Municipal road construction enclosing board mounting structure and its construction method
Technical field
The present invention relates to a kind of municipal road construction enclosing board mounting structure and its construction method, belongs to civil engineering technology neck
Domain.
Background technique
Surrounding baffle be a kind of a kind of building site maintenance after the processing such as machine die mould, spray painting, bending and with the external world every
From a kind of profile, be suitable for construction site, highway maintenance, the light-duty plate that is isolated from the outside of one kind of construction site.It is prevented fires,
Waterproof, it is moisture-proof light-weight the features such as be widely used.
As Publication No. CN106285195A is disclosed, the present invention relates to a kind of adjustable construction enclosings of Novel engineering height
Plate is made of overhead gage and lower baffle plate, and overhead gage is plugged on lower baffle plate top, to adjust the height of whole surrounding baffle.By upper gear
Plate moves down, and shank is inserted into inserting groove, the panel of overhead gage is embedded into panel slot and is pinched, by fixed lockhole and grafting
The fixed hole of bar lower part is coaxial, and runs through a pin, upper lower baffle plate is fixed together, and then have adjusted the height of surrounding baffle
Degree.The adjustable construction of Novel engineering height provided by the present application is formed with ventilation hole with surrounding baffle on baffle, guarantees wind from ventilation hole
Pass through, reduce the pressure of surrounding baffle, increases the stability of surrounding baffle.
For another example the Publication No. CN203783244U utility model discloses a kind of angle-inserting type fast-assembling enclosing plate, including plate
Block matrix and the reinforcing rib being set on plate matrix, the transverse ends of the plate matrix are respectively equipped with one in the of C font
One fastener and one be in J font the second fastener, wherein the notch of the C font of the first fastener is towards the second fastener;Second fastener
The circular arc shaped portion of J font is connect with plate matrix, and the center of circle of the circular arc shaped portion deviates from the first fastener, and the circular arc shaped portion
Internal diameter matched with the outer diameter of the C font of the first fastener.The utility model, will be between existing enclosing plate by cleverly designing
C-J type connection structure is changed by C-C type connection structure, keeps the first fastener of C font direct by way of oblique cutting
It protrudes into and carries out snapping positioning in the second fastener of J font, complete the interplate splicing of enclosing, it is very convenient quick, form oblique cutting
The enclosing that formula fast-assembling enclosing plate is constituted is time saving and energy saving.
Existing surrounding baffle is all to be packaged to be transported to building site, is then barricaded as barricade by one piece of block splicing of construction personnel, this
Sample, which is built, needs a large amount of manpowers, and the speed built and removed is very slow, and construction efficiency is low, and speed is slow, long in time limit.
Summary of the invention
In view of the above deficiencies, this reality invention provides a kind of municipal road construction enclosing board mounting structure and its construction party
Method, by the present invention in that constructed with semi-automated mechanism, it is easy to operate, manpower and material resources have been saved, the construction time is saved.
The specific technical solution that the present invention mentions is as follows:
Municipal road construction enclosing board mounting structure, including anchoring, engineering truck, barrier, it is characterised in that: the engineering
Vehicle is connect by traction device with anchoring;Barrier is whole one block of plate, and top is equipped with the hook for catching on wirerope;
The leading portion of the engineering truck is equipped with push arm, and the push arm is connect with the hydraulic push rod being fixed on above engineering truck,
Baffle is installed, conveyer belt is installed in the middle section of the engineering truck, and rear end is equipped with frame at the hydraulic push rod and push arm contact
The side of body, frame body is equipped with doorframe;It is equipped on frame body through motor-driven driving wheel, the driving wheel is laid in transmission
The top of the discharge end of band, the driving wheel drive auxiliary wheel rotation, and the auxiliary wheel is equipped with barrier conveyer belt one up and down;Institute
The turntable for being also equipped in frame body and driving by bottom motors two is stated, four faces of the turntable are equipped with armlet, the armlet
Bottom be that plate is carried on a shoulder pole in transition, the triangular rack being fixed on above frame body, the connection installation of hydraulic cylinder two are installed above the armlet
Push rod two is installed on the lower section of triangular rack, the hydraulic cylinder two and is directed at doorframe, the two sides of the doorframe are also equipped with logical
Cross the barrier conveyer belt two that motor three drives rotation material transfer;
The anchoring includes pedestal, and the pedestal is mounted below universal wheel, and electric reel and mechanical arm are mounted on the base
Face, face interval is equipped with pulley on the tool arm, and cable wire fixator on the doorframe, wirerope one end is fixed on cable wire and fixes
It on device, is then passed through after the pulley above anchoring, the other end is wound on electric reel.
Preferentially, be also equipped on the inside of the armlet gear buckle, it is described gear button one end be hinged on pin, the other end and
The spring connection being fixed on armlet.
Based on above-mentioned apparatus, the present invention also provides a kind of municipal road construction surrounding baffle construction method of installation, feature exists
In including the following steps:
1) engineering truck is connect by traction device with anchoring, engineering truck drives anchoring to reach construction site, simultaneously
Scene is reached using charge of trucks barrier;
2) both anchoring and engineering truck are separated according to site operation situation, and anchoring is transferred to designated position
Later, wirerope one end is fixed on cable wire fixator, is then passed through after the pulley above anchoring, the other end is wound on
On electric reel, starts electric reel and tense wirerope;
3) charge of trucks barrier is directly unloaded on conveyer belt, barrier is advanced slowly under the drive of hydraulic stem;
4) push arm advances under the drive of hydraulic push rod entangles barrier and is pushed into the barrier conveyer belt one being symmetrically installed,
Barrier conveyer belt one advances under the indirect drive of motor is sent into barrier on the armlet on turntable, and gear button clasps barrier;
5) turntable, which constantly rotates, send barrier into frame side, and when barrier reaches doorframe face, push rod two is under the drive of hydraulic cylinder two
Barrier is pushed open and is sent into barrier conveyer belt two, during this process: spring is elongated, and gear button is rotated along pin, such barrier
Just it is detached from the constraint of gear button, while keeping off button and also springing back to original position;
6) when barrier is transmitted to doorframe by barrier conveyer belt two, the hook above barrier is caught on wirerope automatically;
7) step 3) -6 is constantly repeated), such barrier is just constantly admitted to arrangement on wirerope and forms surrounding baffle, construction knot
Beam.
The invention has the advantages that the present invention is by designing automanual machine application in surrounding baffle Fast Installation,
Mechanization is built and removed the arrangement achieves surrounding baffle, and speed is fast, high degree of automation, reduces manual operation and saves people
Power cost, and it is highly-safe, it is suitble to promote the use of.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Schematic diagram when Fig. 1 is municipal road construction enclosing board mounting structure of the present invention construction;
Fig. 2 another view direction schematic diagram when being municipal road construction enclosing board mounting structure of the present invention construction;
Fig. 3 is the structure chart of barrier of the present invention;
Fig. 4 is the side view of barrier of the present invention;
Fig. 5 is the structure chart of gear button;
Fig. 6 is the structural schematic diagram of engineering truck second half section of the present invention;
Fig. 7 is anchoring structure chart of the present invention;
Fig. 8 is the structure chart of another view direction of engineering truck second half section of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Embodiment 1
Municipal road construction enclosing board mounting structure, including anchoring 1, engineering truck 4, barrier 2, the engineering truck 4 is by leading
Leading-in device is connect with anchoring 1;In the present embodiment, barrier 2 is whole one block of plate, and top is equipped with the extension for catching on wirerope 3
Hook.
The leading portion of engineering truck 4 is equipped with push arm 8, the push arm 8 and the hydraulic push rod 22 being fixed on above engineering truck 4
Connection, the hydraulic push rod 22 are equipped with baffle 23 with push 8 contact position of arm, and barrier 2 falls down baffle 23 in order to prevent.The work
Conveyer belt 10 is installed in the middle section of journey vehicle 4, and conveyer belt 10 in the construction process, can be moved, can not also be moved, meanwhile, transmission
Speed is also adjustable, and in the present embodiment, conveyer belt 10 is slowly moved.
The rear end of engineering truck 4 is equipped with frame body 24, and the side of frame body 24 is equipped with doorframe 26;It is equipped on frame body 24 and passes through electricity
The driving wheel 14 that machine drives, the driving wheel 14 are laid in the top of the discharge end of conveyer belt 10, and the driving wheel 14 drives auxiliary
16 rotation of wheel is helped, about 16 auxiliary wheel is equipped with barrier conveyer belt 1;It is also equipped in the frame body 24 and passes through bottom
The turntable 25 that motor two drives, four faces of the turntable 25 are equipped with armlet 12, and the bottom of the armlet 12 is that plate is carried on a shoulder pole in transition
11, the top of the armlet 12 is equipped with the triangular rack 17 being fixed on above frame body 24, and the connection of hydraulic cylinder 2 18 is mounted on three
The lower section of angle hanger 17 is equipped with push rod 2 19 on the hydraulic cylinder 2 18 and is directed at doorframe 26, and the two sides of the doorframe 26 are also pacified
Equipped with the barrier conveyer belt 2 20 for driving rotation material transfer by motor three;
Anchoring 1 includes pedestal 107, and the pedestal 107 is mounted below universal wheel 108, electric reel 106 and mechanical arm 103
It being mounted on above pedestal 107, face interval is equipped with pulley 101 on the tool arm 103, cable wire fixator 9 on the doorframe 26,
3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, the other end is wound on electricity
On reel 106.
The inside of armlet 12 is also equipped with gear and buckle 13, and one end of the gear button 13 is hinged on pin 31, the other end with admittedly
The spring 32 being scheduled on armlet 12 connects.
Based on above-mentioned apparatus, the present invention also proposes a kind of municipal road construction surrounding baffle construction method of installation, including as follows
Step:
1) engineering truck 4 being connect by traction device with anchoring 1, engineering truck 4 drives anchoring 1 to reach construction site,
Scene is reached using charge of trucks barrier 2 simultaneously;
2) anchoring 1 is separated according to site operation situation with 4 the two of engineering truck, and anchoring 1 is transferred to specific bit
After setting, 3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, separately
One end is wound on electric reel 106.Start electric reel 106 to tense wirerope 3;
3) charge of trucks barrier 2 is directly unloaded on conveyer belt 10, barrier 2 is advanced slowly under the drive of hydraulic stem;
4) push arm 8 advances under the drive of hydraulic push rod 22 entangles barrier 2 and is pushed into the barrier conveyer belt one being symmetrically installed
In 15, barrier conveyer belt 1 advances under the indirect drive of motor is sent into barrier 2 on the armlet 12 on turntable 25, gear button
13 clasp barrier 2;
5) barrier 2 is sent into 26 side of doorframe by the constantly rotation of turntable 25, and when barrier 2 reaches 26 face of doorframe, push rod 2 19 is in hydraulic cylinder
Barrier 2 is pushed open under 2 18 drive and is sent into barrier conveyer belt 2 20, during this process: spring 32 is elongated, and gear button 13 is suitable
Pin 31 rotate, such barrier 2 is just detached from the constraint of gear button 13, while keeping off detaining and 13 also springing back to original position;
6) when barrier 2 is transmitted to doorframe 26 by barrier conveyer belt 2 20, the hook above barrier 2 catches on steel wire automatically
On rope 3;
7) step 3) -6 is constantly repeated), such barrier 2 is just constantly admitted to arrangement on wirerope 3 and forms surrounding baffle, constructs
Terminate.
Embodiment 2
Municipal road construction enclosing board mounting structure, including anchoring 1, engineering truck 4, barrier 2, the engineering truck 4 is by leading
Leading-in device is connect with anchoring 1;In the construction process, due to sufficiently bulky, the number that such lorry transports every time of barrier 2
It measures limited, in order to solve the problems, such as this, saves the volume of barrier, increase freight volume, in the present embodiment, barrier barrier 2 includes upper screen
Barrier 210 and lower barrier 211, the two sides of the upper barrier 210 are equipped with side chute 202 and slide into upper barrier 210 for lower barrier 211
It is internal;The upper barrier 210, top hanging groove 203 is installed, cable wire lock 204 is mounted on barrier 210, above
It is locked with from the back side and passes through the cable wire 201 of coming, the cable wire 201 is connect with lower barrier 211 simultaneously, while folding also can be used
Folded barrier.
The leading portion of engineering truck 4 is equipped with push arm 8, the push arm 8 and the hydraulic push rod 22 being fixed on above engineering truck 4
Connection, the hydraulic push rod 22 are equipped with baffle 23 with push 8 contact position of arm, and barrier 2 falls down baffle 23 in order to prevent.The work
Conveyer belt 10 is installed in the middle section of journey vehicle 4, and conveyer belt 10 in the construction process, can be moved, can not also be moved, meanwhile, transmission
Speed is also adjustable, and in the present embodiment, conveyer belt 10 is slowly moved.
The rear end of engineering truck 4 is equipped with frame body 24, and the side of frame body 24 is equipped with doorframe 26;It is equipped on frame body 24 and passes through electricity
The driving wheel 14 that machine drives, the driving wheel 14 are laid in the top of the discharge end of conveyer belt 10, and the driving wheel 14 drives auxiliary
16 rotation of wheel is helped, about 16 auxiliary wheel is equipped with barrier conveyer belt 1;It is also equipped in the frame body 24 and passes through bottom
The turntable 25 that motor two drives, four faces of the turntable 25 are equipped with armlet 12, and the bottom of the armlet 12 is that plate is carried on a shoulder pole in transition
11, the top of the armlet 12 is equipped with the triangular rack 17 being fixed on above frame body 24, and the connection of hydraulic cylinder 2 18 is mounted on three
The lower section of angle hanger 17 is equipped with push rod 2 19 on the hydraulic cylinder 2 18 and is directed at doorframe 26, and the two sides of the doorframe 26 are also pacified
Equipped with the barrier conveyer belt 2 20 for driving rotation material transfer by motor three;
Anchoring 1 includes pedestal 107, and the pedestal 107 is mounted below universal wheel 108, electric reel 106 and mechanical arm 103
It being mounted on above pedestal 107, face interval is equipped with pulley 101 on the tool arm 103, cable wire fixator 9 on the doorframe 26,
3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, the other end is wound on electricity
On reel 106.
The inside of armlet 12 is also equipped with gear and buckle 13, and one end of the gear button 13 is hinged on pin 31, the other end with admittedly
The spring 32 being scheduled on armlet 12 connects.
Based on above-mentioned apparatus, the present invention also proposes a kind of municipal road construction surrounding baffle construction method of installation, including as follows
Step:
1) engineering truck 4 being connect by traction device with anchoring 1, engineering truck 4 drives anchoring 1 to reach construction site,
Scene is reached using charge of trucks barrier 2 simultaneously;
2) anchoring 1 is separated according to site operation situation with 4 the two of engineering truck, and anchoring 1 is transferred to specific bit
After setting, 3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, separately
One end is wound on electric reel 106.Start electric reel 106 to tense wirerope 3;
3) charge of trucks barrier 2 is directly unloaded on conveyer belt 10, barrier 2 is advanced slowly under the drive of hydraulic stem;
4) push arm 8 advances under the drive of hydraulic push rod 22 entangles barrier 2 and is pushed into the barrier conveyer belt one being symmetrically installed
In 15, barrier conveyer belt 1 advances under the indirect drive of motor is sent into barrier 2 on the armlet 12 on turntable 25, gear button
13 clasp barrier 2;
5) barrier 2 is sent into 26 side of doorframe by the constantly rotation of turntable 25, and when barrier 2 reaches 26 face of doorframe, push rod 2 19 is in hydraulic cylinder
Barrier 2 is pushed open under 2 18 drive and is sent into barrier conveyer belt 2 20, during this process: spring 32 is elongated, and gear button 13 is suitable
Pin 31 rotate, such barrier 2 is just detached from the constraint of gear button 13, while keeping off detaining and 13 also springing back to original position;
6) when barrier 2 is transmitted to doorframe 26 by barrier conveyer belt 2 20, the hanging groove 203 above upper barrier 210 hooks automatically
Firmly on wirerope 3;
7) step 3) -6 is constantly repeated), such barrier 2 is just constantly admitted to arrangement on wirerope 3 and forms surrounding baffle;Arrangement
After the completion, construction personnel releases cable wire 201, extracts lower barrier 211 inside upper barrier 210 out, passes through when to certain position
Cable wire lock 204 locks cable wire 201, and construction terminates.
Embodiment 3
Municipal road construction enclosing board mounting structure, including anchoring 1, engineering truck 4, barrier 2, the engineering truck 4 is by leading
Leading-in device is connect with anchoring 1;In the construction process, due to sufficiently bulky, the number that such lorry transports every time of barrier 2
It measures limited, in order to solve the problems, such as this, saves the volume of barrier, increase freight volume, in the present embodiment, barrier barrier 2 includes upper screen
Barrier 210 and lower barrier 211, the two sides of the upper barrier 210 are equipped with side chute 202 and slide into upper barrier 210 for lower barrier 211
It is internal;The upper barrier 210, top hanging groove 203 is installed, cable wire lock 204 is mounted on barrier 210, above
It is locked with from the back side and passes through the cable wire 201 of coming, the cable wire 201 is connect with lower barrier 211 simultaneously, while folding also can be used
Folded barrier.In addition, the bottom of lower barrier 211 is equipped with 208 He of upper pin in order to solve the problems, such as that barrier is easy to be waved by wind
Lower bearing pin 205 is hinged with interior plate 206 on the upper pin 208, outer panel 207, interior plate 206 is hinged on lower bearing pin 205
Triangle branch frame is hingedly formed again with outer panel 207, is propped up on the ground by the triangle branch frame of lower section, the stability of barrier mentions significantly
It is high.
The leading portion of engineering truck 4 is equipped with push arm 8, the push arm 8 and the hydraulic push rod 22 being fixed on above engineering truck 4
Connection, the hydraulic push rod 22 are equipped with baffle 23 with push 8 contact position of arm, and barrier 2 falls down baffle 23 in order to prevent.The work
Conveyer belt 10 is installed in the middle section of journey vehicle 4, and conveyer belt 10 in the construction process, can be moved, can not also be moved, meanwhile, transmission
Speed is also adjustable, and in the present embodiment, conveyer belt 10 is not moved.
The rear end of engineering truck 4 is equipped with frame body 24, and the side of frame body 24 is equipped with doorframe 26;It is equipped on frame body 24 and passes through electricity
The driving wheel 14 that machine drives, the driving wheel 14 are laid in the top of the discharge end of conveyer belt 10, and the driving wheel 14 drives auxiliary
16 rotation of wheel is helped, about 16 auxiliary wheel is equipped with barrier conveyer belt 1;It is also equipped in the frame body 24 and passes through bottom
The turntable 25 that motor two drives, four faces of the turntable 25 are equipped with armlet 12, and the bottom of the armlet 12 is that plate is carried on a shoulder pole in transition
11, the top of the armlet 12 is equipped with the triangular rack 17 being fixed on above frame body 24, and the connection of hydraulic cylinder 2 18 is mounted on three
The lower section of angle hanger 17 is equipped with push rod 2 19 on the hydraulic cylinder 2 18 and is directed at doorframe 26, and the two sides of the doorframe 26 are also pacified
Equipped with the barrier conveyer belt 2 20 for driving rotation material transfer by motor three;
Anchoring 1 includes pedestal 107, and the pedestal 107 is mounted below universal wheel 108, electric reel 106 and mechanical arm 103
It being mounted on above pedestal 107, face interval is equipped with pulley 101 on the tool arm 103, cable wire fixator 9 on the doorframe 26,
3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, the other end is wound on electricity
On reel 106.
The inside of armlet 12 is also equipped with gear and buckle 13, and one end of the gear button 13 is hinged on pin 31, the other end with admittedly
The spring 32 being scheduled on armlet 12 connects.
In order to save the labour for manually unloading barrier, the side of engineering truck 4 is also movably installed with movable plate 7, the activity
Hydraulic cylinder 46 is installed, the hydraulic cylinder 46 is connected with lifter plate 5, barrier 2 can directly be unloaded and be attached to lifter plate 5 on plate 7
On.
Based on above-mentioned apparatus, the present invention also proposes a kind of municipal road construction surrounding baffle construction method of installation, including as follows
Step:
1) engineering truck 4 being connect by traction device with anchoring 1, engineering truck 4 drives anchoring 1 to reach construction site,
Scene is reached using charge of trucks barrier 2 simultaneously;
2) anchoring 1 is separated according to site operation situation with 4 the two of engineering truck, and anchoring 1 is transferred to specific bit
After setting, 3 one end of wirerope is fixed on cable wire fixator 9, is then passed through after the pulley 101 above anchoring 1, separately
One end is wound on electric reel 106.Start electric reel 106 to tense wirerope 3;
3) charge of trucks barrier 2 is directly discharged on lifter plate 5 from lorry, hydraulic cylinder 46 is by the barrier (2) on lifter plate 5
It rises with conveyer belt 10 side by side, barrier 2 is pushed on conveyer belt 10 by construction personnel;
4) push arm 8 advances under the drive of hydraulic push rod 22 entangles barrier 2 and is pushed into the barrier conveyer belt one being symmetrically installed
In 15, barrier conveyer belt 1 advances under the indirect drive of motor is sent into barrier 2 on the armlet 12 on turntable 25, gear button
13 clasp barrier 2;
5) barrier 2 is sent into 26 side of doorframe by the constantly rotation of turntable 25, and when barrier 2 reaches 26 face of doorframe, push rod 2 19 is in hydraulic cylinder
Barrier 2 is pushed open under 2 18 drive and is sent into barrier conveyer belt 2 20, during this process: spring 32 is elongated, and gear button 13 is suitable
Pin 31 rotate, such barrier 2 is just detached from the constraint of gear button 13, while keeping off detaining and 13 also springing back to original position;
6) when barrier 2 is transmitted to doorframe 26 by barrier conveyer belt 2 20, the hanging groove 203 above upper barrier 210 hooks automatically
Firmly on wirerope 3;
7) step 3) -6 is constantly repeated), such barrier 2 is just constantly admitted on wirerope 3 and arranges;After the completion of arrangement, construction
Personnel release cable wire 201, extract lower barrier 211 inside upper barrier 210 out, pass through cable wire lock when arriving certain position
204 lock cable wire 201, and construction terminates.
Although the illustrative specific embodiment of the present invention is described above, in order to the technology of the art
Personnel are it will be appreciated that the present invention, but the present invention is not limited only to the range of specific embodiment, to the common skill of the art
For art personnel, as long as long as various change the attached claims limit and determine spirit and scope of the invention in, one
The innovation and creation using present inventive concept are cut in the column of protection.