CN102409844A - 墩身翻模施工第二段墩身模板支撑体系及施工方法 - Google Patents
墩身翻模施工第二段墩身模板支撑体系及施工方法 Download PDFInfo
- Publication number
- CN102409844A CN102409844A CN2011102589271A CN201110258927A CN102409844A CN 102409844 A CN102409844 A CN 102409844A CN 2011102589271 A CN2011102589271 A CN 2011102589271A CN 201110258927 A CN201110258927 A CN 201110258927A CN 102409844 A CN102409844 A CN 102409844A
- Authority
- CN
- China
- Prior art keywords
- pier shaft
- section
- template
- section pier
- split heads
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000009415 formwork Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- 230000002093 peripheral effect Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 3
- 239000003673 groundwater Substances 0.000 description 3
- 239000004576 sand Substances 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 102000001999 Transcription Factor Pit-1 Human genes 0.000 description 1
- 108010040742 Transcription Factor Pit-1 Proteins 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110258927 CN102409844B (zh) | 2011-09-02 | 2011-09-02 | 墩身翻模施工第二段墩身模板支撑体系及施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110258927 CN102409844B (zh) | 2011-09-02 | 2011-09-02 | 墩身翻模施工第二段墩身模板支撑体系及施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102409844A true CN102409844A (zh) | 2012-04-11 |
| CN102409844B CN102409844B (zh) | 2013-11-06 |
Family
ID=45912149
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201110258927 Expired - Fee Related CN102409844B (zh) | 2011-09-02 | 2011-09-02 | 墩身翻模施工第二段墩身模板支撑体系及施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102409844B (zh) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20040261331A1 (en) * | 2003-06-27 | 2004-12-30 | Progressive Tool & Industries, Co. | Studding layout |
| CN201176703Y (zh) * | 2008-04-25 | 2009-01-07 | 中冶京唐建设有限公司 | 双曲线冷却塔风筒施工用三角架 |
| CN101696604A (zh) * | 2009-09-24 | 2010-04-21 | 东北电业管理局烟塔工程公司 | 一种烟囱筒壁施工方法及专用电动顶升平桥 |
| CN201554217U (zh) * | 2009-09-15 | 2010-08-18 | 王永利 | 折叠式多功能马凳 |
| CN201802007U (zh) * | 2010-08-13 | 2011-04-20 | 中国二十二冶集团有限公司 | 结构底板上反梁托模架 |
| CN202194375U (zh) * | 2011-09-02 | 2012-04-18 | 中铁上海工程局有限公司 | 墩身翻模施工第二段墩身模板支撑体系 |
-
2011
- 2011-09-02 CN CN 201110258927 patent/CN102409844B/zh not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20040261331A1 (en) * | 2003-06-27 | 2004-12-30 | Progressive Tool & Industries, Co. | Studding layout |
| CN201176703Y (zh) * | 2008-04-25 | 2009-01-07 | 中冶京唐建设有限公司 | 双曲线冷却塔风筒施工用三角架 |
| CN201554217U (zh) * | 2009-09-15 | 2010-08-18 | 王永利 | 折叠式多功能马凳 |
| CN101696604A (zh) * | 2009-09-24 | 2010-04-21 | 东北电业管理局烟塔工程公司 | 一种烟囱筒壁施工方法及专用电动顶升平桥 |
| CN201802007U (zh) * | 2010-08-13 | 2011-04-20 | 中国二十二冶集团有限公司 | 结构底板上反梁托模架 |
| CN202194375U (zh) * | 2011-09-02 | 2012-04-18 | 中铁上海工程局有限公司 | 墩身翻模施工第二段墩身模板支撑体系 |
Non-Patent Citations (2)
| Title |
|---|
| 刘飞: "自然通风冷却塔筒壁", 《建筑安全》 * |
| 竺召炜: "大型双曲线形冷却塔风筒施工方法探讨", 《施工技术》 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102409844B (zh) | 2013-11-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11143027B2 (en) | Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof | |
| CN101538833B (zh) | 竖向分条双壁钢围堰止水施工工法 | |
| CN102434717B (zh) | 工字钢顶管工作坑的施工方法 | |
| CN103195085B (zh) | 一种向下加层地下室及其建造方法 | |
| CN104790410B (zh) | 一种适用于浅水淤泥河道的基坑开挖支护方法 | |
| CN105926669A (zh) | 一种地铁车站施工方法 | |
| CN105350526B (zh) | 钢平台的搭设方法 | |
| CN112575670B (zh) | 一种适用于隧道穿越巨型溶洞的t形刚构桥及其施工技术 | |
| CN106884433A (zh) | 控制震动拔桩导致地下构筑物沉陷的结构及控制沉陷方法 | |
| CN112627002B (zh) | 一种适用于隧道穿越巨型溶洞的连续梁桥及其施工技术方法 | |
| CN111851588A (zh) | 一种顶管井结构及其施工方法 | |
| CN103711056B (zh) | 钢质工具式临时施工道路及其施工方法 | |
| CN108612049B (zh) | 一种护岸工程施工采用整体式钢滑模结构的施工方法 | |
| CN109706952A (zh) | 大型沉井施工方法 | |
| CN114992382B (zh) | 一种沉井法施工泥水平衡顶管工作井洞口施工方法 | |
| CN104988915A (zh) | 一种可拆卸钢护筒装置及水下联系梁预制安装方法 | |
| CN113431065A (zh) | 一种咬合桩与钢套箱组合围堰快速施工方法及结构 | |
| CN102359112A (zh) | 利用钢箱桩进行基坑围护的方法 | |
| CN103510532A (zh) | 基于装配式梁板桩的铁路隧道底部病害整治技术 | |
| KR101474554B1 (ko) | 항만구조물 시공장치 및 이를 이용한 항만구조물 시공방법 | |
| CN102852094A (zh) | 无掩护海洋环境下预制墩台安装板桩组合结构施工方法 | |
| CN106337688A (zh) | 一种电缆隧道带电运行套设内衬加固结构及其施工方法 | |
| CN108035379A (zh) | 一种综合管廊及其施工方法 | |
| CN109403981B (zh) | 地铁盾构井主体结构的施工工艺 | |
| CN202194375U (zh) | 墩身翻模施工第二段墩身模板支撑体系 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC |
|
| CP01 | Change in the name or title of a patent holder |
Address after: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436 Patentee after: Shanghai Civil Engineering Co., Ltd. of Crec Patentee after: THE FIRST CIVIL ENGINEERING CO., LTD. OF CREC SHANGHAI GROUP Address before: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436 Patentee before: Shanghai Civil Engineering Co., Ltd. of CREC Patentee before: The 1st Civil Engineering Co., Ltd. of CREC Shanghai |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131106 Termination date: 20200902 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |