CN102071813B - 一种在旧建筑物下建造地下车库的方法 - Google Patents
一种在旧建筑物下建造地下车库的方法 Download PDFInfo
- Publication number
- CN102071813B CN102071813B CN2010105641418A CN201010564141A CN102071813B CN 102071813 B CN102071813 B CN 102071813B CN 2010105641418 A CN2010105641418 A CN 2010105641418A CN 201010564141 A CN201010564141 A CN 201010564141A CN 102071813 B CN102071813 B CN 102071813B
- Authority
- CN
- China
- Prior art keywords
- building
- underground
- wall
- ground
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000010276 construction Methods 0.000 claims abstract description 12
- 230000002787 reinforcement Effects 0.000 claims description 8
- 241000272165 Charadriidae Species 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000007306 turnover Effects 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010105641418A CN102071813B (zh) | 2010-11-18 | 2010-11-18 | 一种在旧建筑物下建造地下车库的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010105641418A CN102071813B (zh) | 2010-11-18 | 2010-11-18 | 一种在旧建筑物下建造地下车库的方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102071813A CN102071813A (zh) | 2011-05-25 |
| CN102071813B true CN102071813B (zh) | 2012-04-25 |
Family
ID=44030553
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010105641418A Active CN102071813B (zh) | 2010-11-18 | 2010-11-18 | 一种在旧建筑物下建造地下车库的方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102071813B (zh) |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102913000B (zh) * | 2012-10-23 | 2014-08-06 | 山东建筑大学 | 建筑物移位开发利用地下空间的方法 |
| CN102900100B (zh) * | 2012-10-26 | 2014-10-22 | 岩土科技股份有限公司 | 一种在旧建筑物下用管棚建造地下空间的方法 |
| CN105256828A (zh) * | 2014-01-24 | 2016-01-20 | 刘献刚 | 地下空间建筑结构 |
| CN103912134B (zh) * | 2014-03-21 | 2016-09-14 | 上海建工四建集团有限公司 | 既有建筑原位地下空间结构及施工方法 |
| CN105155533A (zh) * | 2014-03-21 | 2015-12-16 | 刘献刚 | 一种地下空间的建筑桩体施工方法 |
| CN104120738A (zh) * | 2014-08-19 | 2014-10-29 | 广东南方电信规划咨询设计院有限公司 | 一种通信人/手井的非迁移式支撑保护系统及方法 |
| CN104878776B (zh) * | 2015-05-27 | 2017-03-15 | 中建地下空间有限公司 | 一种地下浅层全自动停车库库体结构 |
| CN106245927B (zh) * | 2016-07-19 | 2018-06-01 | 山东建筑大学 | 一种适用于框架结构建筑物地下增层的方法及建筑物 |
| CN106088650B (zh) * | 2016-07-19 | 2018-02-09 | 山东建筑大学 | 一种适用于砖混结构建筑物地下增层的方法及建筑物 |
| CN106480976B (zh) * | 2016-10-14 | 2019-03-05 | 岩土科技股份有限公司 | 一种带地下车库的建筑物下井筒基础 |
| CN110306820A (zh) * | 2019-06-12 | 2019-10-08 | 上海市建筑装饰工程集团有限公司 | 一种历史建筑单元化隔墙的加固方法 |
| CN110424765A (zh) * | 2019-08-19 | 2019-11-08 | 岩土科技股份有限公司 | 老旧小区建筑一层及室外地坪改建地下车库的方法 |
| CN110616739B (zh) * | 2019-09-12 | 2021-08-31 | 上海建工集团股份有限公司 | 一种既有建筑地下空间竖向拓建施工方法 |
| CN111321762A (zh) * | 2020-03-02 | 2020-06-23 | 广州市胜特建筑科技开发有限公司 | 精准的加建地下室方法 |
| CN111335670A (zh) * | 2020-03-18 | 2020-06-26 | 同济大学建筑设计研究院(集团)有限公司 | 在既有保留建筑下方原位施工基坑及新增地下结构的方法 |
| CN113356290B (zh) * | 2021-06-25 | 2023-03-10 | 中铁二院华东勘察设计有限责任公司 | 一种用于地下通道施工的纵向墙梁式桩基托换施工方法 |
| CN113914392A (zh) * | 2021-10-13 | 2022-01-11 | 浙江高专建筑设计研究院有限公司 | 一种既有建筑改造方法 |
| CN115354650A (zh) * | 2022-08-29 | 2022-11-18 | 中国土木工程集团有限公司 | 一种建筑地基加固方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2929069Y (zh) * | 2006-07-26 | 2007-08-01 | 邓海燕 | 一种对老旧住宅区进行改造而加建的车库结构 |
| DE202007010092U1 (de) * | 2007-07-18 | 2007-10-04 | Jürgens, Bu-Ja | Vorrichtung zum Überbauen offener Parkdecks |
| CN201095770Y (zh) * | 2007-09-06 | 2008-08-06 | 长业建设集团有限公司 | 嵌入式单层地下室木桩复合土钉墙结构 |
| CN101614019A (zh) * | 2008-11-11 | 2009-12-30 | 中铁四局集团建筑工程有限公司 | 紧临既有建筑物多层地下结构自支护施工方法 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05202631A (ja) * | 1992-01-28 | 1993-08-10 | Kumagai Gumi Co Ltd | 地下駐車場 |
-
2010
- 2010-11-18 CN CN2010105641418A patent/CN102071813B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2929069Y (zh) * | 2006-07-26 | 2007-08-01 | 邓海燕 | 一种对老旧住宅区进行改造而加建的车库结构 |
| DE202007010092U1 (de) * | 2007-07-18 | 2007-10-04 | Jürgens, Bu-Ja | Vorrichtung zum Überbauen offener Parkdecks |
| CN201095770Y (zh) * | 2007-09-06 | 2008-08-06 | 长业建设集团有限公司 | 嵌入式单层地下室木桩复合土钉墙结构 |
| CN101614019A (zh) * | 2008-11-11 | 2009-12-30 | 中铁四局集团建筑工程有限公司 | 紧临既有建筑物多层地下结构自支护施工方法 |
Non-Patent Citations (1)
| Title |
|---|
| JP特开平5-202631A 1993.08.10 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102071813A (zh) | 2011-05-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102071813B (zh) | 一种在旧建筑物下建造地下车库的方法 | |
| CN105862910B (zh) | 一种装配式立体地下车库的逆作式建造方法 | |
| CN110578339B (zh) | 一种井筒式地下立体车库的施工方法 | |
| KR101344063B1 (ko) | 강합성 지하차도 시공 공법 | |
| CN109235499A (zh) | 一种明挖地下建筑结构装配式施工方法 | |
| CN105926669A (zh) | 一种地铁车站施工方法 | |
| CN103452130B (zh) | 预应力钢筋网加筋土柱板式挡墙 | |
| CN107059667A (zh) | 门形装配式钢筋混凝土箱型涵洞及其施工方法 | |
| CN203939288U (zh) | 防风网结构 | |
| JPH11152761A (ja) | 地下構造物およびその構築工法 | |
| CN110397148A (zh) | 一种预制装配式集水坑结构及施工方法 | |
| CN110820471A (zh) | 道口板、平交道口结构及铺设方法 | |
| CN204125872U (zh) | 一种公路护栏加固装置 | |
| CN105064711B (zh) | 一种在居民楼间施工地下车库的方法 | |
| CN104153311A (zh) | 一种公路护栏加固装置及其加固方法 | |
| CN107313454B (zh) | 一种地下车库的施工方法 | |
| CN112681376A (zh) | 一种井筒式地下立体车库的施工方法 | |
| KR101293550B1 (ko) | 지중 구조물 시공방법 | |
| CN105888281A (zh) | 一种利用顶升增层技术提升小区整体功能的方法 | |
| CN108166395B (zh) | 一种跨越营业线修建梁桥的施工方法 | |
| CN205077925U (zh) | 一种现浇多层无梁楼板结构敞开式的小汽车停车库 | |
| CN111058386B (zh) | 上跨既有地面桥的高架桥施工方法 | |
| CN214302989U (zh) | 加建地上装配式停车库 | |
| CN105986830B (zh) | 路边条状地下车库的暗挖建造方法 | |
| CN107859060A (zh) | 一种斜井机械式地下停车场 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: GEOTECHNICAL TECHNOLOGY CO., LTD. Free format text: FORMER NAME: HANGZHOU GEOTECHNICAL ENGINEERING CO., LTD. |
|
| CP03 | Change of name, title or address |
Address after: 310024, Hangzhou, Zhejiang province Xihu District transferred to the streets of Liuzhou Wu Long Industrial Park Patentee after: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Address before: City of Chao Wang Road 310014 Hangzhou city of Zhejiang province No. 59-1 East Verde writer Pavilion 2C Patentee before: HANGZHOU GEOTECHNICAL ENGINEERING Co.,Ltd. |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A method of constructing underground garage under old buildings Effective date of registration: 20220704 Granted publication date: 20120425 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20120425 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A method of constructing an underground garage under an old building Granted publication date: 20120425 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2024980026444 |