CN102235151A - 砂卵石漂石层超前成孔方法 - Google Patents
砂卵石漂石层超前成孔方法 Download PDFInfo
- Publication number
- CN102235151A CN102235151A CN2010101517322A CN201010151732A CN102235151A CN 102235151 A CN102235151 A CN 102235151A CN 2010101517322 A CN2010101517322 A CN 2010101517322A CN 201010151732 A CN201010151732 A CN 201010151732A CN 102235151 A CN102235151 A CN 102235151A
- Authority
- CN
- China
- Prior art keywords
- forming method
- leading
- self
- hole
- type hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 239000004576 sand Substances 0.000 title abstract description 7
- 238000010276 construction Methods 0.000 claims abstract description 28
- 238000013461 design Methods 0.000 claims abstract description 13
- 238000003466 welding Methods 0.000 claims abstract description 3
- 238000009434 installation Methods 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000012360 testing method Methods 0.000 claims description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000011378 shotcrete Substances 0.000 claims description 3
- 238000003892 spreading Methods 0.000 claims description 2
- 238000005553 drilling Methods 0.000 abstract description 17
- 239000004567 concrete Substances 0.000 abstract description 6
- 238000002360 preparation method Methods 0.000 abstract description 2
- 238000005507 spraying Methods 0.000 abstract 1
- 238000009740 moulding (composite fabrication) Methods 0.000 description 15
- 239000002689 soil Substances 0.000 description 5
- 239000011435 rock Substances 0.000 description 4
- 238000007569 slipcasting Methods 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000009933 burial Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000002245 particle Substances 0.000 description 3
- 238000007596 consolidation process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 241000125205 Anethum Species 0.000 description 1
- 241001269238 Data Species 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010151732 CN102235151B (zh) | 2010-04-21 | 2010-04-21 | 砂卵石漂石层超前成孔方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010151732 CN102235151B (zh) | 2010-04-21 | 2010-04-21 | 砂卵石漂石层超前成孔方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102235151A true CN102235151A (zh) | 2011-11-09 |
| CN102235151B CN102235151B (zh) | 2013-05-08 |
Family
ID=44886212
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010151732 Active CN102235151B (zh) | 2010-04-21 | 2010-04-21 | 砂卵石漂石层超前成孔方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102235151B (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105019917A (zh) * | 2015-08-13 | 2015-11-04 | 青岛业高建设工程有限公司 | 冲击钻进式超前旋喷管棚施工装置及施工方法 |
| CN106401462A (zh) * | 2016-10-31 | 2017-02-15 | 广西固瑞科技股份有限公司 | 一种跟踪钻头的钻孔方法 |
| CN107605509A (zh) * | 2017-11-08 | 2018-01-19 | 中铁十局集团有限公司 | 砂卵石地层小曲线半径浅埋隧道暗挖法超前支护施工方法 |
| CN111577335A (zh) * | 2020-05-27 | 2020-08-25 | 蒋贵伟 | 一种隧道施工小导管注浆机 |
| CN116241298A (zh) * | 2023-02-16 | 2023-06-09 | 山东黄金矿业(莱州)有限公司焦家金矿 | 一种用于受限空间内裂隙岩体的注浆锚杆施工系统及方法 |
| CN119825414A (zh) * | 2025-01-21 | 2025-04-15 | 太原理工大学 | 软岩顶板的超前钢钎支护与负压引导注浆加固的治理方法 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02252891A (ja) * | 1989-03-28 | 1990-10-11 | Fujita Corp | トンネル切羽の安定工法 |
| JP2000337077A (ja) * | 1999-05-26 | 2000-12-05 | Ohbayashi Corp | トンネルの施工方法 |
| US20030085037A1 (en) * | 2001-08-06 | 2003-05-08 | Roane Thomas O. | Multilateral open hole gravel pack completion |
| CN1419034A (zh) * | 2002-11-29 | 2003-05-21 | 赵大军 | 一种松散破碎地层的潜孔锤冲击静压跟管钻孔方法 |
| CN101328811A (zh) * | 2008-07-25 | 2008-12-24 | 北京市政建设集团有限责任公司 | Tgrm分段前进式超前深孔注浆施工工艺 |
| JP2009281055A (ja) * | 2008-05-22 | 2009-12-03 | Taisei Corp | 井戸トンネルの構築方法及び保護管ユニット |
-
2010
- 2010-04-21 CN CN 201010151732 patent/CN102235151B/zh active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02252891A (ja) * | 1989-03-28 | 1990-10-11 | Fujita Corp | トンネル切羽の安定工法 |
| JP2000337077A (ja) * | 1999-05-26 | 2000-12-05 | Ohbayashi Corp | トンネルの施工方法 |
| US20030085037A1 (en) * | 2001-08-06 | 2003-05-08 | Roane Thomas O. | Multilateral open hole gravel pack completion |
| CN1419034A (zh) * | 2002-11-29 | 2003-05-21 | 赵大军 | 一种松散破碎地层的潜孔锤冲击静压跟管钻孔方法 |
| JP2009281055A (ja) * | 2008-05-22 | 2009-12-03 | Taisei Corp | 井戸トンネルの構築方法及び保護管ユニット |
| CN101328811A (zh) * | 2008-07-25 | 2008-12-24 | 北京市政建设集团有限责任公司 | Tgrm分段前进式超前深孔注浆施工工艺 |
Non-Patent Citations (2)
| Title |
|---|
| 张利娜等: "全套管钻机在砂卵石地层中成孔施工工艺初探", 《铁道标准设计》, no. 2, 28 February 2010 (2010-02-28) * |
| 阙庆珍: "密实砂卵石地层中超前小导管施工技术研究", 《山西建筑》, vol. 36, no. 3, 31 January 2010 (2010-01-31) * |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105019917A (zh) * | 2015-08-13 | 2015-11-04 | 青岛业高建设工程有限公司 | 冲击钻进式超前旋喷管棚施工装置及施工方法 |
| CN106401462A (zh) * | 2016-10-31 | 2017-02-15 | 广西固瑞科技股份有限公司 | 一种跟踪钻头的钻孔方法 |
| CN106401462B (zh) * | 2016-10-31 | 2018-09-21 | 广西固瑞科技股份有限公司 | 一种跟踪钻头的钻孔方法 |
| CN107605509A (zh) * | 2017-11-08 | 2018-01-19 | 中铁十局集团有限公司 | 砂卵石地层小曲线半径浅埋隧道暗挖法超前支护施工方法 |
| CN111577335A (zh) * | 2020-05-27 | 2020-08-25 | 蒋贵伟 | 一种隧道施工小导管注浆机 |
| CN111577335B (zh) * | 2020-05-27 | 2021-08-10 | 山东美固德新材料有限公司 | 一种隧道施工小导管注浆机 |
| CN116241298A (zh) * | 2023-02-16 | 2023-06-09 | 山东黄金矿业(莱州)有限公司焦家金矿 | 一种用于受限空间内裂隙岩体的注浆锚杆施工系统及方法 |
| CN119825414A (zh) * | 2025-01-21 | 2025-04-15 | 太原理工大学 | 软岩顶板的超前钢钎支护与负压引导注浆加固的治理方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102235151B (zh) | 2013-05-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103835729B (zh) | 深部长距离巷道围岩地面预注浆加固工艺 | |
| CN103089275B (zh) | 富水极破碎围岩隧道塌方段围岩控制方法 | |
| CN104612698B (zh) | 一种浅埋暗挖隧道上台阶中隔壁施工方法 | |
| CN102080518B (zh) | 煤层顶板复杂分支井抽采瓦斯方法 | |
| CN103088819B (zh) | 预应力锚索施工方法 | |
| CN107218045B (zh) | 岩质地层暗挖地铁车站出入口暗挖段的快速施工方法 | |
| CN101737005B (zh) | 一种用于套取锚索的钻具及跟管套取锚索的施工方法 | |
| CN103306687A (zh) | 软岩隧道长悬臂水平旋喷变形控制施工方法 | |
| CN106285617A (zh) | 天然气水平井完井方法 | |
| CN201714307U (zh) | 重型风钻配套支架 | |
| CN109441512B (zh) | 钢筋混凝土对穿锚索及其施工方法 | |
| CN101260784A (zh) | 隧道超前支护风循环钻进施工方法及钻具 | |
| CN103899318B (zh) | 中硬地层隧道铣挖及配套机械化施工工法 | |
| CN102278130A (zh) | 隧道高压富水溶腔加筋注浆工艺方法 | |
| CN106837382B (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
| CN107023300A (zh) | 一种采用棚护法建造地铁车站的施工方法 | |
| CN106917627B (zh) | 一种富水地层暗挖施工下导洞的超前支护方法 | |
| CN107605509A (zh) | 砂卵石地层小曲线半径浅埋隧道暗挖法超前支护施工方法 | |
| CN103321235A (zh) | 一种复合土钉墙边坡支护方法 | |
| CN102235151A (zh) | 砂卵石漂石层超前成孔方法 | |
| CN103410522A (zh) | 浅埋暗挖法连续近距离下穿铁路桥的施工方法 | |
| CN104234726A (zh) | 一种穿越富水不整合接触带隧道的洞内降排水施工方法 | |
| CN107165661A (zh) | 一种高地应力软弱围岩大变形隧道超长扩大头锚索施工方法 | |
| CN109057802A (zh) | 大断面浅埋隧道下穿高速公路施工方法 | |
| CN207513614U (zh) | 浅埋隧道暗挖法超前支护结构及复合式超前小导管 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent of invention or patent application | ||
| CB02 | Change of applicant information |
Address after: 610015 Sichuan province Chengdu City Shuncheng Street No. 206 Sichuan International Building, 19 floor Applicant after: Chengdu Ranken Railway Construction Group Co., Ltd. Address before: 610015 Sichuan province Chengdu City Shuncheng Street No. 206 Sichuan International Building, 19 floor Applicant before: Chengdu Ranken Railway Construction, Ltd. |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: CHENGDU RANKEN RAILWAY CONSTRUCTION, LTD. TO: CHENGDU RANKEN RAILWAY CONSTRUCTION GROUP CO., LTD. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 610015 Sichuan province Chengdu City Shuncheng Street No. 206 Sichuan International Building, 19 floor Patentee after: RANKEN RAILWAY CONSTRUCTION GROUP CO., LTD. Address before: 610015 Sichuan province Chengdu City Shuncheng Street No. 206 Sichuan International Building, 19 floor Patentee before: Chengdu Ranken Railway Construction Group Co., Ltd. |