[go: up one dir, main page]

CN102817605A - Method for accurately measuring elevation of drilling point in subterranean drilling - Google Patents

Method for accurately measuring elevation of drilling point in subterranean drilling Download PDF

Info

Publication number
CN102817605A
CN102817605A CN2012102797705A CN201210279770A CN102817605A CN 102817605 A CN102817605 A CN 102817605A CN 2012102797705 A CN2012102797705 A CN 2012102797705A CN 201210279770 A CN201210279770 A CN 201210279770A CN 102817605 A CN102817605 A CN 102817605A
Authority
CN
China
Prior art keywords
flexible pipe
drilling
elevation
tube head
horizontal flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102797705A
Other languages
Chinese (zh)
Inventor
雷阳传
高杰
杨毅辉
林壮龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2012102797705A priority Critical patent/CN102817605A/en
Publication of CN102817605A publication Critical patent/CN102817605A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a method for accurately measuring elevation of a drilling point in subterranean drilling. The method comprises the following steps of: filling a horizontal flexible pipe with water, and enabling one end of a flexible pipe or the pipe head connectedwith a water pressure box to enter the drilling point along with a drill; leading out the other end of the horizontal flexible pipe through a through hole at a tail part of a drill pipe; sealing both ends of the pipe; drilling a drill hole and stopping the drilling until the elevation of the drilling point reaches to the requirement; finally, measuring the elevation of the drilling point directly outside the drill hole, alternatively reading out an altitude difference through a ground displayer, so as to calculate the elevation of the drilling point. The invention is aimed at tunnel drilling construction. By adopting the method disclosed by the invention, the underground drilling elevation can be accurately detected through instruments such as a horizontal flexible pipe, a water pressure box, and a displayer by utilizing the principle of communicating vessels and the principle of calculating the altitude difference by a pressure value of liquid in communicating pipes; therefore, safety of the existing underground objects can be guaranteed, the operation is simple, the construction is convenient, the construction progress is accelerated, and a very good construction effect is achieved; furthermore, the used operating instruments are low in cost and very suitable for popularization and application in such drilling construction.

Description

Accurately measure the method for probing point height in a kind of subsurface boring
Technical field
The present invention relates to the Reconnaissance Survey field, specifically, relate to measure in a kind of subsurface boring the method for probing point height.
Background technology
In the constructing tunnel process; Be usually directed to subsurface boring; And some existing underground objects; For example underground foundation of communication route, various pipe network facilities, high service pipeline and house, highway bridge etc. etc. belongs to important object of protection, can not injure existing underground object in the construction requirement drilling process, to guarantee property, life security.
The accurate elevation of probing point just proposes higher required precision during for this reason, to underground probing.But in boring procedure; Owing to drilling rod deadweight, country rock hardness is inconsistent and reason such as plant error; Drilling rod can not keep the same elevation angle or the angle of depression to execute brill always, so can not accurately orient the probing point height through run of steel and the elevation angle, the angle of depression.Because of measuring the accurate elevation of probing point, drill bit can't go deep into when causing probing sometimes.
Therefore, press for the method for accurately measuring the probing point height when working out the subsurface boring of a kind of tunnel.
Summary of the invention
What the present invention will solve is the technical problem that leading probing elevation can't accurately be measured in the constructing tunnel process; The method of accurately measuring the probing point height in a kind of subsurface boring is provided; It is nearer to be particularly useful for the existing underground object of tunnel excavation distance, thereby the accurate situation of positioning drilling point height.
In order to solve the problems of the technologies described above, the present invention is achieved through following technical scheme:
Accurately measure the method for probing point height in a kind of subsurface boring, when the probing direction was the elevation angle with angle that horizontal plane becomes, this method was carried out according to following steps:
A., water-filled horizontal flexible pipe is installed in the drilling rod of rig;
B. an end of said horizontal flexible pipe is fixed in the drill bit place of said rig, and sealing should be held tube head;
C. be drilled with through hole at said drilling rod afterbody;
D. the other end of said horizontal flexible pipe is drawn by said through hole, and sealing should be held tube head;
E. begin boring, when needs are measured the probing point height, stop said rig;
F. the outer said horizontal flexible pipe tube head of will holing promotes, and makes it be higher than the Theoretical Calculation position of probing point;
G. remove the sealing of the outer said horizontal flexible pipe tube head of boring;
H. slowly move the outer said horizontal flexible pipe tube head of boring up and down, when the height of water level in this tube head was constant, its water level elevation was the probing point height.
Accurately measure the method for probing point height in a kind of subsurface boring, when the probing direction was the angle of depression with angle that horizontal plane becomes, this method was carried out according to following steps:
A., water-filled horizontal flexible pipe is installed in the drilling rod of rig;
B. an end of said horizontal flexible pipe is fixed in the drill bit place of said rig, and will hold tube head to be connected in the interface of water pressure box;
C. be drilled with through hole at said drilling rod afterbody;
D. this end tube head is drawn and sealed to the other end of said horizontal flexible pipe by said through hole, simultaneously the wiring that is used to connect display instrument on the said water pressure box is drawn through said through hole;
E. begin boring, when needs are measured the probing point height, stop said rig;
F. remove the sealing of the outer said horizontal flexible pipe tube head of boring;
G. be used to connect the wiring and display instrument connection of display instrument on said water pressure box in that boring is outer, and write down the pressure value P that display instrument showed;
H. calculate horizontal flexible pipe on the ground tube head water level and underground tube head water level the discrepancy in elevation
Figure BDA00001984206700021
wherein ρ be the density of water, g is an acceleration of gravity;
I. according to the horizontal flexible pipe elevation h of tube head water level on the ground On the ground, calculate probing point height h=h On the ground-h The discrepancy in elevation
The invention has the beneficial effects as follows:
The present invention is directed to the tunnel drilling operation, utilize law of connected vessels and the force value of utilizing liquid in communicating pipe to calculate the principle of the discrepancy in elevation, through instruments such as horizontal flexible pipe, water pressure box and display instruments; Can accurately survey the subsurface boring elevation; Guarantee the safety of underground existing object, simple to operate, easy construction; Accelerate construction speed, obtained extraordinary construction effect; Used in addition operating instrument is also cheap, is highly suitable in this type of drilling operation and applies.
Description of drawings
Fig. 1 is when the probing direction is the elevation angle with angle that horizontal plane becomes, and accurately measures the method sketch map of drill bit elevation in the subsurface boring provided by the present invention;
Fig. 2 is when the probing direction is the angle of depression with angle that horizontal plane becomes, and accurately measures the method sketch map of drill bit elevation in the subsurface boring provided by the present invention.
Among the figure: 1, horizontal flexible pipe; 2, horizontal absolute altitude outside the hole; 3, the tunnel excavation section; 4, the probing point; 5, existing underground object; 6, display instrument.
The specific embodiment
For further understanding content of the present invention, characteristics and effect, specify as follows below in conjunction with accompanying drawing:
(1) for when the probing direction becomes angle α to be the elevation angle with horizontal plane, the situation that the point of probing just 4 is above the ground level utilizes law of connected vessels directly outside the hole, to measure probing point 4 elevations.
As shown in Figure 1, tunnel excavation section 3 is above the ground level, and near the probing point 4 existing underground object 5 is arranged.
It is in place at first to set up drilling equipment, empty in the drilling rod of rig, in drilling rod, installs water-filled horizontal flexible pipe 1 before the boring.One termination of horizontal flexible pipe 1 extends near fixing near the drill bit of rig, and sealing should be held tube head; Need the horizontal flexible pipe 1 of assurance not fracture, make that the water in the horizontal flexible pipe 1 can flow smoothly.Bore a little through hole at the afterbody of drilling rod, draw the other end of horizontal flexible pipe 1, the sealing of the tube head that will hold then by this through hole.Wherein, the length of horizontal flexible pipe 1 can be estimated as: (the Theoretical Calculation discrepancy in elevation+1 at boring length+probing point 4 and rig place) rice; Can estimate the length of pouring water thus for less than 0.3 ~ 0.5 meter of the length of horizontal flexible pipe 1.
Begin boring, in boring procedure, when needs are measured the drill bit elevation, stop rig.The tube head that improves the outer horizontal flexible pipe 1 of boring then is to 0.5 meter of the Theoretical Calculation position height that is higher than drill bit, the sealing of removing this end tube head.Slowly move up and down and should hold tube head, when the height of water level in this end tube head was constant, height of water level at this moment was crown height, horizontal absolute altitude 2 outside the hole as shown in Figure 1.
(2) for when the probing direction becomes angle α to be the angle of depression with horizontal plane; The point of probing just 4 is lower than the situation on ground; Utilize the force value of liquid in communicating pipe to calculate the principle of the discrepancy in elevation, read the discrepancy in elevation, put 4 elevations thereby accurately calculate subsurface boring through display instrument 6.
It is in place at first to set up drilling equipment, empty in the drilling rod of rig, in drilling rod, installs water-filled horizontal flexible pipe 1 before the boring.One termination of horizontal flexible pipe 1 extends near fixing near the drill bit of rig, and sealing should be held tube head; Need the horizontal flexible pipe 1 of assurance not fracture, make that the water in the horizontal flexible pipe 1 can flow smoothly.The termination that horizontal flexible pipe 1 is fixed in drill bit is connected with a water pressure box, and is connected with the interface of water pressure box, so that the water pressure box can be sensed the pressure of water in the horizontal flexible pipe 1.Bore a little through hole at the afterbody of drilling rod, draw the other end of horizontal flexible pipe 1, the sealing of the tube head that will hold then by this through hole.Simultaneously with the wiring that is used to connect display instrument 6 on the water pressure box from drawing from the small through hole of drilling rod tail end, and be fixed on the drilling rod.Wherein, the length of horizontal flexible pipe 1 can be estimated as: (the Theoretical Calculation discrepancy in elevation+1 at boring length+probing point 4 and rig place) rice; Can estimate the length of pouring water thus for less than 0.3 ~ 0.5 meter of the length of horizontal flexible pipe 1.
Begin boring, in boring procedure, when needs are measured the drill bit elevation, stop rig.Remove the sealing of the tube head of the outer horizontal flexible pipe 1 of boring; The wiring that is used to connect display instrument 6 with the drilling rod tail end is connected to display instrument 6 then; Pressure value P through display instrument 6 indications; According to formula P=ρ gh determine horizontal flexible pipe on the ground tube head water level and underground tube head water level the discrepancy in elevation
Figure BDA00001984206700041
wherein ρ be the density of water, g is an acceleration of gravity.
The last horizontal flexible pipe of measuring according to level gauge is the elevation h of tube head water level on the ground On the ground, calculate the accurate elevation h=h of subsurface boring point 4 On the ground-h The discrepancy in elevation
Although combine accompanying drawing that the preferred embodiments of the present invention are described above; But the present invention is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under enlightenment of the present invention; Not breaking away under the scope situation that aim of the present invention and claim protect, can also make the concrete conversion of a lot of forms, these all belong within protection scope of the present invention.

Claims (2)

1. accurately measure the method for drilling point height in a subsurface boring, it is characterized in that, when the probing direction was the elevation angle with angle that horizontal plane becomes, this method was carried out according to following steps:
A., water-filled horizontal flexible pipe is installed in the drilling rod of rig;
B. an end of said horizontal flexible pipe is fixed in the drill bit place of said rig, and sealing should be held tube head;
C. be drilled with through hole at said drilling rod afterbody;
D. the other end of said horizontal flexible pipe is drawn by said through hole, and sealing should be held tube head;
E. begin boring, when needs are measured the probing point height, stop said rig;
F. the outer said horizontal flexible pipe tube head of will holing promotes, and makes it be higher than the Theoretical Calculation position of probing point;
G. remove the sealing of the outer said horizontal flexible pipe tube head of boring;
H. slowly move the outer said horizontal flexible pipe tube head of boring up and down, when the height of water level in this tube head was constant, its water level elevation was the probing point height.
2. accurately measure the method for drilling point height in a subsurface boring, it is characterized in that, when the probing direction was the angle of depression with angle that horizontal plane becomes, this method was carried out according to following steps:
A., water-filled horizontal flexible pipe is installed in the drilling rod of rig;
B. an end of said horizontal flexible pipe is fixed in the drill bit place of said rig, and will hold tube head to be connected in the interface of water pressure box;
C. be drilled with through hole at said drilling rod afterbody;
D. this end tube head is drawn and sealed to the other end of said horizontal flexible pipe by said through hole, simultaneously the wiring that is used to connect display instrument on the said water pressure box is drawn through said through hole;
E. begin boring, when needs are measured the probing point height, stop said rig;
F. remove the sealing of the outer said horizontal flexible pipe tube head of boring;
G. be used to connect the wiring and display instrument connection of display instrument on said water pressure box in that boring is outer, and write down the pressure value P that display instrument showed;
H. calculate horizontal flexible pipe on the ground tube head water level and underground tube head water level the discrepancy in elevation
Figure FDA00001984206600011
wherein ρ be the density of water, g is an acceleration of gravity;
I. according to the horizontal flexible pipe elevation h of tube head water level on the ground On the ground, calculate probing point height h=h On the ground-h The discrepancy in elevation
CN2012102797705A 2012-08-07 2012-08-07 Method for accurately measuring elevation of drilling point in subterranean drilling Pending CN102817605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102797705A CN102817605A (en) 2012-08-07 2012-08-07 Method for accurately measuring elevation of drilling point in subterranean drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102797705A CN102817605A (en) 2012-08-07 2012-08-07 Method for accurately measuring elevation of drilling point in subterranean drilling

Publications (1)

Publication Number Publication Date
CN102817605A true CN102817605A (en) 2012-12-12

Family

ID=47302006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102797705A Pending CN102817605A (en) 2012-08-07 2012-08-07 Method for accurately measuring elevation of drilling point in subterranean drilling

Country Status (1)

Country Link
CN (1) CN102817605A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982171A (en) * 2014-04-30 2014-08-13 北京北矿亿博科技有限责任公司 Method for monitoring and controlling the elevation of the bottom plane of a borehole and monitoring device
CN108150100A (en) * 2017-12-21 2018-06-12 北京首尔工程技术有限公司 A kind of nearly horizontal drilling bit location height monitoring method and monitoring device
CN112229373A (en) * 2019-07-15 2021-01-15 中国石油天然气集团有限公司 Combined height difference measuring device and method
CN112833865A (en) * 2021-01-06 2021-05-25 河北科技师范学院 A construction project supervision engineering measurement system
CN118776523A (en) * 2024-09-13 2024-10-15 蓝尊科技(山东)有限公司 Differential pressure static level instrument with integrated attitude monitoring function and method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2092088U (en) * 1991-06-15 1992-01-01 金兆云 Simple height measurer
CN101603822A (en) * 2009-07-24 2009-12-16 兰州大学 A device for measuring surface roughness
CN101769737A (en) * 2009-01-02 2010-07-07 郑负 statoscope
CN201628542U (en) * 2009-12-31 2010-11-10 张琪奕 Height measuring gauge
CN102175214A (en) * 2011-01-27 2011-09-07 中国华西企业有限公司 Engineering method for measuring and constructing polyvinyl chloride (PVC) cylinder leveling device
CN102252654A (en) * 2011-04-26 2011-11-23 河南理工大学 Dynamic measurement apparatus for point-position elevation in concealed engineering
CN202304812U (en) * 2011-09-30 2012-07-04 合肥工业大学 Tilting sensor of communicated-pipe-type construction member

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2092088U (en) * 1991-06-15 1992-01-01 金兆云 Simple height measurer
CN101769737A (en) * 2009-01-02 2010-07-07 郑负 statoscope
CN101603822A (en) * 2009-07-24 2009-12-16 兰州大学 A device for measuring surface roughness
CN201628542U (en) * 2009-12-31 2010-11-10 张琪奕 Height measuring gauge
CN102175214A (en) * 2011-01-27 2011-09-07 中国华西企业有限公司 Engineering method for measuring and constructing polyvinyl chloride (PVC) cylinder leveling device
CN102252654A (en) * 2011-04-26 2011-11-23 河南理工大学 Dynamic measurement apparatus for point-position elevation in concealed engineering
CN202304812U (en) * 2011-09-30 2012-07-04 合肥工业大学 Tilting sensor of communicated-pipe-type construction member

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982171A (en) * 2014-04-30 2014-08-13 北京北矿亿博科技有限责任公司 Method for monitoring and controlling the elevation of the bottom plane of a borehole and monitoring device
CN108150100A (en) * 2017-12-21 2018-06-12 北京首尔工程技术有限公司 A kind of nearly horizontal drilling bit location height monitoring method and monitoring device
CN108150100B (en) * 2017-12-21 2020-12-08 北京首尔工程技术有限公司 Method and device for monitoring position and height of near-horizontal drilling bit
CN112229373A (en) * 2019-07-15 2021-01-15 中国石油天然气集团有限公司 Combined height difference measuring device and method
CN112833865A (en) * 2021-01-06 2021-05-25 河北科技师范学院 A construction project supervision engineering measurement system
CN112833865B (en) * 2021-01-06 2022-08-05 河北科技师范学院 Construction project supervision project measurement system
CN118776523A (en) * 2024-09-13 2024-10-15 蓝尊科技(山东)有限公司 Differential pressure static level instrument with integrated attitude monitoring function and method thereof
CN118776523B (en) * 2024-09-13 2024-11-19 蓝尊科技(山东)有限公司 Differential pressure type static level integrating gesture monitoring function and method thereof

Similar Documents

Publication Publication Date Title
CN103512693B (en) Coal and rock mass stress orientation monitoring method and device
CN105444738B (en) Method for Measuring Stratum Horizontal Displacement Using Active Inclinometer and Active Inclinometer
CN201233230Y (en) Displacement measurement machine for working face baseboard
CN103075149A (en) Method and device for quickly determining gas pressure of coal bed in downward superdeep borehole
CN104596405B (en) Rain dirty pipe deforming contact real-time monitoring device and method on ground
CN111914373B (en) Calculation method of friction resistance of long-distance rock jacking pipes and detection method of pipe-rock contact status
CN102817605A (en) Method for accurately measuring elevation of drilling point in subterranean drilling
CN102288157A (en) Method for monitoring deep settlement of foundation
CN103900514A (en) Multi-point displacement meter installation and automatic data collection method of steeply inclined seam roadway
CN203587075U (en) Building foundation pit slope horizontal displacement monitoring device
CN101319610B (en) Down-hole drilling direction ruler and fast orienting method for hole drilling
CN102787616A (en) Burying method of inclination measuring pipes in soil body
CN106595548A (en) Displacement measuring method for the inner part of enclosing rock for tunnel inner face
CN105041294A (en) Conveying and storing type produced fluid profile testing technique for coiled tube of horizontal well
CN102944906A (en) Precise search observation method for form and evolutionary process of crack of coal-mine roof
CN205138480U (en) Activity inclinometer
CN107269270B (en) A kind of permafrost region natural gas hydrate stratum stable state monitoring method
CN106643649B (en) Device and method for measuring deep settlement and pore water pressure of soil body
CN106705947B (en) Measurement method of shaft connection based on the combination of triangular pyramid model and gyro total station
CN204252103U (en) A kind of deviational survey hole osmometer device
CN107100213A (en) Soil disturbance monitoring system and monitoring method of the bridge construction of pile groups to adjacent piles
CN102102358A (en) Method for measuring deep sedimentation deformation of foundation by using wireless conduction water pressure meter
CN206656713U (en) The Vertical Settlement magnet ring structure of deep rock mass or soil body sedimentation and deformation test device
CN205477594U (en) Along with boring inclinometer
CN108692796A (en) A kind of dynamic sinking land in coalmining areas underground water and surface water water level difference measuring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121212