product referring to the part explanation of embodiment of the method.
Each embodiment in this specification all adopts the mode of going forward one by one to describe, and what each embodiment stressed is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
The application can describe in the general context of the computer executable instructions of being carried out by computer, for example program module.Usually, program module comprises the routine carrying out particular task or realize particular abstract data type, program, object, assembly, data structure etc.Also can in distributed computing environment (DCE), put into practice the application, in these distributed computing environment (DCE), by the long-range place that is connected by communication network.
Preprocess method and the device that switch above a kind of residential quarter that the application is provided, be described in detail, used specific case herein the application's principle and execution mode are set forth, the explanation of above embodiment just is used for helping to understand the application's method and core concept thereof; Simultaneously, for one of ordinary skill in the art, the thought according to the application all will change in specific embodiments and applications, and in sum, this description should not be construed as the restriction to the application.
Claims (10)
1. the preprocess method that switch the residential quarter is characterized in that, comprising:
Configuring adjacent cell is as the load thresholding of Target cell, and wherein, described load thresholding is the maximal workload of Target cell;
Obtain the information on load of each adjacent area in the neighborhood region correlation chart of base station, wherein, comprise the residential quarter that belongs to this base station in the described neighborhood region correlation chart, and the adjacent area of described residential quarter;
When the information on load that detects the adjacent area during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades;
Neighborhood region correlation chart by broadcast message issue renewal.
2. method according to claim 1 is characterized in that, described information on load comprises: resource utilization and transmission load, then described load thresholding comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.
3. method according to claim 2 is characterized in that, the information on load of each adjacent area in the described neighborhood region correlation chart that obtains the base station comprises:
The adjacent area that belongs to this base station in the neighborhood region correlation chart to the base station is measured;
Obtain resource utilization and the transmission load of this adjacent area, consist of information on load and the storage of described adjacent area.
4. method according to claim 2 is characterized in that, the information on load of each adjacent area in the described neighborhood region correlation chart that obtains the base station comprises:
To not belonging to the adjacent area of this base station in the neighborhood region correlation chart of base station, inquire about the base station at this place, adjacent area;
The base station obtains resource utilization and the transmission load of this adjacent area to the base station at this place, adjacent area, consist of information on load and the storage of this adjacent area.
5. method according to claim 2 is characterized in that, described information on load when detecting the adjacent area is during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades, comprising:
When resource utilization in the information on load that detects the adjacent area greater than based on the load thresholding of resource utilization the time;
And/or, when transmission load in the information on load that detects the adjacent area greater than based on the load thresholding of transmission load the time;
The described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.
6. the pretreatment unit that switch the residential quarter is characterized in that, comprising:
Configuration module is used for configuring adjacent cell as the load thresholding of Target cell, and wherein, described load thresholding is the maximal workload of Target cell;
Acquisition module, the information on load for each adjacent area of neighborhood region correlation chart that obtains the base station wherein, comprises the residential quarter that belongs to this base station in the described neighborhood region correlation chart, and the adjacent area of described residential quarter;
Update module is used for when the information on load that detects the adjacent area during greater than described load thresholding, the described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart of renewal;
Release module is used for the neighborhood region correlation chart that upgrades by the broadcast message issue.
7. device according to claim 6 is characterized in that, described information on load comprises: resource utilization and transmission load, then described load thresholding comprises: based on the load thresholding of resource utilization and the load thresholding of loading based on transmission.
8. device according to claim 7 is characterized in that, described acquisition module comprises:
Measurement module, the adjacent area that belongs to this base station for the neighborhood region correlation chart to the base station is measured;
The first acquisition module is used for obtaining resource utilization and the transmission load of this adjacent area, consists of information on load and the storage of described adjacent area.
9. device according to claim 7 is characterized in that, described acquisition module comprises:
Enquiry module for the adjacent area that the neighborhood region correlation chart of base station is not belonged to this base station, is inquired about the base station at this place, adjacent area;
The second acquisition module is used for the base station obtains resource utilization from this adjacent area to the base station at this place, adjacent area and transmission load, consists of information on load and the storage of this adjacent area.
10. device according to claim 7 is characterized in that, described update module, be used for when the information on load resource utilization of detection adjacent area greater than based on the load thresholding of resource utilization the time; And/or, when transmission load in the information on load that detects the adjacent area greater than based on the load thresholding of transmission load the time; The described adjacent area of deletion in described neighborhood region correlation chart, and consist of the neighborhood region correlation chart that upgrades.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012103248245A CN102917404A (en) | 2012-09-04 | 2012-09-04 | Method and device for pre-processing cell switch |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012103248245A CN102917404A (en) | 2012-09-04 | 2012-09-04 | Method and device for pre-processing cell switch |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102917404A true CN102917404A (en) | 2013-02-06 |
Family
ID=47615596
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012103248245A Pending CN102917404A (en) | 2012-09-04 | 2012-09-04 | Method and device for pre-processing cell switch |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102917404A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104486781A (en) * | 2014-12-05 | 2015-04-01 | 京信通信系统(中国)有限公司 | Method and device for optimizing centralized switching under LTE (Long Term Evolution) |
| CN109474959A (en) * | 2017-09-07 | 2019-03-15 | 大唐移动通信设备有限公司 | A kind of method and apparatus of cell access |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102088685A (en) * | 2011-01-20 | 2011-06-08 | 大唐移动通信设备有限公司 | Network side device and method for updating system information block (SIB) |
| WO2011148883A1 (en) * | 2010-05-28 | 2011-12-01 | 住友電気工業株式会社 | Adjacent cell processing device, radio base station device, adjacent cell processing method, and data structure |
| CN102281569A (en) * | 2011-08-03 | 2011-12-14 | 京信通信系统(中国)有限公司 | Distributed strategy based measurement control method for Femto base station |
| CN102378323A (en) * | 2010-08-13 | 2012-03-14 | 电信科学技术研究院 | Energy-saving compensation method and base station |
-
2012
- 2012-09-04 CN CN2012103248245A patent/CN102917404A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011148883A1 (en) * | 2010-05-28 | 2011-12-01 | 住友電気工業株式会社 | Adjacent cell processing device, radio base station device, adjacent cell processing method, and data structure |
| CN102378323A (en) * | 2010-08-13 | 2012-03-14 | 电信科学技术研究院 | Energy-saving compensation method and base station |
| CN102088685A (en) * | 2011-01-20 | 2011-06-08 | 大唐移动通信设备有限公司 | Network side device and method for updating system information block (SIB) |
| CN102281569A (en) * | 2011-08-03 | 2011-12-14 | 京信通信系统(中国)有限公司 | Distributed strategy based measurement control method for Femto base station |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104486781A (en) * | 2014-12-05 | 2015-04-01 | 京信通信系统(中国)有限公司 | Method and device for optimizing centralized switching under LTE (Long Term Evolution) |
| CN109474959A (en) * | 2017-09-07 | 2019-03-15 | 大唐移动通信设备有限公司 | A kind of method and apparatus of cell access |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11451362B2 (en) | Systems and methods for non-cellular wireless access using logical entity IDS in a hyper cell | |
| EP3403180B1 (en) | User equipment selection for mobile edge computing | |
| CN106489274B (en) | Mobile control method for terminal in RRC idle state, terminal and base station | |
| KR101562525B1 (en) | Performing measurements in a digital cellular wireless telecommunication network | |
| JP5531164B2 (en) | Method and system for interactively selecting auxiliary cells | |
| CN103959850A (en) | Measurements for the interworking of wireless wide area and wireless local area networks | |
| Li et al. | Deployment of edge servers in 5G cellular networks | |
| JP2014523159A5 (en) | ||
| US20190320372A1 (en) | Cell Measurement Reporting Method and User Equipment | |
| CN104581779A (en) | Business processing method and device | |
| CN110784894B (en) | LTE system load balancing method and device | |
| US9408180B2 (en) | Traffic management for heterogenous networks | |
| CN107920371A (en) | A kind of Target cell choosing method and base station | |
| EP3644646A1 (en) | Load-balancing method and apparatus | |
| CN102740364A (en) | Load balancing method and device | |
| WO2015106450A1 (en) | Load balancing among wireless access points | |
| CN105933923B (en) | A kind of super-intensive networking cell cluster-dividing method | |
| CN104202798B (en) | Electric power wirelessly communicates the network selecting method in the more net environment of isomery | |
| US9282555B2 (en) | Resource control method, device and base station | |
| EP3917276A1 (en) | Method for determining scheduling terminal, terminal, and network side apparatus | |
| KR101924628B1 (en) | Apparatus and Method for controlling traffic offloading | |
| CN102917404A (en) | Method and device for pre-processing cell switch | |
| JP2016201582A (en) | Wireless communication system, base station, and communication control method | |
| CN106455080B (en) | A scheduling method and communication network system based on macro-micro coordination | |
| US20160360523A1 (en) | Access system, device and method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130206 |