CN102054231A - Method and device for generating bill of material - Google Patents
Method and device for generating bill of material Download PDFInfo
- Publication number
- CN102054231A CN102054231A CN2010106163907A CN201010616390A CN102054231A CN 102054231 A CN102054231 A CN 102054231A CN 2010106163907 A CN2010106163907 A CN 2010106163907A CN 201010616390 A CN201010616390 A CN 201010616390A CN 102054231 A CN102054231 A CN 102054231A
- Authority
- CN
- China
- Prior art keywords
- task
- bom
- bill
- wbs
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 title claims abstract description 78
- 238000000034 method Methods 0.000 title claims abstract description 40
- 230000015556 catabolic process Effects 0.000 claims abstract description 22
- 230000008569 process Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a method for generating a bill of material, comprising the following steps: step 102, selecting tasks in a work breakdown structure; step 104, generating items of the bill of material according to the task; step 106, finding a preposed task of the tasks in the work breakdown structure, and returning to the step 104 until no preposed task is found; and step 108, generating the bill of material according to all the items of the bill of material. The invention also provides a device for generating a bill of material. According to the invention, the bill of material can be automatically generated by virtue of the tasks, and the operating load of a user is reduced.
Description
Technical field
The present invention relates to the production management field, particularly, a kind of bill of material generating method and device.
Background technology
Equipment manufacture and development class research institute are in advanced development or development, the work on hand mode is to formulate production task earlier, the production quantity of arrangement task and duration, and rule of thumb arrange the front and back orders and the dependence of task, simultaneously according to actual implementation status, at any time adjust the material product of actual carrying out of task, front and back dependence between duration and the task, at last again according to actual implementation status, create the BOM (Bill of Material (BOM)) of product, its deficiency is, when creating BOM, can not carry out the BOM data that data obtain needs from reality automatically, need the manual amendment, workload is bigger, and is easy to generate the deviation of omission or data.
Therefore, need a kind of mode, project WBS (work breakdown structure (WBS)) task data that needs can be generated BOM generates BOM automatically, and according to the action of WBS network and task, workload and front and back dependence generate the corresponding data item of BOM automatically, reduce user's workload.
Reduced the workload of designer's establishment BOM to greatest extent, and can guarantee the BOM data that generate and actual the consistent of data of carrying out, the inevitable deviation of having avoided manually-operated to bring has improved the work efficiency of design.
Summary of the invention
Technical scheme to be solved by this invention is, a kind of mode is provided, project WBS (work breakdown structure (WBS)) task data that needs can be generated BOM generates BOM automatically, and according to the action of WBS network and task, workload and front and back dependence, automatically generate the corresponding data item of BOM, reduce user's workload.
In view of this, the invention provides a kind of bill of material generating method, comprising: step 102, selection task in work breakdown structure (WBS); Step 104 generates the material list item according to described task; Step 106 finds out the preposition task of task described in the described work breakdown structure (WBS), and returns step 104, does not have preposition task until described task; Step 108 according to all material list items, generates Bill of Material (BOM).According to this technical scheme, can generate Bill of Material (BOM) automatically by task, reduced user's operational ton.
In technique scheme, preferably, in described step 102, condition is set, select described task by described condition.
In technique scheme, preferably, described condition is provided with according to the field in the described work breakdown structure (WBS).
In technique scheme, preferably, in described step 104,, fill the data of described Bill of Material (BOM) project according to the task output data of described task.
In technique scheme, preferably, also comprise: described Bill of Material (BOM) project is edited.
The present invention also provides a kind of Bill of Material (BOM) generating apparatus, comprising: select module, selection task in work breakdown structure (WBS); The project generation module generates described Bill of Material (BOM) project according to described task; Enquiry module finds out the preposition task of task described in the described work breakdown structure (WBS), and described preposition task is returned to described project generation module, does not have preposition task until described task; The document generation module according to all material list items, generates Bill of Material (BOM).According to this technical scheme, can generate Bill of Material (BOM) automatically by task, reduced user's operational ton.
In technique scheme, preferably, also comprise: the condition setting module, condition is set, described selection module is selected described task by described condition.
In technique scheme, preferably, described condition is provided with according to the field in the described work breakdown structure (WBS).
In technique scheme, preferably, described project generation module is filled the data of described Bill of Material (BOM) project also according to the task output data of described task.
In technique scheme, preferably, also comprise: user's editor module, for the user described Bill of Material (BOM) project is edited.
According to above technical scheme, can realize a kind of bill of material generating method and device, the project WBS task data that needs can be generated BOM generates BOM automatically, and according to the action of WBS network and task, workload and front and back dependence generate the corresponding data item of BOM automatically, reduce user's workload, and can guarantee the BOM data that generate and actual the consistent of data of carrying out, the inevitable deviation of having avoided manually-operated to bring has improved work efficiency.
Description of drawings
Fig. 1 is the process flow diagram of bill of material generating method according to an embodiment of the invention;
Fig. 2 is the block diagram of Bill of Material (BOM) generating apparatus according to an embodiment of the invention;
Fig. 3 is the workflow diagram of Bill of Material (BOM) generating apparatus according to an embodiment of the invention.
Embodiment
In order more to be expressly understood above-mentioned purpose of the present invention, feature and advantage, the present invention is further described in detail below in conjunction with the drawings and specific embodiments.
Set forth a lot of details in the following description so that fully understand the present invention, still, the present invention can also adopt other to be different from other modes described here and implement, and therefore, the present invention is not limited to the restriction of following public specific embodiment.
Fig. 1 is the process flow diagram of bill of material generating method according to an embodiment of the invention.
As shown in Figure 1, the invention provides a kind of bill of material generating method, comprising: step 102, selection task in work breakdown structure (WBS); Step 104 generates the material list item according to described task; Step 106 finds out the preposition task of task described in the described work breakdown structure (WBS), and returns step 104, does not have preposition task until described task; Step 108 according to all material list items, generates Bill of Material (BOM).According to this technical scheme, can generate Bill of Material (BOM) automatically by task, reduced user's operational ton.
In technique scheme, in the described step 102, condition is set, select described task by described condition.
In technique scheme, described condition is provided with according to the field in the described work breakdown structure (WBS).
In technique scheme, in described step 104,, fill the data of described Bill of Material (BOM) project according to the task output data of described task.
In technique scheme, also comprise: described Bill of Material (BOM) project is edited.
Fig. 2 is the block diagram of Bill of Material (BOM) generating apparatus according to an embodiment of the invention.
As shown in Figure 2, the present invention also provides a kind of Bill of Material (BOM) generating apparatus 200, comprising: select module 202, selection task in work breakdown structure (WBS); Project generation module 204 generates described Bill of Material (BOM) project according to described task; Enquiry module 206 finds out the preposition task of task described in the described work breakdown structure (WBS), and described preposition task is returned to described project generation module 204, does not have preposition task until described task; Document generation module 208 according to all material list items, generates Bill of Material (BOM).According to this technical scheme, can generate Bill of Material (BOM) automatically by task, reduced user's operational ton.
In technique scheme, also comprise: condition setting module 210, condition is set, described selection module 202 is selected described task by described condition.
In technique scheme, described condition is provided with according to the field in the described work breakdown structure (WBS).
In technique scheme, described project generation module 204 is filled the data of described Bill of Material (BOM) project also according to the task output data of described task.
In technique scheme, also comprise: user's editor module 212, for the user described Bill of Material (BOM) project is edited.
Fig. 3 is the workflow diagram of Bill of Material (BOM) generating apparatus according to an embodiment of the invention.
As shown in Figure 3, the permission user of the Bill of Material (BOM) generating apparatus in the step 302, this enforcement is by querying condition editing machine custom-built query condition, and querying condition can extend to all data item of task output and task, the user behind the typing querying condition, inquires about as required; The Bill of Material (BOM) generating apparatus is responsible for the querying condition of user's typing purchased and is built up WBS and inquire about the WBS querying method that receivable parameter list calls standard; And be responsible for Query Result is offered the user.
Step 304, the Bill of Material (BOM) generating apparatus will be used to generate the WBS task of BOM and task output and offer the user with the form of tabulation, these tasks and output satisfy the user inquiring condition, be shown to the user according to group items, allow the user that the result is selected, the user determines will be used to generate WBS task and the task output of BOM, determine that WBS task that the user is selected and task output are according to sheet format down, formation generates the required parameter list of method of BOM according to WBS task output, and generates BOM according to this parameter list;
Parameter format:
Sequence number | Title | Type |
1 | Task ID | long |
2 | Carry out tissue | long |
3 | Executive arm | long |
4 | The task manager | long |
5 | Ps | datetime |
6 | The output material | long |
7 | Unit | long |
8 | Quantity | decimal |
9 | The output date | datetime |
Previous task | string | |
10 | Rearmounted task | string |
11 | The demand tissue | long |
12 | Owner of cargo's tissue | long |
Step 306, the Bill of Material (BOM) in the present embodiment are taken root according to device according to as above parameter list, create the BOM data automatically according to task and task output data.
Concrete treatment step is as follows: at first create female of BOM, do not have the task output (as WBS01) of rearmounted task to generate female of BOM in the WBS task according to user's selection; The data corresponding relation is as follows:
Create the BOM subitem then, all previous tasks with this output (WBS01), generate the BOM subitem one by one, female of the BOM of these subitems is the female item of BOM that this output (WBS01) generates, the quantity of these subitems, the time in advance, supply tissue, material, offset time be corresponding task output quantity, actual construction time, execution tissue, material and with the offset time of WBS01.
The data corresponding relation is as follows:
If for these previous tasks, also there is previous task, then according to the process of creating female of BOM, for these previous tasks are created female of BOM respectively, according to the process of creating the BOM subitem, the previous task of these previous tasks is created the BOM subitem respectively, and circulation step by step is not till all choosing of tasks have previous task.By above technical scheme, can create out the BOM that the user needs according to the WBS real data.
An example according to the technical scheme of present embodiment is as follows:
Example: certain machine tool plant's project 001 (ps=2009-07-01) the WBS task is as follows:
The user selects to convert BOM to according to above-mentioned WBS, treatment step of the present invention:
At first create female of BOM, do not have in the WBS task of selecting according to the user rearmounted task the task output (
1 | The assembling lathe | 2009-7-3 | 2009-7-3 | The JD36-400 lathe | 1 | 2009-7-3 |
) generate female of BOM, concrete transformation rule: the material of task output is as the material of female of BOM, the quantity of task output as female of BOM in batches, the actual construction time as female of BOM the time in advance, female of the BOM of generation is:
Create the BOM subitem then, all previous tasks with this output (task 1), generate the BOM subitem one by one, female of the BOM of these subitems is the female item of BOM that this output (WBS01) generates, the quantity of these subitems, the time in advance, supply tissue, material, offset time be corresponding task output quantity, actual construction time, execution tissue, material and with the offset time of WBS01, be example with task 2:
Task 2 is
?2 | The assembling fuselage | 2009-7-2 | 2009-7-2 | The fuselage part | 1 | 2009-7-2 |
The BOM subitem that generates is:
Find that simultaneously task 2 also has previous task, needs to create female of BOM; If task 2 does not have previous task, then get other tasks.
Task 2 need be created female of BOM, and process is with the process of the female item of establishment BOM of task 1
Create female of BOM:
To the establishment BOM subitem of the previous task iterative task 2 of task 2 and female process
Repeat above step, can create out complete BOM.
The BOM structure that generates according to top WBS is as follows:
Female of BOM
The BOM subitem
According to technical scheme of the present invention, can realize a kind of bill of material generating method and device, offer the user fast according to WBS task and the output set up, automatically generate the function of BOM, set up the transformational relation of WBS to WBS, reduce user's input service amount, improved the accuracy that the user creates BOM, improved user's work efficiency.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (10)
1. a bill of material generating method is characterized in that, comprising:
Step 102, selection task in work breakdown structure (WBS);
Step 104 generates the material list item according to described task;
Step 106 finds out the preposition task of task described in the described work breakdown structure (WBS), and returns step 104, does not have preposition task until described task;
Step 108 according to all material list items, generates Bill of Material (BOM).
2. bill of material generating method according to claim 1 is characterized in that, in described step 102, condition is set, and selects described task by described condition.
3. bill of material generating method according to claim 2 is characterized in that described condition is provided with according to the field in the described work breakdown structure (WBS).
4. bill of material generating method according to claim 1 is characterized in that, in described step 104, according to the task output data of described task, fills the data of described Bill of Material (BOM) project.
5. according to each described bill of material generating method in the claim 1 to 4, it is characterized in that, also comprise:
Described Bill of Material (BOM) project is edited.
6. a Bill of Material (BOM) generating apparatus is characterized in that, comprising:
Select module, selection task in work breakdown structure (WBS);
The project generation module generates described Bill of Material (BOM) project according to described task;
Enquiry module finds out the preposition task of task described in the described work breakdown structure (WBS), and described preposition task is returned to described project generation module, does not have preposition task until described task;
The document generation module according to all material list items, generates Bill of Material (BOM).
7. Bill of Material (BOM) generating apparatus according to claim 6 is characterized in that, also comprises:
The condition setting module is provided with condition, and described selection module is selected described task by described condition.
8. Bill of Material (BOM) generating apparatus according to claim 7 is characterized in that described condition is provided with according to the field in the described work breakdown structure (WBS).
9. Bill of Material (BOM) generating apparatus according to claim 6 is characterized in that, described project generation module is filled the data of described Bill of Material (BOM) project also according to the task output data of described task.
10. according to each described Bill of Material (BOM) generating apparatus in the claim 6 to 9, it is characterized in that, also comprise:
User's editor module is edited described Bill of Material (BOM) project for the user.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106163907A CN102054231A (en) | 2010-12-30 | 2010-12-30 | Method and device for generating bill of material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106163907A CN102054231A (en) | 2010-12-30 | 2010-12-30 | Method and device for generating bill of material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102054231A true CN102054231A (en) | 2011-05-11 |
Family
ID=43958523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010106163907A Pending CN102054231A (en) | 2010-12-30 | 2010-12-30 | Method and device for generating bill of material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102054231A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102651100A (en) * | 2012-03-13 | 2012-08-29 | 无锡冲驰软件科技有限公司 | Generation system and generation method for bill of garment material |
CN102981904A (en) * | 2011-09-02 | 2013-03-20 | 阿里巴巴集团控股有限公司 | Task scheduling method and system |
CN104504501A (en) * | 2014-12-09 | 2015-04-08 | 上海子游网络技术有限公司 | Combined application technology for WBS (Work Breakdown Structure) and BOM (Bill of Material) in information system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0309374A2 (en) * | 1987-09-24 | 1989-03-29 | International Business Machines Corporation | Automated bill of material |
US20020032611A1 (en) * | 2000-03-06 | 2002-03-14 | Khan Ahmad Hasan | Methods and systems for sourcing bill of material and data handling configurations software |
CN1755718A (en) * | 2004-09-29 | 2006-04-05 | 大众电脑股份有限公司 | A system for automatically generating bills of materials for electronic products |
CN101013451A (en) * | 2007-01-31 | 2007-08-08 | 济南二机床集团有限公司 | Automatic generation system for designing BOM |
CN101025805A (en) * | 2007-01-24 | 2007-08-29 | 上海理工大学 | Product-based bill of material generating method |
-
2010
- 2010-12-30 CN CN2010106163907A patent/CN102054231A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0309374A2 (en) * | 1987-09-24 | 1989-03-29 | International Business Machines Corporation | Automated bill of material |
US20020032611A1 (en) * | 2000-03-06 | 2002-03-14 | Khan Ahmad Hasan | Methods and systems for sourcing bill of material and data handling configurations software |
CN1755718A (en) * | 2004-09-29 | 2006-04-05 | 大众电脑股份有限公司 | A system for automatically generating bills of materials for electronic products |
CN101025805A (en) * | 2007-01-24 | 2007-08-29 | 上海理工大学 | Product-based bill of material generating method |
CN101013451A (en) * | 2007-01-31 | 2007-08-08 | 济南二机床集团有限公司 | Automatic generation system for designing BOM |
Non-Patent Citations (1)
Title |
---|
于晓等: "《基于产品的BOM自动生成方法》", 《精密制造与自动化》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102981904A (en) * | 2011-09-02 | 2013-03-20 | 阿里巴巴集团控股有限公司 | Task scheduling method and system |
CN102981904B (en) * | 2011-09-02 | 2016-08-03 | 阿里巴巴集团控股有限公司 | A kind of method for scheduling task and system |
CN102651100A (en) * | 2012-03-13 | 2012-08-29 | 无锡冲驰软件科技有限公司 | Generation system and generation method for bill of garment material |
CN102651100B (en) * | 2012-03-13 | 2016-05-04 | 无锡冲驰软件科技有限公司 | A kind of generation system of clothes BOM and method |
CN104504501A (en) * | 2014-12-09 | 2015-04-08 | 上海子游网络技术有限公司 | Combined application technology for WBS (Work Breakdown Structure) and BOM (Bill of Material) in information system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105321042B (en) | Genetic algorithm-based advanced plan scheduling system and method | |
CN110597842B (en) | Service data query method and system | |
CN113557517A (en) | Automatic generation device and method of electrical design drawing | |
CN103164573B (en) | PDM managing and designing system | |
Júnior et al. | Creating value with less impact: Lean, green and eco-efficiency in a metalworking industry towards a cleaner production | |
CN106408170A (en) | Electronic worksheet processing method, workflow engine and electronic worksheet system | |
CN102163188A (en) | Generation method and device thereof for EXCEL report in application system | |
CN103295104A (en) | Quota design management method and project investment service platform for cost accounting | |
CN105320504A (en) | Visual software modeling method for constructing software view on basis of software meta view | |
CN103942184A (en) | Collocation method, generation method and system with addition item summary statement | |
CN114830154A (en) | Information processing apparatus, information processing method, and information processing program | |
CN102054231A (en) | Method and device for generating bill of material | |
CN102034168A (en) | Method and system for matching task executor for work breakdown structure | |
CN102402515A (en) | Universal custom query system and method | |
CN112101910A (en) | Process cost accounting method and accounting system thereof | |
CN105574706A (en) | Format and rule management for form data in process editor | |
CN105681106A (en) | Communication network resource life cycle management method | |
CN102207980A (en) | Data exchange method based on extensive makeup language (XML) and database (DB), and data adapter | |
CN102024213A (en) | Task formulation method and device | |
CN102651100B (en) | A kind of generation system of clothes BOM and method | |
CN101646191B (en) | Data processing method and device | |
CN111104744B (en) | Auxiliary type selection method for sand and stone crushing equipment | |
CN104462545B (en) | A kind of page building method and device based on three layer model | |
CN101256487A (en) | Method for representation of service rule facing to component | |
CN111652489A (en) | BOM-driven intelligent manufacturing service task decomposition method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110511 |