[go: up one dir, main page]

CN101179890B - Intelligent illumination facilities automatic controller - Google Patents

Intelligent illumination facilities automatic controller Download PDF

Info

Publication number
CN101179890B
CN101179890B CN2007101644190A CN200710164419A CN101179890B CN 101179890 B CN101179890 B CN 101179890B CN 2007101644190 A CN2007101644190 A CN 2007101644190A CN 200710164419 A CN200710164419 A CN 200710164419A CN 101179890 B CN101179890 B CN 101179890B
Authority
CN
China
Prior art keywords
cpu
illumination facilities
time
road
facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101644190A
Other languages
Chinese (zh)
Other versions
CN101179890A (en
Inventor
胡彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU TIME DOMAIN ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007101644190A priority Critical patent/CN101179890B/en
Publication of CN101179890A publication Critical patent/CN101179890A/en
Application granted granted Critical
Publication of CN101179890B publication Critical patent/CN101179890B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)

Abstract

The invention relates to an automatic controller for an intelligent lighting facility and belongs to the technology field of lighting facility switch timing control. The invention includes: a power supply unit, a switch controlling unit and a central processing unit (CPU).A relay arranged in the switch controlling unit is connected with the controlled lighting facility, and the lighting facility is one route or above one route. External lighting facility is controlled through the CPU. The invention is a timing controller applied to such lighting facilities as street lamps, navigation mark lamps, a neon light, an advertising light box, etc. The sunrise or sunset time every day can be determined by the local phone number or postcode, thereby, the opening or closing time of the lighting facility is controlled accurately, and an assistant controlling by light is also capable of being selected by need. The invention can be widely applied to all such places requiring a timing control for the lighting facilities as a street, a railway, a station, a waterway, an industrial mining, a school, a power supply department, etc. By using the invention, the practicability of the lighting facilities is improved largely.

Description

Intelligent illumination facilities automatic controller
Technical field
The invention belongs to lighting installation switch lamp Time Control Technique field, be specifically related to a kind of intelligent illumination facilities automatic controller that utilizes software programming to realize control procedure.
Background technology
Some present illumination facilities are widely used in the illumination in places such as the square, road, residential block of modern city, and the controller that therefore is used to control these illumination facilities switches has vast market.But some is too simple for present controller function structure, and what have only controls street lamp, can not be applied to the place that other need time control.And the product that has is to carry out light-operatedly, but light-dependent control element is subjected to the interference of dust or other environment thing easily, can cause time control inaccurate.At present some product is the switch lamp time of street lamp of controlling according to longitude and latitude, though be better than light-operatedly, can make troubles to the user in practice, because the user does not understand the longitude and latitude of locality mostly.
Summary of the invention
At problems of the prior art, the object of the present invention is to provide a kind of technical scheme of intelligent illumination facilities automatic controller, the user can accurately determine the switch lamp time according to local phone area code or postcode.
Described intelligent illumination facilities automatic controller, it is characterized in that comprising power subsystem 1, switch control unit 2, CPU CPU 4, power subsystem 1 is connected with switch control unit 2, CPU CPU 4 provides operating voltage, CPU CPU 4 is connected the transmission of carrying out signal with switch control unit 2, the control circuit that is provided with in the switch control unit 2 connects controlled illumination facilities, and illumination facilities is more than one the road or one the tunnel.
Described intelligent illumination facilities automatic controller is characterized in that connection is provided with keyboard 5, display unit 6 on the CPU CPU 4.
Described intelligent illumination facilities automatic controller is characterized in that CPU CPU 4 connects optical control element 3.
Described intelligent illumination facilities automatic controller, the base stage that it is characterized in that the triode in the control circuit of switch control unit 2 connects the control signal that transmits from CPU CPU 4, the emission collection is received on the coil of relay, the two ends of coil fly-wheel diode in parallel.
Described intelligent illumination facilities automatic controller is characterized in that the outside illumination facilities in every road has three kinds of states, automatically running status, manually open state, manual off status.
Described intelligent illumination facilities automatic controller is characterized in that CPU CPU 4 adopts the method for area code or postcode setting that the switch lamp time of illumination facilities is controlled.
Described intelligent illumination facilities automatic controller, it is characterized in that being provided with on the optical control element 3 a socket J2 and an external auxiliary light control sensor, socket J2 exports a signal of whether enabling light control functionality, need enable auxiliary light control functionality when detecting, signal of node output of transducer is exported optically-controlled signal after treatment.
Described intelligent illumination facilities automatic controller is characterized in that the control method of 4 pairs of illumination facilities of CPU CPU is as follows:
(S1) detect whether to need to carry out initialization operation, if testing result, is then carried out execution in step (S2) behind the initialization operation for being;
(S2) if the testing result in the step (S1) for not, reads the switching time of the outside illumination facilities in each state and each road;
(S3) detect whether need auxiliary light-operated, if testing result, is then regulated each outside, road illumination facilities execution in step (S4) after switching time for being;
(S4) if the testing result in the step (S3) for not, is then controlled the on off state on each road according to the switching time on every road;
(S5-S8) progressively detect the state of SET (setting) key, ADD (increase) key, DEC (minimizing) key, SELECT (test) key.
Described intelligent illumination facilities automatic controller, call in SELECT (test) button subprogram when it is characterized in that described SELECT (test) key for down state, SELECT (test) button program comprises that 5 are provided with the page, TIME SETTING (time setting), CHANNEL SETTING (circuit selection), VIEWTIME (checking the accumulative total switching time on each road), VIEW VERSION (checking the controller version), AREACODE (area code or postcode setting) detect the selected page and execution command.
Described intelligent illumination facilities automatic controller, it is characterized in that when AREA CODE (area code or postcode setting) for current when choosing the page, then carry out according to area code or the subprogram of postcode compute switch lamp time, according to the latitude and longitude value of area code that reads or postcode inquiry locality, calculate the switch lamp time on this ground by latitude and longitude value.
The present invention is a kind of time controller that is used for illumination facilities such as street lamp, beacon sign lamp, neon light, advertising lamp box, can accurately determine the sun set/raise time of every day according to the area code of locality or postcode, thereby the switch lamp time to illumination facilities is accurately controlled, and also can select light control functionality as assist control as required.All need carry out the place of time control to illumination facilities can be widely used in street, railway, station, navigation channel, industrial and mineral, school and power supply department etc., have improved practicality greatly.
Description of drawings
Fig. 1 principal function flow chart of the present invention;
The flow chart of Fig. 2 SET (setting), ADD (increase), three buttons of DEC (minimizing);
Fig. 3 is according to area code or postcode compute switch lamp time flow chart;
Fig. 4 SELECT (test) button flow chart;
Fig. 5 block diagram of the present invention;
Fig. 6 CPU CPU circuit theory diagrams;
The former road figure of Fig. 7 switch control unit circuit;
Fig. 8 optical control element circuit theory diagrams.
Embodiment
Describe the control method of the present invention in detail below in conjunction with accompanying drawing to illumination facilities.
The port P10-P17 of CPU meets 8 exchanges data line DB0-DB7 with display unit 6 in the CPU CPU 4, port INTO output RS signal, INT1 output RW signal, T1 output E signal, RW, RS, E are the control signal of display unit 6, port P02 output LCD signal, LCD is control display unit 6 switching signal backlight.Capacitor C 1, C2, crystal oscillator Y1 constitutes the external clock reference of CPU.Chip IC 1 is a clock chip, communicates by three data lines and CPU, for entire circuit provides precise time.BT1 is outside battery, is the clock chip power supply when outage, guarantees that clock chip normally moves.Signal LD1, LD2, LD3 are the signals of being controlled external loading work according to the situation of written program and external environment condition by CPU output.
J2 is a socket in the optical control element 3, an and external auxiliary light control sensor, J2 exports a signal P who whether enables light control functionality, when sensor sensing when needs start light control functionality, just export a signal Q who connects power supply on CPU CPU 4, signal of coming of node LS output from auxiliary light control sensor conveying, this signal is handled back output signal L through IC2 and peripheral resistance element, L is an optically-controlled signal, is connected on the CPU CPU 4.Control signal LD1, LD2, the LD3 signal of port P20, the P21 of CPU CPU 4, P22 output are connected respectively on the base stage of triode Q1, Q2, Q3 in the switch control unit 2; relay two ends diode in parallel; the effect protection relay that plays afterflow is not burnt out; on off operating mode by the control triode makes relay K 1, K2, K3 adhesive or disconnection, and output signal L1, L2, L3 control the switch lamp state of outside illumination facilities.Be provided with SET (setting), ADD (increase), DEC (minimizing), four buttons of SELECT (test) on the keyboard 5, illumination facilities controlled by these four buttons.Power subsystem 1 provides normal operating voltage for other unit.
Control procedure to illumination facilities is specific as follows, connects 3 tunnel outside illumination facilities in the present embodiment.
Referring to Fig. 1, at first carry out an origination action.Whether need carry out initialization operation, then carry out execution in step S2 behind the initialization operation if yes if in step S1, detecting controller.If be that then execution in step S2 does not read the switching time of each state and 3 tunnel among the step S1.Each state that reads here is to read the information that obtains from illumination facilities, as area code or postcode etc.Whether need auxiliary light-operated, then regulate 3 way switch execution in step S4 after the time if yes if in step S3, detecting.If be that then execution in step S4 does not control the on off state on each road according to the switching time on every road among the step S3.In step S5, detect the SET key and whether press, then carry out operating manually or automatically back execution in step S6 if yes the 1 the tunnel.If be not among the step S5, then whether execution in step S6 detection ADD key is pressed.If step S6 detects to being, then carry out manually or operation back execution in step S7 automatically the 2 the tunnel, if step S6 detects to not, then whether execution in step S7 detection DEC key is pressed.If the testing result of step S7 is for being, then carry out operating manually or automatically back execution in step S8 to the 3 the tunnel, if the testing result of step S7 is for denying, then whether execution in step S8 detection SELECT key is pressed, if testing result is for being, turn back to step S2 after then controller being provided with, if step S8 in testing result for otherwise directly turn back to step S2.
The operation principle of SET, ADD, DEC is referring to Fig. 2.X represents 1,2,3 among the figure, and 1STATE represents the 1 tunnel state, and 2STATE represents the 2 tunnel state, and 3STATE represents the 3 tunnel state.Every Lu Yousan kind state: automatically running status, manually open state, manual off status.When the SET key was pressed first, controller entered the state of manually opening, and controller enters manual off status when inferior pressing, by then entering automatic running status for the third time.The operation principle of ADD, DEC key is with the SET key.
To the setting of controller referring to Fig. 4.There are five in the controller of the present invention the page is set: TIME SETTING (time setting), CHANNEL SETTING (circuit selection), VIEW TIME (checking the accumulative total switching time on each road), VIEW VERSION (checking the controller version), AREA CODE (area code or postcode setting).Whether carry out entering after the startup operation and the page is set selects, detecting is TIME SETTING, if testing result is for being that then the time of carrying out is provided with the back and finishes to move this subprogram.Whether if testing result is not TIME SETTING, then detecting is CHANNEL SETTING, if testing result for being then to select one the tunnel to be provided with, is selected operational mode then.Here we have the 0-6 group mode, wherein 0 group mode is that the user is from the configuration switch temporal mode, the 1-5 group mode has configured the switch lamp temporal mode for the typical time according to various places, and 6 group modes are for carrying out the pattern that the switch lamp time is provided with according to area code or postcode.If 0 group mode carries out pattern setting at midnight after then the user was provided with the time; If not 0 group mode then directly carries out pattern setting at midnight.To midnight pattern finish to move this subprogram after setting completed.Whether if testing result is not CHANNELSETTING, then detecting is VIEW TIME, if testing result finishes to move this subprogram after, then checking the accumulative total lighting time on each road for being.Whether if testing result is not VIEW TIME, then detecting is VIEWVERSION, if testing result is for being to finish to move this subprogram after then checking the controller version.Whether if testing result is not VIEW VERSION, then detecting is AREA CODE, if testing result is for being then to carry out area code or postcode end operation this subprogram in back is set, if testing result is otherwise directly finishes to move this subprogram.
To the setting of area code or postcode referring to Fig. 3.Read telephone number or postcode, latitude and longitude value according to area code or postcode inquiry locality, by the latitude of finding and read of that month turning on light hour and the turning on light hour of next month month, read turning on light minute of of that month No. 1 and No. 16 or of that month No. 16 and turned on light next month 1 minute by latitude and date, turn on light hour and turn on light minute and method that date on the same day finely tunes through line style calculates lighting time on the same day according to above.By reading of that month turning off the light hour and the turning off the light hour of next month in latitude and month, read turning off the light minute of of that month No. 1 and No. 16 or of that month No. 16 and turned off the light next month 1 minute by latitude and date, turn off the light hour and turn off the light minute and method that date on the same day finely tunes through line style calculates and turns off the light the time on same day according to above.Program degree of learning from else's experience east longitude 116 of the present invention is a benchmark, and longitude differs 1 degree, switch lamp time phase difference 4 minutes; If institute's longitude that reads is greater than 116, it is on duty with 4 that the switch lamp time will deduct difference of longitude, and less than 116, the switch lamp time will add that difference of longitude is on duty with 4, obtains final switching time as if institute's longitude that reads, and finishes this subprogram of operation then.
By the control of method realization described above to the switch lamp time of illumination facilities.

Claims (3)

1. intelligent illumination facilities automatic controller, it is characterized in that comprising power subsystem (1), switch control unit (2), CPU CPU (4), power subsystem (1) and switch control unit (2), CPU CPU (4) connects provides operating voltage, CPU CPU (4) is connected the transmission of carrying out signal with switch control unit (2), the control circuit that is provided with in the switch control unit (2) connects controlled illumination facilities, illumination facilities is more than one the road or one the tunnel, the outside illumination facilities in every road has three kinds of states, automatically running status, manually open state, manual off status;
CPU CPU (4) goes up to connect keyboard (5), display unit (6) is set;
CPU CPU (4) connects optical control element (3), a socket J2 and an external auxiliary light control sensor are set on the optical control element (3), socket J2 exports a signal of whether enabling light control functionality, need enable auxiliary light control functionality when detecting, signal of node output of transducer is exported optically-controlled signal after treatment;
The base stage of the triode in the control circuit of switch control unit (2) connects the control signal that transmits from CPU CPU (4), and emitter is received on the coil of relay, the two ends of coil fly-wheel diode in parallel;
CPU CPU (4) adopts the area code setting or adopts the method for postcode setting that the switch lamp time of illumination facilities is controlled, and CPU CPU (4) is as follows to the control method of illumination facilities:
(S1) detect whether to need to carry out initialization operation, if testing result, is then carried out execution in step (S2) behind the initialization operation for being;
(S2) if the testing result in the step (S1) for not, reads the switching time of the outside illumination facilities in each state and each road;
(S3) detect whether need auxiliary light-operated, if testing result, is then regulated each outside, road illumination facilities execution in step (S4) after switching time for being;
(S4) if the testing result in the step (S3) for not, is then controlled the on off state on each road according to the switching time on every road;
(S5-S8) progressively detect the state of SET key, ADD key, DEC key, SELECT key.
2. intelligent illumination facilities automatic controller as claimed in claim 1, call in SELECT button subprogram when it is characterized in that described SELECT key for down state, SELECT button program comprises that 5 are provided with the page, TIME SETTING, CHANNEL SETTING, VIEW TIME, VIEW VERSION, AREA CODE detect the selected page and execution command.
3. intelligent illumination facilities automatic controller as claimed in claim 2, it is characterized in that when AREACODE be current when choosing the page, then carry out the subprogram of coming the compute switch lamp time according to area code or postcode, inquire about local latitude and longitude value according to area code that reads or postcode, calculate the switch lamp time on this ground by latitude and longitude value.
CN2007101644190A 2007-11-29 2007-11-29 Intelligent illumination facilities automatic controller Expired - Fee Related CN101179890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101644190A CN101179890B (en) 2007-11-29 2007-11-29 Intelligent illumination facilities automatic controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101644190A CN101179890B (en) 2007-11-29 2007-11-29 Intelligent illumination facilities automatic controller

Publications (2)

Publication Number Publication Date
CN101179890A CN101179890A (en) 2008-05-14
CN101179890B true CN101179890B (en) 2011-06-15

Family

ID=39405922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101644190A Expired - Fee Related CN101179890B (en) 2007-11-29 2007-11-29 Intelligent illumination facilities automatic controller

Country Status (1)

Country Link
CN (1) CN101179890B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101765262A (en) * 2008-10-24 2010-06-30 杨林 Lighting control platform of intelligent home furnishing
CN102497692A (en) * 2011-11-11 2012-06-13 安徽禾田电气有限公司 Energy saving illumination control system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2528162Y (en) * 2002-03-27 2002-12-25 刘胜 Optical control switch for road lamp
EP1672810A1 (en) * 2004-12-14 2006-06-21 Maurice Gainville Power supply control device for electric devices, in particular lamps for public lighting

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2528162Y (en) * 2002-03-27 2002-12-25 刘胜 Optical control switch for road lamp
EP1672810A1 (en) * 2004-12-14 2006-06-21 Maurice Gainville Power supply control device for electric devices, in particular lamps for public lighting

Also Published As

Publication number Publication date
CN101179890A (en) 2008-05-14

Similar Documents

Publication Publication Date Title
KR100463135B1 (en) A programmable timer unit for use in a remote control load management system
CN105005192B (en) A kind of pointer type intelligent clock
CN101674694B (en) Intelligent skylight adaptive system
Archana et al. E–street: LED powered intelligent street lighting system with automatic brightness adjustment based on climatic conditions and vehicle movements
CN206611614U (en) A Simulation Street Light Control System Based on Environment Control
CN101179890B (en) Intelligent illumination facilities automatic controller
CN205726598U (en) Street lamp control system
CN205305199U (en) Long -range monitor control ware in city
CN201509336U (en) Smart Lighting Controller
JP3757838B2 (en) Program timer unit for remote monitoring and control system
US8593268B2 (en) Time clock control for outside lighting
CN203984732U (en) A kind of Lighting Control Assembly and control method
CN103529685A (en) Multifunctional intelligent alarm clock based on travelling condition detection
CN103149401A (en) Multifunctional simple oscilloscope
CN109521667A (en) A kind of automatic prover time device and method
Arifin et al. Development of automated microcontroller-based lighting control system for indoor room implementation
CN110719673A (en) Outdoor lighting control method
US20080204313A1 (en) Radio Navigation Satellite System Wall Power Automatic Timer
CN207665260U (en) A kind of lighting device
CN101873752A (en) Intelligent lamplight control method and system
CN201430707Y (en) Microcomputer energy-saving street lamp automatic controller
Jadhav et al. Automatic street light control system
TWM478314U (en) Lamp control system
CN201788582U (en) Wireless control system for household electrical appliance
CN203149006U (en) Simple multifunctional oscillograph

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANGZHOU SHIYU ELECTRONIC TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: HU BIAO

Effective date: 20120406

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310016 HANGZHOU, ZHEJIANG PROVINCE TO: 310008 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120406

Address after: 2, building 202, building 12, building 16, 310008 South Lok Ma camp, Shangcheng District, Zhejiang, Hangzhou

Patentee after: Hangzhou Time Domain Electronic Technology Co., Ltd.

Address before: 310016 6-25-401 room, Si Fang Fang, Jianggan District, Zhejiang, Hangzhou

Patentee before: Hu Biao

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20201129

CF01 Termination of patent right due to non-payment of annual fee