CN101092161A - 横隔舱与甲板在船舶上的总组方法 - Google Patents
横隔舱与甲板在船舶上的总组方法 Download PDFInfo
- Publication number
- CN101092161A CN101092161A CN 200710044190 CN200710044190A CN101092161A CN 101092161 A CN101092161 A CN 101092161A CN 200710044190 CN200710044190 CN 200710044190 CN 200710044190 A CN200710044190 A CN 200710044190A CN 101092161 A CN101092161 A CN 101092161A
- Authority
- CN
- China
- Prior art keywords
- deck
- bulkhead
- thwartship bulkhead
- ship
- thwartship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 230000000994 depressogenic effect Effects 0.000 claims description 6
- 238000010422 painting Methods 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
一种横隔舱与甲板在船舶上的总组方法,先把横隔舱放置于坞内内底的搁墩上,再将横隔舱与甲板进行定位焊接,之后总段吊装上船并与船上其他部位相连接。本发明使高度问题得到了解决,满足了工装的要求;操作工人的人身安全得到了保证,并且大幅提高了总组速度。
Description
技术领域
本发明涉及一种船舶制造方法,特别是涉及一种横隔舱与甲板在船舶上的总组方法。
背景技术
在现代船舶制造领域中,横隔舱与甲板的总组是其中的一部分。现有的横隔舱与甲板的总组技术是先将横隔舱与甲板吊上船,然后再进行焊接和涂装作业。这种传统的总组方式存在以下的问题:
1、对舷侧总段要求高;甲板与横隔舱合拢,横隔舱要离地面高度5m以上,目前工装无法满足要求。
2、因为横隔舱离地面过高,操作工人的人身安全上存在隐患,并且操作上的不方便也影响了总组的速度,进而影响了船舶总体上的制造工期。
发明内容
本发明的目的是提供一种横隔舱与甲板在船舶上的总组方法。
本发明的目的是通过以下技术方案实现的:
一种横隔舱与甲板在船舶上的总组方法,其特点在于,先把横隔舱放置于坞内内底的搁墩上,再将横隔舱与甲板进行定位焊接,之后总段吊装上船并与船上其他部位相连接。
其中,在总段吊装上船之前,对装焊后的横隔舱和甲板进行涂装作业。
本发明的积极进步效果在于:
1、因为焊接和涂装工作转移到了坞内内底上进行,这样就使高度问题得到了解决,满足了工装的要求。
2、高度问题解决后,操作工人在坞内内底上进行焊接和涂装,保证了人身安全,并且大幅提高了总组速度。
附图说明
图1为本发明较佳实施例的实施状态图。
具体实施方式
下面结合附图给出本发明较佳实施例,以详细说明本发明的技术方案。
如图1所示,该方法包括如下步骤:
1、把横隔舱2的搁墩3放在坞内内底4的分段上,满足甲板1的高度,使甲板1的底端高于坞内内底4一段距离,方便作业。
2、将横隔舱2与甲板1进行定位,定位好之后进行焊接安装。
3、总组装焊后,对甲板1、横隔舱2整体进行涂装作业。
4、涂装作业完毕后,将整体总段吊装上船,完成横隔舱2与甲板1在船舶上的总组工艺。
通过以上的步骤,提高了该总组工艺的速度,进而提高了整体造船速度,并且工人的人身安全方面也得到了很大改善。
Claims (2)
1、一种横隔舱与甲板在船舶上的总组方法,其特征在于,先把横隔舱放置于坞内内底的搁墩上,再将横隔舱与甲板进行定位焊接,之后总段吊装上船并与船上其他部位相连接。
2、根据权利要求1所述的横隔舱与甲板在船舶上的总组方法,其特征在于,在总段吊装上船之前,对装焊后的横隔舱和甲板进行涂装作业。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200710044190 CN101092161A (zh) | 2007-07-25 | 2007-07-25 | 横隔舱与甲板在船舶上的总组方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200710044190 CN101092161A (zh) | 2007-07-25 | 2007-07-25 | 横隔舱与甲板在船舶上的总组方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101092161A true CN101092161A (zh) | 2007-12-26 |
Family
ID=38990649
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200710044190 Pending CN101092161A (zh) | 2007-07-25 | 2007-07-25 | 横隔舱与甲板在船舶上的总组方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101092161A (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102019998A (zh) * | 2010-12-10 | 2011-04-20 | 广州中船黄埔造船有限公司 | 上下水边舱总组搭载方法 |
| CN102218631A (zh) * | 2011-06-02 | 2011-10-19 | 扬帆集团股份有限公司 | 船舶槽型舱壁的安装方法 |
| CN101544268B (zh) * | 2009-05-05 | 2012-11-21 | 沪东中华造船(集团)有限公司 | 船舶建造中半宽型双跨总组搭载方法 |
| CN104875847A (zh) * | 2015-05-28 | 2015-09-02 | 沪东中华造船(集团)有限公司 | 一种集装箱船中间横隔舱的快速搭载方法 |
| CN108394514A (zh) * | 2018-04-26 | 2018-08-14 | 广船国际有限公司 | 一种船舶甲板总段建造方法 |
| CN109606548A (zh) * | 2018-10-31 | 2019-04-12 | 沪东中华造船(集团)有限公司 | 一种船舶平行舯体区p型总段总组的定位方法 |
-
2007
- 2007-07-25 CN CN 200710044190 patent/CN101092161A/zh active Pending
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101544268B (zh) * | 2009-05-05 | 2012-11-21 | 沪东中华造船(集团)有限公司 | 船舶建造中半宽型双跨总组搭载方法 |
| CN102019998A (zh) * | 2010-12-10 | 2011-04-20 | 广州中船黄埔造船有限公司 | 上下水边舱总组搭载方法 |
| CN102019998B (zh) * | 2010-12-10 | 2013-06-05 | 广州中船黄埔造船有限公司 | 上下水边舱总组搭载方法 |
| CN102218631A (zh) * | 2011-06-02 | 2011-10-19 | 扬帆集团股份有限公司 | 船舶槽型舱壁的安装方法 |
| CN104875847A (zh) * | 2015-05-28 | 2015-09-02 | 沪东中华造船(集团)有限公司 | 一种集装箱船中间横隔舱的快速搭载方法 |
| CN108394514A (zh) * | 2018-04-26 | 2018-08-14 | 广船国际有限公司 | 一种船舶甲板总段建造方法 |
| CN108394514B (zh) * | 2018-04-26 | 2019-08-09 | 广船国际有限公司 | 一种船舶甲板总段建造方法 |
| CN109606548A (zh) * | 2018-10-31 | 2019-04-12 | 沪东中华造船(集团)有限公司 | 一种船舶平行舯体区p型总段总组的定位方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101092161A (zh) | 横隔舱与甲板在船舶上的总组方法 | |
| CN102582784A (zh) | 船舶的船台或船坞分段搭载工艺 | |
| CN204775534U (zh) | 汽车顶盖和侧围的搭接结构及汽车车身 | |
| CN111806653B (zh) | 一种邮轮舷侧总段的预总组方法 | |
| CN105416523B (zh) | 一种双板舭龙骨及其安装方法 | |
| CN110027629A (zh) | 一种基于铝合金材料的前副车架及其连接方法 | |
| CN103661807B (zh) | 预先安装压力导轨架的舷侧分段合拢的定位方法 | |
| CN109533196A (zh) | 一种船体钢结构铰链式安装方法 | |
| CN206426775U (zh) | 一种轻型高速轮式两栖车车体 | |
| CN102874388A (zh) | 基于模块化建造上层建筑的全回转拖船结构 | |
| CN208232776U (zh) | 一种汽车尾门铰链加强板 | |
| CN110043721A (zh) | 一种镀锌钢管连接用管接头的制造方法 | |
| CN217022860U (zh) | 一种全悬挂扭曲舵的安装结构 | |
| CN202295224U (zh) | 一种用于船舶尾鳍定位安装的预埋式托架工装 | |
| CN203008601U (zh) | 一种汽车旋转门铰链 | |
| CN201678025U (zh) | 一种可吊离式甲板预装结构 | |
| CN202949178U (zh) | 一种用于汽车线束的橡胶护套 | |
| CN207450158U (zh) | 一种大型集装箱船镂空横舱壁翻身的工装 | |
| CN205520236U (zh) | 一种自动化翻转角度的顶升系统 | |
| CN202949179U (zh) | 一种用于线束固定的橡胶护套 | |
| CN208169231U (zh) | 一种焊接式油缸 | |
| CN207565790U (zh) | 一种新型导缆孔 | |
| CN204566542U (zh) | 一种小型框架式注塑机机身结构 | |
| CN205677730U (zh) | 发动机进气凸轮轴盖罩 | |
| CN212401478U (zh) | 一种船舶压载舱结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Open date: 20071226 |