[go: up one dir, main page]

CN102206839A - 一种镁电解槽的砌筑方法 - Google Patents

一种镁电解槽的砌筑方法 Download PDF

Info

Publication number
CN102206839A
CN102206839A CN 201110172125 CN201110172125A CN102206839A CN 102206839 A CN102206839 A CN 102206839A CN 201110172125 CN201110172125 CN 201110172125 CN 201110172125 A CN201110172125 A CN 201110172125A CN 102206839 A CN102206839 A CN 102206839A
Authority
CN
China
Prior art keywords
pillow
support
electrolytic tank
brick
bricks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110172125
Other languages
English (en)
Inventor
周天华
姜宝伟
郭晓光
王石金
姚云广
周月坤
段系宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZUNBAO TITANIUM CO Ltd
Original Assignee
ZUNBAO TITANIUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZUNBAO TITANIUM CO Ltd filed Critical ZUNBAO TITANIUM CO Ltd
Priority to CN 201110172125 priority Critical patent/CN102206839A/zh
Publication of CN102206839A publication Critical patent/CN102206839A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

一种镁电解槽的砌筑方法,首先在电解槽底用枕砖砌筑好支撑立柱(5),之后在支撑立柱(5)上铺架支撑枕砖(4),支撑枕砖(4)应在同一水平面上,在支撑立柱(5)间隔区域形成沉渣区6,砌筑好支撑枕砖后再安装阴极(3)和双极(2),最后插入阳极(1),阴极(3)、阳极(1)和双极(2)工作面的对齐,采用本发明的方法砌筑的电解槽能保证双极和钢阴极支撑结构,在电解槽长期运行的过程中,双极和钢阴极位置不发生滑移和挪位,枕砖支撑立柱下方区域形成沉渣区,在生产过程中产生的渣聚集沉降于沉渣区,使电解质得以良好循环,确保电解槽的使用寿命,提高电流效率和良好的产品质量。

Description

一种镁电解槽的砌筑方法
技术领域
本发明属于有色金属领域,特别涉及镁电解槽的安装。
背景技术
长期以来,镁电解槽使用寿命问题,是镁电解生产长期以来存在的一个疑难的问题 ,在生产操作过程中,常常会出现因漏槽、帘墙破损或电解室四角内衬破损等问题,如果电解槽的枕砖材质选择不当及砌筑的方式不对,引起电解室尺寸改变、电极位移、槽温过高、产品质量下降、电流效率降低等问题,从而影响电解槽的运行和使用寿命。
发明内容
本发明的目的主要是针对目前电解槽使用寿命存在的问题,提供了一种镁电解槽的砌筑方法。
本发明的技术方案是:一种镁电解槽的砌筑方法,首先在电解槽底用枕砖砌筑好支撑立柱,之后在支撑立柱上铺架支撑枕砖,支撑枕砖应在同一水平面上,在支撑立柱间隔区域形成沉渣区,砌筑好后再安装阴极和双极,最后插入阳极,阴极、阳极和双极工作面的对齐。
本发明的优点和积极效果在于,电解槽的电极支撑枕砖具有良好的耐热性和耐腐蚀性能,针对在生产过程中高热电解质对槽体的冲刷和侵蚀,能保证双极和钢阴极支撑结构,在电解槽长期运行的过程中,双极和钢阴极位置不发生滑移和挪位,在支撑立柱下方区域形成沉渣区,在生产过程中产生的渣聚集沉降于沉渣区,使电解质得以良好循环,确保电流效率和良好的产品质量,从而保证电解槽的使用寿命。
附图说明
图1是采用本发明的方法砌筑的镁电解槽下部主剖视图
图2是图1的视图
1-阳极、2-双极、3-阴极、4-支撑枕砖、5-支撑立柱、6-沉渣区。
具体实施方式
下面结合附图对本发明的技术方案进一步详细说明。
一种镁电解槽的砌筑方法,首先在电解槽底用枕砖砌筑好支撑立柱5,之后在支撑立柱5上铺架支撑枕砖4,支撑枕砖4应在同一水平面上,在支撑立柱5间隔区域形成沉渣区6,砌筑好后再安装阴极3和双极2,最后插入阳极1,阴极3、阳极1和双极2工作面的对齐。
在本发明中,为保证具有稳定的支撑作用和较长的寿命,枕砖选择具有高熔点、低热膨胀、优良的抗腐蚀性能和抗蠕变性能的莫来石作材质。

Claims (2)

1.一种镁电解槽的砌筑方法,其特征在于首先在电解槽底用枕砖砌筑好支撑立柱(5),之后在支撑立柱(5)上铺架支撑枕砖(4),支撑枕砖(4)应在同一水平面上,在支撑立柱(5)间隔区域形成沉渣区6,砌筑好支撑枕砖后再安装阴极(3)和双极(2),最后插入阳极(1),阴极(3)、阳极(1)和双极(2)工作面的对齐。
2.根据权利要求1所述砌筑方法,其特征在于所述枕砖材质是莫来石。
CN 201110172125 2011-06-24 2011-06-24 一种镁电解槽的砌筑方法 Pending CN102206839A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110172125 CN102206839A (zh) 2011-06-24 2011-06-24 一种镁电解槽的砌筑方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110172125 CN102206839A (zh) 2011-06-24 2011-06-24 一种镁电解槽的砌筑方法

Publications (1)

Publication Number Publication Date
CN102206839A true CN102206839A (zh) 2011-10-05

Family

ID=44695889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110172125 Pending CN102206839A (zh) 2011-06-24 2011-06-24 一种镁电解槽的砌筑方法

Country Status (1)

Country Link
CN (1) CN102206839A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102534663A (zh) * 2012-01-17 2012-07-04 青海北辰科技有限公司 电解氯化镁生产金属镁的装置
CN104032329A (zh) * 2014-06-17 2014-09-10 华东理工大学 上插阴极式镁电解槽
CN107557812A (zh) * 2017-08-28 2018-01-09 攀钢集团研究院有限公司 一种延长镁电解槽使用寿命的方法
CN107849718A (zh) * 2015-07-28 2018-03-27 东邦钛株式会社 熔融盐电解槽、以及使用其的金属镁的制造方法以及海绵钛的制造方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101802270A (zh) * 2007-09-14 2010-08-11 艾尔坎国际有限公司 多极轻金属还原槽中的旁路电流控制

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101802270A (zh) * 2007-09-14 2010-08-11 艾尔坎国际有限公司 多极轻金属还原槽中的旁路电流控制

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102534663A (zh) * 2012-01-17 2012-07-04 青海北辰科技有限公司 电解氯化镁生产金属镁的装置
CN102534663B (zh) * 2012-01-17 2016-03-16 青海北辰科技有限公司 电解氯化镁生产金属镁的装置
CN104032329A (zh) * 2014-06-17 2014-09-10 华东理工大学 上插阴极式镁电解槽
CN107849718A (zh) * 2015-07-28 2018-03-27 东邦钛株式会社 熔融盐电解槽、以及使用其的金属镁的制造方法以及海绵钛的制造方法
CN107849718B (zh) * 2015-07-28 2019-05-14 东邦钛株式会社 熔融盐电解槽、以及使用其的金属镁的制造方法以及海绵钛的制造方法
US10837084B2 (en) 2015-07-28 2020-11-17 Toho Titanium Co., Ltd. Molten salt electrolyzer, and method for producing metal magnesium using the same and method for producing a titanium sponge
CN107557812A (zh) * 2017-08-28 2018-01-09 攀钢集团研究院有限公司 一种延长镁电解槽使用寿命的方法
CN107557812B (zh) * 2017-08-28 2019-09-17 攀钢集团研究院有限公司 一种延长镁电解槽使用寿命的方法

Similar Documents

Publication Publication Date Title
JP6501886B2 (ja) 溶融塩電解槽、およびそれを用いた金属マグネシウムの製造方法並びにスポンジチタンの製造方法
CN102534663A (zh) 电解氯化镁生产金属镁的装置
CN102206839A (zh) 一种镁电解槽的砌筑方法
CN202465911U (zh) 25ka氟盐体系稀土熔盐电解槽
CN201141045Y (zh) 一种铝电解槽的导流型组合式阴极
CN101845641B (zh) 沉浸式稀土电解槽
CN112522741A (zh) 一种封闭式稀土氯化物体系电解槽
CN107541755A (zh) 一种内加热式熔盐电解槽
CN201367468Y (zh) 水平出电铝电解槽阴极结构
CN101503809A (zh) 一种具有倒角开槽阴极的新型节能铝电解槽
CN203878226U (zh) 一种电解槽结构
CN102925931B (zh) 侧插潜没式下阴极稀土熔盐电解槽
CN213680931U (zh) 一种封闭式稀土氯化物体系电解槽
CN201883156U (zh) 一种铝电解槽的阳极结构
CN204982087U (zh) 一种铜电解液循环装置
CN201390784Y (zh) 一种铝电解槽阴极结构
CN101985762A (zh) 一种连续阳极立式v型双斜面铝电解槽
CN201367471Y (zh) 阴极炭块结构
CN101899677A (zh) 一种铝电解槽复合阴极炭块结构
CN201358306Y (zh) 一种具有倒角开槽阴极的新型节能铝电解槽
CN101768759B (zh) 一种铝电解槽节能降耗的方法
CN101949035B (zh) 铝电解用新型组合石墨化异型阴极
CN110029360B (zh) 墙式铝电解阴极
CN101781773A (zh) 一种水平出电铝电解槽阴极结构
CN202465897U (zh) 氧化铝电解槽装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111005