CN109058052B - 新能源风力发电设备的集成式固定安装架 - Google Patents
新能源风力发电设备的集成式固定安装架 Download PDFInfo
- Publication number
- CN109058052B CN109058052B CN201810991985.7A CN201810991985A CN109058052B CN 109058052 B CN109058052 B CN 109058052B CN 201810991985 A CN201810991985 A CN 201810991985A CN 109058052 B CN109058052 B CN 109058052B
- Authority
- CN
- China
- Prior art keywords
- frame body
- holes
- fixed
- frame
- groups
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/25—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810991985.7A CN109058052B (zh) | 2018-08-29 | 2018-08-29 | 新能源风力发电设备的集成式固定安装架 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810991985.7A CN109058052B (zh) | 2018-08-29 | 2018-08-29 | 新能源风力发电设备的集成式固定安装架 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109058052A CN109058052A (zh) | 2018-12-21 |
| CN109058052B true CN109058052B (zh) | 2020-08-21 |
Family
ID=64756437
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810991985.7A Active CN109058052B (zh) | 2018-08-29 | 2018-08-29 | 新能源风力发电设备的集成式固定安装架 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109058052B (zh) |
Family Cites Families (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201368886Y (zh) * | 2009-03-05 | 2009-12-23 | 九江整流器厂 | 一种元件专用测试夹具 |
| CN201714605U (zh) * | 2010-04-16 | 2011-01-19 | 辽宁中科天道新能源装备工业有限公司 | 风力发电机组轮毂装配结构 |
| CN102337746B (zh) * | 2010-07-27 | 2013-09-04 | 宝山钢铁股份有限公司 | 水上风力发电塔架基础和结构的安装施工方法 |
| CN201811876U (zh) * | 2010-09-10 | 2011-04-27 | 攀钢集团钢铁钒钛股份有限公司 | 横截面样品粘合夹具 |
| DE102011003164A1 (de) * | 2011-01-26 | 2012-07-26 | Aloys Wobben | Verfahren und Vorrichtung zum Errichten eines Turms einer Windenergieanlage |
| CN104005918A (zh) * | 2013-02-27 | 2014-08-27 | 苏州工业园区欧霸动力设备有限公司 | 风力发电机安装架 |
| CN104009432B (zh) * | 2014-05-13 | 2016-08-31 | 镇江西门子母线有限公司 | 一种风能导电轨安装支架 |
| CN104701794B (zh) * | 2015-03-27 | 2018-02-13 | 国网辽宁省电力有限公司辽阳供电公司 | 可垂直安装的多功能过流夹具 |
| CN205406241U (zh) * | 2016-03-07 | 2016-07-27 | 国网山东省电力公司巨野县供电公司 | 一种具有固定装置的变压器安装架 |
| CN206189033U (zh) * | 2016-10-12 | 2017-05-24 | 广东溢达纺织有限公司 | 可更换车缝模具 |
| CN206845393U (zh) * | 2017-05-28 | 2018-01-05 | 柏小梅 | 一种风力发电机组用组装平台 |
| CN207245942U (zh) * | 2017-08-15 | 2018-04-17 | 浙江运达风电股份有限公司 | 新型变桨轴承加固环夹紧装置 |
| CN207408080U (zh) * | 2017-10-10 | 2018-05-25 | 曼胡默尔滤清器(上海)有限公司 | 一种用于滤清器滤芯测试的压边框架装置 |
| CN207431797U (zh) * | 2017-11-07 | 2018-06-01 | 江苏华祥机械制造有限公司 | 一种装夹不同的小型零件钻床夹具 |
| CN108050020B (zh) * | 2017-12-07 | 2019-05-14 | 南通市海洋水建工程有限公司 | 一种风力发电用的安装架 |
| CN108000183A (zh) * | 2017-12-11 | 2018-05-08 | 合肥挺泰环保科技有限公司 | 一种车床夹具锁紧装置 |
| CN108180116A (zh) * | 2017-12-22 | 2018-06-19 | 新昌县吉利标准件厂 | 一种风力发电安装支架 |
| CN108457810A (zh) * | 2018-04-05 | 2018-08-28 | 南京高传机电自动控制设备有限公司 | 一种厂区用风力发电机安装架中的安装座 |
| CN108443662A (zh) * | 2018-05-14 | 2018-08-24 | 安徽目然信信息科技有限公司 | 一种机电设备安装架 |
-
2018
- 2018-08-29 CN CN201810991985.7A patent/CN109058052B/zh active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN109058052A (zh) | 2018-12-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103925172B (zh) | 张力腿式海上浮动式风力机的整体安装方法 | |
| CN102720207A (zh) | 一种塔架基础及风力发电机的塔架 | |
| KR101408274B1 (ko) | 풍력발전기 블레이드의 수평이동장치 | |
| CN215857826U (zh) | 吸力筒式单桩基础稳桩平台 | |
| CN119894765A (zh) | 用于海上风力发电机的具有多个中心柱的浮动支撑结构及其组装方法 | |
| CN109058052B (zh) | 新能源风力发电设备的集成式固定安装架 | |
| CN215482987U (zh) | 一种基坑支护结构 | |
| CN212389472U (zh) | 一种风力机塔筒加固组件 | |
| CN221565501U (zh) | 一种大直径钢筋笼起吊吊具 | |
| CN213202066U (zh) | 预制混凝土筒节用吊具 | |
| CN112081133B (zh) | 一种海上风机的基座固定结构及基础安装方法 | |
| CN205502608U (zh) | 钢管柱安装卡具 | |
| CN212336077U (zh) | 吸力桩支承锥形独柱风机基础 | |
| CN222878741U (zh) | 一种防洪防冲刷预制电杆基础装置 | |
| CN214237954U (zh) | 一种塔式起重机标准节或套架组装辅助装置 | |
| CN115676625A (zh) | 一种海上风电单桩桩顶替打法兰的施工方法 | |
| CN221030158U (zh) | 一种海上风电钢管桩沉桩测量平台 | |
| CN106378622B (zh) | 一种便于找正的装置 | |
| CN113373967A (zh) | 一种基于门架式多桩风机基础的风机安装施工方法 | |
| CN118327901B (zh) | 一种模块化漂浮式基础及风机 | |
| CN216006968U (zh) | 一种建筑工程施工用深基坑内部支撑机构 | |
| CN220057954U (zh) | 一种深水海上风电桩基施工稳桩结构 | |
| CN218813985U (zh) | 一种动式水仓清淤泵送设备 | |
| CN222254212U (zh) | 一种分片式混凝土塔筒管片拼装平台 | |
| CN223374164U (zh) | 一种装配式混凝土电杆 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20200731 Address after: Building 1, No.2 Shenyu Road, Changshu high tech Industrial Development Zone, Suzhou City, Jiangsu Province Applicant after: Jiangsu Shiwo Precision Machinery Technology Co.,Ltd. Address before: 262315 Xumeng Town Central Primary School, Wulian County, Rizhao City, Shandong Province Applicant before: Li Huaqing |
|
| TA01 | Transfer of patent application right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20230329 Address after: Building 4, No. 2 Jianye Road, High tech Industrial Park, Changshu Economic and Technological Development Zone, Suzhou City, Jiangsu Province, 215000 Patentee after: Pano (Changshu) New Energy Technology Co.,Ltd. Address before: Building 1, No. 2 Shenyu Road, High tech Industrial Development Zone, Changshu City, Suzhou City, Jiangsu Province, 215500 Patentee before: Jiangsu Shiwo Precision Machinery Technology Co.,Ltd. |
|
| TR01 | Transfer of patent right |