CN101892846A - 高水压地层盾构淹埋式接收封堵超挖空隙的方法 - Google Patents
高水压地层盾构淹埋式接收封堵超挖空隙的方法 Download PDFInfo
- Publication number
- CN101892846A CN101892846A CN 201010228478 CN201010228478A CN101892846A CN 101892846 A CN101892846 A CN 101892846A CN 201010228478 CN201010228478 CN 201010228478 CN 201010228478 A CN201010228478 A CN 201010228478A CN 101892846 A CN101892846 A CN 101892846A
- Authority
- CN
- China
- Prior art keywords
- shield
- water
- shield structure
- pressure
- received well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000009933 burial Methods 0.000 title abstract 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 47
- 238000007710 freezing Methods 0.000 claims abstract description 16
- 230000008014 freezing Effects 0.000 claims abstract description 15
- 239000002689 soil Substances 0.000 claims abstract description 4
- 238000005057 refrigeration Methods 0.000 claims description 6
- 230000006641 stabilisation Effects 0.000 claims description 5
- 238000011105 stabilization Methods 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 4
- 239000007924 injection Substances 0.000 claims description 4
- 238000007569 slipcasting Methods 0.000 claims description 4
- 102000010637 Aquaporins Human genes 0.000 claims description 3
- 108010063290 Aquaporins Proteins 0.000 claims description 3
- 230000002153 concerted effect Effects 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 238000004078 waterproofing Methods 0.000 abstract description 7
- 239000004576 sand Substances 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000005641 tunneling Effects 0.000 abstract description 2
- 238000005086 pumping Methods 0.000 abstract 2
- 239000011440 grout Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 9
- 239000002002 slurry Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 229920002635 polyurethane Polymers 0.000 description 3
- 239000004814 polyurethane Substances 0.000 description 3
- 239000000843 powder Substances 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229920005830 Polyurethane Foam Polymers 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000012809 cooling fluid Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000011496 polyurethane foam Substances 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明属于隧道工程超挖空隙防水堵漏的技术领域,具体涉及一种高水压地层盾构淹埋式接收封堵超挖空隙的方法,解决了现有超挖空隙防水堵漏技术不适合高水压地层的,造成盾构接收风险大,易发生事故的问题。其步骤如下:预留盾构接收井;破除盾构接收井墙体凿出环形凹槽,在环形凹槽内铺设冻结管;往盾构接收井内灌水或者先填土再灌水;盾构机推进,待只有盾尾外壳还在洞门圈以内时停止;启动冷冻,并向超挖空隙内注浆;盾构接收井与外界承压水层分开时,抽水;抽水清淤完后,割掉部分盾尾,盾构机解体吊出,完成接收。本发明的有益效果:保证了高承压粉细沙层等极差地层或恶劣地层中盾构的接收,避免不良地层中盾构接收的灾难性事故。
Description
技术领域
本发明属于盾构隧道建设工程中盾构接收时管片壁后超挖空隙防水堵漏的技术领域,具体涉及一种高水压地层盾构淹埋式接收封堵超挖空隙的方法。
背景技术
现有的盾构接收时管片壁后超挖空隙的防水堵漏技术主要有:
①压注双液水泥砂浆防水堵漏技术。这是一种目前常用的盾构接收防水堵漏方法,即,在盾构接收时破除洞门前用水泥浆加一定配比的水玻璃注入到管片及盾构壁后超挖的空隙里面,以防止地下水特别是含有一定压力的地下水顺着超挖空隙涌向洞门形成喷涌事故。这种方法,一定程度上起到了堵水的效果,但是这种方法有个致命的缺点就是在盾构管片的背后的浆液可以起到堵水的效果,但是抽水后盾构壁后的浆液随着盾构的下一步继续推进,原先凝固的浆液被重新扰动破碎,起不到堵水特别是承压水的效果,同时浆液可能在凝固在盾构外壳上,使得下一步推进超挖更大,增大了盾构接收的风险,尤其是在承压较大的粉细沙层地区可能造成灾难性的后果。
②聚氨酯加注双液浆堵漏技术。聚氨酯是一种见水发泡的化学物质,在一般地下工程抢险的过程中较为常见,其配合双液浆能起到良好的防水堵漏效果。在盾构接收破除洞门前先用聚氨酯注入到管片及盾构壁后超挖的空隙里面,以起到过滤堵漏的作用,同时为下一步注入的双液浆起到阻流塞的作用,带聚氨酯发泡后即可注入双液浆填充超挖空隙。此种方法的造价高昂,在一般非承压水地层中效果可以,但是在高承压水地区,基本起不到应有的效果,原因是抽水排淤后盾构壁后的填充物(发泡聚氨酯及凝固双液浆)随着盾构的继续前进移动而发生不规律破坏,被破坏的堵水层在高承压水地区基本起不到防水堵漏的效果,极易发生较大工程事故。
发明内容
本发明为了解决现有盾构接收壁厚超挖空隙防水堵漏技术不适合高水压地层的,造成盾构接收风险大,易发生事故的问题,提供了一种高水压地层盾构淹埋式接收封堵超挖空隙的方法。
本发明采用如下的技术方案实现:
一种高水压地层盾构掩埋式接收封堵超挖空隙的方法,其步骤如下:
1)、在接收车站或在建设车站过程中预留尺寸大于盾构机主体的单独空间作为盾构接收井,此接收井要保证不漏水且能承受车站外部水压力;
2)、盾构机距离盾构接收井10~20m时,破除盾构接收井墙体对应隧道部位的混凝土和钢筋形成洞门圈,然后在洞门圈内凿出环形凹槽,并在凿好的环形凹槽内铺设双层冻结管并固定,冻结管连接地面冷冻系统;
3)、往盾构接收井内灌水或者先填土再灌水;如果灌水,水压与地层承压水的压力持平;如果先填土再灌水,水土压力的合力与地层承压水的压力持平;
4)、盾构机推进,依次穿过端头加固区和洞门圈,推上接收托架,待盾构的刀盘、前盾及中盾都推出洞门圈,整个盾构机只有盾尾外壳还在洞门圈以内时停止前进;
5)、启动地面冷冻系统,冻结管冻结形成洞门冻结密封圈,在盾尾外部形成冻结体不透水层,同时通过盾尾管片及盾构尾部的注浆管向管片壁后超挖空隙内注入双液砂浆填补壁后空隙;
6)、冻结体不透水层达到设计厚度和强度,同时管片壁后超挖空隙形成的过水通道亦被注浆封堵,整个盾构接收井与外界承压水层彻底分开,此时开始抽掉盾构接收井中的水,如有填土时需要进一步清淤;
7)、抽水清淤完毕后,割掉部分盾尾,留下的部分盾尾与盾尾内配装的管片一起形成永久衬砌,盾构机解体吊出,完成盾构机的最终接收。
本发明主要是针对盾构在高水压地层中接收时管片及盾构壁后的防水堵漏设计与施工,采用冻结环的方法把水充分冻结后,达到在盾构周围形成一个密封圈,待排水清淤后割掉盾尾,被割掉的盾尾和后续安装的管片一起形成完全密封的永久衬砌,达到盾构的安全接收,避免灾难性事故的发生。
本发明相对现有技术具有如下有益效果:配合淹埋式盾构接收施工方法,利用洞门冻结圈把高承压水隔离在接收井外,保证了高承压粉细沙层等极差地层中盾构的成功接收,从理论上及实践中保证了恶劣地层中盾构接收的万无一失,避免不良地层中盾构接收的灾难性事故,尤其适用于东部沿海城市地层中地铁盾构接收施工,有极大的推广价值和经济效益。
附图说明
图1为盾构接收井平面布置图
图2为盾构接收井纵剖面图
图3为环形凹槽及冻结管铺设细部构造图
图4为往盾构接收井内注水示意图
图5为盾构机推进至只有盾尾留在洞门圈以内示意图
图6为冻结管启动并在管片壁后注浆形成防水堵漏层示意图
图7为盾构接收井抽水清淤完毕的示意图
图8为盾构淹埋式接收完毕的示意图
图中:1-预开挖隧道,2-端头加固区,3-盾构接收井,4-接收井墙体,5-管片隧道,6-盾构机,7-地平面,8-环形凹槽,9-冻结管,10-接收托架,11-车站底板,12-前盾,13-中盾,14-盾尾,15-管片壁后超挖空隙,16-超挖空隙内注浆填充,17-洞门冻结密封圈,18-端头加固区,19-注入的水位线。
具体实施方式
结合附图对本发明的具体实施方式作进一步说明。
在高水压含水砂层地层中为保证盾构接收的万无一失,需要进行淹埋式盾构接收,预先在接收车站或在建设车站过程中预留尺寸大于盾构机主体的单独空间作为盾构接收井,盾构接收井要保证不漏水且能承受车站外部水压力,盾构专用接收井平面布置图如图1所示。
盾构到达前(一般距离洞门10~20m),破除接收洞门混凝土和钢筋,然后再洞门圈内凿出环形凹槽并在凿好的环形凹槽内铺设双层冻结管并固定,冻结管连接地面冷冻系统,如图2、图3所示。冻结管在洞门凿出的凹槽内铺设并固定完成后,往施作好的接收井内灌水(必要的时候先填土再灌水)至一定水位,此水位根据承压水的压力大小而定,如果外加填土,则计算水土压力的合力基本与地层承压水的压力持平,如图4所示。
注入完成后,盾构按照设计隧道中心线推进,依次穿过端头加固区和已凿除的洞门圈,推上接收架,待盾构的刀盘、前盾及中盾都推出洞门圈时停止前进,此时整个盾构只有盾尾外壳还在洞门圈以内,如图5所示。
此后,开始启动地面冷冻系统,让冷却液在环形冻结管中循环冷冻,基本在盾尾外部形成一定厚度的冻结体不透水层,与此同时,通过盾尾管片及盾构尾部的注浆管向壁后空隙内注入双液砂浆填补壁后空隙。两者形成一定厚度和强度的防水堵漏层,如图6所示。
待冻结达到设计时间,即认为冻结体达到一定厚度和强度,冻结体的厚度和强度,本领域技术人员可以根据已知的设计常识结合水文地质条件而定,一般选取厚度为2~3m,强度不低于5MPa。管片壁后空隙形成的过水通道亦被注浆封堵,整个盾构接收井与外界承压水层彻底分开,此时开始抽掉接收井中的水,如有填土时需要进一步清淤,如图7所示。
抽水清淤完毕后,割掉部分盾尾,留下的部分盾尾与盾尾内配装的管片一起形成永久衬砌,盾构解体吊出,完成盾构的最终接收,如图8所示。
Claims (1)
1.一种高水压地层盾构掩埋式接收封堵超挖空隙的方法,其特征在于步骤如下:
1)、在接收车站或在建设车站过程中预留尺寸大于盾构机(6)主体的单独空间作为盾构接收井(3),此接收井要保证不漏水且能承受车站外部水压力;
2)、盾构机(6)距离盾构接收井(3)10~20m时,破除盾构接收井墙体(4)对应隧道部位的混凝土和钢筋形成洞门圈,然后在洞门圈内凿出环形凹槽(8),并在凿好的环形凹槽(8)内铺设双层冻结管(9)并固定,冻结管(9)连接地面冷冻系统;
3)、往盾构接收井(3)内灌水或者先填土再灌水;如果灌水,水压与地层承压水的压力持平;如果先填土再灌水,水土压力的合力与地层承压水的压力持平;
4)、盾构机(6)推进,依次穿过端头加固区(2)和洞门圈,推上接收托架(10),待盾构的刀盘、前盾(12)及中盾(13)都推出洞门圈,整个盾构机只有盾尾(14)外壳还在洞门圈以内时停止前进;
5)、启动地面冷冻系统,冻结管(9)冻结形成洞门冻结密封圈(17),在盾尾(14)外部形成冻结体不透水层,同时通过盾尾管片及盾构尾部的注浆管向管片壁后超挖空隙(15)内注入双液砂浆填补壁后空隙;
6)、冻结体不透水层达到设计厚度和强度,同时管片壁后超挖空隙(15)形成的过水通道亦被注浆封堵,整个盾构接收井(3)与外界承压水层彻底分开,此时开始抽掉盾构接收井(3)中的水,如有填土时需要进一步清淤;
7)、抽水清淤完毕后,割掉部分盾尾(14),留下的部分盾尾与盾尾内配装的管片一起形成永久衬砌,盾构机解体吊出,完成盾构机的最终接收。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010102284781A CN101892846B (zh) | 2010-07-13 | 2010-07-13 | 高水压地层盾构淹埋式接收封堵超挖空隙的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010102284781A CN101892846B (zh) | 2010-07-13 | 2010-07-13 | 高水压地层盾构淹埋式接收封堵超挖空隙的方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101892846A true CN101892846A (zh) | 2010-11-24 |
| CN101892846B CN101892846B (zh) | 2011-11-16 |
Family
ID=43102176
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010102284781A Active CN101892846B (zh) | 2010-07-13 | 2010-07-13 | 高水压地层盾构淹埋式接收封堵超挖空隙的方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101892846B (zh) |
Cited By (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102352753A (zh) * | 2011-06-29 | 2012-02-15 | 中铁第四勘察设计院集团有限公司 | 冻结加固+堆土灌水的盾构到达接收方法 |
| CN102409691A (zh) * | 2011-09-08 | 2012-04-11 | 同济大学 | 地下连续墙墙体开口处预埋冻结管的冻结法止水装置 |
| CN102536253A (zh) * | 2011-12-30 | 2012-07-04 | 广州轨道交通建设监理有限公司 | 一种土压盾构回填土仓进仓作业的施工方法 |
| CN102606175A (zh) * | 2012-03-12 | 2012-07-25 | 山东新阳能源有限公司 | 煤矿井下砂岩裂隙承压水封堵方法 |
| CN102635362A (zh) * | 2011-11-02 | 2012-08-15 | 中铁隧道集团有限公司 | 一种盾构到达二次接收施工方法 |
| CN102635365A (zh) * | 2012-05-06 | 2012-08-15 | 上海城建市政工程(集团)有限公司 | 一种盾构机进洞的施工方法 |
| CN103032072A (zh) * | 2012-12-08 | 2013-04-10 | 中铁十二局集团第二工程有限公司 | 一种封闭式车站盾构解体提升转移到换乘线吊出的方法 |
| CN103899325A (zh) * | 2014-04-23 | 2014-07-02 | 上海隧道工程股份有限公司 | 混凝土箱体盾构进洞接收的施工方法 |
| CN106194218A (zh) * | 2016-08-30 | 2016-12-07 | 中铁第四勘察设计院集团有限公司 | 高水头深厚砂层地区的盾构端头土体加固体系 |
| CN108222955A (zh) * | 2018-01-08 | 2018-06-29 | 中铁十六局集团北京轨道交通工程建设有限公司 | 用于接收盾构机的轨道装置 |
| CN108505976A (zh) * | 2018-03-19 | 2018-09-07 | 西南石油大学 | 一种利用耦合冷冻墙降压开采海洋天然气水合物的方法 |
| CN108915705A (zh) * | 2018-08-09 | 2018-11-30 | 中铁局集团有限公司 | 一种用于盾构进出洞漏水封堵的挡板注浆施工方法 |
| CN109140046A (zh) * | 2018-11-01 | 2019-01-04 | 中铁十八局集团有限公司 | 一种顶管管幕端头封堵方法 |
| CN109667985A (zh) * | 2018-12-26 | 2019-04-23 | 上海市政建设有限公司 | 顶管施工中顶管机与接收井钢套管对接的方法 |
| CN109695455A (zh) * | 2018-12-21 | 2019-04-30 | 中铁十二局集团有限公司 | 一种土压平衡盾构纯水中接收方法 |
| CN109944596A (zh) * | 2019-03-20 | 2019-06-28 | 中铁四局集团有限公司 | 一种盾构穿越临江富水砂层二次加固方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE19916815C1 (de) * | 1999-04-14 | 2001-02-15 | Gse Lining Technology Gmbh | Dichtungspaneel zum Abdichten von Bauwerken, insbesondere von Tunnelbauwerken |
| JP2009046958A (ja) * | 2007-08-16 | 2009-03-05 | Hiroaki Fujii | シールド工法に用いるセグメントの製造方法と組立方法及びセグメント |
| CN101644161A (zh) * | 2009-07-24 | 2010-02-10 | 上海建工(集团)总公司 | 掘进机具进出洞止水装置及止水方法 |
| CN101660415A (zh) * | 2009-09-08 | 2010-03-03 | 中煤第一建设公司特殊凿井处 | 一种冻结钻孔施工堵漏工艺 |
-
2010
- 2010-07-13 CN CN2010102284781A patent/CN101892846B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE19916815C1 (de) * | 1999-04-14 | 2001-02-15 | Gse Lining Technology Gmbh | Dichtungspaneel zum Abdichten von Bauwerken, insbesondere von Tunnelbauwerken |
| JP2009046958A (ja) * | 2007-08-16 | 2009-03-05 | Hiroaki Fujii | シールド工法に用いるセグメントの製造方法と組立方法及びセグメント |
| CN101644161A (zh) * | 2009-07-24 | 2010-02-10 | 上海建工(集团)总公司 | 掘进机具进出洞止水装置及止水方法 |
| CN101660415A (zh) * | 2009-09-08 | 2010-03-03 | 中煤第一建设公司特殊凿井处 | 一种冻结钻孔施工堵漏工艺 |
Non-Patent Citations (2)
| Title |
|---|
| 《广东土木与建筑》 20050430 辜思达等 盾构法隧道管片防水堵漏施工技术 47-48 1 , 第4期 2 * |
| 《隧道/地下工程》 20091231 孙英伟 成都地铁盾构法隧道防水堵漏技术 113-114、122 1 , 第9期 2 * |
Cited By (28)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102352753A (zh) * | 2011-06-29 | 2012-02-15 | 中铁第四勘察设计院集团有限公司 | 冻结加固+堆土灌水的盾构到达接收方法 |
| CN102352753B (zh) * | 2011-06-29 | 2014-08-27 | 中铁第四勘察设计院集团有限公司 | 采用冻结加固和堆土灌水的盾构到达接收方法 |
| CN102409691A (zh) * | 2011-09-08 | 2012-04-11 | 同济大学 | 地下连续墙墙体开口处预埋冻结管的冻结法止水装置 |
| CN102635362B (zh) * | 2011-11-02 | 2014-05-07 | 中铁隧道集团有限公司 | 一种盾构到达二次接收施工方法 |
| CN102635362A (zh) * | 2011-11-02 | 2012-08-15 | 中铁隧道集团有限公司 | 一种盾构到达二次接收施工方法 |
| CN102536253A (zh) * | 2011-12-30 | 2012-07-04 | 广州轨道交通建设监理有限公司 | 一种土压盾构回填土仓进仓作业的施工方法 |
| CN102536253B (zh) * | 2011-12-30 | 2014-11-12 | 广州轨道交通建设监理有限公司 | 一种土压盾构回填土仓进仓作业的施工方法 |
| CN102606175A (zh) * | 2012-03-12 | 2012-07-25 | 山东新阳能源有限公司 | 煤矿井下砂岩裂隙承压水封堵方法 |
| CN102635365A (zh) * | 2012-05-06 | 2012-08-15 | 上海城建市政工程(集团)有限公司 | 一种盾构机进洞的施工方法 |
| CN102635365B (zh) * | 2012-05-06 | 2015-04-22 | 上海城建市政工程(集团)有限公司 | 一种盾构机进洞的施工方法 |
| CN103032072A (zh) * | 2012-12-08 | 2013-04-10 | 中铁十二局集团第二工程有限公司 | 一种封闭式车站盾构解体提升转移到换乘线吊出的方法 |
| CN103032072B (zh) * | 2012-12-08 | 2015-01-07 | 中铁十二局集团第二工程有限公司 | 一种封闭式车站盾构解体提升转移到换乘线吊出的方法 |
| CN103899325A (zh) * | 2014-04-23 | 2014-07-02 | 上海隧道工程股份有限公司 | 混凝土箱体盾构进洞接收的施工方法 |
| CN103899325B (zh) * | 2014-04-23 | 2016-04-13 | 上海隧道工程有限公司 | 混凝土箱体盾构进洞接收的施工方法 |
| CN106194218A (zh) * | 2016-08-30 | 2016-12-07 | 中铁第四勘察设计院集团有限公司 | 高水头深厚砂层地区的盾构端头土体加固体系 |
| CN106194218B (zh) * | 2016-08-30 | 2019-12-06 | 中铁第四勘察设计院集团有限公司 | 高水头深厚砂层地区的盾构端头土体加固体系 |
| CN108222955A (zh) * | 2018-01-08 | 2018-06-29 | 中铁十六局集团北京轨道交通工程建设有限公司 | 用于接收盾构机的轨道装置 |
| CN108222955B (zh) * | 2018-01-08 | 2019-10-29 | 中铁十六局集团北京轨道交通工程建设有限公司 | 用于接收盾构机的轨道装置 |
| CN108505976A (zh) * | 2018-03-19 | 2018-09-07 | 西南石油大学 | 一种利用耦合冷冻墙降压开采海洋天然气水合物的方法 |
| CN108505976B (zh) * | 2018-03-19 | 2020-12-11 | 西南石油大学 | 一种利用耦合冷冻墙降压开采海洋天然气水合物的方法 |
| CN108915705B (zh) * | 2018-08-09 | 2019-10-22 | 中铁一局集团有限公司 | 一种用于盾构进出洞漏水封堵的挡板注浆施工方法 |
| CN108915705A (zh) * | 2018-08-09 | 2018-11-30 | 中铁局集团有限公司 | 一种用于盾构进出洞漏水封堵的挡板注浆施工方法 |
| CN109140046A (zh) * | 2018-11-01 | 2019-01-04 | 中铁十八局集团有限公司 | 一种顶管管幕端头封堵方法 |
| CN109140046B (zh) * | 2018-11-01 | 2020-04-14 | 中铁十八局集团有限公司 | 一种顶管管幕端头封堵方法 |
| CN109695455A (zh) * | 2018-12-21 | 2019-04-30 | 中铁十二局集团有限公司 | 一种土压平衡盾构纯水中接收方法 |
| CN109667985A (zh) * | 2018-12-26 | 2019-04-23 | 上海市政建设有限公司 | 顶管施工中顶管机与接收井钢套管对接的方法 |
| CN109667985B (zh) * | 2018-12-26 | 2024-04-16 | 上海市政建设有限公司 | 顶管施工中顶管机与接收井钢套管对接的方法 |
| CN109944596A (zh) * | 2019-03-20 | 2019-06-28 | 中铁四局集团有限公司 | 一种盾构穿越临江富水砂层二次加固方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101892846B (zh) | 2011-11-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101892846B (zh) | 高水压地层盾构淹埋式接收封堵超挖空隙的方法 | |
| CN101781993B (zh) | 富含承压水软土层盾构进洞施工方法 | |
| CN104358575B (zh) | 一种富水砂层泥水盾构始发密封装置及始发密封控制方法 | |
| WO2021120991A1 (zh) | 一种改建盾构隧道进行矿山法施工的方法 | |
| CN102094650B (zh) | 复杂工况条件下的盾构进洞施工方法 | |
| CN102352753B (zh) | 采用冻结加固和堆土灌水的盾构到达接收方法 | |
| CN105134248B (zh) | 一种盾构隧道与竖井连接部位的抗震与减震方法 | |
| CN105019919B (zh) | 用于传输流体的隧洞及其施工方法 | |
| CN107605498B (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法 | |
| CN103924987B (zh) | 一种smw工法桩盾构洞门防渗水结构及其施工方法 | |
| CN108374664A (zh) | 富水软土地层中间风井钢套筒密闭过站施工方法 | |
| CN102644467A (zh) | 顶管直接切削管片隧道联络通道施工方法 | |
| CN112282844B (zh) | 一种废弃矿井酸性废水污染阻隔方法 | |
| CN107091101A (zh) | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 | |
| CN111963201A (zh) | 隧道管片结构及施工方法 | |
| CN105781575B (zh) | 富水地层管片组合结构及其施工方法 | |
| CN103899325A (zh) | 混凝土箱体盾构进洞接收的施工方法 | |
| CN106223976A (zh) | 基于主体结构的盾构井端头大管棚加固体系及其施工方法 | |
| CN112647956A (zh) | 一种富水复合地层盾构近距离下穿地铁车站的施工方法 | |
| CN206592136U (zh) | 一种盾构始发素墙封闭止水加固结构 | |
| CN113530559A (zh) | 一种富水砂层地质盾构接收端头的加固方法及加固结构 | |
| CN105386435A (zh) | 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺 | |
| JP2003206691A (ja) | シールド到達工法 | |
| CN204827469U (zh) | 用于传输流体的隧洞 | |
| CN108915702B (zh) | 一种圆形小断面隧道内盾构接收方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |