CN102409703A - 一种基坑桩顶水平位移的监测方法及其监测装置 - Google Patents
一种基坑桩顶水平位移的监测方法及其监测装置 Download PDFInfo
- Publication number
- CN102409703A CN102409703A CN2011102364263A CN201110236426A CN102409703A CN 102409703 A CN102409703 A CN 102409703A CN 2011102364263 A CN2011102364263 A CN 2011102364263A CN 201110236426 A CN201110236426 A CN 201110236426A CN 102409703 A CN102409703 A CN 102409703A
- Authority
- CN
- China
- Prior art keywords
- reference point
- point
- coordinate
- total powerstation
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 45
- 238000012544 monitoring process Methods 0.000 title claims abstract description 30
- 238000006073 displacement reaction Methods 0.000 title claims abstract description 26
- 238000012806 monitoring device Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 238000005259 measurement Methods 0.000 claims abstract description 26
- 239000000853 adhesive Substances 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 15
- 238000010276 construction Methods 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 7
- 238000007689 inspection Methods 0.000 claims description 6
- 238000002271 resection Methods 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 208000015181 infectious disease Diseases 0.000 claims description 3
- 210000001367 artery Anatomy 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000010223 real-time analysis Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种基坑桩顶水平位移的监测方法及其监测装置,属于基坑工程领域。该方法包括以下步骤:步骤一选三个基准点;步骤二使用全站仪确定基准点坐标;步骤三在围挡内布设站点;步骤四全站仪选用后方交会模式测量工作站点坐标,测量模式复核工作站点坐标;步骤五根据工作站点的坐标测量出各位移监测测点的坐标;步骤六根据测量结果和已知的各个测点坐标,确定各个测点所在的桩顶位移变化值。该装置包括钢板(1),自贴式反射片(2),钢筋(3);钢板与钢筋的一个端头焊接,钢板与水平面夹角为60°~90°;自贴式反射片粘贴于钢板仰面上。解决了现有基坑工程监测过程中小角度法、极坐标法和视准线法精度较低的问题;及自由设站法对全站仪要求较高的问题。
Description
技术领域
本发明属于基坑工程领域,适用于地铁车站基坑桩顶水平位移的监测。
背景技术
近年来,随着经济的发展,城市的交通拥堵问题日益突出,人类城市交通的主要动脉已经从地面转入地下空间,目前各种用途的地下空间已在世界各地大中城市得到开发利用,地下工程建设项目的数量和规模也迅速增大,如高层建筑物的基坑、大型管线的深沟槽、地铁工程的车站深基坑等。这些地下空间的建设多采用价廉而方法简便的明挖法进行施工,产生了大量的深基坑工程,为了保证基坑安全,防止基坑失稳破坏,加强基坑围护结构和内支撑结构的监测工作非常重要。由于基坑围护桩桩顶位移量值显著,易于实现快速反馈,数据易于实时分析,常常作为反应基坑安全的主要指标。
目前在工程实践过程中,桩顶位移监测主要采用小角度法、视准线法、极坐标法、以前方交会法为基础的自由设站法等进行。小角度法和视准线法简单易行,便于实地操作;但是其精度较低,且要求场地开阔,只适合形状规则的基坑。极坐标法基点布设灵活,工作量较少,简便、省时、效率高;但由于工作基点距基坑较近,基点位移变化较大,误差大,无法满足监测精度要求。自由设站法设站灵活,作业效率高,不受通视限制,避免了工作基点不稳定对监测精度的影响,但自由设站法要求选用测角与测距精度相匹配的全站仪,要求在交会角接近90°~100°前提下保证基线边尽量短,同时设站点的精度不高,在只有对基准点进行强制对中的前提下,才能提高监测数据的精度和可靠性。在现代的城市环境中,地铁基坑施工必然受到各方面城市因素的制约,场地范围越来越小,况且施工多采用围挡保护,围挡外常有城市道路和建筑物,围挡内有施工车辆、吊车等移动设备及临时堆积材料,通视条件常常无法满足,小角度法、视准线法等难以进行实际操作。为了真实反映桩顶水平位移,位移监测点一般布设在冠梁顶部,由于工作面狭窄,导致测点处无法架设棱镜,自由设站法和极坐标法受到限制,同时自由设站点位精度低、极坐标法工作基点存在位移变化,无法满足地铁深基坑的监测精度要求。
发明内容
本发明所要解决的技术问题:基坑工程监测过程中小角度法、极坐标法和视准线法精度较低的问题;及自由设站法对全站仪要求较高的问题。
本发明解决其技术问题的技术方案:
一种基坑桩顶水平位移的监测方法,该方法包括以下步骤:
步骤一选基准点
分别在基坑周围的不同建筑物上布设三个基准点A、基准点B、基准点C三个基准点;
每个基点与基坑内部形成完全通视,在基准点A、基准点B、基准点C处焊接基准点用钢筋头,并在其上焊上棱镜卡套,将全站仪所用的棱镜固定在棱镜卡套上;
步骤二确定基准点坐标
使用全站仪根据已知控制点的坐标值,依次测量出基准点A、基准点B、基准点C各自的实际坐标值(XA,YA)、(XB,YB)、(XC,YC),并记录,在基坑开挖的过程中,要两周~六周对基准点A、基准点B、基准点C各点的坐标值进行复核;
步骤三布设站点
在围挡内任选工作站点D、E、F...,该工作站点应选在受施工影响较小,并与基准点A、基准点B、基准点C和各个测点形成通视的地方;
步骤四工作站点坐标测量
在工作基点D架设全站仪,并进行对中整平,然后在全站仪测量模式中选择后方交会模式,将步骤二测量出的基准点A的坐标值作为后视点座标值输入全站仪,并对基准点A进行初始测量,然后顺时针转动全站仪,瞄准基准点B,输入基准点B的坐值(XB,YB),对基准点B进行测量,测量得∠ADB的角度和线段SAD、SBD的长度,全站仪自动计算出工作测点D的坐标值(XD,YD);
全站仪在工作站点D位置处固定不动,检查全站仪水泡是否仍然居中,然后以基准点A或基准点B中任一点作为后视点,在测量模式中选择坐标测量模式,输入后视点的坐标值和工作站点D的坐标值(XD,YD),转动全站仪,观察并测量基准点C,得到基准点C的观测坐标(XC1,YC1),将观测坐标(XC1,YC1)和实际坐标(XC,YC)对比,若相差大于0.1mm,则需重新对D点坐标进行测量,反复测量直到基准点C点观测坐标值(XC1,YC1)和实际坐标值(XC,YC)的差值在0.1mm以内时,确定工作站点D点的坐标(XD,YD);
步骤五测点位移监测
在位移监测测点S1,S2,S3...处分别安装基坑桩顶水平位移的监测装置,每个监测装置的自贴式反射片对准工作站点D,钢板与钢筋焊接的一端的钢筋露出桩顶2cmm~5cm;
保证全站仪在D点不动,检查全站仪水泡是否仍然居中,以三个基准点A、基准点B、基准点C中的任一基准点为后视点,选择坐标测量模式,输入后视点的坐标值,然后依次观测位移监测测点S1,S2,S3...,记录相应的坐标值(X1,Y1),(X2,Y2),(X3,Y3)...;
步骤六数据处理
步骤五的测量结果和已知的各个测点S1,S2,S3...坐标的差值,就是各个测点所在的桩顶位移变化值。
所述的全站仪采用带有后方交会模式的全站仪。
基坑桩顶水平位移的监测装置,该装置包括钢板,自贴式反射片,钢筋;
钢板与钢筋的一个端头焊接,且钢板与水平的夹角为60°~90°;
钢筋长为1~2m,钢板长宽各为30~50mm,厚5~10mm,要求钢板表面打磨平整;
将自贴式反射片粘贴于钢板仰面上;
自贴式反射片规格为20mm×20mm的正方形。
本发明的有益效果:
本发明提出了水平位移的监测方法不需在测点架设棱镜,避免了测点的对中误差,不仅提高了测量精度,而且提高了监测效率。该测量方法中的测点布置方法,固定性好、亮度高,尤其适用于作业面狭窄的冠梁处。该监测方法测得的桩顶位移数据能够真实地反映围护桩顶位移变化和基坑周围土体的变形情况,便于采取合适的应对措施保证基坑的安全。在不受场地环境限制下,测量效率高,误差小的前提下,通过本发明的监测方法测得的数据,真实地反应桩顶位移变化情况。
附图说明
图1基坑桩顶水平位移的监测装置立体图。
图2基坑桩顶水平位移的监测装置主视图。
图3工作站点坐标测量示意图。
图4测点位移监测示意图。
具体实施方式
一种基坑桩顶水平位移的监测方法,该方法包括以下步骤:
步骤一选基准点
分别在基坑周围的不同建筑物上布设三个基准点A、基准点B、基准点C三个基准点;
每个基点与基坑内部形成完全通视,在基准点A、基准点B、基准点C处焊接基准点用钢筋头,并在其上焊上棱镜卡套,将全站仪所用的棱镜固定在棱镜卡套上;
步骤二确定基准点坐标
使用全站仪根据已知控制点的坐标值,依次测量出基准点A、基准点B、基准点C各自的实际坐标值(XA,YA)、(XB,YB)、(XC,YC),并记录,在基坑开挖的过程中,要两周~六周对基准点A、基准点B、基准点C各点的坐标值进行复核;
步骤三布设站点
在围挡内任选工作站点D、E、F...,该工作站点应选在受施工影响较小,并与基准点A、基准点B、基准点C和各个测点形成通视的地方;
步骤四工作站点坐标测量
如图3所示,在工作基点D架设全站仪,并进行对中整平,然后在全站仪测量模式中选择后方交会模式,将步骤二测量出的基准点A的坐标值作为后视点座标值输入全站仪,并对基准点A进行初始测量,然后顺时针转动全站仪,瞄准基准点B,输入基准点B的坐值(XB,YB),对基准点B进行测量,测量得∠ADB的角度和线段SAD、SBD的长度,全站仪自动计算出工作测点D的坐标值(XD,YD);
全站仪在工作站点D位置处固定不动,检查全站仪水泡是否仍然居中,然后以基准点A或基准点B中任一点作为后视点,在测量模式中选择坐标测量模式,输入后视点的坐标值和工作站点D的坐标值(XD,YD),转动全站仪,观察并测量基准点C,得到基准点C的观测坐标(XC1,YC1),将观测坐标(XC1,YC1)和实际坐标(XC,YC)对比,若相差大于0.1mm,则需重新对D点坐标进行测量,反复测量直到基准点C点观测坐标值(XC1,YC1)和实际坐标值(XC,YC)的差值在0.1mm以内时,确定工作站点D点的坐标(XD,YD);
步骤五测点位移监测
在位移监测测点S1,S2,S3...处分别安装基坑桩顶水平位移的监测装置,每个监测装置的自贴式反射片2对准工作站点D,钢板1与钢筋3焊接的一端的钢筋3露出桩顶2cmm~5cm;
如图4所示,保证全站仪在D点不动,检查全站仪水泡是否仍然居中,以三个基准点A、基准点B、基准点C中的任一基准点为后视点,选择坐标测量模式,输入后视点的坐标值,然后依次观测位移监测测点S1,S2,S3...,记录相应的坐标值(X1,Y1),(X2,Y2),(X3,Y3)...;
步骤六数据处理
步骤五的测量结果和已知的各个测点S1,S2,S3...坐标的差值,就是各个测点所在的桩顶位移变化值。
所述的全站仪采用带有后方交会模式的全站仪。
基坑桩顶水平位移的监测装置,如图1、2所示,该装置包括钢板1,自贴式反射片2,钢筋3;
钢板1与钢筋3的一个端头焊接,且钢板1与水平的夹角为60°~90°;
钢筋长为1~2m,钢板长宽各为30~50mm,厚5~10mm,要求钢板表面打磨平整;
将自贴式反射片2粘贴于钢板1仰面上;
自贴式反射片2规格为20mm×20mm的正方形。
本发明中出现的使用数值范围,取其两个端值之一或其中间的任意值均可。
Claims (3)
1.一种基坑桩顶水平位移的监测方法,其特征在于:
该方法包括以下步骤:
步骤一选基准点
分别在基坑周围的不同建筑物上布设三个基准点A、基准点B、基准点C三个基准点;
每个基点与基坑内部形成完全通视,在基准点A、基准点B、基准点C处焊接基准点用钢筋头,并在其上焊上棱镜卡套,将全站仪所用的棱镜固定在棱镜卡套上;
步骤二确定基准点坐标
使用全站仪根据已知控制点的坐标值,依次测量出基准点A、基准点B、基准点C各自的实际坐标值(XA,YA)、(XB,YB)、(XC,YC),并记录,在基坑开挖的过程中,要两周~六周对基准点A、基准点B、基准点C各点的坐标值进行复核;
步骤三布设站点
在围挡内任选工作站点D、E、F...,该工作站点应选在受施工影响较小,并与基准点A、基准点B、基准点C和各个测点形成通视的地方;
步骤四工作站点坐标测量
在工作基点D架设全站仪,并进行对中整平,然后在全站仪测量模式中选择后方交会模式,将步骤二测量出的基准点A的坐标值作为后视点座标值输入全站仪,并对基准点A进行初始测量,然后顺时针转动全站仪,瞄准基准点B,输入基准点B的坐值(XB,YB),对基准点B进行测量,测量得∠ADB的角度和线段SAD、SBD的长度,全站仪自动计算出工作测点D的坐标值(XD,YD);
全站仪在工作站点D位置处固定不动,检查全站仪水泡是否仍然居中,然后以基准点A或基准点B中任一点作为后视点,在测量模式中选择坐标测量模式,输入后视点的坐标值和工作站点D的坐标值(XD,YD),转动全站仪,观察并测量基准点C,得到基准点C的观测坐标(XC1,YC1),将观测坐标(XC1,YC1)和实际坐标(XC,YC)对比,若相差大于0.1mm,则需重新对D点坐标进行测量,反复测量直到基准点C点观测坐标值(XC1,YC1)和实际坐标值(XC,YC)的差值在0.1mm以内时,确定工作站点D点的坐标(XD,YD);
步骤五测点位移监测
在位移监测测点S1,S2,S3...处分别安装基坑桩顶水平位移的监测装置,每个监测装置的自贴式反射片(2)对准工作站点D,钢板(1)与钢筋(3)焊接的一端的钢筋(3)露出桩顶2cmm~5cmm;
保证全站仪在D点不动,检查全站仪水泡是否仍然居中,以三个基准点A、基准点B、基准点C中的任一基准点为后视点,选择坐标测量模式,输入后视点的坐标值,然后依次观测位移监测测点S1,S2,S3...,记录相应的坐标值(X1,Y1),(X2,Y2),(X3,Y3)...;
步骤六数据处理
步骤五的测量结果和已知的各个测点S1,S2,S3...坐标的差值,就是各个测点所在的桩顶位移变化值。
2.根据权利要求1所述的一种基坑桩顶水平位移的监测方法,其特征在于:
所述的全站仪采用带有后方交会模式的全站仪。
3.基坑桩顶水平位移的监测装置,其特征在于:
该装置包括钢板(1),自贴式反射片(2),钢筋(3);
钢板(1)与钢筋(3)的一个端头焊接,且钢板(1)与水平的夹角为60°~90°;
钢筋长为1~2m,钢板长宽各为30~50mm,厚5~10mm,要求钢板表面打磨平整;
将自贴式反射片(2)粘贴于钢板(1)仰面上;
自贴式反射片(2)规格为20mm×20mm的正方形。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011102364263A CN102409703A (zh) | 2011-08-17 | 2011-08-17 | 一种基坑桩顶水平位移的监测方法及其监测装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011102364263A CN102409703A (zh) | 2011-08-17 | 2011-08-17 | 一种基坑桩顶水平位移的监测方法及其监测装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102409703A true CN102409703A (zh) | 2012-04-11 |
Family
ID=45912022
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011102364263A Pending CN102409703A (zh) | 2011-08-17 | 2011-08-17 | 一种基坑桩顶水平位移的监测方法及其监测装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102409703A (zh) |
Cited By (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102620699A (zh) * | 2012-04-13 | 2012-08-01 | 靳纪洲 | 定向垂距法测量变形监测定向水平位移的方法 |
| CN103376064A (zh) * | 2012-04-20 | 2013-10-30 | 贵州中建建筑科研设计院有限公司 | 一种建筑基坑或边坡变形的监测方法及监测反射装置 |
| CN106284445A (zh) * | 2016-10-15 | 2017-01-04 | 韩少鹏 | 土木工程基坑施工过程监测装置以及监测方法 |
| CN106500651A (zh) * | 2016-11-16 | 2017-03-15 | 上海建工集团股份有限公司 | 一种结构几何变形的安全监控方法 |
| CN107144267A (zh) * | 2017-05-24 | 2017-09-08 | 中国二十冶集团有限公司 | 垂直设备安装方法 |
| CN108318011A (zh) * | 2018-01-02 | 2018-07-24 | 中铁隧道局集团有限公司 | 一种通过无人机搭载全站仪监测施工场地周边位移的方法 |
| CN108824499A (zh) * | 2018-06-14 | 2018-11-16 | 合肥市测绘设计研究院 | 一种基于后方交会自由设站水平位移监测方法 |
| CN108914994A (zh) * | 2018-08-13 | 2018-11-30 | 山东大学 | 一种基于对边测距的基坑顶部水平位移监测方法 |
| CN108981665A (zh) * | 2018-08-13 | 2018-12-11 | 山东大学 | 一种基于坐标测量的基坑顶部水平位移监测方法 |
| CN110057343A (zh) * | 2019-05-29 | 2019-07-26 | 中铁隧道局集团有限公司 | 一种使用全站仪测量角度监测平面位移的方法 |
| CN110468887A (zh) * | 2019-07-31 | 2019-11-19 | 青岛理工大学 | 一种微型钢管桩桩身土压力和位移监测方法 |
| CN110468888A (zh) * | 2019-07-31 | 2019-11-19 | 青岛理工大学 | 一种微型钢管桩桩身位移监测装置及方法 |
| CN111764447A (zh) * | 2020-07-20 | 2020-10-13 | 天津市地质工程勘察院 | 一种基坑支护桩桩顶水平位移监测方法 |
| CN111854664A (zh) * | 2020-07-30 | 2020-10-30 | 河北建设勘察研究院有限公司 | 一种桥梁桩基托换中墩柱的水平位移监测方法 |
| WO2021017984A1 (zh) * | 2019-07-31 | 2021-02-04 | 青岛理工大学 | 一种微型钢管桩桩身土压力和位移监测系统及方法 |
| CN113188510A (zh) * | 2021-03-10 | 2021-07-30 | 浙江省建工集团有限责任公司 | 一种在大面积深基坑中新三角高程测量的施工方法 |
| CN114541494A (zh) * | 2022-03-02 | 2022-05-27 | 中铁七局集团有限公司 | 用于深基坑悬臂围护桩桩体变形的监测方法 |
| CN114910003A (zh) * | 2022-05-25 | 2022-08-16 | 湖北工业大学 | 基于固定轨道的测量机器人位移监测方法及设备 |
| CN115406421A (zh) * | 2022-09-16 | 2022-11-29 | 中建三局集团有限公司 | 一种全站仪测量信号反射装置及其测量放样方法 |
| CN116202476A (zh) * | 2023-02-24 | 2023-06-02 | 中国电建集团华东勘测设计研究院有限公司 | 一种基于全站仪自由设站的砼支撑轴力测试方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002022442A (ja) * | 2000-07-11 | 2002-01-23 | East Japan Railway Co | トータルステーション測量機による測量方法 |
| CN201059959Y (zh) * | 2007-07-05 | 2008-05-14 | 中国科学院武汉岩土力学研究所 | 一种全站仪和摄影测量变形监测两用靶标 |
| CN101680758A (zh) * | 2007-05-10 | 2010-03-24 | 莱卡地球系统公开股份有限公司 | 用于大地测量仪的位置确定方法 |
| CN201600126U (zh) * | 2010-01-05 | 2010-10-06 | 北京市勘察设计研究院有限公司 | 棱镜监测装置 |
-
2011
- 2011-08-17 CN CN2011102364263A patent/CN102409703A/zh active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002022442A (ja) * | 2000-07-11 | 2002-01-23 | East Japan Railway Co | トータルステーション測量機による測量方法 |
| CN101680758A (zh) * | 2007-05-10 | 2010-03-24 | 莱卡地球系统公开股份有限公司 | 用于大地测量仪的位置确定方法 |
| CN201059959Y (zh) * | 2007-07-05 | 2008-05-14 | 中国科学院武汉岩土力学研究所 | 一种全站仪和摄影测量变形监测两用靶标 |
| CN201600126U (zh) * | 2010-01-05 | 2010-10-06 | 北京市勘察设计研究院有限公司 | 棱镜监测装置 |
Non-Patent Citations (1)
| Title |
|---|
| 曾召启: "深基坑支护水平位移观测方法的研究", 《工程与建设》 * |
Cited By (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102620699A (zh) * | 2012-04-13 | 2012-08-01 | 靳纪洲 | 定向垂距法测量变形监测定向水平位移的方法 |
| CN103376064A (zh) * | 2012-04-20 | 2013-10-30 | 贵州中建建筑科研设计院有限公司 | 一种建筑基坑或边坡变形的监测方法及监测反射装置 |
| CN106284445A (zh) * | 2016-10-15 | 2017-01-04 | 韩少鹏 | 土木工程基坑施工过程监测装置以及监测方法 |
| CN106500651A (zh) * | 2016-11-16 | 2017-03-15 | 上海建工集团股份有限公司 | 一种结构几何变形的安全监控方法 |
| CN107144267B (zh) * | 2017-05-24 | 2020-03-27 | 中国二十冶集团有限公司 | 垂直设备安装方法 |
| CN107144267A (zh) * | 2017-05-24 | 2017-09-08 | 中国二十冶集团有限公司 | 垂直设备安装方法 |
| CN108318011A (zh) * | 2018-01-02 | 2018-07-24 | 中铁隧道局集团有限公司 | 一种通过无人机搭载全站仪监测施工场地周边位移的方法 |
| CN108318011B (zh) * | 2018-01-02 | 2020-05-15 | 中铁隧道局集团有限公司 | 一种通过无人机搭载全站仪监测施工场地周边位移的方法 |
| CN108824499A (zh) * | 2018-06-14 | 2018-11-16 | 合肥市测绘设计研究院 | 一种基于后方交会自由设站水平位移监测方法 |
| CN108981665B (zh) * | 2018-08-13 | 2020-03-31 | 山东大学 | 一种基于坐标测量的基坑顶部水平位移监测方法 |
| CN108981665A (zh) * | 2018-08-13 | 2018-12-11 | 山东大学 | 一种基于坐标测量的基坑顶部水平位移监测方法 |
| CN108914994A (zh) * | 2018-08-13 | 2018-11-30 | 山东大学 | 一种基于对边测距的基坑顶部水平位移监测方法 |
| CN108914994B (zh) * | 2018-08-13 | 2020-01-14 | 山东大学 | 一种基于对边测距的基坑顶部水平位移监测方法 |
| CN110057343B (zh) * | 2019-05-29 | 2021-03-26 | 中铁隧道局集团有限公司 | 一种使用全站仪测量角度监测平面位移的方法 |
| CN110057343A (zh) * | 2019-05-29 | 2019-07-26 | 中铁隧道局集团有限公司 | 一种使用全站仪测量角度监测平面位移的方法 |
| CN110468888A (zh) * | 2019-07-31 | 2019-11-19 | 青岛理工大学 | 一种微型钢管桩桩身位移监测装置及方法 |
| WO2021017984A1 (zh) * | 2019-07-31 | 2021-02-04 | 青岛理工大学 | 一种微型钢管桩桩身土压力和位移监测系统及方法 |
| WO2021017871A1 (zh) * | 2019-07-31 | 2021-02-04 | 青岛理工大学 | 一种微型钢管桩桩身位移监测装置及方法 |
| CN110468887A (zh) * | 2019-07-31 | 2019-11-19 | 青岛理工大学 | 一种微型钢管桩桩身土压力和位移监测方法 |
| CN110468887B (zh) * | 2019-07-31 | 2021-05-04 | 青岛理工大学 | 一种微型钢管桩桩身土压力和位移监测方法 |
| US12435484B2 (en) | 2019-07-31 | 2025-10-07 | Qingdao university of technology | System and method for monitoring earth pressure and displacement of miniature steel pipe pile body |
| CN111764447B (zh) * | 2020-07-20 | 2024-08-23 | 天津市地质工程勘察院 | 一种基坑支护桩桩顶水平位移监测方法 |
| CN111764447A (zh) * | 2020-07-20 | 2020-10-13 | 天津市地质工程勘察院 | 一种基坑支护桩桩顶水平位移监测方法 |
| CN111854664A (zh) * | 2020-07-30 | 2020-10-30 | 河北建设勘察研究院有限公司 | 一种桥梁桩基托换中墩柱的水平位移监测方法 |
| CN113188510A (zh) * | 2021-03-10 | 2021-07-30 | 浙江省建工集团有限责任公司 | 一种在大面积深基坑中新三角高程测量的施工方法 |
| CN113188510B (zh) * | 2021-03-10 | 2022-05-27 | 浙江省建工集团有限责任公司 | 一种在大面积深基坑中新三角高程测量的施工方法 |
| CN114541494A (zh) * | 2022-03-02 | 2022-05-27 | 中铁七局集团有限公司 | 用于深基坑悬臂围护桩桩体变形的监测方法 |
| CN114910003A (zh) * | 2022-05-25 | 2022-08-16 | 湖北工业大学 | 基于固定轨道的测量机器人位移监测方法及设备 |
| CN115406421A (zh) * | 2022-09-16 | 2022-11-29 | 中建三局集团有限公司 | 一种全站仪测量信号反射装置及其测量放样方法 |
| CN116202476A (zh) * | 2023-02-24 | 2023-06-02 | 中国电建集团华东勘测设计研究院有限公司 | 一种基于全站仪自由设站的砼支撑轴力测试方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102409703A (zh) | 一种基坑桩顶水平位移的监测方法及其监测装置 | |
| CN105526908B (zh) | 一种三维激光扫描和gps相结合的边坡监测方法 | |
| Titus et al. | Thirty-five-year creep rates for the creeping segment of the San Andreas fault and the effects of the 2004 Parkfield earthquake: Constraints from alignment arrays, continuous global positioning system, and creepmeters | |
| CN102434209B (zh) | 隧道开挖对近接既有构筑物影响的监测方法 | |
| CN103981906B (zh) | 预设测点式基坑支护变形测量方法 | |
| CN101067375B (zh) | 隧道无线激光放样装置 | |
| CN103591944B (zh) | 一种弧形建筑测量施工方法 | |
| CN111539052B (zh) | 地铁盾构区间近距离下穿顶管隧道沉降控制标准制定方法 | |
| CN108645393A (zh) | 一种顶管机姿态三维测量系统及方法 | |
| CN105783889A (zh) | 一种已知点不通视条件下的施工放样新方法 | |
| CN110261876A (zh) | 高精度位置无关的gnss监测虚拟基准方法 | |
| CN103557800A (zh) | 多层楼板分层水平位移监测方法 | |
| JP2022037699A (ja) | 測量システム、丁張設置支援方法、丁張設置支援プログラム | |
| JP7505957B2 (ja) | トンネル施工における巻立空間測定方法 | |
| CN203443579U (zh) | 一种基于单侧壁导坑法的隧道收敛监测系统 | |
| CN203443580U (zh) | 一种用于开挖过程中的隧道收敛监测系统 | |
| CN203420265U (zh) | 一种基坑边缘变形的监测系统 | |
| CN103628511B (zh) | 一种用于桩基护筒的放样投点方法 | |
| CN206593659U (zh) | 一种用于全球卫星导航定位系统的基准站 | |
| CN119981908A (zh) | 基于bim的居民区及沿海潮汐区浅埋隧道综合施工方法 | |
| CN108488483A (zh) | 一种管道非开挖施工方法 | |
| CN102636161B (zh) | 利用吊线法测设平面控制点的方法 | |
| CN206876176U (zh) | 一种标靶型正垂管预埋置中装置 | |
| CN109577388A (zh) | 一种快速静态gps基坑水平位移安全性监测方法 | |
| CN203024756U (zh) | 一种矿山开采沉陷监测信息移动采集终端系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120411 |