CN109538834A - The fire proof construction and proof assembl of converter transformer bushings - Google Patents

The fire proof construction and proof assembl of converter transformer bushings Download PDF

Info

Publication number
CN109538834A
CN109538834A CN201910081057.1A CN201910081057A CN109538834A CN 109538834 A CN109538834 A CN 109538834A CN 201910081057 A CN201910081057 A CN 201910081057A CN 109538834 A CN109538834 A CN 109538834A
Authority
CN
China
Prior art keywords
proof
explosion
converter transformer
wall
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910081057.1A
Other languages
Chinese (zh)
Inventor
林刚
王建武
赵胜计
张雪波
左干清
韦晨东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201910081057.1A priority Critical patent/CN109538834A/en
Publication of CN109538834A publication Critical patent/CN109538834A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing
    • F16L5/04Sealing to form a firebreak device

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Connector Housings Or Holding Contact Members (AREA)

Abstract

The invention discloses a kind of fire proof construction of converter transformer bushings and proof assembls, flame barrier is installed between converter transformer bushings and wall, so that the gap between converter transformer bushings and wall is well blocked, the intensity of a fire is effectively prevent to spread to valve hall from gap location.The first proof assembl is installed between converter transformer bushings and wall again, and the first proof assembl is located at flame barrier towards the side of converter transformer bushings.When fire occurs due to converter power transformer; phenomenon would generally be fired with chemistry; therefore; flame barrier is arranged in towards on the side of converter transformer bushings in first proof assembl; enable the first proof assembl effectively to offset chemistry and fires bring explosive force; it effectively prevent flame barrier to be destroyed, to be conducive to flame barrier normal work.

Description

The fire proof construction and proof assembl of converter transformer bushings
Technical field
The present invention relates to converter power transformer technical field, more particularly to a kind of converter transformer bushings fire proof construction with Proof assembl.
Background technique
Core main equipment one of of the converter power transformer as DC transmission engineering mainly plays and provides commutation electricity for converter bridge Pressure, transmission electric energy, isolation ac and dc systems etc. and its important role.Converter valve in valve hall is the substantially single of converter power transformer Element device undertakes AC-DC conversion function in converter station, is vital key equipment in super high voltage direct current electricity transmission engineering. Converter power transformer is usually arranged close to valve hall, and converter transformer bushings protrude into valve hall through wall.
The occurrence index of converter power transformer is very high, be valve hall important fire hazard source and converter station it is main Fire hazard source.For this purpose, fire-proof plate would generally be equipped in the gap between converter transformer bushings and wall, to prevent fire Gap location between converter transformer bushings and wall is spread in valve hall.However, the fire of converter power transformer would generally companion With explosion phenomenon, traditional fire-proof plate is under the action of explosive force, it is easy to damage and lose fire resistance property.
Summary of the invention
Based on this, it is necessary to provide the fire proof construction and proof assembl of a kind of converter transformer bushings, it can effectively prevent Only fire-proof plate is destroyed in the case where converter power transformer chemistry fires impact force action.
Its technical solution is as follows:
A kind of fire proof construction of converter transformer bushings, comprising: flame barrier, the flame barrier is for being installed in change of current transformation Between device casing and wall;With the first proof assembl, first proof assembl is for being installed in the converter transformer bushings Between the wall, and first proof assembl is used to be located at side of the flame barrier towards converter power transformer.
The fire proof construction of above-mentioned converter transformer bushings, by flame barrier be installed in converter transformer bushings and wall it Between, so that the gap between converter transformer bushings and wall is well blocked, the intensity of a fire is effectively prevent to spread to from gap location Valve hall.The first proof assembl is installed between converter transformer bushings and wall again, and the first proof assembl is located at fire prevention Part is towards the side of converter power transformer.When fire occurs due to converter transformer bushings, it will usually fire phenomenon hair with chemistry It is raw, therefore, flame barrier is arranged in towards on the side of converter power transformer, enabling the first proof assembl in the first proof assembl It effectively offsets chemistry and fires bring explosive force, flame barrier is effectively prevent to be destroyed, to be conducive to flame barrier normal work.
First proof assembl includes the first explosion-proof part, the second explosion-proof part and the first company in one of the embodiments, Fitting, the first explosion-proof part are connect by first connector with the described second explosion-proof part.
First connector is multiple in one of the embodiments, and multiple first connectors are along described the The length direction of one explosion-proof part is arranged at intervals between the described first explosion-proof part and the second explosion-proof part.
The fire proof construction of converter transformer bushings further includes the second connector in one of the embodiments, and described second Connector is through multiple first connector settings.
The fire proof construction of converter transformer bushings further includes edge sealing member in one of the embodiments, the edge sealing member one End is fixed on first proof assembl, and the edge sealing member other end is for being fixed on the wall, and the edge sealing member It is extended along the edge of first proof assembl.
The fire proof construction of converter transformer bushings further includes mounting assembly in one of the embodiments, the installation group For being installed in the wall, described edge sealing member one end is fixed in the mounting assembly part.
The mounting assembly includes installation part and the first fixing piece in one of the embodiments, and the installation part passes through First fixing piece is installed on the wall, and described edge sealing member one end is fixed on the installation part.
The mounting assembly further includes first thermal insulation layer in one of the embodiments, and the first thermal insulation layer is for setting It sets between the installation part and the wall, and described first thermal insulation layer one end extends in the flame barrier.
The fire proof construction of converter transformer bushings further includes the second proof assembl in one of the embodiments, and described Two proof assembls for being installed between the converter transformer bushings and the wall, and first proof assembl with it is described Second proof assembl is located at the opposite sides of the flame barrier.
A kind of proof assembl, comprising: the first explosion-proof part, the second explosion-proof part and the first connector, the first explosion-proof part are logical It crosses first connector to connect with the described second explosion-proof part, the first explosion-proof part is with the described second explosion-proof part for being installed in Between converter transformer bushings and wall.
Above-mentioned proof assembl connect the first explosion-proof part with the second explosion-proof part by the first connector, so that The structure of proof assembl is improved.In this way, the first explosion-proof part and the second explosion-proof part are installed in converter transformer bushings and wall Between body, enables proof assembl effectively to offset chemistry and fire bring explosive force, flame barrier is effectively prevent to be destroyed, thus Be conducive to flame barrier normal work.
Detailed description of the invention
Fig. 1 is the fire proof construction schematic diagram of converter transformer bushings described in one embodiment of the invention;
Fig. 2 is the fire proof construction of converter transformer bushings in Fig. 1 along A-A sectional view;
Fig. 3 is that mounting assembly described in one embodiment of the invention, edge sealing member and wall body structure cooperate schematic diagram;
Fig. 4 is structure enlargement diagram at Fig. 3 centre circle B;
Fig. 5 is that flame barrier described in one embodiment of the invention and converter transformer bushings structure cooperate schematic diagram;
Fig. 6 is the fire proof construction schematic diagram of converter transformer bushings described in another embodiment of the present invention;
Fig. 7 is the fire proof construction of converter transformer bushings in Fig. 6 along C-C sectional view.
Description of symbols:
100, the first proof assembl, the 110, first explosion-proof part, the 120, second explosion-proof part, the 130, first connector, 140, Two connectors, 150, second thermal insulation layer, 200, flame barrier, 210, mounting base, 220, third connector, 221, first connecting portion, 222, second connecting portion, 2221, stainless steel pipe collar, 300, wall, 310, recess portion, 320, sealant, 400, mounting assembly, 410, Installation part, the 420, first fixing piece, the 421, first fixed part, the 422, first supporting part, 430, first thermal insulation layer, 431, first every Hot arc, the 432, second isolation section, the 440, second fixing piece, the 441, second supporting part, 442, third supporting part, 443, second is fixed Portion, 500, edge sealing member, 510, heat-barrier material, 520, sealer, 600, converter transformer bushings, the 700, second proof assembl, 710, the explosion-proof part of third, the 720, the 4th explosion-proof part, the 730, the 4th connector, the 740, the 5th connector.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only to solve The present invention is released, and the scope of protection of the present invention is not limited.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
In one embodiment, Fig. 1 and Fig. 5, a kind of fire proof construction of converter transformer bushings are please referred to, comprising: fire prevention Part 200 and the first proof assembl 100.Flame barrier 200 is for being installed between converter transformer bushings 600 and wall 300.First Proof assembl 100 is for being installed between converter transformer bushings 600 and wall 300, and the first proof assembl 100 is for being located at Flame barrier 200 is towards the side of converter power transformer.
Flame barrier 200 is installed in converter transformer bushings 600 and wall by the fire proof construction of above-mentioned converter transformer bushings Between body 300 so that the gap between converter transformer bushings 600 and wall 300 is well blocked, effectively prevent the intensity of a fire from Gap location spreads to valve hall.The first proof assembl 100 is installed between converter transformer bushings 600 and wall 300 again, and will First proof assembl 100 is located at flame barrier 200 towards the side of converter power transformer.When fire occurs due to converter power transformer, lead to Often phenomenon can be fired with chemistry, therefore, the first proof assembl 100 is arranged in flame barrier 200 towards converter power transformer Side on, enable the first proof assembl 100 effectively to offset chemistry and fire bring explosive force, effectively prevent flame barrier 200 are destroyed, to be conducive to the normal work of flame barrier 200.Simultaneously as the first proof assembl 100 is arranged in change of current transformation Between device casing 600 and wall 300, therefore, the first proof assembl 100 also can be to converter transformer bushings 600 and wall 300 Between gap play certain plugging action, thus be conducive to improve converter transformer bushings fire proof construction fire prevention effect Fruit.In addition, the first proof assembl 100 through this embodiment, has the fire proof construction of converter transformer bushings good Good explosion-proof effect, so that the fire proof construction of converter transformer bushings is easy to dismount, so that construction personnel is to original knot Structure carries out quick transformation, avoids causing converter power transformer can not normal power supply because long-time is constructed.
Further, referring to FIG. 1, the first proof assembl 100 includes the first explosion-proof part 110, the second explosion-proof part 120 and the A connection piece 130.First explosion-proof part 110 is connect by the first connector 130 with the second explosion-proof part 120.In this way, connecting by first Fitting 130, so that the first explosion-proof part 110 is closely connect with the second explosion-proof part 120, to be conducive to improve converter transformer bushings Fire proof construction intensity.Specifically in the present embodiment, the first connector 130 is channel steel, and the first explosion-proof part 110 is installed in channel steel On one side, the second explosion-proof part 120 is installed on the another side of channel steel.In this way, making the first explosion-proof part 110 and second explosion-proof The connection of part 120 is more stable.Wherein, the material of the first explosion-proof part 110 and the second explosion-proof part 120 can be stainless steel, aluminium alloy, steel Reinforced concrete, carbon fibre composite or other explosion-proof lamps.Meanwhile first proof assembl 100 further include second thermal insulation layer 150, second thermal insulation layer 150 is arranged between the first explosion-proof part 110 and the second explosion-proof part 120, in this way, making the first proof assembl 100 have better heat insulation, and the temperature in valve hall is avoided sharply to increase.Wherein, the material of second thermal insulation layer 150 can be stone Cotton, diatomite, perlite, glass fibre, foam glass concrete, polyurethane foam material, alumina silicate fibre or other every Hot material 510.
Further, Fig. 1 and Fig. 6 are please referred to, the first connector 130 is multiple.Multiple first connectors 130 are along The length direction of one explosion-proof part 110 is arranged at intervals between the first explosion-proof part 110 and the second explosion-proof part 120.In this way, making first Explosion-proof part 110 connect with the second explosion-proof part 120 it is even closer, to improve the structural strength of the first proof assembl 100, in turn Improve the fire proof construction explosion-proof capabilities of converter transformer bushings.Wherein, the length side of the first explosion-proof part 110 in order to facilitate understanding To by taking Fig. 6 as an example, the length direction of the first explosion-proof part 110 is S in Fig. 61The direction of expression.
In one embodiment, Fig. 2 and Fig. 7 are please referred to, the fire proof construction of converter transformer bushings further includes the second connection Part 140.Second connector 140 is arranged through multiple first connectors 130.In this way, making multiple the by the second connector 140 A connection piece 130 is connected with each other, and the fire proof construction intensity of converter transformer bushings is greatly improved, to further increase the change of current The fire proof construction explosion-proof capabilities of bushing shell for transformer.Specifically in the present embodiment, the second connector 140 is multiple, and multiple second connect Fitting 140 is arranged along the short transverse interval of the first explosion-proof part 110.Wherein, the second connector 140 is square steel.Meanwhile in order to It is easy to understand the short transverse of the first explosion-proof part 110, by taking Fig. 7 as an example, the short transverse of the first explosion-proof part 110 is S in Fig. 72Table The direction shown.
In one embodiment, referring to FIG. 1, the fire proof construction of converter transformer bushings further includes edge sealing member 500.Edge sealing 500 one end of part is fixed on the first proof assembl 100, and 500 other end of edge sealing member is for being fixed on wall 300, and edge sealing member 500 are extended along the edge of the first proof assembl 100.It follows that when the first proof assembl 100 is mounted on change of current transformation When between device casing 600 and wall 300, can still there be gap between the first proof assembl 100 and wall 300.In this way, this reality It applies example to be added between the first proof assembl 100 and wall 300 in edge sealing member 500, and edge sealing member 500 facilitates component along first Edge be extended.The gap between the first proof assembl 100 and wall 300 is covered by edge sealing member 500, so that first is anti- The leakproofness of quick-fried component 100 and wall 300 effectively improves, to avoid the intensity of a fire from the first proof assembl 100 and wall 300 Between gap penetrate into valve hall in.Specifically in the present embodiment, edge sealing member 500 is that cover panel structure is made by the cover panel structure The sealing performance for obtaining the first proof assembl 100 and wall 300 is more preferable.Meanwhile the present embodiment is in order to improve flame barrier 200 and wall Edge sealing member 500 is similarly disposed between wall 300 and flame barrier 200 by the leakproofness between 300.In addition, by edge sealing member During 500 are installed on wall 300, edge sealing member 500 is mounted on the recess portion on wall 300 by the present embodiment by fastener In 310, then the filling with sealant 320 into recess portion 310.Wherein, fastener can be bolt, screw, pin or other fastenings zero Part.
Further, Fig. 1, Fig. 3 and Fig. 4 are please referred to, the fire proof construction of converter transformer bushings further includes mounting assembly 400.Mounting assembly 400 is for being installed in wall 300.500 one end of edge sealing member is fixed in mounting assembly 400.It follows that The edge sealing member 500 of the present embodiment is not directly anchored to instead of on wall 300, is fixed in mounting assembly 400, in this way, greatly The installation for facilitating edge sealing member 500 enables construction personnel to be quickly transformed to existing fire proof construction, is conducive to shorten anti- The construction period of fiery structure of modification.Meanwhile by mounting assembly 400, so that the installation of edge sealing member 500 is more stable, to have Conducive to the fire proof construction intensity for improving converter transformer bushings.In addition, edge sealing member 500 is installed in mounting assembly by fastener On 400, and the periphery of fastener is equipped with sealer 520, so that edge sealing member 500 and the sealing effect of mounting assembly 400 are more preferable, In, sealer 520 can be foam, mineral wool, mineral wool or other sealing materials.Wherein, fastener can be bolt, screw, pin Nail or other fastenings.
Further, mounting assembly 400 includes installation part 410 and the first fixing piece 420.Installation part 410 passes through first Fixing piece 420 is installed on wall 300.500 one end of edge sealing member is fixed on installation part 410.In this way, passing through the first fixing piece 420, so that installation part 410 is stably fixed on wall 300, so that but also edge sealing member 500 obtains stablizing fixation.Specifically at this In embodiment, installation part 410 is plate structure, which is sticked on wall 300.Wherein, the material of installation part 410 can For aluminium alloy, stainless steel, titanium alloy, carbon fiber or other materials.Meanwhile first fixing piece 420 include the first fixed part 421 With the first supporting part 422 being installed on the first fixed part 421, installation part 410 is fixed on the first supporting part 422, and first is solid Portion 421 is determined for being fixed on wall 300.In this way, by first fixing piece 420, so that the more stable fixation of installation part 410 On wall 300.
In one embodiment, the fire proof construction of converter transformer bushings further includes heat-barrier material 510.Heat-barrier material 510 For being filled in the filled cavity that edge sealing member 500, wall 300 and mounting assembly 400 are formed.In this way, being conducive to improve edge sealing member 500, the heat insulation between wall 300 and mounting assembly 400 avoids heat from being largely transferred to installation group from edge sealing member 500 On part 400, and then it is transferred in valve hall.
In one embodiment, Fig. 3 and Fig. 4 are please referred to, mounting assembly 400 further includes first thermal insulation layer 430.First is heat-insulated Layer 430 is for being arranged between installation part 410 and wall 300, and 430 one end of first thermal insulation layer extends in flame barrier 200.By This is it is found that first thermal insulation layer 430 is arranged between installation part 410 and wall 300, so that between installation part 410 and wall 300 Heat insulation is improved, and is transmitted to effectively hinder heat into valve hall, and then is conducive to keep the good operation of valve hall Environment.Meanwhile first thermal insulation layer 430 extends in flame barrier 200, so that first thermal insulation layer 430 covers flame barrier 200 and wall Gap between 300 to improve the leakproofness between flame barrier 200 and wall 300, and then effectively prevent the intensity of a fire from fire prevention It penetrates into gap between part 200 and wall 300 to valve hall.Specifically in the present embodiment, first thermal insulation layer 430 be used for along The surface of wall 300 extends in flame barrier 200, it follows that first thermal insulation layer 430 is then along wall 300 close to flame barrier 200 one side extends in flame barrier 200, in this way, making first thermal insulation layer 430 respectively close to wall 300 and flame barrier 200, to be conducive to improve first thermal insulation layer 430 to the heat insulation of wall 300 and flame barrier 200.
Further, Fig. 3 and Fig. 4 are please referred to, mounting assembly 400 further includes the second fixing piece 440, the second fixing piece 440 For being arranged between installation part 410 and wall 300, first thermal insulation layer 430 is connect with the second fixing piece 440.In this way, making One thermal insulation layer 430 obtains stablizing fixation, so that it is heat-insulated between installation part 410 and wall 300 to be conducive to first thermal insulation layer 430 Effect is more stable.
Further, the second fixing piece 440 includes the second supporting part 441, third supporting part 442 and the second fixed part 443, the second supporting part 441 is connect by the second fixed part 443 with third supporting part 442.First thermal insulation layer 430 includes mutually interconnecting The first isolation section 431 and the second isolation section 432 connect, the first isolation section 431 are arranged on the second supporting part 441, and second is heat-insulated Section 432 is connect with the second fixed part 443, and the second isolation section 432 extends in flame barrier 200.Third supporting part 442 is used for and wall Body 300 connects.In this way, further such that first thermal insulation layer 430 is stably fixed between installation part 410 and wall 300.
In one embodiment, referring to FIG. 5, the fire proof construction of converter transformer bushings further includes third connector 220. Third connector 220 is for flame barrier 200 to be connect with converter transformer bushings 600.In this way, it is solid to stablize flame barrier 200 It is scheduled between wall 300 and converter transformer bushings 600, so that flameproof effect can be reached by being conducive to flame barrier 200.Meanwhile Third connector 220 is between flame barrier 200 and converter transformer bushings 600, so that flame barrier 200 and converter power transformer set Gap between pipe 600 is covered by third connector 220, to effectively avoid the intensity of a fire from flame barrier 200 and converter power transformer set It penetrates between pipe 600 into valve hall.
Further, referring to FIG. 5, third connector 220 includes that first connecting portion 221 interconnected is connect with second Portion 222, first connecting portion 221 are sticked in flame barrier 200, and second connecting portion 222 is for being sticked in converter transformer bushings 600 On.In this way, to connect between flame barrier 200 and converter transformer bushings 600 it is even closer, be conducive to improve converter power transformer The flameproof effect of the fire proof construction of casing.Specifically in the present embodiment, second connecting portion 222 is used for by stainless steel pipe collar 2221 It is fixed in converter transformer bushings 600.First connecting portion 221 is installed in flame barrier 200 by fastener.Wherein, it fastens Part can be bolt, screw, pin or other fastenings.
In one embodiment, referring to FIG. 3, the fire proof construction of converter transformer bushings further includes mounting base 210, fire prevention Part 200, for being mounted on wall 300, in this way, passing through the mounting base 210, is stablized by mounting base 210 convenient for flame barrier 200 It is mounted on wall 300.Specifically in the present embodiment, 210 parallactic angle steel construction of mounting base.
In one embodiment, Fig. 6 and Fig. 7 are please referred to, the fire proof construction of converter transformer bushings further includes second explosion-proof Component 700.Second proof assembl 700 is used to be installed between converter transformer bushings 600 and wall 300, and first explosion-proof group Part 100 and the second proof assembl 700 are located at the opposite sides of flame barrier 200.It follows that in the another of flame barrier 200 Side is equipped with the second proof assembl 700, and flame barrier 200 is avoided to be destroyed by external forces and cannot achieve fireproofing function, in this way, The integrality of flame barrier 200 is advantageously ensured that, so that flame barrier 200 reaches between wall 300 and converter transformer bushings 600 Stablize fireproofing function.Meanwhile the second proof assembl 700 is added in 200 side of flame barrier, so that the fire prevention of converter transformer bushings Structure is explosion-proof in two sides, and intermediate fire proof construction design is preferably prevented so that the fire proof construction of converter transformer bushings has Quick-fried and flameproof effect.
Further, the second proof assembl 700 includes the explosion-proof part 710 of third, the 4th explosion-proof part 720 and the 4th connector 730.The explosion-proof part 710 of third is connect by the 4th connector 730 with the 4th explosion-proof part 720.In this way, by the 4th connector 730, So that the explosion-proof part 710 of third is closely connect with the 4th explosion-proof part 720, to be conducive to improve the fire prevention knot of converter transformer bushings Structure intensity.Specifically in the present embodiment, the 4th connector 730 is channel steel, the material of third explosion-proof part 710 and the 4th explosion-proof part 720 Material can be stainless steel, aluminium alloy, armored concrete, carbon fibre composite or other explosion-proof lamps.Meanwhile second explosion-proof group Part 700 further includes third thermal insulation layer, and third thermal insulation layer is arranged between the explosion-proof part 710 of third and the 4th explosion-proof part 720, in this way, So that the first proof assembl 100 has better heat insulation, the temperature of valve hall is avoided sharply to increase.Wherein, third thermal insulation layer Material can be asbestos, diatomite, perlite, glass fibre, foam glass concrete, polyurethane foam material, aluminium silicate fiber Dimension or other heat-barrier materials 510.
Further, referring to FIG. 6, the 4th connector 730 is multiple.Multiple 4th connectors 730 are anti-along third The length direction of quick-fried part 710 is arranged at intervals between the explosion-proof part 710 of third and the 4th explosion-proof part 720.In this way, making third explosion-proof Part 710 connect even closer with the 4th explosion-proof part 720, to improve the structural strength of the second proof assembl 700, and then improves The fire proof construction explosion-proof capabilities of converter transformer bushings.Wherein, the length direction of the explosion-proof part 710 of third in order to facilitate understanding, By taking Fig. 6 as an example, the length direction of the explosion-proof part 710 of third is S in Fig. 63The direction of expression.
In one embodiment, referring to FIG. 7, the fire proof construction of converter transformer bushings further includes the 5th connector 740. 5th connector 740 is arranged through multiple 4th connectors 730.In this way, making multiple 4th connections by the 5th connector 740 Part 730 is connected with each other, and the fire proof construction intensity of converter transformer bushings is greatly improved, to further increase converter power transformer The fire proof construction explosion-proof capabilities of casing.Specifically in the present embodiment, the 5th connector 740 is multiple, multiple 5th connectors 740 It is arranged along the short transverse interval of the explosion-proof part 710 of third.Wherein, the 5th connector 740 is square steel.Meanwhile for the ease of reason The short transverse for solving the explosion-proof part 710 of third, by taking Fig. 7 as an example, the short transverse of the explosion-proof part 710 of third is S in Fig. 74The side of expression To.
In one embodiment, Fig. 1 and Fig. 6, a kind of proof assembl are please referred to, comprising: the first explosion-proof part 110, second is anti- Quick-fried part 120 and the first connector 130.First explosion-proof part 110 is connect by the first connector 130 with the second explosion-proof part 120, and first Explosion-proof part 110 and the second explosion-proof part 120 are for being installed between converter transformer bushings 600 and wall 300.
Above-mentioned proof assembl connect the first explosion-proof part 110 with the second explosion-proof part 120 by the first connector 130, So that the structure of proof assembl is improved.In this way, the first explosion-proof part 110 and the second explosion-proof part 120 are installed in the change of current Between bushing shell for transformer 600 and wall 300, enables proof assembl effectively to offset chemistry and fire bring explosive force, effectively Flame barrier 200 is prevented to be destroyed, to be conducive to the normal work of flame barrier 200.Meanwhile the proof assembl of the present embodiment is in the change of current It is easy to dismount on the fire proof construction of bushing shell for transformer, construction personnel is facilitated to carry out on existing structure quickly by the proof assembl Transformation, to greatly improve construction efficiency.It also effectively prevent leading to converter power transformer electricity shortage because of the construction period simultaneously.
Further, please refer to Fig. 1 and Fig. 6, the first connector 130 be it is multiple, multiple first connectors 130 are along first The length direction of explosion-proof part 110 is arranged at intervals between the first explosion-proof part 110 and the second explosion-proof part 120.In this way, making first to prevent Quick-fried part 110 connect even closer with the second explosion-proof part 120.The short transverse of first explosion-proof part 110 in order to facilitate understanding, with Fig. 6 For, the length direction of the first explosion-proof part 110 is S in Fig. 61The direction of expression.
Further, proof assembl includes the second connector 140, and the second connector 140 runs through multiple first connectors 130 settings.In this way, being connected with each other multiple first connectors 130 by the second connector 140, explosion-proof group is greatly improved The structural strength of part.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of fire proof construction of converter transformer bushings characterized by comprising
Flame barrier, the flame barrier is for being installed between converter transformer bushings and wall;With
First proof assembl, first proof assembl are used to be installed between the converter transformer bushings and the wall, And first proof assembl is used to be located at side of the flame barrier towards converter power transformer.
2. the fire proof construction of converter transformer bushings according to claim 1, which is characterized in that first proof assembl Including the first explosion-proof part, the second explosion-proof part and the first connector, the first explosion-proof part by first connector with it is described Second explosion-proof part connection.
3. the fire proof construction of converter transformer bushings according to claim 2, which is characterized in that first connector is It is multiple, multiple first connectors along the length direction of the described first explosion-proof part be arranged at intervals on the described first explosion-proof part with Between the second explosion-proof part.
4. the fire proof construction of converter transformer bushings according to claim 3, which is characterized in that further include the second connection Part, second connector is through multiple first connector settings.
5. the fire proof construction of converter transformer bushings according to claim 1, which is characterized in that it further include edge sealing member, institute Edge sealing member one end to be stated to be fixed on first proof assembl, the edge sealing member other end is used to be fixed on the wall, and The edge sealing member is extended along the edge of first proof assembl.
6. the fire proof construction of converter transformer bushings according to claim 5, which is characterized in that it further include mounting assembly, For being installed in the wall, described edge sealing member one end is fixed in the mounting assembly mounting assembly.
7. the fire proof construction of converter transformer bushings according to claim 6, which is characterized in that the mounting assembly includes Installation part and the first fixing piece, the installation part are installed on the wall by first fixing piece, the edge sealing member one End is fixed on the installation part.
8. the fire proof construction of converter transformer bushings according to claim 7, which is characterized in that the mounting assembly is also wrapped Include first thermal insulation layer, the first thermal insulation layer is and described first heat-insulated for being arranged between the installation part and the wall Layer one end extends in the flame barrier.
9. the fire proof construction of converter transformer bushings according to claim 1, which is characterized in that further include second explosion-proof group Part, second proof assembl are and described first explosion-proof for being installed between the converter transformer bushings and the wall Component and second proof assembl are located at the opposite sides of the flame barrier.
10. a kind of proof assembl characterized by comprising the first explosion-proof part, the second explosion-proof part and the first connector, described One explosion-proof part is connect by first connector with the described second explosion-proof part, the first explosion-proof part and the described second explosion-proof part For being installed between converter transformer bushings and wall.
CN201910081057.1A 2019-01-28 2019-01-28 The fire proof construction and proof assembl of converter transformer bushings Pending CN109538834A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910081057.1A CN109538834A (en) 2019-01-28 2019-01-28 The fire proof construction and proof assembl of converter transformer bushings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910081057.1A CN109538834A (en) 2019-01-28 2019-01-28 The fire proof construction and proof assembl of converter transformer bushings

Publications (1)

Publication Number Publication Date
CN109538834A true CN109538834A (en) 2019-03-29

Family

ID=65838747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910081057.1A Pending CN109538834A (en) 2019-01-28 2019-01-28 The fire proof construction and proof assembl of converter transformer bushings

Country Status (1)

Country Link
CN (1) CN109538834A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067317A (en) * 2019-04-26 2019-07-30 应急管理部四川消防研究所 One kind is in the fortune converter station valve hall fire prevention fire-proof and explosion-proof plugging structure in wall opening
CN110158801A (en) * 2019-06-20 2019-08-23 应急管理部四川消防研究所 A kind of installation method of the fire-proof and explosion-proof structure with through hole
CN111677943A (en) * 2020-07-03 2020-09-18 南通世睿电力科技有限公司 A flexible plugging structure for the casing hole on the valve side of the converter valve hall

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10140705A (en) * 1996-11-15 1998-05-26 Nikken Sekkei Ltd Dual-purpose heat insulating member that can be used also for fireproof covering for duct for penetrating steel beam and method of constructing duct using the material
CN1338585A (en) * 2000-08-14 2002-03-06 希尔蒂股份公司 Fireproof casing
CN102829251A (en) * 2012-08-24 2012-12-19 特变电工沈阳变压器集团有限公司 Wall-penetrating plugging structure for casing pipe of converter transformer
CN204141076U (en) * 2014-10-14 2015-02-04 中建八局第四建设有限公司 A kind of fireproof blocking layer
CN206530779U (en) * 2017-03-07 2017-09-29 广东理工学院 The security system of fire wall is passed through based on the special feed channel of clean room
CN207686339U (en) * 2018-05-23 2018-08-03 图景设计顾问有限公司 A kind of two-sided steel plate reinforcement partition wall in financial institution's cash area
CN208009481U (en) * 2018-01-10 2018-10-26 中国建筑工程(香港)有限公司 Immersed tunnel tunnel joint fire prevention structure with fixed structure
CN208364971U (en) * 2018-04-26 2019-01-11 上海康豪金属制品有限公司 A kind of through hole fire proof seal structure
CN109193520A (en) * 2018-10-16 2019-01-11 广州供电局有限公司 The plugging structure and its construction method of cable aperture
CN208381508U (en) * 2018-06-23 2019-01-15 成都惟尚建筑设计有限公司 A kind of air hose through-flooring fire proof construction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10140705A (en) * 1996-11-15 1998-05-26 Nikken Sekkei Ltd Dual-purpose heat insulating member that can be used also for fireproof covering for duct for penetrating steel beam and method of constructing duct using the material
CN1338585A (en) * 2000-08-14 2002-03-06 希尔蒂股份公司 Fireproof casing
CN102829251A (en) * 2012-08-24 2012-12-19 特变电工沈阳变压器集团有限公司 Wall-penetrating plugging structure for casing pipe of converter transformer
CN204141076U (en) * 2014-10-14 2015-02-04 中建八局第四建设有限公司 A kind of fireproof blocking layer
CN206530779U (en) * 2017-03-07 2017-09-29 广东理工学院 The security system of fire wall is passed through based on the special feed channel of clean room
CN208009481U (en) * 2018-01-10 2018-10-26 中国建筑工程(香港)有限公司 Immersed tunnel tunnel joint fire prevention structure with fixed structure
CN208364971U (en) * 2018-04-26 2019-01-11 上海康豪金属制品有限公司 A kind of through hole fire proof seal structure
CN207686339U (en) * 2018-05-23 2018-08-03 图景设计顾问有限公司 A kind of two-sided steel plate reinforcement partition wall in financial institution's cash area
CN208381508U (en) * 2018-06-23 2019-01-15 成都惟尚建筑设计有限公司 A kind of air hose through-flooring fire proof construction
CN109193520A (en) * 2018-10-16 2019-01-11 广州供电局有限公司 The plugging structure and its construction method of cable aperture

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067317A (en) * 2019-04-26 2019-07-30 应急管理部四川消防研究所 One kind is in the fortune converter station valve hall fire prevention fire-proof and explosion-proof plugging structure in wall opening
CN110158801A (en) * 2019-06-20 2019-08-23 应急管理部四川消防研究所 A kind of installation method of the fire-proof and explosion-proof structure with through hole
CN111677943A (en) * 2020-07-03 2020-09-18 南通世睿电力科技有限公司 A flexible plugging structure for the casing hole on the valve side of the converter valve hall

Similar Documents

Publication Publication Date Title
CN109538834A (en) The fire proof construction and proof assembl of converter transformer bushings
CN103579965B (en) Fire-resistant cable slot box
CN209620666U (en) A kind of unsymmetric structure fireproof blocking of converter transformer valve-side sleeve valve hall hole
CN201436752U (en) Insulation fire resistant bus duct
CN206541941U (en) A kind of cable fire-proof explosion-proof blanket
CN209168801U (en) A kind of mining fireproof cable
CN105155671A (en) Fireproof shock insulation rubber support
CN209232559U (en) A special-shaped fireproof board for the valve side bushing riser seat of a converter transformer
CN117848052A (en) Graphite heat-preservation carbon brick based on new energy negative electrode graphitizing furnace heat-preservation material
CN206283225U (en) A kind of two-layer equation fire-proof and thermal-insulation flame retardant bus groove
CN111425702B (en) High-temperature-resistant ceramic fiber board
CN209962751U (en) Fireproof cable
CN212210460U (en) Fire-resistant high temperature resistant waterproof creep-resistant cable
CN111853374B (en) Novel anti-explosion fireproof blocking structure for sleeve hole at valve side of converter transformer valve hall
CN211550772U (en) Penetrating object plugging structure
CN210039732U (en) Fireproof and explosion-proof cable
CN209267075U (en) A kind of enclosed bus duct resistant to high temperature
CN210516295U (en) Anti-aging cable with flame-retardant function
CN213547068U (en) Fire-resistant bus duct
CN203932912U (en) Fireproof bus duct
CN209948614U (en) A fire-resistant busway
CN220122572U (en) Fire-resistant bus duct
CN211859517U (en) High-efficient fire-resistant bus duct connector
CN202353142U (en) Fire screen structure for bus duct
CN206313404U (en) Mineral matter enclosed busbar groove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329

RJ01 Rejection of invention patent application after publication