[go: up one dir, main page]

CN102002898A - Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds - Google Patents

Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds Download PDF

Info

Publication number
CN102002898A
CN102002898A CN 201010587304 CN201010587304A CN102002898A CN 102002898 A CN102002898 A CN 102002898A CN 201010587304 CN201010587304 CN 201010587304 CN 201010587304 A CN201010587304 A CN 201010587304A CN 102002898 A CN102002898 A CN 102002898A
Authority
CN
China
Prior art keywords
laying
rail
sleeper
track
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010587304
Other languages
Chinese (zh)
Inventor
陶中兴
雷高攀
唐海斌
范平清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Changyuan Railway Construction Machinery Co Ltd
Original Assignee
Zhuzhou Changyuan Railway Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Changyuan Railway Construction Machinery Co Ltd filed Critical Zhuzhou Changyuan Railway Construction Machinery Co Ltd
Priority to CN 201010587304 priority Critical patent/CN102002898A/en
Publication of CN102002898A publication Critical patent/CN102002898A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention relates to a construction method of a group-sleeper long rail track-laying unit for laying seamless track ballasted beds, which adopts a group-sleeper stepping type track-laying process. Along a track-laying direction, the track-laying unit orderly comprises a long rail tractor; a main machine with a hoisting appliance, a sleeper evening mechanism, a sleeper placing mechanism and the like; a laying machine with a pushing and tracking device; a sleeper transportation cart group carrying sleeper transportation cars; and a locomotive. The work procedure of the group-sleeper stepping type track-laying process comprises the steps of preparation work, sleeper pre-laying, long rail dragging and discharging, rail collection and sleeper distribution. Compared with the traditional single-sleeper continuous method, the group-sleeper long rail track-laying unit is simple and practical and has high cost performance. The cost and the equipment maintenance cost are lower than those of the single-sleeper continuous method equipment, and the actual operation efficiency is as much as that of the single-sleeper continuous laying process.

Description

Group's pillow formula long rail unit laying gapless track of laying a railway track has tiny fragments of stone, coal, etc. ballast construction method
Technical field
The present invention relates to a kind of rail transportation circuit operational method, refer in particular to population pillow formula jointless track track laying method, it is mainly used in that the gapless track ew line is laid a railway track and existing line when transforming in the jointless track track laying.
Background technology
Along with China railways speed raising and great-leap-forward development, newly-built Line for Passenger Transportation all adopts the long rail construction of 500m.According to Ministry of Railways planning, China will build four vertical four horizontal and three intercity personal rapid transit passages in zone totally 11 Lines for Passenger Transportation, and newly-built Line for Passenger Transportation all adopts the long rail of 500m to construct.The tradition construction method is that the section of track changes the Pudong Development Bank, and this worker's method easy operating is simple, and equipment is ripe to be safeguarded simply, but operation is loaded down with trivial details, and operating efficiency and automation are low, and labour intensity is big.The at present domestic list pillow continuous laying method that adopted substantially, promptly long rail, sleeper directly transport the building site to and lay.The equipment that adopts has been introduced the units of laying a railway track such as TCM60 type, PC-NTC type, SVM1000 type earlier, and on being laid a railway track in the basis of unit in introduction, has researched and developed CPG500 type, DPG500 type track-laying machine.Though that single pillow continuous laying method has is multiple functional, easy for operation, homework precision is higher, mechanization degree is than advantages such as height.But equipment investment is huge, crew's operation easier is big, electric, hydraulic system fault rate height, the investigation maintenance difficult, the part accessory is fragile, cause actual synthetic job efficient only for theoretical operating efficiency 60~70%.Because Ministry of Railways's new technology Policy Updates are fast, the required factory of the unit of laying a railway track, shed repair does not now also have the place under repair of the producer of appointment, crosses rail transportation difficulty, and the safety of crossing rail can't guarantee.Therefore necessary this is improved.
Summary of the invention
It is huge to the objective of the invention is to overcome the existing unit equipment investment of laying a railway track, crew's operation easier is big, electric, hydraulic system fault rate height, the investigation maintenance difficult, the part accessory is fragile to be waited not enoughly, provides the littler long rail of group's pillow formula of a kind of crew's operation easier unit laying gapless track of laying a railway track that tiny fragments of stone, coal, etc. ballast construction method is arranged.
The technical solution adopted in the present invention is: the long rail of the population pillow formula unit of laying a railway track is laid gapless track tiny fragments of stone, coal, etc. ballast construction method is arranged, be characterized in adopting group's pillow step-by-step movement platelayer method, the unit of laying a railway track is organized as successively by the direction of laying a railway track: long rail tractor, the main frame that has winding plant, even pillow mechanism and sleeper laying mechanism etc., have the subsidiary engine that pushes and divide the rail device, being loaded with the sleeper transport vehicle group of sleeper carrier, is locomotive at last.Group's pillow step-by-step movement platelayer method workflow is as follows:
A, preparation
Long rail tractor enters the scene of laying a railway track in advance; The unit of laying a railway track is pushed to circuit by locomotive and treats the place, shop, and the main frame forecarriage stops apart from the about 0.5m of the track end place of laying a railway track.With the truck-mounted crane that main frame carries the crawler-mounted pulling device of front end is put to railway ballast, made main frame ride crawler-mounted pulling device voluntarily, bogie and crawler-mounted pulling device locking reach the track laying state.Tie transport vehicle group pushes the scene of laying a railway track that enters by locomotive, and the tie transport vehicle group and the set auxiliary machinery of laying a railway track are connected the locomotive of hanging and unsnap; The installation rail bridge between unit and the tie transport vehicle group of laying a railway track.
B, overlay sleeper
The sleeper carrier is transported to 28 sleepers on the tie transport vehicle group in the even pillow mechanism of main frame, the sleeper carrier withdraws from main frame, the even mechanism of resting the head on is by the even automatically pillow of design pitch, sleeper is laid mechanism and is opened simultaneously to the sleeper top, hoist behind one group of 14 sleepers of clamping, moving forward puts in place, when unit move ahead 8.4m when stopping sleeper laying mechanism and begin stiff neck.
Unit is traveling voluntarily, lay second group of 14 sleepers by above-mentioned same steps as after.Main frame stops apart from spreading the about 0.5m of rail place from walking to trailing bogie.
C, long rail drag and unload
Long rail is hauled out from tie transport vehicle group by the winding plant on the main frame, and tells to the car body both sides by a minute rail device, enters the rail pusher. and the rail pusher drives rail, rail is pushed to the crawler-mounted pulling device front end of main frame.
The dilatory forward rail of long rail tractor.In the dilatory process of rail,, originally align with steel rail laying rail end group up to long rail tail end at placement one cylinder about every 5m on the railway ballast under the long rail.
By above operating process, long rail is laid on the railway roadbed in advance, the rail gauge is about 3100mm.
D, receipts rail and cloth pillow
Control long rail place device with the rail contraposition, and two long rail are linked together with special-purpose atresia rail clamping device.
It is rapid that track-laying machine constantly repeats cloth pillow cloth, and the unit of promptly the laying a railway track 8.4m that whenever moves ahead spreads 14 sleepers sleepers, and when meanwhile constantly moving ahead along with the unit of laying a railway track, rail is taken in the rail support groove.
Beneficial effect of the present invention is as follows:
1, the long rail of group's of the present invention pillow formula is laid a railway track unit and present single pillow continuity method equipment than simple and practical, the cost performance height, and cost and equipment maintenance cost are all far below single pillow continuity method equipment, and actual job efficient is suitable with single continuous laying worker method of resting the head on.
2, reliability height card pillow that single pillow continuous laying worker method given birth to can not occur, turn over the pillow phenomenon.
3, fault rate is low, adopts group's pillow cloth pillow, unit stepping to receive the rail operation scheme, and each Working mechanism modularized design is made, though the innovation of platelayer's method, each Working mechanism adopts mature technology in a large number.
4, compatible strong, not only can also can be used as the laying of the long rail of non-fragment orbit 500m in that laying 500m long rail string on the tiny fragments of stone, coal, etc. roadbed is arranged.
5, in work progress 10% fastener can be installed in advance below main frame, this method can make the All Jobs of jointless track construction finish synchronously.
6, each assembly of this unit is dismantled and assembled, makes things convenient for the road and rail freight shipments, has avoided the reached the standard grade rail transportation of program complexity.
Description of drawings
Fig. 1 is the tiny fragments of stone, coal, etc. ballast construction method that has of the present invention.
The specific embodiment
The present invention will be further described below in conjunction with drawings and Examples.
Accompanying drawing 1 has provided one embodiment of the present of invention, by accompanying drawing as can be seen, the present invention relates to the long rail of the population pillow formula unit of laying a railway track lays gapless track tiny fragments of stone, coal, etc. ballast construction method is arranged, be characterized in adopting group's pillow step-by-step movement platelayer method, the unit of laying a railway track is organized as successively by the direction of laying a railway track: long rail tractor 1, the main frame 2 that has winding plant 7, even pillow mechanism 13 and sleeper laying mechanism 8 etc., have the subsidiary engine 3 that pushes and divide the rail device, being loaded with the sleeper transport vehicle 5 of sleeper carrier 4, is locomotive 6 at last.Group's pillow formula long rail unit laying gapless track of laying a railway track has tiny fragments of stone, coal, etc. ballast construction method flow process as follows:
Referring to Fig. 1: construct by following flow process:
1 preparation
(1) long rail tractor 1 enters the scene of laying a railway track in advance; Main frame 2 and subsidiary engine 3 are pushed to circuit by locomotive and treat the place, shop, stopping apart from the about 0.5m of the track end place of laying a railway track, connect the pipeline of unit, ato unit, and the hydraulic pressure system construction in a systematic way is pressed, and the bogie driving mechanism gear closes;
(2) truck-mounted crane 16 that carries with main frame 2 is put the crawler-mounted pulling device 17 of front end to railway ballast; Make main frame 2 ride crawler-mounted pulling device 17 voluntarily, bogie and crawler-mounted pulling device 17 lockings, and connect pipeline, the main frame front end is supported by crawler-mounted pulling device 17;
(3) unclamp the sleeper carrier 5, rail draw off gear 9, the sleeper that fix in the unit transport process and lay mechanism 8, spare Working mechanisms such as resting the head on mechanism 13, make the track-laying machine main frame reach the track laying state;
(4) each parts is carried out conscientious inspection, good to confirm each parts duty;
(5) tie transport vehicle group 4 pushes the scene of laying a railway track that enters by locomotive 6, and the tie transport vehicle group 4 and the set auxiliary machinery of laying a railway track are connected the locomotive 6 of hanging and unsnap, and the rail bridge of laying a railway track between unit and the tie transport vehicle group is installed.
2 overlay sleeper
When (1) unit is laid a railway track for the first time, need earlier artificial contraposition to lay 16.8m (28) sleeper, unit is traveling voluntarily, and the 8.4m that whenever moves ahead lays one group of sleeper.
(2) sleeper carrier 5 is transported to the sleeper on the tie transport vehicle group in the even pillow mechanism 13 of main frame, sleeper carrier 5 withdraws from main frame 2, even pillow mechanism 13 moves ahead and even automatically pillow, sleeper is laid mechanism 8 and is opened simultaneously to the sleeper top, hoist behind one group of sleeper of clamping, moving forward puts in place, when unit move ahead 8.4m when stopping cloth pillow frame begin stiff neck, sleeper is fallen the about 50mm of railway ballast face place, the sleeper suspension hook is opened suspension hook by folding oil cylinder pushing mechanism, and sleeper is put to the railway ballast face;
(3) unit traveling voluntarily, lay second group of 14 sleepers by above-mentioned same steps as after.Main frame 2 stops apart from spreading the about 0.5m of rail place from walking to trailing bogie.
3 long rail drag and unload
(1) dismantles long rail locking device on the tie transport vehicle group (at every turn only allowing to unclamp a pair of long rail that to draw), unclamp the rail interval iron and take down the preceding baffle plate of a pair of long rail that to draw;
(2) long rail is hauled out from tie transport vehicle group 4 by the winding plant on the main frame 27, and tells to the car body both sides by a minute rail device 11, enters rail pusher 12;
(3) rail pusher 12 drives rail, rail is pushed to crawler-mounted pulling device 17 front ends of main frame 2 by the orienting roll wheels;
(4) after long rail tractor 1 contraposition, rail is fixed on the rail towed equipment the dilatory forward rail of tractor.In the dilatory process of rail, placing a Ground roller 14 on the railway ballast under the long rail about every 5m;
(5) when long rail dilatory during to remaining about 10m, tractor should slow down dilatory speed (≤15m/min), after last guide frame before the long rail alignment device of long rail tail end hauling-out, tractor speed slows down once more.Get in touch with contraposition by wireless talkback and tractor driver this moment, originally aligns with steel rail laying rail end group up to long rail tail end;
(6) by above operating process, long rail is laid on the railway roadbed in advance, the rail gauge is about 3100mm.
4 receive rail and cloth pillow
(1) control rail place device 10, clamping rail to be spread makes its rail end and spreads the steel rail end contraposition, and with special-purpose atresia rail clamping device two long rail is linked together; The locus of rail draw off gear 9 on the conversion main frame 2 makes it be converted to the rail state of receiving by a minute rail state; By each rail draw off gear 9, progressively rail is taken in the rail support groove;
(2) stop limit receipts rail to pillow position, next shop voluntarily in the unit limit;
(3) sleeper pitch between two groups of artificial contrapositions.Be transformed into automatic control mode then, behind the intact pillow of the unit cloth of laying a railway track, traveling and receive rail voluntarily, the cloth pillow of the unit of laying a railway track and even pillow device are under automatic control mode during operation, log arrangement is also started working simultaneously, sends pulse signal to cloth pillow, even pillow mechanism, unit traveling.Along with the unit of laying a railway track moves ahead, the long rail that is laid in advance on the railway ballast is received the rail state by each rail draw off gear 9() and rail place device 10 etc., accurately being positioned in the rail support groove, realization unit step-by-step movement is laid a railway track automatically;
(4) long rail carries out the placement of rubber mat plate 2 times at main frame before going into groove; After long rail is in place, under subsidiary engine, can carry out the initial installation and the fastening work (first loading amount about 10%) of rail clip etc.

Claims (3)

1. the long rail of the population pillow formula unit of laying a railway track is laid gapless track tiny fragments of stone, coal, etc. ballast construction method is arranged, it is characterized in that: adopt group's pillow step-by-step movement platelayer method, the unit of laying a railway track is organized as successively by the direction of laying a railway track: long rail tractor, the main frame that has winding plant, even pillow mechanism and sleeper laying mechanism etc., have the subsidiary engine that pushes and divide the rail device, being loaded with the sleeper transport vehicle group of sleeper carrier, is locomotive at last; Group's pillow step-by-step movement platelayer method workflow is as follows:
A, preparation
Long rail tractor enters the scene of laying a railway track in advance; The unit of laying a railway track is pushed to circuit by locomotive and treats the place, shop, and the main frame forecarriage stops apart from the about 0.5-1m of the track end place of laying a railway track; With the truck-mounted crane that main frame carries the crawler-mounted pulling device of front end is put to railway ballast, made main frame ride crawler-mounted pulling device voluntarily, bogie and crawler-mounted pulling device locking reach the track laying state;
B, overlay sleeper
The sleeper carrier is transported to the sleeper on the tie transport vehicle group in the even pillow mechanism of main frame, the sleeper carrier withdraws from main frame, the even mechanism of resting the head on is by the even automatically pillow of design pitch, sleeper is laid mechanism and is opened simultaneously to the sleeper top, hoist behind one group of sleeper of clamping, moving forward puts in place, when unit move ahead 8-9m when stopping sleeper laying mechanism and begin stiff neck;
Unit is traveling voluntarily, lay second group of sleeper by above-mentioned same steps as after; Main frame stops apart from spreading the about 0.5-1m of rail place from walking to trailing bogie;
C, long rail drag and unload
Long rail is hauled out from tie transport vehicle group by the winding plant on the main frame, and tells to the car body both sides by a minute rail device, enters the rail pusher. and the rail pusher drives rail, rail is pushed to the crawler-mounted pulling device front end of main frame;
The dilatory forward rail of long rail tractor; In the dilatory process of rail,, originally align with steel rail laying rail end group up to long rail tail end at placement one cylinder about every 5m on the railway ballast under the long rail;
By above operating process, long rail is laid on the railway roadbed in advance, the rail gauge is about 3100mm;
D, receipts rail and cloth pillow
Control long rail place device with the rail contraposition, and two long rail are linked together with special-purpose atresia rail clamping device;
It is rapid that track-laying machine constantly repeats cloth pillow cloth, and the unit of promptly the laying a railway track 8-9m that whenever moves ahead spreads 14 sleepers sleepers, and when meanwhile constantly moving ahead along with the unit of laying a railway track, rail is taken in the rail support groove.
2. the long rail of the group's as claimed in claim 1 pillow formula unit of laying a railway track is laid gapless track tiny fragments of stone, coal, etc. ballast construction method is arranged, and it is characterized in that: tie transport vehicle group pushes the scene of laying a railway track that enters by locomotive, with the tie transport vehicle group and the set auxiliary machinery of the laying a railway track locomotive of even hanging and unsnap; The installation rail bridge between unit and the tie transport vehicle group of laying a railway track.
3. the long rail of the group's as claimed in claim 1 pillow formula unit laying gapless track of laying a railway track has tiny fragments of stone, coal, etc. ballast construction method, and it is characterized in that: unit is traveling voluntarily, lay second group of 14 sleepers by above-mentioned same steps as after; Main frame stops apart from spreading the about 0.5m of rail place from walking to trailing bogie.
CN 201010587304 2010-12-15 2010-12-15 Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds Pending CN102002898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010587304 CN102002898A (en) 2010-12-15 2010-12-15 Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010587304 CN102002898A (en) 2010-12-15 2010-12-15 Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds

Publications (1)

Publication Number Publication Date
CN102002898A true CN102002898A (en) 2011-04-06

Family

ID=43810587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010587304 Pending CN102002898A (en) 2010-12-15 2010-12-15 Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds

Country Status (1)

Country Link
CN (1) CN102002898A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817290A (en) * 2012-08-20 2012-12-12 中铁重工有限公司 Automated guide rail loopback system for railway track laying machine
CN103161103A (en) * 2011-12-19 2013-06-19 中铁二局股份有限公司 Sleeper evenly arranging device and evenly arranging construction method used for group-sleeper-type sleeper laying unit
CN104477185A (en) * 2014-11-05 2015-04-01 中国北车集团沈阳机车车辆有限责任公司 Rail connecting device and long steel rail transport trainset
CN105401495A (en) * 2015-10-23 2016-03-16 中铁十七局集团第五工程有限公司 Method for rapidly and directly paving 100 m long rail of ballast track of newly-built railway
CN108118567A (en) * 2018-01-10 2018-06-05 李理 A kind of railroad sleeper handling device
CN108368679A (en) * 2015-11-03 2018-08-03 马蒂萨材料工业股份有限公司 The method and circuit upper part work machinery of sleeper for updating the track being made of rail and sleeper
CN108842541A (en) * 2018-07-20 2018-11-20 中铁二十局集团有限公司 The long rail of Ballast track draws method laying construction method and Ballast track construction method
CN108951323A (en) * 2018-08-06 2018-12-07 中铁十局集团第三工程有限公司 A kind of Ballast track laying method
CN113981753A (en) * 2021-10-29 2022-01-28 重庆交通职业学院 Maintenance and installation robot for rails
CN117626727A (en) * 2023-11-30 2024-03-01 中铁十二局集团有限公司 A construction method for parallel laying of rails across parallel lines

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1544646A (en) * 1976-03-05 1979-04-25 Matisa Materiel Ind Sa Process and apparatus for laying sleepers at regular intervals and in prescribed alignment on the bed of ballast of a railway track
US4542697A (en) * 1982-03-12 1985-09-24 Matisa Materiel Industriel S.A. Train for laying a new railroad track
CN1313430A (en) * 1999-12-07 2001-09-19 弗兰茨普拉塞铁路机械工业股份有限公司 Method and apparatus for laying rails
CN201634970U (en) * 2010-02-02 2010-11-17 中铁十一局集团第六工程有限公司 Long-rail track-laying machine set
CN102071606A (en) * 2010-12-14 2011-05-25 株洲长远铁路建机股份有限公司 Multi-sleeper type long rail laying machine set and rail laying method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1544646A (en) * 1976-03-05 1979-04-25 Matisa Materiel Ind Sa Process and apparatus for laying sleepers at regular intervals and in prescribed alignment on the bed of ballast of a railway track
US4542697A (en) * 1982-03-12 1985-09-24 Matisa Materiel Industriel S.A. Train for laying a new railroad track
CN1313430A (en) * 1999-12-07 2001-09-19 弗兰茨普拉塞铁路机械工业股份有限公司 Method and apparatus for laying rails
CN201634970U (en) * 2010-02-02 2010-11-17 中铁十一局集团第六工程有限公司 Long-rail track-laying machine set
CN102071606A (en) * 2010-12-14 2011-05-25 株洲长远铁路建机股份有限公司 Multi-sleeper type long rail laying machine set and rail laying method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161103A (en) * 2011-12-19 2013-06-19 中铁二局股份有限公司 Sleeper evenly arranging device and evenly arranging construction method used for group-sleeper-type sleeper laying unit
CN103161103B (en) * 2011-12-19 2015-05-13 中铁二局股份有限公司 Sleeper evenly arranging device and evenly arranging construction method used for group-sleeper-type sleeper laying unit
CN102817290A (en) * 2012-08-20 2012-12-12 中铁重工有限公司 Automated guide rail loopback system for railway track laying machine
CN104477185A (en) * 2014-11-05 2015-04-01 中国北车集团沈阳机车车辆有限责任公司 Rail connecting device and long steel rail transport trainset
CN104477185B (en) * 2014-11-05 2016-09-21 中国铁路总公司 Orbit connection device and gapless line transport trainset
CN105401495A (en) * 2015-10-23 2016-03-16 中铁十七局集团第五工程有限公司 Method for rapidly and directly paving 100 m long rail of ballast track of newly-built railway
CN108368679A (en) * 2015-11-03 2018-08-03 马蒂萨材料工业股份有限公司 The method and circuit upper part work machinery of sleeper for updating the track being made of rail and sleeper
CN108118567A (en) * 2018-01-10 2018-06-05 李理 A kind of railroad sleeper handling device
CN108842541A (en) * 2018-07-20 2018-11-20 中铁二十局集团有限公司 The long rail of Ballast track draws method laying construction method and Ballast track construction method
CN108951323A (en) * 2018-08-06 2018-12-07 中铁十局集团第三工程有限公司 A kind of Ballast track laying method
CN113981753A (en) * 2021-10-29 2022-01-28 重庆交通职业学院 Maintenance and installation robot for rails
CN117626727A (en) * 2023-11-30 2024-03-01 中铁十二局集团有限公司 A construction method for parallel laying of rails across parallel lines
CN117626727B (en) * 2023-11-30 2025-12-05 中铁十二局集团有限公司 A construction method for laying parallel rails across parallel tracks.

Similar Documents

Publication Publication Date Title
CN102071606B (en) Multi-sleeper type long rail laying machine set and rail laying method thereof
CN102002898A (en) Construction method of group-sleeper long rail track-laying unit for laying seamless track ballasted beds
CN102102317B (en) Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN109914166B (en) Urban rail scattered paving method mechanized construction equipment and construction method thereof
CN201485790U (en) Balanced single-nose bridge girder erection machine
CN109083467A (en) A kind of suspension type monorail vehicle is without track switch solid parking system
CN101050615A (en) Construction method of CPG500 seamless track long track laying unit for laying seamless track
CN103074829B (en) Railway switch changing construction method and railway switch track laying unit thereof
CN103924985A (en) Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN203021883U (en) Wheel-track railway track laying unit
CN201933372U (en) Sleeper group type long rail laying unit
CN114622450B (en) High-speed railway integrated track-changing train arrangement structure and track-changing method
CN109130736A (en) Can quickly up and down road combined vehicle
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN201137022Y (en) Fragment-free rail long steel rail track laying traction machine
CN115262301A (en) Retracting and changing rail operation system and operation method
CN207015096U (en) Can quickly up and down road combined vehicle
CN103469705A (en) Track layering machine for track panels and track layering method of track layering machine
CN201187021Y (en) Ballastless road bed track unit
CN202969176U (en) Maglev track laying vehicle
CN222961830U (en) Off-vehicle welding integrated rail changing construction system
CN201317902Y (en) Unballasted track lathe long rail bar paving machine set
CN201678918U (en) Steel rail picking and laying device of seamless line rapid rail change operation vehicle
CN201024361Y (en) Coal mine down-hole floating crossing
CN203034322U (en) Long steel rail paving unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110406