[go: up one dir, main page]

CN109083365A - A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means - Google Patents

A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means Download PDF

Info

Publication number
CN109083365A
CN109083365A CN201810933154.4A CN201810933154A CN109083365A CN 109083365 A CN109083365 A CN 109083365A CN 201810933154 A CN201810933154 A CN 201810933154A CN 109083365 A CN109083365 A CN 109083365A
Authority
CN
China
Prior art keywords
artificial stone
nut
moulding
ontology
strength cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810933154.4A
Other languages
Chinese (zh)
Inventor
钟兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN109083365A publication Critical patent/CN109083365A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • B28B1/0873Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/093Producing shaped prefabricated articles from the material by vibrating or jolting by means directly acting on the material, e.g. by cores wholly or partly immersed in the material or elements acting on the upper surface of the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/04Frames for doors, windows, or the like to be fixed in openings
    • E06B1/34Coverings, e.g. protecting against weather, for decorative purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F2019/0404Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the material
    • E04F2019/0418Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the material of stone or stone like material, e.g. ceramics, concrete; of glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means, including artificial stone's ontology, T-nut block, artificial stone's ontology back is equipped with an even surface, multiple T-nut blocks are equipped in artificial stone's ontology, the T-nut block is equipped with nut mouth, nut mouth end face is concordant with the back even surface of artificial stone's ontology, and artificial stone's ontology is fixedly connected by hanging strip with wall.The present invention provides a kind of manufactures various moulding with high-strength cement in a mold, in prefabrication process it is pre-buried can plug-in connection T-nut block, after solidification, the surface effect of the various lithotomes such as smooth surface, hair side, bush-hammered face is processed into various tool equipments on surface, metal hanging strip one end is fixed with screw rod and embedded nut first when installation, the other end is carried out assembled and is fixedly connected with nut with the expansion bolt of implantation wall or screw rod through walls, it is high to overcome lithotome skeleton installation cost, the drawback of electric welding connection safety difference.

Description

A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means
Technical field
The present invention relates to building decoration area, the life of especially a kind of European high-strength cement base artificial stone moulding of assembled Production and mounting means.
Background technique
The existing European Architecture decoration all kinds of building decorating models such as door and window cover, eaves line, stringcourse, FRP Columns, mainly have with Under several techniques: 1, lithotome it is used the methods of cut, be ground, chisel manufacture all kinds of European model articles, when installation Metal joist frame is installed in building masonry wall, is attached installation with outer pendant etc..2, with GRC(glass concrete) Various components are made, with the bolt electric welding connection of the built-in fitting and implantation wall of the metal connecting pieces such as reinforcing bar and component, surface Sprayed coating or mineral varnish are completed.3, with EPS(polystyrene) cystosepiment electric heating is cut into required moulding, surface grid cloth and sand Slurry is smeared and forms EPS lines, is pasted onto wall with stickiness mortar.4, it is fixed with mold in wall, it is straight with cement and colorful rice stone Casting is connect, solidification the methods of rear surface axe or chisel head form removing imitation stone face.There are certain drawbacks in process above 1. lithotome is because its own has been solid-like, intensity is higher, therefore it is big to make moulding difficulty, costly, can not be when installation Built-in fitting is put in inside, and can only slot punching, is connect with joint outer part with wall skeleton, to prevent stone material chipping from falling off, only More thick and heavy stone material can be selected to make moulding, cause load weight, mounting cost high, and stone mining processing welding causes Pollution.2. GRC cement components are prefabricated using shell, infiltration easy to crack;Electric welding connection easy-to-rust, safety is poor, and surface spraying applies Material or mineral varnish fugitive color open shell, and dust accumulation is fouling;It causes building decoration of low grade, influences beauty.3.EPS lines, eps foam are easy Combustion, the mortar stickup time is long, cracking easy to fall off after stickiness reduces.4. cast-in-place imitative stone needs cast-in-site, scene is surface-treated (manual ingredient is larger), is limited by factors such as place, weather, environment, equipment, and low efficiency, Product Precision is poor, and surface quality is irregular It is uneven, standardization, large-scale production procedure cannot be formed.
Summary of the invention
The purpose of the present invention is to provide the productions and installation of a kind of European high-strength cement base artificial stone moulding of assembled Mode, to solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme: a kind of European high-strength cement based artificial stone of assembled Material, including artificial stone's ontology, T-nut block, artificial stone's ontology back are equipped with an even surface, artificial stone's sheet It is equipped with multiple T-nut blocks in vivo, the T-nut block is equipped with nut mouth, nut mouth end face and artificial stone's ontology Back even surface is concordant, and artificial stone's ontology is fixedly connected by hanging strip with wall.
Preferably, the hanging strip both ends are respectively equipped with through-hole, described hanging strip one end through-hole passes through setscrew and wall Connection, the hanging strip other end through-hole are screwed togather by screw and T-nut block.
Preferably, the T-nut block height is greater than or equal to 5mm.
Preferably, the stub end of the T-nut block is embedded in advance in artificial stone's ontology, the T-nut block it is small Head end is concordant with the back even surface of artificial stone's ontology.
Preferably, the hanging strip is vertical bar shape at least provided with more than one bending or the hanging strip.
Preferably, the stub end of the T-nut block is additionally provided with transversely strengthening reinforcing bar.
Preferably, being additionally provided with longitudinal reinforcement reinforcing bar in artificial stone's ontology.
A kind of production technology for assembling European high-strength cement base artificial stone moulding, it is characterized in that the production technology include with Lower step:
One, Mold Making:
1. original molding is made, with gypsum or sculpture clay, archetype is made according to modeling requirement, it is stand-by to wipe release agent after solidification;
2. being produced on archetype according to moulding demand with unlike material with fiber glass resin, flexible glue, cement, artificial stone Required mold, is cleared up after mold solidification and to smear release agent spare;
Two, high-strength cement base artificial stone configures:
525 100 parts of white cements, 10-30 parts of slag powders, 20-30 parts of flyash, 5-10 parts of silicon ash, 100-150 parts of 4-6 mesh rice stone, 100-150 parts of 10-20 mesh rice stone, 50-100 parts of 40-80 mesh rice stone, 0.5-2 parts of air entraining agent, 1-3 parts of defoaming agent, iron oxide pigment 0-3 parts, 0.1-2 parts of high efficiency water reducing agent, water-cement ratio 20-25;The number is mass fraction;
Three, production procedure:
1. mold spare in step 1 is placed on shaking platform;
2. opening vibrator is gradually poured into mould after the configuration of high-strength cement base artificial stone in step 2 is stirred into slurry In tool and it is used for the synchronous vibration of hand-held vibrating head;
3. ready framework of steel reinforcement and T-nut root tuber is pre-buried according to requirement progress is put;
4. gradually the dispensing of required slurry is finished, back is levelling, and guarantee that nut mouth is flushed with back;
5. maintenance is sent into fog room after demoulding, continues maintenance to design strength to normal intensity;
6. sending the prefabricated component conserved to surface treatment workshop, it is surface-treated with the tools such as electronic, pneumatic, forms light The surface effects such as face, hair side, bush-hammered face;
7. pair product handled well, spraying protective agent obtains finished-product material.
A kind of installation method of the European high-strength cement base artificial stone moulding of assembled, comprising the following steps:
1) installation site is determined in wall construction unwrapping wire according to the installation position of model articles;
2) built-in fitting mode is determined according to wall different structure, material, with expansion bolt, screw rod through walls and strengthening steel slab in determination Position is implanted into wall;
3) it according to the different connection hanging strip of different shaping, is connected and fixed with screw rod and prefabricated moulding;
4) moulding that will assemble connection hanging strip, is tightened with nut with the pre embedded bolt to be implanted into wall and carries out assembly connection;
5) it is squeegeeed completion with stone material glue of squeegeeing;
6) it clears up and sprays waterproof.
The present invention provide it is a kind of manufacture various moulding in a mold with high-strength cement, it is pre-buried in prefabrication process can be plug-in The T-nut block of connection after solidification, is processed into the various natural stones such as smooth surface, hair side, bush-hammered face with various tool equipments on surface The surface effect of material, when installation, first fix metal hanging strip one end with screw rod and embedded nut, other end nut and implantation The expansion bolt of wall or screw rod through walls carry out assembled and are fixedly connected, and overcome lithotome skeleton installation cost height, electric welding The drawback of connection safety difference.High-strength cement base is the high-strength cement base of C60 or C60 or more rank, and high-strength cement base can reach Various moulding can be rapidly completed in the intensity and durability of lithotome, moulding technology, and surface treatment method uses at lithotome The various equipment and technique for managing surface, are entirely capable of reaching the various surface effects of lithotome.To solve lithotome production Moulding is at high cost, skeleton mounting cost is big, GRC component is easy to crack, surface coating mineral varnish fugitive color, EPS lines are inflammable, easily takes off It falls;Cast-in-place imitative stone low efficiency, the technical problems such as simulated effect difference.Batch production, standardized production process, cement can be achieved in the present invention Base using naturally discard aggregate chips as main material, overcome lithotome need to cut into a mountain for quarrying welding the drawbacks of, comply fully with items Environment protection requirement is the technology benefited the nation and the people.
Detailed description of the invention
Fig. 1 is the schematic diagram that T-nut block is embedded in finished-product material;
Fig. 2 is the connected mode schematic diagram of a variety of connection hanging strips;
Fig. 3 is schematic diagram of the present invention in actual installation process;
Fig. 4 is another schematic diagram in actual installation process of the present invention;
Fig. 5 is another schematic diagram in actual installation process of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
A kind of European high-strength cement base artificial stone of assembled, including artificial stone's ontology, T-nut block, it is described artificial 3 back of stone material ontology is equipped with an even surface, is equipped with multiple T-nut blocks 2, T-nut block height in artificial stone's ontology More than or equal to 5mm.The stub end of T-nut block is embedded in advance in artificial stone's ontology, and the small head end of the T-nut block is equipped with Nut mouth 23,23 end face of nut mouth are concordant with the back even surface of artificial stone's ontology.The stub end of T-nut block is additionally provided with cross To reinforced steel 32.Artificial stone's ontology 3 is fixedly connected by hanging strip 22 with wall 1, and hanging strip is metal material, and hanging strip is extremely It is equipped with more than one bending less or the hanging strip is vertical bar shape etc..Hanging strip both ends are respectively equipped with through-hole, described 22 one end of hanging strip Through-hole is connect by setscrew 12 with wall 1, and the hanging strip other end through-hole is screwed togather by screw and T-nut block.It is artificial Longitudinal reinforcement reinforcing bar 31 is additionally provided in stone material ontology.
Embodiment 1
There are lid lines, yellow bush-hammered face (as shown in Figs. 1-3)
1. original molding is made: according to line plastic, it is modulated into slurry with gypsum, the lines scraper plate that will be made of PVC board, striking lines Master mould;
2. smearing release agent after former mould gypsum sets;
3. successively brushing patch system with fiber glass resin, grid cloth, mold is made;
4. the fiber reinforced plastic mold of solidification is demoulded cleaning, and brushing release agent is spare;
5. cement base slurry preparation: 525 100 parts of white cements, 25 parts of slag powders, 30 parts of flyash, 8 parts of silicon ash, 4-6 mesh yellow rice 150 parts of stone, 100 parts of 10-20 mesh yellow rice stone, 80 parts of 40-80 mesh yellow rice stone, 1 part of air entraining agent, 2 parts of defoaming agent, oxide yellow 2 parts of iron pigment, 0.8 part of polycarboxylate water-reducer;
6. the slurry that will be prepared according to the above ratio is gradually launched and is stirred 10-15 minutes in blender;
7. spare line mold is placed on shaking platform;
8. the slurry being stirred gradually is launched in mold, and vibrator synchronous vibration is opened simultaneously, hand-held vibrating head exists Higher depth is vibrated simultaneously;
9. will shift to an earlier date ready bar built-in fitting and pre- T-nut block 2, bar built-in fitting is by longitudinal reinforcement reinforcing bar 31, transverse direction The interaction of reinforced steel 32 is constituted, and reinforces stability, according to linear that its is pre-buried to normal place;
10. lines back trowel is levelling, and guarantee that embedded nut mouth 23 is flushed with back;
11. the lines of solidification are demoulded, there will be the place of gap to mend, send to fog room and conserve;
12. sending the lines conserved to surface treatment workshop, with pneumatic alloy chisel head, lift-off processing is carried out on lines surface. Form bush-hammered face effect;
13. clearing up and spraying six face waterproofing agents, artificial stone's ontology 3 is obtained;
14. sending the building-site marked to the construction line-putting;
15. wall 1 uses expansion bolt 12 when being the lower wall of the structures such as aerated bricks, and with fritter steel plate reinforcement, wall is It is pre-buried with expansion stud implantation when concrete structure;
16. hanging strip and lines embedded nut 2 are tightened with screw rod, by fritter steel plate bending at hanging strip 22 shown in Fig. 2 with implantation The expansion bolt 12 of wall with nut tightens connection, and (wall 1 can be connect in several ways with finished-product material 3, such as institute in Fig. 2 Show);
17. seam crossing gluing is sealed with silicone adhesive;
18. clearing up and spraying twice of organosilicon moisture repellent.
Embodiment 2
Uncovered lines, red dull surface (as shown in Figure 4)
1. mould making method is the same as embodiment 1;
2. iron oxide pigment is red, meter Shi Wei red specification is the same as embodiment 1;
3. surface treatment method is metal grinding, lift-off processing is at dull surface;
4. being tightened hanging strip and lines embedded nut 2 with screw rod, hanging strip is fixed on the wall by expansion bolt 12, and hanging strip is vertical bar Shape;
5. after the installation is completed, buckling prefabricated red matt plate 4 above.
Embodiment 3
There are slot FRP Columns 13, Sesame White, undisguised face (as shown in Figure 5)
1. mould making method is with embodiment 1, the brushing retarder in mold;
2. meter Shi Wei black mole and white stone;
3. forming undisguised face with giant impulse face.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. a kind of European high-strength cement base artificial stone of assembled, including artificial stone's ontology, T-nut block, it is characterised in that Artificial stone's ontology back is equipped with an even surface, is equipped with multiple T-nut blocks, the T-type in artificial stone's ontology Nut block is equipped with nut mouth, and nut mouth end face is concordant with the back even surface of artificial stone's ontology, artificial stone's sheet Body is fixedly connected by hanging strip with wall.
2. one kind assembles the production technology of European high-strength cement base artificial stone moulding as described in claim 1, feature exists In the production technology the following steps are included:
One, Mold Making:
A. former molding is made, and with gypsum or sculpture clay, makes archetype according to modeling requirement, it is stand-by to wipe release agent after solidification;
B. it is produced on archetype according to moulding demand with unlike material with fiber glass resin, flexible glue, cement, artificial stone Required mold, is cleared up after mold solidification and to smear release agent spare;
Two, production procedure:
A. mold spare in step 1 is placed on shaking platform;
B. vibrator is opened, after the raw material of high-strength cement base artificial stone material is stirred into slurry, is gradually poured into mold simultaneously For hand-held vibrating head synchronous vibration;
C. ready framework of steel reinforcement and nut block is pre-buried according to requirement progress is put;
D. gradually the dispensing of required slurry is finished, back is levelling, and guarantee that nut mouth is flushed with back;
E. it conserves to normal intensity, is sent into fog room after demoulding, continue maintenance to design strength;
F. the prefabricated component conserved is sent to surface treatment workshop, is surface-treated with the tools such as electronic, pneumatic, form light The surface effects such as face, hair side, bush-hammered face;
G. it to the product handled well, sprays protective agent and obtains finished-product material.
3. a kind of production technology for assembling European high-strength cement base artificial stone moulding according to claim 2, feature The raw material for being the high-strength cement base artificial stone material includes that component below is made by mass fraction proportion:
525 100 parts of white cements, 10-30 parts of slag powders, 20-30 parts of flyash, 5-10 parts of silicon ash, 100-150 parts of 4-6 mesh rice stone, 100-150 parts of 10-20 mesh rice stone, 50-100 parts of 40-80 mesh rice stone, 0.5-2 parts of air entraining agent, 1-3 parts of defoaming agent, iron oxide pigment 0-3 parts, 0.1-2 parts of high efficiency water reducing agent, water-cement ratio 20-25.
4. a kind of installation method of the European high-strength cement base artificial stone moulding of assembled as described in claim 1, including with Lower step:
(1) installation site is determined in wall construction unwrapping wire according to the installation position of model articles;
(2) built-in fitting mode is determined according to wall different structure, material, with expansion bolt, screw rod through walls and strengthening steel slab true Implantation wall is set in positioning;
(3) it according to the different connection hanging strip of different shaping, is connected and fixed with screw rod and prefabricated moulding;
(4) moulding that will assemble connection hanging strip, is tightened with nut with the pre embedded bolt to be implanted into wall and carries out assembly connection;
(5) it is squeegeeed completion with stone material glue of squeegeeing;
(6) it clears up and sprays waterproof.
5. a kind of European high-strength cement base artificial stone moulding of assembly according to claim 1, it is characterised in that the extension Both ends are respectively equipped with through-hole, and described hanging strip one end through-hole passes through setscrew and wall connecting, the hanging strip other end through-hole It is screwed togather by screw and T-nut block.
6. a kind of European high-strength cement base artificial stone moulding of assembly according to claim 1, it is characterised in that the T-type Nut block height is greater than or equal to 5mm.
7. a kind of European high-strength cement base artificial stone moulding of assembly according to claim 1, it is characterised in that the extension Item is metal material, and the hanging strip is vertical bar shape at least provided with more than one bending or the hanging strip.
8. the production technology of the European high-strength cement base artificial stone moulding of assembly according to claim 1, it is characterised in that The stub end of the T-nut block is embedded in advance in artificial stone's ontology, the small head end and artificial stone's ontology of the T-nut block Back even surface it is concordant.
9. the production technology of the European high-strength cement base artificial stone moulding of assembly according to claim 1, it is characterised in that The stub end of the T-nut block is additionally provided with transversely strengthening reinforcing bar.
10. the production technology of the European high-strength cement base artificial stone moulding of assembly according to claim 1, feature is in institute It states and is additionally provided with longitudinal reinforcement reinforcing bar in artificial stone's ontology.
CN201810933154.4A 2018-01-31 2018-08-16 A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means Pending CN109083365A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810096012.7A CN108193858A (en) 2018-01-31 2018-01-31 A kind of production of European high-strength cement base artificial stone moulding of assembled and mounting means
CN2018100960127 2018-01-31

Publications (1)

Publication Number Publication Date
CN109083365A true CN109083365A (en) 2018-12-25

Family

ID=62591615

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810096012.7A Pending CN108193858A (en) 2018-01-31 2018-01-31 A kind of production of European high-strength cement base artificial stone moulding of assembled and mounting means
CN201810933154.4A Pending CN109083365A (en) 2018-01-31 2018-08-16 A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810096012.7A Pending CN108193858A (en) 2018-01-31 2018-01-31 A kind of production of European high-strength cement base artificial stone moulding of assembled and mounting means

Country Status (1)

Country Link
CN (2) CN108193858A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158918A (en) * 2019-05-08 2019-08-23 浙江省建设投资集团股份有限公司 A kind of construction technology of alien invasion concrete decorative line item
CN112780040A (en) * 2020-12-25 2021-05-11 南京国豪装饰安装工程股份有限公司 Functional GRC component and installation method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756147A (en) * 2018-01-31 2018-11-06 钟兵 A kind of cement base very-high performance artificial slabstone moulding linear
CN109356351A (en) * 2018-12-07 2019-02-19 钟兵 A kind of cement base very-high performance artificial slabstone and its mounting structure
CN118123986A (en) * 2024-04-11 2024-06-04 江苏砼美新型建材有限公司 GRC reverse-beating prefabricated part manufacturing and installation construction method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4553366A (en) * 1982-02-25 1985-11-19 Gabriel Guerin Fixation device for an artificial stone plate facing on a wall structure
CN1070603A (en) * 1991-09-16 1993-04-07 林兆魁 Manufacturing process of decorative cement board furniture
CN1128315A (en) * 1995-01-04 1996-08-07 卢国斌 Three-dimensional reinforced pearlite light wall board
CA2529704A1 (en) * 2005-12-09 2007-06-09 Les Pierres Stonedge Inc. Artificial stone anchoring system and method
CN101007727A (en) * 2007-01-25 2007-08-01 上海交通大学 Cladded cement based artificial moulded stone material
CN2934452Y (en) * 2006-06-23 2007-08-15 清华大学建筑设计研究院 Embedded type decoration panel
CN102320810A (en) * 2011-07-03 2012-01-18 江苏德一新型建筑材料科技有限公司 Method for preparing fireproof heat preservation decorating integrated plate
CN202787837U (en) * 2012-07-19 2013-03-13 上海宝冶钢渣综合开发实业有限公司 Dry cladding and mounting structure thereof
CN104533046A (en) * 2014-11-27 2015-04-22 钟兵 Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN105019613A (en) * 2015-06-29 2015-11-04 陈廷雨 Assembly-type exterior wall decoration plate model and processing method thereof
CN105507539A (en) * 2015-11-30 2016-04-20 北京东华绿源建筑装饰工程技术有限公司 Light external wall point-hang heat-insulation and decorative plate combined anchoring system and method for constructing same
CN205637406U (en) * 2015-11-06 2016-10-12 钟兵 Take heat retaining nanometer mud base artificial dull and stereotyped stone material that excels in
CN107476532A (en) * 2017-09-11 2017-12-15 东莞环球经典新型材料有限公司 An outdoor wall stone installation structure and installation method thereof
CN207974469U (en) * 2018-01-31 2018-10-16 钟兵 A kind of European high-strength cement base artificial stone of assembled

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4553366A (en) * 1982-02-25 1985-11-19 Gabriel Guerin Fixation device for an artificial stone plate facing on a wall structure
CN1070603A (en) * 1991-09-16 1993-04-07 林兆魁 Manufacturing process of decorative cement board furniture
CN1128315A (en) * 1995-01-04 1996-08-07 卢国斌 Three-dimensional reinforced pearlite light wall board
CA2529704A1 (en) * 2005-12-09 2007-06-09 Les Pierres Stonedge Inc. Artificial stone anchoring system and method
CN2934452Y (en) * 2006-06-23 2007-08-15 清华大学建筑设计研究院 Embedded type decoration panel
CN101007727A (en) * 2007-01-25 2007-08-01 上海交通大学 Cladded cement based artificial moulded stone material
CN102320810A (en) * 2011-07-03 2012-01-18 江苏德一新型建筑材料科技有限公司 Method for preparing fireproof heat preservation decorating integrated plate
CN202787837U (en) * 2012-07-19 2013-03-13 上海宝冶钢渣综合开发实业有限公司 Dry cladding and mounting structure thereof
CN104533046A (en) * 2014-11-27 2015-04-22 钟兵 Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN105019613A (en) * 2015-06-29 2015-11-04 陈廷雨 Assembly-type exterior wall decoration plate model and processing method thereof
CN205637406U (en) * 2015-11-06 2016-10-12 钟兵 Take heat retaining nanometer mud base artificial dull and stereotyped stone material that excels in
CN105507539A (en) * 2015-11-30 2016-04-20 北京东华绿源建筑装饰工程技术有限公司 Light external wall point-hang heat-insulation and decorative plate combined anchoring system and method for constructing same
CN107476532A (en) * 2017-09-11 2017-12-15 东莞环球经典新型材料有限公司 An outdoor wall stone installation structure and installation method thereof
CN207974469U (en) * 2018-01-31 2018-10-16 钟兵 A kind of European high-strength cement base artificial stone of assembled

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王光炎编著: "《建筑材料与检测》", 31 August 2017, 天津大学出版社 *
石元印等主编: "《建筑施工技术》", 31 March 2016, 重庆大学出版社 *
胡振铎编著: "《实用装潢工艺技术》", 31 July 1999, 科学普及出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158918A (en) * 2019-05-08 2019-08-23 浙江省建设投资集团股份有限公司 A kind of construction technology of alien invasion concrete decorative line item
CN110158918B (en) * 2019-05-08 2024-02-02 浙江省建设投资集团股份有限公司 Construction process of outer elevation concrete decorative moulding
CN112780040A (en) * 2020-12-25 2021-05-11 南京国豪装饰安装工程股份有限公司 Functional GRC component and installation method

Also Published As

Publication number Publication date
CN108193858A (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN109083365A (en) A kind of production of the European high-strength cement base artificial stone moulding of assembled and mounting means
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN101585205B (en) Method for producing and mounting moulded concrete anaglyph unit plate
CN106150001B (en) A kind of fabricated assembly overall stair construction method
JP2003504541A (en) Building panel and its manufacturing equipment
CN103253896B (en) Flexible face brick
CN105804347A (en) Production and installation method of nanometer cement-based high-strength artificial slab stone with heat insulation function
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN105619596A (en) Preparation method of foam concrete composite board
CN108316532A (en) Plate laminated floor slab drops in electromechanical integration laminated floor slab and its production method, toilet
CN104563428A (en) Compound type decorating thermal insulation panel with cement polymer at double surfaces and preparation method thereof
CN110254112A (en) A kind of rockery plastic stone packaging construction method
KR101030221B1 (en) Composite stone block made of a natural stone layer and cement mortar layer integrally attached to the back side of the natural stone layer and its manufacturing method
CN205637406U (en) Take heat retaining nanometer mud base artificial dull and stereotyped stone material that excels in
CN111805696A (en) Manufacturing process of building decoration component
US20020100241A1 (en) Sheet of articulated masonry-like units and method for producing the same
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN207974469U (en) A kind of European high-strength cement base artificial stone of assembled
CN106278065A (en) Imitative stone decoration element and production method thereof
CN105350775B (en) A construction technique for building exterior wall decoration imitating stone dry-hanging effect
US5451620A (en) Methods of producing light weight cement-like building products
CN206256612U (en) Light partition wall boards half-finished product and integral light partition plate
CN218714288U (en) Decoration-free building structure
JP2969140B2 (en) Surface concrete plate and molding method thereof
CN207846756U (en) A kind of image decorating wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination