CN1099510C - Glass fixture combination for point-connected glass curtain wall - Google Patents
Glass fixture combination for point-connected glass curtain wall Download PDFInfo
- Publication number
- CN1099510C CN1099510C CN 99100172 CN99100172A CN1099510C CN 1099510 C CN1099510 C CN 1099510C CN 99100172 CN99100172 CN 99100172 CN 99100172 A CN99100172 A CN 99100172A CN 1099510 C CN1099510 C CN 1099510C
- Authority
- CN
- China
- Prior art keywords
- glass
- curtain wall
- point
- glass fixture
- glass curtain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention relates to a glass fixture combination used in a point-connection type glass curtain wall, which is particularly to suitable for being used on an outer enclosure protection-point connection type glass curtain wall of a main building. A steel claw and a glass fixture in the combination both adopt a spherical surface connection mechanism and a position lifting mechanism which can be adapted to positions at the time of practical construction and installation of glass sheets in the process of the installation of curtain wall glass by random deflection angles and lifting height. Because a worker can complete the installation process of the curtain wall glass on the outer surface of the glass curtain wall in the process of the construction and the installation of the glass curtain wall, the present invention can totally realize that the point connection type glass curtain wall becomes an outer enclosure protection of high-rise buildings.
Description
A kind of glass fixture combination of using in point-connected glass curtain wall, it adapts to the peripheral protective of main building especially---and point-connected glass curtain wall uses.
Utilize curtain wall to make the peripheral protective of super high rise building, very general now, but the curtain wall of all these super high rise buildings now, no matter to be concealed frame glass curtain wall, bright frame glass curtain wall and half bright half latent curtain wall completely all belong to that frame glass curtain wall is arranged for it, (point-connected glass curtain wall belongs to the frame-free glass curtain wall) they all must be on the coagulation adobe wall welded steel structure framework and around sheet glass fixing aluminium extruded sections framework, the ability installation.These have frame glass curtain wall all is to adopt the structure glue sticking structure.The useful life of now best in the world structure glue is 20 years, surpasses effective life safety anything but, must reinstall glass, can cause the waste of a huge sum of money like this.If it is very suitable adopting the peripheral protective that application life, the point-connected glass curtain wall more than 100 years was made super high rise building.But some interconnection system glass curtain is connected on the steel work with screw.Its mounting method is that the workman installs at curtain wall back tighten the screws, because the coagulation adobe wall apart from cladding glass less than 30cm, the workman can't enter into and carry out construction and installation between coagulation adobe wall and the curtain wall, so also there is not point-connected glass curtain wall to mix the peripheral protective of the building of adobe wall as the superelevation layer at present in the world.
Purpose of the present invention is exactly that the combination of the glass fixture in a kind of point-connected glass curtain wall will be provided, and this glass fixture combination can be fixed on sheet glass on the coagulation sun-dried mud brick metope at the curtain wall external surface.
The present invention is achieved in that weldable steel pawl seat on the built-in fitting of coagulation adobe wall, glass fixture base unwrapping wire adjusted position then is installed on steel pawl seat, cladding glass is installed at last, the workman can be at the curtain wall external surface, tighten the glass fixture cover plate, curtain wall is carried out the construction and installation process.
Steel pawl and glass fixture in the glass fixture combination in the point-connected glass curtain wall among the present invention all adopt sphere bindiny mechanism and position elevating mechanism.They in the cladding glass process is installed, the position needs when arbitrarily angle excursion and adjustable height adapt to the installation of sheet glass practice of construction.Because in curtain wall construction and installation process, the workman can finish the cladding glass installation process at the curtain wall external surface, can realize fully so point-connected glass curtain wall becomes the peripheral protective of super high rise building.
Concrete structure of the present invention is provided by following examples and accompanying drawing.
Fig. 1 to Fig. 4 is the structure working principle figure of the glass fixture combination in the point-connected glass curtain wall that proposes according to the present invention.
The glass fixture that describes in detail in the concrete point-connected glass curtain wall that proposes according to the present invention below in conjunction with Fig. 1 makes up, the details and the structure of the point-connected glass curtain wall of in concrete building, installing: on the coagulation adobe wall surface at high-rise building, the point-connected glass curtain wall of installation.
Describe details and the structure that makes up according to the glass fixture in the combination of the glass fixture in the concrete point-connected glass curtain wall of the present invention's proposition in detail below in conjunction with Fig. 2: the built-in fitting (2) in coagulation adobe wall (1) is gone up weldable steel pawl seat (3), load onto steel pawl (4) then, in the hole of the pawl arm of steel pawl (4), load onto eccentric gasket (5), the glass fixture screw (6) of packing into then, adjust the position of each glass fixture base (7) in the glass curtain wall structure at last according to the construction line-putting position, load onto sheet glass (9) at last, and tighten glass fixture cover plate (8).When rotating eccentric gasket (5), the position of glass fixture just can change in the eccentric arm of eccentric gasket (5), satisfies the position needs of cladding glass when practice of construction is installed.Every cladding glass in the point-connected glass curtain wall after installing is being subjected under the external loads effect, and when deforming, this glass fixture can also be adjusted automatically and change displacement, makes glass orifice not produce local additional bending moment on every side.
Describe the structure and the shape of the eccentric gasket in the glass fixture combination in the concrete point-connected glass curtain wall that proposes according to the present invention in detail below in conjunction with Fig. 3: eccentric gasket has step circle and elongated hole of two concentric axis of size, but between the round axial line of the axial line of elongated hole and two steps eccentric throw is arranged.
Describe the details and the structure of the glass fixture inside in the glass fixture combination in the concrete point-connected glass curtain wall that proposes according to the present invention in detail below in conjunction with Fig. 4: on glass fixture base (7) plane, top, have the spline pit, the effect of this spline pit is when tightening glass fixture cover plate (8) screw thread, the operator can insert the spline instrument from the hole of glass fixture cover plate (8), conveniently tighten glass fixture cover plate (8) and glass fixture base (7) connecting thread, guarantee firm grip sheet glass (9), in addition, on glass fixture cover plate (8), be provided with the anti-skidding hole slot that uses wrench.
Claims (1)
1, a kind of glass fixture combination of using in point-connected glass curtain wall, it is made up of glass fixture base (7) and glass fixture cover plate (8), it is characterized in that between glass fixture base (7) and the glass fixture cover plate (8) it being to adopt screw connection structure, and have the spline pit on glass fixture base (7) top; Have on the glass fixture cover plate (8) and make things convenient for spline instrument hole that inserts and the anti-skidding hole slot that uses spanner.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 99100172 CN1099510C (en) | 1999-01-14 | 1999-01-14 | Glass fixture combination for point-connected glass curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 99100172 CN1099510C (en) | 1999-01-14 | 1999-01-14 | Glass fixture combination for point-connected glass curtain wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1260430A CN1260430A (en) | 2000-07-19 |
| CN1099510C true CN1099510C (en) | 2003-01-22 |
Family
ID=5269843
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 99100172 Expired - Fee Related CN1099510C (en) | 1999-01-14 | 1999-01-14 | Glass fixture combination for point-connected glass curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1099510C (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102912909B (en) * | 2012-10-25 | 2014-07-02 | 广州市恒盛建设工程有限公司 | Spherical pyramid glass curtain wall construction method and curtain wall unit connecting system therein |
| CN109629720A (en) * | 2018-12-03 | 2019-04-16 | 中国五冶集团有限公司 | A kind of multidimensional adjustable curtain wall |
| CN109653512B (en) * | 2018-12-03 | 2021-04-16 | 中国五冶集团有限公司 | Installation method of adjustable curtain wall |
-
1999
- 1999-01-14 CN CN 99100172 patent/CN1099510C/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN1260430A (en) | 2000-07-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201801987U (en) | High aseismic combination stone curtain wall with replaceable aluminium suspension member | |
| CN202139744U (en) | Space hyperbolic quadrangular unit type suspended ceiling adapter claw piece | |
| CN1099510C (en) | Glass fixture combination for point-connected glass curtain wall | |
| CN212078409U (en) | Suspended ceiling component | |
| CN211974027U (en) | Adaptor convenient to GRG jib is adjusted location | |
| CN207003903U (en) | A kind of decorative panel suspension member and Side fascia | |
| CN221987947U (en) | A water conservancy and hydropower lifting equipment | |
| CN210289062U (en) | Adjustable cushion block for climbing frame | |
| CN110700464B (en) | Fixing device of fireproof glass curtain wall and construction method of fireproof glass curtain wall | |
| CN115478480B (en) | A method for installing and constructing prestressed cable-stayed anti-fall beams for high-pier simply supported beam bridges | |
| CN217679903U (en) | GRC hangs curtain wall panel installation futilely and uses accurate positioner | |
| CN207003896U (en) | A kind of decorative panel suspension member and decorative panel install node | |
| CN213712117U (en) | Fixing device is used in fire hose installation with press from both sides tight structure of preventing empting | |
| CN2424252Y (en) | Steel grab regulating mechnism for spot-connection glass curtain wall | |
| CN208844777U (en) | A kind of enamelled pressed steel furred ceiling | |
| CN102606595A (en) | Adjustable combined bolt | |
| CN218028504U (en) | Vertical overlock metal roofing anti-wind reinforcing apparatus | |
| CN209129226U (en) | A kind of novel corner fastener structure | |
| CN222714925U (en) | Curtain wall glass hoisting clamp device | |
| CN1111234C (en) | Fixture assembly in glass curtain wall connected without holes | |
| CN213151540U (en) | Pipeline fixing device on construction frame | |
| CN118756888B (en) | Suspended ceiling mounting structure for building decoration and application method thereof | |
| CN205116625U (en) | Keel bracket that can free rotation | |
| CN215253725U (en) | Aluminum veneer for architectural decoration | |
| CN215290867U (en) | Can realize GRC board mounting structure of angle modulation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C06 | Publication | ||
| PB01 | Publication | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |