CN102312776A - 一种风力发电机电磁刹车装置 - Google Patents

一种风力发电机电磁刹车装置 Download PDF

Info

Publication number
CN102312776A
CN102312776A CN201110240818A CN201110240818A CN102312776A CN 102312776 A CN102312776 A CN 102312776A CN 201110240818 A CN201110240818 A CN 201110240818A CN 201110240818 A CN201110240818 A CN 201110240818A CN 102312776 A CN102312776 A CN 102312776A
Authority
CN
China
Prior art keywords
fan
controller
semiconductor
oxide
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110240818A
Other languages
English (en)
Other versions
CN102312776B (zh
Inventor
徐剑雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Fengsheng Energy Saving Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011102408187A priority Critical patent/CN102312776B/zh
Publication of CN102312776A publication Critical patent/CN102312776A/zh
Application granted granted Critical
Publication of CN102312776B publication Critical patent/CN102312776B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开了一种风力发电机电磁刹车装置,风速仪对环境风速进行监测,风机转速测试仪对风机风叶转速进行监测,风速仪与控制器连接,风机转速测试仪与控制器连接,控制器通过卸荷开关与风机线圈连接,控制器通过刹车开关与风机线圈连接,控制器通过负载开关与用户负载连接,其优点在于控制器对风速仪测得的环境风速进行判断,当风速超过安全值时,控制器在切断负载开关的同时,会输出一个分级递增双窄脉冲对卸荷开关进行间断性的闭合,使风机发电机的转速下降,当风机转速测试仪检测到的风叶转速降到安全值时,控制器再次输出一个分级递增双窄脉冲对刹车开关进行间断性的闭合,刹车开关的启动,将风机风叶转速逐渐降低直至完全停止转动。

Description

一种风力发电机电磁刹车装置
技术领域
本发明涉及一种风力发电机,尤其是涉及一种风力发电机电磁刹车装置。
背景技术
随着国际国内对于可再生绿色能源的不断需求,国内风电行业特别是中小型风电行业发展的越来越快,人们对于中小型风力发电机组的硬件控制技术要求越来越高。 
风力发电机在发电运行时,如果进行临时检修或遇到突发的自然状况如过高的风速时,需要对风力发电机进行制动以使风力发电机叶片停止转动。现有的中小型风力发电机,当遇到不可预料的大股强风时,风速仪检测到风速超过安全风速时,风力发电机会立即启动刹车。但是,在这个刹车过程中,往往因为刹车速度过快,刹车的机械部分将风机轮毂立即制动;而风叶部分往往会因为巨大的惯性继续转动,这会导致叶片折断。
为此,迫切需要解决因风速过大,在风力发电机的叶片过速转动的过程时,突然刹车而导致风力发电机叶片折断的问题。
发明内容
本发明所要解决的技术问题是提供一种避免叶片因风速过大而被折断的风力发电机电磁刹车装置。
本发明解决上述技术问题所采用的技术方案为:一种风力发电机电磁刹车装置,其特征在于包括控制器、风速仪、风机转速测试仪、卸荷开关和刹车开关,风速仪对环境风速进行监测,所述的风机转速测试仪对风机风叶转速进行监测,所述的风速仪与控制器连接,所述的风机转速测试仪与控制器连接,所述的控制器通过所述的卸荷开关与风机线圈连接,所述的控制器通过所述的刹车开关与风机线圈连接,所述的控制器通过负载开关与用户负载连接。
远程控制系统与所述的控制器连接。
所述的控制器包括以ARM芯片LPC2132FBD64为主的微处理器。
所述的负载开关包括第一MOS管,卸荷开关包括第二MOS管和第一电阻,所述的刹车开关包括第三MOS管,ARM处理器的第一控制端与第一MOS管的栅极连接,第一MOS管的漏极与用户负载的一端连接,第一MOS管的源极与风机线圈的B端连接,用户负载的另一端与风机线圈的A端连接,ARM处理器的第二控制端与第二MOS管的栅极连接,第二MOS管的漏极与第一电阻一端连接,第一电阻另一端与风机线圈的A端连接,第二MOS管的源极与风机线圈的B端连接,ARM处理器的第三控制端与第三MOS管的栅极连接,第三MOS管的源极与风机线圈的A端连接,第三MOS管的漏极与风机线圈的B端连接。
与现有技术相比,本发明的优点在于控制器对风速仪测得的环境风速进行判断,当风速超过安全值时,控制器会输出一个分级递增双窄脉冲(脉冲信号占空比按照1%、1.5%、2%......90%逐级递增)对卸荷开关进行间断性的闭合,一方面保护了负载用户,另一方面使风机发电机的转速下降,当风机转速测试仪检测到的风叶转速降到安全值时,控制器再次输出一个分级递增双窄脉冲对刹车开关进行间断性的闭合,刹车开关的启动,将风机风叶转速逐渐降低直至完全停止转动。
在风机内部,风机轮毂与风机的转子相连,当有风时,风力吹动叶片,使风机轮毂带动风机内部发电机转子运动,进行发电。当进行脉冲刹车时,卸荷开关闭合,风机线圈通电,产生了与发电机定子磁场方向相反的新磁场,阻碍转子运动,对轮毂产生一个制动力,从而减缓风机叶片的转动,达到刹车的目的。
本发明采用分级递增双窄脉冲方式控制刹车开关,利用逐渐增加占空比的方式,分级闭合,逐渐增加刹车开关闭合的时长,可以使风机逐渐降低速度,最终当占空比达到90%后,风机速度已经很低了,最终当占空比达到100%时,风机会彻底制动,刹车成功。
在刹车的过程中,采用分级递增双窄脉冲方式控制开关闭合,使刹车持续一段时间,然后放开,反复进行,可以给叶片一个缓冲的时间,不至于由于刹车过快而使叶片折断。
附图说明
图1为本发明的结构框图;
图2为本发明的局部电路图;
图3为本发明的风力发电机刹车工作原理示意图。
具体实施方式
以下结合附图实施例对本发明作进一步详细描述。
一种风力发电机电磁刹车装置,包括控制器1、风速仪2、风机转速测试仪3、卸荷开关4和刹车开关5,风速仪2对环境风速进行监测,风机转速测试仪3对风机风叶转速进行监测,风速仪2与控制器1连接,风机转速测试仪3与控制器1连接,控制器1通过卸荷开关4与风机线圈T1连接,控制器1通过刹车开关5与风机线圈T1连接,控制器1通过负载开关6与用户负载7连接。
远程控制系统8与控制器1连接。
控制器1包括型号为LPC2132FBD64的ARM处理器。
负载开关6包括第一MOS管Q1,卸荷开关4包括第二MOS管Q2和第一电阻R1,刹车开关5包括第三MOS管Q3,ARM处理器的第一控制端PL1与第一MOS管Q1的栅极连接,第一MOS管Q1的漏极与用户负载7的一端连接,第一MOS管Q1的源极与风机线圈T1的B端连接,用户负载7的另一端与风机线圈T1的A端连接,ARM处理器的第二控制端PL2与第二MOS管Q2的栅极连接,第二MOS管Q2的漏极与第一电阻R1一端连接,第一电阻R1另一端与风机线圈T1的A端连接,第二MOS管Q2的源极与风机线圈T1的B端连接,ARM处理器的第三控制端PL1与第三MOS管Q3的栅极连接,第三MOS管Q3的源极与风机线圈T1的A端连接,第三MOS管Q3的漏极与风机线圈T1的B端连接。
电路原理:如图2所示,首先,控制器1输出PL1信号,对Q1进行关断,同时PL2 双窄脉冲对Q2进行间断性的闭合和断开,启动卸荷开关4,通过逐级递增双窄脉冲进行电荷卸载,可以使风力发电机的发电通过卸荷开关4,拉低供电电压一方面保护了负载用户,另一方面可以使风力发电机逐渐降低风速。
其次,启动卸荷开关4后,控制器1会根据风机转速测试仪3采样所得的数据判断风机转速是否降低到刹车允许的范围内。当风机转速到达指定范围内时,控制器会输出另一路双窄脉冲PL3,PL3脉冲信号通过第三MOS管Q3对刹车开关进行间断性的闭合和断开。
最后,当PL3脉冲信号使场效应管闭合时,从电路图中可以看出,刹车开关5闭合后与风机形成了一个闭合的回路,此时风机发电仅供自己消耗。根据电磁刹车理论,当开关闭合时,风机线圈通过电流,产生磁场,并且新产生磁场方向与风机发电机磁场方向相反。如图3所示,正常情况下,风机转子顺时针旋转,当进行电磁刹车时,通电线圈产生的磁场与原磁场方向相反阻碍转子的运动,因此产生了制动力,即风机转子受到的洛伦兹力与旋转方向相反,阻碍风机转动,从而逐渐降低风机转速,达到最终刹车的目的。

Claims (4)

1.一种风力发电机电磁刹车装置,其特征在于包括控制器、风速仪、风机转速测试仪、卸荷开关和刹车开关,风速仪对环境风速进行监测,所述的风机转速测试仪对风机风叶转速进行监测,所述的风速仪与控制器连接,所述的风机转速测试仪与控制器连接,所述的控制器通过所述的卸荷开关与风机线圈连接,所述的控制器通过所述的刹车开关与风机线圈连接,所述的控制器通过负载开关与用户负载连接。
2.根据权利要求1所述的风力发电机电磁刹车装置,其特征在于远程控制系统与所述的控制器连接。
3.根据权利要求1所述的风力发电机电磁刹车装置,其特征在于所述的控制器包括型号为LPC2132FBD64的ARM处理器。
4.根据权利要求3所述的风力发电机电磁刹车装置,其特征在于所述的负载开关包括第一MOS管,卸荷开关包括第二MOS管和第一电阻,所述的刹车开关包括第三MOS管,ARM处理器的第一控制端与第一MOS管的栅极连接,第一MOS管的漏极与用户负载的一端连接,第一MOS管的源极与风机线圈的B端连接,用户负载的另一端与风机线圈的A端连接,ARM处理器的第二控制端与第二MOS管的栅极连接,第二MOS管的漏极与第一电阻一端连接,第一电阻另一端与风机线圈的A端连接,第二MOS管的源极与风机线圈的B端连接,ARM处理器的第三控制端与第三MOS管的栅极连接,第三MOS管的源极与风机线圈的A端连接,第三MOS管的漏极与风机线圈的B端连接。
CN2011102408187A 2011-08-22 2011-08-22 一种风力发电机电磁刹车装置 Expired - Fee Related CN102312776B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102408187A CN102312776B (zh) 2011-08-22 2011-08-22 一种风力发电机电磁刹车装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102408187A CN102312776B (zh) 2011-08-22 2011-08-22 一种风力发电机电磁刹车装置

Publications (2)

Publication Number Publication Date
CN102312776A true CN102312776A (zh) 2012-01-11
CN102312776B CN102312776B (zh) 2013-03-27

Family

ID=45426259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102408187A Expired - Fee Related CN102312776B (zh) 2011-08-22 2011-08-22 一种风力发电机电磁刹车装置

Country Status (1)

Country Link
CN (1) CN102312776B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632525A (zh) * 2015-02-05 2015-05-20 战金玉 风力发电机磁粉刹车系统
CN106401870A (zh) * 2015-07-29 2017-02-15 通用电气公司 使用副控制器调整风速和/或风向输入值的风轮机控制
CN110794304A (zh) * 2019-11-13 2020-02-14 西安万翔航空科技有限公司 一种微特电机模拟负载
CN114837978A (zh) * 2022-05-10 2022-08-02 长虹美菱股份有限公司 一种冰箱风机故障检测装置及其检测方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004104975A (ja) * 2002-09-12 2004-04-02 Ishida Seisakusho:Kk 風力発電装置
CN101514687A (zh) * 2009-04-10 2009-08-26 重庆大学 一种兆瓦级风力发电机组的刹车系统及控制方法
WO2010093621A1 (en) * 2009-02-10 2010-08-19 West Virginia University Method for circulation controlled vertical axis wind turbines
CN202203047U (zh) * 2011-08-22 2012-04-25 徐剑雄 一种风力发电机电磁刹车装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004104975A (ja) * 2002-09-12 2004-04-02 Ishida Seisakusho:Kk 風力発電装置
WO2010093621A1 (en) * 2009-02-10 2010-08-19 West Virginia University Method for circulation controlled vertical axis wind turbines
CN101514687A (zh) * 2009-04-10 2009-08-26 重庆大学 一种兆瓦级风力发电机组的刹车系统及控制方法
CN202203047U (zh) * 2011-08-22 2012-04-25 徐剑雄 一种风力发电机电磁刹车装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104632525A (zh) * 2015-02-05 2015-05-20 战金玉 风力发电机磁粉刹车系统
CN106401870A (zh) * 2015-07-29 2017-02-15 通用电气公司 使用副控制器调整风速和/或风向输入值的风轮机控制
CN110794304A (zh) * 2019-11-13 2020-02-14 西安万翔航空科技有限公司 一种微特电机模拟负载
CN114837978A (zh) * 2022-05-10 2022-08-02 长虹美菱股份有限公司 一种冰箱风机故障检测装置及其检测方法

Also Published As

Publication number Publication date
CN102312776B (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102312781B (zh) 风力涡轮机和用于操作风力涡轮机的方法
EP2400150A2 (en) Overspeed protection system and method for wind turbines
EP2375063A1 (en) Wind-power generation device and control method for wind-power generation device
US10677214B2 (en) Hydroelectric power generation apparatus and power generation system
CN102312776B (zh) 一种风力发电机电磁刹车装置
CN202203047U (zh) 一种风力发电机电磁刹车装置
CN202031771U (zh) 风力发电机组独立偏航控制装置
CN108361150B (zh) 偏航控制装置、执行装置、偏航系统及方法
CN103174587B (zh) 风力发电系统及其控制方法
CN105545594B (zh) 一种风力发电机制动能量回收利用系统
CN104791192A (zh) 一种风力机限速与刹车保护控制的装置及方法
EP2476900A1 (en) Wind turbine
CN202545111U (zh) 永磁变桨风力发电机组失电顺桨控制系统
CN103899488B (zh) 风力发电机
CN201874748U (zh) 风力发电机离心式调速变桨距机构
CN102889181B (zh) 一种抗强风小型风力发电机
CN102121456B (zh) 一种抗强风小型风力发电机
CN201650588U (zh) 无刷风力发电机控制装置
TWI498477B (zh) 風力發電系統
KR20090081791A (ko) 이중 날개를 이용한 수평축 풍력 발전 장치
CN203206054U (zh) 一种使用在水平轴风力发电机上的电磁刹车装置
CN202424607U (zh) 一种内置于小型风力发电机内的卸荷控制装置
CN201943896U (zh) 一种抗强风小型风力发电机
CN202108661U (zh) 用于风力发电的偏航控制系统
CN102536687A (zh) 用于风机、潮流发电机构的低流速空载启动装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20120111

Assignee: NINGBO WINPOWER GROUP CO., LTD.

Assignor: Xu Jianxiong

Contract record no.: 2014330000059

Denomination of invention: Electromagnetic brake device for wind power generator

Granted publication date: 20130327

License type: Exclusive License

Record date: 20140331

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150929

Address after: 315040, No. 11, rainbow South Road, Jiangdong District, Zhejiang, Ningbo (5-17)

Patentee after: ZHEJIANG FENGSHENG ENERGY SAVING TECHNOLOGY CO., LTD.

Address before: 315103, Ningbo, Zhejiang province National hi tech Development Zone Mei Hui Industrial Zone, East Road (Holly Road)

Patentee before: Xu Jianxiong

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20160822

CF01 Termination of patent right due to non-payment of annual fee