CN102174892A - 旋切式石门揭煤法 - Google Patents
旋切式石门揭煤法 Download PDFInfo
- Publication number
- CN102174892A CN102174892A CN2011100570590A CN201110057059A CN102174892A CN 102174892 A CN102174892 A CN 102174892A CN 2011100570590 A CN2011100570590 A CN 2011100570590A CN 201110057059 A CN201110057059 A CN 201110057059A CN 102174892 A CN102174892 A CN 102174892A
- Authority
- CN
- China
- Prior art keywords
- coal
- hole
- cavity
- cross
- measure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
本发明公开了一种旋切式石门揭煤法,属于石门揭煤法;旨在提供一种施工周期短、工作效率高、经济性好的石门揭煤法。其方法是:在石门揭煤工作断面钻至少一个措施孔和至少一个排渣孔;通过措施孔对煤层进行割缝作业形成空间,通过排渣孔排出割缝作业所产生的煤粉;通过措施孔将充气模型送入已形成的空腔中,并对充气模型进行充气;通过排渣孔向空腔中的剩余空间区域灌注混凝土;待混凝土凝固以后再进行掘进作业,揭露煤层。本发明不仅可减少淹没射流对割缝效果的影响,而且还避免了措施孔因排粉量小于割缝作业产生的煤粉量而导致钻杆抱死、喷嘴堵塞等诸多问题;是一种理想的石门揭煤方法。
Description
技术领域:本发明涉及一种揭露煤矿井下煤层的方法,尤其涉及一种石门揭煤法。
背景技术:目前,我国揭露煤层的方法主要存在施工周期长,人力、物力及财力投入大,工作效率低等诸多缺陷。
发明内容:针对现有技术中存在的上述缺陷,本发明旨在提供一种施工周期短、人力、物力及财力投入少的旋切式石门揭煤法。
为了实现上述目的,本发明采用以下技术方案:
1)在石门揭煤工作断面的中线位置钻至少一个措施孔达设计深度、在揭煤工作断面靠近煤层底板的位置钻至少一个排渣孔达设计深度;
2)通过所述措施孔对煤层进行割缝作业直至在煤层中形成一个达设计容量的空腔,通过所述排渣孔排出割缝作业所产生的煤粉;
3)通过措施孔将充气模型送入所述空腔内,利用化学反应产生的气体对充气模型进行充气,直至该充气模型将空腔的前、后壁撑满;
4)从排渣孔向空腔中注入混凝土,直至混凝土将由所述充气模型的上、下、左、右四个面分别与空腔的顶壁、底壁、左壁、右壁之间形成的剩余空间填满;
5)待所述混凝土凝固以后再进行掘进作业,揭露煤层。
在上述技术方案中,措施孔的末端与排渣孔的末端之间的距离≥1.5m;为了便于排出煤粉,排渣孔相对于水平面前高后低倾斜设置。
与现有技术比较,本发明由于采用了上述技术方案,因此不仅可减少施工量、缩短施工周期,降低了人力、物力及财力投入,而且还减少了淹没射流对割缝效果的影响;另外,由于可通过排渣孔排出煤粉,因此降低了措施孔的排粉量,从而避免了措施孔因排粉量小于割缝作业产生的煤粉量而导致钻杆抱死、喷嘴堵塞等诸多问题。
附图说明:
图1是本发明的钻孔布置图;
图2是本发明完成煤层切割作业后的效果图;
图3是本发明完成充气模型充气以及灌注混凝土后的效果图;
图4是本发明的最终效果图;
图5是图3中的A-A剖视图。
图中:煤层1 岩石层2 揭煤工作断面3 措施孔4 排渣孔5空腔6 充气模型7 混凝土8
具体实施方式:下面结合附图和具体的实施例对本发明作进一步说明:
1)如图1所示,利用专利号为“ZL200720043590.1”的高压磨料射流钻割一体化割防突设备以及专利号为“ZL200720043589.9”的压控钻割一体化钻头在石门揭煤工作断面3(即掘进头)的中线位置,沿作业推进方向穿过岩石层2钻至少一个措施孔4达设计深度、利用螺旋钻杆在揭煤工作断面3靠近煤层底板的位置沿作业的推进方向穿过岩石层2钻至少一个排渣孔5达设计深度;
2)如图2所示,利用所述高压磨料射流钻割一体化割防突设备和压控钻割一体化钻头通过措施孔4对煤层1进行常规割缝作业,直至在煤层1中形成达设计容量的空腔6;在割缝作业的同时开启钻机带动螺旋钻杆高速空转,使割缝作业所产生的煤粉在螺旋钻杆的作用下通过排渣孔5排出,以减轻措施孔4的排粉负担;
3)如图3、图5所示,分别将压控钻割一体化钻头和螺旋钻杆从措施孔4、排渣孔5中撤出,将由高强度锦纶织物与橡胶复合而成的气囊状充气模型7通过措施孔4送入空腔6内;利用化学反应产生的气体对充气模型7进行充气,直至充气模型7膨胀后将空腔6的前后壁撑满;充气模型7的左右侧面与空腔6的左右壁之间、以及充气模型7的上下面与空腔6的顶底壁之间均留有空隙;
4)如图3、图5所示,从排渣孔5向空腔6中注入混凝土8,直至混凝土8将由充气模型7的上、下、左、右四个面分别与空腔6的顶壁、底壁、左壁、右壁之间形成的剩余空间填满;
5)如图4、图5所示,待混凝土8在空腔6中凝固形成一个“回”字型的支护框以后,再按常规方法进行掘进作业,揭露煤层。
在上述实施例中,措施孔4末端与排渣孔5末端之间的距离≥1.5m;措施孔4以及排渣孔5的数量可根据巷道断面的大小及煤层割缝作业的实际效果进行实时调整。为了便于排出煤粉,排渣孔5相对于水平面按前高后低的方式倾斜设置。
Claims (3)
1.一种旋切式石门揭煤法,其特征在于具体步骤如下:
1)在石门揭煤工作断面的中线位置钻至少一个措施孔达设计深度、在揭煤工作断面靠近煤层底板的位置钻至少一个排渣孔达设计深度;
2)通过所述措施孔对煤层进行割缝作业直至在煤层中形成一个达设计容量的空腔,通过所述排渣孔排出割缝作业所产生的煤粉;
3)通过措施孔将充气模型送入所述空腔内,利用化学反应产生的气体对充气模型进行充气,直至该充气模型将空腔的前、后壁撑满;
4)从排渣孔向空腔中注入混凝土,直至混凝土将由所述充气模型的上、下、左、右四个面分别与空腔的顶壁、底壁、左壁、右壁之间形成的剩余空间填满;
5)待所述混凝土凝固以后再进行掘进作业,揭露煤层。
2.根据权利要求1所述的旋切式石门揭煤法,其特征在于:措施孔的末端与排渣孔的末端之间的距离≥1.5m。
3.根据权利要求1或2所述的旋切式石门揭煤法,其特征在于:排渣孔相对于水平面前高后低倾斜设置。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011100570590A CN102174892A (zh) | 2011-03-10 | 2011-03-10 | 旋切式石门揭煤法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011100570590A CN102174892A (zh) | 2011-03-10 | 2011-03-10 | 旋切式石门揭煤法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102174892A true CN102174892A (zh) | 2011-09-07 |
Family
ID=44518112
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011100570590A Pending CN102174892A (zh) | 2011-03-10 | 2011-03-10 | 旋切式石门揭煤法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102174892A (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103291301A (zh) * | 2012-02-22 | 2013-09-11 | 重庆巨能建设(集团)有限公司 | 导硐揭煤技术 |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3900226A (en) * | 1973-02-26 | 1975-08-19 | Shell Oil Co | Hydraulic mining method |
| CA2243016A1 (en) * | 1998-07-14 | 2000-01-14 | Brian Palmer | Concrete block mining method |
| WO2001069042A1 (en) * | 2000-03-13 | 2001-09-20 | Oil Sands Underground Mining, Inc. | Method and system for mining hydrocarbon-containing materials |
| CN101105138A (zh) * | 2007-08-15 | 2008-01-16 | 湖南科技大学 | 抑制煤与瓦斯突出的方法 |
| CN201090239Y (zh) * | 2007-10-11 | 2008-07-23 | 中国矿业大学 | 高压磨料射流钻割一体化割缝防突设备 |
| CN201090139Y (zh) * | 2007-10-11 | 2008-07-23 | 中国矿业大学 | 压控钻割一体化钻头 |
| CN201620902U (zh) * | 2010-01-10 | 2010-11-03 | 张士林 | 塑料胀壳式气囊锚杆 |
| CN101979835A (zh) * | 2010-09-21 | 2011-02-23 | 安徽省煤田地质局第一勘探队 | 钻孔连通淘煤排气防止煤与瓦斯突出方法 |
-
2011
- 2011-03-10 CN CN2011100570590A patent/CN102174892A/zh active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3900226A (en) * | 1973-02-26 | 1975-08-19 | Shell Oil Co | Hydraulic mining method |
| CA2243016A1 (en) * | 1998-07-14 | 2000-01-14 | Brian Palmer | Concrete block mining method |
| WO2001069042A1 (en) * | 2000-03-13 | 2001-09-20 | Oil Sands Underground Mining, Inc. | Method and system for mining hydrocarbon-containing materials |
| CN101105138A (zh) * | 2007-08-15 | 2008-01-16 | 湖南科技大学 | 抑制煤与瓦斯突出的方法 |
| CN201090239Y (zh) * | 2007-10-11 | 2008-07-23 | 中国矿业大学 | 高压磨料射流钻割一体化割缝防突设备 |
| CN201090139Y (zh) * | 2007-10-11 | 2008-07-23 | 中国矿业大学 | 压控钻割一体化钻头 |
| CN201620902U (zh) * | 2010-01-10 | 2010-11-03 | 张士林 | 塑料胀壳式气囊锚杆 |
| CN101979835A (zh) * | 2010-09-21 | 2011-02-23 | 安徽省煤田地质局第一勘探队 | 钻孔连通淘煤排气防止煤与瓦斯突出方法 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103291301A (zh) * | 2012-02-22 | 2013-09-11 | 重庆巨能建设(集团)有限公司 | 导硐揭煤技术 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111322048B (zh) | 一种坚硬顶板冲击地压分段控向压裂治理方法 | |
| CN104314573B (zh) | 一种基于水力切割的硬岩隧道施工方法 | |
| CN102080525B (zh) | 一种高压气体喷射掏穴卸压防突方法 | |
| CN113464136B (zh) | 地面定向钻井与井下巷道联用的流态化采煤系统及方法 | |
| CN113653490B (zh) | 一种近距离煤层群冲击地压地面防治方法 | |
| CN104612692B (zh) | 分段崩矿底部结构跟随形成连续充填采矿法 | |
| KR101065007B1 (ko) | 플러싱 공기 분사 방향 및 분사압 제어 드릴링 비트를 구비한 지반 천공 장치, 이를 포함한 구조용 파이프체 지반 삽입장치, 및 연약 지반 보강 방법 | |
| CN109139033A (zh) | 一种冲击破碎式岩巷掘锚机 | |
| CN112943246A (zh) | 冲击危险煤层工作面超前中深孔卸压与降尘一体化方法 | |
| CN111140232B (zh) | 一种钻-扩-充水力扩孔割煤的采煤方法 | |
| CN102168560A (zh) | 置换式石门揭煤方法 | |
| CN109723382B (zh) | 一种水平导流孔的施工方法 | |
| KR101745426B1 (ko) | 암반 굴착기 및 암반 굴착방법 | |
| US20130106166A1 (en) | Horizontal Borehole Mining System and Method | |
| CN103046552A (zh) | 钻喷一体化地基处理钻具组件 | |
| CN102174892A (zh) | 旋切式石门揭煤法 | |
| CN117345242A (zh) | 一种特厚煤层综放工作面端头悬空顶煤高效垮落方法 | |
| CN103104289A (zh) | 一种矿井水害治理方法 | |
| CN105350516A (zh) | 一种岩土层注料改性加固方法 | |
| CN104389515B (zh) | 一种液压钻机冲击锤 | |
| CN108505941B (zh) | 一种海上风电钻机钻孔施工工艺 | |
| CN202767877U (zh) | 液压步履式冲击反循环修槽机 | |
| CN204738752U (zh) | 一种冲击型喷射钻头 | |
| CN112879073B (zh) | 井下煤矿开采煤层或岩层的注水方法 | |
| KR20130027763A (ko) | 에어 순환용 해머비트 구조 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110907 |