CN102011354A - 宽轨枕到发线轨排组装平台 - Google Patents
宽轨枕到发线轨排组装平台 Download PDFInfo
- Publication number
- CN102011354A CN102011354A CN 201010551299 CN201010551299A CN102011354A CN 102011354 A CN102011354 A CN 102011354A CN 201010551299 CN201010551299 CN 201010551299 CN 201010551299 A CN201010551299 A CN 201010551299A CN 102011354 A CN102011354 A CN 102011354A
- Authority
- CN
- China
- Prior art keywords
- joist
- broad
- fixed
- bolt
- rotating shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 17
- 239000010959 steel Substances 0.000 claims description 17
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 4
- 238000005728 strengthening Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 13
- 241001669679 Eleotris Species 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本发明具体为一种宽轨枕到发线轨排组装平台,解决现在没有一种宽轨枕到发线轨枕的铺设辅助设备的问题。包括两根平行放置的左托梁和右托梁,左托梁和右托梁的前端固定有高度高于两者的挡板,且左托梁左方设有与其固定且高度高于左托梁的定位板,右托梁的前后方向上拧有若干头部位于右托梁右侧的螺栓,右托梁右侧的螺栓上套有滑动于螺栓上的拨块。本发明填补了目前没有一种铺设辅助设备的空白,克服了人工铺设轨排时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,可较好的控制宽轨枕的中心线、间距等尺寸,减少后期整道工作量,降低了施工成本,减少工人用量60%左右,工效提高3倍以上。
Description
技术领域
本发明涉及轨排组装平台,具体为一种宽轨枕到发线轨排组装平台。
背景技术
高速铁路到发线常采用宽轨枕有碴线路,目前,宽轨枕到发线轨排的铺设是通过人工进行,铺设时,将宽轨枕摆放在已压实的道碴面上,然后在宽轨枕上安装钢轨,存在施工人员踩踏道碴面影响宽轨枕底道碴标高、轨枕间距不匀及线路中线精度误差超标的现象;同时铺设宽轨枕线路时,宽轨枕之间的间距仅为10mm,一旦线路成型后,再想调整线路的高低、方向等十分困难。
鉴于人工铺设宽轨枕到发线线路时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,目前没有一种用于解决上述问题的铺设辅助设备。
发明内容
本发明为了解决现在没有一种宽轨枕到发线轨排的铺设辅助设备而通过人工铺设时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,提供了一种宽轨枕到发线轨排组装平台。
本发明是采用如下技术方案实现的:宽轨枕到发线轨排组装平台,包括两根平行放置的左托梁和右托梁,左托梁和右托梁的前端固定有高度高于两者的挡板,且左托梁左方设有与其固定且高于其高度的定位板,右托梁的前后方向上拧有若干头部位于其右侧的螺栓,右托梁右侧的螺栓上套有滑动于螺栓上的拨块。工作时,叉车上放置有宽轨枕,然后沿左托梁和右托梁后部中间向前行驶至前端,将宽轨枕放置在左托梁和右托梁上,且紧靠挡板,这时将与该宽轨枕位置对应的螺栓拧紧,此时在螺栓头部的作用下带动其上的拨块向左移动,从而推动该宽轨枕顶住定位板,接着通过叉车将下一块宽轨枕运送至左、右托梁上,用轨枕间距塞尺控制两块宽轨枕的间距为10mm,再按上述步骤将宽轨枕向左顶推至顶紧定位板;依次类推,即可实现左、右托梁上所有宽轨枕的精确对位;安装钢轨后通过吊具将轨排吊起、平移、平稳置于宽轨枕到发线的道碴面上,连接钢轨即完成铺设施工,克服了人工铺设线路时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题。
左托梁右侧和右托梁左侧的前后方向上均固定有若干对左右方向对应的钢管,且在每对左右方向对应的钢管内穿有拉杆,当在左、右托梁上不断的放置宽轨枕时,将拉杆插入放置好的宽轨枕下方周围的钢管内,起到控制左、右托梁间距的作用,且提高了宽轨枕到发线轨排组装平台的整体刚度。
左托梁左侧和右托梁右侧均固定有加强钢板,每块加强钢板的前后两侧均穿有转轴,左右两侧的转轴内侧均固定有位于其后方的轮轴,轮轴上穿有滚轮,左右两侧加强钢板外侧的转轴上固定有位于转轴前方且前后方向放置的手柄杆,左右两侧加强钢板外侧均固定有支撑手柄杆的第一限位螺栓和位于转轴后侧上方的第二限位螺栓,当铺设完一段宽轨枕到发线轨排时,手柄杆向上旋转至支撑在第二限位螺栓上,这时滚轮以转轴为中心向下旋转,从而将左、右托梁撑起,省时省力的实现宽轨枕到发线轨排组装平台的向前移动。
本发明填补了目前没有一种铺设辅助设备的空白,克服了人工铺设轨排时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,可较好的控制宽轨枕的中心线、间距等尺寸,减少后期整道工作量,降低了施工成本,减少工人用量60%左右,工效提高3倍以上。
附图说明
图1为本发明的结构示意及使用状态图;
图2为图1滚轮处的俯视结构示意图。
图中:1-左托梁,2-右托梁,3-定位板,4-螺栓,5-第二限位螺栓,6-拨块,7-钢管,8-拉杆,9-加强钢板,10-转轴,11-轮轴,12-滚轮,13-第一限位螺栓,14-手柄杆。
具体实施方式
宽轨枕到发线轨排组装平台,包括两根平行放置的左托梁1和右托梁2,左托梁1和右托梁2的前端固定有高度高于两者的挡板,且左托梁1左方设有与其固定且高于其高度的定位板3,右托梁2的前后方向上拧有若干头部位于其右侧的螺栓4,右托梁2右侧的螺栓4上套有滑动于螺栓4上的拨块6。左托梁1右侧和右托梁2左侧的前后方向上均固定有若干对左右方向对应的钢管7,且在每对左右方向对应的钢管7内穿有拉杆8;左托梁1左侧和右托梁2右侧均固定有加强钢板9,每块加强钢板9的前后两侧均穿有转轴10,左右两侧的转轴10内侧均固定有位于其后方的轮轴11,轮轴11上穿有滚轮12,左右两侧加强钢板9外侧的转轴10上固定有位于转轴10前方且前后方向放置的手柄杆14,左右两侧加强钢板9外侧均固定有支撑手柄杆14的第一限位螺栓13和位于转轴10后侧上方的第二限位螺栓5。
Claims (3)
1.一种宽轨枕到发线轨排组装平台,其特征在于:包括两根平行放置的左托梁(1)和右托梁(2),左托梁(1)和右托梁(2)的前端固定有高度高于两者的挡板,且左托梁(1)左方设有与其固定且高于其高度的定位板(3),右托梁(2)的前后方向上拧有若干头部位于其右侧的螺栓(4),右托梁(2)右侧的螺栓(4)上套有滑动于螺栓(4)上的拨块(6)。
2.根据权利要求1所述的宽轨枕到发线轨排组装平台,其特征在于:左托梁(1)右侧和右托梁(2)左侧的前后方向上均固定有若干对左右方向对应的钢管(7),且在每对左右方向对应的钢管(7)内穿有拉杆(8)。
3.根据权利要求1或2所述的宽轨枕到发线轨排组装平台,其特征在于:左托梁(1)左侧和右托梁(2)右侧均固定有加强钢板(9),每块加强钢板(9)的前后两侧均穿有转轴(10),左右两侧的转轴(10)内侧均固定有位于其后方的轮轴(11),轮轴(11)上穿有滚轮(12),左右两侧加强钢板(9)外侧的转轴(10)上固定有位于转轴(10)前方且前后方向放置的手柄杆(14),左右两侧加强钢板(9)外侧均固定有支撑手柄杆(14)的第一限位螺栓(13)和位于转轴(10)后侧上方的第二限位螺栓(5)。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010105512991A CN102011354B (zh) | 2010-11-19 | 2010-11-19 | 宽轨枕到发线轨排组装平台 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010105512991A CN102011354B (zh) | 2010-11-19 | 2010-11-19 | 宽轨枕到发线轨排组装平台 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102011354A true CN102011354A (zh) | 2011-04-13 |
| CN102011354B CN102011354B (zh) | 2012-01-11 |
Family
ID=43841668
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010105512991A Expired - Fee Related CN102011354B (zh) | 2010-11-19 | 2010-11-19 | 宽轨枕到发线轨排组装平台 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102011354B (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106192624A (zh) * | 2016-08-24 | 2016-12-07 | 中铁十七局集团有限公司铺架分公司 | 铁路架桥机单线作业非标轨排就近存放装置及方法 |
| CN119083252A (zh) * | 2024-10-15 | 2024-12-06 | 青岛地铁集团有限公司 | 铁轨铺设施工系统 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0683370A (ja) * | 1992-09-02 | 1994-03-25 | Tokyu Constr Co Ltd | 鋼製桁の制振装置 |
| JPH08311802A (ja) * | 1995-05-19 | 1996-11-26 | Tokyo Fab Kogyo Kk | 防振まくらぎ軌道の施工方法 |
| CN200940243Y (zh) * | 2006-08-23 | 2007-08-29 | 中铁八局集团有限公司 | 道岔原位铺设平台 |
| CN101173492A (zh) * | 2007-11-26 | 2008-05-07 | 中铁四局集团有限公司 | 有砟轨道客运专线道岔原位铺设方法 |
| CN101289828A (zh) * | 2008-05-22 | 2008-10-22 | 北京铁五院工程机械科技开发有限公司 | 双块式无砟轨道的施工装备及施工工艺 |
| CN201151857Y (zh) * | 2007-12-29 | 2008-11-19 | 南车洛阳机车有限公司 | 双块式无碴轨道施工设备之手动调整横梁 |
| CN201180243Y (zh) * | 2007-12-29 | 2009-01-14 | 南车洛阳机车有限公司 | 双块式无碴轨道施工用横梁 |
| CN201224852Y (zh) * | 2008-06-30 | 2009-04-22 | 北京铁五院工程机械科技开发有限公司 | 用于无砟轨道铺设的组合式轨道排架 |
| CN201850479U (zh) * | 2010-11-19 | 2011-06-01 | 中铁十七局集团有限公司铺架分公司 | 宽轨枕到发线轨排组装平台 |
-
2010
- 2010-11-19 CN CN2010105512991A patent/CN102011354B/zh not_active Expired - Fee Related
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0683370A (ja) * | 1992-09-02 | 1994-03-25 | Tokyu Constr Co Ltd | 鋼製桁の制振装置 |
| JPH08311802A (ja) * | 1995-05-19 | 1996-11-26 | Tokyo Fab Kogyo Kk | 防振まくらぎ軌道の施工方法 |
| CN200940243Y (zh) * | 2006-08-23 | 2007-08-29 | 中铁八局集团有限公司 | 道岔原位铺设平台 |
| CN101173492A (zh) * | 2007-11-26 | 2008-05-07 | 中铁四局集团有限公司 | 有砟轨道客运专线道岔原位铺设方法 |
| CN201151857Y (zh) * | 2007-12-29 | 2008-11-19 | 南车洛阳机车有限公司 | 双块式无碴轨道施工设备之手动调整横梁 |
| CN201180243Y (zh) * | 2007-12-29 | 2009-01-14 | 南车洛阳机车有限公司 | 双块式无碴轨道施工用横梁 |
| CN101289828A (zh) * | 2008-05-22 | 2008-10-22 | 北京铁五院工程机械科技开发有限公司 | 双块式无砟轨道的施工装备及施工工艺 |
| CN201224852Y (zh) * | 2008-06-30 | 2009-04-22 | 北京铁五院工程机械科技开发有限公司 | 用于无砟轨道铺设的组合式轨道排架 |
| CN201850479U (zh) * | 2010-11-19 | 2011-06-01 | 中铁十七局集团有限公司铺架分公司 | 宽轨枕到发线轨排组装平台 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106192624A (zh) * | 2016-08-24 | 2016-12-07 | 中铁十七局集团有限公司铺架分公司 | 铁路架桥机单线作业非标轨排就近存放装置及方法 |
| CN119083252A (zh) * | 2024-10-15 | 2024-12-06 | 青岛地铁集团有限公司 | 铁轨铺设施工系统 |
| CN119083252B (zh) * | 2024-10-15 | 2025-03-14 | 青岛地铁集团有限公司 | 铁轨铺设施工系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102011354B (zh) | 2012-01-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105463981B (zh) | 一种用于道路施工的可移动桥式车辆通行系统 | |
| CN202047325U (zh) | 一种异型过渡轨 | |
| CN201756667U (zh) | 无砟轨道板调整器 | |
| CN201850479U (zh) | 宽轨枕到发线轨排组装平台 | |
| CN101691726A (zh) | 一种双块式无砟轨道施工工艺 | |
| CN102011354B (zh) | 宽轨枕到发线轨排组装平台 | |
| CN105544325B (zh) | 一种crtsⅲ型轨道板粗铺的精度控制装置及施工方法 | |
| CN102304882B (zh) | 城市轨道交通工程中线路轨道4.5号对称道岔 | |
| CN110258771B (zh) | 一种连廊 | |
| CN202440726U (zh) | 铁路轨排组装生产线自动翻枕前混凝土轨枕调整系统 | |
| CN204567663U (zh) | 城市轨道交通工程带停车线的地下车站结构 | |
| CN107460792A (zh) | 一种复合钢轨枕 | |
| CN201023435Y (zh) | 双向行驶无碴轨道运输车 | |
| CN102561117A (zh) | 双线隧道内无碴轨道施工的物流传送方法 | |
| CN204455980U (zh) | 中型捣固车用清扫装置 | |
| CN203100878U (zh) | 一种汽车衡用框架 | |
| CN201512733U (zh) | 钢弹簧浮置板道床钢筋笼轨排组装用调轨架 | |
| CN210561507U (zh) | 一种有砟道床整形装置 | |
| CN207277104U (zh) | 一种便装式盾构台车组合轨枕 | |
| CN207510429U (zh) | 一种轨道平板车 | |
| CN220643671U (zh) | 一种铁路拼接式施工便梁 | |
| CN2556366Y (zh) | 全断面变径砼滑模施工装置 | |
| CN206436170U (zh) | 一种铁路t梁模板螺丝拧紧装置 | |
| CN206438383U (zh) | 弧面双层隧道仰拱栈桥 | |
| CN204490360U (zh) | 应用于圆洞内的无轨门机 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120111 Termination date: 20191119 |