CN102685829A - Method, device and equipment for handover of user under base station straight-through architecture - Google Patents
Method, device and equipment for handover of user under base station straight-through architecture Download PDFInfo
- Publication number
- CN102685829A CN102685829A CN2012101471900A CN201210147190A CN102685829A CN 102685829 A CN102685829 A CN 102685829A CN 2012101471900 A CN2012101471900 A CN 2012101471900A CN 201210147190 A CN201210147190 A CN 201210147190A CN 102685829 A CN102685829 A CN 102685829A
- Authority
- CN
- China
- Prior art keywords
- base station
- handover
- service
- user
- request
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 68
- 230000005540 biological transmission Effects 0.000 claims abstract description 94
- 230000004044 response Effects 0.000 claims abstract description 38
- 230000008569 process Effects 0.000 claims abstract description 31
- 230000011664 signaling Effects 0.000 claims description 48
- 238000005259 measurement Methods 0.000 claims description 15
- 230000000977 initiatory effect Effects 0.000 claims description 10
- 238000004891 communication Methods 0.000 claims description 3
- 230000001960 triggered effect Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 9
- 230000003993 interaction Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 2
- 230000003252 repetitive effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
本发明提供一种基站直通架构下的用户切换方法、装置及设备,方法包括:当切换源基站识别到用户需切换小区时,发起小区切换请求;切换源基站接收小区切换响应并转发给用户,以指示用户建立与切换目的基站之间的无线连接;当切换源基站接收到小区切换成功响应时,将业务对端基站标识发送给切换目的基站或业务对端基站,以使执行切换目的基站和业务对端基站之间的数据直通通道建立流程。根据本发明的基站直通架构下的用户切换方法及装置,使用户在切换小区时,业务数据的传输路径也发生了相应地改变,能够保证业务数据的正常传输。
The present invention provides a user switching method, device and equipment under the base station direct architecture, the method includes: when the switching source base station recognizes that the user needs to switch cells, initiate a cell switching request; the switching source base station receives the cell switching response and forwards it to the user, To instruct the user to establish a wireless connection with the handover destination base station; when the handover source base station receives a cell handover success response, send the identity of the service peer base station to the handover destination base station or the service peer base station, so that the handover destination base station and the service peer base station are executed. The process of establishing a data direct channel between service peer base stations. According to the user switching method and device under the base station direct connection structure of the present invention, when the user switches cells, the transmission path of service data is also changed accordingly, which can ensure the normal transmission of service data.
Description
技术领域 technical field
本发明涉及通信技术,尤其涉及一种基站直通架构下的用户切换方法、装置及设备。The present invention relates to communication technologies, and in particular to a user switching method, device and equipment under a base station direct architecture.
背景技术 Background technique
在3G系统中,基站组网采用分级部署模式。多个NodeB(节点B)可以连接到统一的RNC(Radio Network Controller,无线控制器),并通过RNC连接到核心网。In the 3G system, base station networking adopts a hierarchical deployment mode. Multiple NodeBs (Node B) can be connected to a unified RNC (Radio Network Controller, wireless controller), and connected to the core network through the RNC.
如图1所示,当覆盖发送方用户的源NodeB 101需要向覆盖接收方用户的目标NodeB 104发送业务数据时,首先通过源NodeB 101将业务数据发送到源RNC 102,源RNC 102再将该业务数据传输到核心网103,通过核心网103汇聚后再发送给目标NodeB 104归属的目标RNC 105,之后通过目标NodeB 104归属的目标RNC 105将业务数据发送到目标NodeB 104,再通过目标NodeB 104将该业务数据发送至接收方用户,从而完成业务数据的端到端的传输。As shown in Figure 1, when the source NodeB 101 covering the sender user needs to send service data to the target NodeB 104 covering the receiver user, the service data is first sent to the
在现有的这种网络架构下,当用户移动到另外一个小区时,需要经过核心网控制实体的协调才能完成,而核心网的控制需要进行多次的基站之间的数据转发,在一定程度上增加切换时延。Under the existing network architecture, when a user moves to another cell, it needs to be coordinated by the core network control entity, and the control of the core network requires multiple data forwarding between base stations. increase the switching delay.
发明内容 Contents of the invention
本发明提供一种基站直通架构下的用户切换方法、装置及设备,用于减小用户进行基站切换所需要的时间。The present invention provides a user switching method, device and equipment under a base station direct architecture, which are used to reduce the time required for a user to perform base station switching.
本发明的第一个方面是提供一种基站直通架构下的用户切换方法,包括:The first aspect of the present invention is to provide a user switching method under the base station direct architecture, including:
当切换源基站识别到用户需切换小区时,向对应的切换目的基站发起小区切换请求;When the handover source base station recognizes that the user needs to switch cells, initiate a cell handover request to the corresponding handover target base station;
所述切换源基站接收切换目的基站返回的的小区切换响应,并转发给所述用户,以指示所述用户释放与所述切换源基站之间的无线连接,并建立与所述切换目的基站之间的无线连接;The handover source base station receives the cell handover response returned by the handover target base station, and forwards it to the user, so as to instruct the user to release the wireless connection with the handover source base station and establish a connection with the handover target base station wireless connection between
当所述切换源基站接收到所述切换目的基站返回的小区切换成功响应时,将业务对端基站标识发送给所述切换目的基站,或将切换目的基站标识发送给所述业务对端基站,以使所述切换目的基站或所述业务对端基站触发执行所述切换目的基站和业务对端基站之间的当前数据直通通道建立流程,所述当前数据直通通道的两端分别为所述切换目的基站和所述业务对端基站。When the handover source base station receives the cell handover success response returned by the handover target base station, send the identity of the service peer base station to the handover target base station, or send the handover target base station identity to the service peer base station, so that the handover target base station or the service peer base station triggers the execution of the current data direct channel establishment process between the handover target base station and the service peer base station, and the two ends of the current data direct channel are respectively the handover The target base station and the service peer base station.
本发明的另一个方面是提供一种基站直通架构下的用户切换装置,包括:Another aspect of the present invention is to provide a user switching device under the base station direct architecture, including:
发起请求模块,用于当识别到用户需切换小区时,向对应的切换目的基站发起小区切换请求;Initiating a request module, configured to initiate a cell switching request to a corresponding switching target base station when it is recognized that the user needs to switch cells;
转发模块,用于接收切换目的基站返回的的小区切换响应,并转发给所述用户,以指示所述用户释放与切换源基站之间的无线连接,并建立与所述切换目的基站之间的无线连接;A forwarding module, configured to receive a cell handover response returned by the handover destination base station, and forward it to the user, so as to instruct the user to release the wireless connection with the handover source base station, and establish a connection with the handover destination base station Wireless connections;
发送标识模块,用于当接收到所述切换目的基站返回的小区切换成功响应时,将业务对端基站标识发送给所述切换目的基站,或将切换目的基站标识发送给所述业务对端基站,以使所述切换目的基站或所述业务对端基站触发执行所述切换目的基站和业务对端基站之间的当前数据直通通道建立流程,所述当前数据直通通道的两端分别为所述切换目的基站和所述业务对端基站。A sending identification module, configured to send the identification of the service peer base station to the handover target base station when receiving the cell handover success response returned by the handover target base station, or send the handover target base station identity to the service peer base station so that the handover target base station or the service peer base station triggers the execution of the current data direct channel establishment process between the handover target base station and the service peer base station, and the two ends of the current data direct channel are respectively the Handover the target base station and the service peer base station.
本发明的再一个方面是提供一种切换目的基站,包括:Another aspect of the present invention is to provide a handover target base station, including:
接收小区切换请求模块,用于接收切换源基站发送的小区切换请求,并根据所述小区切换请求向所述切换源基站返回小区切换响应;A module for receiving a cell switching request, configured to receive a cell switching request sent by a switching source base station, and return a cell switching response to the switching source base station according to the cell switching request;
接收业务对端基站标识模块,用于接收所述业务对端基站标识,并向所述管理控制中心发送判断信息,所述判断信息包括切换目的基站标识、切换对端基站标识和业务标识。The service peer base station identifier receiving module is used to receive the service peer base station identifier and send judgment information to the management control center, the judgment information including handover target base station identifier, handover peer base station identifier and service identifier.
本发明的又一个方面是提供一种业务对端基站,包括:Another aspect of the present invention is to provide a service peer base station, including:
第二发送请求模块,用于当接收到所述建立指令时,根据所述建立指令中的切换目的基站标识向所述切换目的基站发起数据直通通道建立请求,所述建立指令包括所述切换目的基站与所述业务对端基站之间的第二传输路径;The second sending request module is configured to, when receiving the establishment instruction, initiate a data direct channel establishment request to the handover destination base station according to the handover destination base station identifier in the establishment instruction, the establishment instruction including the handover purpose a second transmission path between the base station and the service counterpart base station;
第二建立模块,用于当接收到所述切换目的基站返回的数据直通通道建立响应时,建立起与所述切换目的基站建立之间的当前数据直通通道。The second establishment module is configured to establish a current data direct channel with the handover target base station when receiving the data direct channel establishment response returned by the handover target base station.
本发明的另一个方面是提供一种业务数据交换系统,包括根据如上所述的基站直通架构下的用户切换装置、如上所述的切换目的基站以及如上所述的业务对端基站。Another aspect of the present invention is to provide a service data exchange system, including the user switching device according to the above-mentioned base station direct architecture, the above-mentioned handover destination base station, and the above-mentioned service peer base station.
根据本发明的基站直通架构下的用户切换方法、装置及设备,使用户在切换小区时,通过基站之间直接进行切换路径的请求和操作,使得业务数据的传输路径及时地发生改变,不仅能够保证业务数据的正常传输,而且由于请求和业务数据的传输不用再经过核心网进行转发,一定程度上减小了用户进行基站切换所需要的时间。According to the user switching method, device and equipment under the base station direct connection architecture of the present invention, when the user switches cells, the request and operation of the switching path are directly performed between the base stations, so that the transmission path of the service data is changed in time, not only can The normal transmission of business data is guaranteed, and since the transmission of requests and business data does not need to be forwarded through the core network, the time required for users to switch base stations is reduced to a certain extent.
附图说明 Description of drawings
图1为现有技术中业务数据的传输装置的结构示意图;FIG. 1 is a schematic structural diagram of a service data transmission device in the prior art;
图2为根据本发明一实施例的基站直通架构的结构示意图;FIG. 2 is a schematic structural diagram of a base station direct architecture according to an embodiment of the present invention;
图3A为从I-X2接口的控制面协议栈角度示出的源基站、途经基站和目标基站之间的信令交互的过程示意图;3A is a schematic diagram of the signaling interaction process between the source base station, the passing base station and the target base station from the perspective of the control plane protocol stack of the I-X2 interface;
图3B为从I-X2接口的用户面协议栈角度示出的源基站、途经基站和目标基站之间的业务数据交换的过程示意图;3B is a schematic diagram of the process of exchanging service data between the source base station, the passing base station, and the target base station from the perspective of the user plane protocol stack of the I-X2 interface;
图4为根据本发明另一实施例的基站直通架构下的用户切换方法的流程示意图;FIG. 4 is a schematic flowchart of a user handover method under a base station direct architecture according to another embodiment of the present invention;
图5为根据本发明又一实施例的基站直通架构下的用户切换装置的结构示意图;5 is a schematic structural diagram of a user switching device under a base station direct architecture according to another embodiment of the present invention;
图6为根据本发明再一实施例的基站直通架构下的用户切换装置的结构示意图;6 is a schematic structural diagram of a user switching device under a base station direct architecture according to yet another embodiment of the present invention;
图7为根据本发明另一实施例的基站直通架构下的用户切换装置的结构示意图;7 is a schematic structural diagram of a user switching device under a base station direct architecture according to another embodiment of the present invention;
图8为根据本发明另一实施例的基站直通架构下的用户切换装置的结构示意图。FIG. 8 is a schematic structural diagram of a user switching device under a base station direct architecture according to another embodiment of the present invention.
具体实施方式 Detailed ways
实施例一Embodiment one
本实施例提供一种基站直通架构下的用户切换方法。本实施例的方法特别适用于基站之间能够直接进行数据传输的基站直通架构中。例如,如图2所示,接入网中包括管理控制中心和多个基站,每个基站与管理控制中心相连。管理控制中心接收每个基站的业务请求,并根据业务请求下发连接信令,使基站与基站之间建立起来数据直通通道,以便在各基站间进行数据或信令的传输。This embodiment provides a user handover method in a base station direct architecture. The method in this embodiment is particularly applicable to a base station direct architecture in which data transmission can be directly performed between base stations. For example, as shown in Figure 2, the access network includes a management control center and multiple base stations, and each base station is connected to the management control center. The management control center receives the service request of each base station, and sends connection signaling according to the service request, so that the data direct channel is established between the base stations, so as to transmit data or signaling between the base stations.
在本实施的以下描述中,各基站之间的数据以及信令的传送均是通过基站之间已经建立起来的数据直通通道进行连接。该数据直通通道建立的过程可以如下。In the following description of this implementation, the transmission of data and signaling between the base stations is connected through the established data direct channel between the base stations. The process of establishing the data through channel may be as follows.
对于图2所示的网络架构,其建立数据直通通道的流程具体为:For the network architecture shown in Figure 2, the process of establishing a direct data channel is as follows:
步骤2011:管理控制中心接收源基站上报的由发送方用户发起的业务请求,业务请求包括发送方用户标识、业务标识和接收方用户标识;Step 2011: the management control center receives the service request initiated by the sender user reported by the source base station, and the service request includes the sender user ID, service ID and receiver user ID;
步骤2021:管理控制中心根据接收方用户标识,确定接收方用户归属的目标基站;Step 2021: The management control center determines the target base station to which the receiving user belongs according to the receiving user ID;
步骤2031:管理控制中心根据源基站和目标基站,确定业务数据的传输路径,传输路径包括源基站、目标基站和业务数据从源基站到目标基站经过的途经基站;Step 2031: The management control center determines the transmission path of the service data according to the source base station and the target base station, and the transmission path includes the source base station, the target base station and the base stations through which the service data passes from the source base station to the target base station;
步骤2041:管理控制中心根据传输路径和业务标识向源基站、途经基站和目标基站分配连接信令;Step 2041: The management and control center allocates connection signaling to the source base station, via base station and target base station according to the transmission path and service identifier;
步骤2051:源基站、途经基站和目标基站根据连接信令和业务标识进行业务数据的传输。Step 2051: the source base station, the passing base station and the target base station transmit service data according to the connection signaling and the service identifier.
下面以图2所示的网络架构来具体举例说明,对于源基站和目标基站之间是如何建立数据直通通道的。The following uses the network architecture shown in FIG. 2 as an example to illustrate how to establish a direct data channel between the source base station and the target base station.
对源基站来说,当接收到连接建立信令后,从中获取将该业务数据所要发向的途经基站的地址,并识别出需要与该途经基站建立数据直通通道,故开启自己的直通功能接口,例如I-X2接口。然后,源基站通过自己的直通功能接口沿着传输路径向途经基站发送直通控制消息,以与途经基站建立数据直通通道。For the source base station, after receiving the connection establishment signaling, it obtains the address of the passing base station to which the service data is to be sent, and recognizes that it needs to establish a data direct channel with the passing base station, so it opens its own direct function interface , such as the I-X2 interface. Then, the source base station sends a direct control message to the passing base station along the transmission path through its own direct function interface, so as to establish a data direct channel with the passing base station.
对于途经基站来说,当接收到连接信令后,从中获取目标基站地址,并识别出需要与目标基站建立数据直通通道,故开启自己的直通功能接口,例如I-X2接口,在收到目标基站返回的应答之后,建立起途经基站与目标基站之间的数据直通通道。然后,途经基站接收到源基站发送的业务数据后,识别该业务数据标识,从而根据连接信令得知需要将该业务数据发送的目标基站地址,接下来通过已经建立的数据直通通道向目标基站发送该业务数据。特别地,当途经基站包括多个子基站时,传输路径中除最后一个子基站之外的其它每个子基站接收到连接信令后,从中获取需要将业务数据发送到的下一个相邻子基站的地址,故开启自身的直通功能接口,例如I-X2接口,在收到下一个相邻子基站返回的应答之后,建立起自身与下一个相邻子基站之间的数据直通通道。然后自身接收到上一个相邻子基站发送的业务数据后,识别该业务数据标识,从而根据连接信令得知需要将该业务数据发送到的哪一个相邻子基站,接下来通过已经建立的数据直通通道向下一个相邻子基站发送业务数据。对于传输路径中的最后一个子基站,也是相同的处理,只是从连接信令中获取的是目标基站的地址,并与目标基站建立起数据直通通道。For the passing base station, when the connection signaling is received, the address of the target base station is obtained from it, and it is recognized that a direct data channel needs to be established with the target base station, so it opens its own direct function interface, such as the I-X2 interface, after receiving the target base station After the response returned by the base station, a direct data channel between the passing base station and the target base station is established. Then, after receiving the service data sent by the source base station via the base station, it identifies the service data identifier, thereby knowing the address of the target base station that needs to send the service data according to the connection signaling, and then sends the target base station to the target base station through the established data direct channel. Send the business data. In particular, when the passing base station includes multiple sub-base stations, after receiving the connection signaling, each sub-base station except the last sub-base station in the transmission path obtains the information of the next adjacent sub-base station to which the service data needs to be sent. address, so open its own direct function interface, such as the I-X2 interface, after receiving the response returned by the next adjacent sub-base station, establish a data direct channel between itself and the next adjacent sub-base station. Then, after receiving the service data sent by the previous adjacent sub-base station, it identifies the service data identifier, so as to know which adjacent sub-base station the service data needs to be sent to according to the connection signaling, and then passes the established The data direct channel sends service data to the next adjacent sub-base station. The same process is performed for the last sub-base station in the transmission path, except that the address of the target base station is obtained from the connection signaling, and a direct data channel is established with the target base station.
对于目标基站来说,当接收到连接建立信令后,从中获取途经基站地址和传输路径,并识别出需要与途经基站建立数据直通通道,故开启自己的直通功能接口,例如I-X2接口。然后,目标基站等待接收途经基站发送的直通控制消息,并在接收到途经基站发送的直通控制消息后,通过自己的直通功能接口沿着传输路径向途经基站发送直通控制回应消息,当途经基站接收到目标基站返回的直通控制回应消息后就与目标基站建立了数据直通通道。For the target base station, after receiving the connection establishment signaling, it obtains the address and transmission path of the passing base station, and recognizes that it needs to establish a data direct channel with the passing base station, so it opens its own direct function interface, such as the I-X2 interface. Then, the target base station waits to receive the direct control message sent by the passing base station, and after receiving the direct control message sent by the passing base station, sends a direct control response message to the passing base station along the transmission path through its own direct function interface. After receiving the direct control response message returned by the target base station, a data direct channel is established with the target base station.
本实施例中的I-X2接口是一个开放性的接口,其主要功能是实现基站之间的信令与业务数据的交换。从逻辑角度来看,I-X2接口是基站之间的点到点接口。在本实施例中,该I-X2接口主要负责实现源基站、途经基站与目标基站直通时的信令交互,完成源基站、途经基站和目标基站的用户面传数据(即业务数据)的承载传输。图3A从I-X2接口的控制面协议栈角度示出了源基站、途经基站和目标基站之间的信令交互的过程;图3B从I-X2接口的用户面协议栈角度示出了源基站、途经基站和目标基站之间的业务数据交换的过程。如图3A所示,I-X2接口的控制面协议栈主要包括:物理层、数据链路层、IP层、流控制传输协议层和应用层。如图3B所示,I-X2接口的用户面协议栈主要包括:物理层、数据链路层、IP层、用户数据报协议(UserDatagram Protocol;简称为:UDP)层、通用数据传输层和业务数据层。The I-X2 interface in this embodiment is an open interface, and its main function is to realize the exchange of signaling and service data between base stations. From a logical point of view, the I-X2 interface is a point-to-point interface between base stations. In this embodiment, the I-X2 interface is mainly responsible for realizing the signaling interaction between the source base station, the passing base station and the target base station, and completing the bearer of the user plane transmission data (that is, service data) of the source base station, the passing base station and the target base station transmission. Figure 3A shows the process of signaling interaction between the source base station, the passing base station, and the target base station from the perspective of the control plane protocol stack of the I-X2 interface; Figure 3B shows the source station from the perspective of the user plane protocol stack of the I-X2 interface The process of exchanging service data between the base station, the passing base station and the target base station. As shown in FIG. 3A , the control plane protocol stack of the I-X2 interface mainly includes: a physical layer, a data link layer, an IP layer, a stream control transmission protocol layer, and an application layer. As shown in Figure 3B, the user plane protocol stack of the I-X2 interface mainly includes: a physical layer, a data link layer, an IP layer, a User Datagram Protocol (UDP for short) layer, a general data transmission layer, and a service data layer.
上述建立数据直通通道的方式仅为举例说明,本实施例对如何建立数据直通通道不做限定。在上述的网络架构下,用户在进行基站切换的操作时所进行的数据传输均可以通过数据直通通道来完成。The foregoing manner of establishing a data direct channel is for illustration only, and this embodiment does not limit how to establish a data direct channel. Under the above-mentioned network architecture, all data transmissions performed by users when performing base station handover operations can be completed through the data direct channel.
需要指出的是,下面的“切换源基站”可以是发送方用户连接的基站,也可以是接收方用户连接的基站,相应的“切换目的基站”与切换源基站保持一致,可以是上述的源基站,也可以是上述的目标基站。具体来说,当切换源基站和切换目的基站均为源基站时,业务对端基站就是上述的目标基站,当切换源基站和切换目的基站均为目标基站时,业务对端基站就是上述的源基站。It should be pointed out that the following "handover source base station" can be the base station connected by the sending user or the base station connected by the receiving user, and the corresponding "handover destination base station" is consistent with the handover source base station, which can be the above The base station may also be the aforementioned target base station. Specifically, when both the handover source base station and the handover destination base station are source base stations, the service peer base station is the above-mentioned target base station, and when the handover source base station and the handover destination base station are both target base stations, the service peer base station is the above-mentioned source base station. base station.
如图4所示,为根据本实施例的基站直通架构下的用户切换方法的流程示意图,包括:As shown in FIG. 4, it is a schematic flowchart of a user handover method under the base station direct architecture according to this embodiment, including:
步骤401,当切换源基站识别到用户需切换小区时,向对应的切换目的基站发起小区切换请求。
这里的切换源基站指的是用户当前正在连接的基站。切换源基站识别用户需切换小区的方法有很多种。例如,切换源基站接收用户上报的测量报告,根据测量报告中的信号功率和/或当前地理位置信息,判断用户是否需切换小区。当发现用户的信号功率较弱时,则很有可能该用户已经移动了位置到了另外一个基站的信号覆盖范围内,即对于另外一个基站其信号功率较强。此时,用户收集相邻基站的信号功率并形成测量报告,然后用户从各测量报告中选择一个信号功率值最大的基站作为切换目的基站,并将该切换目的基站的切换目的基站标识发送给切换源基站;或者是用户收集相邻基站的信号功率并形成测量报告,并将包含能与该用户连接的各基站的信号功率的强度的测量报告发送给切换源基站,由切换源基站根据测量报告选择切换目的基站,或者是由切换源基站将用户上报的测量报告发送至管理控制中心,由管理控制中心根据测量报告选择切换目的基站。当然,切换源基站还可以直接检测用户的地理位置信息,或者接收用户每隔预设周期上报的地理位置信息,判断用户是否需切换小区。切换源基站判断用户是否需切换小区的方法还有很多,本实施例中对此不做限定。Here, the handover source base station refers to the base station to which the user is currently connected. There are many methods for the handover source base station to identify that the user needs to handover the cell. For example, the handover source base station receives the measurement report reported by the user, and judges whether the user needs to handover the cell according to the signal power and/or current geographic location information in the measurement report. When the signal power of the user is found to be weak, it is likely that the user has moved to the signal coverage of another base station, that is, the signal power of the other base station is relatively strong. At this time, the user collects the signal power of adjacent base stations and forms a measurement report, and then the user selects a base station with the largest signal power value as the handover target base station from each measurement report, and sends the handover target base station ID of the handover target base station to the handover source base station; or the user collects the signal power of adjacent base stations and forms a measurement report, and sends the measurement report containing the strength of the signal power of each base station that can be connected to the user to the handover source base station, and the handover source base station is based on the measurement report The handover destination base station is selected, or the handover source base station sends the measurement report reported by the user to the management control center, and the management control center selects the handover destination base station according to the measurement report. Of course, the handover source base station can also directly detect the geographic location information of the user, or receive the geographic location information reported by the user every preset period, and determine whether the user needs to switch cells. There are many other methods for the handover source base station to determine whether the user needs to handover the cell, which is not limited in this embodiment.
小区切换请求可以包括用户的手机号码和IMEI(International MobileEquipment Identity,国际移动设备身份码),以使切换目的基站识别将要与哪个用户建立无线连接。The cell handover request may include the user's mobile phone number and IMEI (International Mobile Equipment Identity, International Mobile Equipment Identity), so that the handover destination base station identifies which user to establish a wireless connection with.
步骤402,切换源基站接收切换目的基站返回的小区切换响应,并转发给用户,以指示用户释放与切换源基站之间的无线连接,并建立与切换目的基站之间的无线连接。
切换源基站如果接收到切换目的基站返回的小区切换响应之后,就说明切换目的基站已经做好相应的准备,即为用户预留出资源以与其建立无线连接。该小区切换响应可以包括切换目的基站的标识号。切换源基站将小区切换响应发送给用户,用户在接收到小区切换响应之后,释放与切换源基站之间的无线连接,并建立与切换目的基站之间的连接。If the handover source base station receives the cell handover response returned by the handover target base station, it indicates that the handover target base station has made corresponding preparations, that is, reserves resources for users to establish wireless connections with it. The cell handover response may include the identification number of the handover target base station. The handover source base station sends the cell handover response to the user. After receiving the cell handover response, the user releases the wireless connection with the handover source base station and establishes a connection with the handover target base station.
步骤403,当切换源基站接收到切换目的基站返回的小区切换成功响应时,将业务对端基站标识发送给切换目的基站,或将切换目的基站标识发送给业务对端基站,以使切换目的基站或业务对端基站触发执行切换目的基站和业务对端基站之间的当前数据直通通道建立流程,当前数据直通通道的两端分别为切换目的基站和业务对端基站。Step 403, when the handover source base station receives the cell handover success response returned by the handover target base station, send the identity of the service peer base station to the handover target base station, or send the identity of the handover target base station to the service peer base station, so that the handover target base station Or the service peer base station triggers the execution of the current data direct channel establishment process between the handover destination base station and the service peer base station, and the two ends of the current data direct channel are the handover destination base station and the service peer base station respectively.
切换源基站接收到切换目的基站返回的小区切换成功响应,即说明切换目的基站已经与用户建立无线连接。此时,可以指示切换目的基站和业务对端基站建立起当前数据直通通道,以进行业务数据的传输。当前数据直通通道的两端分别为切换目的基站和业务对端基站,即切换目的基站接收发送方用户上传数据,且业务对端基站向接收方用户发送数据,或者业务对端基站接收发送方用户上传数据,且切换目的基站向接收方用户发送数据。The handover source base station receives the cell handover success response returned by the handover target base station, which means that the handover target base station has established a wireless connection with the user. At this time, the target base station of the handover and the peer base station of the service may be instructed to establish a current data direct channel for transmission of service data. The two ends of the current data direct channel are the handover target base station and the service peer base station respectively, that is, the handover target base station receives the data uploaded by the sender user, and the service peer base station sends data to the receiver user, or the service peer base station receives the sender user The data is uploaded, and the handover target base station sends the data to the receiving user.
切换目的基站与业务对端基站建立当前数据直通通道的过程与步骤2011~2051中所描述的一致,在此不再赘述。The process of establishing the current direct data channel between the handover destination base station and the service peer base station is consistent with that described in steps 2011-2051, and will not be repeated here.
需要特别指出的是,这里的切换目的基站与业务对端基站之间建立的当前数据直通通道很有可能与切换源基站和业务对端基站之间建立的原有的数据直通通道有重复的部分,例如切换目的基站即为原有的数据直通通道中的一个中转基站,此时,可以选择重新建立切换目的基站与业务对端基站之间的当前数据直通通道,也可以选择根据原有的数据直通通道进行数据的传输,但是无论怎样,都属于本实施例的“建立”所包含的范围,因为本实施例中所建立的当前数据直通通道是以切换目的基站和业务对端基站为两端的。It should be pointed out that the current data direct channel established between the handover destination base station and the service peer base station is likely to overlap with the original data direct channel established between the handover source base station and the service peer base station , for example, the handover target base station is a transit base station in the original data direct channel. At this time, you can choose to re-establish the current data direct channel between the handover target base station and the service peer base station, or you can choose to The direct channel is used for data transmission, but no matter what, it belongs to the scope of the "establishment" of this embodiment, because the current data direct channel established in this embodiment is based on the handover target base station and the service peer base station. .
根据本实施例的基站直通架构下的用户切换方法,使用户在切换小区时,通过基站之间直接进行切换路径的请求和操作,使得业务数据的传输路径及时地发生改变,不仅能够保证业务数据的正常传输,而且由于请求和业务数据的传输不用再经过核心网进行转发,一定程度上减小了用户进行基站切换所需要的时间。According to the user switching method under the base station direct connection architecture of this embodiment, when the user switches cells, the request and operation of the switching path are directly performed between the base stations, so that the transmission path of the service data is changed in time, which can not only ensure that the service data The normal transmission of requests and business data does not need to be forwarded through the core network, which reduces the time required for users to switch base stations to a certain extent.
实施例二Embodiment two
本实施例对实施例一的基站直通架构下的用户切换方法做进一步补充说明。This embodiment makes a further supplementary description of the user switching method under the base station direct connection architecture of the first embodiment.
本实施例对步骤403中的切换目的基站或业务对端基站触发执行切换目的基站和业务对端基站之间的数据直通通道建立流程做进一步解释说明,其它步骤均与实施例一一致,在此不再赘述。This embodiment further explains the data direct channel establishment process between the handover target base station or the service peer base station triggered by the handover target base station and the service peer base station in step 403, and other steps are consistent with the first embodiment. This will not be repeated here.
切换目的基站或业务对端基站触发执行切换目的基站和业务对端基站之间的数据直通通道建立流程具体包括:The handover target base station or the service peer base station triggers the execution of the data direct channel establishment process between the handover target base station and the service peer base station, specifically including:
步骤A:切换目的基站或业务对端基站向管理控制中心发送判断信息,判断信息包括切换目的基站标识、业务对端基站标识和业务标识。Step A: The handover destination base station or the service peer base station sends judgment information to the management control center, and the judgment information includes the handover destination base station identifier, the service peer base station identifier and the service identifier.
该步骤中的业务标识即为某用户发送的某一个业务数据的的标识,不同的业务数据对应着不同的业务标识。当基站同时进行多个业务数据的传输时,基站可以通过该业务标识确定需要向哪个基站转发用户上传的业务数据。管理控制中心接收到判断信息后,可以根据该业务标识获取切换源基站标识和切换目的基站标识。能够想象到的是,由于在建立切换源基站和业务对端基站之间原有的数据直通通道时,就是通过管理控制中心发送连接信令进行建立的,管理控制中心已经知道与该数据直通通道对应的业务标识,所以管理控制中心能够通过业务标识识别相应的切换源基站和业务对端基站。在判断信息中同时发送业务对端基站标识,是为了使管理控制中心根据预先约定的协议识别到是切换目的基站与业务对端基站之间要建立当前数据直通通道。步骤B:当管理控制中心根据判断信息判断出切换源基站与业务对端基站之间的第一传输路径所包含的基站数目大于切换目的基站与业务对端基站之间的第二传输路径所包含的基站数目时,切换目的基站或业务对端基站接收管理控制中心返回的建立指令,并根据建立指令触发当前数据直通通道建立流程,建立指令包括第二传输路径。The service identifier in this step is the identifier of a certain service data sent by a certain user, and different service data correspond to different service identifiers. When the base station transmits multiple service data at the same time, the base station can determine which base station needs to forward the service data uploaded by the user through the service identifier. After receiving the judging information, the management control center can obtain the identity of the handover source base station and the identity of the handover destination base station according to the service identity. It is conceivable that when the original data direct channel between the handover source base station and the service peer base station is established, it is established by sending connection signaling from the management control center, and the management control center already knows that the data direct channel The corresponding service identifier, so the management control center can identify the corresponding handover source base station and service peer base station through the service identifier. The identification of the service peer base station is sent in the judgment information at the same time, so that the management control center recognizes that the current data direct channel needs to be established between the handover target base station and the service peer base station according to the pre-agreed agreement. Step B: When the management control center judges according to the judgment information that the number of base stations included in the first transmission path between the handover source base station and the service peer base station is greater than the number of base stations contained in the second transmission path between the handover destination base station and the service peer base station When the number of base stations is large, the handover target base station or service peer base station receives the establishment instruction returned by the management control center, and triggers the establishment process of the current data direct channel according to the establishment instruction. The establishment instruction includes the second transmission path.
切换目的基站或业务对端基站在接收到代表着需要建立当前数据直通通道的建立指令时,就进行触发当前数据直通通道建立流程的操作。建立指令中包含第二传输路径,这样可以是切换目的基站或业务对端基站明确需要与哪个基站之间建立当前数据直通通道。这是由于,切换目的基站或业务对端基站有可能同时接收到多个建立信令,当建立信令中包含传输路径时,切换目的基站能够获知接下来要建立的当前数据直通通道对应的业务标识,并在接收到相应的业务数据时,通过所建立的当前数据直通通道进行传输。When the handover destination base station or the service peer base station receives the establishment instruction representing the need to establish the current data direct channel, it will trigger the operation of establishing the current data direct channel. The establishment instruction includes the second transmission path, so that the handover target base station or the service peer base station clearly needs to establish the current data direct channel with which base station. This is because the handover target base station or the service peer base station may receive multiple establishment signalings at the same time. When the establishment signaling includes a transmission path, the handover target base station can know the service corresponding to the current data direct channel to be established next. identification, and when the corresponding business data is received, it is transmitted through the established current data direct channel.
需要说明的是,切换源基站与业务对端基站之间建立起来的原有的数据直通通道可能需要经过0个、1个或多个基站,按照先后顺序经过这些基站所建立起来的路径即为第一传输路径,第一传输路径是以切换源基站和业务对端基站为两端的。同样,切换目的基站与业务对端基站之间建立起来的当前数据直通通道可能需要经过0个、1个或多个基站,按照先后顺序经过这些基站所建立起来的路径即为第二传输路径。当第一传输路径中所包含的基站大于第二传输路径中的基站时,就需要重新建立当前数据直通通道。如果当前数据直通通道中有部分与原有的数据直通通道有重叠的,可以采用原有的数据直通通道。例如,基站P与基站Q同属于第一传输路径和第二传输路径中相邻的两个基站,基站P与基站Q之间已经建立了与业务标识对应的数据直通通道,那么在建立当前数据直通通道时,可以采用基站P与基站Q之间原有的数据直通通道。在此之前,管理控制中心可以选择是否向基站P和基站Q发送连接信令,当管理控制中心向基站P和基站Q发送连接信令时,基站P和基站Q识别到已经建立了与该业务标识对应的数据直通通道时,可以选择不响应该连接信令;当管理控制总新向基站P和基站Q不发送连接信令时,基站P或基站Q接收到与业务标识对应的业务数据时,基站P就通过原有的数据直通通道向基站Q发送或者由基站Q通过原有的数据直通通道向基站P进行发送。It should be noted that the original data direct channel established between the handover source base station and the service peer base station may need to pass through 0, 1 or more base stations, and the path established through these base stations in sequence is The first transmission path. The first transmission path uses the handover source base station and the service peer base station as two ends. Similarly, the current data direct channel established between the handover target base station and the service peer base station may need to pass through 0, 1 or more base stations, and the path established through these base stations in sequence is the second transmission path. When the base stations included in the first transmission path are larger than the base stations in the second transmission path, it is necessary to re-establish the current data direct channel. If some of the current data direct channels overlap with the original data direct channels, the original data direct channels can be used. For example, base station P and base station Q belong to two adjacent base stations in the first transmission path and the second transmission path, and a data direct channel corresponding to the service identifier has been established between base station P and base station Q, then when establishing the current data For the direct channel, the original data direct channel between the base station P and the base station Q may be used. Before this, the management control center can choose whether to send the connection signaling to the base station P and the base station Q, when the management control center sends the connection signaling to the base station P and the base station Q, the base station P and the base station Q recognize that they have established a connection with the service When identifying the corresponding data direct channel, you can choose not to respond to the connection signaling; when the management and control center does not send connection signaling to base station P and base station Q, when base station P or base station Q receives the service data corresponding to the service identifier , the base station P sends to the base station Q through the original data direct channel, or the base station Q transmits to the base station P through the original data direct channel.
另外,还需要指出的是,如果第一传输路径不大于第二传输路径时,就可以继续采用第一传输路径。具体为,业务对端基站接收发送方用户发送的业务数据,并通过与第一传输路径对应的数据直通通道发送至切换源基站,再由切换源基站通过与切换目的基站之间已经建立的切换数据直通通道发送至接收方用户,或者是切换目的基站接收发送方用户发送的业务数据并通过切换目的基站和切换源基站之间已经建立的切换数据直通通道向切换源基站发送,切换源基站接收到业务数据后,就通过与第一传输路径对应的数据直通通道发送至业务对端基站,再由业务对端基站发送至接收方用户。也就是说,第一传输路径对应的数据直通通道与切换数据直通通道合起来作为当前数据直通通道。In addition, it should be pointed out that if the first transmission path is not larger than the second transmission path, the first transmission path can continue to be used. Specifically, the service peer base station receives the service data sent by the sender user, and sends it to the handover source base station through the data direct channel corresponding to the first transmission path, and then the handover source base station passes the established handover data with the handover destination base station. The data direct channel is sent to the receiving user, or the handover destination base station receives the service data sent by the sending user and sends it to the handover source base station through the handover data direct channel established between the handover destination base station and the handover source base station, and the handover source base station receives After receiving the service data, it is sent to the service peer base station through the data direct channel corresponding to the first transmission path, and then sent to the receiving user by the service peer base station. That is to say, the data through channel corresponding to the first transmission path and the switched data through channel are combined as the current data through channel.
可选地,本实施例的方法在步骤B之后还包括:Optionally, the method of this embodiment also includes after step B:
步骤C,管理控制中心触发第一传输路径与第二传输路径中非重复部分的各基站之间的数据直通通道释放流程。In step C, the management control center triggers a data direct channel release process between the base stations in the non-duplicated part of the first transmission path and the second transmission path.
当管理控制中心通过对比第一传输路径和第二传输路径,如果识别到第一传输路径和第二传输路径中有非重复部分,可以向非重复部分中相应的基站发送数据直通通道释放信令,该数据直通通道释放信令可以包括第一传输路径中的相邻基站标识,以使相应的基站获知释放与哪个基站之间的数据直通通道。释放数据直通通道可以避免占用网络资源,进一步减轻了整个网络的负担。When the management control center compares the first transmission path with the second transmission path, if it recognizes that there is a non-repetitive part in the first transmission path and the second transmission path, it can send a data direct channel release signaling to the corresponding base station in the non-repetitive part , the data direct channel release signaling may include an identifier of an adjacent base station in the first transmission path, so that the corresponding base station knows which base station to release the data direct channel with. Releasing the data pass-through channel can avoid occupying network resources, further reducing the burden on the entire network.
具体举例来说,当第一传输路径从源基站到目标基站依次为:基站R1、基站R2、基站R3、基站R4,第二传输路径从源基站到目标基站依次为S1、R3、R4时,管理控制中心通过对比第一传输路径和第二传输路径,能够识别到重复的部分为R3和R4,此时,向基站R1和基站R2发送数据直通通道释放信令,基站R1和基站R2接收到数据直通通道释放信令时,就向相邻的下一基站发送数据直通通道释放请求,当收到相邻的下一基站回复的数据直通通道释放响应时,就释放掉与业务标识对应的数据直通通道。例如,基站R1向基站R2发送数据直通通道释放请求,基站R2向基站R1返回数据直通通道释放响应,基站R1释放掉与基站R2之间的数据直通通道。For example, when the first transmission path from the source base station to the target base station is: base station R1, base station R2, base station R3, and base station R4, and the second transmission path from the source base station to the target base station is S1, R3, and R4, By comparing the first transmission path with the second transmission path, the management and control center can identify the repeated parts as R3 and R4. At this time, it sends the data direct channel release signaling to the base station R1 and the base station R2, and the base station R1 and the base station R2 receive When the data direct channel release signaling, it sends a data direct channel release request to the adjacent next base station, and when receiving the data direct channel release response replied by the adjacent next base station, it releases the data corresponding to the service identifier Pass-thru. For example, base station R1 sends a data direct channel release request to base station R2, base station R2 returns a data direct channel release response to base station R1, and base station R1 releases the data direct channel with base station R2.
实施例三Embodiment three
本实施例对上述实施例一和实施例二的基站直通架构下的用户切换方法做进一步限定。This embodiment further limits the user switching method under the base station direct connection architecture of the first and second embodiments above.
本实施例中,对步骤401的当切换源基站识别到用户需切换小区时,向对应的切换目的基站发起小区切换请求的具体操作进行解释说明,其它步骤均与上述实施例中的一致,在此不再赘述。In this embodiment, the specific operation of initiating a cell switching request to the corresponding switching target base station when the switching source base station recognizes that the user needs to switch cells in
具体地,如下:Specifically, as follows:
步骤501、切换源基站向管理控制中心发送业务请求,业务请求中包括切换源基站标识、小区切换请求标识、切换目的基站标识和/或用户上传的测量报告,以使管理控制中心根据业务请求确定切换目的基站,并根据切换目标识的基站确定第三传输路径。Step 501, the handover source base station sends a service request to the management control center, the service request includes the handover source base station identifier, the cell handover request identifier, the handover destination base station identifier and/or the measurement report uploaded by the user, so that the management control center can determine according to the service request The target base station is handed over, and the third transmission path is determined according to the base station identified by the handover target.
切换源基站识别到用户需切换小区时,会通过与管理控制中心之间的接口向管理控制中心上报业务请求。该切换源基站可以为向发送方用户连接的基站或接收方用户连接的基站。When the switching source base station recognizes that the user needs to switch cells, it will report the service request to the management control center through the interface with the management control center. The handover source base station may be a base station connected to the sending user or a base station connected to the receiving user.
步骤502、切换源基站接收管理控制中心发送的连接建立信令,以使切换源基站和切换目的基站根据连接建立信令建立起数据直通通道,连接建立信令包括切换源基站地址、切换目的基站地址和第三传输路径。Step 502, the handover source base station receives the connection establishment signaling sent by the management control center, so that the handover source base station and the handover destination base station establish a data direct channel according to the connection establishment signaling, and the connection establishment signaling includes the handover source base station address, the handover destination base station address and third transmission path.
当确定出切换源基站和切换目的基站之后,管理控制中心根据预设选择策略为切换源基站和切换目的基站从多条路径中选择一条路径作为建立数据直通通道时使用的第三传输路径。其中,预设选择策略可以是根据最短路径原则进行选择的策略,也可以是根据路径负载最轻原则进行选择的策略等,在本实施例中不做限定。After the handover source base station and the handover destination base station are determined, the management control center selects a path from multiple paths for the handover source base station and the handover destination base station according to a preset selection strategy as the third transmission path used when establishing the direct data channel. Wherein, the preset selection policy may be a policy selected according to the principle of the shortest path, or a policy selected according to the principle of the lightest path load, etc., which is not limited in this embodiment.
当确定出切换源基站、切换目的基站以及第三传输路径后,管理控制中心分别向切换源基站和切换目的基站发送连接建立信令,并将切换源基站地址、切换目的基站地址和选择的第三传输路径携带在连接建立信令中,以使切换源基站和切换目的基站根据连接建立信令中的信息建立切换数据直通通道。After determining the handover source base station, the handover destination base station, and the third transmission path, the management control center sends connection establishment signaling to the handover source base station and the handover destination base station respectively, and sends the address of the handover source base station, the address of the handover destination base station, and the selected first The three transmission paths are carried in the connection establishment signaling, so that the handover source base station and the handover destination base station establish a handover data direct channel according to the information in the connection establishment signaling.
步骤503、切换源基站通过切换数据直通通道向切换目的基站发送小区切换请求。Step 503, the handover source base station sends a cell handover request to the handover target base station through the handover data direct channel.
当切换源基站和切换目的基站之间建立起数据直通通道后,切换源基站和切换目的基站之间的小区切换请求信息就可以通过数据直通通道进行传输,而无需由切换源基站或切换目的基站通过骨干传输网传送给核心网的中心控制节点,再由中心控制节点统一进行转发了。本实施例尤其适用于高带宽业务,例如视频业务、P2P业务等多媒体业务。After the data direct channel is established between the handover source base station and the handover target base station, the cell handover request information between the handover source base station and the handover target base station can be transmitted through the data direct channel without the handover source base station or the handover target base station. It is transmitted to the central control node of the core network through the backbone transmission network, and then forwarded by the central control node in a unified manner. This embodiment is especially suitable for high-bandwidth services, such as multimedia services such as video services and P2P services.
本实施例的基站直通架构下的用户切换方法,切换源基站需要向切换目的基站发送小区切换请求时,将携带有小区切换请求标识的业务请求上报给管理控制中心,管理控制中心分别向切换源基站和切换目的基站发送连接建立信令,以使切换源基站和切换目的基站建立起数据直通通道,以进行小区切换请求的传输,使得小区切换请求不再经过核心网的中心控制节点,减轻了中心控制节点和骨干传输网的负担。In the user handover method under the base station direct connection architecture of this embodiment, when the handover source base station needs to send a cell handover request to the handover destination base station, the service request carrying the cell handover request identifier is reported to the management control center, and the management control center reports to the handover source respectively The base station and the handover destination base station send connection establishment signaling so that the handover source base station and the handover destination base station establish a data direct channel to transmit the cell handover request, so that the cell handover request no longer passes through the central control node of the core network, reducing The central control node and the burden of the backbone transmission network.
实施例四Embodiment Four
本实施例对实施例二和实施例三的基站直通架构下的用户切换方法做进一步说明。This embodiment further describes the user switching method under the base station direct connection architecture of the second and third embodiments.
本实施例中,对步骤403中的B步骤中的切换目的基站根据建立指令触发建立当前数据直通通道建立流程步骤做进一步说明,其它步骤均与实施例一中的一致,在此不再赘述。In this embodiment, further description will be made on the steps of the handover destination base station in step B in step 403 triggering the establishment of the current data through channel establishment process according to the establishment instruction.
本实施例中,切换目的基站触发根据建立指令触发建立当前数据直通通道建立流程包括具体包括:In this embodiment, the handover target base station triggers the establishment of the current data direct channel establishment process according to the establishment instruction and specifically includes:
步骤4031a,切换目的基站根据建立指令向业务对端基站发起数据直通通道建立请求。Step 4031a, the handover target base station initiates a data direct channel establishment request to the service peer base station according to the establishment instruction.
步骤4032a,当切换目的基站接收到业务对端基站返回的数据直通通道建立响应时,建立起与业务对端基站建立之间的当前数据直通通道。In step 4032a, when the handover target base station receives the data direct channel establishment response returned by the service peer base station, it establishes the current data direct channel with the service peer base station.
接下来,该切换源基站所要发送的所有响应和数据都会通过已经建立的数据直通通道进行发送。Next, all responses and data to be sent by the handover source base station will be sent through the established data direct channel.
切换目的基站与业务对端基站建立数据直通通道的具体流程与实施例一中源基站与目标基站建立数据直通通道的流程一致,在此不再赘述。The specific process of establishing a data direct channel between the handover target base station and the service peer base station is the same as the process of establishing a data direct channel between the source base station and the target base station in Embodiment 1, and will not be repeated here.
根据本实施例的基站直通架构下的用户切换方法,通过切换源基站向切换目的基站发起小区切换请求,以将用户与切换源基站的连接改为用户与切换目的基站之间的连接,切换目的基站再与业务对端基站建立当前数据直通通道以进行业务数据的传输,能够保证用户与业务对端基站之间数据传输的连续性,不会由于用户传输信号不好而使数据不能及时进行传输。According to the user handover method under the base station direct connection architecture of this embodiment, the handover source base station initiates a cell handover request to the handover destination base station, so as to change the connection between the user and the handover source base station to the connection between the user and the handover destination base station, and the handover destination The base station then establishes a current data direct channel with the business peer base station for business data transmission, which can ensure the continuity of data transmission between the user and the business peer base station, and will not cause the data to not be transmitted in time due to poor user transmission signals .
实施例五Embodiment five
本实施例对实施例二和实施例三的基站直通架构下的用户切换方法做进一步说明。This embodiment further describes the user switching method under the base station direct connection architecture of the second and third embodiments.
本实施例中,对步骤403中的B步骤中业务对端基站根据建立指令建立数据直通通道建立流程步骤做进一步说明,其它步骤均与实施例二和实施例三中的一致,在此不再赘述。In this embodiment, further description will be made on the step B in step 403 to establish the data direct channel establishment process steps by the service peer base station according to the establishment instruction. repeat.
本实施例中,业务对端基站根据建立指令建立数据直通通道建立流程包括具体包括:In this embodiment, the service peer base station establishes a data direct channel establishment process according to the establishment instruction, including specifically:
步骤4031b,当业务对端基站接收到建立指令时,根据建立指令中的切换目的基站标识向切换目的基站发起数据直通通道建立请求。In step 4031b, when the opposite service base station receives the establishment instruction, it initiates a data direct channel establishment request to the handover destination base station according to the handover destination base station identifier in the establishment instruction.
步骤4032b,当业务对端基站接收到切换目的基站返回的数据直通通道建立响应时,建立起与切换目的基站建立之间的数据直通通道。In step 4032b, when the opposite service base station receives the data direct channel establishment response returned by the handover target base station, it establishes a data direct channel with the handover target base station.
切换目的基站与业务对端基站建立数据直通通道的具体流程与实施例一中源基站与目标基站建立数据直通通道的流程一致,在此不再赘述。The specific process of establishing a data direct channel between the handover target base station and the service peer base station is the same as the process of establishing a data direct channel between the source base station and the target base station in Embodiment 1, and will not be repeated here.
接下来,该切换目的基站所要发送的所有响应和数据都会通过已经建立的直通通道进行发送。Next, all responses and data to be sent by the handover target base station will be sent through the established direct channel.
根据本实施例的基站直通架构下的用户切换方法,通过切换源基站向业务对端基站发送切换目的基站标识,以使业务对端基站与切换目的基站建立当前数据直通通道以进行业务数据的传输,能够保证用户与业务对端基站之间数据传输的连续性,不会由于用户传输信号不好而使数据不能及时进行传输。According to the user handover method under the base station direct architecture of this embodiment, the handover source base station sends the handover destination base station identifier to the service peer base station, so that the service peer base station and the handover destination base station establish a current data direct channel for service data transmission , which can ensure the continuity of data transmission between the user and the service peer base station, and will not cause the data to not be transmitted in time due to the poor transmission signal of the user.
实施例六Embodiment six
本实施例提供一种基站直通架构下的用户切换装置,用于执行实施例一的基站直通架构下的用户切换方法。本实施例将基站直通架构下的用户切换装置集成在切换源基站中,当然也可以单独设置。接下来,将以基站直通构架下的用户切换装置集成在切换源基站中进行说明。This embodiment provides a user switching device under the base station direct architecture, which is used to implement the user switching method under the base station direct architecture of the first embodiment. In this embodiment, the user switching device under the base station direct connection architecture is integrated in the switching source base station, of course, it can also be set separately. Next, the integration of the user handover device under the base station direct architecture into the handover source base station will be described.
如图5所示,为根据本实施例的基站直通架构下的用户切换装置的结构示意图。该基站直通架构下的用户切换装置包括:发起请求模块601、转发模块602、发送标识模块603。As shown in FIG. 5 , it is a schematic structural diagram of a user switching device under the base station direct architecture according to this embodiment. The user switching device under the direct connection architecture of the base station includes: an initiating
其中,发起请求模块601分别与用户610和切换目的基站620连接,用于当识别到用户610需切换小区时,向对应的切换目的基站620发起小区切换请求;转发模块602分别与用户610和切换目的基站620连接,用于接收切换目的基站620返回的的小区切换响应,并转发给用户610,以指示用户610释放与切换源基站630之间的无线连接,并建立与切换目的基站620之间的无线连接;发送标识模块603分别与切换目的基站620、业务对端基站640连接,用于当接收到切换目的基站620返回的小区切换成功响应时,将业务对端基站640标识发送给切换目的基站620,或将切换目的基站标识发送给业务对端基站640,以使切换目的基站620或业务对端基站640触发执行切换目的基站620和业务对端基站640之间的当前数据直通通道建立流程。本实施例的基站直通架构下的用户切换装置的具体操作方法与实施例一中描述的一致,切换目的基站620在接收到业务对端基站标识时,以及业务对端基站640在接收到切换目的基站标识时,向管理控制中心发送判断信息的操作与实施例二一致,在此不再赘述。Wherein, the initiating
根据本实施例的基站直通架构下的用户切换装置,使用户610在切换小区时,通过基站之间直接进行切换路径的请求和操作,使得业务数据的传输路径及时地发生改变,不仅能够保证业务数据的正常传输,而且由于请求和业务数据的传输不用再经过核心网进行转发,一定程度上减小了用户610进行基站切换所需要的时间。According to the user switching device under the direct connection architecture of the base station in this embodiment, the
实施例七Embodiment seven
本实施例对实施例六的基站直通架构下的用户切换装置做进一步说明。This embodiment further describes the user switching device under the base station direct connection architecture of the sixth embodiment.
本实施例仅对发起请求模块做进一步说明,用于执行实施例三的基站直通架构下的用户切换方法,其它结构均与实施例六中的一致,在此不再赘述。This embodiment only further explains the initiating request module, which is used to implement the user handover method under the base station direct architecture of the third embodiment, and other structures are consistent with those in the sixth embodiment, and will not be repeated here.
具体地,如图6所示,发起请求模块601包括发送业务请求子模块701、接收连接建立信令子模块702和发送小区切换请求子模块703。Specifically, as shown in FIG. 6 , the initiating
其中,发送业务请求子模块701与用户610连接,用于当识别到用户610需切换小区时,向管理控制中心(图中未示出)发送业务请求,业务请求中包括切换源基站标识、小区切换请求标识、切换目的基站标识和用户上传的测量报告,以使管理控制中心根据业务请求确定切换目的基站,并根据切换目的基站确定传输路径;接收连接建立信令子模块702用于接收管理控制中心发送的连接建立信令,以使切换源基站630和切换目的基站620根据连接建立信令建立起数据直通通道,连接建立信令包括切换源基站地址、切换目的基站地址和传输路径;发送小区切换请求子模块703分别与接收连接建立信令子模块702和切换目的基站620连接,用于通过切换数据直通通道向切换目的基站620发送小区切换请求。Among them, the sending
根据本实施例的基站直通架构下的用户切换装置,通过管理控制中心来进行传输路径的选择和连接建立信令的发送,以建立起数据直通通道,这样后续的信令的交互均可以通过该数据直通通道来进行。According to the user switching device under the direct connection architecture of the base station in this embodiment, the transmission path selection and the connection establishment signaling are sent through the management control center to establish a data direct channel, so that subsequent signaling interactions can be performed through this data through the channel.
实施例八Embodiment eight
本实施例提供一种切换目的基站,用于执行实施例一至实施例五的基站直通架构下的用户切换方法。This embodiment provides a handover destination base station, which is used to implement the user handover method under the base station direct architecture of Embodiment 1 to Embodiment 5.
如图7所示,本实施例中切换目的基站620包括接收小区切换请求模块801和接收业务对端基站标识模块802。As shown in FIG. 7 , the handover
其中,接收小区切换请求模块801与切换源基站630连接,具体分别与转发模块602以及发送请求模块601中的发送小区切换请求子模块703连接,用于接收切换源基站630发送的小区切换请求,并根据小区切换请求向切换源基站630返回小区切换响应;接收业务对端基站标识模块802与切换源基站630连接,具体与切换源基站630中的发送标识模块603连接,用于接收切换源基站603发送的业务对端基站标识,并向管理控制中心(图中未示出)发送判断信息,判断信息包括切换目的基站标识、切换对端基站标识和业务标识。业务对端基站标识即表示业务对端基站640的标识。Wherein, the receiving cell
可选地本实施例的切换目的基站还包括第一发送请求模块803和第一建立模块804。其中,第一发送请求模块803与业务对端基站640连接,用于根据管理控制中心(图中未示出)下发的建立指令标识向业务对端基站640发起数据直通通道建立请求,建立指令包括切换目的基站与业务对端基站之间的第二传输路径;第一建立模块804与业务对端基站640连接,用于当接收到业务对端基站640返回的数据直通通道建立响应时,建立切换目的基站620与业务对端基站640之间的当前数据直通通道。Optionally, the handover destination base station in this embodiment further includes a first
本实施例中的切换源基站630中的模块均与实施例六和实施例七一致,在此不再赘述。Modules in the handover
根据本实施例的基站直通架构下的用户切换装置,通过切换源基站630向切换目的基站620发起小区切换请求,以将用户610与切换源基站630的连接改为用户610与切换目的基站620之间的连接,切换目的基站620再与业务对端基站640建立当前数据直通通道以进行业务数据的传输,能够保证用户610与业务对端基站640之间数据传输的连续性,不会由于用户610传输信号不好而使数据不能及时进行传输。According to the user switching device under the base station direct connection architecture of this embodiment, the cell switching request is initiated to the switching
实施例九Embodiment nine
本实施例提供一种业务对端基站,用于执行实施例一至实施例五的基站直通架构下的用户切换方法。This embodiment provides a service peer base station, which is used to implement the user handover method under the base station direct architecture of Embodiment 1 to Embodiment 5.
如图8所示,本实施例中的业务对端基站640包括第二发送请求模块901和第二建立模块902。As shown in FIG. 8 , the service
其中,第二发送请求模块901与切换目的基站620连接,用于当接收到管理控制中心下发的建立指令时,根据建立指令中的切换目的基站标识向切换目的基站620发起数据直通通道建立请求,建立指令包括切换目的基站与业务对端基站之间的第二传输路径;第二建立模块902与切换目的基站620连接,用于当接收到切换目的基站620返回的数据直通通道建立响应时,建立起业务对端基站640与切换目的基站620建立之间的当前数据直通通道。Wherein, the second sending request module 901 is connected with the handover
本实施例中的切换源基站630中的模块均与实施例六和实施例七一致,在此不再赘述。Modules in the handover
根据本实施例的基站直通架构下的用户切换装置,通过切换源基站630向业务对端基站640发送切换目的基站标识,以使业务对端基站640与切换目的基站620建立数据直通通道以进行业务数据的传输,能够保证用户610与业务对端基站640之间数据传输的连续性,不会由于用户610传输信号不好而使数据不能及时进行传输。According to the user switching device under the base station direct connection architecture of this embodiment, the handover
需要特别指出的是,由于切换源基站本身还可以是切换目的基站或者是业务对端基站,所以实施例八中的接收小区切换请求模块、接收业务对端基站标识模块、第一发送请求模块和第一建立模块同样可以设置在切换源基站中,实施例九中的第二发送请求模块和第二建立模块也同样可以设置在切换源基站中。It should be pointed out that since the handover source base station itself can also be the handover destination base station or the service peer base station, the receiving cell handover request module, the service peer base station identification module, the first sending request module and the The first establishment module can also be set in the handover source base station, and the second sending request module and the second establishment module in Embodiment 9 can also be set in the handover source base station.
本发明还提供一种业务数据交换系统,包括实施例六或实施例七的基站直通架构下的用户切换装置、实施例八的切换目的基站和实施例九的业务对端基站。The present invention also provides a service data exchange system, including the user switching device under the base station direct connection structure of the sixth or seventh embodiment, the handover destination base station of the eighth embodiment, and the opposite service base station of the ninth embodiment.
最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, rather than limiting them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the technical solutions of the various embodiments of the present invention. scope.
Claims (13)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210147190.0A CN102685829B (en) | 2012-05-11 | 2012-05-11 | Method, device and equipment for handover of user under base station straight-through architecture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210147190.0A CN102685829B (en) | 2012-05-11 | 2012-05-11 | Method, device and equipment for handover of user under base station straight-through architecture |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102685829A true CN102685829A (en) | 2012-09-19 |
CN102685829B CN102685829B (en) | 2015-02-25 |
Family
ID=46817043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210147190.0A Active CN102685829B (en) | 2012-05-11 | 2012-05-11 | Method, device and equipment for handover of user under base station straight-through architecture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102685829B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102904692A (en) * | 2012-10-17 | 2013-01-30 | 中国联合网络通信集团有限公司 | Rate control method, base station and communication system for base station direct communication |
CN103874077A (en) * | 2012-12-07 | 2014-06-18 | 中国联合网络通信集团有限公司 | Method and system for base station straight-through region dividing |
CN104937984A (en) * | 2013-01-22 | 2015-09-23 | 诺基亚技术有限公司 | Method and device for device switching |
CN108419280A (en) * | 2013-04-16 | 2018-08-17 | 华为技术有限公司 | Cell handover method and equipment |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0907295A2 (en) * | 1997-10-02 | 1999-04-07 | Nec Corporation | Method of setting a connection in a mobile communication network |
US6654361B1 (en) * | 1997-09-22 | 2003-11-25 | Lucent Technologies Inc. | Method for rerouting and route optimization for handoff management in a communications network |
CN1473421A (en) * | 2001-08-27 | 2004-02-04 | ��ʽ����Ntt����Ħ | Handover control device, base station, edge router, relay router, wireless terminal, mobile communication system, and handover control method |
US20080137615A1 (en) * | 2006-12-08 | 2008-06-12 | Electronics And Telecommunications Research Institute | METHOD OF SETTING L3 HANDOVER PATH GUARANTEEING FLOW-BASED QoS IN MOBILE IPv6 NETWORK |
CN101489270A (en) * | 2009-01-22 | 2009-07-22 | 华为技术有限公司 | Preprocessing method, device and system for X2 interface switching |
WO2009123512A1 (en) * | 2008-04-03 | 2009-10-08 | Telefonaktiebolaget L M Ericsson (Publ) | Method and arrangement for handling handover related parameters in a mobile communications network |
CN101651604A (en) * | 2008-08-15 | 2010-02-17 | 华为技术有限公司 | Method and system for route optimization |
CN101883406A (en) * | 2009-05-07 | 2010-11-10 | 株式会社Ntt都科摩 | Handover method, mobile terminal and base station |
CN101932120A (en) * | 2009-06-22 | 2010-12-29 | 华为技术有限公司 | Method and device for establishing connection between relay node and network node |
CN101965028A (en) * | 2009-07-23 | 2011-02-02 | 中兴通讯股份有限公司 | Method, device and system for implementing X2 switching |
CN102118810A (en) * | 2010-02-10 | 2011-07-06 | 电信科学技术研究院 | Method, system and equipment for avoiding path conversion in switching |
CN102238668A (en) * | 2010-05-07 | 2011-11-09 | 北京三星通信技术研究有限公司 | Method for performing X2 handover by gateway |
CN102256329A (en) * | 2010-05-19 | 2011-11-23 | 中兴通讯股份有限公司 | Path selection method and device |
CN102256326A (en) * | 2010-05-19 | 2011-11-23 | 中兴通讯股份有限公司 | Method and device for realizing routing |
CN102281587A (en) * | 2010-06-13 | 2011-12-14 | 中兴通讯股份有限公司 | Method and system for realizing direct interface between access network nodes |
CN102291789A (en) * | 2010-06-21 | 2011-12-21 | 中兴通讯股份有限公司 | Adjacent cell information obtaining method, user equipment cell switching method and network |
CN102291796A (en) * | 2011-09-02 | 2011-12-21 | 中国联合网络通信集团有限公司 | Service data transmission method, system and management control center |
-
2012
- 2012-05-11 CN CN201210147190.0A patent/CN102685829B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6654361B1 (en) * | 1997-09-22 | 2003-11-25 | Lucent Technologies Inc. | Method for rerouting and route optimization for handoff management in a communications network |
EP0907295A2 (en) * | 1997-10-02 | 1999-04-07 | Nec Corporation | Method of setting a connection in a mobile communication network |
CN1473421A (en) * | 2001-08-27 | 2004-02-04 | ��ʽ����Ntt����Ħ | Handover control device, base station, edge router, relay router, wireless terminal, mobile communication system, and handover control method |
US20080137615A1 (en) * | 2006-12-08 | 2008-06-12 | Electronics And Telecommunications Research Institute | METHOD OF SETTING L3 HANDOVER PATH GUARANTEEING FLOW-BASED QoS IN MOBILE IPv6 NETWORK |
WO2009123512A1 (en) * | 2008-04-03 | 2009-10-08 | Telefonaktiebolaget L M Ericsson (Publ) | Method and arrangement for handling handover related parameters in a mobile communications network |
CN101651604A (en) * | 2008-08-15 | 2010-02-17 | 华为技术有限公司 | Method and system for route optimization |
CN101489270A (en) * | 2009-01-22 | 2009-07-22 | 华为技术有限公司 | Preprocessing method, device and system for X2 interface switching |
CN101883406A (en) * | 2009-05-07 | 2010-11-10 | 株式会社Ntt都科摩 | Handover method, mobile terminal and base station |
CN101932120A (en) * | 2009-06-22 | 2010-12-29 | 华为技术有限公司 | Method and device for establishing connection between relay node and network node |
CN101965028A (en) * | 2009-07-23 | 2011-02-02 | 中兴通讯股份有限公司 | Method, device and system for implementing X2 switching |
CN102118810A (en) * | 2010-02-10 | 2011-07-06 | 电信科学技术研究院 | Method, system and equipment for avoiding path conversion in switching |
CN102238668A (en) * | 2010-05-07 | 2011-11-09 | 北京三星通信技术研究有限公司 | Method for performing X2 handover by gateway |
CN102256329A (en) * | 2010-05-19 | 2011-11-23 | 中兴通讯股份有限公司 | Path selection method and device |
CN102256326A (en) * | 2010-05-19 | 2011-11-23 | 中兴通讯股份有限公司 | Method and device for realizing routing |
CN102281587A (en) * | 2010-06-13 | 2011-12-14 | 中兴通讯股份有限公司 | Method and system for realizing direct interface between access network nodes |
CN102291789A (en) * | 2010-06-21 | 2011-12-21 | 中兴通讯股份有限公司 | Adjacent cell information obtaining method, user equipment cell switching method and network |
CN102291796A (en) * | 2011-09-02 | 2011-12-21 | 中国联合网络通信集团有限公司 | Service data transmission method, system and management control center |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102904692A (en) * | 2012-10-17 | 2013-01-30 | 中国联合网络通信集团有限公司 | Rate control method, base station and communication system for base station direct communication |
CN103874077A (en) * | 2012-12-07 | 2014-06-18 | 中国联合网络通信集团有限公司 | Method and system for base station straight-through region dividing |
CN103874077B (en) * | 2012-12-07 | 2017-05-17 | 中国联合网络通信集团有限公司 | Method and system for base station straight-through region dividing |
CN104937984A (en) * | 2013-01-22 | 2015-09-23 | 诺基亚技术有限公司 | Method and device for device switching |
CN108419280A (en) * | 2013-04-16 | 2018-08-17 | 华为技术有限公司 | Cell handover method and equipment |
US11638185B2 (en) | 2013-04-16 | 2023-04-25 | Huawei Technologies Co., Ltd. | Cell handover method and device |
Also Published As
Publication number | Publication date |
---|---|
CN102685829B (en) | 2015-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7340111B2 (en) | Communication methods, devices and storage media | |
CN111200848B (en) | Communication method and device | |
JP7135100B2 (en) | Packet transmission method, device and system | |
CN110933623B (en) | A communication method and device | |
US8923816B2 (en) | Apparatus and method for providing seamless service between a cellular network and wireless local area network for a mobile user | |
CN101646205B (en) | Node, method and system for accessing mobile network to public network at high speed | |
US8767692B2 (en) | Communication method in an IEEE 802.11 wireless LAN environment | |
CN102291796A (en) | Service data transmission method, system and management control center | |
CN104469869A (en) | A small cell handover method and base station | |
CN105578513B (en) | A kind of communication means, equipment and system | |
WO2015032043A1 (en) | Data transmission method, device and system | |
WO2023011245A1 (en) | Communication method and communication apparatus | |
WO2011100894A1 (en) | Switching method and relay node | |
JP7597904B2 (en) | Communication method and communication device | |
CN116419339A (en) | Communication method, device and system | |
CN101998547A (en) | Data forwarding method, base station and relay station | |
CN106888459A (en) | Reduce the information terminal and its communication means of D2D signaling consumptions and frequency spectrum resource interference | |
JP6864106B2 (en) | Methods and Devices for Dual Connectivity between Dual Protocol Stack User Equipment and Two Baseband Units in a Wireless Access Telecommunications Network | |
CN102685829B (en) | Method, device and equipment for handover of user under base station straight-through architecture | |
CN116746085A (en) | Method and device for transmitting data | |
CN104768199B (en) | A kind of data pack transmission method and device | |
WO2014067371A1 (en) | Cluster service implementation method, system, and network element | |
CN102984813B (en) | Data straight through processing method, equipment and system | |
CN102695225B (en) | User switching method in through architecture of base station and base station | |
CN103227982B (en) | Data straight through processing method, equipment and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |