CN102140916A - 一种露天矿开采工艺及设备 - Google Patents
一种露天矿开采工艺及设备 Download PDFInfo
- Publication number
- CN102140916A CN102140916A CN2010105892257A CN201010589225A CN102140916A CN 102140916 A CN102140916 A CN 102140916A CN 2010105892257 A CN2010105892257 A CN 2010105892257A CN 201010589225 A CN201010589225 A CN 201010589225A CN 102140916 A CN102140916 A CN 102140916A
- Authority
- CN
- China
- Prior art keywords
- drum
- machine
- coal
- mining
- coal mining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005065 mining Methods 0.000 title claims abstract description 81
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000003245 coal Substances 0.000 claims abstract description 76
- 238000005516 engineering process Methods 0.000 claims description 26
- 230000003028 elevating effect Effects 0.000 claims description 24
- 238000004519 manufacturing process Methods 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 6
- 230000000737 periodic effect Effects 0.000 claims description 3
- 238000005422 blasting Methods 0.000 abstract description 2
- 238000011084 recovery Methods 0.000 abstract description 2
- 238000007599 discharging Methods 0.000 abstract 1
- 238000004080 punching Methods 0.000 abstract 1
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000013467 fragmentation Methods 0.000 description 2
- 238000006062 fragmentation reaction Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003818 cinder Substances 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000003325 tomography Methods 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种露天矿开采工艺及设备,工艺主要包括有,工作面布置,开切口、采高、采宽,工艺构成设备包括有:轮斗式剥离机、滚筒式剥离机、平推式连续采煤机、滚筒式露天采煤机、移动式转载机、移动式漏料装置、自动式皮带机、皮带走廊和排料机,其初始工作面布置开切口,运输车辆以尾部对着滚筒式露天采煤机尾部的移动式转载机,运输车辆排在滚筒式露天采煤机的后面,排列的长度要适应滚筒式露天采煤机和移动式转载机的长度;本发明对所采煤层不需穿孔爆破,在矿体上直接开采;采出的煤不需进行破碎,并可根据用户对煤块的要求选型设备;可选择性开采断层、夹层,提高煤炭回收率。
Description
技术领域
本发明涉及一种煤矿开采工艺,尤其涉及一种露天煤矿开采工艺。
背景技术
我国露天开采工艺的发展过程,从建国初期主要以単斗挖掘-铁道运输工艺为主,发展至20世纪80年代以来转向以単斗挖掘-汽车运输工艺为主,半连续开采工艺、综合开采工艺、拉斗铲倒堆工艺等,出现目前各种露天开采主流工艺并存局面的特点。露天开采工艺系统的发展,取决于开采设备制造能力的提高程度.以往我国露天采煤的年生产能力在全国煤炭生产能力中所占比例不高,露采设备制造能力跟不上,国外设备占据大部分份额。
近30 年来,世界各国在露天开采设备制造方而日趋理性化,由20世纪80年代前后一度片面追求大型化转向追求最佳匹配与经济最优化。我国露天煤矿开采工艺发展过程中,存在的主要问题是自主研发的开采设备少,质量不过关,制造能力无法适应大型露天采矿事业发展的需要,设备维修水平有待提高,露天煤矿采煤作业生产条件落后、生产率低下。
发明内容
本发明的目的在于克服传统露天煤矿采煤作业生产条件落后、生产率低下的问题,亦即传统露天采煤工艺采出的煤由于块度较大,需要进行多次重复破碎,本发明提供了一种露天矿开采工艺及设备。
本发明解决其技术问题的技术方案可以是:
一种露天矿开采工艺及设备,工艺主要包括有,工作面布置,开切口、采高、采宽,工艺构成设备包括有,轮斗式剥离机、滚筒式剥离机、平推式连续采煤机、滚筒式露天采煤机、移动式转载机、移动式漏料装置、自动式皮带机、皮带走廊和排料机,其初始工作面布置开切口,运输车辆以尾部对着滚筒式露天采煤机尾部的移动式转载机,运输车辆排在滚筒式露天采煤机的后面,排列的长度要适应滚筒式露天采煤机和移动式转载机的长度,要留有一台车的空间,以保证运输车辆装车时有前后调动的余量,滚筒式露天采煤机在开始采煤前,将移动式转载机调整好高度和角度,对准运输车辆的车厢,开始采煤,装车,滚筒式露天采煤机向前进采煤,相应的运输车辆向后倒车,始终跟随滚筒式露天采煤机装车,完成开切口工作;做好初始工作面后,滚筒式露天采煤机在给运输车辆装煤时,运输车停在采空区一侧,停车方向也是运输车的尾部对着滚筒式露天采煤机尾部的移动式转载机。可同时停两台车,当一台车装满后,转动移动式转载机对准另一台车进行装载,满载车开走后,再并排停另一辆空车,这样循环工作,来完成采煤,装车,运输的生产过程为半连续开采。
本发明解决其技术问题的技术方案也可以是:
所述的一种露天矿开采工艺及设备,所述的露天矿开采工艺可以是半连续开采工艺也可以是连续开采工艺,在开好切口,做好初始工作后,采高时工作面设置滚筒式露天采煤机,采宽时工作面设置平推式连续采煤机,与工作面平行铺设移动式转载机,依次设置移动式漏料装置、自移式皮带机,露天坑上铺设皮带走廊,与排料机搭接,滚筒式露天采煤机沿工作面切割煤层,通过移动式转载机将切落的煤转运到移动式输送机上,输送到坑上的煤由排料机堆放到煤场,实现连续开采。
本发明的有益效果是:
1、对所采煤层不需穿孔爆破,在矿体上直接开采;
2、采出的煤不需进行破碎,并可根据用户对煤块的要求选型设备。
3、可选择性开采断层、夹层,提高煤炭回收率。
附图说明
图1为本发明连续开采工艺系统示意图。
图2为本发明连续剥离工艺系统示意图。
具体实施方式
图1图2中,一种露天矿开采工艺及设备,工艺主要包括有,工作面布置,开切口、采高、采宽,工艺构成设备包括有,轮斗式剥离机、滚筒式剥离机、平推式连续采煤机、滚筒式露天采煤机、移动式转载机、移动式漏料装置、自动式皮带机、皮带走廊和排料机,其初始工作面布置开切口,运输车辆以尾部对着滚筒式露天采煤机尾部的移动式转载机,运输车辆排在滚筒式露天采煤机的后面,排列的长度要适应滚筒式露天采煤机和移动式转载机的长度,要留有一台车的空间,以保证运输车辆装车时有前后调动的余量,滚筒式露天采煤机在开始采煤前,将移动式转载机调整好高度和角度,对准运输车辆的车厢,开始采煤,装车,滚筒式露天采煤机向前进采煤,相应的运输车辆向后倒车,始终跟随滚筒式露天采煤机装车,完成开切口工作;做好初始工作面后,滚筒式露天采煤机在给运输车辆装煤时,运输车停在采空区一侧,停车方向也是运输车的尾部对着滚筒式露天采煤机尾部的移动式转载机。可同时停两台车,当一台车装满后,转动移动式转载机对准另一台车进行装载,满载车开走后,再并排停另一辆空车,这样循环工作,来完成采煤,装车,运输的生产过程为半连续开采。所述的一种露天矿开采工艺及设备,其所述的露天矿开采工艺,可以是半连续开采工艺也可以是连续开采工艺,在开好切口,做好初始工作后,采高时工作面设置滚筒式露天采煤机,采宽时工作面设置平推式连续采煤机,与工作面平行铺设移动式转载机,依次设置移动式漏料装置、自移式皮带机,露天坑上铺设皮带走廊,与排料机搭接,滚筒式露天采煤机沿工作面切割煤层,通过移动式转载机将切落的煤转运到移动式输送机上,输送到坑上的煤由排料机堆放到煤场,实现连续开采。
Claims (2)
1.一种露天矿开采工艺及设备,工艺主要包括有:剥离及采煤,工作面布置:开切口、采高、采宽。工艺构成主要设备包括有:轮斗式剥离机、滚筒式剥离机、平推式连续采煤机、滚筒式露天采煤机、移动式转载机、移动式漏料装置、自动式皮带机、皮带走廊和排料机。半连续开采其特征是:初始工作面布置开切口,运输车辆以尾部对着滚筒式露天采煤机尾部的移动式转载机,运输车辆排在滚筒式露天采煤机的后面,排列的长度要适应滚筒式露天采煤机和移动式转载机的长度,要留有一台车的空间,以保证运输车辆装车时有前后调动的余量,滚筒式露天采煤机在开始采煤前,将移动式转载机调整好高度和角度,对准运输车辆的车厢,开始采煤、装车,滚筒式露天采煤机向前进采煤,相应的运输车辆向后倒车,始终跟随滚筒式露天采煤机装车,完成开切口工作;做好初始工作面后,滚筒式露天采煤机在给运输车辆装煤时,运输车停在采空区一侧,停车方向也是运输车的尾部对着滚筒式露天采煤机尾部的移动式转载机。可同时停两台车,当一台车装满后,转动移动式转载机对准另一台车进行装载,满载车开走后,再并排停另一辆空车,这样循环工作,来完成采煤,装车,运输的生产过程为半连续开采。
2.根据权利要求1所述的一种露天矿开采工艺及设备,其特征是:所述的露天矿开采工艺及设备,可以是半连续开采工艺也可以是连续开采工艺,在开好切口,做好初始工作后,采高时工作面设置滚筒式露天采煤机,采宽时工作面设置平推式连续采煤机,与工作面平行铺设移动式转载机,依次设置移动式漏料装置、自移式皮带机,露天坑上铺设皮带走廊,与排料机搭接,滚筒式露天采煤机沿工作面切割煤层,通过移动式转载机将切落的煤转运到移动式输送机上,输送到坑上的煤由排料机堆放到煤场,实现连续开采。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010105892257A CN102140916A (zh) | 2010-12-15 | 2010-12-15 | 一种露天矿开采工艺及设备 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010105892257A CN102140916A (zh) | 2010-12-15 | 2010-12-15 | 一种露天矿开采工艺及设备 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102140916A true CN102140916A (zh) | 2011-08-03 |
Family
ID=44408682
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010105892257A Pending CN102140916A (zh) | 2010-12-15 | 2010-12-15 | 一种露天矿开采工艺及设备 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102140916A (zh) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102733808A (zh) * | 2012-07-09 | 2012-10-17 | 薛世忠 | 一种闭坑露天矿山矿石回采方法 |
| CN102889084A (zh) * | 2012-09-05 | 2013-01-23 | 中国煤炭科工集团太原研究院 | 露天煤矿薄煤层的连续开采工艺方法 |
| CN103388478A (zh) * | 2013-07-30 | 2013-11-13 | 中国神华能源股份有限公司 | 露天煤矿应用吊斗铲的运输道路形成方法 |
| CN103726850A (zh) * | 2013-10-09 | 2014-04-16 | 中国矿业大学 | 一种层状近水平矿床条区间三角矿量露天开采方法 |
| CN104612693A (zh) * | 2014-12-13 | 2015-05-13 | 中国煤炭科工集团太原研究院有限公司 | 一种露天矿连续式采煤工艺方法 |
| CN106759245A (zh) * | 2016-12-16 | 2017-05-31 | 中国矿业大学 | 露天煤矿开采冻结含水层的保水方法 |
| CN108386194A (zh) * | 2018-03-29 | 2018-08-10 | 新疆金能矿业有限公司 | 一种露天煤矿模块化大断面连续采煤系统和方法 |
| CN108756875A (zh) * | 2018-03-30 | 2018-11-06 | 中国矿业大学 | 一种内排露天煤矿中厚煤层连续开采装置及方法 |
| CN110984992A (zh) * | 2019-12-10 | 2020-04-10 | 内蒙古黄陶勒盖煤炭有限责任公司 | 连续式采煤工艺 |
| CN115726785A (zh) * | 2022-10-28 | 2023-03-03 | 国能经济技术研究院有限责任公司 | 拉斗铲开采工艺预留行走通道的作业方法 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3134642A1 (de) * | 1981-08-29 | 1983-03-10 | O & K Orenstein & Koppel Ag, 1000 Berlin | Schwerbruchgrossbagger |
| US5165757A (en) * | 1990-09-19 | 1992-11-24 | Man Gutehoffnungshutte Aktiengesellschaft | Method of strip mining |
| US5409298A (en) * | 1992-09-16 | 1995-04-25 | Bhp Australia Coal Limited | Open cut mining apparatus |
| CN2747357Y (zh) * | 2004-08-19 | 2005-12-21 | 神华集团有限责任公司 | 掘进机采煤连续运输系统 |
| CN101701522A (zh) * | 2009-10-15 | 2010-05-05 | 吉林省东宇兴产机械设备有限公司 | 滚筒可调高式露天煤矿采煤、剥离机 |
| CN101899976A (zh) * | 2010-07-15 | 2010-12-01 | 煤炭科学研究总院太原研究院 | 露天煤矿的连续采煤工艺方法 |
-
2010
- 2010-12-15 CN CN2010105892257A patent/CN102140916A/zh active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3134642A1 (de) * | 1981-08-29 | 1983-03-10 | O & K Orenstein & Koppel Ag, 1000 Berlin | Schwerbruchgrossbagger |
| US5165757A (en) * | 1990-09-19 | 1992-11-24 | Man Gutehoffnungshutte Aktiengesellschaft | Method of strip mining |
| US5409298A (en) * | 1992-09-16 | 1995-04-25 | Bhp Australia Coal Limited | Open cut mining apparatus |
| CN2747357Y (zh) * | 2004-08-19 | 2005-12-21 | 神华集团有限责任公司 | 掘进机采煤连续运输系统 |
| CN101701522A (zh) * | 2009-10-15 | 2010-05-05 | 吉林省东宇兴产机械设备有限公司 | 滚筒可调高式露天煤矿采煤、剥离机 |
| CN101899976A (zh) * | 2010-07-15 | 2010-12-01 | 煤炭科学研究总院太原研究院 | 露天煤矿的连续采煤工艺方法 |
Non-Patent Citations (1)
| Title |
|---|
| 蔡玉生: "采用滚筒式露天采煤机的开采工艺", 《科技发》, no. 22, 30 November 2010 (2010-11-30), pages 136 - 138 * |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102733808B (zh) * | 2012-07-09 | 2016-10-19 | 薛世忠 | 一种闭坑露天矿山矿石回采方法 |
| CN102733808A (zh) * | 2012-07-09 | 2012-10-17 | 薛世忠 | 一种闭坑露天矿山矿石回采方法 |
| CN106121652A (zh) * | 2012-07-09 | 2016-11-16 | 薛世忠 | 一种闭坑露天矿山矿石回采方法 |
| CN102889084A (zh) * | 2012-09-05 | 2013-01-23 | 中国煤炭科工集团太原研究院 | 露天煤矿薄煤层的连续开采工艺方法 |
| CN103388478A (zh) * | 2013-07-30 | 2013-11-13 | 中国神华能源股份有限公司 | 露天煤矿应用吊斗铲的运输道路形成方法 |
| CN103388478B (zh) * | 2013-07-30 | 2015-07-15 | 中国神华能源股份有限公司 | 露天煤矿应用吊斗铲的运输道路形成方法 |
| CN103726850A (zh) * | 2013-10-09 | 2014-04-16 | 中国矿业大学 | 一种层状近水平矿床条区间三角矿量露天开采方法 |
| CN104612693A (zh) * | 2014-12-13 | 2015-05-13 | 中国煤炭科工集团太原研究院有限公司 | 一种露天矿连续式采煤工艺方法 |
| CN106759245A (zh) * | 2016-12-16 | 2017-05-31 | 中国矿业大学 | 露天煤矿开采冻结含水层的保水方法 |
| CN108386194A (zh) * | 2018-03-29 | 2018-08-10 | 新疆金能矿业有限公司 | 一种露天煤矿模块化大断面连续采煤系统和方法 |
| CN108386194B (zh) * | 2018-03-29 | 2019-10-29 | 新疆金能矿业有限公司 | 一种露天煤矿模块化大断面连续采煤系统和方法 |
| CN108756875A (zh) * | 2018-03-30 | 2018-11-06 | 中国矿业大学 | 一种内排露天煤矿中厚煤层连续开采装置及方法 |
| CN110984992A (zh) * | 2019-12-10 | 2020-04-10 | 内蒙古黄陶勒盖煤炭有限责任公司 | 连续式采煤工艺 |
| CN110984992B (zh) * | 2019-12-10 | 2021-04-20 | 内蒙古黄陶勒盖煤炭有限责任公司 | 连续式采煤工艺 |
| CN115726785A (zh) * | 2022-10-28 | 2023-03-03 | 国能经济技术研究院有限责任公司 | 拉斗铲开采工艺预留行走通道的作业方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102140916A (zh) | 一种露天矿开采工艺及设备 | |
| CN104533429B (zh) | 一种双巷道联合快速掘进排矸系统及方法 | |
| CN101899976B (zh) | 露天煤矿的连续采煤工艺方法 | |
| CN109488301A (zh) | 一种矿山采选充处开采方法 | |
| CN108150172A (zh) | 一种单一急倾斜厚煤层采煤方法 | |
| CN104612693B (zh) | 一种露天矿连续式采煤工艺方法 | |
| CN103216238A (zh) | 一种露天煤矿开采工艺 | |
| CN107201901A (zh) | 近距离高瓦斯煤层群薄煤层无人工作面开采设备及方法 | |
| CN101761343A (zh) | 超大直径土压平衡盾构快速连续出土施工方法 | |
| CN102086765A (zh) | 一种极薄铜矿体高分段多分层采矿法 | |
| CN105422096B (zh) | 一种综放开采多口同时放煤工艺 | |
| CN108071399A (zh) | 一种露天煤矿自移式连续采煤装煤设备及其布置方法 | |
| CN103498672A (zh) | 一种破装运一体化采煤机及其采煤方法 | |
| CN101858216A (zh) | 一种房式采煤法遗留的呆滞煤柱回收方法 | |
| CN201599055U (zh) | 井下用煤炭装载输送复合装置 | |
| CN102777184B (zh) | 矿山的开采系统和方法 | |
| CN205714207U (zh) | 一种矿用tbm的岩渣排出系统 | |
| CN204299585U (zh) | 煤矿井下岩巷综掘装载线 | |
| CN202628170U (zh) | 一种可移动自卸式矸石仓机构 | |
| CN110529114A (zh) | 一种特厚煤层联合放顶的间隔等量放煤工艺 | |
| CN103433111B (zh) | 自移式破碎机 | |
| CN203476334U (zh) | 露天矿开采工作面用自移式转载机 | |
| CN110026409A (zh) | 一种含铁有用岩干选回收系统 | |
| CN102305073B (zh) | 一种单进路挑檐式结构的有底柱阶段崩落采矿法 | |
| CN110026292A (zh) | 一种用于含铁有用岩干选回收的选矿方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110803 |