CN101917156A - 应对电网电压短时间跌落的风力发电机组防护方法及装置 - Google Patents

应对电网电压短时间跌落的风力发电机组防护方法及装置 Download PDF

Info

Publication number
CN101917156A
CN101917156A CN 201010266619 CN201010266619A CN101917156A CN 101917156 A CN101917156 A CN 101917156A CN 201010266619 CN201010266619 CN 201010266619 CN 201010266619 A CN201010266619 A CN 201010266619A CN 101917156 A CN101917156 A CN 101917156A
Authority
CN
China
Prior art keywords
auxiliary
thyristor
circuit
main thyristor
electrical nodes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010266619
Other languages
English (en)
Other versions
CN101917156B (zh
Inventor
赵燕峰
曹国荣
郭知彼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Zhuzhou Institute Co Ltd
Original Assignee
CSR Zhuzou Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Zhuzou Institute Co Ltd filed Critical CSR Zhuzou Institute Co Ltd
Priority to CN2010102666199A priority Critical patent/CN101917156B/zh
Publication of CN101917156A publication Critical patent/CN101917156A/zh
Application granted granted Critical
Publication of CN101917156B publication Critical patent/CN101917156B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

应对电网电压短时间跌落的风力发电机组防护方法及装置,本发明是在风力发电系统中,设置低电压穿越的crowbar电路,低电压穿越的crowbar电路包括至少一套主晶闸管及由辅助晶闸管、电容和电抗器组成的辅助电路,主晶闸管和辅助电路一同实现crowbar电路的开通和关断。当需要开通时,触发主晶闸管使电路开通,当需要关断时,触发辅助晶闸管,由辅助电容,辅助电抗器一起工作,实现先前开通的主晶闸管关断。本发明利用辅助晶闸管,辅助电容器和辅助电抗器构成的晶闸管的关断回路,在需要关断的时候,触发辅助晶闸管,则可实现先前开通的晶闸管的关断。

Description

应对电网电压短时间跌落的风力发电机组防护方法及装置
技术领域
本发明涉及一种风力发电系统的电网电压控制方法及装置,特别是一种应对电网电压短时间跌落的风力发电机组防护方法及装置。主要应用于风力发电系统中低电压穿越的crowbar电路。
背景技术
在风力发电系统中,例如双馈型风力发电系统,由于电网的波动或电网的短时间故障,而引发电网电压跌落,该电压跌落将使风力发电机组从正常工况转入低电压穿越工况,随着风能在电网中所占比例的升高,如果低电压穿越处理不好,将会引发风电机组大面积停机,给电网造成巨大冲击,甚至引发电网崩溃。
应对电网电压短时间跌落,是风力发电机组必须处理好的问题,对于双馈型风力发电系统,当电网发生跌落时,其转子端会出现过压,过流;使变流器中间直流电压升高,对变流器的安全构成严重威胁,为了消除该问题,在发生低电压穿越时,需要将转子回路旁路,并在旁路中消耗转子回路的一部分能量。因此,新的电网规则要求风力发电系统具有低电压穿越能力,现在一般风电系统通过增加Crowbar保护电路,可以极大地提高其故障穿越能力。
通常,crowbar电路由二极管整流桥及晶闸管组成,二极管整流桥将电机转子三相输出整流成直流,在需要的时候,触发晶闸管,电机转子,二极管整流器,晶闸管及能耗电阻组成一个回路,实现对变流器的保护。
但是,晶闸管触发后,不能自行关断,其关断只能依靠外电路电压的反向。这种crowbar电路只能实现变流器的保护,并不能完成风电机组的低电压穿越。该crowbar电路触发后,需要等待一段时间,并把电机的定子从电网断开,待晶闸管由于外电路的变化而关断后,电机及变流器实施再次并网并发动。该型crowbar电路不能实现低电压穿越,原因在于晶闸管不能受控关断,只能依靠外电路的反向,实现关断。
一些企业看到了这点,将晶闸管换成了IGBT,IGCT,或是GTO,并申请了专利。这样,被改进的crowbar电路能自如开关,能适应低电压穿越的要求。但是,由于需要采用电流等级较高的IGBT,IGCT或GTO,因而成本较高,并且可靠性也较难保证。
一些企业将上述的IGBT,IGCT或GTO换成了高速接触器,或是在晶闸管前面串进高速接触器,该方案虽然也实现了低电压穿越的功能,并且可靠性变高,但是仍存在成本高昂的不足(大容量高速接触器价格昂贵)。因此很有必要对此加以解决。
发明内容
本发明的目的为了克服现有Crowbar保护电路的不足,提供一种既能保证低电压穿越的要求,又成本更低的应对电网电压短时间跌落的风力发电机组防护方法及装置。
本发明的目的是通过下述技术方案实现的,一种应对电网电压短时间跌落的风力发电机组防护方法,在风力发电系统中,设置低电压穿越的crowbar电路,其特征在于所述的低电压穿越的crowbar电路包括至少一套主晶闸管及由辅助晶闸管、电容和电抗器组成的辅助电路,主晶闸管和辅助电路一同实现crowbar电路的开通和关断。当需要开通时,触发主晶闸管使电路开通,当需要关断时,触发辅助晶闸管,由辅助电容,辅助电抗器一起工作,实现先前开通的主晶闸管关断。当检测到需要触发crowbar时,则触发主晶闸管T1,转子通过整流器,能耗电阻R,主晶闸管T1,连线等效的电感L1,组成回路,这时转子处于旁路,无法继续向变流器输送能量;当检测到故障解除,需要断开crowbar回路,以便风力发电机组发电,则触发辅助晶闸管T2,这时事先被充电的电容C2,辅助晶闸管T2,电抗器L2,以及处于导通状态的主晶闸管T1,组成了一个回路,随着电抗器L2中电流的逐渐增加,流过主晶闸管T1的电流逐渐减小,并最终实现关断。主晶闸管T1关断后,crowbar电路随即失去了旁路作用,该电路与电机的转子构成的回路断开。
一种根据上述方法所提出的应对电网电压短时间跌落的风力发电机组防护装置是:一种应对电网电压短时间跌落的风力发电机组防护装置,采用crowbar电路适应低电压穿越的要求,其特征在于所述的低电压穿越的crowbar电路包括至少一套主晶闸管及由辅助晶闸管、电容和电抗器组成的辅助电路,并由主晶闸管和辅助电路一同实现crowbar电路的开通和关断。
本发明的有益效果是:由于实现低电压穿越的crowbar电路具有单次工作,并且较少动作的特点,因此,利用辅助晶闸管,辅助电容器和辅助电抗器构成的晶闸管的关断回路,在需要关断的时候,触发辅助晶闸管,则可实现先前开通的晶闸管的关断。这样不仅能有效保证保证低电压穿越的要求,而由于晶闸管的成本比IGBT,IGCT或GTO要低得多,所以又可以有效降低成本,实现本发明的目的。
附图说明:
图1是本发明的电路结构示意图。
图中:1、crowbar电路模块,2、整流器,3、转子,4、机侧变流器,5、网侧变流器, 6、电网,7、第一电节点,8、第二电节点,9、第三电节点,10、第四电节点,T1、主晶闸管,T2、辅助晶闸管,C1、电容,C2、电容,L1、电感,L2、电抗器,R、能耗电阻。
具体实施方式
下面将结合附图和实施例对本发明做进一步的描述。
如图1所示,根据附图可以看出,本发明是一种应对电网电压短时间跌落的风力发电机组防护方法及装置。他是在风力发电系统中,设置低电压穿越的crowbar电路,其特征在于所述的低电压穿越的crowbar电路包括至少一套主晶闸管及由辅助晶闸管、电容和电抗器组成的辅助电路,主晶闸管和辅助电路一同实现crowbar电路的开通和关断。当需要开通时,触发主晶闸管使电路开通,当需要关断时,触发辅助晶闸管,由辅助电容,辅助电抗器一起工作,实现先前开通的主晶闸管关断。当检测到需要触发crowbar时,则触发主晶闸管T1,转子通过整流器,能耗电阻R,主晶闸管T1,连线等效的电感L1,组成回路,这时转子处于旁路,无法继续向变流器输送能量;当检测到故障解除,需要断开crowbar回路,以便风力发电机组发电,则触发辅助晶闸管T2,这时事先被充电的电容C2,辅助晶闸管T2,电抗器L2,以及处于导通状态的主晶闸管T1,组成了一个回路,随着电抗器L2中电流的逐渐增加,流过主晶闸管T1的电流逐渐减小,并最终实现关断。主晶闸管T1关断后,crowbar电路随即失去了旁路作用,该电路与电机的转子构成的回路断开。
一种根据上述方法所提出的应对电网电压短时间跌落的风力发电机组防护装置是:一种应对电网电压短时间跌落的风力发电机组防护装置,采用crowbar电路适应低电压穿越的要求,其特征在于所述的低电压穿越的crowbar电路包括至少一套主晶闸管T1及由辅助晶闸管T2、电容C2和电抗器L2组成的辅助电路,并由主晶闸管T1和辅助电路一同实现crowbar电路的开通和关断。在电机的转子3与机侧变流器4的电连接线中插接有crowbar电路模块1,在crowbar电路模块1的整流器2旁路设有主晶闸管T1,主晶闸管T1又旁路设有由辅助晶闸管T2、电容C2和电抗器L2组成的辅助电路;主晶闸管T1接在第一电节点7至第二电节点8,及第三电节点9至第四电节点10所构成的旁路中,且在第一电节点7与第二电节点8之间串接有能耗电阻R,在第三电节点9与第四电节点10之间串接有电感L1;辅助晶闸管T2旁接在主主晶闸管T1旁路的第二电节点8与第三电节点9上,且电容C2串接在第二电节点8与辅助晶闸管T2之间,电抗器L2串接在第三电节点9与辅助晶闸管T2之间。
当需要开通时,触发主晶闸管T1使电路开通,当需要关断时,触发触发辅助晶闸管T2,由辅助电容C2,辅助电抗器L2一起工作,实现先前开通的主晶闸管关断。当检测到需要触发crowbar时,则触发主晶闸管T1,转子通过整流器,能耗电阻R,主晶闸管T1,连线等效的电感L1,组成回路,这时转子处于旁路,无法继续向变流器输送能量;当检测到故障解除,需要断开crowbar回路,以便风力发电机组发电,则触发辅助晶闸管T2,这时事先被充电的辅助电容C2,辅助晶闸管T2,辅助电抗器L2,以及处于导通状态的主晶闸管T1,组成了一个回路,随着辅助电抗器L2中电流的逐渐增加,流过主晶闸管T1的电流逐渐减小,并最终实现关断。主晶闸管T1关断后,crowbar电路随即失去了旁路作用,该电路与电机的转子构成的回路断开。

Claims (6)

1.一种应对电网电压短时间跌落的风力发电机组防护方法,其特征在于:在风力发电系统中,设置低电压穿越的crowbar电路,其特征在于所述的低电压穿越的crowbar电路包括至少一套主晶闸管及由辅助晶闸管、电容和电抗器组成的辅助电路,主晶闸管和辅助电路一同实现crowbar电路的开通和关断。
2.如权利要求1所述的应对电网电压短时间跌落的风力发电机组防护方法,其特征在于:当需要开通时,触发主晶闸管使电路开通,当需要关断时,触发辅助晶闸管,由辅助电容,辅助电抗器一起工作,实现先前开通的主晶闸管关断。
3.如权利要求1所述的应对电网电压短时间跌落的风力发电机组防护方法,其特征在于:当检测到需要触发crowbar时,则触发主晶闸管,转子通过整流器,能耗电阻,主晶闸管,连线等效的电感,组成回路,这时转子处于旁路,无法继续向变流器输送能量;当检测到故障解除,需要断开crowbar回路,以便风力发电机组发电,则触发辅助晶闸管,这时事先被充电的电容,辅助晶闸管,电抗器,以及处于导通状态的主晶闸管,组成了一个回路,随着电抗器中电流的逐渐增加,流过主晶闸管的电流逐渐减小,并最终实现关断;主晶闸管关断后,crowbar电路随即失去了旁路作用,该电路与电机的转子构成的回路断开。
4.一种如权利要求1—3所述应对电网电压短时间跌落的风力发电机组防护方法的应对电网电压短时间跌落的风力发电机组防护装置,采用crowbar电路适应低电压穿越的要求,其特征在于:所述的低电压穿越的crowbar电路包括至少一套主晶闸管及由辅助晶闸管、电容和电抗器组成的辅助电路,并由主晶闸管和辅助电路一同实现crowbar电路的开通和关断。
5.如权利要求4所述的应对电网电压短时间跌落的风力发电机组防护装置,其特征在于:在电机的转子与机侧变流器的电连接线中插接有crowbar电路模块,在crowbar电路模块的整流器旁路设有主晶闸管,主晶闸管又旁路设有由辅助晶闸管、电容和电抗器组成的辅助电路。
6.如权利要求5所述的应对电网电压短时间跌落的风力发电机组防护装置,其特征在于:主晶闸管接在第一电节点至第二电节点,及第三电节点至第四电节点所构成的旁路中,且在第一电节点与第二电节点之间串接有能耗电阻,在第三电节点与第四电节点之间串接有电感;辅助晶闸管旁接在主主晶闸管旁路的第二电节点与第三电节点上,且电容串接在第二电节点与辅助晶闸管之间,电抗器串接在第三电节点与辅助晶闸管之间。
CN2010102666199A 2010-08-30 2010-08-30 应对电网电压短时间跌落的风力发电机组防护方法及装置 Expired - Fee Related CN101917156B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102666199A CN101917156B (zh) 2010-08-30 2010-08-30 应对电网电压短时间跌落的风力发电机组防护方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102666199A CN101917156B (zh) 2010-08-30 2010-08-30 应对电网电压短时间跌落的风力发电机组防护方法及装置

Publications (2)

Publication Number Publication Date
CN101917156A true CN101917156A (zh) 2010-12-15
CN101917156B CN101917156B (zh) 2012-11-14

Family

ID=43324574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102666199A Expired - Fee Related CN101917156B (zh) 2010-08-30 2010-08-30 应对电网电压短时间跌落的风力发电机组防护方法及装置

Country Status (1)

Country Link
CN (1) CN101917156B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102223126A (zh) * 2011-06-28 2011-10-19 北京清能华福风电技术有限公司 用于风力发电低电压穿越的变电阻Crowbar结构及其实现方法
CN102324755A (zh) * 2011-10-11 2012-01-18 中国矿业大学 双馈风力发电系统的低电压穿越控制方法及装置
CN103066580A (zh) * 2012-10-30 2013-04-24 中国科学院电工研究所 一种用于风电场的故障保护和能量稳定电路
WO2013041974A3 (en) * 2011-09-01 2014-01-23 Sergio Aurtenetxea Method and apparatus for controlling a converter
CN112152215A (zh) * 2019-06-28 2020-12-29 北京金风科创风电设备有限公司 变流器的滤波电容工作控制装置以及方法
CN112567129A (zh) * 2018-08-30 2021-03-26 通用电气公司 用于风力涡轮功率系统的跳闸减少工具
EP4084319A1 (en) * 2021-04-30 2022-11-02 Siemens Gamesa Renewable Energy Innovation & Technology S.L. A wind power facility and method
WO2022229346A1 (en) * 2021-04-30 2022-11-03 Siemens Gamesa Renewable Energy Innovation & Technology S.L. A wind power facility and method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5734256A (en) * 1995-05-31 1998-03-31 General Electric Company Apparatus for protection of power-electronics in series compensating systems
US20040145188A1 (en) * 2003-01-24 2004-07-29 Wilhelm Janssen Low voltage ride through for wind turbine generators
WO2004098261A2 (en) * 2003-05-02 2004-11-18 Xantrex Technology Inc. Control system for doubly fed induction generator
WO2007077001A2 (en) * 2005-12-30 2007-07-12 Universidad Publica De Navarra Method and system of control of the converter of an electricity generation facility connected to an electricity network in the presence of voltage sags in said network
EP1863162A2 (en) * 2006-06-02 2007-12-05 General Electric Company Refundant electrical brake and protection system for electric generators
EP2130294A2 (de) * 2007-03-24 2009-12-09 Woodward SEG GmbH & Co. KG Verfahren und vorrichtung zum betrieb einer doppeltgespeisten asynchronmaschine bei transienten netzspannungsänderungen
CN101609992A (zh) * 2009-06-24 2009-12-23 北京利德华福电气技术有限公司 低压穿越型双馈风力发电机变流器
CN101621204A (zh) * 2009-08-14 2010-01-06 清华大学 用于双馈式风力发电系统低电压穿越的撬棒电阻设计方法
CN101630850A (zh) * 2009-08-07 2010-01-20 深圳市禾望电气有限公司 一种双馈型感应发电机穿越电网故障的装置及方法
CN101651330A (zh) * 2009-09-23 2010-02-17 哈尔滨九洲电气股份有限公司 一种双馈风电变流器Crowbar保护装置
CN101710715A (zh) * 2009-11-26 2010-05-19 上海大学 电网电压瞬降时双馈感应风力发电机低电压穿越控制系统及方法
CN101741100A (zh) * 2010-01-11 2010-06-16 华锐风电科技(集团)股份有限公司 低电压穿越控制方案

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5734256A (en) * 1995-05-31 1998-03-31 General Electric Company Apparatus for protection of power-electronics in series compensating systems
US20040145188A1 (en) * 2003-01-24 2004-07-29 Wilhelm Janssen Low voltage ride through for wind turbine generators
WO2004098261A2 (en) * 2003-05-02 2004-11-18 Xantrex Technology Inc. Control system for doubly fed induction generator
WO2007077001A2 (en) * 2005-12-30 2007-07-12 Universidad Publica De Navarra Method and system of control of the converter of an electricity generation facility connected to an electricity network in the presence of voltage sags in said network
EP1863162A2 (en) * 2006-06-02 2007-12-05 General Electric Company Refundant electrical brake and protection system for electric generators
EP2130294A2 (de) * 2007-03-24 2009-12-09 Woodward SEG GmbH & Co. KG Verfahren und vorrichtung zum betrieb einer doppeltgespeisten asynchronmaschine bei transienten netzspannungsänderungen
CN101609992A (zh) * 2009-06-24 2009-12-23 北京利德华福电气技术有限公司 低压穿越型双馈风力发电机变流器
CN101630850A (zh) * 2009-08-07 2010-01-20 深圳市禾望电气有限公司 一种双馈型感应发电机穿越电网故障的装置及方法
CN101621204A (zh) * 2009-08-14 2010-01-06 清华大学 用于双馈式风力发电系统低电压穿越的撬棒电阻设计方法
CN101651330A (zh) * 2009-09-23 2010-02-17 哈尔滨九洲电气股份有限公司 一种双馈风电变流器Crowbar保护装置
CN101710715A (zh) * 2009-11-26 2010-05-19 上海大学 电网电压瞬降时双馈感应风力发电机低电压穿越控制系统及方法
CN101741100A (zh) * 2010-01-11 2010-06-16 华锐风电科技(集团)股份有限公司 低电压穿越控制方案

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《现代电力》 20090810 杨涛等 双馈变速风电机组低电压穿越控制方案的研究 , 第04期 2 *
《电力建设》 20070901 胡书举等 适用于直驱式风电系统的Crowbar电路分析 , 第09期 2 *
《电力系统自动化》 20080125 胡家兵等 双馈风力发电系统的低压穿越运行与控制 , 第02期 2 *
《电机与控制学报》 20090115 张学广等 电网对称故障下基于active crowbar双馈发电机控制 , 第01期 2 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102223126A (zh) * 2011-06-28 2011-10-19 北京清能华福风电技术有限公司 用于风力发电低电压穿越的变电阻Crowbar结构及其实现方法
WO2013041974A3 (en) * 2011-09-01 2014-01-23 Sergio Aurtenetxea Method and apparatus for controlling a converter
CN102324755A (zh) * 2011-10-11 2012-01-18 中国矿业大学 双馈风力发电系统的低电压穿越控制方法及装置
CN102324755B (zh) * 2011-10-11 2013-07-17 中国矿业大学 双馈风力发电系统的低电压穿越控制方法及装置
CN103066580A (zh) * 2012-10-30 2013-04-24 中国科学院电工研究所 一种用于风电场的故障保护和能量稳定电路
CN112567129A (zh) * 2018-08-30 2021-03-26 通用电气公司 用于风力涡轮功率系统的跳闸减少工具
CN112567129B (zh) * 2018-08-30 2024-04-19 通用电气可再生能源西班牙有限公司 用于风力涡轮功率系统的跳闸减少工具
CN112152215A (zh) * 2019-06-28 2020-12-29 北京金风科创风电设备有限公司 变流器的滤波电容工作控制装置以及方法
CN112152215B (zh) * 2019-06-28 2024-05-17 北京金风科创风电设备有限公司 变流器的滤波电容工作控制装置以及方法
EP4084319A1 (en) * 2021-04-30 2022-11-02 Siemens Gamesa Renewable Energy Innovation & Technology S.L. A wind power facility and method
EP4084321A1 (en) * 2021-04-30 2022-11-02 Siemens Gamesa Renewable Energy Innovation & Technology S.L. A wind power facility and method
WO2022229346A1 (en) * 2021-04-30 2022-11-03 Siemens Gamesa Renewable Energy Innovation & Technology S.L. A wind power facility and method
US12506427B2 (en) 2021-04-30 2025-12-23 Siemens Gamesa Renewable Energy Innovation & Technology S.L. Wind power facility and method

Also Published As

Publication number Publication date
CN101917156B (zh) 2012-11-14

Similar Documents

Publication Publication Date Title
El Moursi et al. A parallel capacitor control strategy for enhanced FRT capability of DFIG
CN101917156B (zh) 应对电网电压短时间跌落的风力发电机组防护方法及装置
Candelaria et al. VSC-HVDC system protection: A review of current methods
TWI464990B (zh) 雙饋型風力發電系統的直流斬波裝置與方法
AU2010352434B2 (en) System and method for control an electric generator
US20120280665A1 (en) Control method for low voltage ride through
CN101609992A (zh) 低压穿越型双馈风力发电机变流器
CN106877301A (zh) 一种高压直流断路器及试验方法
CN106877300A (zh) 一种低压直流断路器及试验方法
CN103337871B (zh) 一种风力发电机组低电压穿越电路及相应的控制方法
CN102904280A (zh) 一种双馈风电变流器穿越电网故障的装置及方法
CN105140963A (zh) 基于故障限流控制的双馈风力发电机系统及低电压穿越方法
CN102299526A (zh) 一种双馈式风力发电机组低电压穿越控制方法及系统装置
CN102412597A (zh) 一种双馈风力发电系统低电压穿越控制方法和装置
CN102290826A (zh) 并网异步风力发电机组穿越电网低电压故障的方法
CN102790406B (zh) 具备可靠低电压穿越能力的双馈变流器
CN104022529A (zh) 基于改进Crowbar的双馈风力发电机低电压穿越控制方法
CN102790404A (zh) 具备低电压穿越功能的双馈型风电机组
CN201766546U (zh) 一种应对电网电压短时间跌落的风力发电机组防护装置
CN206164111U (zh) 一种双馈风力发电低电压穿越系统
Nguyen et al. A review of fault ride through strategies for different wind turbine systems
Heidary et al. Wind energy generators fault Current protection: Structures survey
CN201466745U (zh) 低压穿越型双馈风力发电机变频器
CN111276995A (zh) 用于海上风电柔直送出系统的功率平衡装置及控制方法
CN207691447U (zh) 双馈风力发电系统低电压穿越装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20190830

CF01 Termination of patent right due to non-payment of annual fee