CN108303901A - A kind of smart machine automatic control system - Google Patents
A kind of smart machine automatic control system Download PDFInfo
- Publication number
- CN108303901A CN108303901A CN201810016599.6A CN201810016599A CN108303901A CN 108303901 A CN108303901 A CN 108303901A CN 201810016599 A CN201810016599 A CN 201810016599A CN 108303901 A CN108303901 A CN 108303901A
- Authority
- CN
- China
- Prior art keywords
- linkage
- state
- smart machine
- automatic control
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000001360 synchronised effect Effects 0.000 claims abstract description 6
- 238000001514 detection method Methods 0.000 claims description 6
- 125000004122 cyclic group Chemical group 0.000 claims description 3
- 238000000034 method Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/06—Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2642—Domotique, domestic, home control, automation, smart house
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Computer And Data Communications (AREA)
Abstract
The present invention relates to a kind of smart machine automatic control systems comprising:High in the clouds;Input unit, input linkage rule, and preserve to the high in the clouds;Link engine, and the linkage regular and synchronized is downloaded to local, judges whether equipment state change meets constraints, obtains judging result, if the judging result is yes, triggering executes linkage.The technical solution combines linkage engine implementation control linkage by the regular definition that links, and multiple smart machines can be controlled by being inputted by once command, improve the convenience used.
Description
Technical field
The present invention relates to field of intelligent control technology, specifically a kind of smart machine automatic control system.
Background technology
With the continuous development of science and technology, the intelligence control systems such as smart home, intelligent transportation, intelligent monitoring are continuous
Development with it is universal, routine work and life to people all bring great convenience.
Intelligent domestic system product is largely required for being controlled using cell phone application at present, and operation interface is comparatively laborious,
Only simply traditional remote controler is substituted, and an equipment can only be controlled every time, it is very cumbersome.
Invention content
The purpose of the present invention is to provide a kind of equipment linkages, can control automatically controlling for multiple smart machines every time and be
System, improves the convenience of user.
Technical solution of the present invention is:A kind of smart machine automatic control system comprising:
High in the clouds;
Input unit, input linkage rule, and preserve to the high in the clouds;
Link engine, and the linkage regular and synchronized is downloaded to local, judges whether equipment state change meets about
Beam condition obtains judging result, if the judging result is yes, triggering executes linkage.
Preferably, above-mentioned a kind of smart machine automatic control system, wherein the linkage rule is defined as follows:
When some state of some equipment changes and meets constraints, then the corresponding scene of certain group, institute are executed
Delay is arranged in the different instruction for stating instruction and/or same equipment that scene includes distinct device between instruction.
Preferably, above-mentioned a kind of smart machine automatic control system, wherein the linkage engine includes:
State securing component is used to obtain state from Intelligent hardware;
State snapshot component, storage obtain state snapshot;
Condition detection components are compared with the state of newest state and snapshot, judge whether to meet constraint item
Part;
Link executive module, and the judging result according to the condition detection components is yes, and triggering executes linkage.
Preferably, above-mentioned a kind of smart machine automatic control system, wherein state securing component acquisition intelligence is hard
Part condition mode includes active reporting and cyclic polling.
Preferably, above-mentioned a kind of smart machine automatic control system, wherein the linkage engine inter-linked controlling method packet
Include following steps:
S1:Continue receiving device state, detects whether that new equipment state is sent to;
S2:If being sent to new equipment state, and state vs in snapshot, and judge whether variation meets constraint
Condition executes linkage, and send and order to smart machine by TCP/IP if meeting condition;If being unsatisfactory for condition, continue
Receiving device state.
Preferably, above-mentioned a kind of smart machine automatic control system, wherein the linkage implementing result of the linkage engine
The high in the clouds is reported to, linkage record is formed, synchronizes to download for the input unit and consult.
Preferably, above-mentioned a kind of smart machine automatic control system, wherein the linkage engine is by hardware and software platform structure
At hardware platform is suitably connected to router, and Intelligent hardware is also coupled to the router, and passes through ICP/IP protocol and intelligence
It can hardware communications connection.
The advantageous effect that the present invention is brought is:The present invention inputs linkage rule by input unit editor, and passes through linkage
Engine is downloaded from high in the clouds and is obtained, and then whether multilevel iudge equipment state change meets the scheduled constraint item of linkage rule institute
Part obtains judging result, if the judging result is yes, triggering executes linkage, control linkage so can be achieved, by once referring to
It enables input that can control multiple smart machines, improves the convenience used.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is structure of the invention schematic block diagram;
Fig. 2 is present invention linkage engine structure schematic block diagram;
Fig. 3 is present invention linkage engine workflow schematic block diagram;
Fig. 4 is present invention connection smart machine structural principle schematic block diagram.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to the technology of the present invention
Scheme carries out clear, complete description.Obviously, the described embodiments are merely a part of the embodiments of the present invention, rather than complete
The embodiment in portion.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connection " should be done
It broadly understood, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be directly connected,
Can also can be indirectly connected through an intermediary the connection inside two elements.For those of ordinary skill in the art
For, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
As shown in Figure 1 to 4, a kind of smart machine automatic control system comprising:
High in the clouds;
Input unit, input linkage rule, and preserve to the high in the clouds;
Link engine, and the linkage regular and synchronized is downloaded to local, judges whether equipment state change meets about
Beam condition obtains judging result, if the judging result is yes, triggering executes linkage.
Linkage rule is inputted by input unit editor, and is downloaded and is obtained from high in the clouds by the engine that links, and then compares and sentences
Whether disconnected equipment state change meets the scheduled constraints of linkage rule institute, judging result is obtained, if the judging result
It is yes, triggering executes linkage, and control linkage so can be achieved, and can control multiple smart machines by once command input, carry
The convenience that height uses.
The wherein described linkage rule is defined as follows:
When some state of some equipment changes and meets constraints, then the corresponding scene of certain group, institute are executed
Delay is arranged in the different instruction for stating instruction and/or same equipment that scene includes distinct device between instruction.
Specifically, equipment control command is combined optimization, constitutes scene, each scene may include distinct device
Instruction, can also include the different instruction of same equipment, and delay is arranged between instruction.The linkage rule of equipment room is defined as working as
Some state change of some equipment and meets constraints and be carried out certain group scene.The variation of equipment state is defined as
Trigger event Ti, relevant constraints are defined as Ci, and the rule that links defines expression formula:
(T1 | T2 | T3 ...) & (C1&C2&C3 ...) → [S1, S2, S3 ...]
Wherein, Ti indicates that trigger event i, Ci indicate that constraint i, Si indicate scene i.
When there is multiple trigger events, as long as even if there are one meet to trigger;When there are multiple constraintss, need all
Meet, it is just eligible.
The generation of above-mentioned linkage rule is automatically generated by input unit, then preserves high in the clouds, is reinformed linkage engine and is carried out
It is synchronous, rule is locally downloading.
The wherein described linkage engine includes:
State securing component is used to obtain state from Intelligent hardware;
State snapshot component, storage obtain state snapshot;
Condition detection components are compared with the state of newest state and snapshot, judge whether to meet constraint item
Part;
Link executive module, and the judging result according to the condition detection components is yes, and triggering executes linkage.
Wherein, it includes active reporting and cyclic polling that state securing component, which obtains Intelligent hardware condition mode,.
In addition, the linkage engine inter-linked controlling method includes the following steps:
S1:Continue receiving device state, detects whether that new equipment state is sent to;
S2:If being sent to new equipment state, and state vs in snapshot, and judge whether variation meets constraint
Condition executes linkage, and send and order to smart machine by TCP/IP if meeting condition;If being unsatisfactory for condition, continue
Receiving device state.
The linkage implementing result of the wherein described linkage engine reports to the high in the clouds, linkage record is formed, for the input
Device is synchronized to download and be consulted, and linkage record includes that linkage execution failure record and linkage run succeeded record.
In addition to this, linkage engine gives tacit consent to the equipment that cannot get user, it is necessary to pass through the mandate of user, it is ensured that
The safety of whole system.
Wherein, it is also necessary to which explanation is:The linkage engine is made of hardware and software platform, and hardware platform is suitably connected to
Router, Intelligent hardware is also coupled to the router, and is communicated to connect by ICP/IP protocol and Intelligent hardware, and the skill
Art scheme is successfully applied in BroadLink DNA systems, greatly improves security of system and convenience.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, it will be understood by those of ordinary skill in the art that:It still may be used
To modify to the technical solution recorded in previous embodiment, either which part or all technical features are equal
It replaces;And these modifications or replacements, the model for technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution
It encloses.
Claims (7)
1. a kind of smart machine automatic control system, which is characterized in that including:
High in the clouds;
Input unit, input linkage rule, and preserve to the high in the clouds;
Link engine, and the linkage regular and synchronized is downloaded to local, judges whether equipment state change meets constraint item
Part obtains judging result, if the judging result is yes, triggering executes linkage.
2. a kind of smart machine automatic control system according to claim 1, which is characterized in that the linkage rule definition
It is as follows:
When some state of some equipment changes and meets constraints, then the corresponding scene of certain group, the field are executed
Scape includes the instruction of distinct device and/or the different instruction of same equipment, and delay is arranged between instruction.
3. a kind of smart machine automatic control system according to claim 1, which is characterized in that the linkage engine packet
It includes:
State securing component is used to obtain state from Intelligent hardware;
State snapshot component, storage obtain state snapshot;
Condition detection components are compared with the state of newest state and snapshot, judge whether to meet constraints;
Link executive module, and the judging result according to the condition detection components is yes, and triggering executes linkage.
4. a kind of smart machine automatic control system according to claim 3, which is characterized in that the state securing component
It includes active reporting and cyclic polling to obtain Intelligent hardware condition mode.
5. a kind of smart machine automatic control system according to any one of claims 1 to 4, which is characterized in that the linkage
Engine inter-linked controlling method includes the following steps:
S1:Continue receiving device state, detects whether that new equipment state is sent to;
S2:If being sent to new equipment state, and state vs in snapshot, and judge whether variation meets constraint item
Part executes linkage, and send and order to smart machine by TCP/IP if meeting condition;If being unsatisfactory for condition, after continued access
Receiving unit state.
6. a kind of smart machine automatic control system according to any one of claims 1 to 4, which is characterized in that the linkage
The linkage implementing result of engine reports to the high in the clouds, forms linkage record, synchronizes to download for the input unit and consult.
7. a kind of smart machine automatic control system according to any one of claims 1 to 4, which is characterized in that the linkage
Engine is made of hardware and software platform, and hardware platform is suitably connected to router, and Intelligent hardware is also coupled to the router, and
It is communicated to connect by ICP/IP protocol and Intelligent hardware.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810016599.6A CN108303901A (en) | 2018-01-08 | 2018-01-08 | A kind of smart machine automatic control system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810016599.6A CN108303901A (en) | 2018-01-08 | 2018-01-08 | A kind of smart machine automatic control system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108303901A true CN108303901A (en) | 2018-07-20 |
Family
ID=62868559
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810016599.6A Pending CN108303901A (en) | 2018-01-08 | 2018-01-08 | A kind of smart machine automatic control system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108303901A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109240098A (en) * | 2018-09-10 | 2019-01-18 | 深圳绿米联创科技有限公司 | Equipment configuration method, device, terminal device and storage medium |
| CN114442576A (en) * | 2022-01-20 | 2022-05-06 | 东莞市云雀科技有限公司 | Software-defined industrial field intelligent scheduling method |
Citations (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1556613A (en) * | 2003-12-30 | 2004-12-22 | 上海交通大学 | Trusted active policy linkage method |
| CN101227479A (en) * | 2008-02-02 | 2008-07-23 | 杭州华三通信技术有限公司 | Method and apparatus of topology linkage |
| CN102299822A (en) * | 2011-09-02 | 2011-12-28 | 四川公用信息产业有限责任公司 | Digital home platform |
| CN103345214A (en) * | 2013-06-17 | 2013-10-09 | 四川长虹电器股份有限公司 | Intelligent household electrical appliance linkage control method based on middleware |
| CN104614997A (en) * | 2014-12-12 | 2015-05-13 | 联想(北京)有限公司 | Control method, control device and electronic equipment |
| CN104699065A (en) * | 2015-03-30 | 2015-06-10 | 联想(北京)有限公司 | Smart home device control method and device |
| CN104898592A (en) * | 2015-03-31 | 2015-09-09 | 联想(北京)有限公司 | Linkage rule generation method and electronic device |
| CN104932330A (en) * | 2015-05-13 | 2015-09-23 | 广州市优泰安防技术有限公司 | Security linkage platform |
| CN104932277A (en) * | 2015-05-29 | 2015-09-23 | 四川长虹电器股份有限公司 | Intelligent household electrical appliance control system with integration of face recognition function |
| CN204719514U (en) * | 2015-05-22 | 2015-10-21 | 深圳市艾瑟网络技术有限公司 | A smart home system capable of conditional control |
| CN105045113A (en) * | 2015-05-29 | 2015-11-11 | 四川长虹电器股份有限公司 | Intelligent household appliance linkage control system based on cloud platform system |
| CN105334810A (en) * | 2014-07-16 | 2016-02-17 | 博西华电器(江苏)有限公司 | Household appliance control system and control method |
| CN105357259A (en) * | 2015-09-29 | 2016-02-24 | 青岛海尔智能家电科技有限公司 | Method and device for automatically setting equipment linkage rule and associated equipment |
| CN105527847A (en) * | 2015-12-02 | 2016-04-27 | 徐智慧 | Electrical appliance control system and method |
| EP3055970A1 (en) * | 2013-11-25 | 2016-08-17 | Microsoft Technology Licensing, LLC | Communication system architecture |
| CN105898892A (en) * | 2016-05-04 | 2016-08-24 | 杭州古北电子科技有限公司 | A method of using wifi probe request and response packets to realize fast communication |
| CN105938326A (en) * | 2016-05-31 | 2016-09-14 | 南昌理工学院 | Intelligent household system |
| US20160266558A1 (en) * | 2015-03-09 | 2016-09-15 | Lenovo (Beijing) Co., Ltd. | Control device and method for controlling intelligent device |
| WO2016184253A1 (en) * | 2015-05-15 | 2016-11-24 | 丰唐物联技术(深圳)有限公司 | Smart device linkage setting method and terminal |
| CN106200427A (en) * | 2016-06-30 | 2016-12-07 | 联想(北京)有限公司 | A kind of processing method and electronic equipment |
| CN106773772A (en) * | 2017-02-10 | 2017-05-31 | 杭州极智科技有限公司 | A kind of ZigBee intelligent domestic gateways scene inter-linked controlling method |
| CN106899464A (en) * | 2017-02-28 | 2017-06-27 | 杭州古北电子科技有限公司 | Intelligent home furnishing control method |
| CN106951564A (en) * | 2017-04-02 | 2017-07-14 | 北京军秀咨询有限公司 | A kind of cloud computing platform analyzed based on data mining and big data and method |
| CN107277172A (en) * | 2017-07-28 | 2017-10-20 | 深圳增强现实技术有限公司 | Machine operates monitor system and its ustomer premises access equipment |
| CN107370644A (en) * | 2017-07-18 | 2017-11-21 | 深圳市斑点猫信息技术有限公司 | Inter-linked controlling method, device, computer-readable recording medium and computer equipment |
-
2018
- 2018-01-08 CN CN201810016599.6A patent/CN108303901A/en active Pending
Patent Citations (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1556613A (en) * | 2003-12-30 | 2004-12-22 | 上海交通大学 | Trusted active policy linkage method |
| CN101227479A (en) * | 2008-02-02 | 2008-07-23 | 杭州华三通信技术有限公司 | Method and apparatus of topology linkage |
| CN102299822A (en) * | 2011-09-02 | 2011-12-28 | 四川公用信息产业有限责任公司 | Digital home platform |
| CN103345214A (en) * | 2013-06-17 | 2013-10-09 | 四川长虹电器股份有限公司 | Intelligent household electrical appliance linkage control method based on middleware |
| EP3055970A1 (en) * | 2013-11-25 | 2016-08-17 | Microsoft Technology Licensing, LLC | Communication system architecture |
| CN105334810A (en) * | 2014-07-16 | 2016-02-17 | 博西华电器(江苏)有限公司 | Household appliance control system and control method |
| CN104614997A (en) * | 2014-12-12 | 2015-05-13 | 联想(北京)有限公司 | Control method, control device and electronic equipment |
| US20160266558A1 (en) * | 2015-03-09 | 2016-09-15 | Lenovo (Beijing) Co., Ltd. | Control device and method for controlling intelligent device |
| CN104699065A (en) * | 2015-03-30 | 2015-06-10 | 联想(北京)有限公司 | Smart home device control method and device |
| CN104898592A (en) * | 2015-03-31 | 2015-09-09 | 联想(北京)有限公司 | Linkage rule generation method and electronic device |
| CN104932330A (en) * | 2015-05-13 | 2015-09-23 | 广州市优泰安防技术有限公司 | Security linkage platform |
| WO2016184253A1 (en) * | 2015-05-15 | 2016-11-24 | 丰唐物联技术(深圳)有限公司 | Smart device linkage setting method and terminal |
| CN204719514U (en) * | 2015-05-22 | 2015-10-21 | 深圳市艾瑟网络技术有限公司 | A smart home system capable of conditional control |
| CN105045113A (en) * | 2015-05-29 | 2015-11-11 | 四川长虹电器股份有限公司 | Intelligent household appliance linkage control system based on cloud platform system |
| CN104932277A (en) * | 2015-05-29 | 2015-09-23 | 四川长虹电器股份有限公司 | Intelligent household electrical appliance control system with integration of face recognition function |
| CN105357259A (en) * | 2015-09-29 | 2016-02-24 | 青岛海尔智能家电科技有限公司 | Method and device for automatically setting equipment linkage rule and associated equipment |
| CN105527847A (en) * | 2015-12-02 | 2016-04-27 | 徐智慧 | Electrical appliance control system and method |
| CN105898892A (en) * | 2016-05-04 | 2016-08-24 | 杭州古北电子科技有限公司 | A method of using wifi probe request and response packets to realize fast communication |
| CN105938326A (en) * | 2016-05-31 | 2016-09-14 | 南昌理工学院 | Intelligent household system |
| CN106200427A (en) * | 2016-06-30 | 2016-12-07 | 联想(北京)有限公司 | A kind of processing method and electronic equipment |
| CN106773772A (en) * | 2017-02-10 | 2017-05-31 | 杭州极智科技有限公司 | A kind of ZigBee intelligent domestic gateways scene inter-linked controlling method |
| CN106899464A (en) * | 2017-02-28 | 2017-06-27 | 杭州古北电子科技有限公司 | Intelligent home furnishing control method |
| CN106951564A (en) * | 2017-04-02 | 2017-07-14 | 北京军秀咨询有限公司 | A kind of cloud computing platform analyzed based on data mining and big data and method |
| CN107370644A (en) * | 2017-07-18 | 2017-11-21 | 深圳市斑点猫信息技术有限公司 | Inter-linked controlling method, device, computer-readable recording medium and computer equipment |
| CN107277172A (en) * | 2017-07-28 | 2017-10-20 | 深圳增强现实技术有限公司 | Machine operates monitor system and its ustomer premises access equipment |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109240098A (en) * | 2018-09-10 | 2019-01-18 | 深圳绿米联创科技有限公司 | Equipment configuration method, device, terminal device and storage medium |
| CN109240098B (en) * | 2018-09-10 | 2022-03-25 | 深圳绿米联创科技有限公司 | Device configuration method, device, terminal device and storage medium |
| CN114442576A (en) * | 2022-01-20 | 2022-05-06 | 东莞市云雀科技有限公司 | Software-defined industrial field intelligent scheduling method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111835565B (en) | Communication network optimization method, device and system based on digital twin | |
| CN110308969B (en) | Fault drill method, device, equipment and computer storage medium | |
| US12074767B2 (en) | Data processing method and device for cooperating with an artificial intelligence management plane, electronic device, and storage medium | |
| WO2020192733A1 (en) | Timed task configuration method, server, system and computer-readable storage medium | |
| EP3091780B1 (en) | Method and device for implementing self-healing of base station device | |
| CN103730959B (en) | The communication protocol method of testing of Distribution Network Equipment | |
| CN104601695A (en) | Intelligent device control method, device and system | |
| CN105430094A (en) | Agricultural Internet of things control method and system | |
| CN117527846A (en) | Internet edge control equipment and method for tire industry | |
| CN112486666A (en) | Model-driven reference architecture method and platform | |
| CN108303901A (en) | A kind of smart machine automatic control system | |
| US20220011753A1 (en) | Generating and distributing configuration data structures for control systems | |
| CN117750408B (en) | Communication fault sniffing method based on Internet of things | |
| CN219351760U (en) | Programmable intelligent industrial control gateway | |
| CN114095311A (en) | Power Internet of Things gateway, power system and method for configuring new power equipment | |
| CN107766649B (en) | System protection real-time closed-loop simulation test system and operation method thereof | |
| CN106059071A (en) | Distribution network distributed loop closing intelligent anti-misoperation system and implementation method | |
| CN103731319B (en) | Distribution scheduling platform remote control trouble intelligent diagnosing method | |
| CN101587351B (en) | Reliable communication method of intelligent electronic device | |
| CN115293378A (en) | Robot-based offshore wind power operation and maintenance method and system | |
| CN108282384A (en) | A kind of Auto-Test System of the MMS server-side communication stabilities based on IEC61850 | |
| Zhang et al. | Application business information interaction bus based on micro frontend framework | |
| CN113915741B (en) | Instruction sending method, device and system | |
| CN103475594B (en) | A kind of system and method for communication non-interference type channel extension in photovoltaic power station | |
| CN114760318A (en) | Edge calculation management method and system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Address after: 310051 Room 101, 1st Floor, Block C, No. 57, Changhe Street, Binjiang District, Hangzhou City, Zhejiang Province Applicant after: Hangzhou Bolian Intelligent Technology Co., Ltd. Address before: 310051 Room 106, Building No. 1, 611 Jianghong Road, Changhe Street, Binjiang District, Hangzhou City, Zhejiang Province Applicant before: Hangzhou Gubei Electronic Technology Co., Ltd. |
|
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180720 |