[go: up one dir, main page]

CN102748032A - 岩巷普掘机械化快速施工方法 - Google Patents

岩巷普掘机械化快速施工方法 Download PDF

Info

Publication number
CN102748032A
CN102748032A CN2012102612130A CN201210261213A CN102748032A CN 102748032 A CN102748032 A CN 102748032A CN 2012102612130 A CN2012102612130 A CN 2012102612130A CN 201210261213 A CN201210261213 A CN 201210261213A CN 102748032 A CN102748032 A CN 102748032A
Authority
CN
China
Prior art keywords
rock
head
loader
gangue
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102612130A
Other languages
English (en)
Other versions
CN102748032B (zh
Inventor
吴向前
张广文
郭念波
陈勇
崔庆林
王竹春
魏秉祥
汤计念
孙振中
岳之顺
黄健利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Energy Group Co Ltd
Original Assignee
Yanzhou Coal Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanzhou Coal Industry Co Ltd filed Critical Yanzhou Coal Industry Co Ltd
Priority to CN201210261213.0A priority Critical patent/CN102748032B/zh
Publication of CN102748032A publication Critical patent/CN102748032A/zh
Application granted granted Critical
Publication of CN102748032B publication Critical patent/CN102748032B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明涉及一种在井下岩巷掘进施工的方法,具体涉及一种岩巷普掘机械化快速施工方法。该方法包括下述的步骤:打全迎头炮眼、喷浆、下部眼装药放炮、通风安全检查、上部眼装药放炮、通风安全检查、临时支护、拱部支护同时迎头5米后出矸、迎头5米内出矸、帮部支护,再进行下一循环。采用液压钻车打眼、侧卸式装岩机配合挖斗装载机装岩、胶带输送机排矸的普掘机械化快速施工方法,具有凿眼速度快,成孔质量高,装岩速度快,支护与出矸平行作业,工时利用率高,安全性能好等优点,实现大幅提高普掘迎头工作效率,降低了劳动强度,是实现岩巷普掘快速施工的有效途径。

Description

岩巷普掘机械化快速施工方法
技术领域
 本发明涉及一种在井下岩巷掘进施工的方法,具体涉及一种岩巷普掘机械化快速施工方法。
背景技术
对煤矿生产矿井来说,岩石巷道的施工速度越来越成为矿井安全高效集约化生产的技术瓶颈,是当前煤炭工业亟需研究开发的重大共性关键性技术,因此研究岩石巷道的快速掘进技术对煤矿的高产高效有着重要的意义。
巷道掘进是一个综合的施工工艺,它不仅取决于掘进设备的现代化程度,而且与各生产工序紧密相连。巷道的掘进速度决定了矿井采区接续质量。对于生产矿井来说,岩巷掘进对生产的制约更明显、更直接。岩巷钻爆法的施工水平及技术经济指标受多种因素制约。主要包括设备配套、地质水文条件、施工组织管理水平及钻掘工艺水平,它们相互联系、相互制约。其中设备配套是最基本的影响因素,地质水文条件是实现快速掘进的基础,科学合理的施工组织是实现快速掘进的前提条件,钻掘工艺水平是影响掘进水平的关键。
目前,岩巷普掘施工普遍采用气腿式凿岩机施工炮眼、槽式耙装机装岩、矿车轨道运输排矸的作业方式。该作业方式存在如下明显缺点:(1)气腿式凿岩机速度慢、噪声大,每台凿岩机的噪声约110dB,在f=6~8的岩石中施工炮眼时,平均钻眼速度0.8m/min;(2)耙装机装岩不连续,需要频繁移动更换矿车,平均装矸时间占循环时间的30%-50%;(3)移机工作量大,每掘进一定长度后,需要集中出矸、平底、铺轨、移近耙装机,一次移机时间一般需要6个小班,按照每天进尺3.2m计算,影响进尺6.4m,正常情况下一个月需移机2-3次,影响进尺12.8-19.2m;(4)耙装机前矸石多,无法实现一次成巷,需要每次移机后集中搞成巷;(5)占用人员多,工人劳动强度大,大量的人工投入到打眼、铺轨、频繁推倒矿车、提升运输和耙装机移机等体力消耗大的环节和工序上;(6)单进低,平均单进水平约80m/月,且提高单进的余地小,已难以适应煤矿安全高效发展的需要。
发明内容
为了解决上述的技术问题,本发明提供了一种岩巷普掘机械化快速施工方法。
本发明的一种岩巷普掘机械化快速施工方法,包括下述的步骤:
(1)安全检查,在掘进迎头具备打眼条件后,根据中腰线画出巷道轮廓线,并按光爆图表标定眼位,然后将全液压钻车开至迎头,将支腿支牢,操作全液压钻车左右钻臂分区同时作业,一次性将迎头全部炮眼打完,打完炮眼后,将钻车退回至迎头后35m处;
液压钻车凿岩速度快,比气腿式钻机凿岩速度高出1倍以上,液压钻车最大打眼深度可达2.53m,在岩性条件允许的情况下,可实现中深孔爆破;动力消耗少、能量利用率高;噪音低,污染小,改善了工作环境(对于S掘≤25m2巷道,1部钻车即可实现全迎头打眼,噪音约100分贝, 而1部气腿式凿岩机噪音约110分贝,而通常情况下,对于S掘≥10 m2的巷道至少需要3部气腿式凿岩机同时打眼,噪音超过330分贝);占用人员少,降低了工人劳动强度(对于S掘≤25m2巷道,1人操作1部钻车即可实现全迎头打眼,而通常情况下,对于S掘≥10 m2的巷道至少需要6人操作3部气腿式凿岩机同时打眼);安全性好,施工时钻车司机位置远离工作面,有效防止了迎头片帮冒顶造成的人身伤害;
(2)迎头打眼时,后部做好拌料、清理喷浆机、接喷浆管与喷浆有关的准备工作,迎头打眼结束后,及时对迎头两排锚网巷道进行喷浆;
(3)放炮前将侧卸式装岩机退到全液压钻车前方,靠近全液压钻车,铲斗最前端距迎头不小于30m,铲斗抬起1m,再用木板或旧皮带对钻车、装岩机易打坏部位进行可靠保护;再将挖斗装载机退至皮带机尾处,最前端距离迎头不小于20m;
侧卸式装岩机装矸插入力大、机动性好、全断面作业;具有安全性好、一机多用的特点,除完成基本的装载、平底清帮作业外,还可完成巷道内短距离物料运输、卧底、辅助临时支护等工作;
挖斗装载机具有连续出矸、安全性好、机动性好、可破碎大块矸石、可自行拖移皮带机尾、跟机电缆管理简单等特点,其一运中心链设计合理,有效避免了矸石卡阻。与侧卸式装岩机配合使用,大大提高了出矸速度;
(4)每次放炮后,等炮烟被吹散且时间超过15min后,安全检查,集中人员找顶并进行临时支护,倒矸后对拱部进行锚网支护;
(5)拱部锚网支护期间,使用侧卸式装岩机配合挖斗装载机出迎头5m外的矸石,拱部锚网支护结束后,退挖斗装载机,用侧卸式装岩机将迎头5m范围内的矸石倒至挖斗装载机前方,然后撤出侧卸式装岩机,再使用挖斗装载机出矸、锚网支护迎头两帮;
(6)胶带机尾随掘进工作面的推进逐段前移,利用挖斗装载机配合链子牵引实现胶带机尾前移;
(7)侧卸式装岩机与钻车在挖斗装载机前方较宽敞的地方错车,当装岩机与钻车错车时,保证有一车是停机状态,且两车的安全间距不小于300mm。
本发明的有益效果如下:
同传统普掘施工方式相比,减少了耙装机移机前的集中出矸、平底、复喷、轨道铺设、提升运输等辅助工作量,增加了有效作业时间。每个新型普掘机械化施工技术掘进队所需人员减少13人,单进平均达到122m/月,相比传统普掘施工方式单进提高46%以上。
采用液压钻车打眼、侧卸式装岩机配合挖斗装载机装岩、胶带输送机排矸的普掘机械化快速施工方法,具有凿眼速度快,成孔质量高,装岩速度快,支护与出矸平行作业,工时利用率高,安全性能好等优点,实现大幅提高普掘迎头工作效率,降低了劳动强度,是实现岩巷普掘快速施工的有效途径。
附图说明
图1为本发明的工艺流程图。
具体实施方式
 下面结合附图和具体实施方式来对本发明作更进一步的说明,以便本领域的技术人员更了解本发明,但并不以此限制本发明。
(1)安全检查,在掘进迎头具备打眼条件后,根据中腰线画出巷道轮廓线,并按光爆图表标定眼位,然后将全液压钻车开至迎头,将支腿支牢,操作全液压钻车左右钻臂分区同时作业,一次性将迎头全部炮眼打完,打完炮眼后,将钻车退回至迎头后35m处; 
(2)迎头打眼时,后部做好拌料、清理喷浆机、接喷浆管与喷浆有关的准备工作,迎头打眼结束后,及时对迎头两排锚网巷道进行喷浆;
(3)放炮前将侧卸式装岩机退到全液压钻车前方,靠近全液压钻车,铲斗最前端距迎头不小于30m,铲斗抬起1.0m,再用木板对钻车、装岩机易打坏部位进行可靠保护;再将挖斗装载机退至皮带机尾处,最前端距离迎头不小于20m; 
(4)每次放炮后,等炮烟被吹散且时间超过15min后,安全检查,集中人员找顶并进行临时支护,倒矸后对拱部进行锚网支护;
(5)拱部锚网支护期间,使用侧卸式装岩机配合挖斗装载机出迎头5m外的矸石,拱部锚网支护结束后,退挖斗装载机,用侧卸式装岩机将迎头5m范围内的矸石倒至挖斗装载机前方,然后撤出侧卸式装岩机,再使用挖斗装载机出矸、锚网支护迎头两帮;
(6)胶带机尾随掘进工作面的推进逐段前移,利用挖斗装载机配合链子牵引实现胶带机尾前移;
(7)侧卸式装岩机与钻车在挖斗装载机前方较宽敞的地方错车,当装岩机与钻车错车时,保证有一车是停机状态,且两车的安全间距不小于300mm。
同传统普掘施工方式相比,减少了耙装机移机前的集中出矸、平底、复喷、轨道铺设、提升运输等辅助工作量,增加了有效作业时间。每个新型普掘机械化施工技术掘进队所需人员减少13人,单进平均达到122m/月,相比传统普掘施工方式单进提高46%以上。
采用液压钻车打眼、侧卸式装岩机配合挖斗装载机装岩、胶带输送机排矸的普掘机械化快速施工方法,具有凿眼速度快,成孔质量高,装岩速度快,支护与出矸平行作业,工时利用率高,安全性能好等优点,实现大幅提高普掘迎头工作效率,降低了劳动强度,是实现岩巷普掘快速施工的有效途径。

Claims (1)

1. 一种岩巷普掘机械化快速施工方法,包括下述的步骤:
(1)安全检查,在掘进迎头具备打眼条件后,根据中腰线画出巷道轮廓线,并按光爆图表标定眼位,然后将全液压钻车开至迎头,将支腿支牢,操作全液压钻车左右钻臂分区同时作业,一次性将迎头全部炮眼打完,打完炮眼后,将钻车退回至迎头后35m处;
(2)迎头打眼时,后部做好拌料、清理喷浆机、接喷浆管与喷浆有关的准备工作,迎头打眼结束后,及时对迎头两排锚网巷道进行喷浆;
(3)放炮前将侧卸式装岩机退到全液压钻车前方,靠近全液压钻车,铲斗最前端距迎头不小于30m,铲斗抬起1 m,再用木板或旧皮带对钻车、装岩机易打坏部位进行可靠保护;再将挖斗装载机退至皮带机尾处,最前端距离迎头不小于20m; 
(4)每次放炮后,等炮烟被吹散且时间超过15min后,安全检查,集中人员找顶并进行临时支护,倒矸后对拱部进行锚网支护;
(5)拱部锚网支护期间,使用侧卸式装岩机配合挖斗装载机出迎头5m外的矸石,拱部锚网支护结束后,退挖斗装载机,用侧卸式装岩机将迎头5m范围内的矸石倒至挖斗装载机前方,然后撤出侧卸式装岩机,再使用挖斗装载机出矸、锚网支护迎头两帮;
(6)胶带机尾随掘进工作面的推进逐段前移,利用挖斗装载机配合链子牵引实现胶带机尾前移;
(7)侧卸式装岩机与钻车在挖斗装载机前方较宽敞的地方错车,当装岩机与钻车错车时,保证有一车是停机状态,且两车的安全间距不小于300mm。
CN201210261213.0A 2012-07-26 2012-07-26 岩巷普掘机械化快速施工方法 Active CN102748032B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210261213.0A CN102748032B (zh) 2012-07-26 2012-07-26 岩巷普掘机械化快速施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210261213.0A CN102748032B (zh) 2012-07-26 2012-07-26 岩巷普掘机械化快速施工方法

Publications (2)

Publication Number Publication Date
CN102748032A true CN102748032A (zh) 2012-10-24
CN102748032B CN102748032B (zh) 2014-07-09

Family

ID=47028486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210261213.0A Active CN102748032B (zh) 2012-07-26 2012-07-26 岩巷普掘机械化快速施工方法

Country Status (1)

Country Link
CN (1) CN102748032B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401599A (zh) * 2016-12-13 2017-02-15 淮南矿业(集团)有限责任公司 一种大断面岩巷掘进系统及其施工方法
CN109281674A (zh) * 2018-12-11 2019-01-29 淮南矿业(集团)有限责任公司 一种采用钻装机的硬岩巷道掘进方法
CN109667581A (zh) * 2018-12-19 2019-04-23 山东东山新驿煤矿有限公司 坚硬煤层薄底板巷道快速掘进工艺
CN113863948A (zh) * 2021-09-26 2021-12-31 山东科技大学 煤矿巷道掘进平行作业施工方法及专用设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01230892A (ja) * 1988-03-11 1989-09-14 Ohbayashi Corp シールド掘進機
CN1763351A (zh) * 2003-12-12 2006-04-26 肖自立 “四控”式全面采煤方法
CN101403302A (zh) * 2007-10-01 2009-04-08 闫振东 履带式可升降顶帮锚杆锚索施工钻机及双巷快速掘进工艺
CN101858219A (zh) * 2010-05-14 2010-10-13 中国矿业大学 一种确定巷道掘进迎头合理空顶距的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01230892A (ja) * 1988-03-11 1989-09-14 Ohbayashi Corp シールド掘進機
CN1763351A (zh) * 2003-12-12 2006-04-26 肖自立 “四控”式全面采煤方法
CN101403302A (zh) * 2007-10-01 2009-04-08 闫振东 履带式可升降顶帮锚杆锚索施工钻机及双巷快速掘进工艺
CN101858219A (zh) * 2010-05-14 2010-10-13 中国矿业大学 一种确定巷道掘进迎头合理空顶距的方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曲延伦等: "兖州矿区岩巷快速施工装备及配套工艺研究与应用", 《中国煤炭》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401599A (zh) * 2016-12-13 2017-02-15 淮南矿业(集团)有限责任公司 一种大断面岩巷掘进系统及其施工方法
CN109281674A (zh) * 2018-12-11 2019-01-29 淮南矿业(集团)有限责任公司 一种采用钻装机的硬岩巷道掘进方法
CN109667581A (zh) * 2018-12-19 2019-04-23 山东东山新驿煤矿有限公司 坚硬煤层薄底板巷道快速掘进工艺
CN113863948A (zh) * 2021-09-26 2021-12-31 山东科技大学 煤矿巷道掘进平行作业施工方法及专用设备

Also Published As

Publication number Publication date
CN102748032B (zh) 2014-07-09

Similar Documents

Publication Publication Date Title
CN101769158B (zh) 掘护锚一体化成套设备
CN102213094B (zh) 煤矿岩巷掘进的施工系统和施工方法
WO2016095538A1 (zh) 一种双巷道联合快速掘进排矸系统及方法
CN105971628A (zh) 掘进巷道临时支护方法
CN1932240B (zh) 一次全高、后退、分体移动、全跨落综合机械化采煤方法
CN102587903B (zh) 岩巷综合掘进系统
CN108150165B (zh) 一种包括液压控制装载机构的悬臂式纵轴掘锚机
CN201087428Y (zh) 铲斗式装运机
CN101824986B (zh) 钻装运锚一体化机采煤工艺
CN109931065A (zh) 一种露天煤矿抛掷爆破-松动爆破分区开采方法
CN116025355A (zh) 一种用于开采极薄煤层的采煤方法
CN102748032B (zh) 岩巷普掘机械化快速施工方法
CN102383795B (zh) 综合机械化岩巷掘进工艺
CN204476407U (zh) 一种掘锚平行作业施工装备
CN204941586U (zh) 煤矿井下掘进工作面临时支架
CN107575228A (zh) 一种减少双巷护巷煤柱尺寸及降低巷道变形量的采煤方法
CN101302932A (zh) 一种巷道开口掘进和硐室掘进的方法
CN104564070A (zh) 一种连续采煤机短壁开采工作面设备选型方法
CN210829265U (zh) 特大倾角中厚煤层放顶煤开采系统
CN105065048A (zh) 煤矿井下掘进工作面临时支架
CN209780954U (zh) 一种采煤工作面端头三角区充填装置
CN103821530A (zh) 一种巷道连续开挖设备及工艺
CN208456613U (zh) 一种矿井综采工作面巷道布置结构
CN206267853U (zh) 一种大断面岩巷掘进系统
CN85103628A (zh) 岩石巷道掘进钻爆法新工艺及综合机组

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wu Xiangqian

Inventor after: Yue Zhishun

Inventor after: Huang Jianli

Inventor after: Bai Maiying

Inventor after: Zhou Gang

Inventor after: Wei Yongqi

Inventor after: Qin Litang

Inventor after: Zhang Guangwen

Inventor after: Guo Nianbo

Inventor after: Chen Yong

Inventor after: Cui Qinglin

Inventor after: Wang Zhuchun

Inventor after: Wei Bingxiang

Inventor after: Tang Jinian

Inventor after: Sun Zhenzhong

Inventor before: Wu Xiangqian

Inventor before: Yue Zhishun

Inventor before: Huang Jianli

Inventor before: Zhang Guangwen

Inventor before: Guo Nianbo

Inventor before: Chen Yong

Inventor before: Cui Qinglin

Inventor before: Wang Zhuchun

Inventor before: Wei Bingxiang

Inventor before: Tang Jinian

Inventor before: Sun Zhenzhong

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160721

Address after: 250102 Shandong city of Ji'nan province high tech Industrial Development Zone, Hong Xing three northbound Ji'nan trough Building 1 floor A block 16

Patentee after: YANKUANG TECHNOLOGY Co.,Ltd.

Address before: 273599 Shandong city of Jining province Zoucheng City Fushan Road No. 298

Patentee before: YANZHOU COAL MINING Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20240131

Address after: No. 28 Shunhua Road, High tech Zone, Jinan City, Shandong Province, 250014

Patentee after: SHANDONG ENERGY GROUP Co.,Ltd.

Country or region after: China

Address before: 250102, 16th Floor, Building A, Building 1, Jinan Yaogu, North Section of Gangxing Third Road, High tech Industrial Development Zone, Jinan City, Shandong Province

Patentee before: YANKUANG TECHNOLOGY Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right