CN101042759B - Construction payment management system and method with document tracking feature - Google Patents

Construction payment management system and method with document tracking feature Download PDF

Info

Publication number
CN101042759B
CN101042759B CN200710088737.3A CN200710088737A CN101042759B CN 101042759 B CN101042759 B CN 101042759B CN 200710088737 A CN200710088737 A CN 200710088737A CN 101042759 B CN101042759 B CN 101042759B
Authority
CN
China
Prior art keywords
project
file
payment
notification
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200710088737.3A
Other languages
Chinese (zh)
Other versions
CN101042759A (en
Inventor
帕特里克·J·阿林
查尔斯·C·彻丽
威廉·H·艾克霍恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Textura Corp
Original Assignee
Textura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/509,385 external-priority patent/US7925584B2/en
Application filed by Textura Corp filed Critical Textura Corp
Publication of CN101042759A publication Critical patent/CN101042759A/en
Application granted granted Critical
Publication of CN101042759B publication Critical patent/CN101042759B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A system and method of managing a construction payment process involving a plurality of participants associated with a construction project and at least one file transferred between at least two of the plurality of participants over at least one computer network during the construction project. A method includes specifying at least one enforcement action for the at least one file, wherein the enforcement action occurs automatically if the at least one file is not electronically transferred between the at least two participants.

Description

具有文档跟踪特性的施工支付管理系统及方法Construction payment management system and method with document tracking feature

相关申请related application

该专利申请是同时待审的于2005年1月10日提交的美国专利申请序列号11/032,699的部分继续申请,要求于2004年6月29日提交的美国专利申请序列号60/583,782的优先权,其整体内容通过引用结合于此。该专利申请同样要求于2006年3月23日提交的美国临时专利申请序列号60/785,411的优先权,其整体内容通过引用结合于此。This patent application is a continuation-in-part of co-pending U.S. Patent Application Serial No. 11/032,699, filed January 10, 2005, claiming priority over U.S. Patent Application Serial No. 60/583,782, filed June 29, 2004 rights, the entire contents of which are hereby incorporated by reference. This patent application also claims priority to US Provisional Patent Application Serial No. 60/785,411, filed March 23, 2006, the entire contents of which are hereby incorporated by reference.

背景技术 Background technique

住宅和商用施工工程(project)要求几个组织彼此通信以便分发支付款。传统的施工支付管理方法首先是通过口头通知来告知可以从工程贷款或业主方的帐户进行支取。施工工程的总承包商(GC)通过电话、传真或在会议上把这种支取通知给各分包商(或由GC聘请的任何其他人、企业或公司,诸如材料供应商)。分包商要准备发票,并通过邮件、传真、直接递送或在与GC的会议上将其送交给GC。GC和各分包商通常必须通过电话或在会议上协商最终发票金额。GC确认这些发票,将细目写入GC工程记帐系统,以及准备其自己的发票。Residential and commercial construction projects require several organizations to communicate with each other in order to distribute payments. The traditional method of construction payment management is firstly to notify through verbal notice that it can be withdrawn from the project loan or the owner's account. The general contractor (GC) of the construction works notifies the subcontractors (or any other person, firm or company engaged by the GC, such as material suppliers) of such withdrawals by telephone, fax or at a meeting. Subcontractors are to prepare invoices and send them to GC by mail, fax, direct delivery or at a meeting with GC. The GC and the various subcontractors usually have to negotiate the final invoice amount over the phone or in a meeting. The GC validates these invoices, writes the details to the GC engineering billing system, and prepares its own invoices.

只要完成这些发票,GC还手工准备誓词(sworn statement)。在这种誓词中,GC确认由GC聘请的分包商已经执行房地产建筑或维修中的特定服务。在该誓词中,GC还确认给予每一分包商的金额。As soon as these invoices are completed, the GC also prepares the sworn statement by hand. In this affidavit, the GC affirms that subcontractors hired by the GC have performed specific services in the construction or repair of the property. In this affidavit, GC also confirms the amount given to each subcontractor.

GC将生效的誓词转发给产权保险公司(Title company)以及工程贷款贷方和/或业主。贷方、业主或产权保险公司通知监理必须执行房地产的检查并将誓词发送给监理。监理汇编该房地产项目先前的检查报告。监理执行新的检查并手工地定制检查报告。监理通过传真、邮件或直接递送,将检查报告分发给贷方、业主和/或产权保险公司。GC forwards effective affidavit to title company and project loan lender and/or owner. The lender, landlord, or title insurance company notifies the superintendent that an inspection of the property must be performed and an affidavit sent to the superintendent. The supervisor compiles previous inspection reports for the real estate project. Supervisors perform new inspections and manually customize inspection reports. The inspector distributes the inspection report to lenders, homeowners, and/or title insurance companies by fax, mail, or direct delivery.

贷方、业主和/或产权保险公司通过邮件、传真、直接递送或在与GC和/或监理的会议上,接收该誓词和检查报告。贷方、业主和/或产权保险公司必须检索先前的支取和工程文档。贷方、业主和/或产权保险公司通常必须通过电话、传真或在会议上,与GC协商支付额和工程明细。贷方、业主和/或产权保险公司批准该誓词并通过电话、传真或在会议上传送该批准。贷方或房产业主然后批准在誓词中规定的金额的支出。The affidavit and inspection report is received by the lender, homeowner and/or title insurance company by mail, fax, direct delivery or at a meeting with the GC and/or superintendent. Lenders, homeowners and/or title insurance companies must retrieve prior drawdown and engineering documents. Lenders, homeowners, and/or title insurance companies must usually negotiate payments and project details with the GC by phone, fax, or in a meeting. The lender, homeowner, and/or title insurance company approves the affidavit and transmits the approval by phone, fax, or at a meeting. The lender or property owner then approves the disbursement of the amount specified in the affidavit.

工程贷款贷方或业主的开户银行通常将支付所有分包商所需的资金划拨到托管(escrow)帐户。通常产权保险公司由此把来自托管帐户的资金支付给GC。GC和/或产权保险公司准备用于分包商的支票。此时,分包商通常结束用于从工程贷款资金的先前支取或用于在前一月期间完成的工作的留置权放弃(lien waiver)。因此,用于当前支取或当前月的留置权放弃,直到从工程贷款进行后续支取为止或直到在下一月期间为止才实际释放。另外,分包商可能又有其自己的分包商,在从GC收到支付款后,他们必须支付给他们的分包商。The construction loan lender or the owner's bank usually transfers the funds required to pay all subcontractors into an escrow account. Typically the title insurance company thereby pays the GC funds from the escrow account. GC and/or title insurance company prepare checks for subcontractors. At this point, the subcontractor typically closes a lien waiver for previous drawdowns of project loan funds or for work completed during the preceding month. Thus, the lien for the current drawdown or current month is waived until a subsequent drawdown from the project loan or until during the next month. In addition, subcontractors may have their own subcontractors, and after receiving payment from GC, they must pay their subcontractors.

传统的工程支付方法从口头支取通知的日期到分包商真正收到支付款的日期,会花费90天或更长。传统的工程支付方法通常涉及事件的不可靠口头通知,而该方法的运转要基于这些事件。例如,如果一个分包商难以获得定制发票或提交留置权放弃,会延迟对所有其他分包商的支付过程。此外,如果一个分包商无法提供GC所要求的正确文件,GC(或者其他上线和/或下线参与方)通常以撤消对分包商的支付相威胁,使分包商履行法律标准。例如,GC可以通知分包商如果其不交回带有签字的分包合同,他们将不予支付。Traditional engineering payment methods can take 90 days or more from the date of the verbal withdrawal notice to the date the subcontractor actually receives the payment. Traditional engineering payment methods often involve unreliable verbal notification of events upon which the method operates. For example, if one subcontractor has difficulty obtaining a custom invoice or submitting a lien waiver, it will delay the payment process to all other subcontractors. In addition, if a subcontractor fails to provide the correct documentation required by the GC, the GC (or other upline and/or downline parties) often threatens to rescind payment to the subcontractor to make the subcontractor comply with legal standards. For example, the GC can notify subcontractors that they will not pay if they do not return the signed subcontract.

传统的工程支付过程还包含巨大的数据录入量。例如,对单一的大施工工程,GC每一月通常必须将上百张发票输入其记帐系统。同时,GC每一月必须收集上百个留置权放弃。另外,GC必须每一月定制、批准、签名和分发上百张支票给分包商。另外,GC必须保存每一支取过程期间所收集的所有纸件文档。支取通知、批准和将留置权放弃兑换支付的期间每月要求上百个传真、电话和会议。The traditional engineering payment process also involves a huge amount of data entry. For example, for a single large construction project, GC usually has to enter hundreds of invoices into its accounting system every month. At the same time, the GC must collect hundreds of lien waivers every month. In addition, GC must customize, approve, sign and distribute hundreds of checks to subcontractors every month. Additionally, the GC must maintain all paper documentation collected during each extraction process. The period of withdrawal notices, approvals, and lien waivers for payment requires hundreds of faxes, phone calls, and meetings each month.

发明内容 Contents of the invention

本发明的实施例提供用于管理工程支付过程系统和方法。所述过程涉及同工程项目相关的多个参与方以及在工程项目过程中在该多个参与方中至少两个参与方之间传递的至少一个文件。实施本发明的工程支付管理的一种方法可以包含文件跟踪模块,用来把至少一个强制动作(enforcement action)指定到所述至少一个文件,其中当所述文件未在所述至少两个参与方之间传送时所述强制动作自动发生。Embodiments of the present invention provide systems and methods for managing the engineering payment process. The process involves a plurality of parties associated with the engineering project and at least one document passed between at least two of the plurality of parties during the course of the engineering project. A method of implementing the project payment management of the present invention may include a document tracking module for assigning at least one enforcement action to said at least one document, wherein when said document is not in said at least two parties The coercion action happens automatically when teleporting between.

实施本发明的工程支付管理的一种方法可以包含文件跟踪模块,用来把至少一个强制动作指定到所述至少一个文件,其中当所述文件未在所述至少两个参与方之间传送时所述强制动作自动发生。A method of implementing the project payment management of the present invention may comprise a document tracking module for assigning at least one mandatory action to said at least one document, wherein when said document is not transferred between said at least two parties Said mandatory action occurs automatically.

实施本发明的工程支付管理系统的图形用户界面包括:文件状态个别页面,可由所述至少两个参与方访问;文件状态总结页面,显示指定到所述至少一个文件的至少一个强制动作,当所述至少一个文件未在所述至少两个参与方之间传送的情况下所述强制动作自动发生。The graphical user interface of the project payment management system embodying the present invention includes: a file status individual page, accessible by said at least two parties; a file status summary page, displaying at least one mandatory action assigned to said at least one file, when the Said mandatory action occurs automatically if said at least one file is not transferred between said at least two parties.

附图说明 Description of drawings

图1是根据本发明一实施例的工程支付管理系统的示意图。Fig. 1 is a schematic diagram of a project payment management system according to an embodiment of the present invention.

图2是通过使用图1中的系统执行的工程支付管理过程的示意图。FIG. 2 is a schematic diagram of a project payment management process performed by using the system in FIG. 1 .

图3是管理工程过程的示意图。Figure 3 is a schematic diagram of the management engineering process.

图4是管理组织过程的示意图。Figure 4 is a schematic diagram of the management organization process.

图5是管理支取过程的示意图。Fig. 5 is a schematic diagram of the management withdrawal process.

图6是管理更改订单过程的示意图。Figure 6 is a schematic diagram of the process of managing change orders.

图7是管理系统环境任务的示意图。Fig. 7 is a schematic diagram of managing system environment tasks.

图8是创建组织过程的示意图。Figure 8 is a schematic diagram of the process of creating an organization.

图9是创建管理表单(form)的例图。Fig. 9 is an illustration of creating a management form (form).

图10是更新用户系统通知的例图。Figure 10 is an illustration of an update user system notification.

图11是系统通知的例图。Fig. 11 is an illustration of a system notification.

图12是编辑组织表单的例图。Figure 12 is an illustration of the edit organization form.

图13是启用组织通知的例图。Figure 13 is an illustration of enabling organizational notifications.

图14是启用组织表单的例图。Figure 14 is an illustration of the Enable Organization form.

图15是组织启用的通知的例图。Figure 15 is an illustration of notifications enabled by an organization.

图16是组织停用通知的例图。Figure 16 is an illustration of an organization deactivation notification.

图17是维护组织过程的示意图。Figure 17 is a schematic diagram of the maintenance organization process.

图18是查看组织屏的例图。Figure 18 is an illustration of the view organization screen.

图19是浏览组织屏的例图。Figure 19 is an illustration of the browse organization screen.

图20是编辑组织表单的例图。Figure 20 is an illustration of the edit organization form.

图21是组织配置文件更新通知的例图。Figure 21 is an illustration of an organization profile update notification.

图22是创建用户过程的示意图。Figure 22 is a schematic diagram of the process of creating a user.

图23是创建用户表单的例图。Figure 23 is an example of creating a user form.

图24是更新用户配置文件通知的例图。Figure 24 is an illustration of an update user profile notification.

图25是维护用户过程的示意图。Figure 25 is a schematic diagram of the maintenance user process.

图26是查看用户屏的例图。Figure 26 is an illustration of the view user screen.

图27是浏览用户屏的例图。Figure 27 is an illustration of the browse user screen.

图28是编辑用户表单的例图。Figure 28 is an illustration of an edit user form.

图29是用户配置文件更新通知的例图。Figure 29 is an illustration of a user profile update notification.

图30是创建工程过程的示意图。Fig. 30 is a schematic diagram of the process of creating a project.

图31、32是创建工程表单的例图。Figures 31 and 32 are examples of creating project forms.

图33是工程创建通知的例图。Fig. 33 is an illustration of a project creation notification.

图34是工程用户访问屏的例图。Figure 34 is an illustration of an engineering user access screen.

图35是工程责任通知的例图。Figure 35 is an illustration of an Engineering Responsibility Notice.

图36是维护预算过程的示意图。Figure 36 is a schematic diagram of the maintenance budget process.

图37是进入顶级预算表单的示意图。Figure 37 is a schematic diagram of entering the top-level budget form.

图38是进入支取日期表单的例图。Figure 38 is an illustration of the Enter Withdrawal Date form.

图39是发票代码建立表单的例图。Figure 39 is an illustration of the invoice code creation form.

图40是指定发票代码表单的例图。Figure 40 is an illustration of the Specify Invoice Code form.

图41是接收工程通知的例图。Fig. 41 is an illustration of receiving engineering notices.

图42是接受工程表单的例图。Fig. 42 is an illustration of an acceptance project form.

图43是工程拒收通知的例图。Figure 43 is an illustration of a project rejection notice.

图44是工程接收通知的例图。Fig. 44 is an illustration of an engineering acceptance notice.

图45是工程主页的例图。Fig. 45 is an illustration of the project home page.

图46是添加用户通知的例图。Figure 46 is an illustration of adding a user notification.

图47是工程用户访问表单的例图。Figure 47 is an illustration of an engineering user access form.

图48是工程责任通知的例图。Figure 48 is an illustration of an Engineering Responsibility Notice.

图49是工程预算查看屏的例图。Figure 49 is an illustration of a project budget viewing screen.

图50是进入预算表单的例图。Figure 50 is an illustration of entering the budget form.

图51是终止预算项目过程的示意图。Figure 51 is a schematic diagram of the process for terminating a budget line.

图52A是进入顶级预算表单的例图。Figure 52A is an illustration of the entry to top-level budget form.

图52B-C是编辑预算表单的例图。52B-C are illustrations of the edit budget form.

图52D是工程主页的例图。Figure 52D is an illustration of the project home page.

图53是终止预算屏的例图。Figure 53 is an illustration of the Termination Budget screen.

图54是支取过程的示意图。Figure 54 is a schematic diagram of the withdrawal process.

图55是创建计划支取通知的例图。Figure 55 is an illustration of creating a plan withdrawal notification.

图56A-C是初始支取表单的例图。56A-C are illustrations of initial withdrawal forms.

图56D是工程主页的例图。Figure 56D is an illustration of the project home page.

图56E是包含在支取通知内的参与方的例图。Figure 56E is an illustration of the parties involved in a withdrawal notification.

图57A-B是输入发票通知的例图。57A-B are illustrations of inputting invoice notifications.

图57C是查看所有信息屏的例图。Figure 57C is an illustration of the View All Information screen.

图58A-B是输入发票表单的例图。58A-B are illustrations of an input invoice form.

图58C是发票提交通知的例图。Figure 58C is an illustration of an invoice submission notification.

图59是签名发票通知的例图。Figure 59 is an illustration of a signed invoice notification.

图60A是查看未决支取请求屏的例图。Figure 60A is an illustration of the View Pending Withdrawal Requests screen.

图60B是签名文件屏的例图。Figure 60B is an illustration of the Signature Documents screen.

图60C-D是自动生成发票表单的例图。60C-D are illustrations of automatically generated invoice forms.

图60E是签名发票的例图。Figure 60E is an illustration of a signed invoice.

图60F是签名审计报告的例图。Figure 60F is an illustration of a signed audit report.

图60G是文件签名通知的例图。Figure 60G is an illustration of a file signature notification.

图61是发票细目更新通知的例图。Fig. 61 is an illustration of an invoice detail update notification.

图62是查看未决支取请求屏的例图。Figure 62 is an illustration of the View Pending Withdrawal Requests screen.

图63是发票细目拒收通知的例图。Figure 63 is an illustration of an invoice line rejection notification.

图64A是未包含在支取通知中的发票的例图。Figure 64A is an illustration of an invoice not included in a withdrawal notice.

图64B是输入发票表单的例图。Figure 64B is an illustration of an input invoice form.

图64C是工程主页的例图。Figure 64C is an illustration of the project home page.

图64D是发票提交通知的例图。Figure 64D is an illustration of an invoice submission notification.

图64E是批准发票表单的例图。Figure 64E is an illustration of an Approve Invoice form.

图64F是查看发票屏的例图。Figure 64F is an illustration of the view invoice screen.

图64G是发票批准通知的例图。Figure 64G is an illustration of an invoice approval notification.

图65是自动生成发票表单的例图。Figure 65 is an example of an automatically generated invoice form.

图66A是自动生成誓词表单的例图。Figure 66A is an illustration of an automatically generated affidavit form.

图66B是发送至签名者屏的例图。Figure 66B is an illustration of the Send to Signer screen.

图66C是发票发送至签名者通知的例图。Figure 66C is an illustration of an Invoice Sent to Signer Notification.

图66D是工程主页的例图。Figure 66D is an illustration of the project home page.

图66E是签名文件屏的例图。Figure 66E is an illustration of the Sign Files screen.

图66F是自动生成留置权放弃表单的例图。Figure 66F is an illustration of an automatically generated lien waiver form.

图66G-H是签名的留置权放弃的例图。Figures 66G-H are illustrations of signed lien waivers.

图66I是发票签名通知的例图。Figure 66I is an illustration of an invoice signature notification.

图66J是签名文件屏的例图。Figure 66J is an illustration of the Sign Files screen.

图66K是自动生成的留置权放弃表单的例图。Figure 66K is an illustration of an automatically generated lien waiver form.

图66L是签名留置权放弃的例图。Figure 66L is an illustration of a signature lien waiver.

图66M是签名文件屏的例图。Figure 66M is an illustration of the Signature Files screen.

图66N是公正的签名留置权放弃表单的例图。Figure 66N is an illustration of an impartial signature lien waiver form.

图66O是已公正的留置权放弃的例图。Figure 66O is an illustration of a justified lien release.

图66P是文件签名通知的例图。Figure 66P is an illustration of a file signature notification.

图67是使资金可用通知的例图。Figure 67 is an illustration of a Make Funds Available Notification.

图68A是查看支取请求屏的例图。Figure 68A is an illustration of the view withdrawal request screen.

图68B是请求留置权放弃屏的例图。Figure 68B is an illustration of the Request Lien Waiver screen.

图68C是工程主页的例图。Figure 68C is an illustration of the project home page.

图68D是留置权放弃要求的通知的例图。Figure 68D is an illustration of a notice of lien waiver requirement.

图69A是签名留置权放弃通知的例图。Figure 69A is an illustration of a signature lien waiver notice.

图69B是工程主页的例图。Fig. 69B is an illustration of the project home page.

图69C是签名文件屏的例图。Figure 69C is an illustration of the Sign Files screen.

图70A和70B是自动生成留置权放弃表单的例图。70A and 70B are illustrations of automatically generated lien waiver forms.

图70C是签名留置权的例图。Figure 70C is an illustration of a signature lien.

图70D是签名文件屏的例图。Figure 70D is an illustration of the Signature Documents screen.

图70E是公正签名留置权放弃表单的例图。Figure 70E is an illustration of an impartial signature lien waiver form.

图70F是已公正的留置权放弃的例图。Figure 70F is an illustration of a justified lien release.

图70G是文件签名通知的例图。Figure 70G is an illustration of a file signature notification.

图71是留置权签名通知的例图。Figure 71 is an illustration of a signed notice of lien.

图72是查看支取请求屏的例图。Figure 72 is an illustration of the view withdrawal request screen.

图73A是所有留置权放弃通知的例图。Figure 73A is an illustration of all lien waiver notices.

图73B是查看所有信息屏的例图。Figure 73B is an illustration of the view all information screen.

图74A和74B是查看支取请求表单的例图。74A and 74B are illustrations of viewing withdrawal request forms.

图75A和75B是支付发出通知的例图。75A and 75B are illustrations of payment placement notifications.

图75C是工程主页的例图。Figure 75C is an illustration of the project home page.

图75D是支取支付接收页的例图。Figure 75D is an illustration of a withdrawal payment acceptance page.

图76是维护系统屏任务的示意图。Figure 76 is a schematic diagram of maintenance system screen tasks.

图77是维护阶段码表单的例图。Figure 77 is an illustration of a maintenance stage code form.

图78是管理使用注册屏的例图。Fig. 78 is an illustration of the management usage registration screen.

图79是添加/编辑参数选用表表单的例图。Figure 79 is an illustration of the Add/Edit Picklist form.

图80是添加/编辑组织角色表单的例图。Figure 80 is an illustration of the Add/Edit Organization Role form.

图81是默认/配置设定值表单的例图。Figure 81 is an illustration of the Default/Configuration Settings form.

图82是编辑通知表单的例图。Fig. 82 is an illustration of the edit notification form.

图83是默认/配置过程表单的例图。Figure 83 is an illustration of the Default/Configuration Process Form.

图84是添加/编辑用户任务表单的例图。Figure 84 is an illustration of the Add/Edit User Task form.

图85是执行检查过程和相关任务的示意图。Fig. 85 is a schematic diagram of performing an inspection process and related tasks.

图86是准备实施检查通知的例图。Fig. 86 is an illustration of a notification of preparation for inspection.

图87是检查所需通知的例图。Fig. 87 is an illustration of checking required notification.

图88是所需检查屏的例图。Figure 88 is an illustration of the required inspection screen.

图89是输入检查报告通知的例图。Fig. 89 is an illustration of input inspection report notification.

图90是输入检查报告表单的例图。Fig. 90 is an illustration of an input inspection report form.

图91是检查报告表单屏的例图。Fig. 91 is an illustration of an inspection report form screen.

图92是检查报告失败通知的的例图。Figure 92 is an illustration of an inspection report failure notification.

图93是查看先前检查屏的例图。Figure 93 is an illustration of the view previous check screen.

图94是认可支取请求过程的示意图。Fig. 94 is a schematic diagram of a process for approving a withdrawal request.

图95是授权支取请求一表单的例图。Figure 95 is an illustration of a form authorizing a withdrawal request.

图96是授权支取请求一拒绝通知的例图。Figure 96 is an illustration of an authorized withdrawal request-rejection notification.

图97是检查确认通知的例图。Fig. 97 is an example of a check confirmation notification.

图98是支取细目修改通知的例图。Figure 98 is an illustration of a withdrawal detail modification notice.

图99是检查认可通知的例图。Fig. 99 is an illustration of an inspection approval notice.

图100是授权支取请求二通知的例图。Figure 100 is an illustration of an authorized withdrawal request two notification.

图101是授权支取请求二表单的例图。Figure 101 is an illustration of the second form of authorization withdrawal request.

图102是授权支取请求二拒绝通知的例图。Fig. 102 is an illustration of the rejection notification of the authorized withdrawal request 2.

图103是授权支取请求二许可通知的例图。Fig. 103 is an illustration of authorization notification of withdrawal request 2.

图104是发出留置权放弃通知的例图。Figure 104 is an illustration of issuing a lien waiver notice.

图105是改变请求过程的示意图。Figure 105 is a schematic diagram of a change request process.

图106是改变请求表单的例图。Figure 106 is an illustration of a change request form.

图107是改变请求发出通知的例图。Figure 107 is an illustration of change request notification.

图108是授权改变请求通知的例图。Figure 108 is an illustration of an authorization change request notification.

图109是过程改变请求过程的示意图。Fig. 109 is a schematic diagram of a process change request process.

图110是查看未决改变请求屏的例图。Figure 110 is an illustration of the View Pending Change Requests screen.

图111是授权改变请求表单的例图。Figure 111 is an illustration of an authorization change request form.

图112是改变请求拒绝通知的例图。Figure 112 is an illustration of a change request rejection notification.

图113是改变请求许可通知的例图。Fig. 113 is an illustration of change request permission notification.

图114是改变工程参与方过程的示意图。Figure 114 is a schematic diagram of the process of changing project participants.

图115是改变参与方屏的例图。Figure 115 is an illustration of the Change Party screen.

图116是支取参与方删除屏的例图。Figure 116 is an illustration of a withdrawal participant deletion screen.

图117是更改誓言书(affidavit)屏的例图。Figure 117 is an illustration of the Change Affidavit screen.

图118是维护工程屏任务的示意图。Figure 118 is a schematic diagram of maintenance engineering screen tasks.

图119是工程配置文件表单的例图。Figure 119 is an illustration of the project configuration file form.

图120是工程承包信息屏的例图。Fig. 120 is an illustration of an engineering contract information screen.

图121是工程信息屏的例图。Fig. 121 is an illustration of a project information screen.

图122是关闭工程屏的例图。Figure 122 is an example of closing the engineering screen.

图123是管理访问屏任务的示意图。Figure 123 is a schematic diagram of a task in the management access screen.

图124是注册屏的例图。Fig. 124 is an illustration of a registration screen.

图125是注销屏的例图。Figure 125 is an illustration of a logout screen.

图126是工程主页屏的例图。Figure 126 is an illustration of the Project home screen.

图127是复位密码屏的例图。Figure 127 is an illustration of the reset password screen.

图128是用于特定用户的主屏的例图。Figure 128 is an illustration of a home screen for a specific user.

图129是浏览工程屏的例图。Figure 129 is an example of the browse project screen.

图130是遗忘密码屏的例图。Figure 130 is an illustration of the Forgot Password screen.

图131是你的密码通知的例图。Figure 131 is an example of your password notification.

图132是管理消息屏过程的示意图。Fig. 132 is a schematic diagram of the process of managing a message screen.

图133是查看消息屏的例图。Fig. 133 is an illustration of the view message screen.

图134是由用户查看特定消息的例图。Figure 134 is an illustration of viewing a specific message by a user.

图135是创建/发送消息屏的例图。Figure 135 is an illustration of the Create/Send Message screen.

图136是状态消息屏的例图。Figure 136 is an illustration of a status message screen.

图137-153是示例说明管理根据本发明的另一实施例的工程支付过程的方法的流程图。137-153 are flowcharts illustrating a method of managing a project payment process according to another embodiment of the present invention.

图154-179是示例说明管理根据本发明的另一实施的工程支付过程方法的输入/输出图。154-179 are input/output diagrams illustrating a method of managing a project payment process according to another implementation of the present invention.

图180是根据本发明的另一实施例的施工工程支付系统的示意图。Fig. 180 is a schematic diagram of a construction project payment system according to another embodiment of the present invention.

图181是根据本发明的另一实施例的由图180所示施工工程支付管理系统所管理的数据的示意图。Fig. 181 is a schematic diagram of data managed by the construction project payment management system shown in Fig. 180 according to another embodiment of the present invention.

图182A是文件要求页的例图。Figure 182A is an illustration of a file request page.

图182B是文件要求通知的例图。Figure 182B is an illustration of a document request notification.

图182C是文件要求修改通知的例图。Figure 182C is an illustration of a file request modification notification.

图183是工程主页的例图。Figure 183 is an illustration of the project home page.

图184是文件状态总结页的例图。Figure 184 is an illustration of the File Status Summary page.

图185A是文件状态个别页的例图。Figure 185A is an illustration of a file status individual page.

图185B是文件状态个别页的只供查看版本的例图。Figure 185B is an illustration of a view-only version of the Document Status individual page.

图185C是工程主页的的例图。Figure 185C is an illustration of the project home page.

图186A-B是提交文件页的例图。186A-B are illustrations of submission documents pages.

图187是文件提交通知的例图。Figure 187 is an illustration of a file submission notification.

图188是主页的例图。Figure 188 is an illustration of the home page.

图189是接收文件通知的例图。Figure 189 is an illustration of receiving a file notification.

图190是文件信息更新通知的例图。Fig. 190 is an illustration of a file information update notification.

图191是根据本发明一实施例的识别过期文件的方法的流程图。FIG. 191 is a flowchart of a method for identifying outdated files according to an embodiment of the present invention.

图192是过期警告通知的例图。Figure 192 is an illustration of an overdue warning notification.

图193是过期通知的例图。Figure 193 is an illustration of an overdue notification.

图194是更新文件所需的通知的例图。Figure 194 is an illustration of a notification required to update a file.

图195A是暂缓支付通知的例图。Figure 195A is an illustration of a payment hold notice.

图195B是查看所有消息屏的例图。Figure 195B is an illustration of the View All Messages screen.

图196是用于暂缓通知的支付科目的例图。Figure 196 is an illustration of payment accounts for hold notifications.

图197A-B是管理支付页的例图。197A-B are illustrations of the Manage Payments page.

图198A-B是管理支付页的例图。198A-B are illustrations of the Manage Payments page.

图198C是支付页的例图。Figure 198C is an illustration of a payment page.

图199是工程主页的例图。Figure 199 is an illustration of the project home page.

图200是管理支付页的例图。Figure 200 is an illustration of the Manage Payments page.

图201是资金支出通知的例图。Figure 201 is an illustration of a funds disbursement notification.

具体实施方式 Detailed ways

在详细地说明本发明的任何实施例前,应该理解本发明不将其应用限制到在下面的描述中所阐述或在图中例示的施工的细节和部件的排列上。本发明还有其他实施例并能以各种方式实施或执行。同时,将理解到在此使用的措辞和术语用于描述目的,而不应当视为限制。使用“包括”、“由..组成”或“具有”以及其变形意指包含此后列出的项及其等效,以及另外的项。广泛使用术语“安装”、“连接”和“耦合”以及包含直接和间接安装、连接和耦合。另外,“连接”和“耦合”不限制到物理或组织连接或耦合,并可包括电连接或耦合,不管是直接还是间接。同时,电通信和通知可以使用任何已知手段,包括直接连接、无线连接等等执行。Before any embodiment of the invention is described in detail, it is to be understood that the invention is not limited in application to the details of construction and arrangement of parts set forth in the following description or illustrated in the drawings. The invention is still capable of other embodiments and of being practiced or carried out in various ways. Also, it is to be understood that the phraseology and terminology used herein are for the purpose of description and should not be regarded as limiting. The use of "comprising", "consisting of" or "having" and variations thereof is meant to encompass the items listed thereafter and equivalents thereof, as well as additional items. The terms "mounted", "connected" and "coupled" are used broadly and include direct and indirect mounting, connection and coupling. Additionally, "connected" and "coupled" are not limited to physical or organizational connections or couplings, and may include electrical connections or couplings, whether direct or indirect. Meanwhile, electronic communication and notification may be performed using any known means including direct connection, wireless connection, and the like.

应注意到可以利用基于设备的多种硬件和软件,以及多个不同结构部件来实现本发明。此外,以及如在后续段落中所述,在附图中例示的具体结构是用于例示本发明的实施例,而其他另外的结构也是可能的。It should be noted that the present invention can be implemented using a variety of hardware and software based devices, as well as a number of different structural components. Furthermore, and as described in subsequent paragraphs, the specific structures illustrated in the drawings are intended to illustrate embodiments of the invention, and other additional structures are possible.

图1示例说明根据本发明的一个实施例的工程支付管理系统(CPMS)10。CPMS 10能包括应用服务器12、数据库服务器14、应用逻辑模块16、web服务器18、网络20(诸如互联网或单独的或与互联网结合的其他网络)、验证服务22、参与组织或个人24(在下文中,“参与方”或“组织”)以及支付系统26。支付系统26能包括自动结算中心(ACH)系统、电汇系统、借记卡系统、信用卡系统或任何其他适当的电子转帐(EFT)系统。Figure 1 illustrates a project payment management system (CPMS) 10 according to one embodiment of the present invention. The CPMS 10 can include an application server 12, a database server 14, an application logic module 16, a web server 18, a network 20 (such as the Internet or other networks alone or in combination with the Internet), an authentication service 22, participating organizations or individuals 24 (hereinafter , "participant" or "organization") and payment system 26. Payment system 26 can include an automated clearing house (ACH) system, a wire transfer system, a debit card system, a credit card system, or any other suitable electronic funds transfer (EFT) system.

应用服务器12能存储和提供对工程模块28、表单处理模块30、许可和授权引擎32、数据库管理系统34、预算模块36、访问管理器38、通知管理器40、组织模块42、支取模块44、承包模块46、更改订单模块48、用户模块50、系统环境管理器52和电子保管箱/托管54的访问。支取模块44能包括核心模块56、检查模块58和支取准许模块60、系统环境管理器52能包括报告生成器62、帮助模块65和系统维护模块66。电子保管箱/托管54能存储一个或多个留置权放弃68。应理解,可以按相对于图1所示和所述不同的方式,组合应用服务器12的部件。能以任何适当方式组合或分离用来编码应用服务器12的各个模块、管理器和引擎的软件以及能以任何适当方式存储和访问。The application server 12 can store and provide access to the engineering module 28, the form processing module 30, the permission and authorization engine 32, the database management system 34, the budget module 36, the access manager 38, the notification manager 40, the organization module 42, the withdrawal module 44, Access to Contracting Module 46 , Change Order Module 48 , User Module 50 , System Environment Manager 52 , and E-Deposit Box/Escrow 54 . The withdrawal module 44 can include a core module 56 , a check module 58 and a withdrawal authorization module 60 , and the system environment manager 52 can include a report generator 62 , a help module 65 and a system maintenance module 66 . Electronic safe deposit box/escrow 54 can store one or more lien waivers 68 . It should be understood that components of the application server 12 may be combined in different ways relative to those shown and described in FIG. 1 . The software encoding the various modules, managers and engines of application server 12 can be combined or separated and stored and accessed in any suitable manner.

应用服务器12能连接到数据库服务器14、应用逻辑模块16和验证服务22。然而,在一些实施例中,验证服务22可以仅连接到网络20。应用逻辑模块16能连接到web服务器18,或在一些实施例中,直接连接到网络20。Web服务器18能连接到网络20。Application server 12 can connect to database server 14 , application logic module 16 and authentication service 22 . However, in some embodiments, authentication service 22 may only be connected to network 20 . Application logic module 16 can be connected to web server 18 or, in some embodiments, directly to network 20 . Web server 18 is connectable to network 20 .

参与方24能包括业主70(和/或业主代表72)、总承包商(GC)74、监理76、一个或多个分包商(分包商A 78、分包商B 80等等)、一个或多个材料供应商82、一个或多个贷方84(和/或一个或多个信贷员86)、一个或多个产权保险公司86,以及一个或多个建筑师88。参与方24也能包括一个或多个室内设计者(和/或家具制造商)和一个或多个不动产业主(即将工地出售给业主70的土地业主),或一个或更多的工程师。参与方24能包括视为“线上”(即在施工过程中高于GC)或“线下”(即由GC雇佣)的组织和/或个人。线上的参与方24能包括贷方、建筑师、室内设计者、业主、业主代表、产权保险公司和不动产业主。线下的参与方24能包括分包商和材料供应商。CPMS 10能用来便于这些类型的参与方,不管是GC的线上或下的任何之间的工程支付过程。CPMS 10通常在此描述成用来便于GC和分包商之间的支付。然而,应理解,CPMS 10能用来便于任何类型的参与方之间的支付,不仅是GC和分包商之间。The parties 24 can include the owner 70 (and/or the owner's representative 72), a general contractor (GC) 74, a supervisor 76, one or more subcontractors (Subcontractor A 78, Subcontractor B 80, etc.), One or more material suppliers 82 , one or more lenders 84 (and/or one or more loan officers 86 ), one or more title insurance companies 86 , and one or more architects 88 . The parties 24 can also include one or more interior designers (and/or furniture manufacturers) and one or more real estate owners (land owners who sell the site to the owner 70), or one or more engineers. Parties 24 can include organizations and/or individuals considered "online" (ie, above the GC during construction) or "offline" (ie, employed by the GC). Online parties 24 can include lenders, architects, interior designers, homeowners, homeowner representatives, title insurance companies, and real estate owners. Offline parties 24 can include subcontractors and material suppliers. The CPMS 10 can be used to facilitate the project payment process between any of these types of parties, whether online or offline for the GC. CPMS 10 is generally described herein as being used to facilitate payments between GCs and subcontractors. However, it should be understood that the CPMS 10 can be used to facilitate payments between any type of parties, not just between GCs and subcontractors.

除将参与方划分成GC的线上或线下外,能将与施工过程有关的成本划分成“软”成本或“硬”成本。软成本能包括监理费、建筑师费、室内设计费、产权保险公司费、许可费、用于施工过程期间的房地产的水电费帐单、家具成本、音频/视频设备、计算机等等。硬成本能包括由GC雇佣的组织或个人产生的所有成本,包括用于由GC雇佣的分包商和材料供应商的所有成本。每一施工工程能包括整体预算(从业主的观点看),包括所有软和硬成本。每一施工工程还能包括GC预算。CPMS 10能用来方便整体预算和GC预算内所进行的所有支付。然而,在本发明的一些实施例中,CPMS 10可只用来方便由GC管理的硬成本的支付(即,仅GC预算)。本领域的普通技术人员应理解到CPMS10能用来仅对于GC的硬成本、仅对GC的线上的参与方的软成本,或GC的线上和下的参与方的硬和软成本的组合来方便支付。在此,通常相对于硬成本来描述CPMS 10,但也可以用于软成本或硬和软成本的组合。In addition to dividing the parties into GC's online or offline, the costs related to the construction process can be divided into "soft" costs or "hard" costs. Soft costs can include superintendent fees, architect fees, interior design fees, title insurance company fees, permit fees, utility bills for the property during the construction process, furniture costs, audio/video equipment, computers, and the like. Hard costs can include all costs incurred by organizations or individuals employed by the GC, including all costs for subcontractors and material suppliers employed by the GC. Each construction project can include an overall budget (from the owner's point of view), including all soft and hard costs. Each construction project can also include a GC budget. CPMS 10 can be used to facilitate all payments made within the overall budget and GC budget. However, in some embodiments of the invention, the CPMS 10 may only be used to facilitate payment of hard costs managed by the GC (i.e., GC budget only). Those of ordinary skill in the art will understand that CPMS 10 can be used for the hard costs of the GC only, the soft costs of the on-line participants of the GC only, or a combination of hard and soft costs of the on-line and off-line participants of the GC to facilitate payment. Here, CPMS 10 is generally described with respect to hard costs, but can also be used for soft costs or a combination of hard and soft costs.

参与方24的每一个能连接到支付系统26。然而,在本发明的一些实施例中,一些参与方24可以不连接到支付系统26。在一些实施例中,支付系统26能包括具有一个或多个发起信托金融机构(ODFI)和一个或多个接收信托金融机构(RDFI)。Each of the parties 24 can be connected to a payment system 26 . However, some participants 24 may not be connected to the payment system 26 in some embodiments of the invention. In some embodiments, payment system 26 can include one or more originating trusted financial institutions (ODFIs) and one or more receiving trusted financial institutions (RDFIs).

参与方24能访问应用服务器12以便使用各个模块、管理器和引擎来执行根据本发明的几个实施例的工程支付管理方法。The parties 24 have access to the application server 12 in order to use the various modules, managers and engines to execute the project payment management method according to several embodiments of the present invention.

在一些实施例中,CPMS 10能将所有工程参与方连接到基本上统一的、基于Web的实时系统,能组织该施工工程的预算,能便于发票的电子提交和准许,以及能通过使用电子支付和匹配电子留置权放弃释放产品,自动化和简化支付和留置权放弃释放过程。In some embodiments, the CPMS 10 can connect all project participants to a substantially unified, real-time, web-based system, can organize budgets for the construction project, can facilitate electronic submission and approval of invoices, and can and matching electronic lien waiver release products that automate and simplify the payment and lien waiver release process.

尽管在细节上可有各种变化(例如在公众融资工程中,通过担保发行人,而不是银行,进行工程的启动和监督),CPMS 10的一个实施例可以使用如下。信贷员能注册到互联网上,以及进入CPMS网站。在安全许可后,信贷员能进入贷方的公文夹,以及访问一系列屏幕来通过输入所有工程明细创建新工程。工程明细能包括用于每一工程的参与方的明细,例如业主、建筑师、总承包商和产权保险公司。每一参与方能接收包含在工程中的电子邮件通知以及能验证他们的配置文件明细。GC能添加分包商和材料供应商。分包商和材料供应商能接收将他们添加到该工程的通知以及能经历安全和验证过程。GC能选择用于该工程的支取数和支取日期。CPMS 10能实时通知参与方未决支取日期。每一参与方能通过输入他们的材料和劳动清单明细,完成他们的支取请求。GC能评审支取请求并对其授权,以及CPMS 10能生成誓词。随之进行一系列工程现场检查、核准、留置权放弃的完成、声明(statement)的生成等等,所有这些由CPMS 10通过实时电子邮件通知来提示。只要完成和验证所有表单,CPMS 10就能方便支付。能通过电子支付系统,将支付款直接存入参与方的银行帐号。对所有支取,重复该过程。通过支付额的完成、留置权放弃收取和核准检查,使工程预算保持平衡。利用形进度指示器可通过CPMS 10跟踪工程进度。While variations in details are possible (eg, in a public finance project, the project is initiated and supervised by the security issuer, rather than the bank), one embodiment of the CPMS 10 can be used as follows. Loan officers can log on to the Internet and access the CPMS website. After security clearance, the loan officer can access the lender's portfolio and access a series of screens to create a new project by entering all project details. The project details can include details of the parties involved in each project, such as the owner, architect, general contractor, and title insurer. Each party can receive email notifications of inclusion in the project and can verify their profile details. GC can add subcontractors and material suppliers. Subcontractors and material suppliers can receive notification of their addition to the project and can go through the safety and verification process. The GC can choose the withdrawal amount and withdrawal date for the project. CPMS 10 can notify participants of the pending withdrawal date in real time. Each party can complete their withdrawal request by entering their bill of materials and labor details. The GC can review and authorize withdrawal requests, and the CPMS 10 can generate pledges. This is followed by a series of engineering site inspections, approvals, completion of lien waivers, generation of statements, etc., all prompted by the CPMS 10 via real-time email notifications. CPMS 10 facilitates payments as long as all forms are completed and verified. The payment can be directly deposited into the bank account of the participant through the electronic payment system. Repeat the process for all withdrawals. Balance the project budget through the completion of payments, lien waiver collection, and approval checks. Project progress can be tracked through CPMS 10 using the graphical progress indicator.

CPMS 10能包括下述特征:组织加入CPMS 10的一次性注册、支取的实时通知、自动发票生成、自动誓词、自动留置权放弃生成、协调支付/留置权放弃释放以及将资金直接指定给参与组织。CPMS 10 can include the following features: one-time registration of organizations joining CPMS 10, real-time notification of disbursements, automatic invoice generation, automatic affidavits, automatic lien waiver generation, coordinated payment/lien waiver release, and direct designation of funds to participating organizations .

参与组织到CPMS 10的一次性注册能降低参与服务的成本,因为参与方必须仅注册一次。一次性注册还降低潜在错误的数量,因为输入必须一次完成。这使得潜在参与方将事实上参与更可能,以及当他们进行该操作时,他们将具有好的(无错误)结果。一次性注册有助于确保希望参与该过程的对方和使用该过程的在线团体仅需要注册一次,便能参与通过CPMS 10执行其支付的任一工程。CPMS 10能通过一次性俘获组织和个人信息,创建便于随时间参与多个工程的过程的稳定团体,提高使组织加入工程支付过程的注册的效率。该方法允许组织使用CPMS 10,注册为由商业界的成员启动的任一工程中的潜在的参与方。除参与多个工程的价值外,一次性注册对参与方访问有关多个GC、业主、贷方、分包商等等的信息有用。例如,一次性注册为业主、贷方和GC提供通过CPMS 10了解新的分包商的机会。在一些实施例中,CPMS 10的用户可以通过使用CPMS 10来寻找可承包项目的组织。例如,CPMS 10可以生成列有与某特定工程任务、特定地理区域等相关的组织的报告。CPMS 10也可以提供在该系统注册的组织的信息(如信任程度、资质、联系方式等)。这些信息可在用户掌握信息后选择组织承包工程时使用。CPMS 10也可以根据由CPMS 10管理的组织历史和/或其他组织向CPMS 10提供的评价来提供列有“优选的”或“推荐的”组织的列表。在一些实施例中,参与方也可以生成他们自己“优选的”组织列表,该列表只能由创建列表的参与方访问或者被CPMS 10的其他参与方和/或CPMS 10在创建信任程度或为注册组织排名时使用。同时,具有多个未决工程,分别通过不同的GC而具有几个工程的业主能访问有关每一个GC的信息。One-time registration of participating organizations to CPMS 10 can reduce the cost of participating services, because participants must only register once. One-time registration also reduces the number of potential errors because the entry must be done in one go. This makes it more likely that potential parties will actually participate, and when they do, they will have good (error-free) outcomes. The one-time registration helps to ensure that counterparties wishing to participate in the process and online groups using the process only need to register once to participate in any project for which payment is performed through CPMS 10 . CPMS 10 can create a stable group that can participate in the process of multiple projects over time by capturing organizational and personal information at one time, and improve the efficiency of registration for organizations to participate in the project payment process. This approach allows organizations to use the CPMS 10 to register as potential participants in any project initiated by members of the business community. In addition to the value of participating in multiple projects, a single registration is useful for participants to access information about multiple GCs, owners, lenders, subcontractors, and so on. For example, a one-time registration provides owners, lenders, and GCs the opportunity to learn about new subcontractors through CPMS 10. In some embodiments, a user of the CPMS 10 can use the CPMS 10 to find organizations that can contract projects. For example, CPMS 10 can generate reports listing organizations associated with a particular engineering task, a particular geographic area, and so on. CPMS 10 can also provide information (such as degree of trust, qualifications, contact information, etc.) of organizations registered in the system. This information can be used when the user chooses to organize the contracting project after mastering the information. The CPMS 10 may also provide a list of "preferred" or "recommended" organizations based on the organization's history managed by the CPMS 10 and/or evaluations provided to the CPMS 10 by other organizations. In some embodiments, participants may also generate their own "preferred" organizational lists that can only be accessed by the participant that created the list or by other participants of the CPMS 10 and/or by the CPMS 10 when creating a level of trust or for Used when registering organization rankings. Also, an owner with several projects pending through different GCs can access information about each GC.

支取的实时通知有助于确保支取中的所有参与方1)及时地和按统一的方式被告知,以及2)具有提供支付所需的信息的模板。CPMS 10有助于消除延迟支付过程的错误(未得到通知或弄错该请求来自哪一工程)。CPMS 10通过为GC提供在CPMS 10上维护支取时间表的选择,通过降低通知支取的参与方的工作,通过自动化构建用于支取的参与方的列表的过程,通过一旦宣布就自动通知支取的支取参与方,通过提供易于访问的链接,来提高支取过程的实时通知的效率,以使得分包商能访问CPMS 10来提交该支取所需的文档。CPMS 10实时通知参与方,其准时性已成为该系统正常情况下的内在方面。因此,CPMS10实时操作已达满足其时间(如底线)的要求。换句话说,CPMS 10在支取生成时会以最快的速度通知所有参与方。虽然参与方可能不会以最快的速度访问通知(例如,可能不会访问CPMS 10),但是CPMS10会使支取信息到达所有参与方。只要信息可以获得,实时通知各参与方给提供公平访问支取信息的机会。实时操作不能理解为“在线”操作、“通过网页看到”或者操作“十分迅速”。包括有底线要求、回答时间、时间模式或者时间限制的时间问题典型依靠单个申请。他们不单为官僚怠慢、网络带宽、处理器速度或浏览器、服务器或者某人通过使用网络编程语言创建的人机或者用户接口的功能。(虽然这些方面可影响处理速度,但是他们并没有提供实际管理满足时间要求的资源的方法。)Real-time notification of withdrawals helps to ensure that all parties involved in a withdrawal 1) are notified in a timely and consistent manner, and 2) have a template to provide the information required for payment. CPMS 10 helps eliminate errors that delay the payment process (not being notified or mistaking which project the request came from). CPMS 10 by providing the GC with the option to maintain a withdrawal schedule on CPMS 10, by reducing the effort of notifying parties involved in withdrawals, by automating the process of building a list of parties for withdrawals, by automatically notifying withdrawals of withdrawals once announced Participant, to improve the efficiency of real-time notification of the withdrawal process by providing an easily accessible link to enable subcontractors to access the CPMS 10 to submit the documents required for the withdrawal. CPMS 10 notifies participants in real time, and its punctuality has become an intrinsic aspect of the system under normal circumstances. Therefore, CPMS 10 operates in real time to meet its time (eg, bottom line) requirements. In other words, CPMS 10 will notify all parties at the fastest speed when the withdrawal is generated. Although the parties may not have the fastest access to notifications (eg, the CPMS 10 may not be accessed), the CPMS 10 will make the withdrawal information reach all parties. Real-time notifications to all parties provide fair access to withdrawal information as long as the information is available. Real-time operation cannot be understood as "online" operation, "visible through a web page" or "very fast" operation. Including time questions with baseline requirements, response times, time patterns or time limits typically rely on a single application. They're not just bureaucratic snubs, network bandwidth, processor speed or the capabilities of browsers, servers or human-machine or user interfaces that someone creates by using a web programming language. (While these aspects can affect processing speed, they do not provide a way to actually manage resources to meet timing requirements.)

能由业主、业主代表、贷方、GC或产权保险公司使用CPMS 10以便创建和维护工程预算。如上所述,工程预算能包括GC的线上的软成本、GC的线下的硬成本,或硬和软成本的组合。在一些实施例中,参与方也可以使用CPMS 10来批准预算。例如,所有人可以批准GC创建的预算,GC可以批准分包商创建的预算,和/或分包商可以批准其缔结的下级分包商创建的预算等等。也能使用CPMS 10的一些实施例来创建和管理修改预算(通常通过扩充预算)的更改订单以及由适当的参与方核准所修改的预算。预算能包括用于该施工工程的总成本,以及用于必须执行来完成施工工程的每一阶段或作业的项目成本。CPMS 10能构造预算以便于分包商的支付,允许有效进度跟踪,以及允许自动开发票。CPMS 10 can be used by owners, owner representatives, lenders, GCs or title insurance companies to create and maintain project budgets. As noted above, the project budget can include soft costs for the GC online, hard costs for the GC offline, or a combination of hard and soft costs. In some embodiments, parties may also use the CPMS 10 to approve budgets. For example, an owner can approve budgets created by a GC, a GC can approve budgets created by subcontractors, and/or a subcontractor can approve budgets created by subcontractors it has contracted, and so on. Some embodiments of the CPMS 10 can also be used to create and manage change orders that modify budgets (usually by augmenting the budget) and approval of the modified budgets by the appropriate parties. The budget can include the total cost for the construction project, as well as project costs for each phase or activity that must be performed to complete the construction project. CPMS 10 can structure budgets to facilitate payment of subcontractors, allow efficient progress tracking, and allow automatic invoicing.

CPMS 10能创建精确地对应于工程预算以及也精确地对应于留置权放弃和誓词的自动发票。CPMS 10能在相对于整体工程预算上已经产生的活动时,创建作为快照的自动发票。能使用CPMS 10来创建精确地对应于整体预算中支出项的自动发票。这导致与为金融目的、跟踪目的等而分解施工工程的方式一致的发票和报告。使用CPMS 10,能使用发票屏来俘获创建发票所需的信息,然而,并非创建发票所需的所有信息必须重新输入,因为能通过引用整体工程预算来收集信息。这也保证发票(以及G702/703文档)将与整体工程预算一致,以及在支取期间,或在任何其他时间周期间将是一致的(除非参与方,诸如业主希望修改发票)。CPMS 10也能用来根据贷方、业主、业主的代表、GC等等的需求,定制自动发票(或G702/703文档)。CPMS 10 can create automated invoices that correspond precisely to project budgets and also to lien waivers and affidavits. CPMS 10 can create automatic invoices as snapshots at the time of activity that has occurred relative to the overall project budget. CPMS 10 can be used to create automated invoices that correspond exactly to expenditure items in the overall budget. This results in invoices and reports consistent with the way construction work is broken down for financial purposes, tracking purposes, and the like. With CPMS 10, the invoice screens can be used to capture the information needed to create an invoice, however not all the information needed to create an invoice has to be re-entered as the information can be gathered by referencing the overall project budget. This also ensures that the invoice (and G702/703 document) will be consistent with the overall project budget, and will be consistent during drawdown, or any other time period (unless a party, such as the owner, wishes to modify the invoice). CPMS 10 can also be used to customize automated invoices (or G702/703 documents) according to the needs of lenders, owners, owners' representatives, GCs, etc.

能使用预算和自动发票来统一收集和连续地引用在整个工程支付管理过程中将使用的信息。所收集的信息在支付过程中不必再次重新输入,有助于确保不引入错误(击键或由于数据的误解)。通常,参与方对使用CPMS 10实施的支付过程具有可视性。这有助于降低确定工程状态和理解每一参与方必须做什么工作所需的努力,便于支付过程。也有助于高亮显示可能惯于引起过程中延迟或错误的组织或个人,使得更容易纠正该行为或清除该参与方。精确的发票最小化了发票评审和解决问题的劳动,促进了完整和精确的誓词,最小化誓词和检查间的差异,并使得及时支付。CPMS 10能通过以及时方式俘获完整和一致的发票信息,提高在工程支付过程中稍后几个活动的效率。Estimates and automated invoicing can be used to centrally collect and continuously reference information that will be used throughout the project payment management process. The information collected does not have to be re-entered again during the payment process, helping to ensure that errors are not introduced (keystrokes or due to misinterpretation of data). Typically, participating parties have visibility into the payment process implemented using the CPMS 10. This helps reduce the effort required to determine the status of the project and understand what work each party must do, facilitating the payment process. It is also helpful to highlight organizations or individuals that may habitually cause delays or errors in the process, making it easier to correct that behavior or weed out that party. Accurate Invoices minimizes invoice review and problem-solving labor, facilitates complete and accurate affidavits, minimizes discrepancies between affidavits and inspections, and enables timely payments. CPMS 10 can improve the efficiency of several activities later in the project payment process by capturing complete and consistent invoice information in a timely manner.

CPMS 10能用来生成自动誓词和自动留置权放弃。使用CPMS 10,GC知道通知谁支取以及谁通过提供发票来响应。只要由GC(和必须核准发票的GC的线上的任何其他参与方,诸如业主、业主的代表、贷方、产权保险公司等等)核准发票,CPMS 10能使用核准的发票来自动生成誓词和留置权放弃,和其他带有其他名称而所提供功能相同的文件(例如法令性的声明)。CPMS 10能由分包商和材料供应商提交的发票,自动地生成誓词和留置权放弃,有助于确保不引入印刷错误,并且誓词和留置权放弃将仅包括已经由分包商和材料供应商提交的支出项。CPMS 10能通过在发票上写上已经在系统中存储的细目以便自动创建誓词和留置权放弃的内容,帮助降低誓词和留置权放弃中的不准确风险。该处理有助于消除可能由于抄写期间可能出现的不标准、不兼容和不适当发票和印刷错误。总的来说,这通过增加关键施工工程信息的精度并及时降低工程支付过程的风险指标。CPMS 10能根据施工现场所处的状态的法定标准,创建自动留置权放弃。CPMS 10 can be used to generate automatic affidavits and automatic lien releases. Using CPMS 10, the GC knows who to notify for withdrawal and who responds by providing an invoice. As long as the invoice is approved by the GC (and any other party on the GC's line that must approve the invoice, such as the owner, owner's representative, lender, title insurance company, etc.), CPMS 10 can use the approved invoice to automatically generate affidavits and liens Waiver of rights, and other documents with other names that provide the same function (such as statutory declarations). CPMS 10 can automatically generate affidavits and lien waivers for invoices submitted by subcontractors and material suppliers, helping to ensure that typographical errors are not introduced, and that affidavits and lien waivers will only include invoices that have been submitted by subcontractors and material suppliers Expenditure items submitted by vendors. CPMS 10 can help reduce the risk of inaccuracy in affidavits and lien waivers by overwriting invoices with details already stored in the system to automatically create affidavits and lien waivers. This process helps eliminate non-standard, incompatible and inappropriate invoicing and typographical errors that may occur during transcription. Collectively, this reduces risk indicators for the project payment process in a timely manner by increasing the accuracy of key construction project information. CPMS 10 can create automatic lien releases based on statutory criteria for the state of the construction site.

CPMS 10能生成精确地对应于发票的誓词。进行工作的某类工人(例如电工、管道工等等)常常弄坏发票,同时进行该工作的参与方(例如GC、分包商和材料供应商)常常弄坏誓词。能使用CPMS 10来确保发票总额等于誓词的总额。同时,也能使用CPMS 10来确保留置权放弃的金额等于发票的金额,因为由已经在CPMS 10中存储的核准发票,收集用于自动留置权放弃的信息。另外,留置权放弃将与誓词一致,因为使用来自核准发票的信息,由CPMS 10生成誓词。当GC和分包商(或业主、贷方和GC)已经在一段时间争论发票金额和协商最终金额时,这特别有用。在CPMS 10中存储的自动和核准发票中,反映最终金额,并用来生成留置权放弃和誓词。CPMS 10确保在留置权放弃和誓词文档中,仅反映核准的发票。也通过将所存储的预算用作所有自动文档的框架,CPMS 10进一步确保发票、留置权放弃和誓词将是精确和一致的。CPMS 10也能用来基于贷方、业主、业主的代表、GC等等的需求,定制发票、誓词和留置权放弃。在一些实施例中,参与方可以使用CPMS 10来给留置权放弃添加文本。例如,GC可以为某些工程添加“保护性”语言于留置权放弃。在这些工程中,特定法律(如与该工程相关的地区或国家法律)使留置权放弃不受法律限制。在一些实施例中,参与方也可以使用CPMS 10来定义和/或管理附加类型的文件或信息,如包含有同工程相关的供应商和其他方的表格。除此之外,参与方可在CPMS 10输入或定义业主表单,这样参与方可以为特定工程、组织等使用。CPMS 10 can generate affidavits that correspond exactly to invoices. Certain types of workers performing the work (such as electricians, plumbers, etc.) often corrupt invoices, while parties performing the work (such as GCs, subcontractors, and material suppliers) often corrupt pledges. CPMS 10 can be used to ensure that the invoice total equals the affidavit total. Also, CPMS 10 can be used to ensure that the lien waiver amount is equal to the invoice amount since the information for automatic lien waiver is gathered from the approved invoice already stored in CPMS 10. Additionally, the lien waiver will be consistent with the affidavit, as the affidavit is generated by the CPMS 10 using information from the approved invoice. This is especially useful when the GC and subcontractor (or owner, lender and GC) have been arguing over the invoice amount and negotiating the final amount for some time. In automatic and approved invoices stored in CPMS 10, final amounts are reflected and used to generate lien waivers and affidavits. CPMS 10 ensures that only approved invoices are reflected in lien waiver and affidavit documents. Also by using the stored budget as the framework for all automated documentation, CPMS 10 further ensures that invoices, lien waivers and affidavits will be accurate and consistent. CPMS 10 can also be used to customize invoices, affidavits and lien releases based on the needs of lenders, owners, owners' representatives, GCs, etc. In some embodiments, a party may use CPMS 10 to add text to a lien release. For example, a GC may add "protective" language to lien waivers for certain projects. In these works, specific laws (such as regional or national laws relating to the work) make the lien waiver unfettered by law. In some embodiments, parties may also use CPMS 10 to define and/or manage additional types of documents or information, such as tables containing suppliers and other parties related to the project. In addition, parties can enter or define owner forms in CPMS 10 that parties can use for specific projects, organizations, etc.

CPMS 10也通过将发票、誓词和留置权放弃的存储转移到电介质上,有助于提高生成誓词和留置权放弃的效率,降低存储和访问它们的时间和精力。通过使这些文档可用于执行他们的责任所需的授权方,提高工程支付过程的整体效率。CPMS 10的数据库能存储电子签名的发票、誓词和留置权放弃的库。如果需要,参与方能使用CPMS 10来生成电子签名文档的任何一个的硬拷贝。CPMS 10 also helps increase the efficiency of generating affidavits and lien waivers, reducing the time and effort required to store and access them by offloading the storage of invoices, affidavits, and lien waivers to dielectric. Improve the overall efficiency of the project payment process by making these documents available to authorized parties required to perform their responsibilities. The database of CPMS 10 can store electronically signed invoices, affidavits and libraries of lien waivers. The participating parties can use the CPMS 10 to generate hard copies of any of the electronically signed documents, if desired.

在一个实施例中,CPMS 10能创建自动发票、誓词和留置权放弃,只要输入所有信息并解决所有问题。在其他实施例中,CPMS 10能首先创建自动发票,确保核准发票,其次创建自动誓词,确保签名誓词,第三创建自动留置权放弃。In one embodiment, the CPMS 10 can create automatic invoices, affidavits and lien waivers as long as all information is entered and all issues resolved. In other embodiments, the CPMS 10 can first create an automatic invoice, ensure approval of the invoice, second create an automatic affidavit, ensure a signature affidavit, and third create an automatic lien release.

只要已经输入所有信息(发票、检查报告、银行信息等等)并已经解决所有问题,业主、业主的代表、贷方、产权保险公司或GC能对支取的参与方付款。在一些实施例中,参与方可由业主、业主代表、贷方、产权保险公司或GC直接支付。在其他实施例中,参与方可由直接雇佣每个参与方的参与方间接支付。例如,GC将工程承包于第一级分包商,第一级分包商又将工程承包于第二级分包商,GC可以支付由第一级分包商和第二级分包商完成的工作,并且第一级分包商可以支付第二级分包商。Once all information has been entered (invoices, inspection reports, bank details, etc.) and all issues have been resolved, the owner, owner's representative, lender, title insurance company, or GC can pay the drawing party. In some embodiments, participants may be paid directly by the property owner, property owner's representative, lender, title insurance company, or GC. In other embodiments, participants may be paid indirectly by the participants who directly employ each participant. For example, if GC contracts the project to the first-level subcontractor, and the first-level subcontractor contracts the project to the second-level subcontractor, GC can pay for the completion of the project by the first-level subcontractor and the second-level subcontractor work, and the first-tier subcontractor can pay the second-tier subcontractor.

分包商、材料供应商或任何其他参与方能提供他们的留置权放弃,以换取支付。CPMS 10能组织该过程以及能自动地执行交换,而不会有一方尽责另一方不尽责的风险。CPMS 10也有助于消除为实现以留置权放弃换取支付需亲自参会的昂贵和耗时需要。CPMS 10(严格跟踪文档)也有助于确保收集所有留置权放弃。这降低因不良记录保持而导致在施工工程结束时不释放留置权放弃的风险。CPMS 10能通过在可使用网络的计算机系统中实现该方法,提高支付/留置权放弃释放过程的效率。这允许所有各方在信任环境中安全地定制支付和留置权放弃。CPMS 10便于将支付有效地换成留置权放弃,因为CPMS 10允许在准备自动交换中,分级支付和留置权放弃,从而降低与工程有关的风险。能确保GC将接收与支付一致的适当留置权放弃,以及分包商不承担与支付中的过长延迟有关的风险。Subcontractors, material suppliers, or any other parties involved can offer their lien waiver in exchange for payment. The CPMS 10 can organize this process and can carry out the exchange automatically without the risk of one party being responsible and the other not. CPMS 10 also helps eliminate the need for costly and time-consuming in-person meetings to effect lien waivers for payment. CPMS 10 (Strong Tracking Documentation) also helps ensure that all lien waivers are collected. This reduces the risk of a lien waiver not being released at the conclusion of construction work due to poor record keeping. CPMS 10 can improve the efficiency of the payment/lien release release process by implementing the method in a network-enabled computer system. This allows all parties to securely customize payments and lien waivers in a trusted environment. CPMS 10 facilitates the efficient exchange of payments for lien waivers because CPMS 10 allows for tiered payments and lien waivers in preparation for an automatic exchange, reducing project-related risks. Can ensure that GC will receive an appropriate lien waiver consistent with payment and that subcontractors will not bear the risks associated with excessive delays in payment.

CPMS 10能便于留置权放弃和支付指令的交换。在一些实施例中,CPMS 10能基本上与参与方已经收到支付的来自支付系统26的确认的同时释放留置权放弃。在这里和权利要求书中所使用的术语“基本上同时”包括小于请求、处理和通过自动结算中心(ACH)支付、划拨资金所需的时间的任何时间段(将占用达约72小时)。例如,“基本上同时”释放留置权放弃可包括立即释放留置权放弃、在营业日结束时留置权放弃的批量释放或在经ACH系统划拨资金所花费的通常时间周期后释放留置权放弃。在一个实施例中,CPMS 10能接收和将留置权放弃存储在电子保管箱/托管54中,直到已经收到来自支取的所有参与方的所有留置权放弃为止。只要已经收到所有留置权放弃,CPMS 10能发送用于支付系统26将资金划拨到支取的每一参与方的指示。例如,只要所有分包商电子签名并将它们的留置权放弃提交给CPMS 10,CPMS 10能指示支付系统26对每一分包商付款。当将支付指示传送到支付系统26时或仅在收到参与方已经真正收到资金的确认后,CPMS10能释放留置权放弃。CPMS 10 can facilitate the exchange of lien releases and payment instructions. In some embodiments, the CPMS 10 can release the lien waiver substantially simultaneously with confirmation from the payment system 26 that the participant has received payment. As used herein and in the claims, the term "substantially simultaneously" includes any period of time (which would take up to about 72 hours) that is less than the time required to request, process and pay, transfer funds through an Automated Clearinghouse (ACH). For example, "substantially simultaneous" release of lien waivers may include immediate release of lien waivers, batch release of lien waivers at the end of the business day, or release of lien waivers after the usual period of time it takes for funds to be transferred through the ACH system. In one embodiment, the CPMS 10 can receive and store lien waivers in electronic safe deposit box/escrow 54 until all lien waivers have been received from all parties involved in the draw. Once all lien waivers have been received, CPMS 10 can send instructions for payment system 26 to transfer funds to each of the parties involved in the draw. For example, CPMS 10 can instruct payment system 26 to pay each subcontractor as long as all subcontractors electronically sign and submit their lien waivers to CPMS 10 . The CPMS 10 can release the lien waiver when payment instructions are communicated to the payment system 26 or only upon receipt of confirmation that the funds have actually been received by the participant.

如果支付系统26包括ACH系统,通常成批处理支付指令,以致参与方将不能立即收到资金。在ACH系统中,在48小时周期期间,通常能由RDFI返回支付指令。在该48小时周期期间,RDFI能通知CPMS 10和ODFI未能划拨资金(例如由于不足资金、无效金额等等)。在该48小时周期后,如果未通知CPMS 10,CPMS 10能假定RDFI已经处理支付指令。ODFI通常具有24小时的前端窗口,收集来自RDFI的支付指令以及释放支取的参与方的支付金额。因此,从CPMS 10传送支付指令的时间直到ODFI将资金划拨到参与方的帐户中,花费约72小时。If payment system 26 includes an ACH system, payment instructions are typically batched so that participants will not receive funds immediately. In an ACH system, payment instructions can usually be returned by the RDFI during a 48 hour period. During this 48-hour period, the RDFI can notify the CPMS 10 and the ODFI of the failure to transfer funds (eg, due to insufficient funds, invalid amount, etc.). After this 48 hour period, if the CPMS 10 has not been notified, the CPMS 10 can assume that the RDFI has processed the payment instruction. ODFI usually has a 24-hour front-end window to collect payment instructions from RDFI and the payment amount of the participating parties who release the withdrawal. Therefore, it takes approximately 72 hours from the time the CPMS 10 transmits the payment instruction until the ODFI transfers the funds to the participant's account.

在一些实施例中,CPMS 10即便在收到参与方收取支付的支付系统26的认可时,也可以暂缓留置权放弃。例如,CPMS 10可以暂缓留置权放弃直到31天之后,或者直到第二次支取发生时。In some embodiments, the CPMS 10 may suspend a lien waiver even upon receipt of acceptance from the payment system 26 by which the party collects the payment. For example, CPMS 10 may suspend lien waivers until after 31 days, or until a second withdrawal occurs.

在一些实施例中,CPMS 10能标记某些参与方以便从ACH系统的批处理中移除这些参与方,以及能通过另一方法,诸如通过直接电汇资金或另一即时类型的电子资金转帐,单独地支付这些参与方。在其他实施例中,能通过即时类型的电子资金转帐(诸如直接电汇),支付大多数参与方,但一些参与方能与一个或多个ACH批量转帐结合。在其他实施例中,当CPMS 10从每一参与方接收每一留置权放弃时,CPMS 10能将每一支付指令传送到支付系统26,并能将资金直接划拨到从其接收留置权放弃的参与方。通常,CPMS 10能以任何适当的方式控制支付指令,以及能使用任何适当类型的支付方法。In some embodiments, the CPMS 10 can flag certain parties for removal from the ACH system's batch, and can by another method, such as by direct wire transfer of funds or another instant type of electronic funds transfer, These parties are paid individually. In other embodiments, most parties can be paid by an instant type of electronic funds transfer, such as a direct wire transfer, but some parties can be combined with one or more ACH bulk transfers. In other embodiments, as CPMS 10 receives each lien waiver from each party, CPMS 10 can communicate each payment instruction to payment system 26 and can transfer funds directly to the party from which the waiver of lien was received. participants. In general, the CPMS 10 can control payment instructions in any suitable manner, and can use any suitable type of payment method.

在本发明的每一实施例中,CPMS 10能根据当前支取,在当前留置权放弃和当前支付之间建立连接,而不是将先前的留置权放弃换成当前支取的当前支付。例如,CPMS 10能释放用于当前支取的当月的留置权放弃,而不是释放用于当前支取的前一月的留置权放弃。用这种方式,如果CPMS 10在进行支付前,释放其留置权放弃,不暴露分包商债务,以及如果在释放留置权放弃前,CPMS 10进行支付,不暴露业主(或GC、产权保险公司、贷方等等)债务。In each embodiment of the present invention, CPMS 10 can establish a link between the current lien waiver and the current payment based on the current drawdown, rather than exchanging the previous lien waiver for the current payment of the current drawdown. For example, CPMS 10 can release the current month's lien waiver for the current drawdown, but not the prior month's lien waiver for the current drawdown. In this way, if CPMS 10 releases its lien waiver before making the payment, the subcontractor debt is not exposed, and if CPMS 10 makes the payment before the lien waiver is released, the owner (or GC, title insurance company) is not exposed. , lenders, etc.) debt.

以往是先支付GC,该GC再支付其分包商,然后,分包商支付他们自己的分包商,代替这种方式,使用资金的电子分发(例如任何适当类型的EFT、ACH或电汇资金),能直接支付CPMS 10中的各参与方。这加速了支付过程(降低成本),并降低不支付对方(体系中)的风险。通过用来收集进行支付所需的所有信息的CPMS 10,使直接分发资金成为可能。能信任使用CPMS 10收集的信息,因为通过软件,能实现方法的精确。因此,资金的直接分发可以是有效的(无重复工作或重新输入信息必要)以及无错误。CPMS 10能通过降低完成支付过程的占用时间,提高分包商/材料供应商支付过程的效率。CPMS 10可通过用分层支付过程代替直接支付,降低交易成本,同时改善财政和管理控制。CPMS 10能用资金的电子划拨,代替使用支票,降低通信成本以及提高支付状态的可视性以及降低施工过程中包含的所有各方的不适当或不完整支付的风险(特别是供应链中较低级)。Instead of paying the GC first, who in turn pays its subcontractors, who then pay their own subcontractors, use electronic distribution of funds (e.g. any appropriate type of EFT, ACH or wire transfer of funds ), which can directly pay each participant in CPMS 10. This speeds up the payment process (reduces costs) and reduces the risk of not paying the counterparty (in the system). Direct disbursement of funds is made possible by the CPMS 10 used to collect all the information required to make payments. Information collected using CPMS 10 can be trusted because of the accuracy of the method achieved through the software. Thus, direct disbursement of funds can be efficient (no duplication of effort or re-entry of information necessary) and error-free. CPMS 10 can improve the efficiency of the subcontractor/material supplier payment process by reducing the time taken to complete the payment process. CPMS 10 can reduce transaction costs by replacing direct payments with a tiered payment process while improving fiscal and managerial control. CPMS 10 can replace the use of checks with the electronic transfer of funds, reduce communication costs and improve the visibility of payment status and reduce the risk of improper or incomplete payment of all parties involved in the construction process (especially in the supply chain). low level).

图2-7示例说明了可由参与方24使用在应用服务器12中存储的各种模块、管理器和引擎来执行的工程支付管理过程的概述。图2示例说明(能由工程模块28和/或预算模块36执行的)管理工程过程94、(能由支取模块44执行的)管理支取过程96、(能由管理更改订单模块48执行的)管理更改订单过程98、(能由组织模块42和/或用户模块50执行的)管理初始化过程100、(能由访问管理器38、通知管理器40和/或系统环境管理器52执行的)管理系统环境过程102。2-7 illustrate an overview of the project payment management process that may be performed by the parties 24 using the various modules, managers, and engines stored in the application server 12 . FIG. 2 illustrates the Manage Engineering Process 94 (which can be performed by the Engineering Module 28 and/or the Budget Module 36), the Manage Drawout Process 96 (which can be performed by the Drawout Module 44), the Manage Change Order Process 98, Admin Initialization Process 100 (executable by Organization Module 42 and/or User Module 50), Admin System (executable by Access Manager 38, Notification Manager 40, and/or System Environment Manager 52) Environment process 102.

图3示例说明管理工程过程94,能包括创建工程任务104、维护工程任务106和创建预算任务108。图4示例说明管理组织过程100,能包括创建组织任务112、维护组织任务114、创建用户任务116和维护用户任务118。图5示例说明管理支取过程96,能包括初始化支取任务120、创建支取请求任务122、支付资金任务124、执行检查任务126和核准支取请求任务128。图6示例说明管理更改订单过程98,能包括创建更改请求任务130、过程更改请求任务132和更改参与方任务134。图7示例说明管理系统环境任务102,能包括管理访问任务136、管理消息任务138、创建报告任务140、提供帮助任务142和维护系统任务。由GC的线上或下的任一参与方,执行创建报告任务140,以便创建与施工工程的进度有关的定制报告,包括监视施工工程部分的能力、特定参与方、整体工程、由参与方提交的文件等等。FIG. 3 illustrates the manage engineering process 94 , which can include create engineering tasks 104 , maintain engineering tasks 106 , and create budget tasks 108 . FIG. 4 illustrates a manage organization process 100 , which can include create organization tasks 112 , maintain organization tasks 114 , create user tasks 116 , and maintain user tasks 118 . FIG. 5 illustrates the manage drawout process 96, which can include an initialize drawout task 120, create drawout request task 122, pay funds task 124, execute check task 126, and approve drawout request task 128. FIG. 6 illustrates the manage change order process 98 , which can include a create change request task 130 , a process change request task 132 , and a change party task 134 . Figure 7 illustrates Manage System Environment tasks 102, which can include Manage Access task 136, Manage Messages task 138, Create Reports task 140, Provide Help task 142, and Maintain System tasks. Create report task 140 is performed by any party on or off the GC in order to create custom reports related to the progress of the construction work, including the ability to monitor parts of the construction work, specific parties, the overall project, submissions by parties files etc.

图8-136和图182A-201示例说明根据本发明的几个实施例的工程支付管理方法。图8示例说明能包括在管理组织过程100中的创建组织过程146。使用组织模块42,由任一参与方24执行创建组织过程146。创建组织过程146能包括创建组织任务148、更新组织配置文件任务150、编辑组织任务152、使组织通知有效154、使组织有效任务156以及组织拒绝任务158或组织启动任务160。也能执行更新用户配置文件任务162,如参考图22所述。8-136 and 182A-201 illustrate project payment management methods according to several embodiments of the invention. FIG. 8 illustrates a create organization process 146 that can be included in the manage organization process 100 . Using the organization module 42 , a create organization process 146 is performed by any party 24 . Create Organization process 146 can include Create Organization Task 148 , Update Organization Profile Task 150 , Edit Organization Task 152 , Validate Organization Notification 154 , Validate Organization Task 156 , and Organization Rejection Task 158 or Organization Initiation Task 160 . An update user profile task 162 can also be performed, as described with reference to FIG. 22 .

图9示例说明能与创建组织任务148有关的创建组织表单。每一参与方24能通过组织模块42,访问创建组织表单。参与方24能输入请求信息,诸如公司信息、主要联系人信息、纳税信息和银行帐户信息。在一些实施例中,将输入他或她的信息作为主要联系人信息的参与组织24的第一用户视为用于该参与方24的管理员,以及能比后续用户更有权访问用于该参与方的信息。CPMS 10能使用基于综合角色的安全性,以便工程参与方仅看到工程中与他们的具体需要有关的信息。只要在CPMS 10中注册组织,该组织能接收用于由CPMS 10管理的任何工程的支付。FIG. 9 illustrates a create organization form that can be associated with create organization task 148 . Through the organization module 42, each participant 24 has access to create an organization form. Participant 24 can enter requested information, such as company information, primary contact information, tax information, and bank account information. In some embodiments, the first user of a participating organization 24 who enters his or her information as primary contact information is considered an administrator for that party 24 and has more access than subsequent users to the Information about the parties. CPMS 10 can use comprehensive role-based security so that project participants see only the information in the project that is relevant to their specific needs. As long as an organization is registered in CPMS 10, that organization can receive payment for any project managed by CPMS 10.

图10示例说明能在更新用户配置文件任务162期间传送的通知。在此和附加权利要求书中所使用的术语“系统通知”或“通知”或“系统消息”是指与参与方的任何形式的通信,诸如电子邮件消息、屏幕通知、文本消息、语音消息等等。图10的系统通知能包括用于参与方24的第一用户的用户名和临时密码。FIG. 10 illustrates notifications that can be transmitted during the update user profile task 162 . As used herein and in the appended claims, the term "system notification" or "notification" or "system message" refers to any form of communication with a party, such as email messages, screen notifications, text messages, voice messages, etc. wait. The system notification of FIG. 10 can include a username and temporary password for the first user of party 24 .

图11示例说明在更新组织配置文件任务150期间传送的通知。图11的通知能发送到用于该参与方24的管理员。该通知能包括表示接收方的声明以更新组织配置文件,以及在参与工程前添加用户,以及提供银行明细。FIG. 11 illustrates notifications communicated during an update organization profile task 150 . The notification of FIG. 11 can be sent to the administrator for that party 24 . The notification can include a statement indicating the recipient to update the organization profile and add the user prior to participating in the project, as well as provide bank details.

图12示例说明能与编辑组织任务152有关的编辑组织表单。每一参与方24能修改现有的信息,诸如公司信息、主要联系人信息、纳税信息和银行帐户信息。在一些实施例中,将他或她的信息输入成主要原始信息的参与组织24的第一用户为有权访问编辑组织表单的唯一用户。FIG. 12 illustrates an edit organization form that can be associated with an edit organization task 152 . Each participant 24 can modify existing information such as company information, primary contact information, tax information, and bank account information. In some embodiments, the first user of participating organization 24 who enters his or her information as primary source information is the only user with access to the edit organization form.

图13示例说明在有效组织通知任务156期间传送的有效组织通知。图13的通知能包括已经更新组织的明细以及验证和启动组织的请求的声明。FIG. 13 illustrates an effective organization notification communicated during the effective organization notification task 156 . The notification of Figure 13 can include a statement that the organization's details have been updated and a request to verify and activate the organization.

图14示例说明能与有效组织任务156有关的有效组织表单。图14的表单能包括参与方24的清单(例如包括组织名、施工过程中的角色、选择参与方24的能力以及查看参与方24的信息的能力)。图14的表单还能包括“查找”特征、指定参与方24的类型的能力以及拒绝/停用所选组织和提供拒绝/停用的原因的能力。FIG. 14 illustrates an active organization form that can be associated with an active organizational task 156 . The form of FIG. 14 can include a list of parties 24 (including, for example, organization name, role in the construction process, ability to select parties 24, and ability to view party 24 information). The form of FIG. 14 could also include a "lookup" feature, the ability to specify the type of party 24, and the ability to reject/deactivate a selected organization and provide a reason for the denial/deactivation.

图15示例说明能在组织启动任务160期间传送的组织启动通知。类似地,图16示例说明能在组织拒绝任务158期间传送的组织拒绝通知。FIG. 15 illustrates an organization-initiated notification that can be communicated during an organization-initiated task 160 . Similarly, FIG. 16 illustrates an organization rejection notification that can be communicated during an organization rejection task 158 .

图17示例说明能包括在管理组织过程100中的维护组织过程162。能由组织本身或其他参与方使用维护组织过程162以便维护联系人信息的准确性、银行帐户信息或工程支付过程所需的其他类型的信息。使用组织模块42,能由任何参与方执行维护组织过程162。维护组织过程162能包括浏览组织任务164、编辑组织任务166、组织更新任务168和查看组织任务170。FIG. 17 illustrates a maintain organization process 162 that can be included in the manage organization process 100 . The maintain organization process 162 can be used by the organization itself or other parties in order to maintain the accuracy of contact information, bank account information, or other types of information required for the project payment process. Using the organization module 42, the maintain organization process 162 can be performed by any party. The maintain organization process 162 can include browse organization tasks 164 , edit organization tasks 166 , organize update tasks 168 , and view organization tasks 170 .

图18示例说明能与查看组织任务170有关的查看组织屏。查看组织屏能包括用于组织的公司信息和主要联系人信息。FIG. 18 illustrates a view organization screen that can be associated with view organization tasks 170 . The View Organization screen can include company information and primary contact information for the organization.

图19示例说明能与浏览组织任务164有关的浏览组织屏。浏览组织屏能包括参与方列表,包括组织名、在施工过程中的组织角色、主要联系人以及电话号码。浏览组织屏能包括“查找”特征和用于浏览有关每一参与方的另外的信息的链接。在一个实施例中,浏览组织屏能由GC使用来查看其最佳分包商或材料供应商。FIG. 19 illustrates a browse organization screen that can be associated with a browse organization task 164 . The Browse Organization screen can include a list of parties involved, including the organization's name, the organization's role in the construction process, key contacts, and phone numbers. The browse organization screen can include a "look up" feature and links for browsing additional information about each party. In one embodiment, the browse organization screen can be used by the GC to view its best subcontractors or material suppliers.

图20示例说明能与编辑组织任务166有关的编辑组织表单。参与方能编辑现有的信息,包括公司信息、主要联系人信息、纳税信息和银行帐户信息。在一些实施例中,将他或她的信息输入成主要联系人信息的组织的第一用户是有权访问编辑组织表单的唯一用户。FIG. 20 illustrates an edit organization form that can be associated with an edit organization task 166 . Participants can edit existing information, including company information, primary contact information, tax information, and bank account information. In some embodiments, the first user of the organization who entered his or her information as primary contact information is the only user with access to the edit organization form.

图21示例说明能在组织更新任务168期间传送的组织配置文件更新通知。图21的通知能包括有关用于该参与方的更新配置文件的信息以及主要用户的名称或该参与方的管理员。在一些实施例中,组织配置文件更新通知可以传送至所有与更新其配置文件的组织相关的组织。例如,如果某组织更新其地址或者联邦雇主认证号码(FederalEmployer Identification Number)时,CPMS 10可以支持组织工程更新通知传送至其他与系统10相关的其他组织。在一些实施例中,CPMS 10只传送至与其更新其信息的组织有关或与该组织共同工作的组织。CPMS几乎可以实时传送通知。FIG. 21 illustrates an organization profile update notification that can be communicated during an organization update task 168 . The notification of FIG. 21 can include information about the updated configuration file for the party as well as the name of the primary user or administrator of the party. In some embodiments, an organization profile update notification may be sent to all organizations associated with the organization whose profile was updated. For example, if an organization updates its address or Federal Employer Identification Number (Federal Employer Identification Number), CPMS 10 can support the transmission of organizational engineering update notifications to other organizations related to the system 10. In some embodiments, the CPMS 10 transmits only to organizations related to or working with the organization whose information it updates. CPMS can deliver notifications in almost real time.

图22示例说明能包括在管理组织过程100中的创建用户过程172。每次创建现有组织的新用户时,能使用创建用户过程172,以便允许新用户适当访问CPMS 10(例如具有用户标识和密码的适当安全级)。也能使用创建用户过程172来更新用户配置文件。使用组织模块42,能由任一参与方24执行创建用户过程172。创建用户过程172能包括创建用户任务174和更新用户配置文件任务176。FIG. 22 illustrates a create user process 172 that can be included in the manage organization process 100 . The Create User process 172 can be used each time a new user of an existing organization is created in order to allow the new user proper access to the CPMS 10 (e.g., with an appropriate level of security for a user ID and password). The create user process 172 can also be used to update user profiles. Using the organization module 42 , the create user process 172 can be performed by any party 24 . Create User process 172 can include Create User task 174 and Update User Profile task 176 .

图23示例说明能与创建用户任务174有关的创建用户表单。在一些实施例中,在已经为该参与方创建第一用户或管理员之后,可使用创建用户表单来添加用户。新用户可输入个人信息、安全信息(例如用户名和密码)、电子邮件通知首选项以及安全许可(security clearance)级(例如用户是否允许管理工程和/或签名文档)。FIG. 23 illustrates a create user form that can be associated with a create user task 174 . In some embodiments, a create user form may be used to add users after a first user or administrator has been created for the party. New users can enter personal information, security information (such as username and password), email notification preferences, and security clearance level (such as whether the user is allowed to manage projects and/or sign documents).

图24示例说明能在更新用户配置文件任务176期间传送的更新用户配置文件通知。图24的通知能包括已经将该用户添加为组织的成员的声明,以及用户的安全信息(例如用户名和临时密码)。FIG. 24 illustrates an update user profile notification that can be transmitted during the update user profile task 176 . The notification of FIG. 24 can include a statement that the user has been added as a member of the organization, as well as the user's security information (eg, username and temporary password).

图25示例说明能包括在消息组织过程100中并从图22接续的维护用户过程178。能使用维护用户过程178来浏览每一组织中的用户以及查看、编辑和更新每一组织中的用户。使用组织模块42,能由任一参与方执行维护用户过程178。维护用户过程178能包括浏览用户任务180和编辑用户任务182、用户配置文件更新任务184和查看用户任务186。FIG. 25 illustrates a maintenance user process 178 that can be included in the message organization process 100 and continues from FIG. 22 . The maintain users process 178 can be used to browse and view, edit and update users in each organization. Using the organization module 42, the maintain user process 178 can be performed by any party. The maintain user process 178 can include browse user tasks 180 and edit user tasks 182 , user profile update tasks 184 and view user tasks 186 .

图26示例说明能与查看用户任务186有关的查看用户屏。图26的查看用户屏能包括用户的个人信息、电子邮件通知首选项,以及安全许可等级。FIG. 26 illustrates a view user screen that can be associated with view user tasks 186 . The View User screen of Figure 26 can include the user's personal information, email notification preferences, and security clearance level.

图27示例说明能与浏览用户任务180有关的浏览用户屏。图27的浏览用户屏可包括用于每一参与方的一个或多个用户的列表,并且可包括用户名、电子邮件地址和电话号码。浏览用户屏也能包括编辑用于每一用户的信息的链接。FIG. 27 illustrates a browse user screen that can be associated with a browse user task 180 . The Browse Users screen of FIG. 27 may include a list of one or more users for each party, and may include usernames, email addresses, and phone numbers. Browsing the user screen can also include links to edit information for each user.

图28示例说明能与编辑用户任务182有关的编辑用户表单。用户能提供个人信息、电子邮件通知首选项以及安全许可等级。FIG. 28 illustrates an edit user form that can be associated with an edit user task 182 . Users can provide personal information, email notification preferences, and security clearance levels.

图29示例说明能在用户配置文件更新任务184期间传送的用户配置文件更新通知。FIG. 29 illustrates user profile update notifications that can be communicated during a user profile update task 184 .

图30示例说明能包括在管理工程过程94中的创建工程过程188。能由GC、贷方、业主或业主代表使用工程模块28来执行创建工程过程188以便启动CPMS 10中的新工程。创建工程过程188能包括创建工程任务190、工程建立任务192、工程用户访问任务194和工程责任任务196。FIG. 30 illustrates a create engineering process 188 that can be included in the manage engineering process 94 . The create project process 188 can be performed by the GC, lender, owner, or owner's representative using the engineering module 28 to start a new project in the CPMS 10. Create engineering process 188 can include create engineering task 190 , engineering setup task 192 , engineering user access task 194 , and engineering responsibility task 196 .

图31和32示例说明能与创建工程任务190有关的创建工程表单。GC、贷方、业主或业主代表能提供工程标识信息、工程筹款信息、工程业主信息、工程建筑师信息和现场信息。在一些实施例中,GC、贷方、业主或业主代表也可以使用创建工程表单来建立其他工程选项,如指定分包商是否可以查看工程信息以及指定文件设定值(如留置权放弃文本、留置权放弃设置、支付方法等)。例如,GC、贷方、业主、或者业主代表可以使用创建配置文件表单来定义用来定义每种将在特定工程(如部分留置权放弃和终结留置权放弃)中被管理的留置权放弃的留置权放弃设置,如释放留置权放弃的时间。例如,系统10可以在签名时、资金支出时、随后支取发生时等释放留置权放弃。此外,GC可以使用创建工程表单或由CPMS 10提供的用来设置批准不同工程阶段的路径的其他设置表单。例如,GC可以设定发票限制和/或对某特定工程的签名要求。31 and 32 illustrate create engineering forms that can be associated with create engineering tasks 190 . The GC, lender, owner or owner's representative can provide project identification information, project financing information, project owner information, project architect information, and site information. In some embodiments, the GC, lender, owner, or owner's representative may also use the Create Project form to establish other project options, such as specifying whether subcontractors can view project information and specifying document settings (such as lien waiver text, lien right to waive settings, payment methods, etc.). For example, a GC, lender, owner, or owner's representative can use the Create Profile form to define the liens used to define each type of lien waiver that will be administered in a particular project (such as partial lien waiver and final lien waiver) Waiver settings, such as when the lien waiver is released. For example, the system 10 may release the lien disclaimer at the time of signing, when the funds are disbursed, when a subsequent withdrawal occurs, and the like. Additionally, the GC can use the Create Project form or other setup form provided by CPMS 10 to set the path for approving the different project phases. For example, the GC may set invoice limits and/or signature requirements for a particular project.

此外,GC、贷方、业主、或业主代表可以使用创建工程表单或其他有CPMS 10提供的,用来指定工程为“开卷”还是“闭卷”工程的其他表单。在开卷工程中,GC、贷方、业主、或者业主代表(如线上参与方)可以查看由包含在该工程中的分包商和材料供应商(如线下参与方)所管理工程的部分的细目。例如,在开卷工程中,如果承包于GC的分包商创建了为一个或更多的指定到分包商的留置权项目的二级预算,GC可以查看二级预算的细目,如数量、承包于分包商的二级分包商等等。在一些实施例中,GC、贷方、业主或业主代表可以在开卷工程中从各级分包商和与该工程相关的材料供应商那里要求合同和文件(如留置权放弃、承包者、誓词等)。In addition, the GC, lender, owner, or owner's representative may use the create project form or other form provided by CPMS 10 to designate whether the project is an "open book" or "closed book" project. In an open-book project, the GC, lender, owner, or owner's representative (such as an online party) can view the portion of the project that is managed by subcontractors and material suppliers (such as an offline party) included in the project. detail. For example, in an open-book project, if a subcontractor to the GC creates a secondary budget for one or more lien items assigned to the subcontractor, the GC can view the breakdown of the secondary budget, such as quantity, contract Secondary subcontractors to subcontractors, etc. In some embodiments, a GC, lender, owner, or owner's representative may request contracts and documents (such as lien waivers, contractors, affidavits, etc.) ).

在闭卷工程中,GC、贷方、业主或业主代表只可由该工程的一级分包商和材料供应商逐级向下查阅。例如,在闭卷过程中,GC、贷方、业主或业主代表只可进入自己的预算、分包商、材料供应商等,并且一级分包商和材料供应商只能向GC提供一次性总付资金数额和信息,因为GC未被授权来查看分包商、材料供应商的合同、预算、发票等细目。In a closed-book project, the GC, lender, owner or owner's representative can only be checked down step by step by the first-level subcontractors and material suppliers of the project. For example, during the closing process, the GC, lender, owner or owner's representative can only enter their own budget, subcontractors, material suppliers, etc., and the first-level subcontractors and material suppliers can only provide a lump sum to the GC Funding amount and information, because GC is not authorized to view details of subcontractors, material suppliers' contracts, budgets, invoices, etc.

在一些实施例中,工程每级的参与方可以明确他们管理的工程部分是开卷工程还是闭卷工程。这样,如果每级被设置为开卷工程,工程每级的参与方可以查看该参与方下面各级的细目。然而如果该工程的一级被设置为闭卷工程,参与方只可查看该闭卷工程的细目,而不可查看其他各级的细目。以由用户设置的工程设置为基础,CPMS 10可以管理和规范在某工程中对信息的进入。In some embodiments, participants at each level of the project can specify whether the portion of the project they manage is an open-book project or a closed-book project. In this way, if each level is set as an open-book project, the participants of each level of the project can view the details of the lower levels of the participant. However, if the first level of the project is set as a closed-book project, the participants can only view the details of the closed-book project, but not the details of other levels. Based on the project settings set by the user, CPMS 10 can manage and standardize the entry of information in a project.

在一些实施例中,除了创建工程以外,GC、贷方、业主、业主代表、分包商或材料供应商可以在某工程内部创建一个或多个子工程。例如在多楼复杂建筑工程中,GC可为每栋楼创建子工程。每个子工程可包含独立的预算;独立的发票、誓词和留置权放弃;独立的工程设置;独立的参与方等。In some embodiments, in addition to creating a project, a GC, lender, owner, owner's representative, subcontractor, or material supplier may create one or more sub-projects within a project. For example, in a multi-story complex construction project, GC can create sub-projects for each building. Each subproject can contain independent budgets; independent invoices, affidavits and lien waivers; independent project settings; independent parties, etc.

图33示例说明能在工程创建任务192期间传送的工程创建通知。图33的通知能包括GC、贷方、业主或业主代表已经创建新工程的声明,以及允许将来自参与方的用户指定给该工程的至屏幕的链接。FIG. 33 illustrates project creation notifications that can be communicated during a project creation task 192 . The notification of Figure 33 can include a statement that the GC, lender, owner, or owner's representative has created a new project, and a link to a screen that allows users from parties to be assigned to the project.

图34示例说明能与工程用户访问任务194相结合的工程用户访问屏。工程用户访问屏能包括工程名、工程号、GC名以及特定工程和/或特定组织的用户列表。按名称和用户名来标识用户,并可被视为工程管理员或签名者。FIG. 34 illustrates an engineering user access screen that can be combined with the engineering user access task 194. The project user access screen can include project name, project number, GC name, and a list of project-specific and/or organization-specific users. Users are identified by name and username, and can be considered project administrators or signers.

图35示例说明能在工程责任任务196期间传送的工程责任通知。图35的通知能包括相对于工程的用户责任已经修改的声明。FIG. 35 illustrates an engineering responsibility notification that can be communicated during an engineering responsibility task 196. The notification of Figure 35 can include a statement that the user's responsibilities with respect to the project have been modified.

图36示例说明能包括在管理工程过程94中的维护预算过程198。维护预算过程198能用来创建和查看用于施工工程的顶级预算(toplevel budget),将支出项指定给参与方,以及将责任指定给参与方。在一些实施例中,CPMS 10允许用户将支出项指定于一个或多个参与方或合同。例如,如果GC将某预算支出项承包至三个组织,GC可以将该支出项的部分指定到每个组织。除此之外,如果GC或者分包商在某特定支出项内要求另外的细目或子任务,GC或分包商可以使用CPMS 10来将一支出项分割成多个支出项。GC或分包商可以使用CPMS 10来从原始支出项将预算额的部分、保留额、工作完成部分或百分数、支付数量等指定到新的支出项。FIG. 36 illustrates a Maintenance Budget process 198 that can be included in the Manage Engineering process 94. The maintenance budget process 198 can be used to create and view top level budgets for construction projects, assign expenditure items to parties, and assign responsibilities to parties. In some embodiments, the CPMS 10 allows users to assign payout items to one or more parties or contracts. For example, if a GC contracts a budget item to three organizations, the GC can assign portions of that item to each organization. In addition, the GC or subcontractor can use CPMS 10 to split an expense item into multiple expense items if the GC or subcontractor requires additional details or subtasks within a particular expense item. A GC or subcontractor can use the CPMS 10 to assign portions of budgeted amounts, encumbrances, work complete parts or percentages, payment amounts, etc. from the original expense item to the new expense item.

使用预算模块36,维护预算过程198可由GC对分包商执行或由分包商对二级分包商或材料供应商执行。维护预算过程198能包括进入顶级预算任务200、接收工程任务202、接收工程表单任务204、工程拒绝任务206、添加用户任务208、工程接收任务210、工程主页任务211、工程用户访问任务212、工程责任任务214和工程预算查看任务216。如果拒绝工程,维护预算过程198能包括输入预算任务218和能返回到接收工程任务202。在进入顶级预算任务200后,维护预算过程198能包括发票代码设置任务220、输入支取日期任务222和指定发票代码任务224。Using the budget module 36, the maintenance budget process 198 may be performed by the GC on the subcontractor or by the subcontractor on the secondary subcontractor or material supplier. Maintain Budget Process 198 can include Enter Top Level Budget Task 200, Receive Project Task 202, Receive Project Forms Task 204, Project Reject Task 206, Add User Task 208, Project Receive Task 210, Project Home Page Task 211, Project User Access Task 212, Project Responsibility task 214 and project budget review task 216 . If the project is rejected, the maintenance budget process 198 can include an input budget task 218 and can return to the receive project task 202 . After entering the top-level budget task 200 , the maintain budget process 198 can include an invoice code setup task 220 , an enter draw date task 222 , and an assign invoice code task 224 .

图37示例说明能与进入顶级预算任务200有关的进入顶级预算表单。进入顶级预算表单可包括工程名、工程号,以及合同价值。GC或分包商能提供保留百分值、阶段代码、阶段代码描述、组织名、预算金额和帐户代码。GC或分包商能指定该组织是否正在提供材料。进入顶级预算表单也可包括设置支取日期和设置发票代码屏/表单的链接。能使用阶段代码和阶段代码描述来定义必须完成的每一特定作业的合同要求以便完成工程。例如,能通过美国建筑师协会(AIA)、通过建筑规范协议(CSI)或通过定制AIA或CSI阶段代码和阶段描述,提供阶段代码和阶段描述。在一些实施例中,能完全由参与方定制阶段代码和阶段描述。也可将顶级预算称为价格计划、约定成本(在GC已经从分包商接收投标后)或工程估算。在一些实施例中,包括在顶级预算中的阶段代码提供用于支取请求的基础,因为每一支取请求包括与特定阶段代码有关的特定支出项。在一些实施例中,GC能使用外部软件程序来生成预算以及预算模块36能与外部软件程序相互作用以便将预算输入应用服务器12或数据库服务器14中。在一些实施例中,参与方可以通过使用CPMS 10创建或输入预算模板。CPMS 10可以在用户为工程创建预算时使用。FIG. 37 illustrates the Enter Top-Level Budget form that can be associated with the Enter Top-Level Budget task 200 . Entering the top-level budget form can include project name, project number, and contract value. GC or subcontractor can provide reserve percentage value, stage code, stage code description, organization name, budget amount and account code. The GC or subcontractor can specify whether the organization is providing the material. Access to the top-level budget form may also include links to the Set Draw Date and Set Invoice Code screens/forms. Phase codes and phase code descriptions can be used to define contractual requirements for each specific activity that must be completed in order to complete the project. For example, phase codes and phase descriptions can be provided through the American Institute of Architects (AIA), through the Building Specification Agreement (CSI), or through custom AIA or CSI phase codes and phase descriptions. In some embodiments, the phase codes and phase descriptions can be fully customized by the parties. Top-level budgets may also be referred to as price plans, agreed costs (after the GC has received bids from subcontractors), or engineering estimates. In some embodiments, the stage codes included in the top-level budget provide the basis for drawdown requests, since each drawdown request includes a specific expenditure item associated with a particular stage code. In some embodiments, the GC can use an external software program to generate the budget and the budget module 36 can interact with the external software program to enter the budget into the application server 12 or the database server 14 . In some embodiments, a participant may create or enter a budget template by using the CPMS 10. CPMS 10 can be used when users create budgets for projects.

图38示例说明能与输入支取日期任务222有关的输入支取日期表单。GC或分包商可输入该月份将进行支取的日子,以及用于支取的特定日期(例如每个月在特定的日)。输入支取日期表单还能包括用于支取日期的自动计算的支取日期计算按钮和/或用于手工输入支取日期的支取日期添加按钮。在一些实施例中,GC或分包商也可使用CPMS10为允许工程参与方在工程期间的任何时候提交发票的特定工程提供开放的发票环境。FIG. 38 illustrates an Enter Withdrawal Dates form that can be associated with the Enter Withdrawal Dates task 222 . The GC or subcontractor can enter the days of the month when the payout will be made, as well as a specific date for the payout (eg, on a specific day of the month). The input withdrawal date form can also include a withdrawal date calculation button for automatic calculation of the withdrawal date and/or a withdrawal date addition button for manual entry of the withdrawal date. In some embodiments, a GC or subcontractor may also use CPMS 10 to provide an open invoicing environment for a particular project allowing project participants to submit invoices at any point during the project.

图39示例说明能与发票代码设置任务220有关的发票代码设置表单。GC或分包商能选择发票代码(例如按建筑物-建筑物1,2或3编号的代码),输入新发票代码、创建发票代码、输入预算项的显示的首选项(例如按阶段代码),以及输入用于打印选择的首选项。通过CPMS 10,发票代码设置表单能便利发票和誓词的自动生成。发票代码能用于定制报告或与其他类型的现有软件交互。发票代码能允许参与方基于建筑师、业主等等的需求对预算支出项分类。能使用帐户代码来维护预算、记录支取结果或便于开发票和支付。Figure 39 illustrates an invoice code setup form that can be associated with the invoice code setup task 220. GC or Subcontractor can select invoice codes (e.g. codes by building - building 1, 2 or 3), enter new invoice codes, create invoice codes, enter budget line display preferences (e.g. by phase code) , and enter preferences for printing selections. With CPMS 10, the invoice code setup form facilitates the automatic generation of invoices and affidavits. Invoice codes can be used for custom reporting or to interface with other types of existing software. Invoice codes can allow parties to categorize budget expenditure items based on the needs of architects, owners, and the like. Account codes can be used to maintain budgets, record withdrawals, or facilitate invoicing and payments.

图40示例说明能与指定发票代码任务224有关的指定发票代码表单。GC或分包商能提供发票代码(例如建筑1,2或3),并能使用访问每一阶段代码的子预算的链接。指定发票代码表单能包括工程名、工程地址、阶段代码、阶段代码描述、承包该作业的组织以及预算金额。指定发票代码表单还能通过CPMS 10便利发票和誓词的自动生成。FIG. 40 illustrates the Specify Invoice Code form that can be associated with the Specify Invoice Code task 224 . The GC or subcontractor can provide an invoice code (eg Construction 1, 2 or 3) and can use links to access subbudgets for each phase code. The Specify Invoice Code form can include the project name, project address, phase code, phase code description, the organization contracting the job, and the budgeted amount. The Specify Invoice Code form also facilitates the automatic generation of invoices and affidavits through CPMS 10.

图41示例说明能与接收工程任务202有关的接收工程通知。图41的通知能包括已经将分包商或材料供应商添加为工程的参与方、工程描述和分包商或材料供应商的参与细节的声明。分包商或材料供应商能使用访问图42所示的接收工程表单的链接来接收或拒绝该工程。FIG. 41 illustrates a receipt engineering notification that can be related to a receipt engineering task 202 . The notification of Figure 41 can include a statement that the subcontractor or material supplier has been added as a party to the project, a description of the project and details of the subcontractor or material supplier's participation. The subcontractor or material supplier can accept or reject the project using the link to access the accept project form shown in FIG. 42 .

图42示例说明能与接收工程表单任务204有关的接收工程表单。接收工程表单能包括GC工程号、系统工程号、GC名、工程名、工程地址和预算支出项。接收工程表单能为分包商或材料供应商提供工程信息和预算支出项。分包商或材料供应商能使用接收或拒绝按钮来接收或拒绝与预算支出项有关的工程。分包商或材料供应商也能提供拒绝该工程的原因。来自接收工程表单的支出项也能用来通过CPMS 10,便于发票和誓词的自动生成。FIG. 42 illustrates a receiving engineering form that can be associated with the receiving engineering form task 204 . The receiving project form can include GC project number, system project number, GC name, project name, project address and budget expenditure items. The receiving engineering form can provide subcontractors or material suppliers with engineering information and budget expenditure items. Subcontractors or material suppliers can use the Accept or Decline buttons to accept or reject works related to budget expenditure items. Subcontractors or material suppliers can also provide reasons for rejecting the work. Expenditure items from receiving engineering forms can also be used through CPMS 10 to facilitate automatic generation of invoices and affidavits.

图43示例说明在工程拒绝任务206期间传送的工程拒绝通知。图43的通知能包括已经拒绝该工程的分包商或材料供应商的名称、拒绝的预算项以及拒绝原因。图43的通知可提供将组织角色指定给另一参与方的能力。FIG. 43 illustrates an engineering rejection notification communicated during the engineering rejection task 206 . The notification of Figure 43 can include the name of the subcontractor or material supplier who has rejected the project, the budget item rejected and the reason for the rejection. The notification of Figure 43 may provide the ability to assign an organizational role to another party.

图44示例说明能在工程接收任务210期间传送的工程接收通知。图44的通知能包括已经接收该工程的分包商或材料供应商的名称以及所接收的预算项。图43的通知能提供访问工程明细的能力。FIG. 44 illustrates engineering receipt notifications that can be communicated during the engineering receipt task 210 . The notification of Figure 44 can include the name of the subcontractor or material supplier who has accepted the work and the budget line received. The notification of Figure 43 can provide the ability to access project details.

图45示例说明能与工程主页任务211有关的工程主页。工程主页能包括工程名、完成的支取信息以及未决支取信息。工程主页能包括具有工程时间表进度条的工程概述、资金支付进度条以及百分比完成进度条。工程主页能包括与相对于工程执行的特定动作的一个或多个链接(例如工程配置文件、工程预算、查看工程参与方、设置发票码、管理工程用户、启动未计划支取等等)。FIG. 45 illustrates an engineering home page that can be associated with the engineering home page task 211 . The project home page can include the project name, completed withdrawal information, and pending withdrawal information. The project home page can include a project overview with a project timeline progress bar, a funding progress bar, and a percent complete progress bar. The project home page can include one or more links to specific actions performed with respect to the project (eg, project configuration file, project budget, view project parties, set invoice codes, manage project users, initiate unplanned withdrawals, etc.).

图46示例说明在添加用户任务208期间传送的添加用户通知。图46的通知能包括确认分包商或材料供应商已经加入该工程的声明。图46的通知能包括用于分包商或材料供应商将用户(例如组织的成员)添加到该系统的请求。FIG. 46 illustrates an add user notification communicated during the add user task 208 . The notification of Figure 46 can include a statement confirming that a subcontractor or material supplier has joined the project. The notification of Figure 46 can include a request for a subcontractor or material supplier to add a user (eg, a member of an organization) to the system.

图47示例说明能与工程用户访问任务212有关的工程用户访问表单。分包商或材料供应商能选择每一用户的安全许可(例如工程管理员或签名者)。工程用户访问表单能包括工程名、GC名和分包商或材料供应商组织的用户清单。FIG. 47 illustrates an engineering user access form that can be associated with an engineering user access task 212. Subcontractors or material suppliers can select security permissions for each user (eg, project administrator or signer). The project user access form can include project name, GC name and user list for subcontractor or material supplier organization.

图48示例说明能与工程责任任务214有关的工程责任通知。图48的通知能包括已经修改用户的责任,以及新的安全认可的声明。图48的通知能包括访问工程预算的链接。FIG. 48 illustrates an engineering responsibility notification that can be related to an engineering responsibility task 214 . The notification of Figure 48 can include a statement that the user's responsibilities have been modified, as well as new security approvals. The notification of Figure 48 can include a link to access the project budget.

图49示例说明能与工程预算查看任务216有关的工程预算查看屏。GC或分包商能通过预算模块36,访问工程预算查看屏。工程预算查看屏能包括工程名、GC名、工程地址,以及预算项的清单。预算项的清单能包括阶段代码、阶段代码描述、承包预算项的分包商或材料供应商、预算金额、支付、保留、余额和任何子预算的链接。FIG. 49 illustrates a project budget review screen that can be associated with the project budget review task 216 . The GC or subcontractor can access the project budget viewing screen through the budget module 36 . The project budget view screen can include project name, GC name, project address, and a list of budget items. A list of budget items can include a phase code, a description of the phase code, subcontractors or material suppliers contracting for the budget item, budget amounts, payments, encumbrances, balances, and links to any sub-budgets.

图50示例说明能与输入预算任务218有关的输入预算表单。GC或分包商能通过预算模块36访问输入预算表单。GC或分包商能输入所请求的信息,诸如阶段代码、阶段代码描述和预算金额。GC或分包商能改变与特定预算支出项有关的组织。GC或分包商能选择该组织是否仅提供材料。FIG. 50 illustrates an input budget form that can be associated with the input budget task 218 . The GC or subcontractor can access the input budget form through the budget module 36 . The GC or subcontractor can enter requested information such as stage codes, stage code descriptions, and budget amounts. A GC or subcontractor can change the organization associated with a particular budget expenditure item. The GC or subcontractor can choose whether the organization will only provide the material.

图51示例说明能包括在管理工程过程94中的终止预算项过程226。能由GC或分包商执行终止预算项过程226。终止预算项过程226能包括进入顶级预算任务228和终结预算任务230。FIG. 51 illustrates the End Budget Lines process 226 that can be included in the Manage Engineering process 94. The terminate budget line process 226 can be performed by a GC or a subcontractor. Terminate budget line process 226 can include entering top-level budget task 228 and finalizing budget task 230 .

图52A示例说明能与进入顶级预算任务228有关的进入顶级预算表单。GC或分包商能通过预算模块36,访问进入顶级预算表单。进入顶级预算表单可包括工程名、工程号、合同价值和组织列表。GC或分包商能输入所请求的信息,诸如保留百分比、阶段代码,阶段代码描述、帐号以及该组织是否仅提供材料。GC或分包商也能选择添加新支出项或终结特定支出项。进入顶级预算表单可包括与设置支取日期表单和/或设置发票码表单的链接。FIG. 52A illustrates the Enter Top-Level Budget form that can be associated with the Enter Top-Level Budget task 228. The GC or subcontractor can access the top-level budget form through the budget module 36 . Entry into the top-level budget form may include project name, project number, contract value, and organization listing. The GC or subcontractor can enter requested information such as retention percentage, stage code, stage code description, account number, and whether the organization is only supplying material. The GC or subcontractor can also choose to add new expenditure items or terminate specific expenditure items. Access to the top-level budget form may include links to a Set Draw Date form and/or a Set Invoice Code form.

图52B-C示出了编辑预算或价值计划表单。GC和/或分包商或材料供应商可使用编辑预算表单来为工程编辑预算信息。在一些实施例中,用户可由主页进入编辑预算表单,如图52D所示。Figures 52B-C illustrate the Edit Budget or Value Plan form. GCs and/or subcontractors or material suppliers can use the Edit Budget form to edit budget information for a project. In some embodiments, the user can enter the edit budget form from the home page, as shown in Figure 52D.

图53示例说明能与终结预算任务226有关的终止预算屏。在GC或分包商选择终结的支出项后,终结预算屏提供能使任何未付余额用于重新指定的确认和声明。FIG. 53 illustrates a termination budget screen that can be associated with the termination budget task 226. FIG. After the GC or subcontractor selects a finalized expense line, the finalized budget screen provides confirmation and statement enabling any outstanding balance to be reassigned.

图54示例说明能包括在管理支取过程96中的支取过程232。支取过程232能用来创建用于工程支取的计划、初始化每一支取、输入和签名发票、查看未决支取、生成发票、誓词和留置权放弃、确定资金是否可用,以及支付资金。可由几个参与方使用支取模块44来执行支取过程232。支取过程232能包括创建支取时间表单任务234、初始化支取任务236、输入发票任务238、输入发票表单任务240、签名发票任务242、更新的发票明细任务244、查看未决支取请求任务246、生成发票任务248、誓词表单任务250、资金可用任务252、查看支取请求任务254、签名留置权放弃任务256、留置权放弃表单任务258、所有留置权放弃签名任务260、通过支付资金按钮查看支取请求任务262、支付的支付额任务264、签名的留置权放弃任务266、查看支取请求任务268。支取过程232也可包括接收的支付明细任务270、未包括在支取任务中的发票272,以及未接收的支付明细任务274。可执行支取过程232以对当前支取而非以前的支取释放留置权放弃。FIG. 54 illustrates a withdrawal process 232 that can be included in the manage withdrawal process 96. Withdrawal process 232 can be used to create a schedule for project withdrawals, initiate each withdrawal, enter and sign invoices, view pending withdrawals, generate invoices, affidavit and lien releases, determine availability of funds, and disburse funds. The payout process 232 may be performed by several parties using the payout module 44 . Withdrawal process 232 can include create withdrawal time form task 234, initialize withdrawal task 236, enter invoice task 238, enter invoice form task 240, sign invoice task 242, update invoice detail task 244, view pending withdrawal request task 246, generate invoice Task 248, Affidavit Form Task 250, Funds Available Task 252, View Withdrawal Request Task 254, Signature Lien Waiver Task 256, Lien Waiver Form Task 258, All Lien Waiver Signature Task 260, View Withdrawal Request via Pay Funds Button Task 262 , Paid Payment Amount task 264 , Signed Lien Waiver task 266 , View Drawout Request task 268 . The debit process 232 may also include received payment detail tasks 270 , invoices not included in the debit task 272 , and unreceived payment detail tasks 274 . The withdrawal process 232 may be performed to release the lien waiver for the current withdrawal but not for the previous withdrawal.

图55示例说明能在创建支取时间表单任务234期间传送的创建计划支取通知。能将图55的通知实时传送到所有支取参与方以及能包括计划支取未决以及还没有选择用于该支取的参与方的声明。FIG. 55 illustrates a create plan payout notification that can be communicated during the create drawdown schedule task 234. The notification of FIG. 55 can be communicated in real time to all drawout participants and can include a statement that a planned payout is pending and parties that have not yet been selected for the drawout.

图56A-C示例说明能与初始化支取任务236有关的初始化支取表单。GC能通过支取模块44访问初始化支取表单。在一些实施例中,GC可以通过工程主页的链接进入初始支取表单。初始化支取表单能包括工程名、工程号、工程地址、支取数、支取日期以及用于该支取的潜在参与方的列表。潜在参与方的列表能包括阶段代码、阶段代码描述、组织名、预算金额、支付金额、应计的扣款以及余额。GC能选择每一参与方支取。GC可以为该支取选择潜在参与方(如至少一个潜在的参与方)的子集,或者可以为该支取选择所有潜在的参与方。在一些实施例中,初始支取表单包括有一次选择所有潜在参与方的选择机构。在其他实施例中,CPMS 10可以为不用提请GC来选择个体参与方的支取自动选择所有潜在参与方或者其子集。56A-C illustrate an initialization payout form that can be associated with the initialization payout task 236. The GC can access the initial withdrawal form through the withdrawal module 44. In some embodiments, the GC can access the initial withdrawal form through a link on the project home page. The initial withdrawal form can include project name, project number, project address, withdrawal amount, withdrawal date, and a list of potential parties for the withdrawal. The list of potential parties can include stage codes, stage code descriptions, organization names, budget amounts, payment amounts, accrued deductions, and balances. GC can choose each participant to withdraw. The GC may select a subset of potential participants (eg, at least one potential participant) for the withdrawal, or may select all potential participants for the withdrawal. In some embodiments, the initial withdrawal form includes a selection mechanism that selects all potential parties at once. In other embodiments, the CPMS 10 may automatically select all potential parties, or a subset thereof, for drawouts that do not require a GC to select individual parties.

在一些实施例中,GC也可以使用初始支取表单来关闭未决支取。另外,GC可以使用初始支取表单或其他由CPMS 10提供的其他表单来打开重叠支取。然而CPMS 10可以为打开重叠支取添加规则或准则,来一次管理多项支取,如防止在前一支取签字之前新支取签字(如授权支出),或者防止支取在顺序外支出。In some embodiments, the GC may also use the initial withdrawal form to close pending withdrawals. Alternatively, the GC can use the initial withdrawal form or other forms provided by CPMS 10 to open overlapping withdrawals. However, CPMS 10 may add rules or criteria for opening overlapping draws to manage multiple draws at once, such as preventing new draws from being signed before previous draws are signed (eg, authorizing payouts), or preventing draws from being spent out of sequence.

图57A-B示例说明能在输入发票任务238期间传送的输入发票通知。通知能包括已经计划用于工程的支取以及分包商或材料供应商已经输入应付款的明细的声明。该通知能包括用于分包商或材料供应商的组织角色和特定预算项。能将通知实时传送到所有支取参与方。在一些实施例中,分包商或材料供应商可由查看所有信息屏进入输入发票通知,如图57C所示。57A-B illustrate the input invoice notifications that can be transmitted during the input invoice task 238. The notification can include a statement that debits have been planned for the work and that subcontractors or material suppliers have entered details of payments due. The notification can include organizational roles and specific budget items for subcontractors or material suppliers. The notification can be transmitted to all withdrawal participants in real time. In some embodiments, a subcontractor or material supplier may enter an input invoice notification from the View All Information screen, as shown in Figure 57C.

图58A-B示例说明能与输入发票表单任务240有关的输入发票表单。分包商或材料供应商能使用输入发票表单来提供用于支取的发票金额。输入发票表单也能包括工程名、工程号、工程地址、支取数、支取日期和用于该分包商或材料供应商的特定支出项。在分包商或材料供应商提交发票信息后,CPMS 10可以生成发票通知,如图58C所示,并且可以为分包商和材料供应商显示发票提交通知。58A-B illustrate an input invoice form that can be associated with the input invoice form task 240 . Subcontractors or material suppliers can use the Enter Invoice form to provide invoice amounts for billing. The input invoice form can also include project name, project number, project address, billed amount, billed date, and specific expense items for that subcontractor or material supplier. After the subcontractor or material supplier submits the invoice information, the CPMS 10 can generate an invoice notification, as shown in Figure 58C, and can display the invoice submission notification for the subcontractor and material supplier.

在一些实施例中,GC或工程管理者可以指明由分包商输入的发票或帐单数额。例如,通过使用CPMS 10,GC可以为某特定分包商指明发票数额(如百分比完整数额)。分包商可通过使用CPMS 10审阅和提交指定的发票数额,但是在一些实施例中,分包商不可修改数额。In some embodiments, the GC or project manager may specify the invoice or bill amount entered by the subcontractor. For example, using CPMS 10, a GC can specify an invoiced amount (such as a percentage full amount) for a particular subcontractor. Subcontractors can review and submit specified invoice amounts by using the CPMS 10, but in some embodiments, subcontractors cannot modify the amounts.

图59示例说明能在签名发票任务242期间,传送到分包商或材料供应商的签名发票通知。图59的通知能包括GC或工程管理者已经核准用于特定支取的发票以及誓词必须签名的声明。CPMS 10能用来向每一用户指定安全/授权角色,诸如管理、记帐或授权签名。CPMS 10能通过签名誓词的授权来通知用户,以使得在必要时由该组织的成员签名誓词。CPMS 10能用来改变签名誓词所需的安全/授权角色(例如贷方能要求签名誓词,而不是组织的管理员)。FIG. 59 illustrates a signed invoice notification that can be communicated to a subcontractor or material supplier during the signed invoice task 242. The notification of Figure 59 can include a statement that the GC or project manager has approved the invoice for the particular payout and the affidavit must be signed. CPMS 10 can be used to assign security/authorization roles to each user, such as administrative, accounting or authorized signatures. The CPMS 10 can notify the user of the authorization to sign an affidavit, so that an affidavit can be signed by a member of the organization if necessary. CPMS 10 can be used to change the security/authorization roles required for signing affidavits (eg lenders can require signing affidavits, not administrators of the organization).

图60A-B示例说明能与签名发票任务242有关的签名文件屏幕或签名发票表单。分包商或材料供应商能通过支取模块44访问签名发票。通过使用签名发票表单,分包商或材料供应商能查看发票的明细,诸如特定组织、请求金额、预算金额、支付额、扣款以及余额。然后,分包商或材料供应商能选择签名发票声明。签名发票表单可包括查看自动生成的发票表单或自动生成的誓词表单的链接。60A-B illustrate the Sign Documents screen or the Sign Invoice form that can be associated with the Sign Invoice task 242 . Subcontractors or material suppliers can access signed invoices through the withdrawal module 44 . By using the signed invoice form, subcontractors or material suppliers can view invoice details such as specific organization, request amount, budget amount, payment amount, deduction and balance. Subcontractors or material suppliers can then choose to sign the invoice statement. A signed invoice form can include a link to view the auto-generated invoice form or the auto-generated affidavit form.

在一些实施例中,给发票电子签名,分包商或材料供应商可选择包含在签名文件屏或签名发票表前的签名发票声明选择机构,如图60A-B所示。在分包商或材料供应商选择签名发票声明选择机构后,CPMS 10可以生成和显示自动生成的发票表单,如图60C-D所示。给发票表单签名,分包商或者材料供应商可以选择包含在该表单中的签名文件选择机构。在分包商或材料供应商电子地给自动生成的发票表单签名后,系统10可以创建并显示合法绑定的发票表单,如图60E所示。在一些实施例中,当用户每次通过使用CPMS 10电子地给文件签名时,CPMS 10可以生成审计报告,比如由图60F示出的签名审计报告屏。In some embodiments, to electronically sign an invoice, a subcontractor or material supplier may choose to include a signature invoice statement selection mechanism in front of the signature document screen or signature invoice form, as shown in Figures 60A-B. After a subcontractor or material supplier selects a signature invoice statement selection agency, the CPMS 10 can generate and display an auto-generated invoice form, as shown in Figures 60C-D. To sign the invoice form, subcontractors or material suppliers may choose to include the signed document selection agency on the form. After the subcontractor or material supplier electronically signs the automatically generated invoice form, the system 10 can create and display a legally bound invoice form, as shown in Figure 60E. In some embodiments, CPMS 10 may generate an audit report each time a user electronically signs a document through use of CPMS 10, such as the signature audit report screen shown by FIG. 60F.

在分包商或材料供应商在自动生成的发票表单签字,CPMS 10可生成文件签名通知,如图60G所示,并且可以向分包商或材料供应商显示文件签名通知。在一些实施例中,当分包商或材料供应商提供签名发票时,CPMS 10也可以要求分包商或材料供应商提交签名的前留置权通知。After the subcontractor or material supplier signs the automatically generated invoice form, the CPMS 10 can generate a document signature notification, as shown in Figure 60G, and can display the document signature notification to the subcontractor or material supplier. In some embodiments, when a subcontractor or material supplier provides a signed invoice, the CPMS 10 may also require the subcontractor or material supplier to file a signed pre-lien notice.

图61示例说明能在发票明细更新任务244期间,传送到GC的发票明细更新通知。图61的通知能包括分包商或材料供应商已经在用于特定工程的特定日期更新用于支取的支付明细的声明。该通知能包括链接以便查看发票细目。Figure 61 illustrates an invoice detail update notification that can be sent to the GC during the invoice detail update task 244. The notification of FIG. 61 can include a statement that the subcontractor or material supplier has updated the payment details for payment on a specific date for a specific project. The notification can include a link to view invoice details.

图62示例说明能与查看未决支取请求任务246有关的查看未决支取请求屏。GC能通过支取模块44访问查看未决支取请求屏。GC能选择每一参与方包括在该支取中、确认支取以及将通知实时发送到每一组织的签名者。然而,GC也能拒绝未决支取请求,通知被选参与方重新输入发票以及提供拒绝支取请求的原因。查看未决支取请求屏能包括工程名、工程号、工程地址、支取数、支取日期、已经提交发票的参与方列表,以及还未提及发票的参与方列表。可按阶段代码组织参与方。对每一阶段代码,查看未决支取请求屏能包括请求金额、预算金额、支付金额、扣款和余额。在一些实施例中,查看未决支取要求屏(或工程主页)也可提供一个或更多的某特定支取进度的图形提示,如进度条。工程管理者可以指定哪个参与方可以查看进度提示。此外,在一些实施例中,CPMS 10可以自动传送通知(如几乎实时)至告知参与方某特定支取状态的参与方。FIG. 62 illustrates the View Pending Withdrawal Requests screen that can be associated with the View Pending Withdrawal Requests task 246. FIG. The GC can access the View Pending Withdrawal Requests screen through the Withdrawal Module 44 . The GC can select each party to be included in the withdrawal, confirm the withdrawal, and send notifications to each organization's signers in real time. However, the GC can also reject pending withdrawal requests, notify selected parties to re-enter the invoice and provide reasons for rejecting the withdrawal request. View pending withdrawal requests screen can include project name, project number, project address, withdrawal amount, withdrawal date, a list of parties that have submitted invoices, and a list of parties that have not yet mentioned invoices. Participants can be organized by phase code. For each stage code, the View Pending Withdrawal Requests screen can include requested amounts, budgeted amounts, paid amounts, debits, and balances. In some embodiments, the View Pending Withdrawal Requests screen (or project home page) may also provide one or more graphical reminders of the progress of a particular withdrawal, such as a progress bar. Project managers can specify which parties can view progress notifications. Additionally, in some embodiments, the CPMS 10 may automatically transmit notifications (eg, in near real time) to participants informing them of a particular withdrawal status.

图63示例说明能在未接收的支付金额任务274期间传送的发票细目拒绝通知。图63的通知能包括未接收将在用于特定工程的日期上、由支取的特定用户输入的付款和发票细目以及拒绝原因的声明。通知能包括分包商或材料供应商在支取关闭前,重新输入支付细目的请求。FIG. 63 illustrates an invoice line rejection notification that can be transmitted during the Unreceived Payment Amount task 274. The notification of FIG. 63 can include a statement that payment and invoice details to be entered by the particular user of the draw were not received on the date for the particular project and the reason for the rejection. Notifications can include requests by subcontractors or material suppliers to re-enter payment details before drawouts are closed.

图64A示例说明能在未包括在支取中的发票任务272期间传送的、未包括在支取通知中的发票。图64的通知能包括参与方未提交用于工程的支取的核准誓词,以及参与方和所有他们的分包商将不包括在支取中的声明。通知能声明已经撤销所提交的所有誓词和发票。FIG. 64A illustrates an invoice not included in a withdrawal notification that can be transmitted during an invoice not included in withdrawal task 272. The notice of Figure 64 can include an affidavit of approval that the parties have not submitted a payment for the Works, and a statement that the parties and all their subcontractors will not be included in the payment. The notice can state that all affidavits and invoices submitted have been revoked.

在分包商或材料供应商为某特定支取提交发票,CPMS 10可以生成基于所收到发票的联合发票。CPMS 10也可以包含由GC提供的发票细目,图64B示出了输入发票表单,GC可使用该表单为某特定支取输入发票细目。在一些实施例中,GC可由工程首页进入输入发票表单,如图64C所示。如图64B所示,GC可以为自己执行的工作输入发票数额。输入发票表单也可显示由包括在支取中的分包商或材料供应商收到的发票数额。在一些实施例中,GC的或者工程管理者可以为分包商或材料供应商提出帐单。例如,GC可以为一个或多个项目或者GC未从分包商或材料供应商收到发票的工作期间开帐单。通过提出帐单,GC可以收到为项目或者工作期间的保留数额。When a subcontractor or material supplier submits an invoice for a particular charge, CPMS 10 can generate a joint invoice based on the invoice received. The CPMS 10 can also contain invoice details provided by the GC, Figure 64B shows an input invoice form which the GC can use to enter invoice details for a particular draw. In some embodiments, the GC can access the input invoice form from the engineering home page, as shown in Figure 64C. As shown in Figure 64B, the GC can enter invoiced amounts for work it has performed. The Enter Invoice form can also display invoiced amounts received by subcontractors or material suppliers included in the draw. In some embodiments, the GC's or project manager may initiate billing for subcontractors or material suppliers. For example, a GC may bill for one or more projects or work periods for which the GC has not received invoices from subcontractors or material suppliers. By submitting a bill, the GC can receive the reserved amount for the project or work period.

在GC通过使用图64B示出的输入发票表单输入发票细目时,CPMS 10可生成发票提交通知,如图64D所示,并且可以向GC显示发票提交通知。When the GC enters the invoice details by using the input invoice form shown in FIG. 64B, the CPMS 10 may generate an invoice submission notification, as shown in FIG. 64D, and may display the invoice submission notification to the GC.

GC可以通过使用图64E示出的核准发票表单来核准或者拒绝分包商和材料供应商向GC发送的发票。通过使用核准发票表单,GC可以选择一个或多个发票来拒绝和/或一个或多个发票来反对。在一些实施例中,如果GC拒绝发票,GC可以使用核准发票表单来提供GC拒绝发票的原因或者评语。The GC may approve or reject invoices from subcontractors and material suppliers to the GC by using the Approve Invoice form shown in Figure 64E. Using the Approve Invoices form, GC can select one or more invoices to reject and/or one or more invoices to object to. In some embodiments, if the GC rejects the invoice, the GC can use the Approve Invoice form to provide the GC's reasons for rejecting the invoice or comments.

如图64E所示,对于每个收到的发票,核准发票表单可以包含查看发票链接。GC可以选择与某特定分包商或材料供应商相关的查看发票链接来查看收自分包商或材料供应商的发票。例如,如果GC选择了同某特定分包商或材料供应商相关的查看发表链接,CPMS 10可显示如图64F所示的查看发票屏,该屏显示了由分包商或材料供应商提交的发票。在GC批准一个或更多的发票后,CPMS 10可生发票核准通知,如图64G所示,并能向GC显示发票核准通知。As shown in Figure 64E, for each invoice received, the Approve Invoice form may contain a View Invoice link. The GC may select the View Invoices link associated with a particular subcontractor or material supplier to view invoices received from the subcontractor or material supplier. For example, if the GC selects the View Published link associated with a particular subcontractor or material supplier, the CPMS 10 may display the View Invoice screen shown in Figure 64F, which shows the invoices submitted by the subcontractor or material supplier. bill. After the GC approves one or more invoices, the CPMS 10 can generate an invoice approval notification, as shown in Figure 64G, and can display the invoice approval notification to the GC.

在GC核准一个或更多由分包商或材料供应商发送的发票和/或通过使用图64B所示的输入发票表单输入的发票细目,CPMS 10可生成基于收自分包商和材料供应商和GC的发票信息的发票。图65示例说明能与生成发票任务248(在图54中标记G702/703)有关的自动生成发票表单(例如与工业实践相一致的表单,诸如G702/703表单)。GC、分包商和材料供应商能通过支取模块44访问发票表单。分包商、材料供应商和/或建筑师能电子地签名发票表单(例如使用电子签名软件提供商如AlphaTrust Corporation的产品)。After the GC approves one or more invoices sent by subcontractors or material suppliers and/or by entering invoice details using the Enter Invoice form shown in Figure 64B, CPMS 10 can generate GC's invoice information for the invoice. Figure 65 illustrates an automatically generated invoice form (eg, a form consistent with industry practice, such as a G702/703 form) that can be associated with the Generate Invoice task 248 (labeled G702/703 in Figure 54). GCs, subcontractors and material suppliers can access the invoice form through the withdrawal module 44. Subcontractors, material suppliers, and/or architects can sign invoice forms electronically (eg, using products from electronic signature software providers such as AlphaTrust Corporation).

图66A示例说明能与誓词表单任务250有关的自动生成的誓词表单。GC能通过支取模块44访问誓词表单。GC能电子地签名誓词表单(例如使用电子签名软件提供商如AlphaTrust Corporation的产品)。FIG. 66A illustrates an automatically generated affidavit form that can be associated with the affidavit form task 250. The GC can access the affidavit form through the withdrawal module 44. The GC can electronically sign the affidavit form (eg, using a product from an electronic signature software provider such as AlphaTrust Corporation).

在CPMS 10生成基于来自分包商和材料供应商核准的发票以及由GC输入的发票细目的发票和/或誓词后,GC可以通过使用发送至签名者屏来查阅电子文件,如图66B所示。在GC查阅自动生成的文件后,GC可以使用发送至签名者屏来向与由CPMS 10授权的给文件签名的GC(以下简称“签名者”)有关的用户提交发票和/或誓词。在GC为签名提交文件后,CPMS 10可生成发送至签名者通知的发票,如图66C所示,并且可以向GC显示发送至签名者通知的发票。After CPMS 10 generates invoices and/or affidavits based on approved invoices from subcontractors and material suppliers and invoice details entered by the GC, the GC can review the electronic documents by using the Send to Signer screen, as shown in Figure 66B . After the GC has reviewed the automatically generated document, the GC can use the Send to Signer screen to submit invoices and/or affidavits to users associated with the GC authorized by the CPMS 10 to sign the document (hereinafter referred to as "signers"). After the GC submits the files for signature, the CPMS 10 can generate an invoice sent to the signer notification, as shown in Figure 66C, and can display the invoice to the signer notification to the GC.

当一个或更多的文件为签名被GC提交,CPMS 10可以通知签名者一个或更多文件需要签名。例如,当CPMS 10可在签名者的主页上显示通知,如图66D所示。给文件签字,签名者可进入签名文件屏,如图66E所示。通过使用由图66所示的签名文件屏,签名者也可以拒绝文件并且可以输入拒绝该文件的原因或评语。When one or more files are submitted by GC for signature, CPMS 10 can notify the signer that one or more files need to be signed. For example, when the CPMS 10 can display a notification on the signer's home page, as shown in Figure 66D. To sign the document, the signer can enter the signature document screen, as shown in Figure 66E. By using the Sign Document screen shown in FIG. 66, the signer can also reject the document and can enter a reason or comment for rejecting the document.

签名者可以通过选择包含在签名文件屏的签名发票(如“签名G702”)选择机构来给文件签名。如果签名者选择签名发票选择机构,CPMS 10可显示自动生成的发票表单,如图66F所示。电子地给显示的发票表单签名,签名者可选择包括在发票表单内的签名文件选择机构如图66F所示。在签名者选择签名文件选择机构后,CPMS 10生成并显示已签名的发票,如图66G-H所示。在签名者给发票签完名后,CPMS 10能生成发票签名通知,如图66I所示,并且可以向签名者显示发票签名通知。The signer may sign the document by selecting the agency selected from the signature invoice (eg, "Signature G702") included in the Sign Document screen. If the signer selects the signature invoice selection agency, CPMS 10 may display an automatically generated invoice form, as shown in Figure 66F. To electronically sign the displayed invoice form, the signer can select the signature file selection mechanism for inclusion in the invoice form as shown in Figure 66F. After the signer selects the signature document selection authority, the CPMS 10 generates and displays the signed invoice, as shown in Figures 66G-H. After the signer finishes signing the invoice, the CPMS 10 can generate an invoice signature notification, as shown in Figure 66I, and can display the invoice signature notification to the signer.

在签名者给发票和/或誓词签名后,CPMS 10可提醒签名者(同给发票和/或誓词签名的同一用户或者与GC相关的、被授权给文件签名的不同用户)通过使用签名文件屏来给与该发票和/或誓词相关的留置权放弃签名,如图66J所示。给留置权放弃签名,签名者可以选择包含在签名文件屏中的签名留置权放弃选择机构。如果签名者选择了签名发票选择机构,CPMS 10显示自动生成的留置权放弃表单,如图66K所示。按电子方式给显示的留置权放弃表签名,签名者可选择包含在留置权放弃表单中的签名文件选择机构,如图66K所示。在签名者选择签名文件选择机构后,CPMS 10生成并显示签名的留置权放弃,如图66L所示。After the signer signs the invoice and/or affidavit, the CPMS 10 can remind the signer (either the same user who signed the invoice and/or affidavit or a different user associated with the GC who is authorized to sign the document) by using the Signed Documents screen to sign the lien waiver associated with the invoice and/or affidavit, as shown in Figure 66J. To sign a lien waiver, the signer may select the agency included in the signature lien waiver selection in the Signed Documents screen. If the signer selected the signature invoice selection agency, CPMS 10 displays the automatically generated lien waiver form, as shown in Figure 66K. By electronically signing the displayed lien waiver form, the signer may select a signature document selection agency included in the lien waiver form, as shown in Figure 66K. After the signer selects the signature document selection agency, CPMS 10 generates and displays the signed lien waiver, as shown in Figure 66L.

同样地,CPMS 10可提请与GC相关的公证人来通过使用签名文件屏给签名的留置权放弃做公证,如图66M所示。在一些实施例中,每个登记于系统10的组织可以指定至少一个用户作为该组织的公证人。公证人可以使用CPMS 10来建立公证人密码或者个人密码(PIN)。公证人可在登录系统10和/或当给某特定文件签名时被提请输入认证人PIN。为了防止未经授权而使用公证人PIN,在CPMS 10的公证人部分可以超时并且CPMS 10可要求公证人重新输入公证人PIN。此外,在一些实施例中,CPMS 10可在每次公证人公证文件时创建审计踪迹。进入某特定公正的审计踪迹,用户可通过CPMS 10进入公证的文件并且在显示于文件的电子公证上选择或点击。然后,CPMS 10可显示与所选择公证相关的审计踪迹。CPMS 10可为其所有形式的电子签名和记录于系统10的授权提供相同的审计踪迹功能。Likewise, the CPMS 10 can ask the notary associated with the GC to notarize the signed lien release by using the Signed Documents screen, as shown in Figure 66M. In some embodiments, each organization registered with the system 10 may designate at least one user as the organization's notary. Notaries can use CPMS 10 to create a Notary Password or a Personal Number (PIN). The notary may be prompted to enter the certifier PIN when logging into the system 10 and/or when signing a particular document. To prevent unauthorized use of the notary PIN, the notary portion of the CPMS 10 may time out and the CPMS 10 may require the notary to re-enter the notary PIN. Additionally, in some embodiments, CPMS 10 may create an audit trail each time a notary notarizes a document. To access an audit trail for a particular impartiality, a user may enter a notarized document through CPMS 10 and select or click on an electronic notarization displayed on the document. The CPMS 10 can then display the audit trail associated with the selected notarization. The CPMS 10 can provide the same audit trail functionality for all forms of electronic signatures and authorizations recorded in the system 10.

公证签字的留置权放弃,公证人可选择包含在如图66M所示的签名文件屏中的公证留置权放弃选择机构。如果公证人选择公证留置权放弃选择机构,CPMS 10可显示公证签名的留置权放弃表单,如图66N所示。按电子方式公证所显示的签名的留置权放弃表单,公证人可选择包含在公证签名的留置权放弃表单的公证或签名文件选择机构,如图66N所示。在公证人选择签名文件选择机构后,CPMS 10可生成并显示公证的签名的留置权放弃,如图66O所示。CPMS 10也可生成文件签名的通知,如图66P所示,并可向签名人显示文件签名的通知。For notarized signed lien waivers, the notary may select the notarial lien waiver selection agency included in the signed document screen shown in Figure 66M. If the notary selects the notary lien waiver selection agency, CPMS 10 may display the notarized signed lien waiver form, as shown in Figure 66N. By electronically notarizing the displayed signed lien waiver form, the notary may select the notary or signature document selection agency included in the notarized signed lien waiver form, as shown in Figure 66N. After the notary selects the signature file selection authority, the CPMS 10 may generate and display the notarized signed lien waiver, as shown in Figure 66O. CPMS 10 can also generate a notification of document signature, as shown in Figure 66P, and can display the notification of document signature to the signer.

图67示例说明能在资金可用任务252期间传送的资金可用通知。图67的通知包括指令,按照请求留置权放弃的链接以及当资金可用于释放工程上的支取时释放资金。FIG. 67 illustrates a funds available notification that can be sent during the funds available task 252. The notice of FIG. 67 includes instructions, a link to follow to request a lien waiver and to release the funds when they are available to release the drawdown on the works.

图68A示例说明能与查看支取请求任务254有关的查看支取请求屏。GC能通过支取模块44访问查看支取请求屏。GC能查看支取的明细、授权资金以及请求留置权放弃。查看支取请求能包括工程名、工程号、工程地址、支取数、支取日期和支取的参与方列表。参与方列表能包括参与方名、阶段代码、是否已经接收留置权放弃、请求金额、预算金额、支付金额、扣款和余额。参与方列表也能包括任何分包商和它们的留置权放弃或其他种类的提交文件(如发票、誓词、合同等)。FIG. 68A illustrates a View Payout Requests screen that can be associated with the View Payout Requests task 254. The GC can access a view withdrawal request screen through the withdrawal module 44 . GCs can view details of withdrawals, authorize funds, and request lien releases. View withdrawal request can include project name, project number, project address, withdrawal amount, withdrawal date and withdrawal party list. The party list can include party name, phase code, whether a lien waiver has been received, requested amount, budgeted amount, paid amount, chargeback, and balance. The party list can also include any subcontractors and their lien waivers or other kinds of submissions (eg, invoices, affidavits, contracts, etc.).

图68B示出了可通过如图68A所示的查看支取要求屏或如图68C所示的工程主页进入的要求留置权放弃屏。通过使用要求留置权放弃屏,GC可查看与支取相关的分包商和材料供应商的列表,从所列分包商和材料供应商中要求留置权放弃,GC可选择包含在要求留置权放弃屏中的要求留置权放弃选择机构。在GC选择要求留置权放弃选择机构后,CPMS 10可生成留置权放弃要求的通知,如图68D所示,并可向GC显示留置权放弃要求的通知。Figure 68B illustrates a claim lien waiver screen accessible through the View Drawout Claims screen, as shown in Figure 68A, or the Engineering Home page, as shown in Figure 68C. By using the Request Lien Waiver screen, the GC can view a list of subcontractors and material suppliers associated with the draw, from which to request a lien waiver, the GC can choose to include in the request lien waiver Request a Lien Waiver in the Select Agency screen. After the GC elects to require a lien waiver to select an agency, the CPMS 10 may generate a lien waiver demand notice, as shown in Figure 68D, and may display the lien waiver demand notice to the GC.

图69A示例说明能在签名留置权放弃任务256期间传送的签名留置权放弃通知。图69A的通知能实时传送到所有支取参与方以及能包括已经授权工程计划的支取和请求分包商或材料供应商签名它的留置权放弃来接收支取请求的声明。在一些实施例中,分包商和材料供应商可通过工程主页进入签名留置权放弃通知,如图69B所示。FIG. 69A illustrates a signature lien waiver notification that can be communicated during the signature lien waiver task 256. The notification of FIG. 69A can be transmitted in real time to all drawing participants and can include a statement that has authorized the drawing of the project plan and requested the subcontractor or material supplier to sign its lien waiver to accept the drawing request. In some embodiments, subcontractors and material suppliers may access the Signature Lien Waiver Notice through the Engineering Home Page, as shown in Figure 69B.

在一些实施例中,给留置权放弃签字,分包商和材料供应商可以选择包含在签名留置权放弃通知中的链接。如果分包商或材料供应商选择包含在签名留置权放弃通知中的链接,CPMS 10可生成并显示签名文件屏,如图96C所示。给留置权放弃签名,分包商或材料供应商可选择包含在签名文件屏中的签名留置权选择机构。如果分包商或材料供应商选择签名留置权选择机构,CPMS 10显示自动生成的留置权放弃表单。图70A-B示例说明能与留置权放弃表单任务258有关的自动生成留置权放弃表单。分包商和材料供应商能通过支取模块44访问留置权放弃表单。留置权放弃表单能基于预算自动地生成,包括用于每一分包商或材料供应商的支出项。分包商和材料供应商能通过选择如图70B所示的包含在留置权放弃中的签名选择机构电子地签名留置权放弃表单(例如使用AlphaTrust Corporation的电子签名产品)。只要签名,能将留置权放弃68存储在电子保管箱/托管54中。只要分包商或者材料供应商在留置权放弃上签名,CPMS 10可以显示签名的或电子执行的留置权放弃,如图70C所示。In some embodiments, to sign a lien waiver, subcontractors and material suppliers may choose to include a link in the signed lien waiver notice. If the subcontractor or material supplier chooses to include a link in the signature lien waiver notice, the CPMS 10 may generate and display the signature file screen, as shown in Figure 96C. To sign a lien waiver, a subcontractor or material supplier may choose to include a signature lien selection agency in the Signature Documents screen. If the subcontractor or material supplier selects the signature lien selection agency, CPMS 10 displays an automatically generated lien waiver form. 70A-B illustrate an automatically generated lien waiver form that can be associated with the lien waiver form task 258. Subcontractors and material suppliers can access the lien waiver form through the withdrawal module 44 . Lien waiver forms can be automatically generated based on budgets, including expenditure items for each subcontractor or material supplier. Subcontractors and material suppliers can electronically sign the lien waiver form (eg, using AlphaTrust Corporation's electronic signature product) by selecting the signature selection agency included in the lien waiver as shown in Figure 70B. Lien release 68 can be stored in electronic safe deposit box/escrow 54 as long as it is signed. As long as the subcontractor or material supplier signs the lien waiver, the CPMS 10 may display a signed or electronically executed lien waiver, as shown in Figure 70C.

在一些实施例中,除了给留置权放弃签名外,分包商或材料供应商可公证留置权放弃。例如,CPMS 10可提请与分包商或材料供应商相关的公证人通过使用签名文件屏来公证签名的留置权放弃,如图70D所示。公证签名的留置权放弃,公证人可以选择包含在如图70D所示的签名文件屏中的公证留置权放弃选择机构。如果公证人选择公证留置权放弃选择机构,CPMS 10可显示公证签名的留置权放弃表单,如图70E所示。电子地公证所显示的签名的留置权放弃表单,公证人可选择包含在如图70E所示的公证签名留置权放弃表单中的公证或签名文件选择机构。在公证人选择签名文件选择机构后,CPMS 10生成并显示公证的签名的留置权放弃,如图70F所示。CPMS 10也可生成文件签名的通知,如图70G所示,并可向分包商或材料供应商显示文件签名的通知。In some embodiments, in addition to signing the lien release, the subcontractor or material supplier may notarize the lien release. For example, the CPMS 10 may ask a notary associated with a subcontractor or material supplier to notarize a signed lien release by using the Signed Documents screen, as shown in Figure 70D. For notarized signed lien waivers, the notary may select the notarial lien waiver selection agency included in the signed document screen shown in Figure 70D. If the notary selects the notary lien waiver selection agency, CPMS 10 may display a notarized signed lien waiver form, as shown in Figure 70E. Electronically notarizing the displayed signed lien waiver form, the notary may select the notary or signature document selection agency included in the notarized signed lien waiver form as shown in Figure 70E. After the notary selects the signature file selection authority, the CPMS 10 generates and displays the notarized signed lien waiver, as shown in Figure 70F. The CPMS 10 can also generate document signature notifications, as shown in Figure 70G, and can display the document signature notifications to subcontractors or material suppliers.

图71示例说明能在留置权放弃签名任务266期间传送的留置权放弃签名通知。图71的通知能包括分包商或材料供应商已经签名用于工程的支取的他们的留置权放弃的声明。通知可包括对支取的细目以及迄今收到的留置权放弃的访问(权)。FIG. 71 illustrates a lien waiver signature notification that can be communicated during the lien waiver signature task 266. The notice of FIG. 71 can include a statement that the subcontractor or material supplier has signed their lien waiver for payment of the works. The notice may include access to a breakdown of the disbursements and lien waivers received to date.

图72示例说明能与查看支取请求任务268有关的查看支取请求屏。GC、分包商或材料供应商能通过支取模块44访问查看支取请求屏。查看支取请求屏能包括工程名、工程数、工程地址、支取数、支取日期和支取的参与方列表。参与方列表能包括参与方名、阶段代码、是否收到留置权放弃、请求金额、预算金额、支付金额、扣款和余额。参与方列表也能包括任何分包商和他们的留置权放弃。FIG. 72 illustrates a View Payout Requests screen that can be associated with the View Payout Requests task 268. A GC, subcontractor, or material supplier can access a view payout request screen through the payout module 44 . View withdrawal request screen can include project name, project number, project address, withdrawal number, withdrawal date and withdrawal party list. The party list can include party name, phase code, whether a lien waiver has been received, requested amount, budgeted amount, paid amount, chargeback, and balance. The party list can also include any subcontractors and their lien waivers.

图73A示例说明能在签名所有留置权放弃任务260期间传送的所有留置权放弃签名通知。图73A的通知能包括已经签名用于工程的支取的所有留置权放弃的声明。通知能包括查看支取明细的链接和支付资金。在一些实施例中,GC可以通过查看所有消息屏进入所有留置权放弃签名的通知,如图73B所示。FIG. 73A illustrates all lien waiver signature notifications that can be transmitted during the sign all lien waiver task 260. The notice of FIG. 73A can include a statement of waiver of all liens that have been signed for disbursement of the works. Notifications can include links to view withdrawal details and disburse funds. In some embodiments, the GC can access all lien waiver signed notifications through the View All Messages screen, as shown in Figure 73B.

图74A-B示例说明能与具有支付资金任务的查看支取请求任务363有关的查看支取请求表单。GC(或建筑师、业主、业主的代表、贷方或产权保险公司)能访问查看支取请求表单和通过支取模块44和/或支取核准模块60来核准支取。查看支取请求表单能包括工程名、工程数、工程地址、支取数、支取日期、支取参与方的列表。参与方的列表能包括参与方名、阶段代码、是否接收留置权放弃、请求金额、预算金额、支付金额、扣款和余额。参与方列表也能包括任何分包商和他们的留置权放弃。当GC支付资金时,基本上同时释放留置权放弃和将支付指令发送到ACH系统26。74A-B illustrate a view withdrawal request form that can be associated with a view withdrawal request task 363 with a pay funds task. The GC (or architect, owner, owner's representative, lender or title insurer) can access the withdrawal request form and approve the withdrawal through the withdrawal module 44 and/or the withdrawal approval module 60. Viewing the withdrawal request form can include a project name, project number, project address, withdrawal number, withdrawal date, and a list of withdrawal participants. The list of parties can include party name, phase code, whether to accept lien waiver, requested amount, budgeted amount, paid amount, chargeback, and balance. The party list can also include any subcontractors and their lien waivers. When the GC disburses the funds, the lien waiver is released and payment instructions are sent to the ACH system 26 substantially simultaneously.

如图74B所示,查看支取请求表单可为特定的分包商或材料供应商提示支付数额。查看支取请求表单也可为特定分包商或材料供应商提示暂缓支付数额。在一些实施例中,CPMS 10可自动暂缓对分包商或材料供应商支付。如下所述,CPMS 10可自动暂缓对没有提供一个或多个所需文件(如合同、执照、保险文件等)的分包商或材料供应商的支付。GC也可由其他各种原因通过使用CPMS 10人工地向特定分包商或材料供应商暂缓支付。As shown in Figure 74B, viewing the withdrawal request form may prompt payment amounts for specific subcontractors or material suppliers. Viewing the Withdrawal Request Form may also prompt payment holdback amounts for specific subcontractors or material suppliers. In some embodiments, the CPMS 10 may automatically withhold payments to subcontractors or material suppliers. As described below, the CPMS 10 may automatically withhold payment to subcontractors or material suppliers who do not provide one or more required documents (eg, contracts, licenses, insurance documents, etc.). The GC can also manually withhold payment to specific subcontractors or material suppliers by using the CPMS 10 for various other reasons.

如图74B所示,查看支取请求表单也可包含链接。通过使用这些链接,GC可以查阅为支取提交的留置权放弃或查阅由支取参与方要求的文件的状态。As shown in Figure 74B, the view withdrawal request form may also contain a link. By using these links, a GC may review a lien waiver filed for a drawout or review the status of a document requested by a drawout party.

图75A-B示例说明在付款支付任务264期间传送的付款支付通知。图75A-B的通知能实时传送到所有支取参与方以及能包括对该工程的特定日期的计划内支取已经支付付款的声明。在一些实施例中,GC可以通过工程主页进入支付支出通知。75A-B illustrate payment notifications transmitted during a payment payment task 264. The notifications of Figures 75A-B can be communicated in real time to all drawout parties and can include a statement that planned drawdowns for a specific date for the project have been paid. In some embodiments, GCs can access payment disbursement notifications through the project home page.

除了通知GC支出的支付或者代替通知GC支出的支付,CPMS 10可通过使用支取支付收到屏通知收到为支取的支付的分包商或材料供应商,如图75D所示。In addition to, or instead of, notifying the GC of payment for a GC disbursement, the CPMS 10 may notify subcontractors or material suppliers who received payment for debit by using the Withdrawal Payment Received screen, as shown in Figure 75D.

图76示例说明能包括在管理系统环境过程102中的维护系统屏任务276。能由每一用户或每一组织使用维护系统屏任务276以便根据特定需要定制软件环境。例如,组织能定制用于他们的工程的阶段代码。维护系统屏任务276能由任何参与方,使用系统环境管理器52来执行。维护系统环境任务276能包括维护阶段代码任务278、管理员用户登录任务280、添加/编辑参数选用表单任务282、添加/编辑组织角色任务284、默认设置任务286、编辑通知任务288、默认配置任务290和添加/编辑用户角色任务292。FIG. 76 illustrates a Maintain System screen task 276 that can be included in the Manage System Environment process 102. The Maintain System screen task 276 can be used by each user or each organization to customize the software environment to specific needs. For example, organizations can customize phase codes for their projects. The maintain system screen task 276 can be performed by any party using the system environment manager 52 . Maintain system environment task 276 can include maintenance stage code task 278, administrator user login task 280, add/edit parameter selection form task 282, add/edit organization role task 284, default setting task 286, edit notification task 288, default configuration task 290 and Add/Edit User Role Task 292.

图77示例说明能与维护阶段代码任务278有关的维护阶段代码。每一参与方能通过系统环境管理器52,访问维护阶段代码。参与方能添加新的或删除被选预算项。FIG. 77 illustrates maintenance phase codes that can be associated with maintenance phase code tasks 278. Each participant can access the maintenance phase code through the system environment manager 52 . Participants can add new or delete selected budget items.

图78示例说明能与管理员用户登录任务280有关的管理用户登录屏。每一参与方能通过系统环境管理器52来访问管理员用户登录屏。组织的用户能输入用户名和使用该屏登录到系统上作为系统中的任一用户。FIG. 78 illustrates an administrative user login screen that can be associated with an administrator user login task 280. Each participant can access the administrator user login screen through the system environment manager 52 . Users of the organization can enter a user name and use this screen to log on to the system as any user in the system.

图79示例说明能与添加/编辑参数选用表任务282有关的添加/编辑参数选用表表单。CPMS 10的管理员能添加新的或删除被选参数选用表表目(例如状态列表、工程类型等等),用于由CPMS 10提供的各种下拉菜单。FIG. 79 illustrates an Add/Edit Pickles form that can be associated with the Add/Edit Pickles task 282. The CPMS 10 administrator can add new or delete selected pickle items (eg, status list, project type, etc.) for the various drop-down menus provided by CPMS 10.

图80示例说明能与添加/编辑组织角色任务284有关的添加/编辑组织角色表单。GC能通过系统环境管理器52,访问添加/编辑组织角色表单。GC能选择用于每一类型组织的安全许可(例如银行、产权保险公司、GC、分包商或建筑师)。FIG. 80 illustrates an Add/Edit Organization Role form that can be associated with the Add/Edit Organization Role task 284. The GC can access the Add/Edit Organizational Roles form through the System Environment Manager 52 . GCs can choose security clearances for each type of organization (eg bank, title insurance company, GC, subcontractor, or architect).

图81示例说明能与默认设置任务286有关的默认/配置设置表单。GC能通过系统环境管理器52访问默认/配置设置表单。GC能输入其优选设定值,诸如支取关闭提醒天数、支取开始提醒天数、支取请求最小超前时间、安全标识、监理是否将经ACH系统支付、是否等待所有留置权放弃,以及谁支付监理(例如银行、产权保险公司、业主、业主的代表或GC)。FIG. 81 illustrates a default/configuration setup form that can be associated with the default setup task 286. The GC can access the default/configuration settings form through the system environment manager 52 . The GC can enter its preferred settings, such as withdrawal close reminder days, withdrawal start reminder days, minimum lead time for withdrawal requests, security flags, whether the supervisor will pay through the ACH system, whether to wait for all liens to be waived, and who will pay the supervisor (e.g. bank, title insurance company, owner, owner's representative or GC).

图82示例说明能与编辑通知任务288有关的编辑通知表单。GC能通过系统环境管理器52访问编辑通知表单。GC能修改在各个过程期间传送的通知。根据需要,GC能选择特定通知和编辑默认通知。GC还能指定特定授权是否必要,诸如由银行授权来改变通知。FIG. 82 illustrates an edit notification form that can be associated with the edit notification task 288. The GC can access the edit notification form through the system environment manager 52 . The GC can modify the notifications sent during various processes. GC can select specific notifications and edit default notifications as needed. The GC can also specify whether certain authorizations are necessary, such as authorization by the bank to change notifications.

图83示例说明能与默认配置任务290有关的默认/配置过程表单。GC、业主、业主的代表、贷方等等能通过系统环境管理器52访问默认/配置过程表单,以便定制施工支付过程部分或改变用于施工支付过程部分的原则。例如,GC能定义和存储其自己的阶段代码。GC、业主、业主的代表、贷方等等能选择是否启动每一过程中的特定任务以及能访问编辑与任务有关的通知的每一个的链接。FIG. 83 illustrates a default/configuration process form that can be associated with the default configuration task 290. GCs, owners, owners' representatives, lenders, etc. can access default/configured process forms through the system environment manager 52 in order to customize or change the principles used for parts of the construction payment process. For example, the GC can define and store its own phase codes. The GC, owner, owner's representative, lender, etc. can choose whether to initiate specific tasks in each process and can access links for each to edit notifications related to the task.

图84示例说明能与添加/编辑用户角色任务292有关的添加/编辑用户角色表单。GC能通过系统环境管理器52访问添加/编辑用户角色表单。GC能选择角色用于特定用户,诸如系统管理员、系统帮助用户、本地管理员、常规用户以及仅查看访问。GC能添加新角色或删除被选角色。FIG. 84 illustrates an Add/Edit User Role form that can be associated with the Add/Edit User Role task 292. The GC can access the Add/Edit User Role form through the System Environment Manager 52. GC can select roles for specific users, such as system administrator, system help user, local administrator, regular user, and view-only access. GC can add new roles or remove selected roles.

图85示例说明能包括在管理支取过程96中的执行检查任务294。执行检查任务294能用来在每一支取前,计划和便于施工工程的检查,如果必要的话。执行检查任务294能由GC和监理使用支取模块94的检查模块58执行。执行检查任务294能包括检查所需任务296、检查所需表单任务298、准备实施检查任务300、查看先前检查任务302、输入检查任务304、输入检查报告任务306、检查报告表单任务308,以及检查报告失败任务310。FIG. 85 illustrates an Execution Check task 294 that can be included in the Manage Drawout process 96. Execute inspection tasks 294 can be used to plan and facilitate inspections of construction work, if necessary, prior to each withdrawal. Perform check task 294 can be performed by check module 58 of GC and supervisor usage drawout module 94 . Perform inspection tasks 294 can include inspection required tasks 296, inspection required forms tasks 298, prepare to perform inspection tasks 300, review previous inspection tasks 302, enter inspection tasks 304, enter inspection report tasks 306, inspection report form tasks 308, and inspect Report failed task 310.

图86示例说明能在准备实施检查通知任务300期间传送的准备实施检查通知。图86的通知能包括已经在某一日期,对一工程计划支取以及要求监理对该支取准备实施检查的声明。通知能声明检查应当仅在接收确认后实施。FIG. 86 illustrates a ready to conduct inspection notification that can be transmitted during the ready to conduct inspection notification task 300 . The notice of Figure 86 can include a statement that a project plan has been drawn on a certain date and that the supervisor is required to conduct an inspection of the readiness for the draw. The notification can state that inspections should only be performed after confirmation of receipt.

图87示例说明能在检查所需通知任务296期间传送的检查所需通知。图87的通知能包括计划支取为未决工程以及指定对该支取是否需要检查的链接的声明。FIG. 87 illustrates inspection required notifications that can be transmitted during the inspection required notifications task 296. The notification of FIG. 87 can include a statement that the planned withdrawal is pending work and a link specifying whether the withdrawal requires review.

图88示例说明能与检查所需任务298有关的所需检查屏。GC(或业主、业主的代表、贷方或产权保险公司)能通过支取模块44的检查模块58来访问所需检查屏。所需检查屏能包括工程名、工程数、支取数、业主名、支取日期、工程地址、以及参与方列表。参与方列表能包括请求金额、组织名称、组织角色、预算项、预算金额、支付金额、扣款以及余额。所需检查屏也能包括一般注释、监理的注释以及是否应当计划检查。Figure 88 illustrates a required inspection screen that can be associated with the inspection required task 298. The GC (or the owner, owner's representative, lender or title insurance company) can access the required inspection screens through the inspection module 58 of the drawout module 44 . Required check screens can include project name, project number, withdrawal number, owner name, withdrawal date, project address, and a list of parties involved. The party list can include request amount, organization name, organization role, budget item, budget amount, payment amount, chargeback, and balance. Required inspection screens can also include general comments, supervisor's comments, and whether inspections should be scheduled.

图89示例说明能在输入检查任务304期间传送的输入检查报告通知。图89的通知能包括已经授权对工程的按日期的支取时间表,以及接收方应当继续进行检查。通知能包括查看工程的明细的链接以及生成检查表。FIG. 89 illustrates an input inspection report notification that can be transmitted during an input inspection task 304. The notification of Figure 89 can include a date-by-date drawdown schedule for the work that has been authorized and that the recipient should proceed with inspections. Notifications can include links to view project details and generate checklists.

图90示例说明能与输入检查报告任务306有关的输入检查报告表单。监理能在检查报告表单上输入检查的明细。检查报告表单能包括工程项、工程号、支取号、支取日期、业主名称、工程地址、检查日期和一般检查注释。FIG. 90 illustrates an input check report form that can be associated with the input check report task 306 . Supervisors can enter inspection details on the inspection report form. The inspection report form can include project item, project number, withdrawal number, withdrawal date, owner name, project address, inspection date and general inspection notes.

图91示例说明能与检查报告表单任务308有关的检查报告表单屏。GC、业主、业主的代表、产权保险公司或监理能通过支取模块44的检查模块58来访问检查报告表单屏。FIG. 91 illustrates an inspection report form screen that can be associated with the inspection report form task 308. The inspection report form screen can be accessed through the inspection module 58 of the withdrawal module 44 by the GC, the owner, the owner's representative, the title insurance company, or the superintendent.

图92示例说明能在检查报告失败任务310期间传送的检查报告失败通知。图92的通知能包括在特定日期实施的检查后,存在对于该工程的高关注等级。通知能包括访问检查报告表单的链接。FIG. 92 illustrates inspection report failure notifications that can be communicated during the inspection report failure task 310 . The notification of Figure 92 can include that there is a high level of concern for the project following inspections performed on a particular date. The notification can include a link to access the inspection report form.

图93示例说明能与查看先前检查任务302有关的查看先前检查屏。GC、业主、业主的代表、产权保险公司或监理能通过支取模块44的检查模块58来访问查看先前检查屏,以及能选择在特定日期执行的检查。FIG. 93 illustrates the view previous exams screen that can be associated with the view previous exams task 302 . The GC, owner, owner's representative, title insurer, or supervisor can access a previous inspections screen through the inspection module 58 of the withdrawal module 44 and can select inspections to be performed on specific dates.

图94示例说明能包括在管理支取过程96中的核准支取请求过程312。能使用核准支取请求过程312来确认执行必要的检查,以核准施工支付过程中的每一支取,以及发出留置权放弃。使用支取模块44的支取核准模块60,能由GC和/或GC线上的任何参与方(诸如业主、业主的代表、产权保险公司、建筑师等等)执行核准支取请求过程312。只要已经启动工程,CPMS 10能用来核准与施工过程有关的任何类型的支付。CPMS 10能提供并行核准(例如GC和业主必须核准支取)或串行核准(例如建筑师必须核准该支取,然后是业主,然后是贷方)。CPMS 10能用来配置用于每一工程的核准过程。CPMS 10能用来核准用于预算的更改订单或双方间约定的特定金额。例如,能使用CPMS 10来从GC和/或任何GC的线上的参与方获得用于超出某一金额的更改订单的核准或核准超出该限制后的所有更改订单。核准支取请求过程312能包括授权支取请求一任务314、授权支取请求一-拒绝任务316、检查确认任务318、检查授权任务320、支付细目修改任务322、授权支取请求二-通知任务324、授权支取请求二任务326、授权支取请求二拒绝任务328、授权支取请求二核准任务330以及发出留置权放弃任务332。FIG. 94 illustrates an Approved Withdrawal Request process 312 that can be included in the Manage Withdrawal process 96. The Approve Drawout Request process 312 can be used to confirm that the necessary checks are performed to authorize each drawdown in the construction payment process and to issue a lien release. Using the drawout approval module 60 of the drawout module 44, the approve drawout request process 312 can be performed by the GC and/or any party on the GC line, such as the owner, owner's representative, title insurance company, architect, etc. CPMS 10 can be used to authorize any type of payment related to the construction process as long as work has been initiated. CPMS 10 can provide parallel approval (eg the GC and owner must approve the draw down) or serial approval (eg the architect must approve the draw down, then the owner, then the lender). CPMS 10 can be used to configure the approval process for each project. CPMS 10 can be used to approve change orders for budgeting or specific amounts agreed between parties. For example, the CPMS 10 can be used to obtain approval from the GC and/or any of the GC's on-line participants for change orders above a certain amount or approval of all change orders above that limit. Approval withdrawal request process 312 can include authorization withdrawal request one task 314, authorization withdrawal request one-rejection task 316, check and confirmation task 318, check authorization task 320, payment details modification task 322, authorization withdrawal request two-notification task 324, authorization withdrawal Request Two Task 326 , Authorize Withdrawal Request Two Reject Task 328 , Authorize Withdrawal Request Two Approve Task 330 , and Issue Lien Waiver Task 332 .

图95示例说明能与授权支取请求一任务314有关的授权支取请求一表单或授权誓词表单。GC、业主、业主的代表或产权保险公司能通过支取模块44,访问授权支取请求一表单。授权支取请求一表单能包括工程名、工程数、业主、工程地址、支取号以及支取日期。授权支取请求一表单能包括用于每一组织的任何输入,包括请求金额、组织名、组织任务、预算项、预算金额、支付金额、扣款以及余额。授权支取请求一表单能包括能接收的授权,未解决的授权、是否要求检查、输入授权密码的能力以及拒绝授权和指明原因的能力。FIG. 95 illustrates an Authorization Withdrawal Request-Form or Authorization Affidavit Form that can be associated with the Authorization Withdrawal Request-Task 314. Through the withdrawal module 44, the GC, the owner, the owner's representative, or the title insurance company can access an authorized withdrawal request form. The authorized withdrawal request form can include project name, project number, owner, project address, withdrawal number and withdrawal date. Authorized Withdrawal Requests—a form can include any input for each organization, including request amount, organization name, organization task, budget item, budget amount, payment amount, debit, and balance. Authorization Withdrawal Request - A form can include authorizations that can be received, authorizations that are outstanding, whether a check is required, the ability to enter an authorization password, and the ability to deny an authorization and specify the reason.

图96示例说明能在授权支取请求一-拒绝任务316期间传送的授权第一支取拒绝通知。图96的通知能包括已经拒绝授权用于工程的支取以及查看和/或修改支取细目的链接的声明。FIG. 96 illustrates an Authorized First Withdrawal Denied notification that can be transmitted during the Authorized Withdrawal Request One-Rejected task 316. The notification of FIG. 96 can include a statement that authorization for withdrawal for the project has been denied and a link to view and/or modify the withdrawal details.

图97示例说明能在检查确认任务318期间传送的检查确认通知。图97的通知能包括已经授权为工程计划的支取以及继续进入现场检查的指令,以及查看工程的明细以及生成检查表的链接的声明。FIG. 97 illustrates check confirmation notifications that can be sent during a check confirmation task 318. The notification of Figure 97 can include instructions to have authorized withdrawal of the project plan and proceed to site inspection, as well as a statement to view project details and a link to generate a checklist.

图98示例说明能在支付明细修改任务322期间传送的支付明细修改通知。图98的通知能包括还未接收用于支取的工程的支付明细。通知能列出工程参与的列表细目以及该支付的应付款、组织角色、预算项和支付金额。FIG. 98 illustrates a payment detail modification notification that can be transmitted during the payment detail modification task 322. The notification of Figure 98 can include payment details for projects not yet received for payout. Notifications can list the breakdown of project participation along with the payables, organizational roles, budget items and payment amounts for that payment.

图99示例说明在检查授权任务320期间传送的检查授权通知。图99的通知能包括已经授权用于工程的现场检查的声明。FIG. 99 illustrates the inspection authorization notification communicated during the inspection authorization task 320. The notice of Figure 99 can include a statement that an on-site inspection of the works has been authorized.

图100示例说明能在授权支取请求二-通知任务324期间传送的授权支取请求二通知。图100的通知能包括要求接收方对为工程所输入的检查报告进行核查,在支取能进入下一阶段前,要求接收方的授权(例如询问支取接收方有关留置权放弃)以及查看检查报告以及准许或否决该支取的授权的声明。Diagram 100 illustrates an Authorized Withdrawal Request Two Notification that can be transmitted during the Authorized Withdrawal Request Two - Notify task 324 . The notification of Figure 100 can include requesting the recipient to review the inspection report entered for the project, requesting the recipient's authorization before the withdrawal can proceed to the next stage (e.g., asking the withdrawal recipient about a lien waiver) and reviewing the inspection report and A statement of authorization to grant or deny the withdrawal.

图101示例说明能与授权支取请求二任务326有关的授权支取请求二表单。GC、业主、业主的代表或产权保险公司能通过支取模块44的支取核准模块60,访问授权支取请求二表单。授权支取请求二表单能包括工程名、工程号、业主、工程地址、支取号以及支取日期。授权支取请求二表单能包括用于每一组织的项,包括请求金额、组织名称、组织角色、预算项、预算金额、支付金额、扣款以及余额。授权支取请求二表单能包括所接收的授权、未解决的、是否要求检查、输入授权密码的能力以及拒绝授权和表明原因的能力。Figure 101 illustrates an Authorized Withdrawal Request Two form that can be associated with the Authorized Withdrawal Request Two task 326. The Authorized Withdrawal Request II form can be accessed by the GC, the owner, the owner's representative, or the title insurance company through the Withdrawal Approval module 60 of the Withdrawal module 44 . The second form of authorized withdrawal request can include project name, project number, owner, project address, withdrawal number and withdrawal date. The authorized withdrawal request two form can include items for each organization, including request amount, organization name, organization role, budget item, budget amount, payment amount, debit, and balance. The Authorization Withdrawal Request Two Form can include authorizations received, outstanding, whether a check is required, the ability to enter an authorization password, and the ability to deny an authorization and indicate a reason.

图102示例说明能在授权支取请求二拒绝任务328期间传送的授权支取请求二拒绝通知。图102的通知能包括已经由参与方拒绝授权为工程计划的支取以及在没有该授权的情况下,支取不能进行的声明。Figure 102 illustrates an Authorized Withdrawal Request Two Deny notification that can be transmitted during the Authorized Withdrawal Request Two Denied task 328. The notification of FIG. 102 can include a statement that authorization for withdrawal of the project has been denied by the participating party and that withdrawal cannot proceed without such authorization.

图103示例说明在授权支取请求二任务330期间传送的授权支取请求二准许通知。图103的通知能包括已经由参与方授权工程支取的声明。FIG. 103 illustrates an Authorized Withdrawal Request Two Grant Notification transmitted during the Authorized Withdrawal Request Two task 330 . The notification of Figure 103 can include a statement that project withdrawal has been authorized by the party.

图104示例说明在发出留置权放弃任务332期间传送的发出留置权放弃通知。图104的通知能包括已经由参与方授权工程计划的支取以及请求接收方发出留置权放弃以便接收支取付款,以及允许接收方发出留置权放弃的链接的声明。Figure 104 illustrates the Issue Lien Waiver notification communicated during the Issue Lien Waiver task 332 . The notification of FIG. 104 can include a statement that withdrawal of the project has been authorized by the party and a request to the recipient to issue a lien waiver in order to receive payment for the withdrawal, as well as a link allowing the recipient to issue a lien waiver.

图105示例说明能包括在管理更改订单工程98中的更改请求过程334。更改请求过程334能用来通过添加新支出项、分离支出项、通过改变现有支出项或通过终止分包商或使剩余资金用于其他参与方,来修改整个工程预算(通常扩大预算)。能由GC、建筑师、业主、业主的代表、贷方或分包商,使用更改订单模块48来执行更改请求过程334。更改请求过程334能包括改变请求任务336、改变请求发出任务338以及授权改变请求任务340。FIG. 105 illustrates a change request process 334 that can be included in manage change order engineering 98 . The change request process 334 can be used to modify the overall project budget (generally expanding the budget) by adding new expense lines, separating expense lines, by changing existing expense lines, or by terminating subcontractors or making remaining funds available to other parties. The change request process 334 can be performed using the change order module 48 by the GC, architect, owner, owner's representative, lender, or subcontractor. Change request process 334 can include change request task 336 , change request issue task 338 , and authorize change request task 340 .

图106示例说明能与更改请求任务336有关的更改请求表单。GC或分包商能通过更改订单模块48,访问更改请求表单。更改请求表单能包括工程名、工程号、工程地址、业主名以及更改金额清单。更改金额清单可包括更改金额、组织名、组织任务、预算项、预算金额、支付金额和余额。更改请求表单能包括更改描述字段。更改请求表单能包括支付表单是贷款还是业主付款,支付方法是贷款、业主支票还是信用卡。更改请求表单能包括当前估计完成日期和新的估计完成日期。Figure 106 illustrates a change request form that can be associated with a change request task 336. The GC or subcontractor can access the change request form through the change order module 48 . The change request form can include project name, project number, project address, owner name, and a list of change amounts. The change amount list may include change amount, organization name, organization task, budget item, budget amount, payment amount, and balance. A change request form can include a change description field. A change request form can include whether the payment form is a loan or owner payment, and whether the payment method is loan, owner's check, or credit card. A change request form can include the current estimated completion date and a new estimated completion date.

图107示例说明能在更改请求发出任务338期间传送的更改请求发出通知。图107的通知能包括能在工程上发出以及为未决授权的更改请求的声明。通知能包括更改请求的明细、组织名、预算项、当前预算金额和更改金额。FIG. 107 illustrates a change request issue notification that can be communicated during a change request issue task 338 . The notification of FIG. 107 can include a statement that can be issued on engineering as well as pending authorized change requests. Notifications can include details of the change request, organization name, budget line, current budget amount, and change amount.

图108示例说明能在授权更改请求任务340期间传送的授权更改请求通知。图108的通知能包括已经在工程上发出更改请求以及对该更改请求要求接收方核准的声明。该通知能包括查看更改请求的明细的链接,以及核准或拒绝更改请求。FIG. 108 illustrates an authorization change request notification that can be transmitted during an authorization change request task 340 . The notification of FIG. 108 can include a statement that a change request has been engineering made and that the recipient's approval is required for the change request. The notification can include links to view the details of the change request, and to approve or deny the change request.

图109示例说明能包括在管理更改订单过程98中的过程更改请求过程342。过程更改请求过程342能用来确定由适当的参与方,诸如建筑师、贷方、产权保险公司、业主、业主的代表或GC,授权对该预算所做的更改。使用更改订单模块48,由GC、建筑师、贷方、产权保险公司、业主、业主的代表、贷方或分包商执行过程更改请求过程342。过程更改请求过程342能包括查看未决更改请求任务344、授权更改请求任务346、更改请求拒绝任务348和更改请求核准任务350。FIG. 109 illustrates a process change request process 342 that can be included in the manage change order process 98. The process change request process 342 can be used to determine that changes to the budget are authorized by the appropriate parties, such as architects, lenders, title insurers, owners, owners' representatives, or GC. Using the change order module 48, a process change request process 342 is performed by the GC, architect, lender, title insurance company, owner, owner's representative, lender, or subcontractor. Process Change Request Process 342 can include View Pending Change Requests task 344 , Authorize Change Requests task 346 , Change Request Rejection task 348 , and Change Request Approval task 350 .

图110示例说明能与查看未决更改请求任务344有关的查看未决更改请求屏。GC、分包商、业主、业主的代表、贷方或建筑师能通过更改订单模块48,访问查看未决更改请求屏。查看未决更改请求屏能包括工程名、工程号、工程地址、业主名和更改金额清单。更改金额清单能包括更改金额、组织名、组织角色、预算项、预算金额、支付金额和余额。查看未决更改请求屏能包括改变描述字段。查看未决更改请求屏能包括支付方法是贷款、业主支票还是信用卡。查看未决更改请求屏能包括新估计的完成日期、所接收的授权以及未决授权FIG. 110 illustrates a View Pending Change Requests screen that can be associated with the View Pending Change Requests task 344 . The View Pending Change Requests screen can be accessed by the GC, subcontractor, owner, owner's representative, lender or architect through the change order module 48 . The View Pending Change Requests screen can include a list of project name, project number, project address, owner name and change amount. The change amount list can include change amount, organization name, organization role, budget item, budget amount, payment amount, and balance. The View Pending Change Requests screen can include a change description field. The View Pending Change Requests screen can include whether the method of payment is a loan, owner's check, or credit card. The View Pending Change Requests screen can include new estimated completion dates, authorizations received, and pending authorizations

图111示例说明能与授权更改请求任务346有关的授权更改请求表单。GC、分包商、业主、业主的代表、贷方或建筑师能通过更改订单模块48来访问授权更改请求表单。授权更改请求表单能包括工程名、工程号、工程地址、业主名和更改金额清单。更改金额清单能包括更改金额、组织名、组织角色、预算项、预算金额、支付金额和余额。授权未决更改请求屏能包括改变描述字段。授权未决更改请求表单能包括支付方法是贷款、业主支票还是信用卡。授权未决更改请求表单能包括新估计的完成日期、所接收的授权以及未决授权。权未决更改请求表单能包括输入密码和授权更改请求的能力以及拒绝更改请求和输入拒绝原因的能力。Figure 111 illustrates an authorization change request form that can be associated with the authorization change request task 346. The GC, subcontractor, owner, owner's representative, lender, or architect can access the authorized change request form through the change order module 48 . The authorized change request form can include a list of project name, project number, project address, owner name and change amount. The change amount list can include change amount, organization name, organization role, budget item, budget amount, payment amount, and balance. The Authorization Pending Change Request screen can include a change description field. The Authorization Pending Change Request form can include whether the method of payment is a loan, owner's check, or credit card. The Authorization Pending Change Request form can include new estimated completion dates, authorizations received, and pending authorizations. The Pending Change Request form can include the ability to enter a password and authorize a change request and the ability to reject a change request and enter a reason for the rejection.

图112示例说明能在更改请求拒绝任务348期间传送的更改请求拒绝通知。图112的通知能包括已经由参与方拒绝为工程,在某一日期发出的更改请求的声明。Figure 112 illustrates a change request rejection notification that can be transmitted during the change request rejection task 348. The notification of FIG. 112 can include a statement that a change request for a project has been rejected by a party by a certain date.

图113示例说明能在更改请求核准任务350期间传送的更改请求核准通知。图113的通知能包括已经由参与方(例如领导)核准用于工程的在某一日期发出的更改请求。仅使用更改请求来通过添加新支出项、通过修改现有的支出项,或通过终止分包商或使剩余资金用于其他参与方,修改整个工程预算(通常扩大预算)。能使用CPMS 10来确定由适当的参与方,诸如建筑师、贷方、产权保险公司、业主、业主代表或GC,授权对该预算所做的更改。当适当的参与方已经核准更改请求时,传送图113的通知。FIG. 113 illustrates a change request approval notification that can be transmitted during the change request approval task 350 . The notification of FIG. 113 can include a change request issued on a certain date that has been approved for engineering by a party involved (eg, leadership). Change requests are used only to modify the overall project budget (often expanding the budget) by adding new expense lines, by modifying existing expense lines, or by terminating subcontractors or making remaining funds available to other parties. The CPMS 10 can be used to determine that changes to the budget are authorized by the appropriate parties, such as the architect, lender, title insurer, owner, owner's representative, or GC. The notification of Figure 113 is transmitted when the change request has been approved by the appropriate parties.

图114示例说明能包括在管理更改订单过程98中的更改工程参与方过程352。例如,能使用更改工程参与方过程352来终止一个分包商并使剩余资金可用于另一参与方(诸如替代分包商)。更改工程参与方过程352能由GC或分包商使用更改订单模块48来执行。更改工程参与方过程352能包括更改参与任务354、核对参与方删除任务356和更改誓言书任务358。FIG. 114 illustrates a change engineering party process 352 that can be included in the manage change order process 98. For example, the change engineering party process 352 can be used to terminate a subcontractor and make remaining funds available to another party (such as a replacement subcontractor). The change engineering party process 352 can be performed by a GC or a subcontractor using the change order module 48 . Change engineering party process 352 can include change party task 354 , check party deletion task 356 , and change affidavit task 358 .

图115示例说明能与更改参与方任务354有关的更改参与方屏。GC或分包商能通过更改订单模块48来访问更改参与方屏。更改参与方屏能包括工程名、工程号、业主名、工程地址和工程的当前状态。更改参与方屏能包括能修改的组织的列表。组织列表能包括组织名、组织角色、预算项、预算金额、支付金额、扣款、余额和删除每一参与方的链接。FIG. 115 illustrates a change party screen that can be related to the change party task 354 . A GC or subcontractor can access the change party screen through the change order module 48 . The change participant screen can include project name, project number, owner name, project address and current status of the project. The Change Party screen can include a list of organizations that can be modified. The organization list can include organization name, organization role, budget item, budget amount, payment amount, chargeback, balance and a link to delete each party.

图116示例说明能与核对参与方删除任务356有关的核对参与方删除屏。GC或分包商能通过更改订单模块48来访问核对参与方删除屏。核对参与方删除屏能包括工程名、工程号、业主名、工程地址,以及有关将删除的参与方的信息(例如组织名、组织角色、预算项、预算金额、支付金额、扣款和余额)。核对参与方删除屏能包括能力来指明参与方是否已经实质上参与该工程。FIG. 116 illustrates a checkout party deletion screen that can be associated with a checkout party deletion task 356 . The GC or subcontractor can access the reconciliation party deletion screen through the change order module 48. Check party deletion screen can include project name, project number, owner name, project address, and information about the party to be deleted (e.g. organization name, organization role, budget item, budget amount, payment amount, deduction, and balance) . The checkout party deletion screen can include the ability to indicate whether a party has substantially participated in the project.

图117示例说明能与更改誓言书任务358有关的更改誓言书屏。GC或分包商能通过更改订单模块48来访问更改誓言书屏。更改誓言书屏能包括工程名、工程号、业主名、工程地址、工程的当前状态、预算金额、先前到期支付的金额和延期金额以及剩余预算。更改誓言书屏能包括输入注释的字段和输入密码的能力以及授权誓言书修改。Figure 117 illustrates the Change Affidavits screen that can be associated with the Change Affidavits task 358. The GC or subcontractor can access the change affidavit screen through the change order module 48. The change oath screen can include the project name, project number, owner name, project address, current status of the project, budgeted amount, previously due and deferred amounts, and remaining budget. The Change Affidavit screen can include fields to enter notes and the ability to enter a password and authorize affidavit modification.

图118示例说明能包括在管理工程过程94中的维护工程屏任务360。维护工程屏任务360能用来编辑工程配置文件、联系人信息和清算工程。维护工程屏任务360能由GC、贷方、业主、或业主代表,使用工程模块28来执行。维护工程屏任务360能包括工程配置文件任务362、工程联系人信息任务364、工程信息任务366和关闭工程任务368。FIG. 118 illustrates maintenance engineering screen tasks 360 that can be included in the manage engineering process 94. The Maintain Project screen task 360 can be used to edit project configuration files, contact information and clear projects. Maintenance engineering screen tasks 360 can be performed by the GC, lender, owner, or owner's representative using the engineering module 28 . Maintain engineering screen tasks 360 can include an engineering configuration file task 362 , an engineering contact information task 364 , an engineering information task 366 , and a close engineering task 368 .

图119示例说明能与工程配置文件任务362有关的工程配置文件表单。GC、贷方、业主、业主的代表能通过工程模块28访问工程配置文件表单。GC、贷方、业主、业主的代表能输入请求信息,诸如工程信息、工程资金信息、工程业主信息、现场信息和GC信息。FIG. 119 illustrates a project profile form that can be associated with the project profile task 362. GCs, lenders, owners, owners' representatives can access the engineering configuration file form through the engineering module 28 . GC, lender, owner, owner's representative can enter request information such as project information, project funding information, project owner information, site information, and GC information.

图120示例说明能与工程联系人信息任务364有关的工程联系人信息屏。GC、贷方、业主、业主的代表能通过工程模块28来访问工程联系人信息。工程联系人信息屏能包括工程名、工程标识、工程地址和工程参与方的联系人信息列表。联系人信息的列表能包括参与方标识号、组织名称、组织角色、工程管理名、联系人电子邮件地址和联系人电话号码。Figure 120 illustrates an engineering contact information screen that can be associated with the engineering contact information task 364. GCs, lenders, owners, owners' representatives can access engineering contact information through the engineering module 28 . The project contact information screen can include project name, project identification, project address and contact information list of project participants. The list of contact information can include a party identification number, organization name, organization role, project management name, contact email address, and contact phone number.

图121示例说明能与创建工程信息任务366有关的工程信息屏。GC、贷方、业主、业主的代表能通过工程模块28访问工程信息屏。工程信息屏能包括工程信息、现场信息、工程业主信息和GC信息。FIG. 121 illustrates a project information screen that can be associated with the create project information task 366. GCs, lenders, owners, owners' representatives can access the engineering information screen through the engineering module 28 . The project information screen can include project information, site information, project owner information and GC information.

图122示例说明能与关闭工程任务368有关的关闭工程屏。GC、贷方、业主、业主的代表能通过工程模块28访问关闭工程屏。关闭工程屏能包括工程名、贷款帐号、业主名和关闭工程的能力。FIG. 122 illustrates a close engineering screen that can be associated with a close engineering task 368. GC, lender, owner, owner's representative can access the engineering module 28 to close the engineering screen. The close project screen can include project name, loan account number, owner name and the ability to close the project.

图123示例说明能包括在管理系统环境过程102中的管理访问屏任务370。通过在施工支付过程期间,能使用管理访问屏任务370来定制显示给特定用户或组织的各种屏。例如,管理访问屏任务370可用于包含在施工支付过程期间显示在屏上的一个或多个组织的商标或徽标(例如,贷方的商标能包括在每一屏幕的右上角)。另外,能使用管理访问屏任务370来根据特定用户或组织的喜好或需求来修改特定表单或屏幕的布局。能由任一参与方,使用系统环境管理器52,执行管理访问屏任务370。管理访问屏任务370能包括登录任务372、退出任务374、工程主页任务376、重设密码任务378、主屏任务380、浏览工程任务382、遗忘密码任务384和你的密码任务386。FIG. 123 illustrates an Administration Access Screen task 370 that can be included in the Manage System Environment process 102. The various screens displayed to specific users or organizations can be customized using the Manage Access Screens task 370 during the construction payment process. For example, the Manage Access Screen task 370 may be used to include one or more organization's logos or logos displayed on the screen during the construction payment process (eg, the lender's logo could be included in the upper right corner of each screen). Additionally, the Manage Access Screens task 370 can be used to modify the layout of a particular form or screen according to the preferences or needs of a particular user or organization. The manage access screen task 370 can be performed by any party, using the system environment manager 52 . Administrative access screen tasks 370 can include login tasks 372 , logout tasks 374 , engineering home tasks 376 , reset password tasks 378 , home screen tasks 380 , browse engineering tasks 382 , forgot password tasks 384 , and your password tasks 386 .

图124示例说明与登录任务372有关的登录屏。每一参与方能通过访问管理器38,访问登录屏。参与方能输入用户名和密码来登录。如果用户遗忘他或她的密码,登录屏能提供链接。FIG. 124 illustrates a login screen associated with a login task 372. Through the access manager 38, each party can access the login screen. Participants can enter a user name and password to log in. If the user forgets his or her password, the login screen can provide a link.

图125示例说明能与退出任务374有关的退出屏。每一参与方能通过访问管理器38,访问退出屏。退出屏能确认用户已经退出。Figure 125 illustrates an exit screen that can be associated with exiting a task 374. Through the access manager 38, each participant can access the exit screen. The logout screen confirms that the user has logged out.

图126示例说明能与工程主页任务376有关的工程主页屏。每一参与方能通过访问管理器38,访问工程主页屏。工程主页屏能包括工程名、新消息的数量以及读取新消息的链接。工程主页能包括工程概述信息(包括工程时间表进度条和资金支付进度条)、完成支取信息(包括支取数、支取日期和支取信息的链接)、未决支取信息(包括支取数和起始日期)。工程主页能包括几个动作的链接、表单或屏幕(包括工程配置文件、工程预算、查看工程参与方、设置发票码、管理工程用户、产权保险公司核准跟踪、初始化未计划支取等等)。FIG. 126 illustrates an Engineering Home screen that can be associated with the Engineering Home task 376. Each participant can access the project home screen through the access manager 38 . The project home screen can include the project name, the number of new messages, and a link to read new messages. The project home page can include project overview information (including project schedule progress bar and fund payment progress bar), completed withdrawal information (including withdrawal amount, withdrawal date and link to withdrawal information), pending withdrawal information (including withdrawal amount and start date ). The project home page can include links, forms or screens for several actions (including project configuration files, project budgets, view project participants, set invoice codes, manage project users, title insurance company approval tracking, initiate unplanned drawdowns, etc.).

图127示例说明能与重设密码任务378有关的重设密码屏。每一参与方能通过访问管理器38来访问重设密码屏。参与方可两次输入新密码以改变与特定用户名相关联的密码。FIG. 127 illustrates a reset password screen that can be associated with the reset password task 378. Each party can access the reset password screen through the access manager 38 . A participant may enter a new password twice to change the password associated with a particular username.

图128示例说明用于与主屏任务380有关的特定用户的主屏。每一参与方能通过访问管理器38来访问主屏。主屏能列出参与方涉及的工程,以及与每一工程有关的新消息的数量以及读取新消息的链接。FIG. 128 illustrates a home screen for a particular user related to home screen tasks 380 . Each participant can access the main screen through the access manager 38 . The main screen can list the projects involved by the party, as well as the number of new messages related to each project and the link to read the new messages.

图129示例说明能与浏览工程任务382有关的浏览工程屏。每一参与方能通过访问管理器38来访问浏览工程屏。浏览工程屏能包括工程搜索特征以及工程列表。工程列表能包括工程名、GC名、编辑工程的链接以及选择一个或多个工程来浏览的能力。FIG. 129 illustrates a browse engineering screen that can be associated with the browse engineering task 382. Each participant can access through the access manager 38 to browse project screens. The Browse Projects screen can include a project search feature as well as a project list. The project list can include the project name, GC name, a link to edit a project, and the ability to select one or more projects to browse.

图130示例说明能与遗忘密码任务384有关的遗忘密码屏。每一参与方能通过访问管理器38来访问遗忘密码屏。用户能输入他的或她的用户名和电子邮件地址,系统能将密码电邮给用户。Figure 130 illustrates a Forgot Password screen that can be associated with the Forgot Password task 384. Each participant can access the forgotten password screen through the access manager 38 . The user can enter his or her username and email address, and the system can email the password to the user.

图131示例说明能在你的密码任务386期间传送的你的密码。图131的通知能包括你请求将你的密码电邮给你、密码以及下次你登录时使用该密码的请求的声明。Figure 131 illustrates your password that can be transmitted during your password task 386. The notification of FIG. 131 can include a statement that you request that your password be emailed to you, the password, and a request to use that password the next time you log in.

图132示例说明能包括在管理系统环境过程102中的管理消息屏过程388。管理消息屏过程388能用来查看消息、创建消息或查看系统状态消息。管理消息屏过程388可由任何参与方使用系统环境管理器52来执行。管理消息屏过程388能包括查看消息任务390、查看特定消息任务392、创建消息任务394和状态消息任务396。FIG. 132 illustrates an Admin Message Screen process 388 that can be included in the Admin System Environment process 102. The Manage Messages screen process 388 can be used to view messages, create messages, or view system status messages. The manage message screen process 388 can be performed by any party using the system environment manager 52 . Manage message screen process 388 can include view message task 390 , view specific message task 392 , create message task 394 , and status message task 396 .

图133示例说明能与查看消息任务390有关的查看消息屏。每一参与方能通过系统环境管理器52来访问查看消息任务390。查看消息屏能包括用户名、指定所显示消息的类型的能力(例如未读、最近、所有、发送消息或归档),以及所指定的消息的类型的列表。消息的列表能包括选择特定消息的能力、消息日期、工程名、消息主题以及是否要求动作。查看消息屏也能提供归档被选消息和移动到消息的另一屏的能力。FIG. 133 illustrates a View Messages screen that can be associated with the View Messages task 390. Each participant can access the view message task 390 through the system environment manager 52 . The View Messages screen can include a user name, the ability to specify the type of message displayed (eg, unread, recent, all, sent message, or archived), and a list of the types of messages specified. The list of messages can include the ability to select a specific message, message date, project name, message subject, and whether action is required. The View Messages screen can also provide the ability to archive selected messages and move to another screen of messages.

图134示例说明能由用户查看的特定消息。特定消息能包括在此所示和所述的任一通知。Figure 134 illustrates specific messages that can be viewed by the user. Specific messages can include any of the notifications shown and described herein.

图135示例说明能与创建消息任务394有关的创建/发送消息屏。每一参与方能通过系统环境管理器52来访问创建/发送消息屏。用户能输入工程名、是否将消息发送到组织或用户、组织名、用户名、消息主题和消息。FIG. 135 illustrates the Create/Send Message screen that can be associated with the Create Message task 394. Each party can access the create/send message screen through the system context manager 52. User can input project name, whether to send message to organization or user, organization name, user name, message subject and message.

图136示例说明能与状态消息任务396有关的状态消息屏。每一参与方能通过系统环境管理器52来访问状态消息屏。状态消息屏能发送消息,诸如已经初始化用于工程的支取以及已经通知所有参与方的声明。状态消息屏能包括组织或用户主页的链接。Figure 136 illustrates a status message screen that can be associated with the status message task 396. Each participant can access the status message screen through the system context manager 52 . The status message screen can send messages, such as a statement that the withdrawal for the project has been initiated and that all parties involved have been notified. The status message screen can include links to organization or user home pages.

图137-153示例说明根据本发明的另外实施例的管理施工支付过程的方法。结合参考图1-136和图154-179所示和所述的本发明的实施例来使用图137-153的方法的各方面。137-153 illustrate a method of managing the construction payment process according to additional embodiments of the invention. Aspects of the method of Figures 137-153 are used in conjunction with embodiments of the invention shown and described with reference to Figures 1-136 and Figures 154-179.

图154-179是根据本发明的又一实施例的管理施工支付过程的方法的输入/输出图。结合参考图1-136和图137-153所示和所述的本发明的实施例来使用图154-179的方法的各方面。154-179 are input/output diagrams of a method of managing a construction payment process according to yet another embodiment of the present invention. Aspects of the method of Figures 154-179 are used in conjunction with the embodiments of the invention shown and described with reference to Figures 1-136 and Figures 137-153.

图155包括公开工程任务、创建支取时间表单任务和识别和指定工程角色任务,其中每个由GC来执行。输入预算任务能由业主、业主的代表、GC、贷方或产权保险公司执行。更新细目任务能由GC对分包商和/或材料供应商执行,或由业主、贷方或产权保险公司对任何类型的参与方执行。关闭工程任务能由产权保险公司、GC或贷方执行。Figure 155 includes a Disclose Engineering Task, a Create Drawout Time Sheet task, and an Identify and Assign Engineering Role task, each of which is performed by the GC. The task of entering a budget can be performed by the owner, the owner's representative, the GC, the lender, or the title insurance company. The update itemization task can be performed by the GC on subcontractors and/or material suppliers, or by the owner, lender or title insurer on any type of party involved. Closing tasks can be performed by the title insurance company, GC or lender.

图156包括进入工程明细任务,其中,系统假定,在公开工程前,工程已经具有来自所有必要机构和参与组织的完全许可。图156包括输入贷款明细,其中贷方可以选择仅输入用于法律和商业原因的信息。如果该工程不存在贷款,不输入信息。Figure 156 includes the Enter Project Details task, where the system assumes that the project already has full permissions from all necessary agencies and participating organizations prior to making the project public. Figure 156 includes entering loan details where the lender may choose to enter only information for legal and business reasons. If no loan exists for this project, enter no information.

图157包括评审建议的支取时间表单任务,其中,系统能通过在估计的工程时间表上,按同等间隔支取数来生成建议的支取时间表。图157包括接收或拒绝建议的支取时间表单任务,其中,GC能根据由业主、业主代表、贷方或GC建立的计划,人工地宣布支取。能拒绝自动计划并可手动地维护计划。Figure 157 includes the Review Proposed Drawout Schedule task, where the system can generate a proposed drawdown schedule by drawing numbers at equal intervals on the estimated project schedule. Figure 157 includes the Accept or Reject Proposed Withdrawal Schedule Task, where the GC can manually announce a drawdown according to a schedule established by the owner, owner's representative, lender, or GC. Ability to reject automatic schedules and maintain schedules manually.

图159包括用于参与组织的输入工程预算,其中,能使用分层过程。在每一级,参与组织能执行他们用来支持他们的组织的过程。Figure 159 includes input engineering budgets for participating organizations, where a tiered process can be used. At each level, participating organizations can implement the processes they use to support their organization.

图160包括授权更改订单任务,其中,问题解决(issue resolution)过程可以要求拒绝初始更改订单和创建所有方相互认可的第二更改订单。只有问题解决过程中的最终更改订单才必须核准。Diagram 160 includes authorizing a change order task, where an issue resolution process may require rejecting an initial change order and creating a second change order mutually acceptable to all parties. Only final change orders in the problem resolution process must be approved.

图162包括添加组织任务,在参与工程前,必须添加组织。系统、产权保险公司、贷方或GC能将组织添加到系统。尽管在识别和指定维护工程支付诸过程的工程角色任务期间能添加组织,但可以通该过程相独立地添加组织。图162包括输入组织明细任务,其中,组织的初始联系人能负责输入他们的组织的明细和另外的联系人信息。每一组织能识别可负责更新他们的组织明细和联系人信息的内部系统管理员。图162包括维护组织明细任务,其中,由于敏感的金融信息,安全性会特别严格。Figure 162 includes the task of adding an organization. Before participating in a project, an organization must be added. Organizations can be added to the system by the system, title insurance companies, lenders or GCs. Although organizations can be added during the Identify and Specify Engineering Role task for the Maintain Engineering Payments processes, organizations can be added independently through this process. Figure 162 includes the Enter Organization Details task, where an organization's initial contact can be responsible for entering their organization's details and additional contact information. Each organization can identify an internal system administrator who can be responsible for updating their organization details and contact information. Figure 162 includes maintenance organization detail tasks where security can be particularly stringent due to sensitive financial information.

图164包括基于参与方的需求,能由第三方提供的核查组织任务。系统能便于验证组织和收取服务费。Figure 164 includes verification organizational tasks that can be provided by third parties based on the needs of the participating parties. The system facilitates verification of organizations and collection of service fees.

图166包括能由GC执行的宣布支取任务。该支取是工程参与方能提交发票、业主(通常通过GC)能支付已完成的工作以及参与方接收付款并释放它们的相关留置权放弃的机构。图166包括生成誓词任务,其中,GC能在线评审提交(当需要时,参考备份纸张文件),并且只要提交正确,系统能根据已经由参与支取的对方电子提交的信息来生成誓词。GC能拒绝提交以及能修订它们并准许重新提交。该机构能用来解决与发票有关的任何问题。图166包括通常能由贷方或产权保险公司执行的请求检查任务。图166包括通常能由贷方执行的授权支取任务,但可以要求包含业主、业主的代表,或另一指定的工程参与方。可配置授权机构能将任何工程参与方包括在授权过程中。图166包括能要求完成支取的输入和分级留置权放弃。不将资金传送到开发票方,直到输入并分级它们的留置权放弃为止。该要求确保支付和留置权放弃释放基本上在同时执行。图166包括执行同时支付/留置权放弃释放任务,其中,用于支付的留置权放弃的基本上同时的交换是自动的。该自动化交换能消除会议的需求并能消除支付和留置权放弃释放的延时。该自动交换能通过消除支付过程中的中间组织,降低留置权放弃的丢失的机会,并能加速对所有支取参与方的付款。Figure 166 includes declare drawdown tasks that can be performed by the GC. The draw is the mechanism by which project participants can submit invoices, the owner (usually through the GC) can pay for work done, and the participants receive payment and release their associated lien waivers. Figure 166 includes the Generate Affidavit task, where the GC can review submissions online (referring to backup paper files when needed), and as long as the submission is correct, the system can generate an affidavit based on the information that has been electronically submitted by the counterparty participating in the withdrawal. The GC can reject commits as well as revise them and grant resubmissions. This facility can be used to resolve any issues related to invoices. Figure 166 includes request review tasks that can typically be performed by a lender or title insurance company. Figure 166 includes authorized drawdown tasks that can normally be performed by the lender, but may require the inclusion of the owner, the owner's representative, or another designated project participant. A configurable authorization authority can include any engineering party in the authorization process. Figure 166 includes inputs and graded lien waivers that can require a drawdown to be completed. Funds are not transferred to the invoicing party until their lien waiver is entered and graded. This requirement ensures that payment and lien release are performed substantially simultaneously. Figure 166 includes performing a Simultaneous Payment/Lien Waiver Release task, wherein the substantially simultaneous exchange of a lien waiver for payment is automatic. This automated exchange can eliminate the need for meetings and can eliminate delays in payment and lien release. This automatic exchange can reduce the chance of loss of lien waivers by eliminating intermediaries in the payment process and can speed up payment to all drawing participants.

图167包括能将电子消息基本上同时发送到所有参与的和/或有关组织的公告支取任务。Fig. 167 includes posting withdrawal tasks that can send electronic messages to all participating and/or related organizations substantially simultaneously.

图168包括能由希望通过支取过程支付的任何方执行的输入发票细目。电子提交跟随在支持提交的文书工作之后。能提供允许各方经扫描来提交支持信息的服务。Figure 168 includes input invoice details that can be performed by any party wishing to pay through the withdrawal process. Electronic filing follows the paperwork supporting the submission. A service can be provided that allows parties to submit supporting information via scanning.

图169包括授权发票任务,其中,疑难解决过程可以要求拒绝初始发票以及创建所有各方相互认可的第二发票。仅核准该解决过程中的最终发票。Figure 169 includes the Authorize Invoice task, where a troubleshooting process may require rejection of the initial invoice and creation of a second invoice that is mutually acceptable to all parties. Only final invoices in the resolution process are approved.

图170包括可以有与工程有关的一个以上监理的选择监理任务。在这种情况下,必须选择适当的监理来执行检查。Diagram 170 includes select supervision tasks that may have more than one supervision related to the project. In such cases, an appropriate supervisor must be selected to carry out the inspection.

图171包括检查任务的确认范围,其中,请求检查的组织能定义检查的范围,用于整个誓词或誓词子集。图171包括输入检查结果任务,其中,视检查的范围和属性而定,支持文档可能是必要的。图171包括转发支持文档任务,其中,系统能允许将与数字照片或其他电子材料有关的文件附加到电子检查报告。Figure 171 includes the scope of validation for inspection tasks, where the organization requesting the inspection can define the scope of the inspection, for the entire affidavit or a subset of the affidavit. Figure 171 includes the Enter Inspection Results task, where supporting documentation may be necessary depending on the scope and nature of the inspection. Figure 171 includes Forwarding Supporting Documentation tasks, wherein the system can allow documents related to digital photographs or other electronic materials to be attached to the electronic inspection report.

图173包括分级(stage)留置权放弃任务,其中,能在系统中分级电子签名的留置权放弃,防止任何更改。在本发明的一个实施例中,不将留置权放弃释放给产权保险公司,直到支付和留置权放弃的基本上同时交换。Figure 173 includes the Stage Lien Release task, where an electronically signed lien release can be staged in the system, preventing any alteration. In one embodiment of the invention, the lien release is not released to the title insurer until substantially simultaneous exchange of payment and lien release.

图174包括确认支取授权和分级留置权放弃任务,这可包含所有留置权放弃的评审以确保它们完整和正确。Figure 174 includes the Confirm Drawdown Authorization and Graded Lien Waiver tasks, which may include a review of all lien waivers to ensure they are complete and correct.

图178包括提供客户支持任务,这可包括支持添加或修改组织或工程、修复密码问题、修复工程和交易。图178包括系统管理任务,这可包括安全管理、金融审计和偶然性支持。图178包括用于系统参与方任务的维护活动性历史,能包括厂商历史,具有有关厂商和/或厂商的等级的历史。Figure 178 includes providing customer support tasks, which may include support for adding or modifying organizations or projects, fixing password issues, fixing projects and transactions. Figure 178 includes system management tasks, which may include security management, financial auditing, and contingency support. Map 178 includes maintenance activity history for system participant tasks, can include vendor history, has history pertaining to vendor and/or vendor's level.

在一些实施例中,CPMS 10能帮助用户(如总承包商)利用某些法定标准来跟踪与工程有关的参与方(如分包商)的合规性(compliance),如多种所需文件。这些法定标准可依照地点、业主、产权保险公司、总承包商或分包商而在不同各工程中有所差异。在一些实施例中,由于特定参与方的合规性和所欠参与方的支付之间的关系,CPMS 10可以跟踪参与方的所要求的文件(如法律文件),提供管理该文件的帮助,提供有关不完备的警告以及在一些个案中,在文件未准备好的情况下拒给支付。In some embodiments, CPMS 10 can help users (such as general contractors) track compliance (compliance) of project-related parties (such as subcontractors) with certain statutory standards, such as various required documents . These statutory standards may vary from project to project depending on location, owner, title insurer, general contractor or subcontractor. In some embodiments, the CPMS 10 may track a party's required documentation (e.g., legal documents) due to the relationship between a particular party's compliance and payments owed to the party, provide assistance in managing that document, Provide warnings about incompleteness and, in some cases, withhold payment if documents are not ready.

如图180所示,在一些实施例中,CPMS 10可包含文件跟踪模块400。文件跟踪模块400可指定和跟踪文件,例如从与工程相关的参与方(如分包商和/或分包商的分包商)接收到的合同、支付申请、誓词、保险文件、前留置权通知、留置权放弃等,并且可以提供警告并给出用于整个支付过程的强制合规性选项,直到并包括自动暂缓支付。文件可与特定工程、工程内特定预算支出项、特定参与方或组织相关联。应当理解,文件可包括纸质文件和电子文件。As shown in FIG. 180, in some embodiments, the CPMS 10 may include a file tracking module 400. The document tracking module 400 can specify and track documents such as contracts, requisitions for payment, affidavits, insurance documents, prior liens received from parties related to the project, such as subcontractors and/or subcontractors Notices, Lien Waivers, etc., and can provide warnings and give enforced compliance options for the entire payment process, up to and including an automatic withholding of payments. A document can be associated with a specific project, a specific budget item within a project, a specific party or organization. It should be understood that documents may include paper documents and electronic documents.

为了为工程定义、指定和跟踪文件,CPMS 10可通过文件跟踪模块400来支持定义一个或多个被跟踪的文件的数据实体。文件类型数据实体可以定义标准的文件类型和由CPMS 10跟踪的标准文件类型的特征。CPMS 10可使用文件类型数据实体来识别每一工程中被跟踪文件之间的标准区别,并且为每个文件类型的强制合规性识别警告和选项的性质。例如,每个文件类型数据实体可包含文件名和有效状态(如“未完成”、“未签名”、“已签名”、“未收到”、“已收到”、“现行(active)”、“过期”等)列表。虽然其他法律文件类型在不同情况下以及在不同法律管辖权下适用,但三种典型法律文件类型可包括带有有效状态“未完成”、“未签名”和“已签名”的协议;带有有效状态“未收到”和“已收到”的表单;以及带有“未收到”、“现行”和“过期”有效状态的证书。In order to define, specify and track files for a project, CPMS 10 may, through a file tracking module 400, support defining data entities of one or more tracked files. The file type data entity may define standard file types and characteristics of standard file types tracked by CPMS 10. CPMS 10 may use the file type data entity to identify standard differences between tracked files in each project, and to identify the nature of warnings and options for each file type to enforce compliance. For example, each file type data entity may contain a file name and a valid status (such as "incomplete", "unsigned", "signed", "not received", "received", "active", "expired", etc.) list. While other legal document types apply in different situations and in different legal jurisdictions, three typical legal document types can include agreements with valid statuses "incomplete," "unsigned," and "signed"; Forms with valid statuses "Not Received" and "Received"; and certificates with valid statuses "Not Received", "Current", and "Expired".

CPMS 10也可提供工程文件要求表,在此表上,工程管理者可以创建要求某特定工程各分包商提供的文件的列表。为便于说明,“分包商”用来指代传统上的分包商、分包商下的分包商和材料供应商。此外,在一些实施例中,法律文件跟踪功能可以应用在系统中和脱离系统的分包商和材料供应商。CPMS 10 can also provide a project document request form, on which the project manager can create a list of required documents from various subcontractors for a particular project. For ease of explanation, "subcontractor" is used to refer to traditional subcontractors, subcontractors under subcontractors, and material suppliers. Additionally, in some embodiments, legal document tracking functionality may apply to subcontractors and material suppliers both on and off the system.

工程文件要求表可识别工程标识符、法律文件类型和文件名称。文件名称可由工程管理者输入并可包括诸如“分包合同”、“保险证明”、“城市执照”等的值。为便于说明,“工程管理者”用来指代线上参与方(如总承包商、工程业主、产权保险公司等)或线下参与方(如分包商,该分包商为与其签订合同的各分包商定义文件要求)。The project document requirements form identifies the project identifier, legal document type, and document name. The file name can be entered by the project manager and can include values such as "Subcontract", "Certificate of Insurance", "City License", etc. For ease of explanation, "project manager" is used to refer to online participants (such as general contractors, project owners, title insurance companies, etc.) Each subcontractor defines the document requirements).

CPMS 10也可使用其他数据实体来跟踪每个分包商对工程文件要求的合规性的状态。例如,CPMS 10可使用包含有工程标识符、文件名称、分包商标识符、文件状态、文件标识符(如可选)和文件期满日(如可选)的分包商工程文件表。图181示出了与文件跟踪相关的数据实体的概念数据模型。The CPMS 10 may also use other data entities to track the status of each subcontractor's compliance with engineering document requirements. For example, CPMS 10 may use a subcontractor project document table that includes project identifier, document name, subcontractor identifier, document status, document identifier (if optional), and document expiration date (if optional). Figure 181 shows a conceptual data model of data entities related to file tracking.

在一些实施例中,系统10也可以允许工程管理者或分包商来建立新的文件类型来解决工程管理者或分包商、工程性质、或管辖区或参与方或工程所在国家的法律规定的特别需要。可选择地,系统可以向工程管理者或分包商提供屏幕显示或其他用来帮助用户创建新文件类型的机构。In some embodiments, the system 10 may also allow project managers or subcontractors to create new file types to address legal requirements of the project manager or subcontractor, the nature of the project, or the jurisdiction or participant or country where the project is located special needs. Optionally, the system may provide project managers or subcontractors with screen displays or other mechanisms to assist users in creating new document types.

在一些实施例中,系统10定义单一的文件类型,用于所有类型的具有单一的一组状态的文件,而不是定义特定的文件类型。单一个文件类型可指定一个或多个数据元素,如某个参与方(如分包商)要求的特定文件的文件标识符、文件日期、期满日等。在一些实施例中,每个数据元素都是可选的。如果工程管理者输入期满日,文件跟踪模块认为文件会在该期满日过期,并跟踪该过期的时间。每个根据单个文件类型定义的文件也同各状态(如“未收到”,“已收到”,“不可用”)相关。在一些实施例中,每个文件的默认状态可被指定为“未收到”。In some embodiments, rather than defining a specific file type, system 10 defines a single file type for all types of files with a single set of states. A single document type may specify one or more data elements, such as the document identifier, document date, expiration date, etc., of a particular document required by a party (such as a subcontractor). In some embodiments, each data element is optional. If the project manager enters an expiration date, the file tracking module considers that the file will expire on that expiration date, and tracks the expiration time. Each document defined in terms of a single document type is also associated with various states (eg "not received", "received", "unavailable"). In some embodiments, the default status of each file may be designated as "not received."

通过使用上述单一的文件类型,在工程管理者选择一个或多个需要从与特定施工工程相关的分包商获得的文件后,系统10可自动查阅文件状态,并可动态地确定文件处于现行状态还是过期状态。例如,如果文件有状态“未收到”或“不可用”,系统10可确定该文件既不处于现行状态,又没到期。同样地,带有“已收到”状态却没有期满日的文件被系统10认为处于现行状态。此外,带有“已收到”状态及期满目的文件,在系统或当前日期小于文件期满日时被系统10认为处于现行状态,并且在系统或当前日期大于文件期满日时被系统10认为处于过期状态。系统10可动态地评价文件是现行的还是过期的,当这样的信息对处理或显示必要时。By using the single document type described above, after the project manager selects one or more documents that need to be obtained from subcontractors related to a particular construction project, the system 10 can automatically check the status of the documents and can dynamically determine the status of the documents. Still expired. For example, if a file has a status of "not received" or "unavailable," system 10 may determine that the file is neither current nor expired. Likewise, documents with a status of "Received" but no expiration date are considered active by the system 10. Additionally, documents with a status of "Received" and an expiration date are considered active by the system 10 when the system or current date is less than the document expiration date, and are considered active by the system 10 when the system or current date is greater than the document expiration date. considered expired. The system 10 can dynamically evaluate whether a file is current or expired when such information is necessary for processing or display.

图182A示出了文件要求页450。工程管理者可使用文件要求页450来选择所需要的或需要从与特定施工工程相关的分包商获得的文件。工程管理者可从工程主页454的链接452进入文件选择页450,如图183所示。在一些实施例中,CPMS 10只允许工程管理者进入文件要求页450。FIG. 182A shows the file requirements page 450. The project manager can use the document requirements page 450 to select the documents that are required or obtained from subcontractors associated with a particular construction project. The project manager can enter the file selection page 450 from the link 452 of the project home page 454, as shown in FIG. 183 . In some embodiments, the CPMS 10 only allows project managers to access the document requirements page 450.

文件要求页450允许工程管理者建立用于某工程的所需法律文件的表。该表支持任意数量的行(从零到无穷)并可允许工程管理者添加文件、选择文件用于删除和/或选择文件用于编辑。在一些实施例中,包含在文件要求页450中的表显示文件类型列,所述列包括提供系统预定义文件类型的下拉菜单,以及文件名称列,所述列包括用于用户输入和/或编辑字母数字(alpha-numeric)字段。The Documentation Requirements page 450 allows the project manager to create a list of required legal documents for a project. The table supports any number of rows (from zero to infinity) and may allow a project manager to add files, select files for deletion and/or select files for editing. In some embodiments, the table contained in the file requirements page 450 displays a file type column, which includes a drop-down menu providing system-predefined file types, and a file name column, which includes a list for user input and/or Edit the alpha-numeric field.

如图182A所示,文件要求页450可显示工程号、工程标识符、和从一个或多个同该工程相关的分包商要求的文件的列表。对于每个列出的文件,工程管理者可使用选择机构(如单选按钮)456来选择至少一个强制动作。强制动作规定了当分包商未提供所需文件时由系统10自动执行的至少一个动作。例如,强制动作可包含“仅提建议”动作,该动作包含自动向工程管理者通知缺少文件。强制动作也可包含“暂缓支付(Hold Payment)”动作,该动作包括自动向未提供所需文件的分包商暂缓支付。As shown in FIG. 182A, the document requirements page 450 may display a project number, a project identifier, and a list of documents requested from one or more subcontractors associated with the project. For each listed file, the project manager can use a selection mechanism (eg, radio buttons) 456 to select at least one mandatory action. A mandatory action specifies at least one action to be automatically performed by the system 10 when the subcontractor fails to provide the required documentation. For example, mandatory actions may include a "suggest only" action that includes automatically notifying project managers of missing files. Mandatory actions may also include "Hold Payment" actions, which include automatic hold payments to subcontractors who do not provide the required documentation.

如图182A所示,工程管理者可以自选地跟踪所需文件的过期。例如,工程管理者可使用与特定文件相关的跟踪过期选择机构458(如复选框)来指明是否跟踪文件过期。在一些实施例中,如果工程管理者为特定文件选择跟踪过期机构458,工程管理者可通过使用一个或多个通知日期选择或输入机构460来指明一个或多个通知日期。系统10可以通过使用通知日期机构来确定提前通知过期文件的天数,系统10需警告工程管理者和/或分包商文件将要过期。在一些实施例中,工程管理者可为特定文件指定多个通知日期。例如图182A所示,工程管理者可指定第一通知日期和第二通知日期。在一些实施例中,如果工程管理者指定零通知日期,系统10不会在文件到期前发送任何到期警告。即便工程管理者指定零通知日期,系统10可在文件到期时通知工程管理者。通知日期的默认值可设为零。As shown in Figure 182A, project managers can optionally track expiration of required files. For example, a project manager may use a track expiration selection mechanism 458 (eg, a check box) associated with a particular file to indicate whether the track file expires. In some embodiments, if the project manager selects the track expiration mechanism 458 for a particular file, the project manager can specify one or more notification dates by using the one or more notification date selection or input mechanism 460 . The system 10 can determine the number of days of advance notice of expired documents that the system 10 needs to warn the project manager and/or subcontractors that the documents are about to expire by using a notification date mechanism. In some embodiments, a project manager may specify multiple notification dates for a particular document. For example, as shown in FIG. 182A, the project manager may designate a first notification date and a second notification date. In some embodiments, if the project manager specifies a zero notification date, the system 10 will not send any expiration warnings before the file is due. Even if the project manager specifies a zero notification date, the system 10 can notify the project manager when the file is due. The default value for notification date can be set to zero.

文件要求页450可包括添加要求选择机构462,工程管理者可选择添加要求选择机构用来向所要求文件的列表中添加文件。此外,文件要求页450可包括有一个或多个删除文件选择机构464,通过该机构,工程管理者可从所选择的文件中删除一个或多个文件。如图182A所示,工程管理者可通过选择包含在文件要求页450中的保存设置选择机构466来保存和提交对该工程所要求文件的修改。此外,工程管理者可通过选择取消选择机构468来取消对文件要求页450所列出的文件的任何修改。The file requirements page 450 may include an add requirement selection mechanism 462 that a project manager may select to add a file to the list of required files. Additionally, the file request page 450 may include one or more delete file selection mechanisms 464 by which the project manager may delete one or more files from the selected files. As shown in FIG. 182A , the project manager can save and submit changes to the project's required files by selecting the save settings option 466 included in the file requirements page 450 . Additionally, the project manager may cancel any modifications to the documents listed on the document requirements page 450 by selecting the deselect mechanism 468 .

在一些实施例中,系统10可自动选择和指定用于某特定工程的一个或多个文件和/或文件选项。例如,系统10可自动选择待跟踪的留置权放弃并对所请求的留置权放弃指定暂缓支付强制动作。CPMS 10也可提供一个或多个类似文件要求页450的文件要求页,用来使工程管理者可在不同于工程级别的其他级别上规定文件需求,如组织级别、预算级别、预算支出项级别、合同级别等。例如,CPMS 10可提供文件要求页,使得工程管理者可指定组织级别的文件需求。组织级别的文件需求规定了该工程管理者与之签约的每个组织的所要求文件,而不管与该组织相关联的具体工程。In some embodiments, system 10 may automatically select and specify one or more files and/or file options for a particular project. For example, the system 10 may automatically select a lien release to track and assign a payment hold enforcement action to the requested lien release. CPMS 10 can also provide one or more document requirements pages similar to document requirements page 450, which are used to enable project managers to specify document requirements at other levels than project levels, such as organizational level, budget level, and budget expenditure item level , contract level, etc. For example, CPMS 10 may provide a Documentation Requirements page that enables project managers to specify organizational level documentation requirements. Organization-level documentation requirements specify the required documentation for each organization with which the project manager is contracted, regardless of the specific project associated with that organization.

在工程管理者对具体工程指定了文件选项和/或要求后,CPMS 10可生成文件要求通知469a,如图128B所示。CPMS 10可向与工程相关的分包商展示文件要求通知469a,这种展示或者在分包商接受为该工程指定任务的责任之前,或者在其后。如图182B所示,文件要求通知469a可列出参与方所需的每个文件,以及与文件相关的强制动作。如果工程管理者修改用于该工程(如使用文件要求页450)的文件要求,系统10可生成文件要求修改通知469b,如图182C所示。系统10可向与该工程有关的每个参与方(如分包商或材料供应商)显示通知469B。在一些实施例中,如图182C所示,文件要求修改通知469b可包含链接469C,各参与方可选择该链接来查看文件状态个别页490,如下图185B所描述的那样,用来查看需要从该参与方获得的文件的状态。After the project manager specifies file options and/or requirements for a specific project, the CPMS 10 may generate a file request notification 469a, as shown in Figure 128B. The CPMS 10 may display a document requirement notice 469a to subcontractors associated with the project, either before or after the subcontractor accepts responsibility for the assigned tasks for the project. As shown in FIG. 182B, a file requirement notification 469a may list each file required by a party, along with mandatory actions associated with the file. If the project manager modifies the documentation requirements for the project (eg, using the documentation requirements page 450), the system 10 may generate a documentation requirements modification notification 469b, as shown in Figure 182C. System 10 may display notification 469B to each party involved in the project, such as subcontractors or material suppliers. In some embodiments, as shown in FIG. 182C, the file requirement modification notification 469b may include a link 469C that each participant may select to view the file status individual page 490, as described below in FIG. The state of the file obtained by this party.

图184示出了根据本发明一实施例的文件状态总结页470。工程管理者可使用文件状态页470来输入关于特定分包商对工程文件要求的合规性的信息。在一些实施例中,工程管理者可通过选择包含在工程管理者的工程主页454中的链接472来到达文件状态总结页470,如图183所示。Figure 184 illustrates a file status summary page 470 according to one embodiment of the invention. The project manager may use the document status page 470 to enter information regarding a particular subcontractor's compliance with project document requirements. In some embodiments, the project manager can reach the file status summary page 470 by selecting a link 472 included in the project manager's project home page 454, as shown in FIG. 183 .

如图184所示,文件状态总结页470可在单个的视图或页面上显示需要从与某个工程相关的所有分包商获得的一个或多个文件的状态。文件状态总结页470可显示工程名称,工程号,所有与该工程相关的分包商列表(仅限一层或多层)和用于该工程的每个被跟踪文件的列,指出了所需要文件的名称(如由工程管理者定义)。对于包含在文件状态总结页470中的每个文件来说,文件状态总结页可显示状态值、期满日(如果可用)、暂缓安置状态和对每个分包商的暂缓支付信息。As shown in FIG. 184, the document status summary page 470 can display the status of one or more documents that need to be obtained from all subcontractors associated with a project in a single view or page. Document status summary page 470 may display the project name, project number, a list of all subcontractors associated with the project (one or more layers only) and a column for each tracked document for the project, indicating the required The name of the file (as defined by the project manager). For each document contained in the document status summary page 470, the document status summary page may display the status value, expiration date (if available), on hold placement status, and on hold payment information for each subcontractor.

在一些实施例中,如图184所示,每个文件的状态可通过不同颜色或其他视觉表现被显示出来。例如,如果一个文件的状态为“未收到”,与该文件相关的格可呈现桔红色,表示该文件缺失。如果文件的状态为“已收到”、该文件是现行的,并且该文件的期满日距系统或当前日期还有60日或超过60日,与该文件相关的格呈现绿色,表示该文件被认为是当前的文件。如果文件的状态为“已收到”,该文件是现行的,并且文件的期满日距系统或当前日期在60日以内,与该文件相关的格呈现黄色,表示文件距过期时间不足60日。如果文件的状态为“已收到”并且该文件是过期的,与该文件相关的格呈现红色,表示该文件已过期。同样,如果文件的状态为“不可用”,与该文件相关的格呈现灰色,表示该文件对当前分包商不可用。In some embodiments, as shown in FIG. 184, the status of each file may be indicated by a different color or other visual representation. For example, if a document has a status of "Not Received", the cell associated with that document may be colored orange, indicating that the document is missing. If the status of the file is "Received", the file is current, and the expiration date of the file is 60 days or more from the system or the current date, the box related to the file is green, indicating that the file is considered the current document. If the status of the file is "Received", the file is current, and the expiration date of the file is within 60 days from the system or the current date, and the box related to the file is yellow, indicating that the file is less than 60 days from the expiration date . If the status of the file is "Received" and the file is expired, the box related to the file will be red, indicating that the file has expired. Similarly, if the status of the file is "unavailable", the grid related to the file is grayed out, indicating that the file is not available to the current subcontractor.

如图184所示,如果文件的状态表示该文件距过期时间不足60日或已经过期,文件状态总结页470可显示该文件的到期日期。此外,如果文件的状态指示文件尚未收到或已过期,并且文件被指定有“暂缓支付”强制值,文件状态总结页470可指出由于文件尚未收到或已过期因此支付被暂缓。另外,如果支付被暂缓,文件状态总结页470可显示由于缺失或过期的文件先前支付同样被暂缓。如果对于单个分包商有一个以上的支付在特定支取中被置于暂缓状态,文件状态总结页470也可显示每个暂缓支出的列表。如图184所示,文件状态总结页470也可包括包含有暂缓支付的支取的支取链接471。在一些实施例中,工程管理者可使用支取链接471来查看管理支出页585,如下图197A-B描述的那样。As shown in Figure 184, if the status of the file indicates that the file is less than 60 days from the expiration date or has expired, the file status summary page 470 may display the expiration date of the file. Additionally, if the status of the file indicates that the file has not been received or has expired, and the file is assigned a "Payment Withhold" mandatory value, the file status summary page 470 may indicate that payment is on hold because the file has not been received or has expired. Additionally, if a payment is on hold, the document status summary page 470 may show that previous payments were also on hold due to missing or expired documents. If more than one payment for a single SCE has been placed on hold in a particular payout, the file status summary page 470 may also display a list of each payout on hold. As shown in FIG. 184, the file status summary page 470 may also include a withdrawal link 471 that includes withdrawals that are on hold. In some embodiments, the Project Manager can use the Payout link 471 to view the Manage Payouts page 585, as depicted in Figures 197A-B below.

在一些实施例中,文件状态总结页470也可包含与每个所列的特定分包商相关的链接,工程管理者可选择这些链接来查看用于该特定分包商的文件信息。例如,每个在文件总结页470中所列的分包商可以包含链接472,通过选择该链接,工程管理者可以查看文件状态个别页480,如图185A所示。In some embodiments, the document status summary page 470 may also contain links associated with each specific SCE listed that the project manager may select to view document information for that particular SCE. For example, each subcontractor listed in the document summary page 470 may contain a link 472 by selecting which the project manager may view the document status individual page 480, as shown in Figure 185A.

如图184所示,文件状态总结页470也可包含编辑文件要求链接或其他选择机构474,通过该机构,工程管理者可以进行选择来进入文件要求页450,并且查阅和/或编辑工程的文件要求。As shown in FIG. 184, the document status summary page 470 may also contain an Edit Document Requirements link or other selection mechanism 474 by which the project manager may select to enter the document requirements page 450 and view and/or edit the project's documents Require.

如图184所示,文件状态总结页470可以包括经由分包商链接473的文件报告和经由文件链接475的文件报告。工程管理者可通过分包商链接473选择文件报告,用来查看报告,该报告指示了需要从一个或多个工程的分包商获得的全部文件的状态。同样地,工程管理者可以同过文件链接475选择文件报告,来查看指示需要从用于一个或多个工程的分包商获得的全部文件状态的报告。As shown in FIG. 184 , document status summary page 470 may include a document report via SCE link 473 and a document report via document link 475 . The project manager may select Documentation Report via subcontractor link 473 to view a report indicating the status of all documentation required from subcontractors for one or more projects. Likewise, a project manager can select a file report via file link 475 to view a report indicating the status of all files that need to be obtained from subcontractors for one or more projects.

在一些实施例中,在文件状态总结页470显示的信息可以在工程管理者对特定工程所需的文件做更改(如对某工程的文件要求表做更改)时被更新。在做此更改的情况下,法律文件跟踪表和文件状态总结表460被相应地更新,或添加行(row),或删除行,并且文件名称也改变。例如,如果工程管理者对用于工程的法律文件要求表添加新文件,新表行被添加到法律文件跟踪表,每个分包商有一个行,并展示文件名称(例如来自法律文件跟踪表)以及文件的初始状态。在一些实施例中,新文件的初始状态自动设置到与文件类型(如新的类型协议文件可有初始默认状态值“未完成”)相关的有效状态之一。工程管理者可在工程期间的任何时候更新表和/或文件状态总结页。In some embodiments, the information displayed on the document status summary page 470 can be updated when the project manager makes changes to the documents required for a particular project (such as making changes to a project's document requirements table). Where this change is made, the legal document tracking table and document status summary table 460 are updated accordingly, or rows are added, or rows are deleted, and the document names are also changed. For example, if the project manager adds a new document to the legal document requirements table for the project, the new table row is added to the legal document tracking table, one row for each subcontractor, and shows the document name (such as from the legal document tracking table ) and the initial state of the file. In some embodiments, the initial state of a new document is automatically set to one of the valid states associated with the document type (eg, a new type protocol document may have an initial default state value of "incomplete"). The project manager can update the tables and/or document status summary pages at any time during the project.

如上所述,工程管理者可选择与列于文件总结页470的分包商相关的链接472来查看文件状态个别页480,如图185A所示。如图185A所示,文件状态个别页480对需要从特定分包商(如该工程法律文件要求表所辨明的)获得的每个文件,可以显示具有多个列和一个行的表。与该文件状态个别页480相关的分包商(和工程)可在页480顶端标识。这些列可包含:文件名称列,在一些实施例中这些文件名称列不可编辑;文件状态列,包含有下拉菜单或其他类型的选择机构482,并且根据与该文件相关的法律文件类型为该文件提供有效的状态;可选择的文件标识符列,可以是字母数字字段;以及可选的文件到期日期列,包括有日期字段。文件状态个别页480也可包括指示与特定文件相关的强制动作。As described above, the project manager may select the link 472 associated with the SCE listed on the document summary page 470 to view the document status individual page 480, as shown in FIG. 185A. As shown in Figure 185A, the Document Status individual page 480 may display a table with columns and one row for each document that needs to be obtained from a particular subcontractor (as identified by the Project Legal Document Requirements table). Subcontractors (and projects) associated with the document status individual page 480 can be identified at the top of the page 480 . These columns may include: a file name column, which in some embodiments is not editable; a file status column, which contains a drop-down menu or other type of selection mechanism Provides a valid status; an optional file identifier column, which can be an alphanumeric field; and an optional file expiration date column, which includes a date field. The file status individual page 480 may also include indications of mandatory actions associated with particular files.

如图185A所示,文件状态个别页480显示了该文件的标识符。在一些实施例中,系统10依照从分包商收到的文件,自动设置文件的标识符。例如,系统10可随机地把唯一的标识符指定到从分包商收到的文件。工程管理者或分包商也可把唯一的标识符指定给文件。As shown in FIG. 185A, the file status individual page 480 displays the file's identifier. In some embodiments, the system 10 automatically sets the file's identifier upon receipt of the file from the subcontractor. For example, system 10 may randomly assign unique identifiers to documents received from SCEs. A project manager or subcontractor may also assign unique identifiers to documents.

对于每一列于文件状态个别页480的文件,页480显示了文件日期和期满日。在一些实施例中,工程管理者为特定文件设置文件日期和期满日。例如,工程管理者可以将文件日期设置为文件生效日期或工程管理者的收到日期。由工程管理者通过使用文件状态页480输入的日期可通过系统10生效。在一些实施例中,系统10也可为特定文件自动设置文件日期和/或期满日。For each document listed on the document status individual page 480, page 480 shows the document date and expiration date. In some embodiments, the project manager sets file dates and expiration dates for specific files. For example, the project manager can set the file date to be the file effective date or the project manager's receipt date. Dates entered by the project manager through use of the document status page 480 can be validated by the system 10 . In some embodiments, system 10 may also automatically set file dates and/or expiration dates for specific files.

如图185A所示,文件状态个别页480也可显示指定到每个所需文件的强制动作。如以上描述的那样,如果分包商未提供所需文件,强制动作定义由系统10自动执行的动作As shown in FIG. 185A, the file status individual page 480 may also display mandatory actions assigned to each desired file. As described above, mandatory actions define actions to be automatically performed by the system 10 if the required documentation is not provided by the subcontractor

如图185A所示,文件状态个别页480可包括列有一个或多个可由工程管理者为特定文件执行的一个或多个动作的文件动作列。例如,如果分包商提交特定文件,文件动作列可包括通过查看链接483来查看提交的文件。其他包含在文件动作列的动作可包括用来下载所提交文件的下载链接,用来编辑所提交文件的编辑链接,用来删除所提交文件的提交链接以及代表分包商用来提交文件的提交链接。As shown in FIG. 185A, the document status individual page 480 may include a document action column listing one or more actions that may be performed by the project manager for a particular document. For example, if a subcontractor submits a particular document, the document action column may include viewing the submitted document via view link 483 . Other actions included in the File Actions column may include a download link to download a submitted file, an edit link to edit a submitted file, a submit link to delete a submitted file, and a submit link to submit a file on behalf of a subcontractor .

如果工程管理者对文件状态个别页480所显示的数据做任何修改,总承包商可选择包含在页480中的保存更新选择机构484来保存这种改变,或选择包含在页480中的取消选择机构486来取消该改变。在一些实施例中,所保存的来自文件状态个别页480的修改自动反映在文件状态总结页460中。If the project manager makes any changes to the data displayed on the document status individual page 480, the general contractor can select the save update selection mechanism 484 contained in the page 480 to save this change, or select the deselect contained in the page 480 mechanism 486 to undo the change. In some embodiments, saved modifications from the file status individual page 480 are automatically reflected in the file status summary page 460 .

系统10也可向与包含在特定文件状态个别页480内的文件信息相关的分包商提供文件状态个别页480的版本。向分包商提供的页480的版本可包含页480的只许查看版本(与向工程管理者提供的可编辑版本不同)。如图185B所示,只许查看文件状态个别页490显示工程(名称或标识符)以及参与方或组织(如名称或标识符)和参与方或组织(如名称或标识符)。在一些实施例中,分包商可通过使用工程主页500上的链接491进入只许查看文件状态个别页490,如图185C所示。System 10 may also provide versions of document status individual pages 480 to subcontractors associated with document information contained within particular document status individual pages 480 . The version of page 480 provided to the subcontractor may contain a view-only version of page 480 (as opposed to the editable version provided to the project manager). As shown in FIG. 185B, the view-only file status individual page 490 displays the project (name or identifier) and the party or organization (eg, name or identifier) and party or organization (eg, name or identifier). In some embodiments, the subcontractor can access the view-only file status individual page 490 by using link 491 on the project home page 500, as shown in Figure 185C.

如图185B所示,只许查看版的文件状态个别页490可显示相同的信息,如文件状态个别页480的可编辑版显示的信息。例如,只许查看文件个别页490可为每个分包商要求的文件显示文件名、文件状态、文件标识符、文件日期、期满日、和强制动作。在一些实施例中,CPMS10可防止分包商修改只许查看版的页490显示的数据。As shown in FIG. 185B , the view-only version of the file status individual page 490 may display the same information as the editable version of the file status individual page 480 displays. For example, the view-only file individual page 490 may display the file name, file status, file identifier, file date, expiration date, and mandatory actions for each SCE required file. In some embodiments, CPMS 10 may prevent subcontractors from modifying the data displayed on page 490 of the view-only version.

只许查看版的文件状态个别页490也可包含列有一个或多个分包商对于所给文件可执行动作的文件动作列。例如,文件动作列可包含提交链接492。分包商可以选择与列于页492的特定文件相关的链接490按电子方式提交系统10所需文件。其他包括在文件动作列的动作可包含用来查看所提交文件的查看链接,用来编辑所提交文件的编辑链接,以及用来删除所提交文件的删除链接。The view-only file status individual page 490 may also contain a file action column listing actions one or more SCEs can perform for a given file. For example, a file action column may contain a submit link 492 . The subcontractor may select the link 490 associated with the particular document listed on page 492 to electronically submit the required documents to the system 10 . Other actions included in the file action column may include a view link to view the submitted file, an edit link to edit the submitted file, and a delete link to delete the submitted file.

如果分包商选择与特定文件相关的提交链接492,系统10可显示提交文件页510,如图186A-B所示。分包商可使用提交文件页510来选择一个或多个用来向系统10按电子方式提交的文件。在一些实施例中,提交文件页510可包括浏览选择机构512,分包商可选择该机构在用于该特定文件的一个或多个存储装置和/或文件目录中搜索。分包商在浏览存储装置和/或文件目录时找到或选择的文件可在输入机构513上显示。分包商也可通过使用输入机构513直接输入某特定文件的文件名(如完整的路径名)和/或通过使用浏览选择机构512来浏览文件。If the SCE selects the submit link 492 associated with a particular file, the system 10 may display the submit file page 510, as shown in Figures 186A-B. Submit files page 510 may be used by subcontractors to select one or more files for electronic submission to system 10 . In some embodiments, the submit file page 510 may include a browse selection mechanism 512 that the SCE may select to search in one or more storage devices and/or file directories for that particular file. Files found or selected by the subcontractor while browsing the storage device and/or file directory may be displayed on the input mechanism 513 . The subcontractor can also browse the file by directly entering the file name (eg, the full path name) of a particular file by using the input mechanism 513 and/or by using the browse selection mechanism 512 .

一旦分包商找到并且选择或输入用来提交的特定文件,分包商可选择包含在提交文件页510中的添加附件选择机构514。分包商也可选择包含在提交文件页510中的清除选择机构516,在未向系统10提交文件的情况下清除显示于输入机构中的文件或文件名。Once the SCE locates and selects or enters the specific files for submission, the SCE may select the add attachment selection mechanism 514 included in the submit file page 510 . The subcontractor may also select the clear selection mechanism 516 included in the submit file page 510 to clear the file or file name displayed in the input mechanism if the file has not been submitted to the system 10 .

如图186B所示,分包商通过使用增加附件选择机构514来添加或附加的文件可被列于“附件(Attachments)”标题下的提交文件页510中。分包商可通过选择与特定文件相关的删除选择机构518,如某个复选框,来删除或去除一个或多个附加的文件。在分包商选择一个或多个用来删除的附加文件后,分包商可选择包含在提交文件页510中的删除选择机构520来将将所选择的文件从附加文件列表中删除。As shown in FIG. 186B , files added or attached by the subcontractor by using the Add Attachments selection mechanism 514 may be listed on the Submission Files page 510 under the "Attachments" heading. The subcontractor may delete or remove one or more additional files by selecting a deletion option mechanism 518, such as a check box, associated with the particular file. After the SCE selects one or more additional files for deletion, the SCE may select the delete selection mechanism 520 included in the submit file page 510 to delete the selected files from the list of attached files.

一旦分包商附加一个或多个文件,分包商可以选择包含在提交文件页510中的提交选择机构522来把所附加的文件电子地传送至系统10。在分包商将附加的文件传送到系统10后,系统10可生成文件传送通知,如图187所示。系统10向分包商显示文件传送通知524。Once the SCE attaches one or more files, the SCE may select the submission selection mechanism 522 included in the submit files page 510 to electronically transmit the attached files to the system 10 . After the SCE transfers the attached files to the system 10, the system 10 may generate a file transfer notification, as shown in FIG. 187 . The system 10 displays a file transfer notification 524 to the SCE.

在分包商提交一个或多个附加的文件后,系统10也可生成查阅提交的文件工程动作或通知,并可将工程动作发送至接收所述提交文件的工程管理者。在一些实施例中,系统10在工程管理者工程主页526中列出在工程管理者未决动作下的查阅提交的文件工程动作,如图188所示。如果工程管理者从工程主页选择工程动作或相关的选择机构,系统10可显示接收文件通知528,如图189所示。通知528可向工程管理者通知分包商已提交一个或多个要求文件的电子拷贝。此外,接收文件通知528可列出从分包商电子收到的一个或多个文件。After the subcontractor submits one or more additional documents, the system 10 may also generate a review submitted document project action or notification, and may send the project action to the project manager who received the submitted document. In some embodiments, the system 10 lists the View Submitted Files project action under Project Manager Pending Actions in the Project Manager Project Home Page 526, as shown in FIG. 188 . If the project manager selects a project action or related selection mechanism from the project home page, the system 10 may display a file receipt notification 528, as shown in FIG. 189 . Notification 528 may notify the project manager that the subcontractor has submitted an electronic copy of one or more required documents. Additionally, the document receipt notification 528 may list one or more documents received electronically from the SCE.

接收文件通知528也可通知工程管理者他/她应该下载每个提交的文件。在一些实施例中,如图189所示,下载并查阅提交的文件,工程管理者可在接收文件通知528选择与收到文件(如与所列文件相关的链接)相关的选择机构530。如果工程管理者选择该选择机构530,系统10可下载并显示向工程管理者提交的文件。Receive file notification 528 may also notify the project manager that he/she should download each submitted file. In some embodiments, as shown in FIG. 189 , to download and view submitted files, the project manager may select the selection mechanism 530 associated with the received files (eg, links associated with listed files) at the received file notification 528 . If the project manager selects the selection mechanism 530, the system 10 can download and display the file submitted to the project manager.

在工程管理者查阅提交的文件后,工程管理者可根据需要更新被系统10跟踪的文件的状态。例如,如图189所示,接收文件通知528可包含更新文件信息选择机构532。如果工程管理者选择更新文件选择机构532,系统10可显示与提交文件分包商相关的文件状态个别页480,如图185A描述的那样!如以上描述的那样,工程管理者可对文件状态个别页480显示的数据进行修改,并且选择包含在页480中的保存选择机构484来保存这种改变。在一些实施例中,如果工程管理者修改在文件状态个别页480中显示的数据,系统10可生成文件信息更新通知540,如图190所示。系统10可向工程管理者显示文件信息更新通知540。After the project manager reviews the submitted files, the project manager can update the status of the files tracked by the system 10 as needed. For example, as shown in FIG. 189 , receiving file notification 528 may include updating file information selection mechanism 532 . If the project manager chooses to update the file selection mechanism 532, the system 10 may display the file status individual page 480 associated with the submitting file subcontractor, as depicted in FIG. 185A! As described above, the project manager can make changes to the data displayed on the document status individual page 480 and select the save option mechanism 484 included in the page 480 to save the changes. In some embodiments, if the project manager modifies the data displayed in the file status individual page 480, the system 10 may generate a file information update notification 540, as shown in FIG. 190 . The system 10 may display a file information update notification 540 to the project manager.

在一些实施例中,只有工程管理者能更新文件信息。在一些实施例中,除了包括或代替工程管理者的人工修改,系统10可自动更新或修改文件信息。例如,系统10在分包商向系统10提交文件后可自动将文件状态改为“已收到”。In some embodiments, only project managers can update file information. In some embodiments, system 10 may automatically update or modify document information in addition to or instead of manual modification by a project manager. For example, the system 10 may automatically change the document status to "received" after the subcontractor submits the document to the system 10.

在一些实施例中,系统10执行例行的或周期的文件查阅(如每天的夜间)来识别过期文件。例如,作为批处理活动,系统10可有规律地(如每日)检查过期文件,如在系统不繁忙的时候(如凌晨5点前)。如图191所示,系统10可扫描由该系统管理的文件,并且对于每个文件来说,可以决定文件的是否设定为“已收到”。如果特定文件的状态设置为“已收到”,系统10扫描或查阅由系统10管理的其他或下一个文件。In some embodiments, the system 10 performs routine or periodic file reviews (eg, every night) to identify expired files. For example, as a batch activity, the system 10 may check for expired files on a regular basis (eg, daily), such as when the system is not busy (eg, before 5 am). As shown in FIG. 191, the system 10 can scan the documents managed by the system, and for each document, can determine whether the document's setting is "received". If the status of a particular document is set to "Received", the system 10 scans or consults other or next documents managed by the system 10.

如果由系统10查阅的文件的状态被设定为“已收到”,系统10可决定该文件是否与期满日相关(如与文件相关的期满日属性被设定为特定日期)。如果文件不与期满日相关(如与文件相关的期满日属性被设定为零),系统10可扫描或查阅另外或下一个由系统10管理的文件。If the status of a document reviewed by the system 10 is set to "received", the system 10 can determine whether the document is associated with an expiration date (eg, the expiration date attribute associated with the document is set to a specific date). If the document is not associated with an expiration date (eg, the expiry date attribute associated with the document is set to zero), the system 10 may scan or refer to another or next document managed by the system 10 .

如果系统10查阅的文件与期满日相关,系统10可决定当前或系统日期大于或等于文件期满日减去工程管理者为第一通知设定的天数。如果系统日期小于文件期满日减去该第一通知的天数,系统10判定文件并未过期,并且不需要过期通知,以及可以扫描或查阅另外或下个由系统10管理的文件。If the document that system 10 is reviewing is associated with an expiration date, system 10 may determine that the current or system date is greater than or equal to the document's expiration date minus the number of days set by the project manager for the first notification. If the system date is less than the file expiration date minus the number of days of the first notification, the system 10 determines that the file is not expired and no expiration notification is required, and another or next file managed by the system 10 can be scanned or viewed.

如果系统10判定系统日期大于或等于文件期满日减去第一通知的天数,系统10可确定该有关该文件的第一通知是否已经被发送。在一些实施例中,系统10可跟踪过期通知何时被发送以及是否被发送。如果第一通知未被发送,系统10可发送第一过期警告通知。在一些实施例中,系统10将第一过期警告通知发送至与文件相关的分包商和/或工程管理者。图192示出根据本发明的一实施例的过期警告通知550。If the system 10 determines that the system date is greater than or equal to the file expiration date minus the number of days of the first notification, the system 10 can determine whether the first notification has been sent for the file. In some embodiments, system 10 may track when and whether overdue notifications are sent. If the first notification has not been sent, system 10 may send a first overdue warning notification. In some embodiments, the system 10 sends the first expiration warning notification to the subcontractor and/or project manager associated with the file. Figure 192 illustrates an overdue warning notification 550 according to one embodiment of the invention.

如图191所示,系统10判定用于特定文件的第一通知已被发送,或在系统10为特定文件发送第一个通知后,系统10判定当前系统日期是否大于或等于文件期满日减去与工程管理者所设置的第二通知相关的天数。如果系统日期小于文件期满日减去与工程管理者设置的第二通知相关的天数,系统10可扫描或查看系统10管理的另外或下一个文件。As shown in Figure 191, the system 10 determines that the first notification for a particular file has been sent, or after the system 10 sends the first notification for a particular file, the system 10 determines whether the current system date is greater than or equal to the file expiration date minus Go to the number of days associated with the second notification set by the project manager. If the system date is less than the file expiration date minus the number of days associated with the second notification set by the project manager, the system 10 may scan or view another or next file managed by the system 10 .

如果系统10判定系统日期大于或等于文件的期满目减去与第二通知相关的天数,系统10可判定与文件相关的第二通知是否已被发送。如果第二通知已被发送,系统10可发送第二过期警告通知(如图192所示的过期警告通知550)。If the system 10 determines that the system date is greater than or equal to the expiration date of the file minus the number of days associated with the second notification, the system 10 may determine whether a second notification has been sent associated with the file. If the second notification has already been sent, system 10 may send a second overdue warning notification (such as overdue warning notification 550 shown in FIG. 192 ).

如果系统10判定用于特定文件的第二通知已被发送,或在系统10为特定文件发送第二个过期警告通知后,系统10可判定当前系统日期是否大于或等于文件的期满日。如果系统日期小于文件期满日,系统10可扫描或查看另外或下一个由系统10管理的文件。If system 10 determines that a second notification has been sent for a particular file, or after system 10 sends a second expiration warning notification for a particular file, system 10 may determine whether the current system date is greater than or equal to the file's expiration date. If the system date is less than the file expiration date, the system 10 may scan or view another or next file managed by the system 10 .

如图191所示,如果系统10判定当前系统日期大于或等于某特定文件的期满日,系统10可判定用于该文件的期满日是否已发送。如果期满日已被发送,系统10可扫描或查看另外的或下一个由系统10管理的文件。As shown in Figure 191, if the system 10 determines that the current system date is greater than or equal to the expiration date for a particular file, the system 10 may determine whether the expiration date for that file has been sent. If an expiration date has been sent, the system 10 can scan or view additional or next documents managed by the system 10 .

如果期满日未被发送,系统10可发送过期通知。在一些实施例中,系统10可向与过期文件相关的分包商和/或与工程相关的工程管理者发送过期通知。图193示出了依据本发明的一实施例的过期通知。在发送完过期通知后,系统10可扫描或查看另外或下一个由系统10管理的文件。If the expiration date has not been sent, the system 10 may send an expiration notification. In some embodiments, system 10 may send expiration notifications to subcontractors associated with expired documents and/or project managers associated with projects. Figure 193 illustrates expiration notifications in accordance with one embodiment of the present invention. After the expiration notification has been sent, the system 10 can scan or view additional or next files managed by the system 10 .

当支取被启动(或分包商被添加或选择用于某个支取),系统10也可检查需要从包含在该支取中的每位分包商获得的文件的状态,并且如果必要,生成提交文件工程动作或者对有缺失或过期文件的分包商的通知。例如,如果需要从某个分包商求获得的文件的状态被设为“未收到”,系统10可生成要求缺失文件的提交文件工程动作。另外,如果需要从分包商获得的文件的状态被设为“已收到”,并且相关期满日在支取日期(如60日)后的预设时间之内,或者与支取日期相符或先于支取日期,系统10也可生成要求新文件的提交文件工程动作。图194示出了依照本发明的一实施例的更新所需要文件工程动作或通知560。在一些实施例中,分包商可通过包括在分包商工程主页500中的链接或选择机构562进入通知560,如图185C所示。When a draw is initiated (or a subcontractor is added or selected for a certain draw), the system 10 can also check the status of the documents that need to be obtained from each subcontractor included in the draw and, if necessary, generate a commit Document engineering actions or notifications to subcontractors with missing or outdated documents. For example, if the status of a document that needs to be obtained from a subcontractor is set to "Not Received," the system 10 may generate a submit document engineering action that requires the missing document. In addition, if the status of the documents to be obtained from the subcontractor is set to "Received" and the relevant expiry date is within the preset time after the withdrawal date (such as 60 days), or coincides with or precedes the withdrawal date On the draw date, the system 10 may also generate a submit file project action that requires a new file. Figure 194 illustrates an update required file engineering action or notification 560 in accordance with one embodiment of the invention. In some embodiments, the SCE can access the notification 560 through a link or selection mechanism 562 included in the SCE home page 500, as shown in Figure 185C.

如图194所示,更新所需要文件的通知560可包含选择机构564,分包商可选择该机构来查看分包商的所要求文件的状态和/或提交要求的文件(如使用文件状态个别页490)。As shown in FIG. 194, the notification 560 to update required documents may include a selection mechanism 564 that the SCE may select to view the status of the SCE's required documents and/or submit required documents (e.g. using the document status individual page 490).

在工程管理者选择“暂缓支付”动作作为为特定文件的强制值的情况中,系统10(如在工程管理者签名其发票之后)可对工程管理者指定有“暂缓支付”的任何有缺失或过期文件的分包商自动暂缓支付。例如,系统10可对每个包括在支取中的分包商查阅所要求文件的状态,并可决定与分包商相关的文件是否具有“未收到”状态,或已过期。如果文件未收到或已过期,系统10可判定该文件是否与“暂缓支付”强制动作相关。在一些实施例中,只要有一个文件不符合规定(如分包商缺失三个所需文件中的一个),系统10自动对分包商暂缓支付。如果分包商有缺失或者过期文件,系统10只可对当前支取暂缓与该分包商相关的支付,并且不暂缓与其他支取相关的任何其他未完成支付。在其他实施例中如果分包商有缺失或过期文件,系统10可暂缓向该分包商的所有未完成支付。In the event that the project manager selects the "hold payment" action as a mandatory value for a particular document, the system 10 (such as after the project manager has signed his invoice) can place a "hold" on any missing or Subcontractors with expired documents are automatically withheld from payment. For example, the system 10 can review the status of required documents for each subcontractor included in the checkout, and can determine whether the documents associated with the subcontractor have a "not received" status, or have expired. If the document has not been received or has expired, the system 10 can determine whether the document is related to a "payment withholding" enforcement action. In some embodiments, the system 10 automatically withholds payment to the subcontractor as soon as one document is out of compliance (eg, the subcontractor is missing one of three required documents). If a subcontractor has missing or outdated documentation, the system 10 can only suspend payments related to that subcontractor for the current drawdown, and not suspend any other outstanding payments related to other drawdowns. In other embodiments, the system 10 may suspend all outstanding payments to a subcontractor if the subcontractor has missing or expired documentation.

当系统10暂缓支付时,系统10可以记录暂缓支付(如记录指示由于缺少或过期文件而暂缓支付的原因)并且生成一个或多个警告该暂缓支付相应个体的通知或消息。如图74B所描述的那样,查看支取要求表单可指示任何暂缓支付(如自动暂缓或人工暂缓),该暂缓支付不会包含在为未决支取支出的支付中。When the system 10 holds a payment, the system 10 may record the hold (eg, record indicating the reason for the hold due to missing or expired documents) and generate one or more notifications or messages alerting the individual on which the payment is held. As depicted in FIG. 74B, viewing the withdrawal request form may indicate any payment holds (eg, automatic holds or manual holds) that will not be included in the payment for the pending payment.

如果对特定分包商的支付被暂缓,系统10可生成暂缓支付通知570,如图195A所示。系统10可向分包商显示暂缓支付通知570(如通过包含在查看所有信息屏572的链接,如图195B所示)。如图195A所示暂缓支付通知570可通知分包商暂缓已被置于向分包商的支付中。在一些实施例中,暂缓支付通知570也可包含一个或多个链接或选择机构,通过该链接或选择机构,分包商可用来选择以查阅暂缓支付和/或执行用来更正暂缓支付的动作。If payment to a particular SCE is on hold, the system 10 may generate a payment hold notification 570, as shown in Figure 195A. The system 10 may display a payment hold notification 570 to the subcontractor (eg, via a link included in the view all information screen 572, shown in Figure 195B). Hold payment notification 570 as shown in Figure 195A may notify the SCE that a hold has been placed in payment to the SCE. In some embodiments, the payment hold notice 570 may also contain one or more links or selection mechanisms by which the subcontractor may choose to review the payment hold and/or perform actions to correct the payment hold .

在一些实施例中,如果对分包商的将被暂缓的支付被标记为特定支付方法,系统10可简单地通知专对暂缓的支付的工程管理者,而非自动暂缓支付。例如,如果对分包商的将被暂缓的支付被标记为系统10之外进行的支付(如通过人工支票),系统10可生成处于暂缓工程动作或通知580的支付,如图196所示。系统10可向工程管理者显示处于暂缓通知580的支付。处于暂缓通知580的支付可通知工程管理者,向特定分包商的支付依照缺失或过期的文件应被暂缓。针对暂缓通知580的支付也可指示与支付相关的方法。另外,如图196所示,通知580可指示工程管理者是否想改变与支付相关的支付方法(如将支付方法改为系统10内部管理的方法),工程管理者应暂缓支付。处于暂缓通知580的支付也可包括链接或其他选择机构582,通过该链接或选择机构,工程管理者可进行选择,以查阅与其支付处于暂缓的分包商相关的文件状态(如通过与分包商相关的文件状态个别屏480)。In some embodiments, if a payment to a subcontractor to be withheld is flagged for a particular payment method, the system 10 may simply notify the project manager specific to the payment on hold, rather than automatically hold the payment. For example, if a payment to a subcontractor to be held is flagged as a payment made outside the system 10 (such as by manual check), the system 10 may generate a payment that is in hold engineering action or notice 580, as shown in FIG. 196 . The system 10 may display the payment on hold notice 580 to the project manager. A payment on hold notice 580 may notify the project manager that payment to a particular subcontractor should be held in accordance with missing or expired documentation. Payment for hold notice 580 may also indicate the method associated with the payment. In addition, as shown in Figure 196, the notification 580 can indicate whether the project manager wants to change the payment method related to payment (such as changing the payment method to the method of internal management of the system 10), and the project manager should suspend the payment. Payments on hold notice 580 may also include a link or other selection mechanism 582 by which the project manager may elect to review the status of documents associated with subcontractors whose payments are on hold (e.g., through Supplier-related file status individual screen 480).

如以上参考文件要求页480所描述的那样,工程管理者可对所需文件指定“仅提建议”强制动作。与“暂缓支付”强制动作相同,在工程管理者在他/她的支付申请上签名后,系统10可为有缺失或过期文件的分包商向工程管理者发送查阅文件工程动作或通知。例如系统10可查阅需要从包括在支取中的分包商获得的文件的状态,并且如果所需文件的状态为“未收到”或已过期,系统10可生成查阅文件工程动作或者通知,并且向工程管理者显示工程动作或通知。在一些实施例中,系统10可为每个有缺失文件或过期文件的分包商生成查阅文件工程动作或通知。在其他实施例中,系统10可生成单个的查阅文件工程动作或通知,指出具有过期或缺失文件的所有分包商。查阅文件工程动作或通知可包括链接或选择机构,通过该链接或机构,工程管理者可选择以查阅需要从与查阅文件工程动作或通知(如文件状态个别页480或文件状态总结页470)相关的一个或多个分包商获得的文件的状态。As described above in reference to Document Requirements page 480, the project manager can specify a "suggest only" mandatory action on required documents. Same as the "suspension of payment" mandatory action, after the project manager signs his/her payment application, the system 10 can send a file review project action or notification to the project manager for subcontractors with missing or expired documents. For example, the system 10 may review the status of documents that need to be obtained from subcontractors included in the draw, and if the status of the required documents is "not received" or expired, the system 10 may generate a review document engineering action or notification, and Display project actions or notifications to project managers. In some embodiments, the system 10 may generate a review document engineering action or notification for each subcontractor with missing or outdated documents. In other embodiments, the system 10 may generate a single review document engineering action or notification, identifying all subcontractors with outdated or missing documents. View file project actions or notifications may include a link or selection mechanism by which a project manager may select to view a file project action or notification (e.g., file status individual page 480 or file status summary page 470) associated with a review file project action or notification The status of the documents obtained by one or more subcontractors.

在一些实施例中,只有工程管理者可通过使用管理支付页585手动释放支付来释放暂缓支付,如下面参考图197A-B描述的那样。在其他一些实施例中,系统10可自动释放暂缓支付。例如一旦要求分包商提供的文件是当前有效的,系统10可自动向分包商释放任何暂缓支付。In some embodiments, only the Project Manager can release the payment hold by manually releasing the payment using the Manage Payments page 585, as described below with reference to Figures 197A-B. In some other embodiments, the system 10 may automatically release the payment hold. For example, the system 10 may automatically release any payment hold to the subcontractor once the required documentation from the subcontractor is current.

为了手动释放暂缓支付,工程管理者可使用管理支付页585,如图197A-B所示。如图197A-B所示,管理支付页585可列出对特定支取的每个暂缓支付。工程支付页也可为特定支取列出每项支付。To manually release a payment hold, the Project Manager may use the Manage Payments page 585, as shown in Figures 197A-B. As shown in Figures 197A-B, the Manage Payments page 585 may list each payment hold for a particular drawdown. The Project Payments page may also list each payment for a specific withdrawal.

如图197A-B所示,管理支付页585可包含查看留置权放弃选择机构586,文件跟踪选择机构587,和查看支取要求选择机构586来查阅由与该支取相关的每位分包商提交的留置权放弃。工程管理者可选择文件跟踪选择机构587来查看与该支取相关的每位分包商提交的文件的状态(如通过查看由图60A,62,68A,72或74A-B描述的未决支取要求屏)。As shown in Figures 197A-B, the Manage Payments page 585 may include a View Lien Waiver option 586, a Document Tracking option 587, and a View Withdrawal Request option 586 to review the documents filed by each subcontractor associated with the withdrawal. Lien Waiver. The project manager can select the document tracking selection mechanism 587 to view the status of each subcontractor's submitted documents related to the withdrawal (such as by viewing the outstanding withdrawal requirements described by Figures 60A, 62, 68A, 72 or 74A-B Screen).

对于列于管理支付页585的每位分包商(或支付)来说,页585可包含编辑链接或选择机构589,通过该链接或选择机构,工程管理者可进行选择,用以编辑与特定分包商相关的支付信息。在一些实施例中,如果工程管理者选择与特定分包商相关的编辑链接598,系统10可显示管理支付页590,如图198A-B所示。通过使用管理支付页590,工程管理者可修改与对该分包商所完成支付相关的信息。For each subcontractor (or payer) listed on the Manage Payments page 585, the page 585 may include an edit link or selection mechanism 589 by which the project manager may select for editing and specific Subcontractor-related payment information. In some embodiments, if the project manager selects the edit link 598 associated with a particular SCE, the system 10 may display the manage payments page 590, as shown in Figures 198A-B. Using the manage payments page 590, the project manager can modify information related to payments made to the subcontractor.

如图198A-B所示,管理支付页590可包括进行核查选择机构591,分割支付选择机构592,和释放暂缓选择机构593。为了改变与支付相关的支付方法(如将支付方法改为系统10外管理的方法),工程管理者可选择支票选择机构591。在一些实施例中,将与支付相关的支付方法改变为系统10外管理的方法可自动释放暂缓支付。如果工程管理者选择进行核查选择机构591,系统10可自动更新显示于管理支付页590中的支付方法,可显示单独的改变支付方法页,或可允许工程管理者来更新显示于管理支付页590的支付方法。As shown in FIGS. 198A-B , the Manage Payments page 590 may include a proceed verification option 591 , a split payment option 592 , and a release hold option 593 . In order to change the payment method related to payment (such as changing the payment method to a method managed outside the system 10), the project manager can select the check selection mechanism 591 . In some embodiments, changing the payment method associated with the payment to a method managed outside of system 10 may automatically release the payment hold. If the project manager chooses to review the selection mechanism 591, the system 10 can automatically update the payment method displayed on the manage payment page 590, can display a separate change payment method page, or can allow the project manager to update the payment method displayed on the manage payment page 590 payment method.

为了将支付分割为多个子支付,工程管理者可选择分割支付选择机构592。例如,如果工程管理者想按多个子支付而非单独一个总支付来支付分包商,可选择分割支付选择机构592。在一些实施例中,如果工程管理者选择分割支付选择机构592,系统10可显示单独分割支付表单或可允许工程管理者来编辑在管理支付页590显示的支付数额。In order to split a payment into multiple sub-payments, the project manager may select split payment selection mechanism 592 . For example, split payment option mechanism 592 may be selected if the project manager wishes to pay subcontractors in multiple sub-payments rather than a single lump sum payment. In some embodiments, if the project manager selects the split payment option 592 , the system 10 may display an individual split payment form or may allow the project manager to edit the payment amount displayed on the manage payments page 590 .

为了释放暂缓支付,工程管理者可从暂缓选择机构593的选择释放。在一些实施例中,工程管理者也可通过使用评述输入机构594来提供释放暂缓支付的原因或评述,如图198A-B所示。如果工程管理者从暂缓选择机构593选择释放,系统10可改变支付状态,如管理选择页590所显示的那样,由“暂缓(Held)”到“请求(Requested)”,如图198B所示。In order to release the suspension of payment, the project manager may release from the selection of the suspension selection mechanism 593 . In some embodiments, the project manager may also provide a reason or comment for releasing the payment hold by using the comment input mechanism 594, as shown in Figures 198A-B. If the project manager chooses to release from the suspension selection mechanism 593, the system 10 can change the payment status, as displayed on the management selection page 590, from "Held" to "Requested", as shown in Figure 198B.

如果工程管理者改变显示于管理支付页590中的支付信息,工程管理者可选择包含在管理支付页590中的保存改变选择机构595。如果工程管理者保存对支付信息的改变,系统10可更新图198B所示的管理支付页590,并且可以更新图197B所示的管理支付屏585。另外,为了忽略对显示于管理支付页590的支付的任何改变,工程管理者可选择包含在页590中的取消选择机构596。If the project manager changes the payment information displayed in the manage payment page 590 , the project manager can select the save changes option 595 included in the manage payment page 590 . If the project manager saves changes to the payment information, the system 10 can update the manage payment page 590 shown in Figure 198B, and can update the manage payment screen 585 shown in Figure 197B. Additionally, in order to ignore any changes to the payments displayed on the Manage Payments page 590 , the project manager can select a deselect mechanism 596 included in the page 590 .

在一些实施例中,管理支付页590可包括其他选择机构。例如,如果支付未被支出,管理支付页590可包括支付选择机构,通过该机构,工程管理者可人工暂缓支付。In some embodiments, manage payments page 590 may include other options. For example, the Manage Payments page 590 may include a payment selection mechanism by which a project manager may manually hold payments if the payment has not been disbursed.

在一些实施例中,列有用于特定支取的所有支出的管理支付页585可与管理支付页590结合,管理支付页590列有与特定支付相关的支付信息,并允许工程管理者来修改这些支付信息,以创建支付页600,如图198C所示。在一些实施例中,支付页600可显示用于特定支取的所有支付。在其他实施例中,支付页600可只显示用于特定支取的暂缓支付。如图198C所示,工程管理者可使用支付页600来暂缓或释放用于支取的一个或多个支付。例如,支付页600所显示的每个支付可与选择机构602(如复选框)相关,工程管理者可选择该机构来选择特定支付。在工程管理者选择完一个或多个支付,工程管理者可选择包含在支付页600中的暂缓选择的支付选择机构603,来暂缓所有选择的支付。另外,工程管理者可选择释放选择的支付选择机构604来释放所有选择的支付。在一些实施例中,工程管理者也可通过使用包含在支付页600中的评述输入机构605来输入暂缓或释放特定支付的原因或评述。通过使用暂缓所选择支付选择机构603和释放所选择支付选择机构604,工程管理者可手动暂缓或释放支付。在一些实施例中,如前述那样,工程管理者可因不同于所需要文件缺失或过期的多种原因来手动暂缓和释放支付。In some embodiments, the Manage Payments page 585, which lists all payouts for a particular payout, may be combined with the Manage Payments page 590, which lists payment information associated with a particular payout and allows the project manager to modify these payouts. information to create a payment page 600, as shown in Figure 198C. In some embodiments, payment page 600 may display all payments for a particular withdrawal. In other embodiments, payment page 600 may only display payment holds for certain withdrawals. As shown in Figure 198C, the project manager can use the payments page 600 to hold or release one or more payments for withdrawal. For example, each payment displayed on payment page 600 may be associated with a selection mechanism 602 (eg, a checkbox) that a project manager may select to select a particular payment. After the project manager has selected one or more payments, the project manager can select the payment selection mechanism 603 included in the payment page 600 to suspend all selected payments. Additionally, the project manager may choose to release selected payment selection mechanism 604 to release all selected payments. In some embodiments, the project manager may also enter a reason or comment for withholding or releasing a particular payment by using the comment entry mechanism 605 included in the payment page 600 . By using the Suspend Selected Payment Option 603 and Release Selected Payment Option 604, the Project Manager may manually suspend or release payments. In some embodiments, as previously described, the project manager may manually hold and release payments for a variety of reasons other than missing or out-of-date required documents.

在一些实施例中,如果工程管理者手动释放暂缓支付,系统10会要求来自与工程管理者相关的授权用户的授权。例如,向与工程管理者相关的特定用户要求释放支付的授权,系统10可生成特殊支出工程动作或通知,并可在授权用户的工程主页610列出工程动作或通知,如图199所示。工程动作或通知可包括链接或其他选择机构612,通过该链接或其他选择机构612,授权用户可进行选择,以查看管理支付页620,如图200所示。工程支付页620可包括与管理支付页585相同的信息和选择机构,但可包括支出资金选择机构622。在授权用户查阅所释放的支付后,用户可选择支出资金选择机构622来授权被暂缓支付的释放。在授权用户选择支出资金选择机构622后,系统10可生成支付支出通知630,如图201所示。系统10可向授权用户显示支付支出通知630。In some embodiments, if the project manager manually releases the hold, the system 10 will require authorization from an authorized user associated with the project manager. For example, if a specific user related to the project manager is required to release payment authorization, the system 10 can generate special expenditure engineering actions or notifications, and can list the engineering actions or notifications on the authorized user's engineering home page 610, as shown in FIG. 199 . The engineering action or notification may include a link or other selection mechanism 612 by which an authorized user may select to view a manage payment page 620 , as shown in FIG. 200 . The project payment page 620 may include the same information and selection mechanisms as the management payment page 585 , but may include a disbursement funds selection mechanism 622 . After authorizing the user to review the released payment, the user may select the payout funds selection mechanism 622 to authorize the release of the suspended payment. After the authorized user selects the disbursement funds selection mechanism 622, the system 10 may generate a payment disbursement notification 630, as shown in FIG. 201 . System 10 may display payment disbursement notification 630 to the authorized user.

本领域的普通技术人员能够理解,可使用各种计算机设备,诸如个人计算机、服务器和具有处理器或能够执行程序或指令集的其他设备来实现本发明的实施例。通常,使用现有的硬件或本领域的普通技术人员易于创建的硬件来实现本发明。因此,并不总是详细地说明示例性设备的体系结构,只是提及该设备通常将具有处理器、存储器(一些类型)、以及输入和输出应用程序。处理器能是微型处理器、可编程逻辑控制、应用专用集成电路,或配置成提取和执行指令的计算设备。在某些情况下,设备也能具有操作系统和由操作系统管理的应用程序。还应当注意到尽管所示的CPMS 10的组成部分连接在网络中,但不隐含具体的网络结构。如本领域的普通技术人员能想到的,能在各种组合中使用一个或多个网络或通信系统,诸如互联网、电话系统、无线网络、卫星网络、电缆TV网络和各种其他专用和公用网络以便提供创建本发明的实施例或实现所要求或所需的通信链路。因此,本发明不限于任何具体的网络或网络组合。Those of ordinary skill in the art can understand that various computer devices, such as personal computers, servers and other devices with processors or capable of executing programs or sets of instructions, can be used to implement the embodiments of the present invention. In general, the invention is implemented using existing hardware or hardware that can be easily created by one of ordinary skill in the art. Therefore, the architecture of an exemplary device is not always described in detail, just to mention that the device will generally have a processor, memory (of some type), and input and output applications. A processor can be a microprocessor, programmable logic control, application specific integrated circuit, or computing device configured to fetch and execute instructions. In some cases, a device can also have an operating system and applications managed by the operating system. It should also be noted that although the components of the CPMS 10 are shown connected in a network, no specific network structure is implied. One or more networks or communication systems can be used in various combinations, such as the Internet, telephone systems, wireless networks, satellite networks, cable TV networks, and various other private and public networks, as will occur to those of ordinary skill in the art In order to provide the communication links required or needed to create an embodiment of the invention or to implement it. Thus, the invention is not limited to any particular network or combination of networks.

在权利要求书中阐述本发明的各个特征和优点。Various features and advantages of the invention are set forth in the claims.

Claims (23)

1. manage a method for construction payment process, this construction payment process relates to the multiple participants that are associated with construction work in network, and the method comprises:
Use computing machine to be defined in the multiple required file that must transmit between at least two participants during the process of described construction work in described multiple participants, wherein said multiple participants comprise the first participant, the second participant and the 3rd participant;
On participant equipment, show that described the first participant must offer the list of described multiple required files of described the 3rd participant;
By described participant equipment, from described the second participant, receive the selection of one of described multiple required files;
By described participant equipment, from described the second participant, receive the selection that the pressure pressure action lists is moved, wherein said pressure action lists comprises cancels payment action;
By described computing machine, selected pressure action is assigned to selected file;
By described computing machine, checked the state of selected file;
If selected file does not offer described the second participant by described the first participant through described computing machine, by described computing machine, described pressure action is occurred automatically, wherein, when selected pressure action comprises cancelling, pay action, make this pressure action automatically comprise and cancel the payment to described first party from described third party.
2. the method for claim 1, further comprises selected file designated state.
3. method as claimed in claim 2, wherein said state comprised, unsigned, signed, do not received, received, existing, expired and can not apply at least one.
4. method as claimed in claim 2, wherein said state is assigned to the file of described selection according at least one selection receiving in electronics mode from described multiple participants.
5. method as claimed in claim 2, wherein said state is specified automatically.
6. method as claimed in claim 2, further comprises automatically by electronics mode described state notifying at least two participants.
7. method as claimed in claim 2, also comprise upgrade described state and automatically in electronics mode the state notifying being upgraded at least two participants.
8. the method for claim 1, also comprises automatically in electronics mode selected pressure action notice at least two participants.
9. the method for claim 1, the list of wherein said pressure action comprises notification action, the pressure action of wherein said selection is described notification action, and wherein automatically make described pressure action comprise: if described at least one file is not transmitted between at least two participants, automatically to notify at least one party in described multiple participant.
10. the method for claim 1, wherein selected pressure action is cancelled described in being and is paid action, and automatically makes described pressure action comprise automatically by electronics mode this postponement advise for payments at least one party in described multiple participants.
11. the method for claim 1, wherein selected file comprises agreement, at least one in list and certificate.
12. the method for claim 1, further comprise at least one file are specified to the expiration day.
13. methods as claimed in claim 12, wherein specify the described expiration day according to the selection that at least one party receives by electronics mode from described multiple participants.
14. methods as claimed in claim 12, wherein specify the described expiration day automatically.
15. methods as claimed in claim 12, wherein make described pressure action automatically be included in the described expiration day and are automatically notified at least one party of described multiple participants this expiration day.
16. methods as claimed in claim 12, also comprised described appointment expiration notice day expiration day.
17. methods as claimed in claim 16, wherein make described pressure action automatically be included in and expiration notice day automatically in electronics mode, notify at least one party to described multiple participants the expiration day.
18. the method for claim 1, also comprise the file that transmits described selection in electronics mode between described the first participant and described the second participant.
19. methods as claimed in claim 18, also comprise and in electronics mode, notify at least one party to described multiple participants the file of the described selection of transmitting in electronics mode between described the first participant and described the second participants.
20. the method for claim 1, the file of described selection is that lien is abandoned.
21. the method for claim 1, the list of wherein said pressure action comprises notification action, the action of file expiration notice and cancels to pay and move, and wherein makes described pressure action automatically comprise:
When selected pressure action is described notification action, if selected file does not transmit between at least two participants, automatically notify at least one party of described multiple participants,
When selected pressure action is that the action of file expiration notice and selected file are the renewal versions of expired file, the expiration day that is assigned to this expired file, notify at least one party to described multiple participants, and
When selected pressure action is to cancel to pay action, if selected file does not transmit between at least two participants, at least one party of described multiple participants is postponed paying.
22. the method for claim 1, also comprise the construction work configuration file of storing in the storer that is accessed in described computing machine, this construction work configuration file identifies each role of multiple participants in multiple participants of being associated with this construction work and this construction work
Wherein, according to described construction work configuration file, described the 3rd participant is the payer of this construction work, described the second participant is the contractor that is subordinated to described the 3rd participant for this construction work with the form of treaty, described the first participant is the contractor that is subordinated to described the second participant for this construction work with the form of treaty, and does not directly sign a contract with described the 3rd participant for the first participant described in this construction work.
23. the method for claim 1, wherein when selected pressure action is to cancel to pay action, make described pressure move automatic generation also comprise response from described the first participant receive invoice and automatically with electronics mode described in cancel and pay at least one party of action notice to described multiple participants.
CN200710088737.3A 2006-03-23 2007-03-22 Construction payment management system and method with document tracking feature Active CN101042759B (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US78541106P 2006-03-23 2006-03-23
US60/785,411 2006-03-23
US11/509,385 2006-08-24
US11/509,385 US7925584B2 (en) 2004-06-29 2006-08-24 Construction payment management system and method with document tracking features

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201410175665.6A Division CN103985034A (en) 2006-03-23 2007-03-22 Construction payment management system and method with document tracking features

Publications (2)

Publication Number Publication Date
CN101042759A CN101042759A (en) 2007-09-26
CN101042759B true CN101042759B (en) 2014-04-16

Family

ID=38808255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710088737.3A Active CN101042759B (en) 2006-03-23 2007-03-22 Construction payment management system and method with document tracking feature

Country Status (4)

Country Link
CN (1) CN101042759B (en)
EA (1) EA015056B1 (en)
MX (1) MX2007003585A (en)
ZA (1) ZA200702149B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938115B (en) * 2012-11-22 2017-02-08 南京途牛科技有限公司 Contract agreement management system
RU169654U1 (en) * 2015-10-15 2017-03-28 Виктор Александрович Пуминов Automated data processing device for evaluating the repair of premises
CN115422933B (en) * 2022-11-03 2023-01-17 中国雄安集团数字城市科技有限公司 Cost data extraction method and device, electronic equipment and storage medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002044863A2 (en) * 2000-12-01 2002-06-06 James Conlow Efficient presentment and payment of bills
US20020107788A1 (en) * 2001-02-05 2002-08-08 Cunningham Patrick Steven Application and payment database system for lenders and builders and a method therefor
US7168077B2 (en) * 2003-01-31 2007-01-23 Handysoft Corporation System and method of executing and controlling workflow processes
MX2007000352A (en) * 2004-06-29 2007-11-09 Textura Corp Construction payment management system and method.

Also Published As

Publication number Publication date
MX2007003585A (en) 2008-12-01
CN101042759A (en) 2007-09-26
EA200700481A1 (en) 2008-06-30
EA015056B1 (en) 2011-04-29
ZA200702149B (en) 2008-07-30

Similar Documents

Publication Publication Date Title
AU2007201268B2 (en) Construction payment management system and method with document tracking features
US7882004B2 (en) Construction payment management system and method with hierarchical invoicing and direct payment features
US9727871B2 (en) Construction payment management system and method with lien waiver exchange features
CN101042759B (en) Construction payment management system and method with document tracking feature
AU2014256334A1 (en) Construction Payment Management System and Method
AU2016200117B2 (en) Construction Payment Management System and Method with Document Tracking Features
AU2014200162B2 (en) Construction payment management system and method with document tracking features
AU2012207008B2 (en) Construction payment management system and method with document tracking features
HK1108503B (en) Construction payment management system and method with document tracking features
AU2012202809A1 (en) Construction payment management system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080321

Address after: Delaware

Applicant after: Textura Corp.

Address before: Illinois State

Applicant before: Textura LLC

REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1108503

Country of ref document: HK

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1108503

Country of ref document: HK