CN101899977B - 地铁盾构超浅覆土穿越运营隧道的施工方法 - Google Patents
地铁盾构超浅覆土穿越运营隧道的施工方法 Download PDFInfo
- Publication number
- CN101899977B CN101899977B CN201010105681XA CN201010105681A CN101899977B CN 101899977 B CN101899977 B CN 101899977B CN 201010105681X A CN201010105681X A CN 201010105681XA CN 201010105681 A CN201010105681 A CN 201010105681A CN 101899977 B CN101899977 B CN 101899977B
- Authority
- CN
- China
- Prior art keywords
- construction
- tunnel
- shield
- crossing
- ultra
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010105681XA CN101899977B (zh) | 2010-02-04 | 2010-02-04 | 地铁盾构超浅覆土穿越运营隧道的施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010105681XA CN101899977B (zh) | 2010-02-04 | 2010-02-04 | 地铁盾构超浅覆土穿越运营隧道的施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101899977A CN101899977A (zh) | 2010-12-01 |
| CN101899977B true CN101899977B (zh) | 2012-11-28 |
Family
ID=43225853
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201010105681XA Expired - Fee Related CN101899977B (zh) | 2010-02-04 | 2010-02-04 | 地铁盾构超浅覆土穿越运营隧道的施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101899977B (zh) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102704937B (zh) * | 2011-03-28 | 2014-06-25 | 同济大学 | 一种盾构隧道施工沉降模式的识别处理方法 |
| CN102352757B (zh) * | 2011-10-28 | 2014-05-28 | 上海公路桥梁(集团)有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
| CN103510962B (zh) * | 2013-10-22 | 2016-01-20 | 北京交通大学 | 一种软土地层盾构穿越建筑物的分阶段变形控制方法 |
| CN103867208B (zh) * | 2014-03-12 | 2016-03-02 | 西安建筑科技大学 | 控制隧道及地下工程施工过程中地表、管线变形的方法 |
| CN104389613B (zh) * | 2014-09-26 | 2016-04-13 | 上海隧道工程有限公司 | 泥水平衡盾构穿越危险地下管线的施工方法 |
| CN104533434B (zh) * | 2014-12-28 | 2017-05-03 | 宁波市轨道交通集团有限公司 | 超浅覆土类矩形隧道的构建方法 |
| CN106066920B (zh) * | 2016-06-13 | 2019-03-22 | 暨南大学 | 上下重叠隧道盾构施工对托换桩基影响的数值分析方法 |
| CN108049876A (zh) * | 2017-11-13 | 2018-05-18 | 浙江大学城市学院 | 一种复合地层盾构近距离下穿暗挖隧道的施工方法 |
| CN108643937B (zh) * | 2018-04-27 | 2020-01-31 | 中铁十二局集团有限公司 | 水工隧洞下穿居住区的预防恢复方法 |
| CN108979659B (zh) * | 2018-07-04 | 2022-02-01 | 中铁第一勘察设计院集团有限公司 | 软土富水大断面隧道群下穿构筑物的加固结构及方法 |
| CN109184743A (zh) * | 2018-09-25 | 2019-01-11 | 中铁十二局集团有限公司 | 圆砾泥岩复合地层泥水盾构近距离下穿既有隧道施工方法 |
| CN111764923B (zh) * | 2020-06-29 | 2022-02-11 | 中铁隆工程集团有限公司 | 一种下穿斜交的既有隧道临时仰拱拆除的施工方法 |
| CN112459790B (zh) * | 2020-11-12 | 2023-05-16 | 上海隧道工程有限公司 | 穿越地下构建筑物前隧道穿越段预保护结构及预保护方法 |
| CN112507424B (zh) * | 2020-11-24 | 2023-09-01 | 中铁隧道局集团有限公司 | 一种膨胀土地层盾构下穿铁路轨道的施工方法 |
| CN112253142B (zh) * | 2020-11-27 | 2022-05-24 | 鲁东大学 | 一种深长隧道联络风道近净距上跨主洞施工方法 |
| CN113279771A (zh) * | 2021-06-22 | 2021-08-20 | 中建交通建设集团有限公司 | 一种防止水下盾构隧道管片上浮的预制装配式结构 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4118938A (en) * | 1975-11-07 | 1978-10-10 | Gewerkschaft Eisenhutte Westfalia | Apparatus for and method of driving tunnels |
| CN1932243A (zh) * | 2006-09-28 | 2007-03-21 | 上海隧道工程股份有限公司 | 双圆盾构浅覆土施工方法 |
| CN1932244A (zh) * | 2006-09-28 | 2007-03-21 | 上海隧道工程股份有限公司 | 双圆盾构近距离穿越建筑物或构筑物的施工方法 |
-
2010
- 2010-02-04 CN CN201010105681XA patent/CN101899977B/zh not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4118938A (en) * | 1975-11-07 | 1978-10-10 | Gewerkschaft Eisenhutte Westfalia | Apparatus for and method of driving tunnels |
| CN1932243A (zh) * | 2006-09-28 | 2007-03-21 | 上海隧道工程股份有限公司 | 双圆盾构浅覆土施工方法 |
| CN1932244A (zh) * | 2006-09-28 | 2007-03-21 | 上海隧道工程股份有限公司 | 双圆盾构近距离穿越建筑物或构筑物的施工方法 |
Non-Patent Citations (1)
| Title |
|---|
| JP特开2009-121099A 2009.06.04 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101899977A (zh) | 2010-12-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101899977B (zh) | 地铁盾构超浅覆土穿越运营隧道的施工方法 | |
| CN101936167B (zh) | 桥梁托换结合盾构施工穿越桥梁桩基的施工方法 | |
| CN104912562B (zh) | 一种盾构下穿既有运营隧道变形控制的施工方法 | |
| CN109296378B (zh) | 潜孔钻配合破碎锤掘进开挖施工方法 | |
| CN102808381B (zh) | 高水位粉砂土地质下穿多股铁路框架桥顶进对接施工方法 | |
| CN111794774A (zh) | 一种半路堑单压型明洞隧道快速进洞防护结构及施工方法 | |
| CN105804758A (zh) | 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法 | |
| CN102071607A (zh) | 一种不影响既有行车条件下铁路路基修复方法 | |
| CN114508629B (zh) | 一种穿越混卵砾石层和砂岩层的顶管施工方法 | |
| CN113775344A (zh) | 隧道原位单侧扩建施工方法 | |
| CN106761776A (zh) | 超浅埋隧道盾构下穿既有管线施工方法 | |
| CN105569666A (zh) | 一种盾构长距离掘进常压换刀配套的地层加固方法 | |
| CN111663385A (zh) | 一种天窗期内完成整体道床沉降快速修复施工方法 | |
| CN107938680A (zh) | 一种基坑开挖安全施工方法 | |
| CN103276645B (zh) | 既有线隧道基底病害预制桩梁板整治技术 | |
| CN205370577U (zh) | 一种盾构长距离掘进常压换刀配套的地层加固结构 | |
| CN110529120B (zh) | Ⅵ级围岩浅埋暗挖黄土隧道凿除侵限构筑物施工方法 | |
| CN115897426A (zh) | 一种叠落隧道盾构安全穿越既有桥桩侵入隧道区施工方法 | |
| CN111576921A (zh) | 轨交保护区内既有基础建筑的拆除以及复建施工方法 | |
| CN117449876A (zh) | 基于长大锁脚锚管技术的炭质千枚岩大变形隧道施工工法 | |
| CN116575924A (zh) | 一种隧道tbm始发、掘进、到达的施工方法 | |
| CN108301256A (zh) | 铁路营业线车站股道间排水槽施工方法 | |
| CN207295348U (zh) | 一种ⅰ级饮用水源地附近铁路岩溶地基处理防污染结构 | |
| CN205100298U (zh) | 一种大直径自来水管安全防护结构 | |
| CN106555379A (zh) | 穿越既有线高路基组合式便桥施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: SHANGHAI TUNNEL ENGINEERING CO., LTD. Free format text: FORMER OWNER: SHANGHAI TUNNEL ENGINEERING CO LTD Effective date: 20150130 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200082 HONGKOU, SHANGHAI TO: 200232 XUHUI, SHANGHAI |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20150130 Address after: 200232 Shanghai Wanping Road No. 1099 Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Address before: 200082 No. 118, Dalian Road, Shanghai Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121128 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |