CN102071822A - 换流站用直流滤波器构架 - Google Patents

换流站用直流滤波器构架 Download PDF

Info

Publication number
CN102071822A
CN102071822A CN 201010604536 CN201010604536A CN102071822A CN 102071822 A CN102071822 A CN 102071822A CN 201010604536 CN201010604536 CN 201010604536 CN 201010604536 A CN201010604536 A CN 201010604536A CN 102071822 A CN102071822 A CN 102071822A
Authority
CN
China
Prior art keywords
montant
cross bar
connecting rod
oblique connecting
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010604536
Other languages
English (en)
Inventor
曾程
朱海华
韦文兵
刘宗辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Electric Power Design Institute
Original Assignee
Guangdong Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute filed Critical Guangdong Electric Power Design Institute
Priority to CN 201010604536 priority Critical patent/CN102071822A/zh
Publication of CN102071822A publication Critical patent/CN102071822A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种换流站用直流滤波器构架,包括横梁及至少两个塔架,横梁设于至少两个塔架上,每个塔架包括四根竖杆,即第一竖杆、第二竖杆、第三竖杆及第四竖杆,第一竖杆、第二竖杆、第三竖杆及第四竖杆的横断面的连线形成矩形,第一竖杆与第二竖杆之间、第二竖杆与第三竖杆之间、第三竖杆与第四竖杆之间、第四竖杆与第一竖杆之间均通过多条第一斜向连接杆及多条第二斜向连接杆连接,且相邻的第一斜向连接杆与第二斜向连接杆交叉。本发明占地面积小,重量轻。

Description

换流站用直流滤波器构架
技术领域
本发明涉及一种换流站用直流滤波器构架。
背景技术
随着国家的土地政策愈加趋紧,现在变电站的征地越来越困难,如何减少站内构架的占地面积成为变电站节省土地的关键所在,目前国内的变电站构架一般采用焊接多边形钢管人字柱+三角形格构式钢横梁的结构形式,此类构架结构形式简单,设计、计算、加工均较容易,在国内各级电压等级的变电站中得到了广泛的应用。
由于直流换流站电压等级高,设备类型与常规交流变电站有所不同,站内出现了一些悬挂超高,重量超重的电气设备,设备对其悬挂支撑体系要求高,如果继续沿用钢管人字柱构架很不经济,柱根开将超过7m,构架自重将超过100吨,其受力及体型均较大。
发明内容
本发明的目的在于克服现有技术的缺陷,提供一种换流站用直流滤波器构架,本发明占地面积小,重量轻。
其技术方案如下。
一种换流站用直流滤波器构架,包括横梁及至少两个塔架,横梁设于至少两个塔架上,每个塔架包括四根竖杆,即第一竖杆、第二竖杆、第三竖杆及第四竖杆,第一竖杆、第二竖杆、第三竖杆及第四竖杆的横断面的连线形成矩形,第一竖杆与第二竖杆之间、第二竖杆与第三竖杆之间、第三竖杆与第四竖杆之间、第四竖杆与第一竖杆之间均通过多条第一斜向连接杆及多条第二斜向连接杆连接,且相邻的第一斜向连接杆与第二斜向连接杆交叉。
下面对本发明进一步技术方案进行说明。
相邻的所述第一斜向连接杆相互平行,相邻的所述第二斜向连接杆相互平行。
越往上端,所述第一竖杆、第二竖杆、第三竖杆及第四竖杆之间的距离越近。
所述第一竖杆与第二竖杆之间、第二竖杆与第三竖杆之间、第三竖杆与第四竖杆之间、第四竖杆与第一竖杆之间、第一竖杆与第三竖杆之间、第二竖杆与第四竖杆之间还通过横向连接杆连接。
所述横梁包括四根横杆,即第一横杆、第二横杆、第三横杆及第四横杆,第一横杆、第二横杆、第三横杆及第四横杆的横断面的连线形成矩形,第一横杆与第二横杆之间、第二横杆与第三横杆之间、第三横杆与第四横杆之间、第四横杆与第一横杆之间均通过多条第一斜向连接杆及多条第二斜向连接杆连接,且相邻的第一斜向连接杆与第二斜向连接杆交叉。
所述塔架为三个,分别支撑在所述横梁的两端及中段。
所述第一横杆与第二横杆之间、第二横杆与第三横杆之间、第三横杆与第四横杆之间、第四横杆与第一横杆之间、第一横杆与第三横杆之间、第二横杆与第四横杆之间还通过横向连接杆连接。
下面对本发明的优点进行说明。
1、由于塔架采用四根竖杆,且四根竖杆之间通过多根第一斜向连接杆、第二斜向连接杆连接,使四根竖杆与第一斜向连接杆、第二斜向连接杆之间形成稳定的三角结构,可以承受更大的力,且塔架整体结构的强度更高。
2、采用前述结构后,塔架的四根竖杆之间的角度可以远远小于现有结构中人字形柱的角度,在同等高度的情况下,可以大大的减少塔架底部的面积,进而减少构架的占地面积,同时,四根竖杆及第一斜向连接杆、第二斜向连接杆的直径可以降低,减轻了构架的重量。
附图说明
图1是本发明实施例所述换流站用直流滤波器构架的结构图。
图2是图1中A处的局部放大图。
附图标记说明:1、塔架,2、横梁,3、第一竖杆,4、第二竖杆,5、第三竖杆,6、第四竖杆,7、第一斜向连接杆,8、第二斜向连接杆,9、横向连接杆。
具体实施方式
下面结合附图对本发明的实施例进行详细说明。
如图1、图2所示,一种换流站用直流滤波器构架,包括横梁2及至少两个塔架1,横梁2设于至少两个塔架1上,每个塔架1包括四根竖杆,即第一竖杆3、第二竖杆4、第三竖杆5及第四竖杆6,第一竖杆3、第二竖杆4、第三竖杆5及第四竖杆6的横断面的连线形成矩形,第一竖杆3与第二竖杆4之间、第二竖杆4与第三竖杆5之间、第三竖杆5与第四竖杆6之间、第四竖杆6与第一竖杆3之间均通过多条第一斜向连接杆7及多条第二斜向连接杆8连接,且相邻的第一斜向连接杆7与第二斜向连接杆8交叉。
其中,所述塔架1为三个,分别支撑在横梁2的两端及中段。相邻的第一斜向连接杆7相互平行,相邻的第二斜向连接杆8相互平行。越往上端,第一竖杆3、第二竖杆4、第三竖杆5及第四竖杆6之间的距离越近。第一竖杆3与第二竖杆4之间、第二竖杆4与第三竖杆5之间、第三竖杆5与第四竖杆6之间、第四竖杆6与第一竖杆3之间、第一竖杆3与第三竖杆5之间、第二竖杆4与第四竖杆6之间还通过横向连接杆9连接。
所述横梁2包括四根横杆,即第一横杆、第二横杆、第三横杆及第四横杆,第一横杆、第二横杆、第三横杆及第四横杆的横断面的连线形成矩形,第一横杆与第二横杆之间、第二横杆与第三横杆之间、第三横杆与第四横杆之间、第四横杆与第一横杆之间均通过多条第一斜向连接杆7及多条第二斜向连接杆8连接,且相邻的第一斜向连接杆7与第二斜向连接杆8交叉。第一横杆与第二横杆之间、第二横杆与第三横杆之间、第三横杆与第四横杆之间、第四横杆与第一横杆之间、第一横杆与第三横杆之间、第二横杆与第四横杆之间还通过横向连接杆9连接。
本实施例具有如下优点。
1、由于塔架1采用四根竖杆,且四根竖杆之间通过多根第一斜向连接杆7、第二斜向连接杆8连接,使四根竖杆与第一斜向连接杆7、第二斜向连接杆8之间形成稳定的三角结构,可以承受更大的力,且塔架1整体结构的强度更高。
2、采用前述结构后,塔架1的四根竖杆之间的角度可以远远小于现有结构中人字形柱的角度,在同等高度的情况下,可以大大的减少塔架1底部的面积,进而减少构架的占地面积,同时,四根竖杆及第一斜向连接杆7、第二斜向连接杆8的直径可以降低,减轻了构架的重量。
以上仅为本发明的具体实施例,并不以此限定本发明的保护范围;在不违反本发明构思的基础上所作的任何替换与改进,均属本发明的保护范围。

Claims (7)

1.一种换流站用直流滤波器构架,包括横梁及至少两个塔架,横梁设于至少两个塔架上,其特征在于,每个塔架包括四根竖杆,即第一竖杆、第二竖杆、第三竖杆及第四竖杆,第一竖杆、第二竖杆、第三竖杆及第四竖杆的横断面的连线形成矩形,第一竖杆与第二竖杆之间、第二竖杆与第三竖杆之间、第三竖杆与第四竖杆之间、第四竖杆与第一竖杆之间均通过多条第一斜向连接杆及多条第二斜向连接杆连接,且相邻的第一斜向连接杆与第二斜向连接杆交叉。
2.如权利要求1所述换流站用直流滤波器构架,其特征在于,相邻的所述第一斜向连接杆相互平行,相邻的所述第二斜向连接杆相互平行。
3.如权利要求1所述换流站用直流滤波器构架,其特征在于,越往上端,所述第一竖杆、第二竖杆、第三竖杆及第四竖杆之间的距离越近。
4.如权利要求1所述换流站用直流滤波器构架,其特征在于,所述第一竖杆与第二竖杆之间、第二竖杆与第三竖杆之间、第三竖杆与第四竖杆之间、第四竖杆与第一竖杆之间、第一竖杆与第三竖杆之间、第二竖杆与第四竖杆之间还通过横向连接杆连接。
5.如权利要求1至4中任一项所述换流站用直流滤波器构架,其特征在于,所述横梁包括四根横杆,即第一横杆、第二横杆、第三横杆及第四横杆,第一横杆、第二横杆、第三横杆及第四横杆的横断面的连线形成矩形,第一横杆与第二横杆之间、第二横杆与第三横杆之间、第三横杆与第四横杆之间、第四横杆与第一横杆之间均通过多条第一斜向连接杆及多条第二斜向连接杆连接,且相邻的第一斜向连接杆与第二斜向连接杆交叉。
6.如权利要求1至4中任一项所述换流站用直流滤波器构架,其特征在于,所述塔架为三个,分别支撑在所述横梁的两端及中段。
7.如权利要求1至4中任一项所述换流站用直流滤波器构架,其特征在于,所述第一横杆与第二横杆之间、第二横杆与第三横杆之间、第三横杆与第四横杆之间、第四横杆与第一横杆之间、第一横杆与第三横杆之间、第二横杆与第四横杆之间还通过横向连接杆连接。
CN 201010604536 2010-12-24 2010-12-24 换流站用直流滤波器构架 Pending CN102071822A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010604536 CN102071822A (zh) 2010-12-24 2010-12-24 换流站用直流滤波器构架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010604536 CN102071822A (zh) 2010-12-24 2010-12-24 换流站用直流滤波器构架

Publications (1)

Publication Number Publication Date
CN102071822A true CN102071822A (zh) 2011-05-25

Family

ID=44030562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010604536 Pending CN102071822A (zh) 2010-12-24 2010-12-24 换流站用直流滤波器构架

Country Status (1)

Country Link
CN (1) CN102071822A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485540A (zh) * 2013-09-27 2014-01-01 国家电网公司 斜拉式加固换流站直流滤波器悬吊钢构架的方法及钢构架
CN103485572A (zh) * 2013-09-27 2014-01-01 国家电网公司 悬索式加固换流站直流滤波器悬吊钢构架的方法及钢构架

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2136830C1 (ru) * 1991-12-11 1999-09-10 Координационно-аналитический центр по межвузовским инновационным и научно-техническим программам Опора линии электропередачи
CN201148761Y (zh) * 2008-01-18 2008-11-12 北京国电华北电力工程有限公司 试验线段门型直线塔
JP2010043505A (ja) * 2008-08-09 2010-02-25 Denro Corp 鉄塔の主柱材取替え工法
CN201433591Y (zh) * 2008-12-30 2010-03-31 国家电网公司 一种门型直线塔
CN201574609U (zh) * 2009-11-24 2010-09-08 北京国电华北电力工程有限公司 交直流三柱门型终端塔架
CN201883728U (zh) * 2010-12-24 2011-06-29 广东省电力设计研究院 换流站用直流滤波器构架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2136830C1 (ru) * 1991-12-11 1999-09-10 Координационно-аналитический центр по межвузовским инновационным и научно-техническим программам Опора линии электропередачи
CN201148761Y (zh) * 2008-01-18 2008-11-12 北京国电华北电力工程有限公司 试验线段门型直线塔
JP2010043505A (ja) * 2008-08-09 2010-02-25 Denro Corp 鉄塔の主柱材取替え工法
CN201433591Y (zh) * 2008-12-30 2010-03-31 国家电网公司 一种门型直线塔
CN201574609U (zh) * 2009-11-24 2010-09-08 北京国电华北电力工程有限公司 交直流三柱门型终端塔架
CN201883728U (zh) * 2010-12-24 2011-06-29 广东省电力设计研究院 换流站用直流滤波器构架

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485540A (zh) * 2013-09-27 2014-01-01 国家电网公司 斜拉式加固换流站直流滤波器悬吊钢构架的方法及钢构架
CN103485572A (zh) * 2013-09-27 2014-01-01 国家电网公司 悬索式加固换流站直流滤波器悬吊钢构架的方法及钢构架
CN103485540B (zh) * 2013-09-27 2015-07-22 国家电网公司 斜拉式加固换流站直流滤波器悬吊钢构架的方法及钢构架

Similar Documents

Publication Publication Date Title
CN204386221U (zh) 一种用于220kV户外GIS变电站的三层联合式出线架构
CN107911032B (zh) ±800kV/5000MW柔直换流阀支柱式阀塔结构
CN204386242U (zh) 用于500kV变电站的组合式构架柱
CN202732240U (zh) 一种风力发电机的塔筒与支撑塔架的过渡段结构
CN201883728U (zh) 换流站用直流滤波器构架
CN102071822A (zh) 换流站用直流滤波器构架
CN102536681A (zh) 一种六边形风机塔架结构
CN205752997U (zh) 基于垂直排列导线的变电构架
CN202280270U (zh) 220千伏gis出线构架
CN201043361Y (zh) 单柱式钢管塔
CN202689585U (zh) 大型钢桁架的地面组对拼装胎具
CN214116553U (zh) 用于海上升压站的吊篮式上部组块
CN217975618U (zh) 一种新型220kV HGIS联合构架
CN102312599B (zh) 输电线路多棱钢管杆
CN102277999B (zh) 大断面门形钢结构抱杆
CN205724585U (zh) 多功能检修平台
CN201771245U (zh) 门型电力钢管塔
CN206608283U (zh) 一种用于风力发电的塔架
CN203891514U (zh) 变电站内取消端撑的主变构架
CN205282953U (zh) 变电站立体结构组装式货架
CN102808742A (zh) 风力发电机的塔筒与支撑塔架的连接结构
CN201605864U (zh) 输电线路用的窄基塔
CN201605865U (zh) 多棱钢管塔
CN203522065U (zh) 垂直段离相母线导体临时支撑结构
CN207513286U (zh) 新型三线拉柱通讯塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zeng Cheng

Inventor after: Zhang Jinsong

Inventor after: Zhu Haihua

Inventor after: Wei Wenbing

Inventor after: Liu Zonghui

Inventor before: Zeng Cheng

Inventor before: Zhu Haihua

Inventor before: Wei Wenbing

Inventor before: Liu Zonghui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZENG CHENG ZHU HAIHUA WEI WENBING LIU ZONGHUI TO: ZENG CHENG ZHANG JINSONGZHU HAIHUA WEI WENBING LIU ZONGHUI

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110525